IDV vehicle
FA487724D0017
A. THE MULTIPLE AWARD CONSTRUCTION CONTRACT IS DESIGNED TO PROVIDE A FLEXIBLE, COMPETITIVE, AND RESPONSIVE CONTRACTUAL CAPABILITY TO PERFORM DESIGN-BUILD AND BID-BUILD CONSTRUCTION WORK AT DAVIS-MONTHAN AFB, AZ AND LUKE AFB, AZ.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | FA4877 355 CONS PK |
| NAICS | 236220 — Commercial and Institutional Building Construction |
| PSC | Z2AA — REPAIR OR ALTERATION OF OFFICE BUILDINGS |
| Parent award / vehicle | Not reported |
| Set-aside | 8A COMPETED |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $0 |
| Current contract value | Not reported |
| Potential contract value / ceiling | $350.0M |
| Start date | Sep 10, 2024 |
| Current end date | Not available |
| Potential end date | Not available |
| Latest award activity | Feb 13, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 3 of 3 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Feb 13, 2026 | P00003 | $0 | A. THE MULTIPLE AWARD CONSTRUCTION CONTRACT IS DESIGNED TO PROVIDE A FLEXIBLE, COMPETITIVE, AND RESPONSIVE CONTRACTUAL CAPABILITY TO PERFORM DESIGN-BUILD AND BID-BUILD CONSTRUCTION WORK AT DAVIS-MONTHAN AFB, AZ AND LUKE AFB, AZ. |
| Jul 29, 2025 | P00002 | $0 | A. THE MULTIPLE AWARD CONSTRUCTION CONTRACT IS DESIGNED TO PROVIDE A FLEXIBLE, COMPETITIVE, AND RESPONSIVE CONTRACTUAL CAPABILITY TO PERFORM DESIGN-BUILD AND BID-BUILD CONSTRUCTION WORK AT DAVIS-MONTHAN AFB, AZ AND LUKE AFB, AZ. |
| Mar 25, 2025 | P00001 | $0 | A. THE MULTIPLE AWARD CONSTRUCTION CONTRACT IS DESIGNED TO PROVIDE A FLEXIBLE, COMPETITIVE, AND RESPONSIVE CONTRACTUAL CAPABILITY TO PERFORM DESIGN-BUILD AND BID-BUILD CONSTRUCTION WORK AT DAVIS-MONTHAN AFB, AZ AND LUKE AFB, AZ. |
Research next steps
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.