IDV vehicle
GS10F0467Y
SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, AND CONSULTING. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL BE IDENTIFIED AND DESIGNED IN THIS STAGE INCLUDING TRAINING, OPERATION AND MAINTENANCE REQUIREMENTS, AND REPLACEMENT PROCEDURES. PES DOES NOT INCLUDE ARCHITECT-ENGINEER SERVICES AS DEFINED IN THE BROOKS ACT AND FAR PART 2. PES DOES NOT INCLUDE DESIGN OR CONSTRUCTION SERVICES AS DEFINED IN T
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | General Services Administration |
| Office | GSA/FAS/PSHC/PROF SRVCS SCHED-PSS |
| NAICS | 541712 |
| PSC | R425 — Engineering and Technical Services |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIXED PRICE WITH ECONOMIC PRICE ADJUSTMENT |
| Obligations | $0 |
| Current contract value | Not reported |
| Potential contract value / ceiling | $12.9M |
| Start date | Sep 14, 2012 |
| Current end date | Not available |
| Potential end date | Not available |
| Latest award activity | Sep 4, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 56 of 56 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Sep 4, 2026 | PA0035 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Aug 6, 2026 | PA0033 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Aug 5, 2026 | PA0032 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Jun 24, 2026 | PSA917 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| May 8, 2026 | PSA914 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Jan 13, 2026 | PSA907 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Oct 30, 2025 | PS0031 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Oct 17, 2025 | PSA905 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Jul 29, 2025 | PSA904 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| May 27, 2025 | PSA897 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Mar 10, 2025 | PSA888 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Aug 21, 2024 | PSA885 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Jun 18, 2024 | PSA883 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| May 20, 2024 | PSA882 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Jan 25, 2024 | PSA869 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Sep 15, 2023 | PSA863 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Apr 20, 2023 | PSA853 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Apr 1, 2023 | PA0028 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Sep 7, 2022 | PO0022 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Sep 7, 2022 | PS0027 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Jul 15, 2022 | PO0023 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Jul 15, 2022 | PSA847 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Feb 18, 2022 | PSA839 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Nov 5, 2021 | PSA837 | $0 | EO14042 THIS CONTRACT IS HEREBY MODIFIED TO INCORPORATE FEDERAL ACQUISITION REGULATION (FAR) CLAUSE 52.223-99 ENSURING ADEQUATE COVID-19 SAFETY PROTOCOLS FOR FEDERAL CONTRACTORS - FEDERAL SUPPLY SCHEDULE CONTRACT |
| Jun 18, 2021 | PSA832 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Apr 7, 2021 | PA0021 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Oct 2, 2020 | PSA824 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Sep 30, 2020 | PSA815 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Sep 3, 2020 | PSA812 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Jul 23, 2020 | PA0020 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Jul 2, 2020 | PA0019 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Dec 11, 2019 | PSA808 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Apr 23, 2019 | PM0018 | $0 | SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITYAND MAINTAINABILITY, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, CONSULTING, CONDUCT ACCEPTANCE, FUNCTIONAL AND POST ACCEPTANCE TESTING, TESTING, INTEGRATION OF THE PAYLOAD FOR FLIGHT CUSTOMER AGENCY,SUPPORT PROVIDED DURING LAUNCH, ORBITAL MANEUVERING AND SATELLITE SEPARATION FROM THE SPACECRAFT. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL BE IDE |
| Dec 4, 2018 | PM0017 | $0 | SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, CONSULTING, CONDUCT ACCEPTANCE, FUNCTIONAL AND POST ACCEPTANCE TESTING, TESTING, INTEGRATION OF THE PAYLOAD FOR FLIGHT CUSTOMER AGENCY, SUPPORT PROVIDED DURING LAUNCH, ORBITAL MANEUVERING AND SATELLITE SEPARATION FROM THE SPACECRAFT. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL BE |
| Jan 31, 2018 | PS0014ADMINPOC | $0 | SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, CONSULTING, CONDUCT ACCEPTANCE, FUNCTIONAL AND POST ACCEPTANCE TESTING, TESTING, INTEGRATION OF THE PAYLOAD FOR FLIGHT CUSTOMER AGENCY, SUPPORT PROVIDED DURING LAUNCH, ORBITAL MANEUVERING AND SATELLITE SEPARATION FROM THE SPACECRAFT. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL B |
| Jan 31, 2018 | PS0014AUTHNEG | $0 | SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, CONSULTING, CONDUCT ACCEPTANCE, FUNCTIONAL AND POST ACCEPTANCE TESTING, TESTING, INTEGRATION OF THE PAYLOAD FOR FLIGHT CUSTOMER AGENCY, SUPPORT PROVIDED DURING LAUNCH, ORBITAL MANEUVERING AND SATELLITE SEPARATION FROM THE SPACECRAFT. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL B |
| Jan 31, 2018 | PS0014DELLABCAT | $0 | SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, CONSULTING, CONDUCT ACCEPTANCE, FUNCTIONAL AND POST ACCEPTANCE TESTING, TESTING, INTEGRATION OF THE PAYLOAD FOR FLIGHT CUSTOMER AGENCY, SUPPORT PROVIDED DURING LAUNCH, ORBITAL MANEUVERING AND SATELLITE SEPARATION FROM THE SPACECRAFT. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL B |
| Jan 31, 2018 | PS0014ORDERPOC | $0 | SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, CONSULTING, CONDUCT ACCEPTANCE, FUNCTIONAL AND POST ACCEPTANCE TESTING, TESTING, INTEGRATION OF THE PAYLOAD FOR FLIGHT CUSTOMER AGENCY, SUPPORT PROVIDED DURING LAUNCH, ORBITAL MANEUVERING AND SATELLITE SEPARATION FROM THE SPACECRAFT. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL B |
| Jan 25, 2018 | PMA594 | $0 | SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, CONSULTING, CONDUCT ACCEPTANCE, FUNCTIONAL AND POST ACCEPTANCE TESTING, TESTING, INTEGRATION OF THE PAYLOAD FOR FLIGHT CUSTOMER AGENCY, SUPPORT PROVIDED DURING LAUNCH, ORBITAL MANEUVERING AND SATELLITE SEPARATION FROM THE SPACECRAFT. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL B |
| Oct 17, 2017 | PA0011REASSIGNMENT | $0 | SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, CONSULTING, CONDUCT ACCEPTANCE, FUNCTIONAL AND POST ACCEPTANCE TESTING, TESTING, INTEGRATION OF THE PAYLOAD FOR FLIGHT CUSTOMER AGENCY, SUPPORT PROVIDED DURING LAUNCH, ORBITAL MANEUVERING AND SATELLITE SEPARATION FROM THE SPACECRAFT. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL B |
| Aug 9, 2017 | PO0010EXERCISEOPTION | $0 | SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, CONSULTING, CONDUCT ACCEPTANCE, FUNCTIONAL AND POST ACCEPTANCE TESTING, TESTING, INTEGRATION OF THE PAYLOAD FOR FLIGHT CUSTOMER AGENCY, SUPPORT PROVIDED DURING LAUNCH, ORBITAL MANEUVERING AND SATELLITE SEPARATION FROM THE SPACECRAFT. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL B |
| Aug 7, 2017 | CMA541CLAUSEEXCPTN | $0 | SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, CONSULTING, CONDUCT ACCEPTANCE, FUNCTIONAL AND POST ACCEPTANCE TESTING, TESTING, INTEGRATION OF THE PAYLOAD FOR FLIGHT CUSTOMER AGENCY, SUPPORT PROVIDED DURING LAUNCH, ORBITAL MANEUVERING AND SATELLITE SEPARATION FROM THE SPACECRAFT. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL B |
| Aug 7, 2017 | CMA541REVTERMCOND | $0 | SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, CONSULTING, CONDUCT ACCEPTANCE, FUNCTIONAL AND POST ACCEPTANCE TESTING, TESTING, INTEGRATION OF THE PAYLOAD FOR FLIGHT CUSTOMER AGENCY, SUPPORT PROVIDED DURING LAUNCH, ORBITAL MANEUVERING AND SATELLITE SEPARATION FROM THE SPACECRAFT. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL B |
| Aug 7, 2017 | PSA509REVTERMCOND | $0 | SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, CONSULTING, CONDUCT ACCEPTANCE, FUNCTIONAL AND POST ACCEPTANCE TESTING, TESTING, INTEGRATION OF THE PAYLOAD FOR FLIGHT CUSTOMER AGENCY, SUPPORT PROVIDED DURING LAUNCH, ORBITAL MANEUVERING AND SATELLITE SEPARATION FROM THE SPACECRAFT. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL B |
| Aug 7, 2017 | PSA580REVTERMCOND | $0 | SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, CONSULTING, CONDUCT ACCEPTANCE, FUNCTIONAL AND POST ACCEPTANCE TESTING, TESTING, INTEGRATION OF THE PAYLOAD FOR FLIGHT CUSTOMER AGENCY, SUPPORT PROVIDED DURING LAUNCH, ORBITAL MANEUVERING AND SATELLITE SEPARATION FROM THE SPACECRAFT. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL B |
| May 16, 2016 | PA0009AUTHNEG | $0 | SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, AND CONSULTING. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL BE IDENTIFIED AND DESIGNED IN THIS STAGE INCLUDING TRAINING, OPERATION AND MAINTENANCE REQUIREMENTS, AND REPLACEMENT PROCEDURES. PES DOES NOT INCLUDE ARCHITECT-ENGINEER SERVICES AS DEFINED IN THE BROOKS ACT AND FAR PART 2. PES DOES NOT INCLUDE DESIGN OR CONSTRUCTION SERVICES AS DEFINED IN TH |
| Jan 2, 2016 | CMA475REVTERMCOND | $0 | SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, AND CONSULTING. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL BE IDENTIFIED AND DESIGNED IN THIS STAGE INCLUDING TRAINING, OPERATION AND MAINTENANCE REQUIREMENTS, AND REPLACEMENT PROCEDURES. PES DOES NOT INCLUDE ARCHITECT-ENGINEER SERVICES AS DEFINED IN THE BROOKS ACT AND FAR PART 2. PES DOES NOT INCLUDE DESIGN OR CONSTRUCTION SERVICES AS DEFINED IN TH |
| Dec 22, 2015 | PA0007REASSIGNMENT | $0 | SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, AND CONSULTING. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL BE IDENTIFIED AND DESIGNED IN THIS STAGE INCLUDING TRAINING, OPERATION AND MAINTENANCE REQUIREMENTS, AND REPLACEMENT PROCEDURES. PES DOES NOT INCLUDE ARCHITECT-ENGINEER SERVICES AS DEFINED IN THE BROOKS ACT AND FAR PART 2. PES DOES NOT INCLUDE DESIGN OR CONSTRUCTION SERVICES AS DEFINED IN TH |
| Oct 1, 2015 | CMA473REVTERMCOND | $0 | SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, AND CONSULTING. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL BE IDENTIFIED AND DESIGNED IN THIS STAGE INCLUDING TRAINING, OPERATION AND MAINTENANCE REQUIREMENTS, AND REPLACEMENT PROCEDURES. PES DOES NOT INCLUDE ARCHITECT-ENGINEER SERVICES AS DEFINED IN THE BROOKS ACT AND FAR PART 2. PES DOES NOT INCLUDE DESIGN OR CONSTRUCTION SERVICES AS DEFINED IN TH |
| Aug 14, 2015 | PA0006REASSIGNMENT | $0 | SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, AND CONSULTING. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL BE IDENTIFIED AND DESIGNED IN THIS STAGE INCLUDING TRAINING, OPERATION AND MAINTENANCE REQUIREMENTS, AND REPLACEMENT PROCEDURES. PES DOES NOT INCLUDE ARCHITECT-ENGINEER SERVICES AS DEFINED IN THE BROOKS ACT AND FAR PART 2. PES DOES NOT INCLUDE DESIGN OR CONSTRUCTION SERVICES AS DEFINED IN T |
| Aug 27, 2014 | PA0005AUTHNEG | $0 | SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, AND CONSULTING. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL BE IDENTIFIED AND DESIGNED IN THIS STAGE INCLUDING TRAINING, OPERATION AND MAINTENANCE REQUIREMENTS, AND REPLACEMENT PROCEDURES. PES DOES NOT INCLUDE ARCHITECT-ENGINEER SERVICES AS DEFINED IN THE BROOKS ACT AND FAR PART 2. PES DOES NOT INCLUDE DESIGN OR CONSTRUCTION SERVICES AS DEFINED IN T |
| Aug 13, 2014 | PA0004REASSIGNMENT | $0 | SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, AND CONSULTING. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL BE IDENTIFIED AND DESIGNED IN THIS STAGE INCLUDING TRAINING, OPERATION AND MAINTENANCE REQUIREMENTS, AND REPLACEMENT PROCEDURES. PES DOES NOT INCLUDE ARCHITECT-ENGINEER SERVICES AS DEFINED IN THE BROOKS ACT AND FAR PART 2. PES DOES NOT INCLUDE DESIGN OR CONSTRUCTION SERVICES AS DEFINED IN T |
| Jan 31, 2014 | PA0003REASSIGNMENT | $0 | SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, AND CONSULTING. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL BE IDENTIFIED AND DESIGNED IN THIS STAGE INCLUDING TRAINING, OPERATION AND MAINTENANCE REQUIREMENTS, AND REPLACEMENT PROCEDURES. PES DOES NOT INCLUDE ARCHITECT-ENGINEER SERVICES AS DEFINED IN THE BROOKS ACT AND FAR PART 2. PES DOES NOT INCLUDE DESIGN OR CONSTRUCTION SERVICES AS DEFINED IN T |
| May 30, 2013 | 2 | $0 | SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, AND CONSULTING. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL BE IDENTIFIED AND DESIGNED IN THIS STAGE INCLUDING TRAINING, OPERATION AND MAINTENANCE REQUIREMENTS, AND REPLACEMENT PROCEDURES. PES DOES NOT INCLUDE ARCHITECT-ENGINEER SERVICES AS DEFINED IN THE BROOKS ACT AND FAR PART 2. PES DOES NOT INCLUDE DESIGN OR CONSTRUCTION SERVICES AS DEFINED IN T |
| Feb 21, 2013 | 1 | $0 | SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, AND CONSULTING. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL BE IDENTIFIED AND DESIGNED IN THIS STAGE INCLUDING TRAINING, OPERATION AND MAINTENANCE REQUIREMENTS, AND REPLACEMENT PROCEDURES. PES DOES NOT INCLUDE ARCHITECT-ENGINEER SERVICES AS DEFINED IN THE BROOKS ACT AND FAR PART 2. PES DOES NOT INCLUDE DESIGN OR CONSTRUCTION SERVICES AS DEFINED IN T |
| Sep 12, 2012 | 0 | $0 | SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, AND CONSULTING. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL BE IDENTIFIED AND DESIGNED IN THIS STAGE INCLUDING TRAINING, OPERATION AND MAINTENANCE REQUIREMENTS, AND REPLACEMENT PROCEDURES. PES DOES NOT INCLUDE ARCHITECT-ENGINEER SERVICES AS DEFINED IN THE BROOKS ACT AND FAR PART 2. PES DOES NOT INCLUDE DESIGN OR CONSTRUCTION SERVICES AS DEFINED IN T |
Buyer contacts from matching notices
Matched on exact award/solicitation identifier and awarding agency. Source dates describe the notice, not current contact verification.
| Contact | Role | Published contact methods | Evidence | Source date |
|---|---|---|---|---|
| National Customer Service GSA, MANAGEMENT SERVICES CTR, 400 15TH ST, SW RM 2757 (AQSA) , AUBURN, WA 98001 | Contact | Contact method not published | Source | Aug 3, 2015 |
| National Customer Service GSA, MANAGEMENT SERVICES CTR, 400 15TH ST, SW RM 2757 (AQSA) , AUBURN, WA 98001 | Contact | Contact method not published | Source | Aug 3, 2015 |
Research next steps
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.