IDV vehicle
GS10F060AA
SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, CONSULTING, CONDUCT ACCEPTANCE, FUNCTIONAL AND POST ACCEPTANCE TESTING, TESTING, INTEGRATION OF THE PAYLOAD FOR FLIGHT CUSTOMER AGENCY, SUPPORT PROVIDED DURING LAUNCH, ORBITAL MANEUVERING AND SATELLITE SEPARATION FROM THE SPACECRAFT. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL B
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | General Services Administration |
| Office | GSA/FAS/PSHC/PROF SRVCS SCHED-PSS |
| NAICS | 541330 — Engineering Services |
| PSC | R425 — Engineering and Technical Services |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIXED PRICE WITH ECONOMIC PRICE ADJUSTMENT |
| Obligations | $0 |
| Current contract value | Not reported |
| Potential contract value / ceiling | $80.1M |
| Start date | Dec 13, 2012 |
| Current end date | Not available |
| Potential end date | Not available |
| Latest award activity | Sep 4, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 82 of 82 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Sep 4, 2026 | PA0062 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Jun 8, 2026 | PSA917 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Jun 2, 2026 | PS0061 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Apr 8, 2026 | PSA914 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Jan 20, 2026 | PO0057 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Jan 7, 2026 | PA0058 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Dec 9, 2025 | PSA907 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Sep 9, 2025 | PSA905 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Jul 23, 2025 | PSA904 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| May 7, 2025 | PA0056 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| May 6, 2025 | PSA897 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Apr 29, 2025 | PA0055 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Apr 8, 2025 | PSA893 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Feb 27, 2025 | PO0054 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Jan 28, 2025 | PSA888 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Dec 26, 2024 | PSA887 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Aug 19, 2024 | PSA885 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Jun 3, 2024 | PSA883 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Apr 23, 2024 | PSA882 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Dec 13, 2023 | PSA869 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Dec 7, 2023 | PA0053 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Dec 6, 2023 | PA0052 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Dec 1, 2023 | PA0051 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Nov 8, 2023 | PSA863 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Oct 14, 2022 | PO0044 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Jul 4, 2022 | PSA847 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Jun 6, 2022 | PA0047 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Jun 2, 2022 | PA0046 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Apr 14, 2022 | PSA842 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Feb 25, 2022 | PA0043 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Oct 12, 2021 | PSA837 | $0 | EO14042 THIS CONTRACT IS HEREBY MODIFIED TO INCORPORATE FEDERAL ACQUISITION REGULATION (FAR) CLAUSE 52.223-99 ENSURING ADEQUATE COVID-19 SAFETY PROTOCOLS FOR FEDERAL CONTRACTORS - FEDERAL SUPPLY SCHEDULE CONTRACT |
| Sep 14, 2021 | PSA834 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| May 21, 2021 | PSA832 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Apr 13, 2021 | PA0042 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Nov 23, 2020 | PSA826 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Aug 20, 2020 | PSA824 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Feb 4, 2020 | PSA812 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Oct 2, 2019 | PSA808 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Oct 1, 2019 | PA0041 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| May 7, 2019 | PMA765 | $0 | SIN: 00CORP 500ORDER-LEVEL MATERIALS (OLMS) ARE SUPPLIES AND/OR SERVICES ACQUIRED IN DIRECT SUPPORT OF AN INDIVIDUAL TASK OR DELIVERY ORDER PLACED AGAINST A FEDERAL SUPPLY SCHEDULE (FSS) CONTRACT OR FSS BLANKET PURCHASE AGREEMENT (BPA). OLMS ARE NOT DEFINED, PRICED, OR AWARDED AT THE FSS CONTRACT LEVEL. THEY ARE UNKNOWN BEFORE A TASK OR DELIVERY ORDER IS PLACED AGAINST THE FSS CONTRACT OR FSS BPA. OLMS ARE ONLY AUTHORIZED FOR INCLUSION AT THE ORDER LEVEL UNDER A TIME-AND-MATERIALS (T&M)OR LABOR-HOUR (LH) CONTRACT LINE ITEM NUMBER (CLIN) AND ARE SUBJECT TO A NOT TOEXCEED (NTE) CEILING PRICE. OLMS INCLUDE DIRECT MATERIALS, SUBCONTRACTS FOR SUPPLIES AND INCIDENTAL SERVICES FOR WHICH THERE IS NOT A LABOR CATEGORY SPECIFIEDIN THE FSS CONTRACT, OTHER DIRECT COSTS (SEPARATE FROM THOSE UNDER ODC SINS), AND INDIRECT COSTS. OLMS ARE PURCHASED UNDER THE AUTHORITY OF THE FSS PROGRAM AND ARE NOT OPEN MARKET ITEMS. ITEMS AWARDED UNDER ANCILLARY SUPPLIES/SERVICES OR OTHER DIRECT COST (ODC |
| Jan 11, 2019 | PM0040 | $0 | SIN: 00CORP 500ORDER-LEVEL MATERIALS (OLMS) ARE SUPPLIES AND/OR SERVICES ACQUIRED IN DIRECT SUPPORT OF AN INDIVIDUAL TASK OR DELIVERY ORDER PLACED AGAINST A FEDERAL SUPPLY SCHEDULE (FSS) CONTRACT OR FSS BLANKET PURCHASE AGREEMENT (BPA). OLMS ARE NOT DEFINED, PRICED, OR AWARDED AT THE FSS CONTRACT LEVEL. THEY ARE UNKNOWN BEFORE A TASK OR DELIVERY ORDER IS PLACED AGAINST THE FSS CONTRACT OR FSS BPA. OLMS ARE ONLY AUTHORIZED FOR INCLUSION AT THE ORDER LEVEL UNDER A TIME-AND-MATERIALS (T&M)OR LABOR-HOUR (LH) CONTRACT LINE ITEM NUMBER (CLIN) AND ARE SUBJECT TO A NOT TOEXCEED (NTE) CEILING PRICE. OLMS INCLUDE DIRECT MATERIALS, SUBCONTRACTS FOR SUPPLIES AND INCIDENTAL SERVICES FOR WHICH THERE IS NOT A LABOR CATEGORY SPECIFIEDIN THE FSS CONTRACT, OTHER DIRECT COSTS (SEPARATE FROM THOSE UNDER ODC SINS), AND INDIRECT COSTS. OLMS ARE PURCHASED UNDER THE AUTHORITY OF THE FSS PROGRAM AND ARE NOT OPEN MARKET ITEMS. ITEMS AWARDED UNDER ANCILLARY SUPPLIES/SERVICES OR OTHER DIRECT COST (ODC |
| Dec 18, 2018 | PMA723 | $0 | SIN: 00CORP 500ORDER-LEVEL MATERIALS (OLMS) ARE SUPPLIES AND/OR SERVICES ACQUIRED IN DIRECT SUPPORT OF AN INDIVIDUAL TASK OR DELIVERY ORDER PLACED AGAINST A FEDERAL SUPPLY SCHEDULE (FSS) CONTRACT OR FSS BLANKET PURCHASE AGREEMENT (BPA). OLMS ARE NOT DEFINED, PRICED, OR AWARDED AT THE FSS CONTRACT LEVEL. THEY ARE UNKNOWN BEFORE A TASK OR DELIVERY ORDER IS PLACED AGAINST THE FSS CONTRACT OR FSS BPA. OLMS ARE ONLY AUTHORIZED FOR INCLUSION AT THE ORDER LEVEL UNDER A TIME-AND-MATERIALS (T&M)OR LABOR-HOUR (LH) CONTRACT LINE ITEM NUMBER (CLIN) AND ARE SUBJECT TO A NOT TOEXCEED (NTE) CEILING PRICE. OLMS INCLUDE DIRECT MATERIALS, SUBCONTRACTS FOR SUPPLIES AND INCIDENTAL SERVICES FOR WHICH THERE IS NOT A LABOR CATEGORY SPECIFIEDIN THE FSS CONTRACT, OTHER DIRECT COSTS (SEPARATE FROM THOSE UNDER ODC SINS), AND INDIRECT COSTS. OLMS ARE PURCHASED UNDER THE AUTHORITY OF THE FSS PROGRAM AND ARE NOT OPEN MARKET ITEMS. ITEMS AWARDED UNDER ANCILLARY SUPPLIES/SERVICES OR OTHER DIRECT COST (ODC |
| Sep 6, 2018 | PM0037 | $0 | SIN: 00CORP 500ORDER-LEVEL MATERIALS (OLMS) ARE SUPPLIES AND/OR SERVICES ACQUIRED IN DIRECT SUPPORT OF AN INDIVIDUAL TASK OR DELIVERY ORDER PLACED AGAINST A FEDERAL SUPPLY SCHEDULE (FSS) CONTRACT OR FSS BLANKET PURCHASE AGREEMENT (BPA). OLMS ARE NOT DEFINED, PRICED, OR AWARDED AT THE FSS CONTRACT LEVEL. THEY ARE UNKNOWN BEFORE A TASK OR DELIVERY ORDER IS PLACED AGAINST THE FSS CONTRACT OR FSS BPA. OLMS ARE ONLY AUTHORIZED FOR INCLUSION AT THE ORDER LEVEL UNDER A TIME-AND-MATERIALS (T&M)OR LABOR-HOUR (LH) CONTRACT LINE ITEM NUMBER (CLIN) AND ARE SUBJECT TO A NOT TOEXCEED (NTE) CEILING PRICE. OLMS INCLUDE DIRECT MATERIALS, SUBCONTRACTS FOR SUPPLIES AND INCIDENTAL SERVICES FOR WHICH THERE IS NOT A LABOR CATEGORY SPECIFIEDIN THE FSS CONTRACT, OTHER DIRECT COSTS (SEPARATE FROM THOSE UNDER ODC SINS), AND INDIRECT COSTS. OLMS ARE PURCHASED UNDER THE AUTHORITY OF THE FSS PROGRAM AND ARE NOT "OPEN MARKET ITEMS." ITEMS AWARDED UNDER ANCILLARY SUPPLIES/SERVICES OR OTHER DIRECT COST (ODC |
| Sep 6, 2018 | PM0039 | $0 | SIN: 00CORP 500ORDER-LEVEL MATERIALS (OLMS) ARE SUPPLIES AND/OR SERVICES ACQUIRED IN DIRECT SUPPORT OF AN INDIVIDUAL TASK OR DELIVERY ORDER PLACED AGAINST A FEDERAL SUPPLY SCHEDULE (FSS) CONTRACT OR FSS BLANKET PURCHASE AGREEMENT (BPA). OLMS ARE NOT DEFINED, PRICED, OR AWARDED AT THE FSS CONTRACT LEVEL. THEY ARE UNKNOWN BEFORE A TASK OR DELIVERY ORDER IS PLACED AGAINST THE FSS CONTRACT OR FSS BPA. OLMS ARE ONLY AUTHORIZED FOR INCLUSION AT THE ORDER LEVEL UNDER A TIME-AND-MATERIALS (T&M)OR LABOR-HOUR (LH) CONTRACT LINE ITEM NUMBER (CLIN) AND ARE SUBJECT TO A NOT TOEXCEED (NTE) CEILING PRICE. OLMS INCLUDE DIRECT MATERIALS, SUBCONTRACTS FOR SUPPLIES AND INCIDENTAL SERVICES FOR WHICH THERE IS NOT A LABOR CATEGORY SPECIFIEDIN THE FSS CONTRACT, OTHER DIRECT COSTS (SEPARATE FROM THOSE UNDER ODC SINS), AND INDIRECT COSTS. OLMS ARE PURCHASED UNDER THE AUTHORITY OF THE FSS PROGRAM AND ARE NOT "OPEN MARKET ITEMS." ITEMS AWARDED UNDER ANCILLARY SUPPLIES/SERVICES OR OTHER DIRECT COST (ODC |
| May 8, 2018 | PMA650 | $0 | SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, CONSULTING, CONDUCT ACCEPTANCE, FUNCTIONAL AND POST ACCEPTANCE TESTING, TESTING, INTEGRATION OF THE PAYLOAD FOR FLIGHT CUSTOMER AGENCY, SUPPORT PROVIDED DURING LAUNCH, ORBITAL MANEUVERING AND SATELLITE SEPARATION FROM THE SPACECRAFT. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL B |
| Apr 5, 2018 | PM0035 | $0 | SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, CONSULTING, CONDUCT ACCEPTANCE, FUNCTIONAL AND POST ACCEPTANCE TESTING, TESTING, INTEGRATION OF THE PAYLOAD FOR FLIGHT CUSTOMER AGENCY, SUPPORT PROVIDED DURING LAUNCH, ORBITAL MANEUVERING AND SATELLITE SEPARATION FROM THE SPACECRAFT. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL B |
| Dec 8, 2017 | PO0030EXERCISEOPTION | $0 | SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, CONSULTING, CONDUCT ACCEPTANCE, FUNCTIONAL AND POST ACCEPTANCE TESTING, TESTING, INTEGRATION OF THE PAYLOAD FOR FLIGHT CUSTOMER AGENCY, SUPPORT PROVIDED DURING LAUNCH, ORBITAL MANEUVERING AND SATELLITE SEPARATION FROM THE SPACECRAFT. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL B |
| Dec 7, 2017 | PO0034REREPSMALLBUSS | $0 | SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, CONSULTING, CONDUCT ACCEPTANCE, FUNCTIONAL AND POST ACCEPTANCE TESTING, TESTING, INTEGRATION OF THE PAYLOAD FOR FLIGHT CUSTOMER AGENCY, SUPPORT PROVIDED DURING LAUNCH, ORBITAL MANEUVERING AND SATELLITE SEPARATION FROM THE SPACECRAFT. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL B |
| Dec 7, 2017 | PSA594REVTERMCOND | $0 | SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, CONSULTING, CONDUCT ACCEPTANCE, FUNCTIONAL AND POST ACCEPTANCE TESTING, TESTING, INTEGRATION OF THE PAYLOAD FOR FLIGHT CUSTOMER AGENCY, SUPPORT PROVIDED DURING LAUNCH, ORBITAL MANEUVERING AND SATELLITE SEPARATION FROM THE SPACECRAFT. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL B |
| Jul 27, 2017 | PSA580REVTERMCOND | $0 | SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, CONSULTING, CONDUCT ACCEPTANCE, FUNCTIONAL AND POST ACCEPTANCE TESTING, TESTING, INTEGRATION OF THE PAYLOAD FOR FLIGHT CUSTOMER AGENCY, SUPPORT PROVIDED DURING LAUNCH, ORBITAL MANEUVERING AND SATELLITE SEPARATION FROM THE SPACECRAFT. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL B |
| Jul 14, 2017 | PO0033SMALLBUSSTYPE | $0 | SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, CONSULTING, CONDUCT ACCEPTANCE, FUNCTIONAL AND POST ACCEPTANCE TESTING, TESTING, INTEGRATION OF THE PAYLOAD FOR FLIGHT CUSTOMER AGENCY, SUPPORT PROVIDED DURING LAUNCH, ORBITAL MANEUVERING AND SATELLITE SEPARATION FROM THE SPACECRAFT. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL B |
| Jun 12, 2017 | CMA541REVTERMCOND | $0 | SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, CONSULTING, CONDUCT ACCEPTANCE, FUNCTIONAL AND POST ACCEPTANCE TESTING, TESTING, INTEGRATION OF THE PAYLOAD FOR FLIGHT CUSTOMER AGENCY, SUPPORT PROVIDED DURING LAUNCH, ORBITAL MANEUVERING AND SATELLITE SEPARATION FROM THE SPACECRAFT. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL B |
| May 24, 2017 | PA0032REASSIGNMENT | $0 | SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, CONSULTING, CONDUCT ACCEPTANCE, FUNCTIONAL AND POST ACCEPTANCE TESTING, TESTING, INTEGRATION OF THE PAYLOAD FOR FLIGHT CUSTOMER AGENCY, SUPPORT PROVIDED DURING LAUNCH, ORBITAL MANEUVERING AND SATELLITE SEPARATION FROM THE SPACECRAFT. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL B |
| May 18, 2017 | PA0031REASSIGNMENT | $0 | SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, CONSULTING, CONDUCT ACCEPTANCE, FUNCTIONAL AND POST ACCEPTANCE TESTING, TESTING, INTEGRATION OF THE PAYLOAD FOR FLIGHT CUSTOMER AGENCY, SUPPORT PROVIDED DURING LAUNCH, ORBITAL MANEUVERING AND SATELLITE SEPARATION FROM THE SPACECRAFT. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL B |
| Oct 11, 2016 | PA0029AUTHNEG | $0 | SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, CONSULTING, CONDUCT ACCEPTANCE, FUNCTIONAL AND POST ACCEPTANCE TESTING, TESTING, INTEGRATION OF THE PAYLOAD FOR FLIGHT CUSTOMER AGENCY, SUPPORT PROVIDED DURING LAUNCH, ORBITAL MANEUVERING AND SATELLITE SEPARATION FROM THE SPACECRAFT. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL B |
| Jun 15, 2016 | PA0028REASSIGNMENT | $0 | SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, CONSULTING, CONDUCT ACCEPTANCE, FUNCTIONAL AND POST ACCEPTANCE TESTING, TESTING, INTEGRATION OF THE PAYLOAD FOR FLIGHT CUSTOMER AGENCY, SUPPORT PROVIDED DURING LAUNCH, ORBITAL MANEUVERING AND SATELLITE SEPARATION FROM THE SPACECRAFT. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL B |
| May 5, 2016 | PA0027REASSIGNMENT | $0 | SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, AND CONSULTING. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL BE IDENTIFIED AND DESIGNED IN THIS STAGE INCLUDING TRAINING, OPERATION AND MAINTENANCE REQUIREMENTS, AND REPLACEMENT PROCEDURES. PES DOES NOT INCLUDE ARCHITECT-ENGINEER SERVICES AS DEFINED IN THE BROOKS ACT AND FAR PART 2. PES DOES NOT INCLUDE DESIGN OR CONSTRUCTION SERVICES AS DEFINED IN TH |
| Jan 2, 2016 | CMA475REVTERMCOND | $0 | SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, AND CONSULTING. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL BE IDENTIFIED AND DESIGNED IN THIS STAGE INCLUDING TRAINING, OPERATION AND MAINTENANCE REQUIREMENTS, AND REPLACEMENT PROCEDURES. PES DOES NOT INCLUDE ARCHITECT-ENGINEER SERVICES AS DEFINED IN THE BROOKS ACT AND FAR PART 2. PES DOES NOT INCLUDE DESIGN OR CONSTRUCTION SERVICES AS DEFINED IN TH |
| Dec 22, 2015 | PA0026REASSIGNMENT | $0 | SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, AND CONSULTING. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL BE IDENTIFIED AND DESIGNED IN THIS STAGE INCLUDING TRAINING, OPERATION AND MAINTENANCE REQUIREMENTS, AND REPLACEMENT PROCEDURES. PES DOES NOT INCLUDE ARCHITECT-ENGINEER SERVICES AS DEFINED IN THE BROOKS ACT AND FAR PART 2. PES DOES NOT INCLUDE DESIGN OR CONSTRUCTION SERVICES AS DEFINED IN TH |
| Oct 1, 2015 | CMA473REVTERMCOND | $0 | SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, AND CONSULTING. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL BE IDENTIFIED AND DESIGNED IN THIS STAGE INCLUDING TRAINING, OPERATION AND MAINTENANCE REQUIREMENTS, AND REPLACEMENT PROCEDURES. PES DOES NOT INCLUDE ARCHITECT-ENGINEER SERVICES AS DEFINED IN THE BROOKS ACT AND FAR PART 2. PES DOES NOT INCLUDE DESIGN OR CONSTRUCTION SERVICES AS DEFINED IN TH |
| Oct 1, 2015 | PA0023AUTHNEG | $0 | SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, AND CONSULTING. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL BE IDENTIFIED AND DESIGNED IN THIS STAGE INCLUDING TRAINING, OPERATION AND MAINTENANCE REQUIREMENTS, AND REPLACEMENT PROCEDURES. PES DOES NOT INCLUDE ARCHITECT-ENGINEER SERVICES AS DEFINED IN THE BROOKS ACT AND FAR PART 2. PES DOES NOT INCLUDE DESIGN OR CONSTRUCTION SERVICES AS DEFINED IN TH |
| Sep 9, 2015 | PA0022AUTHNEG | $0 | SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, AND CONSULTING. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL BE IDENTIFIED AND DESIGNED IN THIS STAGE INCLUDING TRAINING, OPERATION AND MAINTENANCE REQUIREMENTS, AND REPLACEMENT PROCEDURES. PES DOES NOT INCLUDE ARCHITECT-ENGINEER SERVICES AS DEFINED IN THE BROOKS ACT AND FAR PART 2. PES DOES NOT INCLUDE DESIGN OR CONSTRUCTION SERVICES AS DEFINED IN TH |
| Sep 2, 2015 | PA0021REASSIGNMENT | $0 | SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, AND CONSULTING. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL BE IDENTIFIED AND DESIGNED IN THIS STAGE INCLUDING TRAINING, OPERATION AND MAINTENANCE REQUIREMENTS, AND REPLACEMENT PROCEDURES. PES DOES NOT INCLUDE ARCHITECT-ENGINEER SERVICES AS DEFINED IN THE BROOKS ACT AND FAR PART 2. PES DOES NOT INCLUDE DESIGN OR CONSTRUCTION SERVICES AS DEFINED IN T |
| Jul 21, 2015 | PS0020GEOCOVCHG | $0 | SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, AND CONSULTING. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL BE IDENTIFIED AND DESIGNED IN THIS STAGE INCLUDING TRAINING, OPERATION AND MAINTENANCE REQUIREMENTS, AND REPLACEMENT PROCEDURES. PES DOES NOT INCLUDE ARCHITECT-ENGINEER SERVICES AS DEFINED IN THE BROOKS ACT AND FAR PART 2. PES DOES NOT INCLUDE DESIGN OR CONSTRUCTION SERVICES AS DEFINED IN T |
| Apr 9, 2015 | PA0019REASSIGNMENT | $0 | SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, AND CONSULTING. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL BE IDENTIFIED AND DESIGNED IN THIS STAGE INCLUDING TRAINING, OPERATION AND MAINTENANCE REQUIREMENTS, AND REPLACEMENT PROCEDURES. PES DOES NOT INCLUDE ARCHITECT-ENGINEER SERVICES AS DEFINED IN THE BROOKS ACT AND FAR PART 2. PES DOES NOT INCLUDE DESIGN OR CONSTRUCTION SERVICES AS DEFINED IN T |
| Nov 5, 2014 | PA0017REASSIGNMENT | $0 | SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, AND CONSULTING. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL BE IDENTIFIED AND DESIGNED IN THIS STAGE INCLUDING TRAINING, OPERATION AND MAINTENANCE REQUIREMENTS, AND REPLACEMENT PROCEDURES. PES DOES NOT INCLUDE ARCHITECT-ENGINEER SERVICES AS DEFINED IN THE BROOKS ACT AND FAR PART 2. PES DOES NOT INCLUDE DESIGN OR CONSTRUCTION SERVICES AS DEFINED IN T |
| Sep 9, 2014 | PA0016ADDRESSCHG | $0 | SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, AND CONSULTING. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL BE IDENTIFIED AND DESIGNED IN THIS STAGE INCLUDING TRAINING, OPERATION AND MAINTENANCE REQUIREMENTS, AND REPLACEMENT PROCEDURES. PES DOES NOT INCLUDE ARCHITECT-ENGINEER SERVICES AS DEFINED IN THE BROOKS ACT AND FAR PART 2. PES DOES NOT INCLUDE DESIGN OR CONSTRUCTION SERVICES AS DEFINED IN T |
| Aug 10, 2014 | PA0015REASSIGNMENT | $0 | SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, AND CONSULTING. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL BE IDENTIFIED AND DESIGNED IN THIS STAGE INCLUDING TRAINING, OPERATION AND MAINTENANCE REQUIREMENTS, AND REPLACEMENT PROCEDURES. PES DOES NOT INCLUDE ARCHITECT-ENGINEER SERVICES AS DEFINED IN THE BROOKS ACT AND FAR PART 2. PES DOES NOT INCLUDE DESIGN OR CONSTRUCTION SERVICES AS DEFINED IN T |
| Jun 7, 2014 | PA0014REASSIGNMENT | $0 | SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, AND CONSULTING. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL BE IDENTIFIED AND DESIGNED IN THIS STAGE INCLUDING TRAINING, OPERATION AND MAINTENANCE REQUIREMENTS, AND REPLACEMENT PROCEDURES. PES DOES NOT INCLUDE ARCHITECT-ENGINEER SERVICES AS DEFINED IN THE BROOKS ACT AND FAR PART 2. PES DOES NOT INCLUDE DESIGN OR CONSTRUCTION SERVICES AS DEFINED IN T |
| Feb 19, 2014 | PS0012ADDLABCAT | $0 | SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, AND CONSULTING. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL BE IDENTIFIED AND DESIGNED IN THIS STAGE INCLUDING TRAINING, OPERATION AND MAINTENANCE REQUIREMENTS, AND REPLACEMENT PROCEDURES. PES DOES NOT INCLUDE ARCHITECT-ENGINEER SERVICES AS DEFINED IN THE BROOKS ACT AND FAR PART 2. PES DOES NOT INCLUDE DESIGN OR CONSTRUCTION SERVICES AS DEFINED IN T |
| Feb 19, 2014 | PS0012ADDSINS | $0 | SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, AND CONSULTING. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL BE IDENTIFIED AND DESIGNED IN THIS STAGE INCLUDING TRAINING, OPERATION AND MAINTENANCE REQUIREMENTS, AND REPLACEMENT PROCEDURES. PES DOES NOT INCLUDE ARCHITECT-ENGINEER SERVICES AS DEFINED IN THE BROOKS ACT AND FAR PART 2. PES DOES NOT INCLUDE DESIGN OR CONSTRUCTION SERVICES AS DEFINED IN T |
| Jan 31, 2014 | PA0013REASSIGNMENT | $0 | SIN: 871 6SERVICES REQUIRED UNDER THIS SIN INVOLVE ALL OF THE PLANNING, BUDGET, CONTRACT AND SYSTEMS/PROGRAM MANAGEMENT FUNCTIONS REQUIRED TO PROCURE AND OR/PRODUCE, RENDER OPERATIONAL AND PROVIDE LIFE CYCLE SUPPORT (MAINTENANCE, REPAIR, SUPPLIES, ENGINEERING SPECIFIC LOGISTICS) TO (TECHNOLOGY BASED) SYSTEMS, ACTIVITIES, SUBSYSTEMS, PROJECTS, ETC. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO OPERATION AND MAINTENANCE, EVALUATION OF INSPECTION, TESTING, AND MAINTENANCE PROGRAM FOR FIRE PROTECTION AND LIFE SAFETY SYSTEMS, PROGRAM/PROJECT MANAGEMENT, TECHNOLOGY TRANSFER/INSERTION, TRAINING AND CONSULTING. EXAMPLE: DURING THIS STAGE THE ACTUAL MANUFACTURING, LAUNCH, AND PERFORMANCE MONITORING OF THE NAVIGATION SATELLITE WILL BE ASSISTED THROUGH PROJECT MANAGEMENT, CONFIGURATION MANAGEMENT, RELIABILITY ANALYSIS, ENGINEERING RETROFIT IMPROVEMENTS AND SIMILAR FUNCTIONS. PES DOES NOT INCLUDE ARCHITECT-ENGINEER SERVICES AS DEFINED IN THE BROOKS ACT AND FAR PART 2. PES DOES NOT IN |
| Oct 24, 2013 | PA0011REASSIGNMENT | $0 | SIN: 871 6SERVICES REQUIRED UNDER THIS SIN INVOLVE ALL OF THE PLANNING, BUDGET, CONTRACT AND SYSTEMS/PROGRAM MANAGEMENT FUNCTIONS REQUIRED TO PROCURE AND OR/PRODUCE, RENDER OPERATIONAL AND PROVIDE LIFE CYCLE SUPPORT (MAINTENANCE, REPAIR, SUPPLIES, ENGINEERING SPECIFIC LOGISTICS) TO (TECHNOLOGY BASED) SYSTEMS, ACTIVITIES, SUBSYSTEMS, PROJECTS, ETC. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO OPERATION AND MAINTENANCE, EVALUATION OF INSPECTION, TESTING, AND MAINTENANCE PROGRAM FOR FIRE PROTECTION AND LIFE SAFETY SYSTEMS, PROGRAM/PROJECT MANAGEMENT, TECHNOLOGY TRANSFER/INSERTION, TRAINING AND CONSULTING. EXAMPLE: DURING THIS STAGE THE ACTUAL MANUFACTURING, LAUNCH, AND PERFORMANCE MONITORING OF THE NAVIGATION SATELLITE WILL BE ASSISTED THROUGH PROJECT MANAGEMENT, CONFIGURATION MANAGEMENT, RELIABILITY ANALYSIS, ENGINEERING RETROFIT IMPROVEMENTS AND SIMILAR FUNCTIONS. PES DOES NOT INCLUDE ARCHITECT-ENGINEER SERVICES AS DEFINED IN THE BROOKS ACT AND FAR PART 2. PES DOES NOT IN |
| Oct 22, 2013 | PA0010REASSIGNMENT | $0 | SIN: 871 6SERVICES REQUIRED UNDER THIS SIN INVOLVE ALL OF THE PLANNING, BUDGET, CONTRACT AND SYSTEMS/PROGRAM MANAGEMENT FUNCTIONS REQUIRED TO PROCURE AND OR/PRODUCE, RENDER OPERATIONAL AND PROVIDE LIFE CYCLE SUPPORT (MAINTENANCE, REPAIR, SUPPLIES, ENGINEERING SPECIFIC LOGISTICS) TO (TECHNOLOGY BASED) SYSTEMS, ACTIVITIES, SUBSYSTEMS, PROJECTS, ETC. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO OPERATION AND MAINTENANCE, EVALUATION OF INSPECTION, TESTING, AND MAINTENANCE PROGRAM FOR FIRE PROTECTION AND LIFE SAFETY SYSTEMS, PROGRAM/PROJECT MANAGEMENT, TECHNOLOGY TRANSFER/INSERTION, TRAINING AND CONSULTING. EXAMPLE: DURING THIS STAGE THE ACTUAL MANUFACTURING, LAUNCH, AND PERFORMANCE MONITORING OF THE NAVIGATION SATELLITE WILL BE ASSISTED THROUGH PROJECT MANAGEMENT, CONFIGURATION MANAGEMENT, RELIABILITY ANALYSIS, ENGINEERING RETROFIT IMPROVEMENTS AND SIMILAR FUNCTIONS. PES DOES NOT INCLUDE ARCHITECT-ENGINEER SERVICES AS DEFINED IN THE BROOKS ACT AND FAR PART 2. PES DOES NOT IN |
| Jul 16, 2013 | 7 | $0 | SIN: 871 6SERVICES REQUIRED UNDER THIS SIN INVOLVE ALL OF THE PLANNING, BUDGET, CONTRACT AND SYSTEMS/PROGRAM MANAGEMENT FUNCTIONS REQUIRED TO PROCURE AND OR/PRODUCE, RENDER OPERATIONAL AND PROVIDE LIFE CYCLE SUPPORT (MAINTENANCE, REPAIR, SUPPLIES, ENGINEERING SPECIFIC LOGISTICS) TO (TECHNOLOGY BASED) SYSTEMS, ACTIVITIES, SUBSYSTEMS, PROJECTS, ETC. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO OPERATION AND MAINTENANCE, EVALUATION OF INSPECTION, TESTING, AND MAINTENANCE PROGRAM FOR FIRE PROTECTION AND LIFE SAFETY SYSTEMS, PROGRAM/PROJECT MANAGEMENT, TECHNOLOGY TRANSFER/INSERTION, TRAINING AND CONSULTING. EXAMPLE: DURING THIS STAGE THE ACTUAL MANUFACTURING, LAUNCH, AND PERFORMANCE MONITORING OF THE NAVIGATION SATELLITE WILL BE ASSISTED THROUGH PROJECT MANAGEMENT, CONFIGURATION MANAGEMENT, RELIABILITY ANALYSIS, ENGINEERING RETROFIT IMPROVEMENTS AND SIMILAR FUNCTIONS. PES DOES NOT INCLUDE ARCHITECT-ENGINEER SERVICES AS DEFINED IN THE BROOKS ACT AND FAR PART 2. PES DOES NOT IN |
| Jun 3, 2013 | 6 | $0 | SIN: 871 6SERVICES REQUIRED UNDER THIS SIN INVOLVE ALL OF THE PLANNING, BUDGET, CONTRACT AND SYSTEMS/PROGRAM MANAGEMENT FUNCTIONS REQUIRED TO PROCURE AND OR/PRODUCE, RENDER OPERATIONAL AND PROVIDE LIFE CYCLE SUPPORT (MAINTENANCE, REPAIR, SUPPLIES, ENGINEERING SPECIFIC LOGISTICS) TO (TECHNOLOGY BASED) SYSTEMS, ACTIVITIES, SUBSYSTEMS, PROJECTS, ETC. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO OPERATION AND MAINTENANCE, EVALUATION OF INSPECTION, TESTING, AND MAINTENANCE PROGRAM FOR FIRE PROTECTION AND LIFE SAFETY SYSTEMS, PROGRAM/PROJECT MANAGEMENT, TECHNOLOGY TRANSFER/INSERTION, TRAINING AND CONSULTING. EXAMPLE: DURING THIS STAGE THE ACTUAL MANUFACTURING, LAUNCH, AND PERFORMANCE MONITORING OF THE NAVIGATION SATELLITE WILL BE ASSISTED THROUGH PROJECT MANAGEMENT, CONFIGURATION MANAGEMENT, RELIABILITY ANALYSIS, ENGINEERING RETROFIT IMPROVEMENTS AND SIMILAR FUNCTIONS. PES DOES NOT INCLUDE ARCHITECT-ENGINEER SERVICES AS DEFINED IN THE BROOKS ACT AND FAR PART 2. PES DOES NOT IN |
| Mar 14, 2013 | 4 | $0 | SIN: 871 6SERVICES REQUIRED UNDER THIS SIN INVOLVE ALL OF THE PLANNING, BUDGET, CONTRACT AND SYSTEMS/PROGRAM MANAGEMENT FUNCTIONS REQUIRED TO PROCURE AND OR/PRODUCE, RENDER OPERATIONAL AND PROVIDE LIFE CYCLE SUPPORT (MAINTENANCE, REPAIR, SUPPLIES, ENGINEERING SPECIFIC LOGISTICS) TO (TECHNOLOGY BASED) SYSTEMS, ACTIVITIES, SUBSYSTEMS, PROJECTS, ETC. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO OPERATION AND MAINTENANCE, EVALUATION OF INSPECTION, TESTING, AND MAINTENANCE PROGRAM FOR FIRE PROTECTION AND LIFE SAFETY SYSTEMS, PROGRAM/PROJECT MANAGEMENT, TECHNOLOGY TRANSFER/INSERTION, TRAINING AND CONSULTING. EXAMPLE: DURING THIS STAGE THE ACTUAL MANUFACTURING, LAUNCH, AND PERFORMANCE MONITORING OF THE NAVIGATION SATELLITE WILL BE ASSISTED THROUGH PROJECT MANAGEMENT, CONFIGURATION MANAGEMENT, RELIABILITY ANALYSIS, ENGINEERING RETROFIT IMPROVEMENTS AND SIMILAR FUNCTIONS. PES DOES NOT INCLUDE ARCHITECT-ENGINEER SERVICES AS DEFINED IN THE BROOKS ACT AND FAR PART 2. PES DOES NOT IN |
| Mar 14, 2013 | 5 | $0 | SIN: 871 6SERVICES REQUIRED UNDER THIS SIN INVOLVE ALL OF THE PLANNING, BUDGET, CONTRACT AND SYSTEMS/PROGRAM MANAGEMENT FUNCTIONS REQUIRED TO PROCURE AND OR/PRODUCE, RENDER OPERATIONAL AND PROVIDE LIFE CYCLE SUPPORT (MAINTENANCE, REPAIR, SUPPLIES, ENGINEERING SPECIFIC LOGISTICS) TO (TECHNOLOGY BASED) SYSTEMS, ACTIVITIES, SUBSYSTEMS, PROJECTS, ETC. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO OPERATION AND MAINTENANCE, EVALUATION OF INSPECTION, TESTING, AND MAINTENANCE PROGRAM FOR FIRE PROTECTION AND LIFE SAFETY SYSTEMS, PROGRAM/PROJECT MANAGEMENT, TECHNOLOGY TRANSFER/INSERTION, TRAINING AND CONSULTING. EXAMPLE: DURING THIS STAGE THE ACTUAL MANUFACTURING, LAUNCH, AND PERFORMANCE MONITORING OF THE NAVIGATION SATELLITE WILL BE ASSISTED THROUGH PROJECT MANAGEMENT, CONFIGURATION MANAGEMENT, RELIABILITY ANALYSIS, ENGINEERING RETROFIT IMPROVEMENTS AND SIMILAR FUNCTIONS. PES DOES NOT INCLUDE ARCHITECT-ENGINEER SERVICES AS DEFINED IN THE BROOKS ACT AND FAR PART 2. PES DOES NOT IN |
| Feb 21, 2013 | 3 | $0 | SIN: 871 6SERVICES REQUIRED UNDER THIS SIN INVOLVE ALL OF THE PLANNING, BUDGET, CONTRACT AND SYSTEMS/PROGRAM MANAGEMENT FUNCTIONS REQUIRED TO PROCURE AND OR/PRODUCE, RENDER OPERATIONAL AND PROVIDE LIFE CYCLE SUPPORT (MAINTENANCE, REPAIR, SUPPLIES, ENGINEERING SPECIFIC LOGISTICS) TO (TECHNOLOGY BASED) SYSTEMS, ACTIVITIES, SUBSYSTEMS, PROJECTS, ETC. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO OPERATION AND MAINTENANCE, EVALUATION OF INSPECTION, TESTING, AND MAINTENANCE PROGRAM FOR FIRE PROTECTION AND LIFE SAFETY SYSTEMS, PROGRAM/PROJECT MANAGEMENT, TECHNOLOGY TRANSFER/INSERTION, TRAINING AND CONSULTING. EXAMPLE: DURING THIS STAGE THE ACTUAL MANUFACTURING, LAUNCH, AND PERFORMANCE MONITORING OF THE NAVIGATION SATELLITE WILL BE ASSISTED THROUGH PROJECT MANAGEMENT, CONFIGURATION MANAGEMENT, RELIABILITY ANALYSIS, ENGINEERING RETROFIT IMPROVEMENTS AND SIMILAR FUNCTIONS. PES DOES NOT INCLUDE ARCHITECT-ENGINEER SERVICES AS DEFINED IN THE BROOKS ACT AND FAR PART 2. PES DOES NOT IN |
| Dec 18, 2012 | 2 | $0 | SIN: 871 6SERVICES REQUIRED UNDER THIS SIN INVOLVE ALL OF THE PLANNING, BUDGET, CONTRACT AND SYSTEMS/PROGRAM MANAGEMENT FUNCTIONS REQUIRED TO PROCURE AND OR/PRODUCE, RENDER OPERATIONAL AND PROVIDE LIFE CYCLE SUPPORT (MAINTENANCE, REPAIR, SUPPLIES, ENGINEERING SPECIFIC LOGISTICS) TO (TECHNOLOGY BASED) SYSTEMS, ACTIVITIES, SUBSYSTEMS, PROJECTS, ETC. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO OPERATION AND MAINTENANCE, EVALUATION OF INSPECTION, TESTING, AND MAINTENANCE PROGRAM FOR FIRE PROTECTION AND LIFE SAFETY SYSTEMS, PROGRAM/PROJECT MANAGEMENT, TECHNOLOGY TRANSFER/INSERTION, TRAINING AND CONSULTING. EXAMPLE: DURING THIS STAGE THE ACTUAL MANUFACTURING, LAUNCH, AND PERFORMANCE MONITORING OF THE NAVIGATION SATELLITE WILL BE ASSISTED THROUGH PROJECT MANAGEMENT, CONFIGURATION MANAGEMENT, RELIABILITY ANALYSIS, ENGINEERING RETROFIT IMPROVEMENTS AND SIMILAR FUNCTIONS. PES DOES NOT INCLUDE ARCHITECT-ENGINEER SERVICES AS DEFINED IN THE BROOKS ACT AND FAR PART 2. PES DOES NOT IN |
| Dec 12, 2012 | 0 | $0 | SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, CONSULTING, CONDUCT ACCEPTANCE, FUNCTIONAL AND POST ACCEPTANCE TESTING, TESTING, INTEGRATION OF THE PAYLOAD FOR FLIGHT CUSTOMER AGENCY, SUPPORT PROVIDED DURING LAUNCH, ORBITAL MANEUVERING AND SATELLITE SEPARATION FROM THE SPACECRAFT. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL B |
| Dec 12, 2012 | 1 | $0 | SIN: 871 6SERVICES REQUIRED UNDER THIS SIN INVOLVE ALL OF THE PLANNING, BUDGET, CONTRACT AND SYSTEMS/PROGRAM MANAGEMENT FUNCTIONS REQUIRED TO PROCURE AND OR/PRODUCE, RENDER OPERATIONAL AND PROVIDE LIFE CYCLE SUPPORT (MAINTENANCE, REPAIR, SUPPLIES, ENGINEERING SPECIFIC LOGISTICS) TO (TECHNOLOGY BASED) SYSTEMS, ACTIVITIES, SUBSYSTEMS, PROJECTS, ETC. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO OPERATION AND MAINTENANCE, EVALUATION OF INSPECTION, TESTING, AND MAINTENANCE PROGRAM FOR FIRE PROTECTION AND LIFE SAFETY SYSTEMS, PROGRAM/PROJECT MANAGEMENT, TECHNOLOGY TRANSFER/INSERTION, TRAINING AND CONSULTING. EXAMPLE: DURING THIS STAGE THE ACTUAL MANUFACTURING, LAUNCH, AND PERFORMANCE MONITORING OF THE NAVIGATION SATELLITE WILL BE ASSISTED THROUGH PROJECT MANAGEMENT, CONFIGURATION MANAGEMENT, RELIABILITY ANALYSIS, ENGINEERING RETROFIT IMPROVEMENTS AND SIMILAR FUNCTIONS. PES DOES NOT INCLUDE ARCHITECT-ENGINEER SERVICES AS DEFINED IN THE BROOKS ACT AND FAR PART 2. PES DOES NOT IN |
Buyer contacts from matching notices
Matched on exact award/solicitation identifier and awarding agency. Source dates describe the notice, not current contact verification.
| Contact | Role | Published contact methods | Evidence | Source date |
|---|---|---|---|---|
| National Customer Service | Contact | Contact method not published | Source | Sep 27, 2019 |
| National Customer Service | Contact | Contact method not published | Source | Sep 25, 2019 |
| National Customer Service GSA, FAS, PSHC, 400 15TH ST, SW RM 2757 (QRA) , AUBURN, WA 98001 | Contact | Contact method not published | Source | Jun 10, 2019 |
| National Customer Service GSA, FAS, PSHC, 400 15TH ST, SW RM 2757 (QRA) , AUBURN, WA 98001 | Contact | Contact method not published | Source | Jun 10, 2019 |
Research next steps
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.