IDV vehicle
DEEM0004895
THE SCOPE OF THIS CONTRACT FOCUSES ON THE CONTINUED DEACTIVATION OF THE PADUCAH GASEOUS DIFFUSION PLANT FACILITIES, PREPARING THE FACILITIES FOR FUTURE DEMOLITION, AND PERFORMING ENVIRONMENTAL REMEDIATION ACTIVITIES REQUIRED BY THE FEDERAL FACILITY AGREEMENT AND SITE MANAGEMENT PLAN. IGF::OT::IGF
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Energy |
| Office | EM-PORTSMOUTH/PADUCAH PROJECT OFC |
| NAICS | 562910 — Remediation Services |
| PSC | F999 — Other Environmental Services, Studies, and Analytical Support |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | COST PLUS AWARD FEE |
| Obligations | $1.7B |
| Current contract value | Not reported |
| Potential contract value / ceiling | $2.0B |
| Start date | May 25, 2017 |
| Current end date | Not available |
| Potential end date | Not available |
| Latest award activity | Aug 24, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 200 of 209 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Aug 24, 2026 | 208 | $38.5M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. MODIFICATION IS TO DEFINITIZE CHANGE ORDER 0199 FOR ADMINISTRATION BUILDING AND ADD FUNDING |
| Aug 20, 2026 | 207 | $30.9M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. MODIFICATION IS TO ADD INCREMENTAL FUNDING AND UPDATE CONTRACT SECTIONS |
| Aug 18, 2026 | 206 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. MODIFICATION IS TO UPDATE CONTRACT SECTION |
| Jun 30, 2026 | 205 | $21.9M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. ADD INCREMENTAL FUNDING |
| May 21, 2026 | 204 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. EXECUTIVE ORDER 14398 |
| May 13, 2026 | 203 | $23.5M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING TO THE CONTRACT. |
| Apr 30, 2026 | 202 | $14.6M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING TO THE CONTRACT. |
| Mar 31, 2026 | 201 | $6.8M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING TO THE CONTRACT. |
| Mar 13, 2026 | 200 | $10.5M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING TO THE CONTRACT. |
| Feb 24, 2026 | 199 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. THE PURPOSE OF THIS MODIFICATION IS TO ISSUE CHANGE ORDER FOR THE ADMINISTRATION BUILDING DESIGN. |
| Jan 26, 2026 | 198 | $24.6M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING AND UPDATE CONTRACT SECTIONS |
| Dec 31, 2025 | 197 | $5.1M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING. |
| Nov 26, 2025 | 196 | $30.0M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING. |
| Nov 6, 2025 | 195 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. THE PURPOSE OF THIS MODIFICATION IS TO REALIGN SCOPE. |
| Nov 3, 2025 | 194 | $1.0M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. THE PURPOSE OF THIS MODIFICATION IS ADD FUNDING. |
| Oct 20, 2025 | 193 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. THE PURPOSE OF THIS MODIFICATION IS ADD THE PERFORMANCE EVALUATION MANAGEMENT PLAN FOR CONTRACT PERIOD OCTOBER 1, 2025 THROUGH JUNE 19,2027. |
| Sep 29, 2025 | 192 | $6.9M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. THE PURPOSE OF THIS MODIFICATION IS ADD INCREMENTAL FUNDING. |
| Sep 24, 2025 | 191 | $11.4M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. THE PURPOSE OF THIS MODIFICATION IS ADD INCREMENTAL FUNDING. |
| Aug 29, 2025 | 190 | $15.8M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. THE PURPOSE OF THIS MODIFICATION IS ADD OCCUPATIONAL MEDICAL PROGRAM AND FUNDING |
| Aug 4, 2025 | 189 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. THE PURPOSE OF THIS MODIFICATION IS ADD DECISION 2029- ON-SITE WASTE DISPOSAL FACILITY |
| Jul 31, 2025 | 188 | $24.5M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. THE PURPOSE OF THIS MODIFICATION IS ADD INCREMENTAL FUNDING AND BUILDING 337 FIELD SUPPORT, PROGRAM MANAGEMENT AND PADUCAH AREA COMMUNITY REUSE. |
| Jul 1, 2025 | 187 | $10.5M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. THE PURPOSE OF THIS MODIFICATION IS TO UPDATE CONTRACT SECTIONS AND ADD INCREMENTAL FUNDING. |
| Jun 30, 2025 | 186 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. THE PURPOSE OF THIS MODIFICATION IS TO UPDATE CONTRACT SECTIONS. |
| Jun 18, 2025 | 185 | $2.2M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. THE PURPOSE OF THIS MODIFICATION IS TO ADD SURVEILLANCE AND MAINTENANCE TO OPTION PERIOD 2 AND ADD INCREMENTAL FUNDING. |
| Jun 10, 2025 | 184 | $10.9M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. |
| May 29, 2025 | 183 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. |
| May 14, 2025 | 182 | $13.8M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. THE PURPOSE OF THIS MODIFICATION IS TO UPDATE INCREMENTAL FUNDING AND ADD CHARACTERIZATION, CONVERTER AND COMPRESSOR DISCONNECTS. |
| Apr 8, 2025 | 181 | $14.3M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. THE PURPOSE OF THIS MODIFICATION IS TO UPDATE INCREMENTAL FUNDING AND ADD INFRASTRUCTURE AND MOBILIZATION, AND PANEL REMOVAL. |
| Mar 20, 2025 | 180 | $-100.0K | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. THE PURPOSE OF THIS MODIFICATION IS TO UPDATE INCREMENTAL FUNDING AND ADD LAND TRANSFER |
| Mar 13, 2025 | 179 | $9.4M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING |
| Feb 19, 2025 | 178 | $21.6M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING AND UPDATE CONTRACT SECTIONS. |
| Jan 27, 2025 | 177 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. THE PURPOSE OF THIS MODIFICATION IS TO UPDATE CONTRACT SECTIONS. |
| Jan 7, 2025 | 176 | $19.5M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING IN THE AMOUNT OF $19,473,000.00. |
| Dec 19, 2024 | 175 | $5.9M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING IN THE AMOUNT OF $5,941,000.00. |
| Nov 26, 2024 | 174 | $23.7M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING IN THE AMOUNT OF $23,705,000. |
| Nov 19, 2024 | 173 | $6.0K | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. THE PURPOSE OF THIS MODIFICATION IS TO ADD FUNDING AND UPDATE CONTRACT SECTION C. |
| Nov 5, 2024 | 172 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. THE PURPOSE OF THIS MODIFICATION IS TO APPROVE BUILDING CHARACTERIZATION. |
| Oct 10, 2024 | 171 | $14.9M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING. |
| Sep 27, 2024 | 170 | $19.5M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING. |
| Sep 18, 2024 | 169 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. THE PURPOSE OF THIS MODIFICATION IS TO REDISTRIBUTE FUNDING WITHIN THE CONTRACT. |
| Sep 17, 2024 | 168 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE THE REQUEST FOR PROPOSAL FOR ON-SITE WASTE DISPOSAL FACILITY PLANNING AND SUPPORT PHASE TWO. |
| Aug 14, 2024 | 167 | $24.2M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING. |
| Jul 15, 2024 | 166 | $14.5M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. THE PURPOSE OF THIS MODIFICATION IS TO ADD ADDITIONAL BUDGET FOR TECHNICAL TRAPS AND ADD INCREMENTAL FUNDING. |
| Jul 8, 2024 | 165 | $1.9M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE THE SECOND OPTION PERIOD ON THE CONTRACT EXTENDING THE PERIOD OF PERFORMANCE FROM JUNE 2025 TO JUNE 2027 AND ADD INCREMENTAL FUNDING. |
| Jun 25, 2024 | 164 | $7.8M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING. |
| Jun 7, 2024 | 163 | $15.2M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING. |
| May 13, 2024 | 162 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. THE PURPOSE OF THIS MODIFICATION IS TO ADD ADDITIONAL BUDGET FOR MAINTENANCE COST |
| May 2, 2024 | 161 | $18.1M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING AND UPDATE CONTRACT SECTIONS |
| Apr 11, 2024 | 160 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE THE REQUEST FOR PROPOSAL FOR C-333 DEACTIVATION AND SUPPORT |
| Mar 29, 2024 | 159 | $17.9M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING. |
| Mar 6, 2024 | 158 | $1.4M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE THE REQUEST FOR PROPOSAL FOR ON-SITE WASTE DISPOSAL FACILITY PLANNING AND SUPPORT, ALONG WITH ADDING INCREMENTAL FUNDING. |
| Feb 27, 2024 | 157 | $22.4M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE THE REQUEST FOR PROPOSAL FOR LAND TRANSFER AND ADD INCREMENTAL FUNDING. |
| Jan 29, 2024 | 156 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE THE REQUEST FOR PROPOSAL FOR C-333 NON-DESTRUCTIVE ASSAY ACTIVITIES AND PROJECT MANAGEMENT TO SUPPORT STABILIZATION AND DEACTIVATION ACT |
| Jan 16, 2024 | 155 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE THE REQUEST FOR EQUITABLE ADJUSTMENT FOR COVID COST INCURRED DURING FISCAL YEAR 2023 |
| Dec 21, 2023 | 154 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. |
| Dec 20, 2023 | 153 | $32.1M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. |
| Dec 14, 2023 | 152 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE B2-2 TABLE OF CONTRACT COST AND FEE, UPDATE SECTION C TABLE C.2.EM.PA.0040.A005.10.DR.01-2, C-400 COMPLEX OPERABLE UNIT REMEDIATION MILEST |
| Nov 27, 2023 | 151 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE THE REQUEST FOR PROPOSAL FOR THE SOLID WASTE MANAGEMENT UNIT 211-A OPERATIONS AND MAINTENANCE PLAN DEVELOPMENT. |
| Nov 20, 2023 | 150 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. THE PURPOSE OF THIS MODIFICATION TO ADD ADDITIONAL BUDGET FOR PAD RESURFACING ABOVE THAT ORIGINALLY PLANNED FOR IN THE CONTRACT BASELINE. |
| Nov 17, 2023 | 149 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. THE PURPOSE OF THIS MODIFICATION TO ADD ADDITIONAL BUDGET FOR FOOTPRINT REDUCTION DUE TO DEMOLITION OF ADDITIONAL STRUCTURES OVER AND ABOVE THOSE ORIGINALLY PLANNED FOR IN THE CONTRACT BAS |
| Nov 8, 2023 | 148 | $25.3M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING IN THE AMOUNT OF $25,311,000, INCREASING OBLIGATED DOLLARS FROM $1,054,005,086.31 TO $1,079,316,086.31. |
| Nov 7, 2023 | 147 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE THE OPERATION OF THE MATERIAL SIZING AREA REQUEST FOR PROPOSAL AND ADD PREVIOUSLY AGREED TO CHANGES TO THE DELIVERABLE SECTION. |
| Oct 25, 2023 | 146 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. THE PURPOSE OF MODIFICATION 0146 IS TO UPDATE SECTION J OF THE CONTRACT. SPECIFICALLY, THIS MODIFICATION UPDATES ATTACHMENT J-12A AND ATTACHMENT J-18. |
| Sep 29, 2023 | 145 | $3.7M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING IN THE AMOUNT OF $3,654,276.70 TO THE CONTRACT. THIS WILL INCREASE TOTAL OBLIGATIONS FROM $1,050,350,809.61 TO $1,054,005 |
| Sep 19, 2023 | 144 | $30.5M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING IN THE AMOUNT OF $30,498,638 TO THE CONTRACT. THIS WILL INCREASE TOTAL OBLIGATIONS FROM $1,019,852,171.61 TO $1,050,350,8 |
| Sep 13, 2023 | 143 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION THE PURPOSE OF MODIFICATION 0143 IS TO DEFINITIZE THE REQUEST FOR PROPOSAL TO INSTALL THE MATERIAL SIZING AREA. THIS MODIFICATION WILL ALSO MOVE MANAGEMENT RESERVE AT THE CONTRACTOR'S |
| Sep 7, 2023 | 142 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION THE PURPOSE OF MODIFICATION 0142 IS TO DEFINITIZE THE REQUEST FOR PROPOSAL TO UPDATE SECTION C TO ACCURATELY REFLECT THE OPTION 1 REPLAN. |
| Aug 22, 2023 | 141 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION MODIFICATION 0141'S PURPOSE IS A BILATERAL ADMINISTRATIVE UPDATE TO SECTIONS C, J, AND I OF THE CONTRACT. |
| Jun 28, 2023 | 140 | $34.0M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION MODIFICATION TO IS TO UPDATE SECTIONS B, C, AND J AND TO ADD INCREMENTAL FUNDING IN THE AMOUNT OF $34,010,000. |
| May 31, 2023 | 139 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION MODIFICATION TO IS TO DEFINITIZE THE REQUEST FOR EQUITABLE ADJUSTMENT FOR COVID COST FOR FISCAL YEAR 22. |
| Apr 27, 2023 | 138 | $33.1M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION MODIFICATION TO ADD INCREMENTAL FUNDING IN THE AMOUNT OF $33,113,361.92. |
| Apr 4, 2023 | 137 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION MODIFICATION TO UPDATE ATTACHMENT J-4 LIST A AND LIST B. |
| Mar 20, 2023 | 136 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION MODIFICATION TO MOVE FUNDING FROM CONTRACT LINE ITEM 00101 TO 00201. |
| Mar 15, 2023 | 135 | $20.9M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION MODIFICATION TO ADD INCREMENTAL FUNDING IN THE AMOUNT OF $20,850,000, INCREASING THE TOTAL OBLIGATIONS FROM $931,878,809.69 TO $952,728,809.69. |
| Mar 1, 2023 | 134 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION MODIFICATION IS TO UPDATE MULTIPLE SECTIONS OF THE CONTRACT. |
| Feb 16, 2023 | 133 | $28.2M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION MODIFICATION IS TO ADD INCREMENTAL FUNDING IN THE AMOUNT OF $28,200,000, INCREASING TOTAL OBLIGATIONS FROM $903,678,809.69 TO $931,878,809.69. |
| Jan 6, 2023 | 132 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION MODIFICATION IS TO DEFINITIZE THE OVERRUN FOR UTILITIES ASSOCIATED WITH STEAM, CHILLED WATER, COMPRESSED AIR AND WASTE HEAT SYSTEMS. |
| Nov 14, 2022 | 131 | $750.0K | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING IN THE AMOUNT OF $750,000, INCREASING FUNDING FROM $902,928,809.69 TO $903,678,809.69. |
| Oct 28, 2022 | 130 | $36.1M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING IN THE AMOUNT OF $36,090,000, INCREASING FUNDING FROM $866,838,809.69 TO $902,928,809.69. |
| Oct 19, 2022 | 129 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION MODIFICATION IS TO PROVIDE ENVIRONMENTAL MONITORING AND REPORTING FOR PER- AND POLYFLUOROALKYL SUBSTANCES SCREENING ASSESSMENTS AND COLLECT SAMPLES AS RECOMMENDED IN THE VAPOR INTRUSION STU |
| Oct 14, 2022 | 128 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION MODIFICATION TO REALIGN MANAGEMENT RESERVE BETWEEN CONTRACT LINE ITEMS AT THE REQUEST OF THE CONTRACTOR. NO CHANGE IS BEING MADE TO THE CONTRACT VALUE. |
| Oct 6, 2022 | 127 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION MODIFICATION TO DEFINITIZE THE REQUEST FOR PROPOSAL FOR THE OVERRUN IN SURVEILLANCE AND MAINTENANCE. |
| Sep 29, 2022 | 126 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION MODIFICATION TO UPDATE AND REPLACE SECTION J-14 PERFORMANCE EVALUATION MANAGEMENT PLAN FOR CONTRACT PERIOD OCTOBER 1, 2022 THROUGH JUNE 19, 2025. |
| Sep 23, 2022 | 125 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION MODIFICATION TO DEFINITIZE THE REQUEST FOR PROPOSAL TO UPDATE THE SITEWIDE GROUNDWATER FLOW MODEL FOR THE PADUCAH SITE. |
| Sep 20, 2022 | 124 | $14.7M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION MODIFICATION TO ADD INCREMENTAL FUNDING. |
| Aug 30, 2022 | 123 | $43.2M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION MODIFICATION TO ADD INCREMENTAL FUNDING. |
| Aug 29, 2022 | 122 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION MODIFICATION TO UPDATE VARIOUS SECTIONS OF THE CONTRACT. |
| Jul 21, 2022 | 121 | $29.5M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION MODIFICATION IS TO ADD INCREMENTAL FUNDING. |
| Jul 19, 2022 | 120 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION MODIFICATION IS TO DEFINITIZE THE REQUEST FOR EQUITABLE ADJUSTMENT FOR COVID FOR FISCAL YEAR 2021. |
| Jul 14, 2022 | 119 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION MODIFICATION IS TO DEFINITIZE THE CHANGE ORDER ISSUED IN MODIFICATION 0111 FOR THE C-709, C-720 AND C-720 C DRY HYBRID FIRE SYSTEM. |
| Jul 11, 2022 | 118 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION MODIFICATION IS TO DEFINITIZE THE REQUEST FOR PROPOSAL TO DEVELOP A SAMPLING PLAN FOR PER-AND POLYFLUOROALKYL SUBSTANCES IN PLANT WATER SOURCES. |
| Jun 28, 2022 | 117 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION MODIFICATION IS TO INCREASE THE COST ASSOCIATED WITH THE SOUTHWEST PLUME SOURCE REMEDIATION. |
| Jun 24, 2022 | 116 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION MODIFICATION IS TO ADD COST OF OCCUPATIONAL MEDICINE TO CONTRACT. |
| Jun 22, 2022 | 115 | $23.0M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION MODIFICATION IS TO ADD INCREMENTAL FUNDING. |
| Jun 21, 2022 | 114 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION MODIFICATION IS TO DEFINITIZE THE REQUEST FOR PROPOSAL FOR UTILITY OPTIMIZATION - WATER SYSTEMS. |
| Jun 2, 2022 | 113 | $2.4M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION MODIFICATION TO EXERCISE THE FIRST OPTION PERIOD, EXTENDING THE PERIOD OF PERFORMANCE FROM JUN 2022 TO JUNE 2025. |
| May 12, 2022 | 112 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION MODIFICATION TO DEFINITIZE COST OVERRUNS ASSOCIATED WITH C-331 STABILIZATION AND DEACTIVATION. |
| May 3, 2022 | 111 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION MODIFICATION TO CONVERT THE SANITARY WATER SYSTEMS TO DRY HYBRID SYSTEMS IN THREE BUILDINGS. |
| Apr 28, 2022 | 110 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION MODIFICATION TO EXTEND C-100 SURVEILLANCE AND MAINTENANCE WORK SCOPE THROUGH OPTION PERION 1. |
| Apr 26, 2022 | 109 | $17.8M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION MODIFICATION TO ADD INCREMENTAL FUNDING. |
| Apr 19, 2022 | 108 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION MODIFICATION TO DEFINITIZE COST OVERRUNS ASSOCIATED WITH UTILITY OPERATIONS - SEWER TREATMENT SYSTEMS. |
| Apr 11, 2022 | 107 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION MODIFICATION TO DEFINITIZE CHANGE ORDER ISSUED UNDER MODIFICATION 0104 FOR MODIFICATIONS TO THE HIGH PRESSURE FIRE WATER SYSTEMS IN THE C-310 PROCESS FACILITY. |
| Apr 7, 2022 | 106 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION MODIFICATION TO DEFINITIZE COST OVERRUNS ASSOCIATED WITH UTILITY OPTIMIZATION - ELECTRICAL POWER DISTRIBUTION. |
| Mar 31, 2022 | 105 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION MODIFICATION TO DEFINITIZE COST OVERRUNS ASSOCIATED WITH UTILITY OPERATIONS. |
| Mar 9, 2022 | 104 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION CHANGE ORDER TO MAKE NECESSARY MODIFICATIONS TO THE HIGH PRESSURE FIRE WATER SYSTEMS IN THE C-310 PROCESS FACILITY. |
| Mar 7, 2022 | 103 | $5.1M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION MODIFICATION TO ADD INCREMENTAL FUNDING. |
| Mar 1, 2022 | 102 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO ISSUE A BILATERAL AGREEMENT TO UPDATE MULTIPLE SECTIONS OF THE CONTRACT TO INCLUDE UPDATING SECTION J, ATTACHMENT J-4, LIST OF APPLICABLE DOE DIRECTIVES (LIST B) AND ASSOCIATED PORTIONS OF SECTION C, PERFORMANCE |
| Feb 24, 2022 | 101 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION MODIFICATION TO DEFINITIZE COST OVERRUNS ASSOCIATED WITH ANALYTICAL LAB OPERATIONS. |
| Feb 17, 2022 | 100 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION MODIFICATION TO DEFINITIZE COST OVERRUNS ASSOCIATED WITH THE C-400 DEACTIVATION PROJECT. |
| Feb 9, 2022 | 99 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION MODIFICATION TO MOVE MANAGEMENT RESERVE BETWEEN CONTRACT LINE ITEM NUMBERS AS REQUESTED BY FOUR RIVERS NUCLEAR PARTNERSHIP, LLC, AND TO UPDATE CLAUSE H.26 TO REFLECT THE CURRENT BOARD OF DI |
| Jan 13, 2022 | 98 | $35.8M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION MODIFICATION TO ADD INCREMENTAL FUNDING TO CONTRACT LINE ITEM NUMBERS 00101, 00103, 00104 AND 00105. |
| Dec 8, 2021 | 97 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION MODIFICATION TO REDISTRIBUTE MANAGEMENT RESERVE BETWEEN CONTRACT LINE ITEMS |
| Nov 18, 2021 | 96 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION DEFINITIZATION OF EQUITABLE ADJUSTMENT FOR COVID 19 FOR FISCAL YEAR 2020. |
| Oct 29, 2021 | 95 | $14.0M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION INCREMENTAL FUNDING MODIFICATION. |
| Oct 25, 2021 | 94 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION ADMINISTRATIVE MODIFICATION TO RESCIND MODS 92 AND 93 AND REVERT BACK TO THE FORMER VERSION OF THE PERFORMANCE EVALUATION MANAGEMENT PLAN ISSUED IN MODIFICATION 0072. |
| Oct 12, 2021 | 91 | $0 | EO14042 PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION MODIFICATION TO ADD COVID 19 VACCINATION REQUIREMENT |
| Oct 12, 2021 | 93 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION ADMINISTRATIVE MODIFICATION TO CORRECT MODIFICATION 0092. |
| Oct 8, 2021 | 92 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION MODIFICATION TO UPDATE SECTION J-14 PERFORMANCE EVALUATION MANAGEMENT PLAN TO INCLUDE A VACCINE INCENTIVE FOR COVID-19. |
| Sep 21, 2021 | 90 | $-857.8K | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION |
| Sep 15, 2021 | 89 | $28.9M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION |
| Aug 2, 2021 | 88 | $39.9M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION |
| Jul 21, 2021 | 87 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION |
| Jul 1, 2021 | 86 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION |
| Jun 17, 2021 | 85 | $33.3M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION |
| May 3, 2021 | 83 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION |
| May 3, 2021 | 84 | $22.3M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION |
| Mar 17, 2021 | 82 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION |
| Mar 3, 2021 | 81 | $22.8M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION |
| Jan 15, 2021 | 80 | $1.5M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION |
| Jan 8, 2021 | 79 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION |
| Dec 18, 2020 | 78 | $20.5M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION |
| Nov 30, 2020 | 77 | $14.8M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION |
| Nov 9, 2020 | 76 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION |
| Oct 22, 2020 | 75 | $550.0K | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION |
| Oct 6, 2020 | 74 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION |
| Sep 28, 2020 | 72 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION |
| Sep 28, 2020 | 73 | $10.2M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION |
| Sep 10, 2020 | 70 | $2.4M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION |
| Sep 10, 2020 | 71 | $21.3M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION |
| Aug 4, 2020 | 69 | $67.5K | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION |
| Jul 30, 2020 | 68 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION |
| Jul 17, 2020 | 67 | $41.0M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION |
| Jul 8, 2020 | 65 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION |
| Jul 8, 2020 | 66 | $3.5M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION |
| Jun 18, 2020 | 64 | $0 | MODIFICATION FOR THE PADUCAH DEACTIVATION AND REMEDIATION CONTRACT. |
| Jun 8, 2020 | 63 | $5.0M | MODIFICATION IS TO INCREASE COVID 19 FUNDING FOR THE PADUCAH DEACTIVATION AND REMEDIATION CONTRACT. |
| May 19, 2020 | 62 | $0 | MODIFICATION IS DEFINITIZE THE REQUEST FOR PROPOSAL FOR WELL AND PIEZOMETER ABANDONMENT AND TO INCREASE CONTRACT VALUE TO ALLOW FOR THE PURCHASE OF A FIRE-LADDER TRUCK FOR THE PADUCAH DEACTIVATION AND REMEDIATION CONTRACT. |
| May 12, 2020 | 61 | $0 | MODIFICATION TO ADD FUNDING TO PADUCAH DEACTIVATION AND REMEDIATION CONTRACT. |
| May 8, 2020 | 60 | $750.0K | MODIFICATION TO ADD FUNDING TO PADUCAH DEACTIVATION AND REMEDIATION CONTRACT. |
| May 7, 2020 | 59 | $2.6M | COVID-19- MODIFICATION TO ADD COVID 19 FUNDING TO PADUCAH DEACTIVATION AND REMEDIATION CONTRACT. |
| May 5, 2020 | 58 | $0 | COVID-19- MODIFICATION TO ADD COVID 19 RELATED CLAUSES TO THE CONTRACT. |
| Apr 16, 2020 | 57 | $18.9M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. |
| Mar 30, 2020 | 56 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. |
| Mar 20, 2020 | 55 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. |
| Mar 9, 2020 | 54 | $26.1M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. |
| Mar 5, 2020 | 53 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. |
| Feb 6, 2020 | 52 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. |
| Jan 24, 2020 | 51 | $21.1M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. |
| Dec 16, 2019 | 50 | $11.8M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. |
| Nov 22, 2019 | 49 | $13.3M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. |
| Nov 21, 2019 | 48 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. |
| Sep 30, 2019 | 47 | $361.1K | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. |
| Sep 23, 2019 | 46 | $17.9M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. |
| Aug 22, 2019 | 45 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. |
| Jul 16, 2019 | 44 | $43.6M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. |
| Jun 13, 2019 | 43 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. |
| May 30, 2019 | 42 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. |
| May 1, 2019 | 41 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. |
| Apr 18, 2019 | 39 | $31.6M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. |
| Apr 18, 2019 | 40 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. |
| Feb 7, 2019 | 38 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. |
| Jan 25, 2019 | 37 | $33.3M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. |
| Jan 17, 2019 | 36 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. |
| Dec 19, 2018 | 35 | $11.1M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. |
| Nov 19, 2018 | 34 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. |
| Nov 14, 2018 | 33 | $15.3M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. |
| Nov 5, 2018 | 32 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. |
| Nov 1, 2018 | 31 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. |
| Oct 16, 2018 | 30 | $7.0M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. |
| Sep 24, 2018 | 29 | $1.9M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. |
| Aug 24, 2018 | 28 | $18.0M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. |
| Aug 22, 2018 | 27 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. |
| Aug 17, 2018 | 26 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. |
| Aug 9, 2018 | 25 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. |
| Jul 18, 2018 | 24 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. |
| Jun 28, 2018 | 23 | $18.0M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. |
| Jun 20, 2018 | 22 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. |
| Jun 14, 2018 | 20 | $0 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. |
| Jun 14, 2018 | 21 | $20.6M | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION. |
| Jun 1, 2018 | 19 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO CORRECT THE CONTRACT VALUE TO ADD 89 DAYS OF ESCALATION FOR THE SLIP IN CONTRACT AWARD DATE. |
| May 21, 2018 | 18 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE THE CHANGES MADE UNDER MODIFICATION 0009 TO TRUE-UP THE CONTRACT SO THAT THE CONTRACT ACCURATELY REFLECTS THE SITE WORK AND CONDITIONS AT THE TIME OF CONTRACT TRANSITION. |
| May 15, 2018 | 17 | $0 | THE PURPOSE OF THIS MODIFICATION IS CORRECT THE CONTRACT VALUE BASED ON THE AUDIT DONE PRIOR TO CONTRACT AWARD. THE L6 AND L7 TABLES HAVE BEEN ADJUSTED TO REFLECT THE CORRECT ESCALATION, LABOR RATES, TAXES AND FEES AS WELL AS OTHER MATHEMATICAL CALCULATION ERRORS. |
| Apr 24, 2018 | 16 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE THE CHANGE ORDER ISSUED UNDER MODIFICATION 0007 FOR THE C-400 CERLCA DOCUMENTS. |
| Apr 19, 2018 | 15 | $16.6M | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING IN THE AMOUNT OF $16,600,000 |
| Mar 8, 2018 | 14 | $19.0M | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING IN THE AMOUNT OF $19,000,000 AND TO UPDATE THE LIST OF BOARD MEMBERS. |
| Feb 7, 2018 | 13 | $11.2M | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING IN THE AMOUNT OF $11,0200,000. |
| Jan 19, 2018 | 12 | $11.0M | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING IN THE AMOUNT OF $11,010,000. |
| Dec 22, 2017 | 11 | $6.0M | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING IN THE AMOUNT OF $5,969,000. |
| Dec 21, 2017 | 10 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO ISSUE A UNILATERAL CHANGE ORDER MODIFICATION TO ADDRESS MATERIAL DIFFERENCE REGARDING RECONFIGURABLE SHIELDED PASSIVE NEUTRON SYSTEM (RSPNS) |
| Dec 4, 2017 | 9 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO ISSUE A UNILATERAL CHANGE ORDER MODIFICATION FOR CONTRACT TRUE UP. |