IDV vehicle

DTMA91U140005

PROVIDE UTILITY SERVE TO CAPE D/E RRF VESSELS AT PIERS S-T-U IN CHARLESTON,SC. IGF::OT::IGF

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Transportation
Office693JF7 DOT MARITIME ADMINISTRATION
NAICS221122 — Electric Power Distribution
PSCS112 — Electric Services
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$15.9M
Current contract valueNot reported
Potential contract value / ceiling$15.9M
Start dateNov 21, 2013
Current end dateNot available
Potential end dateNot available
Latest award activityAug 12, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 57 of 57 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Aug 12, 2026P00056$600.0KDOMINION ENERGY MODIFICATION IS TO ADD FUNDING FOR ELECTRICAL SERVICES FOR THE CAPE DS AND E AT PIERS S-T-U CHARLESTON, SC
May 29, 2026P00055$600.0KDOMINION ENERGY MODIFICATION IS TO ADD FUNDING FOR ELECTRICAL SERVICES FOR THE CAPE DS AND E AT PIERS S-T-U CHARLESTON, SC
Oct 9, 2025P00054$0DOMINION ENERGY MODIFICATION IS TO ADD FUNDING FOR ELECTRICAL SERVICES FOR THE CAPE DS AND E AT PIERS S-T-U CHARLESTON, SC
Sep 3, 202553$825.1KDOMINION ENERGY MODIFICATION IS TO ADD FUNDING FOR ELECTRICAL SERVICES FOR THE CAPE DS AND E AT PIERS S-T-U CHARLESTON, SC
Jul 11, 202552$298.0KDOMINION ENERGY MODIFICATION IS TO ADD FUNDING FOR ELECTRICAL SERVICES FOR THE CAPE DS AND E AT PIERS S-T-U CHARLESTON, SC
Apr 8, 202551$298.0KDOMINION ENERGY MODIFICATION IS TO ADD FUNDING FOR ELECTRICAL SERVICES FOR THE CAPE DS AND E AT PIERS S-T-U CHARLESTON, SC
Feb 10, 2025P00050$244.1KDOMINION ENERGY MODIFICATION IS TO ADD FUNDING FOR ELECTRICAL SERVICES FOR THE CAPE DS AND E AT PIERS S-T-U CHARLESTON, SC
Jan 3, 2025P00049$287.5KDOMINION ENERGY MODIFICATION IS TO ADD FUNDING FOR ELECTRICAL SERVICES FOR THE CAPE DS AND E AT PIERS S-T-U CHARLESTON, SC
Nov 19, 2024P00048$120.0KDOMINION ENERGY MODIFICATION IS TO ADD FUNDING FOR ELECTRICAL SERVICES FOR THE CAPE DS AND E AT PIERS S-T-U CHARLESTON, SC
Jul 18, 202447$0MODIFICATION IS TO EXTEND THE END DATE TO 10/31/2034.
Mar 25, 202446$53.2KMODIFICATION TO INCREASE FUNDING FROM $12,569,686.39 BY $53,172.00 TO $12,622,858.39 FOR ELECTRICAL SERVICES WITH DOMINION FOR RRF VESSELS CAPE DECISION, CAPE DIAMOND, CAPE DOMINGO, CAPE DOUGLAS, CAPE DUCATO, AND CAPE EDMONT MOORED AT PIERS S-T-U IN
Feb 26, 202445$127.6KMODIFICATION TO INCREASE FUNDING FROM $12,442,066.39 BY $127,620.00 TO $12,569,686.39 FOR ELECTRICAL SERVICES WITH DOMINION FOR RRF VESSELS CAPE DECISION, CAPE DIAMOND, CAPE DOMINGO, CAPE DOUGLAS, CAPE DUCATO, AND CAPE EDMONT MOORED AT PIERS S-T-U IN
Jan 25, 202444$413.6KMODIFICATION TO INCREASE FUNDING FROM $12,028,516.39 BY $413,550.00 TO $12,442,066.39 FOR ELECTRICAL SERVICES WITH DOMINION FOR RRF VESSELS CAPE DECISION, CAPE DIAMOND, CAPE DOMINGO, CAPE DOUGLAS, CAPE DUCATO, AND CAPE EDMONT MOORED AT PIERS S-T-U IN
Dec 1, 202343$270.0KMODIFICATION TO INCREASE FUND FOR FROM $11,758,516.39 BY $270,000.00 TO $12,028,516.39 FOR ELECTRICAL SERVICES WITH DOMINION FOR RRF VESSELS CAPE DECISION, CAPE DIAMOND, CAPE DOMINGO, CAPE DOUGLAS, CAPE DUCATO, AND CAPE EDMONT MOORED AT PIERS S-T-U I
Feb 23, 202342$756.0KTHE PURPOSE OF THIS MODIFICATION IS TO INCREASE FUNDING FROM $11,002,516.39 BY $756,000.00 TO $11,758,516.39 FOR ELECTRICAL SERVICES WITH DOMINION ENERGY.
Nov 8, 202241$399.2KTHE PURPOSE OF THIS MODIFICATION IS TO INCREASE FUNDING FROM $10,603,348.39 BY $399,168.00 TO $11,002,516.39 FOR ELECTRICAL SERVICES WITH DOMINION ENERGY/SCE&G FOR CAPE D/E CLASS VESSELS MOORED AT PIERS S-T-U IN CHARLESTON.
May 17, 202240$576.0KTHE PURPOSE OF THIS MODIFICATION IS TO INCREASE FUNDING FROM $10,027,348.39 BY $576,000.00 TO $10,603,348.39 FOR ELECTRICAL SERVICES WITH DOMINION ENERGY/SCE&G FOR CAPE D/E CLASS VESSELS MOORED AT PIERS S-T-U IN CHARLESTON.
Mar 10, 202239$129.9KTHE PURPOSE OF THIS MODIFICATION IS TO INCREASE FUNDING FROM $9,897,460.39 BY $129,888.00 TO $10,027,348.39 FOR ELECTRICAL SERVICES WITH DOMINION ENERGY/SCE&G FOR CAPE D/E CLASS VESSELS MOORED AT PIERS S-T-U IN CHARLESTON.
Jan 11, 202238$243.9KTHE PURPOSE OF THIS MODIFICATION IS TO INCREASE FUNDING FROM $9,653,524.39 BY $243,936.00 TO $9,897,460.39 FOR ELECTRICAL SERVICES WITH DOMINION ENERGY/SCE&G FOR CAPE D/E CLASS VESSELS MOORED AT PIERS S-T-U IN CHARLESTON.
Nov 10, 202137$199.6KTHE PURPOSE OF THIS MODIFICATION IS TO INCREASE FUNDING FROM $9,453,940.39 BY $199,584.00 TO $9,653,524.39 FOR ELECTRICAL SERVICES WITH DOMINION ENERGY/SCE&G FOR CAPE D/E CLASS VESSELS MOORED AT PIERS S-T-U IN CHARLESTON.
Mar 11, 202136$621.3KTHE PURPOSE OF THIS MODIFICATION IS TO INCREASE FUNDING FROM $8,832,616.39 BY $621,324.00 TO $9,453,940.39 FOR ELECTRICAL SERVICES WITH DOMINION ENERGY/SCE&G FOR CAPE D/E CLASS VESSELS MOORED AT PIERS S-T-U IN CHARLESTON.
Feb 17, 202135$139.4KTHE PURPOSE OF THIS MODIFICATION IS TO INCREASE FUNDING FROM $8,693,182.39 BY $139,434.00 TO $8,832,616.39 FOR ELECTRICAL SERVICES WITH DOMINION ENERGY/SCE&G FOR CAPE D/E CLASS VESSELS MOORED AT PIERS S-T-U IN CHARLESTON.
Jan 15, 202134$110.9KTHE PURPOSE OF THIS MODIFICATION IS TO INCREASE FUNDING FROM $8,582,302.39 BY $110,880.00 TO $8,693,182.39 FOR ELECTRICAL SERVICES WITH DOMINION ENERGY/SCE&G FOR CAPE D/E CLASS VESSELS MOORED AT PIERS S-T-U IN CHARLESTON.
Nov 10, 202033$225.0KTHE PURPOSE OF THIS MODIFICATION IS TO INCREASE FUNDING FROM $8,357,302.39 BY $225,000.00 TO $8,582,302.39 FOR ELECTRICAL SERVICES WITH DOMINION ENERGY/SCE&G FOR CAPE D/E CLASS VESSELS MOORED AT PIERS S-T-U IN CHARLESTON.
Feb 20, 202032$821.0KTHE PURPOSE OF THIS MODIFICATION IS TO INCREASE FUNDING FROM $7,536,322.39 BY $820,980.00 TO $8,357,302.39 FOR ELECTRICAL SERVICES WITH DOMINION ENERGY/SCE&G FOR CAPE D/E CLASS VESSELS MOORED AT PIERS S-T-U IN CHARLESTON.
Jan 23, 202031$95.0KTHE PURPOSE OF THIS MODIFICATION IS TO INCREASE FUNDING FROM $7,441,282.39 BY $95,040.00 TO $7,536,322.39 FOR ELECTRICAL SERVICES WITH DOMINION ENERGY/SCE&G FOR CAPE D/E CLASS VESSELS MOORED AT PIERS S-T-U IN CHARLESTON.
Dec 18, 201930$91.9KTHE PURPOSE OF THIS MODIFICATION IS TO INCREASE FUNDING FROM $7,349,380.39 BY $91,902.00 TO $7,441,282.39 FOR ELECTRICAL SERVICES WITH DOMINION ENERGY/SCE&G FOR CAPE D/E CLASS VESSELS MOORED AT PIERS S-T-U IN CHARLESTON.
Nov 12, 2019P00029$164.8KTHE PURPOSE OF THIS MODIFICATION IS TO INCREASE FUNDING FROM $7,184,590.39 BY $164,790.00 TO $7,349,380.39 FOR ELECTRICAL SERVICES WITH DOMINION ENERGY/SCE&G FOR CAPE D/E CLASS VESSELS MOORED AT PIERS S-T-U IN CHARLESTON.
Sep 12, 201928$22.9KTHE PURPOSE OF THIS MODIFICATION IS TO INCREASE FUNDING FROM $7,161,720.39 BY $22,780.00 TO $7,184,590.39 FOR ELECTRICAL SERVICES WITH SCE&G FOR CAPE D/E CLASS VESSELS MOORED AT PIERS S-T-U.
Aug 26, 201927$0LEGAL CHANGE OF NAME
Dec 7, 201826$336.0KTHE PURPOSE OF THIS MODIFICATION IS TO INCREASE FUNDING FROM $6,825,720.39, BY $336,000.00 TO $7,161,720.39 FOR ELECTRICAL SERVICES WITH SCE&G FOR CAPE D/E CLASS VESSELS MOORED AT PIERS S-T-U.
May 10, 201825$596.7KTHE PURPOSE OF THIS MODIFICATION IS TO INCREASE FUNDING FROM $6,229,020.39, BY $596,700.00 TO $6,825,720.39 FOR ELECTRICAL SERVICES WITH SCE&G.
Apr 23, 201824$148.2KTHE PURPOSE OF THIS MODIFICATION IS TO INCREASE FUNDING FROM $6,080,820.39, BY $148,200.00 TO $6,229,020.39, FOR ELECTRICAL SERVICES.
Feb 28, 201823$245.7KTHE PURPOSE OF THIS MODIFICATION IS TO INCREASE FUNDING FROM $5,835,120.39 BY $245,700.00 TO $6,080,820.39, FOR ELECTRICAL SERVICES.
Feb 2, 201822$74.1KTHE PURPOSE OF THIS MODIFICATION IS TO INCREASE FUNDING FROM $5,761,020.39 BY $74,100.00 TO $5,835,120.39, FOR ELECTRICAL SERVICES
Jan 9, 201821$85.8KTHE PURPOSE OF THIS MODIFICATION IS TO INCREASE FUNDING FROM $5,675,220.39 BY $85,800.00 TO $5,761,020.39, FOR ELECTRICAL SERVICES.
Nov 14, 201720$265.2KTHE PURPOSE OF THIS MODIFICATION IS TO INCREASE FUNDING FROM $5,410,020.39 BY $265,200.00 TO $5,675,220.39, FOR ELECTRICAL SERVICES.
Aug 9, 201719$65.7KTHE PURPOSE OF THIS MODIFICATION IS TO INCREASE FUNDING FROM $5,344,350.39 BY $65,670.00 TO $5,410,020.39, FOR ELECTRICAL SERVICES SCGE IGF::OT::IGF
Aug 8, 201718$328.4KTHE PURPOSE OF THIS MODIFICATION IS TO INCREASE FUNDING FROM $5,016,000.39 BY $328,350.00 TO $5,344,350.39, FOR ELECTRICAL SERVICES SCGE IGF::OT::IGF
Jun 20, 201717$102.8KIGF::OT::IGF THE PURPOSE OF THIS MODIFICATION IS TO INCREASE FUNDING FROM $4,913,185.39 BY $102,815.00 TO $5,016,000.39, FOR ELECTRICAL SERVICES.
Jun 7, 201716$242.8KSOUTH CAROLINA ELECTRIC GAS COMPANY IGF::OT::IGF
Jan 18, 201715$477.6KIGF::OT::IGF THE PURPOSE OF THIS MODIFICATION IS TO INCREASE THE ORDER FROM $4,192,807.39 BY $477,600.00 TO $4,670,407.39, FOR ELECTRICAL UTILITY SERVICES TO CAPE D'S AND CAPE E'S MOORED AT CHARLESTON BERTHS PIERS. THE PURPOSE OF THIS MODIFICATION IS TO INCREASE THE ORDER FROM $3,359,663.39 BY $173,144.00 TO $4,192,807.39, FOR ELECTRICAL UTILITY SERVICES TO CAPE D'S AND CAPE E'S MOORED AT CHARLESTON BERTHS PIERS. THE PURPOSE OF THIS MODIFICATION IS TO INCREASE THE ORDER FROM $2,899,967.39 BY $459,696.00 TO $3,359,663.39 AND TO EXTEND THE PERIOD OF PERFORMANCE END DATE FROM 02/29/2016 TO 10/31/2024, FOR ELECTRICAL UTILITY SERVICES TO CAPE D'S AND CAPE E'S MOORED AT CHARLESTON BERTHS PIERS. THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE END DATE FROM 01/31/2016 TO 02/29/2016, FOR ELECTRICAL UTILITY SERVICES TO CAPE D'S AND CAPE E'S MOORED AT CHARLESTON BERTHS PIERS. THE PURPOSE OF THIS MODIFICATION IS TO INCREASE THE ORDER FROM $2,783,159.39 BY $116,808.00 TO $2,899,967.39 FOR ELECTRICAL UTILITY SERVICES TO CAPE D'S AND CAPE E'S MOORED AT CHARLESTON BERTHS PIERS. TO EXTEND THE PERIOD OF PERFORMANCE END DATE FROM 12/31/2015 TO 01/31/2016. THE PURPOSE OF THIS MODIFICATION IS TO INCREASE THE ORDER FROM $2,666,351.39 BY $116,808.00 TO $2,783,159.39 FOR ELECTRICAL UTILITY SERVICES TO CAPE D'S AND CAPE E'S MOORED AT CHARLESTON BERTHS PIERS. THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE END DATE FROM 10/31/2015 TO 12/31/2015 FOR ELECTRICAL UTILITY SERVICES TO CAPE DUCATO AND CAPE EDMONT MOORED AT CHARLESTON BERTHS PIERS. THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE FUNDING FROM $165,090.00 BY $-83,574.61 TO $1,566,515.39 FOR ELECTRICAL UTILITY SERVICES TO CAPE DUCATO AND CAPE EDMONT MOORED AT CHARLESTON BERTHS PIERS. THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE FUNDING PROVIDED FOR ELECTRICAL UTILITY SERVICES TO CAPE DUCATO AND CAPE EDMONT MOORED AT CHARLESTON BERTHS PIERS.
Nov 28, 201614$173.1KIGF::OT::IGF THE PURPOSE OF THIS MODIFICATION IS TO INCREASE THE ORDER FROM $3,359,663.39 BY $173,144.00 TO $4,192,807.39, FOR ELECTRICAL UTILITY SERVICES TO CAPE D'S AND CAPE E'S MOORED AT CHARLESTON BERTHS PIERS. THE PURPOSE OF THIS MODIFICATION IS TO INCREASE THE ORDER FROM $2,899,967.39 BY $459,696.00 TO $3,359,663.39 AND TO EXTEND THE PERIOD OF PERFORMANCE END DATE FROM 02/29/2016 TO 10/31/2024, FOR ELECTRICAL UTILITY SERVICES TO CAPE D'S AND CAPE E'S MOORED AT CHARLESTON BERTHS PIERS. THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE END DATE FROM 01/31/2016 TO 02/29/2016, FOR ELECTRICAL UTILITY SERVICES TO CAPE D'S AND CAPE E'S MOORED AT CHARLESTON BERTHS PIERS. THE PURPOSE OF THIS MODIFICATION IS TO INCREASE THE ORDER FROM $2,783,159.39 BY $116,808.00 TO $2,899,967.39 FOR ELECTRICAL UTILITY SERVICES TO CAPE D'S AND CAPE E'S MOORED AT CHARLESTON BERTHS PIERS. TO EXTEND THE PERIOD OF PERFORMANCE END DATE FROM 12/31/2015 TO 01/31/2016. THE PURPOSE OF THIS MODIFICATION IS TO INCREASE THE ORDER FROM $2,666,351.39 BY $116,808.00 TO $2,783,159.39 FOR ELECTRICAL UTILITY SERVICES TO CAPE D'S AND CAPE E'S MOORED AT CHARLESTON BERTHS PIERS. THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE END DATE FROM 10/31/2015 TO 12/31/2015 FOR ELECTRICAL UTILITY SERVICES TO CAPE DUCATO AND CAPE EDMONT MOORED AT CHARLESTON BERTHS PIERS. THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE FUNDING FROM $165,090.00 BY $-83,574.61 TO $1,566,515.39 FOR ELECTRICAL UTILITY SERVICES TO CAPE DUCATO AND CAPE EDMONT MOORED AT CHARLESTON BERTHS PIERS. THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE FUNDING PROVIDED FOR ELECTRICAL UTILITY SERVICES TO CAPE DUCATO AND CAPE EDMONT MOORED AT CHARLESTON BERTHS PIERS.
Mar 31, 201613$660.0KIGF::OT::IGF THE PURPOSE OF THIS MODIFICATION IS TO INCREASE THE ORDER FROM $2,899,967.39 BY $459,696.00 TO $3,359,663.39 AND TO EXTEND THE PERIOD OF PERFORMANCE END DATE FROM 02/29/2016 TO 10/31/2024, FOR ELECTRICAL UTILITY SERVICES TO CAPE D'S AND CAPE E'S MOORED AT CHARLESTON BERTHS PIERS. THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE END DATE FROM 01/31/2016 TO 02/29/2016, FOR ELECTRICAL UTILITY SERVICES TO CAPE D'S AND CAPE E'S MOORED AT CHARLESTON BERTHS PIERS. THE PURPOSE OF THIS MODIFICATION IS TO INCREASE THE ORDER FROM $2,783,159.39 BY $116,808.00 TO $2,899,967.39 FOR ELECTRICAL UTILITY SERVICES TO CAPE D'S AND CAPE E'S MOORED AT CHARLESTON BERTHS PIERS. TO EXTEND THE PERIOD OF PERFORMANCE END DATE FROM 12/31/2015 TO 01/31/2016. THE PURPOSE OF THIS MODIFICATION IS TO INCREASE THE ORDER FROM $2,666,351.39 BY $116,808.00 TO $2,783,159.39 FOR ELECTRICAL UTILITY SERVICES TO CAPE D'S AND CAPE E'S MOORED AT CHARLESTON BERTHS PIERS. THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE END DATE FROM 10/31/2015 TO 12/31/2015 FOR ELECTRICAL UTILITY SERVICES TO CAPE DUCATO AND CAPE EDMONT MOORED AT CHARLESTON BERTHS PIERS. THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE FUNDING FROM $165,090.00 BY $-83,574.61 TO $1,566,515.39 FOR ELECTRICAL UTILITY SERVICES TO CAPE DUCATO AND CAPE EDMONT MOORED AT CHARLESTON BERTHS PIERS. THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE FUNDING PROVIDED FOR ELECTRICAL UTILITY SERVICES TO CAPE DUCATO AND CAPE EDMONT MOORED AT CHARLESTON BERTHS PIERS.
Feb 25, 201612$459.7KIGF::OT::IGF THE PURPOSE OF THIS MODIFICATION IS TO INCREASE THE ORDER FROM $2,899,967.39 BY $459,696.00 TO $3,359,663.39 AND TO EXTEND THE PERIOD OF PERFORMANCE END DATE FROM 02/29/2016 TO 10/31/2024, FOR ELECTRICAL UTILITY SERVICES TO CAPE D'S AND CAPE E'S MOORED AT CHARLESTON BERTHS PIERS. THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE END DATE FROM 01/31/2016 TO 02/29/2016, FOR ELECTRICAL UTILITY SERVICES TO CAPE D'S AND CAPE E'S MOORED AT CHARLESTON BERTHS PIERS. THE PURPOSE OF THIS MODIFICATION IS TO INCREASE THE ORDER FROM $2,783,159.39 BY $116,808.00 TO $2,899,967.39 FOR ELECTRICAL UTILITY SERVICES TO CAPE D'S AND CAPE E'S MOORED AT CHARLESTON BERTHS PIERS. TO EXTEND THE PERIOD OF PERFORMANCE END DATE FROM 12/31/2015 TO 01/31/2016. THE PURPOSE OF THIS MODIFICATION IS TO INCREASE THE ORDER FROM $2,666,351.39 BY $116,808.00 TO $2,783,159.39 FOR ELECTRICAL UTILITY SERVICES TO CAPE D'S AND CAPE E'S MOORED AT CHARLESTON BERTHS PIERS. THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE END DATE FROM 10/31/2015 TO 12/31/2015 FOR ELECTRICAL UTILITY SERVICES TO CAPE DUCATO AND CAPE EDMONT MOORED AT CHARLESTON BERTHS PIERS. THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE FUNDING FROM $165,090.00 BY $-83,574.61 TO $1,566,515.39 FOR ELECTRICAL UTILITY SERVICES TO CAPE DUCATO AND CAPE EDMONT MOORED AT CHARLESTON BERTHS PIERS. THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE FUNDING PROVIDED FOR ELECTRICAL UTILITY SERVICES TO CAPE DUCATO AND CAPE EDMONT MOORED AT CHARLESTON BERTHS PIERS.
Jan 28, 201611$0IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE END DATE FROM 01/31/2016 TO 02/29/2016, FOR ELECTRICAL UTILITY SERVICES TO CAPE D'S AND CAPE E'S MOORED AT CHARLESTON BERTHS PIERS. THE PURPOSE OF THIS MODIFICATION IS TO INCREASE THE ORDER FROM $2,783,159.39 BY $116,808.00 TO $2,899,967.39 FOR ELECTRICAL UTILITY SERVICES TO CAPE D'S AND CAPE E'S MOORED AT CHARLESTON BERTHS PIERS. TO EXTEND THE PERIOD OF PERFORMANCE END DATE FROM 12/31/2015 TO 01/31/2016. THE PURPOSE OF THIS MODIFICATION IS TO INCREASE THE ORDER FROM $2,666,351.39 BY $116,808.00 TO $2,783,159.39 FOR ELECTRICAL UTILITY SERVICES TO CAPE D'S AND CAPE E'S MOORED AT CHARLESTON BERTHS PIERS. THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE END DATE FROM 10/31/2015 TO 12/31/2015 FOR ELECTRICAL UTILITY SERVICES TO CAPE DUCATO AND CAPE EDMONT MOORED AT CHARLESTON BERTHS PIERS. THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE FUNDING FROM $165,090.00 BY $-83,574.61 TO $1,566,515.39 FOR ELECTRICAL UTILITY SERVICES TO CAPE DUCATO AND CAPE EDMONT MOORED AT CHARLESTON BERTHS PIERS. THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE FUNDING PROVIDED FOR ELECTRICAL UTILITY SERVICES TO CAPE DUCATO AND CAPE EDMONT MOORED AT CHARLESTON BERTHS PIERS.
Dec 17, 201510$116.8KIGF::OT::IGF THE PURPOSE OF THIS MODIFICATION IS TO INCREASE THE ORDER FROM $2,783,159.39 BY $116,808.00 TO $2,899,967.39 FOR ELECTRICAL UTILITY SERVICES TO CAPE D'S AND CAPE E'S MOORED AT CHARLESTON BERTHS PIERS. TO EXTEND THE PERIOD OF PERFORMANCE END DATE FROM 12/31/2015 TO 01/31/2016. THE PURPOSE OF THIS MODIFICATION IS TO INCREASE THE ORDER FROM $2,666,351.39 BY $116,808.00 TO $2,783,159.39 FOR ELECTRICAL UTILITY SERVICES TO CAPE D'S AND CAPE E'S MOORED AT CHARLESTON BERTHS PIERS. THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE END DATE FROM 10/31/2015 TO 12/31/2015 FOR ELECTRICAL UTILITY SERVICES TO CAPE DUCATO AND CAPE EDMONT MOORED AT CHARLESTON BERTHS PIERS. THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE FUNDING FROM $165,090.00 BY $-83,574.61 TO $1,566,515.39 FOR ELECTRICAL UTILITY SERVICES TO CAPE DUCATO AND CAPE EDMONT MOORED AT CHARLESTON BERTHS PIERS. THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE FUNDING PROVIDED FOR ELECTRICAL UTILITY SERVICES TO CAPE DUCATO AND CAPE EDMONT MOORED AT CHARLESTON BERTHS PIERS.
Nov 30, 20159$116.8KIGF::OT::IGF THE PURPOSE OF THIS MODIFICATION IS TO INCREASE THE ORDER FROM $2,666,351.39 BY $116,808.00 TO $2,783,159.39 FOR ELECTRICAL UTILITY SERVICES TO CAPE D'S AND CAPE E'S MOORED AT CHARLESTON BERTHS PIERS. THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE END DATE FROM 10/31/2015 TO 12/31/2015 FOR ELECTRICAL UTILITY SERVICES TO CAPE DUCATO AND CAPE EDMONT MOORED AT CHARLESTON BERTHS PIERS. THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE FUNDING FROM $165,090.00 BY $-83,574.61 TO $1,566,515.39 FOR ELECTRICAL UTILITY SERVICES TO CAPE DUCATO AND CAPE EDMONT MOORED AT CHARLESTON BERTHS PIERS. THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE FUNDING PROVIDED FOR ELECTRICAL UTILITY SERVICES TO CAPE DUCATO AND CAPE EDMONT MOORED AT CHARLESTON BERTHS PIERS.
Oct 30, 20158$0IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE END DATE FROM 10/31/2015 TO 12/31/2015 FOR ELECTRICAL UTILITY SERVICES TO CAPE DUCATO AND CAPE EDMONT MOORED AT CHARLESTON BERTHS PIERS. THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE FUNDING FROM $165,090.00 BY $-83,574.61 TO $1,566,515.39 FOR ELECTRICAL UTILITY SERVICES TO CAPE DUCATO AND CAPE EDMONT MOORED AT CHARLESTON BERTHS PIERS. THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE FUNDING PROVIDED FOR ELECTRICAL UTILITY SERVICES TO CAPE DUCATO AND CAPE EDMONT MOORED AT CHARLESTON BERTHS PIERS.
Apr 16, 20157$-83.6KIGF::OT::IGF THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE FUNDING PROVIDED FOR ELECTRICAL UTILITY SERVICES TO CAPE DUCATO AND CAPE EDMONT MOORED AT CHARLESTON BERTHS PIERS.
Mar 9, 20156$990.0KSCEG IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION IS TO INCREASE FUNDING FROM $1,759,926.00 BY $990,000.00 TO $2,749,926.00. FOR ELECTRICAL UTILITY SERVICES TO CAPE D AND CAPE E CLASS VESSELS MOORED AT CHARLESTON BERTHS PIER S-T-U.THE PURPOSE OF THIS MODIFICATION IS TO INCREASE FUNDING FROM $1,650,090.00 BY $109,836.00 TO $1,759,926.00. FOR ELECTRICAL UTILITY SERVICES TO CAPE D AND CAPE E CLASS VESSELS MOORED AT CHARLESTON BERTHS PIER S-T-U. THE PURPOSE OF THIS MODIFICATION IS A NO COST EXTENSION, TO EXTEND THE PERIOD OF PERFORMANCE FROM 10/01/2014 TO 10/31/2015. FOR ELECTRICAL UTILITY SERVICES TO CAPE D AND CAPE E CLASS VESSELS MOORED AT CHARLESTON BERTHS PIER S-T-U. PROVIDE ELECTRICAL UTILITY SERVICES TO CAPE D AND CAPE E CLASS VESSELS MOORED AT CHARLESTON BERTHS PIER S-T-U
Feb 2, 20155$109.8KTHE PURPOSE OF THIS MODIFICATION IS A NO COST EXTENSION, TO EXTEND THE PERIOD OF PERFORMANCE FROM 10/01/2014 TO 10/31/2015. FOR ELECTRICAL UTILITY SERVICES TO CAPE D AND CAPE E CLASS VESSELS MOORED AT CHARLESTON BERTHS PIER S-T-U. FY14-4 SCEG IGF::OT::IGF PROVIDE ELECTRICAL UTILITY SERVICES TO CAPE D AND CAPE E CLASS VESSELS MOORED AT CHARLESTON BERTHS PIER S-T-U
Nov 19, 20144$0FY14-4 SCEG IGF::OT::IGF PROVIDE ELECTRICAL UTILITY SERVICES TO CAPE D AND CAPE E CLASS VESSELS MOORED AT CHARLESTON BERTHS PIER S-T-U
Apr 29, 20143$966.6KFY14-4 SCEG IGF::OT::IGF
Feb 27, 20142$285.4KFY14-2 SCEG IGF::OT::IGF
Dec 16, 20131$142.7KFY14-2 SCEG IGF::OT::IGF
Nov 21, 20130$255.4KPROVIDE UTILITY SERVE TO CAPE D/E RRF VESSELS AT PIERS S-T-U IN CHARLESTON,SC. IGF::OT::IGF