IDV vehicle

GS10F060AA

SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, CONSULTING, CONDUCT ACCEPTANCE, FUNCTIONAL AND POST ACCEPTANCE TESTING, TESTING, INTEGRATION OF THE PAYLOAD FOR FLIGHT CUSTOMER AGENCY, SUPPORT PROVIDED DURING LAUNCH, ORBITAL MANEUVERING AND SATELLITE SEPARATION FROM THE SPACECRAFT. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL B

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyGeneral Services Administration
OfficeGSA/FAS/PSHC/PROF SRVCS SCHED-PSS
NAICS541330 — Engineering Services
PSCR425 — Engineering and Technical Services
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIXED PRICE WITH ECONOMIC PRICE ADJUSTMENT
Obligations$0
Current contract valueNot reported
Potential contract value / ceiling$80.1M
Start dateDec 13, 2012
Current end dateNot available
Potential end dateNot available
Latest award activitySep 4, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 82 of 82 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Sep 4, 2026PA0062$0FEDERAL SUPPLY SCHEDULE CONTRACT
Jun 8, 2026PSA917$0FEDERAL SUPPLY SCHEDULE CONTRACT
Jun 2, 2026PS0061$0FEDERAL SUPPLY SCHEDULE CONTRACT
Apr 8, 2026PSA914$0FEDERAL SUPPLY SCHEDULE CONTRACT
Jan 20, 2026PO0057$0FEDERAL SUPPLY SCHEDULE CONTRACT
Jan 7, 2026PA0058$0FEDERAL SUPPLY SCHEDULE CONTRACT
Dec 9, 2025PSA907$0FEDERAL SUPPLY SCHEDULE CONTRACT
Sep 9, 2025PSA905$0FEDERAL SUPPLY SCHEDULE CONTRACT
Jul 23, 2025PSA904$0FEDERAL SUPPLY SCHEDULE CONTRACT
May 7, 2025PA0056$0FEDERAL SUPPLY SCHEDULE CONTRACT
May 6, 2025PSA897$0FEDERAL SUPPLY SCHEDULE CONTRACT
Apr 29, 2025PA0055$0FEDERAL SUPPLY SCHEDULE CONTRACT
Apr 8, 2025PSA893$0FEDERAL SUPPLY SCHEDULE CONTRACT
Feb 27, 2025PO0054$0FEDERAL SUPPLY SCHEDULE CONTRACT
Jan 28, 2025PSA888$0FEDERAL SUPPLY SCHEDULE CONTRACT
Dec 26, 2024PSA887$0FEDERAL SUPPLY SCHEDULE CONTRACT
Aug 19, 2024PSA885$0FEDERAL SUPPLY SCHEDULE CONTRACT
Jun 3, 2024PSA883$0FEDERAL SUPPLY SCHEDULE CONTRACT
Apr 23, 2024PSA882$0FEDERAL SUPPLY SCHEDULE CONTRACT
Dec 13, 2023PSA869$0FEDERAL SUPPLY SCHEDULE CONTRACT
Dec 7, 2023PA0053$0FEDERAL SUPPLY SCHEDULE CONTRACT
Dec 6, 2023PA0052$0FEDERAL SUPPLY SCHEDULE CONTRACT
Dec 1, 2023PA0051$0FEDERAL SUPPLY SCHEDULE CONTRACT
Nov 8, 2023PSA863$0FEDERAL SUPPLY SCHEDULE CONTRACT
Oct 14, 2022PO0044$0FEDERAL SUPPLY SCHEDULE CONTRACT
Jul 4, 2022PSA847$0FEDERAL SUPPLY SCHEDULE CONTRACT
Jun 6, 2022PA0047$0FEDERAL SUPPLY SCHEDULE CONTRACT
Jun 2, 2022PA0046$0FEDERAL SUPPLY SCHEDULE CONTRACT
Apr 14, 2022PSA842$0FEDERAL SUPPLY SCHEDULE CONTRACT
Feb 25, 2022PA0043$0FEDERAL SUPPLY SCHEDULE CONTRACT
Oct 12, 2021PSA837$0EO14042 THIS CONTRACT IS HEREBY MODIFIED TO INCORPORATE FEDERAL ACQUISITION REGULATION (FAR) CLAUSE 52.223-99 ENSURING ADEQUATE COVID-19 SAFETY PROTOCOLS FOR FEDERAL CONTRACTORS - FEDERAL SUPPLY SCHEDULE CONTRACT
Sep 14, 2021PSA834$0FEDERAL SUPPLY SCHEDULE CONTRACT
May 21, 2021PSA832$0FEDERAL SUPPLY SCHEDULE CONTRACT
Apr 13, 2021PA0042$0FEDERAL SUPPLY SCHEDULE CONTRACT
Nov 23, 2020PSA826$0FEDERAL SUPPLY SCHEDULE CONTRACT
Aug 20, 2020PSA824$0FEDERAL SUPPLY SCHEDULE CONTRACT
Feb 4, 2020PSA812$0FEDERAL SUPPLY SCHEDULE CONTRACT
Oct 2, 2019PSA808$0FEDERAL SUPPLY SCHEDULE CONTRACT
Oct 1, 2019PA0041$0FEDERAL SUPPLY SCHEDULE CONTRACT
May 7, 2019PMA765$0SIN: 00CORP 500ORDER-LEVEL MATERIALS (OLMS) ARE SUPPLIES AND/OR SERVICES ACQUIRED IN DIRECT SUPPORT OF AN INDIVIDUAL TASK OR DELIVERY ORDER PLACED AGAINST A FEDERAL SUPPLY SCHEDULE (FSS) CONTRACT OR FSS BLANKET PURCHASE AGREEMENT (BPA). OLMS ARE NOT DEFINED, PRICED, OR AWARDED AT THE FSS CONTRACT LEVEL. THEY ARE UNKNOWN BEFORE A TASK OR DELIVERY ORDER IS PLACED AGAINST THE FSS CONTRACT OR FSS BPA. OLMS ARE ONLY AUTHORIZED FOR INCLUSION AT THE ORDER LEVEL UNDER A TIME-AND-MATERIALS (T&M)OR LABOR-HOUR (LH) CONTRACT LINE ITEM NUMBER (CLIN) AND ARE SUBJECT TO A NOT TOEXCEED (NTE) CEILING PRICE. OLMS INCLUDE DIRECT MATERIALS, SUBCONTRACTS FOR SUPPLIES AND INCIDENTAL SERVICES FOR WHICH THERE IS NOT A LABOR CATEGORY SPECIFIEDIN THE FSS CONTRACT, OTHER DIRECT COSTS (SEPARATE FROM THOSE UNDER ODC SINS), AND INDIRECT COSTS. OLMS ARE PURCHASED UNDER THE AUTHORITY OF THE FSS PROGRAM AND ARE NOT OPEN MARKET ITEMS. ITEMS AWARDED UNDER ANCILLARY SUPPLIES/SERVICES OR OTHER DIRECT COST (ODC
Jan 11, 2019PM0040$0SIN: 00CORP 500ORDER-LEVEL MATERIALS (OLMS) ARE SUPPLIES AND/OR SERVICES ACQUIRED IN DIRECT SUPPORT OF AN INDIVIDUAL TASK OR DELIVERY ORDER PLACED AGAINST A FEDERAL SUPPLY SCHEDULE (FSS) CONTRACT OR FSS BLANKET PURCHASE AGREEMENT (BPA). OLMS ARE NOT DEFINED, PRICED, OR AWARDED AT THE FSS CONTRACT LEVEL. THEY ARE UNKNOWN BEFORE A TASK OR DELIVERY ORDER IS PLACED AGAINST THE FSS CONTRACT OR FSS BPA. OLMS ARE ONLY AUTHORIZED FOR INCLUSION AT THE ORDER LEVEL UNDER A TIME-AND-MATERIALS (T&M)OR LABOR-HOUR (LH) CONTRACT LINE ITEM NUMBER (CLIN) AND ARE SUBJECT TO A NOT TOEXCEED (NTE) CEILING PRICE. OLMS INCLUDE DIRECT MATERIALS, SUBCONTRACTS FOR SUPPLIES AND INCIDENTAL SERVICES FOR WHICH THERE IS NOT A LABOR CATEGORY SPECIFIEDIN THE FSS CONTRACT, OTHER DIRECT COSTS (SEPARATE FROM THOSE UNDER ODC SINS), AND INDIRECT COSTS. OLMS ARE PURCHASED UNDER THE AUTHORITY OF THE FSS PROGRAM AND ARE NOT OPEN MARKET ITEMS. ITEMS AWARDED UNDER ANCILLARY SUPPLIES/SERVICES OR OTHER DIRECT COST (ODC
Dec 18, 2018PMA723$0SIN: 00CORP 500ORDER-LEVEL MATERIALS (OLMS) ARE SUPPLIES AND/OR SERVICES ACQUIRED IN DIRECT SUPPORT OF AN INDIVIDUAL TASK OR DELIVERY ORDER PLACED AGAINST A FEDERAL SUPPLY SCHEDULE (FSS) CONTRACT OR FSS BLANKET PURCHASE AGREEMENT (BPA). OLMS ARE NOT DEFINED, PRICED, OR AWARDED AT THE FSS CONTRACT LEVEL. THEY ARE UNKNOWN BEFORE A TASK OR DELIVERY ORDER IS PLACED AGAINST THE FSS CONTRACT OR FSS BPA. OLMS ARE ONLY AUTHORIZED FOR INCLUSION AT THE ORDER LEVEL UNDER A TIME-AND-MATERIALS (T&M)OR LABOR-HOUR (LH) CONTRACT LINE ITEM NUMBER (CLIN) AND ARE SUBJECT TO A NOT TOEXCEED (NTE) CEILING PRICE. OLMS INCLUDE DIRECT MATERIALS, SUBCONTRACTS FOR SUPPLIES AND INCIDENTAL SERVICES FOR WHICH THERE IS NOT A LABOR CATEGORY SPECIFIEDIN THE FSS CONTRACT, OTHER DIRECT COSTS (SEPARATE FROM THOSE UNDER ODC SINS), AND INDIRECT COSTS. OLMS ARE PURCHASED UNDER THE AUTHORITY OF THE FSS PROGRAM AND ARE NOT OPEN MARKET ITEMS. ITEMS AWARDED UNDER ANCILLARY SUPPLIES/SERVICES OR OTHER DIRECT COST (ODC
Sep 6, 2018PM0037$0SIN: 00CORP 500ORDER-LEVEL MATERIALS (OLMS) ARE SUPPLIES AND/OR SERVICES ACQUIRED IN DIRECT SUPPORT OF AN INDIVIDUAL TASK OR DELIVERY ORDER PLACED AGAINST A FEDERAL SUPPLY SCHEDULE (FSS) CONTRACT OR FSS BLANKET PURCHASE AGREEMENT (BPA). OLMS ARE NOT DEFINED, PRICED, OR AWARDED AT THE FSS CONTRACT LEVEL. THEY ARE UNKNOWN BEFORE A TASK OR DELIVERY ORDER IS PLACED AGAINST THE FSS CONTRACT OR FSS BPA. OLMS ARE ONLY AUTHORIZED FOR INCLUSION AT THE ORDER LEVEL UNDER A TIME-AND-MATERIALS (T&M)OR LABOR-HOUR (LH) CONTRACT LINE ITEM NUMBER (CLIN) AND ARE SUBJECT TO A NOT TOEXCEED (NTE) CEILING PRICE. OLMS INCLUDE DIRECT MATERIALS, SUBCONTRACTS FOR SUPPLIES AND INCIDENTAL SERVICES FOR WHICH THERE IS NOT A LABOR CATEGORY SPECIFIEDIN THE FSS CONTRACT, OTHER DIRECT COSTS (SEPARATE FROM THOSE UNDER ODC SINS), AND INDIRECT COSTS. OLMS ARE PURCHASED UNDER THE AUTHORITY OF THE FSS PROGRAM AND ARE NOT "OPEN MARKET ITEMS." ITEMS AWARDED UNDER ANCILLARY SUPPLIES/SERVICES OR OTHER DIRECT COST (ODC
Sep 6, 2018PM0039$0SIN: 00CORP 500ORDER-LEVEL MATERIALS (OLMS) ARE SUPPLIES AND/OR SERVICES ACQUIRED IN DIRECT SUPPORT OF AN INDIVIDUAL TASK OR DELIVERY ORDER PLACED AGAINST A FEDERAL SUPPLY SCHEDULE (FSS) CONTRACT OR FSS BLANKET PURCHASE AGREEMENT (BPA). OLMS ARE NOT DEFINED, PRICED, OR AWARDED AT THE FSS CONTRACT LEVEL. THEY ARE UNKNOWN BEFORE A TASK OR DELIVERY ORDER IS PLACED AGAINST THE FSS CONTRACT OR FSS BPA. OLMS ARE ONLY AUTHORIZED FOR INCLUSION AT THE ORDER LEVEL UNDER A TIME-AND-MATERIALS (T&M)OR LABOR-HOUR (LH) CONTRACT LINE ITEM NUMBER (CLIN) AND ARE SUBJECT TO A NOT TOEXCEED (NTE) CEILING PRICE. OLMS INCLUDE DIRECT MATERIALS, SUBCONTRACTS FOR SUPPLIES AND INCIDENTAL SERVICES FOR WHICH THERE IS NOT A LABOR CATEGORY SPECIFIEDIN THE FSS CONTRACT, OTHER DIRECT COSTS (SEPARATE FROM THOSE UNDER ODC SINS), AND INDIRECT COSTS. OLMS ARE PURCHASED UNDER THE AUTHORITY OF THE FSS PROGRAM AND ARE NOT "OPEN MARKET ITEMS." ITEMS AWARDED UNDER ANCILLARY SUPPLIES/SERVICES OR OTHER DIRECT COST (ODC
May 8, 2018PMA650$0SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, CONSULTING, CONDUCT ACCEPTANCE, FUNCTIONAL AND POST ACCEPTANCE TESTING, TESTING, INTEGRATION OF THE PAYLOAD FOR FLIGHT CUSTOMER AGENCY, SUPPORT PROVIDED DURING LAUNCH, ORBITAL MANEUVERING AND SATELLITE SEPARATION FROM THE SPACECRAFT. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL B
Apr 5, 2018PM0035$0SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, CONSULTING, CONDUCT ACCEPTANCE, FUNCTIONAL AND POST ACCEPTANCE TESTING, TESTING, INTEGRATION OF THE PAYLOAD FOR FLIGHT CUSTOMER AGENCY, SUPPORT PROVIDED DURING LAUNCH, ORBITAL MANEUVERING AND SATELLITE SEPARATION FROM THE SPACECRAFT. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL B
Dec 8, 2017PO0030EXERCISEOPTION$0SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, CONSULTING, CONDUCT ACCEPTANCE, FUNCTIONAL AND POST ACCEPTANCE TESTING, TESTING, INTEGRATION OF THE PAYLOAD FOR FLIGHT CUSTOMER AGENCY, SUPPORT PROVIDED DURING LAUNCH, ORBITAL MANEUVERING AND SATELLITE SEPARATION FROM THE SPACECRAFT. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL B
Dec 7, 2017PO0034REREPSMALLBUSS$0SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, CONSULTING, CONDUCT ACCEPTANCE, FUNCTIONAL AND POST ACCEPTANCE TESTING, TESTING, INTEGRATION OF THE PAYLOAD FOR FLIGHT CUSTOMER AGENCY, SUPPORT PROVIDED DURING LAUNCH, ORBITAL MANEUVERING AND SATELLITE SEPARATION FROM THE SPACECRAFT. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL B
Dec 7, 2017PSA594REVTERMCOND$0SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, CONSULTING, CONDUCT ACCEPTANCE, FUNCTIONAL AND POST ACCEPTANCE TESTING, TESTING, INTEGRATION OF THE PAYLOAD FOR FLIGHT CUSTOMER AGENCY, SUPPORT PROVIDED DURING LAUNCH, ORBITAL MANEUVERING AND SATELLITE SEPARATION FROM THE SPACECRAFT. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL B
Jul 27, 2017PSA580REVTERMCOND$0SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, CONSULTING, CONDUCT ACCEPTANCE, FUNCTIONAL AND POST ACCEPTANCE TESTING, TESTING, INTEGRATION OF THE PAYLOAD FOR FLIGHT CUSTOMER AGENCY, SUPPORT PROVIDED DURING LAUNCH, ORBITAL MANEUVERING AND SATELLITE SEPARATION FROM THE SPACECRAFT. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL B
Jul 14, 2017PO0033SMALLBUSSTYPE$0SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, CONSULTING, CONDUCT ACCEPTANCE, FUNCTIONAL AND POST ACCEPTANCE TESTING, TESTING, INTEGRATION OF THE PAYLOAD FOR FLIGHT CUSTOMER AGENCY, SUPPORT PROVIDED DURING LAUNCH, ORBITAL MANEUVERING AND SATELLITE SEPARATION FROM THE SPACECRAFT. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL B
Jun 12, 2017CMA541REVTERMCOND$0SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, CONSULTING, CONDUCT ACCEPTANCE, FUNCTIONAL AND POST ACCEPTANCE TESTING, TESTING, INTEGRATION OF THE PAYLOAD FOR FLIGHT CUSTOMER AGENCY, SUPPORT PROVIDED DURING LAUNCH, ORBITAL MANEUVERING AND SATELLITE SEPARATION FROM THE SPACECRAFT. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL B
May 24, 2017PA0032REASSIGNMENT$0SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, CONSULTING, CONDUCT ACCEPTANCE, FUNCTIONAL AND POST ACCEPTANCE TESTING, TESTING, INTEGRATION OF THE PAYLOAD FOR FLIGHT CUSTOMER AGENCY, SUPPORT PROVIDED DURING LAUNCH, ORBITAL MANEUVERING AND SATELLITE SEPARATION FROM THE SPACECRAFT. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL B
May 18, 2017PA0031REASSIGNMENT$0SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, CONSULTING, CONDUCT ACCEPTANCE, FUNCTIONAL AND POST ACCEPTANCE TESTING, TESTING, INTEGRATION OF THE PAYLOAD FOR FLIGHT CUSTOMER AGENCY, SUPPORT PROVIDED DURING LAUNCH, ORBITAL MANEUVERING AND SATELLITE SEPARATION FROM THE SPACECRAFT. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL B
Oct 11, 2016PA0029AUTHNEG$0SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, CONSULTING, CONDUCT ACCEPTANCE, FUNCTIONAL AND POST ACCEPTANCE TESTING, TESTING, INTEGRATION OF THE PAYLOAD FOR FLIGHT CUSTOMER AGENCY, SUPPORT PROVIDED DURING LAUNCH, ORBITAL MANEUVERING AND SATELLITE SEPARATION FROM THE SPACECRAFT. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL B
Jun 15, 2016PA0028REASSIGNMENT$0SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, CONSULTING, CONDUCT ACCEPTANCE, FUNCTIONAL AND POST ACCEPTANCE TESTING, TESTING, INTEGRATION OF THE PAYLOAD FOR FLIGHT CUSTOMER AGENCY, SUPPORT PROVIDED DURING LAUNCH, ORBITAL MANEUVERING AND SATELLITE SEPARATION FROM THE SPACECRAFT. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL B
May 5, 2016PA0027REASSIGNMENT$0SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, AND CONSULTING. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL BE IDENTIFIED AND DESIGNED IN THIS STAGE INCLUDING TRAINING, OPERATION AND MAINTENANCE REQUIREMENTS, AND REPLACEMENT PROCEDURES. PES DOES NOT INCLUDE ARCHITECT-ENGINEER SERVICES AS DEFINED IN THE BROOKS ACT AND FAR PART 2. PES DOES NOT INCLUDE DESIGN OR CONSTRUCTION SERVICES AS DEFINED IN TH
Jan 2, 2016CMA475REVTERMCOND$0SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, AND CONSULTING. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL BE IDENTIFIED AND DESIGNED IN THIS STAGE INCLUDING TRAINING, OPERATION AND MAINTENANCE REQUIREMENTS, AND REPLACEMENT PROCEDURES. PES DOES NOT INCLUDE ARCHITECT-ENGINEER SERVICES AS DEFINED IN THE BROOKS ACT AND FAR PART 2. PES DOES NOT INCLUDE DESIGN OR CONSTRUCTION SERVICES AS DEFINED IN TH
Dec 22, 2015PA0026REASSIGNMENT$0SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, AND CONSULTING. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL BE IDENTIFIED AND DESIGNED IN THIS STAGE INCLUDING TRAINING, OPERATION AND MAINTENANCE REQUIREMENTS, AND REPLACEMENT PROCEDURES. PES DOES NOT INCLUDE ARCHITECT-ENGINEER SERVICES AS DEFINED IN THE BROOKS ACT AND FAR PART 2. PES DOES NOT INCLUDE DESIGN OR CONSTRUCTION SERVICES AS DEFINED IN TH
Oct 1, 2015CMA473REVTERMCOND$0SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, AND CONSULTING. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL BE IDENTIFIED AND DESIGNED IN THIS STAGE INCLUDING TRAINING, OPERATION AND MAINTENANCE REQUIREMENTS, AND REPLACEMENT PROCEDURES. PES DOES NOT INCLUDE ARCHITECT-ENGINEER SERVICES AS DEFINED IN THE BROOKS ACT AND FAR PART 2. PES DOES NOT INCLUDE DESIGN OR CONSTRUCTION SERVICES AS DEFINED IN TH
Oct 1, 2015PA0023AUTHNEG$0SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, AND CONSULTING. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL BE IDENTIFIED AND DESIGNED IN THIS STAGE INCLUDING TRAINING, OPERATION AND MAINTENANCE REQUIREMENTS, AND REPLACEMENT PROCEDURES. PES DOES NOT INCLUDE ARCHITECT-ENGINEER SERVICES AS DEFINED IN THE BROOKS ACT AND FAR PART 2. PES DOES NOT INCLUDE DESIGN OR CONSTRUCTION SERVICES AS DEFINED IN TH
Sep 9, 2015PA0022AUTHNEG$0SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, AND CONSULTING. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL BE IDENTIFIED AND DESIGNED IN THIS STAGE INCLUDING TRAINING, OPERATION AND MAINTENANCE REQUIREMENTS, AND REPLACEMENT PROCEDURES. PES DOES NOT INCLUDE ARCHITECT-ENGINEER SERVICES AS DEFINED IN THE BROOKS ACT AND FAR PART 2. PES DOES NOT INCLUDE DESIGN OR CONSTRUCTION SERVICES AS DEFINED IN TH
Sep 2, 2015PA0021REASSIGNMENT$0SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, AND CONSULTING. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL BE IDENTIFIED AND DESIGNED IN THIS STAGE INCLUDING TRAINING, OPERATION AND MAINTENANCE REQUIREMENTS, AND REPLACEMENT PROCEDURES. PES DOES NOT INCLUDE ARCHITECT-ENGINEER SERVICES AS DEFINED IN THE BROOKS ACT AND FAR PART 2. PES DOES NOT INCLUDE DESIGN OR CONSTRUCTION SERVICES AS DEFINED IN T
Jul 21, 2015PS0020GEOCOVCHG$0SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, AND CONSULTING. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL BE IDENTIFIED AND DESIGNED IN THIS STAGE INCLUDING TRAINING, OPERATION AND MAINTENANCE REQUIREMENTS, AND REPLACEMENT PROCEDURES. PES DOES NOT INCLUDE ARCHITECT-ENGINEER SERVICES AS DEFINED IN THE BROOKS ACT AND FAR PART 2. PES DOES NOT INCLUDE DESIGN OR CONSTRUCTION SERVICES AS DEFINED IN T
Apr 9, 2015PA0019REASSIGNMENT$0SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, AND CONSULTING. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL BE IDENTIFIED AND DESIGNED IN THIS STAGE INCLUDING TRAINING, OPERATION AND MAINTENANCE REQUIREMENTS, AND REPLACEMENT PROCEDURES. PES DOES NOT INCLUDE ARCHITECT-ENGINEER SERVICES AS DEFINED IN THE BROOKS ACT AND FAR PART 2. PES DOES NOT INCLUDE DESIGN OR CONSTRUCTION SERVICES AS DEFINED IN T
Nov 5, 2014PA0017REASSIGNMENT$0SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, AND CONSULTING. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL BE IDENTIFIED AND DESIGNED IN THIS STAGE INCLUDING TRAINING, OPERATION AND MAINTENANCE REQUIREMENTS, AND REPLACEMENT PROCEDURES. PES DOES NOT INCLUDE ARCHITECT-ENGINEER SERVICES AS DEFINED IN THE BROOKS ACT AND FAR PART 2. PES DOES NOT INCLUDE DESIGN OR CONSTRUCTION SERVICES AS DEFINED IN T
Sep 9, 2014PA0016ADDRESSCHG$0SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, AND CONSULTING. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL BE IDENTIFIED AND DESIGNED IN THIS STAGE INCLUDING TRAINING, OPERATION AND MAINTENANCE REQUIREMENTS, AND REPLACEMENT PROCEDURES. PES DOES NOT INCLUDE ARCHITECT-ENGINEER SERVICES AS DEFINED IN THE BROOKS ACT AND FAR PART 2. PES DOES NOT INCLUDE DESIGN OR CONSTRUCTION SERVICES AS DEFINED IN T
Aug 10, 2014PA0015REASSIGNMENT$0SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, AND CONSULTING. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL BE IDENTIFIED AND DESIGNED IN THIS STAGE INCLUDING TRAINING, OPERATION AND MAINTENANCE REQUIREMENTS, AND REPLACEMENT PROCEDURES. PES DOES NOT INCLUDE ARCHITECT-ENGINEER SERVICES AS DEFINED IN THE BROOKS ACT AND FAR PART 2. PES DOES NOT INCLUDE DESIGN OR CONSTRUCTION SERVICES AS DEFINED IN T
Jun 7, 2014PA0014REASSIGNMENT$0SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, AND CONSULTING. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL BE IDENTIFIED AND DESIGNED IN THIS STAGE INCLUDING TRAINING, OPERATION AND MAINTENANCE REQUIREMENTS, AND REPLACEMENT PROCEDURES. PES DOES NOT INCLUDE ARCHITECT-ENGINEER SERVICES AS DEFINED IN THE BROOKS ACT AND FAR PART 2. PES DOES NOT INCLUDE DESIGN OR CONSTRUCTION SERVICES AS DEFINED IN T
Feb 19, 2014PS0012ADDLABCAT$0SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, AND CONSULTING. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL BE IDENTIFIED AND DESIGNED IN THIS STAGE INCLUDING TRAINING, OPERATION AND MAINTENANCE REQUIREMENTS, AND REPLACEMENT PROCEDURES. PES DOES NOT INCLUDE ARCHITECT-ENGINEER SERVICES AS DEFINED IN THE BROOKS ACT AND FAR PART 2. PES DOES NOT INCLUDE DESIGN OR CONSTRUCTION SERVICES AS DEFINED IN T
Feb 19, 2014PS0012ADDSINS$0SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, AND CONSULTING. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL BE IDENTIFIED AND DESIGNED IN THIS STAGE INCLUDING TRAINING, OPERATION AND MAINTENANCE REQUIREMENTS, AND REPLACEMENT PROCEDURES. PES DOES NOT INCLUDE ARCHITECT-ENGINEER SERVICES AS DEFINED IN THE BROOKS ACT AND FAR PART 2. PES DOES NOT INCLUDE DESIGN OR CONSTRUCTION SERVICES AS DEFINED IN T
Jan 31, 2014PA0013REASSIGNMENT$0SIN: 871 6SERVICES REQUIRED UNDER THIS SIN INVOLVE ALL OF THE PLANNING, BUDGET, CONTRACT AND SYSTEMS/PROGRAM MANAGEMENT FUNCTIONS REQUIRED TO PROCURE AND OR/PRODUCE, RENDER OPERATIONAL AND PROVIDE LIFE CYCLE SUPPORT (MAINTENANCE, REPAIR, SUPPLIES, ENGINEERING SPECIFIC LOGISTICS) TO (TECHNOLOGY BASED) SYSTEMS, ACTIVITIES, SUBSYSTEMS, PROJECTS, ETC. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO OPERATION AND MAINTENANCE, EVALUATION OF INSPECTION, TESTING, AND MAINTENANCE PROGRAM FOR FIRE PROTECTION AND LIFE SAFETY SYSTEMS, PROGRAM/PROJECT MANAGEMENT, TECHNOLOGY TRANSFER/INSERTION, TRAINING AND CONSULTING. EXAMPLE: DURING THIS STAGE THE ACTUAL MANUFACTURING, LAUNCH, AND PERFORMANCE MONITORING OF THE NAVIGATION SATELLITE WILL BE ASSISTED THROUGH PROJECT MANAGEMENT, CONFIGURATION MANAGEMENT, RELIABILITY ANALYSIS, ENGINEERING RETROFIT IMPROVEMENTS AND SIMILAR FUNCTIONS. PES DOES NOT INCLUDE ARCHITECT-ENGINEER SERVICES AS DEFINED IN THE BROOKS ACT AND FAR PART 2. PES DOES NOT IN
Oct 24, 2013PA0011REASSIGNMENT$0SIN: 871 6SERVICES REQUIRED UNDER THIS SIN INVOLVE ALL OF THE PLANNING, BUDGET, CONTRACT AND SYSTEMS/PROGRAM MANAGEMENT FUNCTIONS REQUIRED TO PROCURE AND OR/PRODUCE, RENDER OPERATIONAL AND PROVIDE LIFE CYCLE SUPPORT (MAINTENANCE, REPAIR, SUPPLIES, ENGINEERING SPECIFIC LOGISTICS) TO (TECHNOLOGY BASED) SYSTEMS, ACTIVITIES, SUBSYSTEMS, PROJECTS, ETC. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO OPERATION AND MAINTENANCE, EVALUATION OF INSPECTION, TESTING, AND MAINTENANCE PROGRAM FOR FIRE PROTECTION AND LIFE SAFETY SYSTEMS, PROGRAM/PROJECT MANAGEMENT, TECHNOLOGY TRANSFER/INSERTION, TRAINING AND CONSULTING. EXAMPLE: DURING THIS STAGE THE ACTUAL MANUFACTURING, LAUNCH, AND PERFORMANCE MONITORING OF THE NAVIGATION SATELLITE WILL BE ASSISTED THROUGH PROJECT MANAGEMENT, CONFIGURATION MANAGEMENT, RELIABILITY ANALYSIS, ENGINEERING RETROFIT IMPROVEMENTS AND SIMILAR FUNCTIONS. PES DOES NOT INCLUDE ARCHITECT-ENGINEER SERVICES AS DEFINED IN THE BROOKS ACT AND FAR PART 2. PES DOES NOT IN
Oct 22, 2013PA0010REASSIGNMENT$0SIN: 871 6SERVICES REQUIRED UNDER THIS SIN INVOLVE ALL OF THE PLANNING, BUDGET, CONTRACT AND SYSTEMS/PROGRAM MANAGEMENT FUNCTIONS REQUIRED TO PROCURE AND OR/PRODUCE, RENDER OPERATIONAL AND PROVIDE LIFE CYCLE SUPPORT (MAINTENANCE, REPAIR, SUPPLIES, ENGINEERING SPECIFIC LOGISTICS) TO (TECHNOLOGY BASED) SYSTEMS, ACTIVITIES, SUBSYSTEMS, PROJECTS, ETC. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO OPERATION AND MAINTENANCE, EVALUATION OF INSPECTION, TESTING, AND MAINTENANCE PROGRAM FOR FIRE PROTECTION AND LIFE SAFETY SYSTEMS, PROGRAM/PROJECT MANAGEMENT, TECHNOLOGY TRANSFER/INSERTION, TRAINING AND CONSULTING. EXAMPLE: DURING THIS STAGE THE ACTUAL MANUFACTURING, LAUNCH, AND PERFORMANCE MONITORING OF THE NAVIGATION SATELLITE WILL BE ASSISTED THROUGH PROJECT MANAGEMENT, CONFIGURATION MANAGEMENT, RELIABILITY ANALYSIS, ENGINEERING RETROFIT IMPROVEMENTS AND SIMILAR FUNCTIONS. PES DOES NOT INCLUDE ARCHITECT-ENGINEER SERVICES AS DEFINED IN THE BROOKS ACT AND FAR PART 2. PES DOES NOT IN
Jul 16, 20137$0SIN: 871 6SERVICES REQUIRED UNDER THIS SIN INVOLVE ALL OF THE PLANNING, BUDGET, CONTRACT AND SYSTEMS/PROGRAM MANAGEMENT FUNCTIONS REQUIRED TO PROCURE AND OR/PRODUCE, RENDER OPERATIONAL AND PROVIDE LIFE CYCLE SUPPORT (MAINTENANCE, REPAIR, SUPPLIES, ENGINEERING SPECIFIC LOGISTICS) TO (TECHNOLOGY BASED) SYSTEMS, ACTIVITIES, SUBSYSTEMS, PROJECTS, ETC. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO OPERATION AND MAINTENANCE, EVALUATION OF INSPECTION, TESTING, AND MAINTENANCE PROGRAM FOR FIRE PROTECTION AND LIFE SAFETY SYSTEMS, PROGRAM/PROJECT MANAGEMENT, TECHNOLOGY TRANSFER/INSERTION, TRAINING AND CONSULTING. EXAMPLE: DURING THIS STAGE THE ACTUAL MANUFACTURING, LAUNCH, AND PERFORMANCE MONITORING OF THE NAVIGATION SATELLITE WILL BE ASSISTED THROUGH PROJECT MANAGEMENT, CONFIGURATION MANAGEMENT, RELIABILITY ANALYSIS, ENGINEERING RETROFIT IMPROVEMENTS AND SIMILAR FUNCTIONS. PES DOES NOT INCLUDE ARCHITECT-ENGINEER SERVICES AS DEFINED IN THE BROOKS ACT AND FAR PART 2. PES DOES NOT IN
Jun 3, 20136$0SIN: 871 6SERVICES REQUIRED UNDER THIS SIN INVOLVE ALL OF THE PLANNING, BUDGET, CONTRACT AND SYSTEMS/PROGRAM MANAGEMENT FUNCTIONS REQUIRED TO PROCURE AND OR/PRODUCE, RENDER OPERATIONAL AND PROVIDE LIFE CYCLE SUPPORT (MAINTENANCE, REPAIR, SUPPLIES, ENGINEERING SPECIFIC LOGISTICS) TO (TECHNOLOGY BASED) SYSTEMS, ACTIVITIES, SUBSYSTEMS, PROJECTS, ETC. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO OPERATION AND MAINTENANCE, EVALUATION OF INSPECTION, TESTING, AND MAINTENANCE PROGRAM FOR FIRE PROTECTION AND LIFE SAFETY SYSTEMS, PROGRAM/PROJECT MANAGEMENT, TECHNOLOGY TRANSFER/INSERTION, TRAINING AND CONSULTING. EXAMPLE: DURING THIS STAGE THE ACTUAL MANUFACTURING, LAUNCH, AND PERFORMANCE MONITORING OF THE NAVIGATION SATELLITE WILL BE ASSISTED THROUGH PROJECT MANAGEMENT, CONFIGURATION MANAGEMENT, RELIABILITY ANALYSIS, ENGINEERING RETROFIT IMPROVEMENTS AND SIMILAR FUNCTIONS. PES DOES NOT INCLUDE ARCHITECT-ENGINEER SERVICES AS DEFINED IN THE BROOKS ACT AND FAR PART 2. PES DOES NOT IN
Mar 14, 20134$0SIN: 871 6SERVICES REQUIRED UNDER THIS SIN INVOLVE ALL OF THE PLANNING, BUDGET, CONTRACT AND SYSTEMS/PROGRAM MANAGEMENT FUNCTIONS REQUIRED TO PROCURE AND OR/PRODUCE, RENDER OPERATIONAL AND PROVIDE LIFE CYCLE SUPPORT (MAINTENANCE, REPAIR, SUPPLIES, ENGINEERING SPECIFIC LOGISTICS) TO (TECHNOLOGY BASED) SYSTEMS, ACTIVITIES, SUBSYSTEMS, PROJECTS, ETC. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO OPERATION AND MAINTENANCE, EVALUATION OF INSPECTION, TESTING, AND MAINTENANCE PROGRAM FOR FIRE PROTECTION AND LIFE SAFETY SYSTEMS, PROGRAM/PROJECT MANAGEMENT, TECHNOLOGY TRANSFER/INSERTION, TRAINING AND CONSULTING. EXAMPLE: DURING THIS STAGE THE ACTUAL MANUFACTURING, LAUNCH, AND PERFORMANCE MONITORING OF THE NAVIGATION SATELLITE WILL BE ASSISTED THROUGH PROJECT MANAGEMENT, CONFIGURATION MANAGEMENT, RELIABILITY ANALYSIS, ENGINEERING RETROFIT IMPROVEMENTS AND SIMILAR FUNCTIONS. PES DOES NOT INCLUDE ARCHITECT-ENGINEER SERVICES AS DEFINED IN THE BROOKS ACT AND FAR PART 2. PES DOES NOT IN
Mar 14, 20135$0SIN: 871 6SERVICES REQUIRED UNDER THIS SIN INVOLVE ALL OF THE PLANNING, BUDGET, CONTRACT AND SYSTEMS/PROGRAM MANAGEMENT FUNCTIONS REQUIRED TO PROCURE AND OR/PRODUCE, RENDER OPERATIONAL AND PROVIDE LIFE CYCLE SUPPORT (MAINTENANCE, REPAIR, SUPPLIES, ENGINEERING SPECIFIC LOGISTICS) TO (TECHNOLOGY BASED) SYSTEMS, ACTIVITIES, SUBSYSTEMS, PROJECTS, ETC. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO OPERATION AND MAINTENANCE, EVALUATION OF INSPECTION, TESTING, AND MAINTENANCE PROGRAM FOR FIRE PROTECTION AND LIFE SAFETY SYSTEMS, PROGRAM/PROJECT MANAGEMENT, TECHNOLOGY TRANSFER/INSERTION, TRAINING AND CONSULTING. EXAMPLE: DURING THIS STAGE THE ACTUAL MANUFACTURING, LAUNCH, AND PERFORMANCE MONITORING OF THE NAVIGATION SATELLITE WILL BE ASSISTED THROUGH PROJECT MANAGEMENT, CONFIGURATION MANAGEMENT, RELIABILITY ANALYSIS, ENGINEERING RETROFIT IMPROVEMENTS AND SIMILAR FUNCTIONS. PES DOES NOT INCLUDE ARCHITECT-ENGINEER SERVICES AS DEFINED IN THE BROOKS ACT AND FAR PART 2. PES DOES NOT IN
Feb 21, 20133$0SIN: 871 6SERVICES REQUIRED UNDER THIS SIN INVOLVE ALL OF THE PLANNING, BUDGET, CONTRACT AND SYSTEMS/PROGRAM MANAGEMENT FUNCTIONS REQUIRED TO PROCURE AND OR/PRODUCE, RENDER OPERATIONAL AND PROVIDE LIFE CYCLE SUPPORT (MAINTENANCE, REPAIR, SUPPLIES, ENGINEERING SPECIFIC LOGISTICS) TO (TECHNOLOGY BASED) SYSTEMS, ACTIVITIES, SUBSYSTEMS, PROJECTS, ETC. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO OPERATION AND MAINTENANCE, EVALUATION OF INSPECTION, TESTING, AND MAINTENANCE PROGRAM FOR FIRE PROTECTION AND LIFE SAFETY SYSTEMS, PROGRAM/PROJECT MANAGEMENT, TECHNOLOGY TRANSFER/INSERTION, TRAINING AND CONSULTING. EXAMPLE: DURING THIS STAGE THE ACTUAL MANUFACTURING, LAUNCH, AND PERFORMANCE MONITORING OF THE NAVIGATION SATELLITE WILL BE ASSISTED THROUGH PROJECT MANAGEMENT, CONFIGURATION MANAGEMENT, RELIABILITY ANALYSIS, ENGINEERING RETROFIT IMPROVEMENTS AND SIMILAR FUNCTIONS. PES DOES NOT INCLUDE ARCHITECT-ENGINEER SERVICES AS DEFINED IN THE BROOKS ACT AND FAR PART 2. PES DOES NOT IN
Dec 18, 20122$0SIN: 871 6SERVICES REQUIRED UNDER THIS SIN INVOLVE ALL OF THE PLANNING, BUDGET, CONTRACT AND SYSTEMS/PROGRAM MANAGEMENT FUNCTIONS REQUIRED TO PROCURE AND OR/PRODUCE, RENDER OPERATIONAL AND PROVIDE LIFE CYCLE SUPPORT (MAINTENANCE, REPAIR, SUPPLIES, ENGINEERING SPECIFIC LOGISTICS) TO (TECHNOLOGY BASED) SYSTEMS, ACTIVITIES, SUBSYSTEMS, PROJECTS, ETC. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO OPERATION AND MAINTENANCE, EVALUATION OF INSPECTION, TESTING, AND MAINTENANCE PROGRAM FOR FIRE PROTECTION AND LIFE SAFETY SYSTEMS, PROGRAM/PROJECT MANAGEMENT, TECHNOLOGY TRANSFER/INSERTION, TRAINING AND CONSULTING. EXAMPLE: DURING THIS STAGE THE ACTUAL MANUFACTURING, LAUNCH, AND PERFORMANCE MONITORING OF THE NAVIGATION SATELLITE WILL BE ASSISTED THROUGH PROJECT MANAGEMENT, CONFIGURATION MANAGEMENT, RELIABILITY ANALYSIS, ENGINEERING RETROFIT IMPROVEMENTS AND SIMILAR FUNCTIONS. PES DOES NOT INCLUDE ARCHITECT-ENGINEER SERVICES AS DEFINED IN THE BROOKS ACT AND FAR PART 2. PES DOES NOT IN
Dec 12, 20120$0SIN: 871 5SERVICES REQUIRED UNDER THIS SIN INVOLVES THE ANALYSIS, PLANNING AND DETAILED DESIGN OF ALL ENGINEERING SPECIFIC LOGISTICS SUPPORT INCLUDING MATERIAL GOODS, PERSONNEL, AND OPERATIONAL MAINTENANCE AND REPAIR OF SYSTEMS THROUGHOUT THEIR LIFECYCLES, EXCLUDING THOSE SYSTEMS ASSOCIATED WITH REAL PROPERTY. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO ERGONOMIC/HUMAN PERFORMANCE ANALYSIS, FEASIBILITY ANALYSIS, LOGISTICS PLANNING, REQUIREMENTS DETERMINATION, POLICY STANDARDS/PROCEDURES DEVELOPMENT, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, CONDUCTING RESEARCH STUDIES, LONG-TERM RELIABILITY AND MAINTAINABILITY, TRAINING, CONSULTING, CONDUCT ACCEPTANCE, FUNCTIONAL AND POST ACCEPTANCE TESTING, TESTING, INTEGRATION OF THE PAYLOAD FOR FLIGHT CUSTOMER AGENCY, SUPPORT PROVIDED DURING LAUNCH, ORBITAL MANEUVERING AND SATELLITE SEPARATION FROM THE SPACECRAFT. EXAMPLE: THE FULL RANGE OF LIFE CYCLE LOGISTICS SUPPORT FOR THE NAVIGATION SATELLITE WILL B
Dec 12, 20121$0SIN: 871 6SERVICES REQUIRED UNDER THIS SIN INVOLVE ALL OF THE PLANNING, BUDGET, CONTRACT AND SYSTEMS/PROGRAM MANAGEMENT FUNCTIONS REQUIRED TO PROCURE AND OR/PRODUCE, RENDER OPERATIONAL AND PROVIDE LIFE CYCLE SUPPORT (MAINTENANCE, REPAIR, SUPPLIES, ENGINEERING SPECIFIC LOGISTICS) TO (TECHNOLOGY BASED) SYSTEMS, ACTIVITIES, SUBSYSTEMS, PROJECTS, ETC. TYPICAL ASSOCIATED TASKS INCLUDE, BUT ARE NOT LIMITED TO OPERATION AND MAINTENANCE, EVALUATION OF INSPECTION, TESTING, AND MAINTENANCE PROGRAM FOR FIRE PROTECTION AND LIFE SAFETY SYSTEMS, PROGRAM/PROJECT MANAGEMENT, TECHNOLOGY TRANSFER/INSERTION, TRAINING AND CONSULTING. EXAMPLE: DURING THIS STAGE THE ACTUAL MANUFACTURING, LAUNCH, AND PERFORMANCE MONITORING OF THE NAVIGATION SATELLITE WILL BE ASSISTED THROUGH PROJECT MANAGEMENT, CONFIGURATION MANAGEMENT, RELIABILITY ANALYSIS, ENGINEERING RETROFIT IMPROVEMENTS AND SIMILAR FUNCTIONS. PES DOES NOT INCLUDE ARCHITECT-ENGINEER SERVICES AS DEFINED IN THE BROOKS ACT AND FAR PART 2. PES DOES NOT IN

Buyer contacts from matching notices

Matched on exact award/solicitation identifier and awarding agency. Source dates describe the notice, not current contact verification.

ContactRolePublished contact methodsEvidenceSource date
National Customer ServiceContactContact method not publishedSourceSep 27, 2019
National Customer ServiceContactContact method not publishedSourceSep 25, 2019
National Customer Service GSA, FAS, PSHC, 400 15TH ST, SW RM 2757 (QRA) , AUBURN, WA 98001ContactContact method not publishedSourceJun 10, 2019
National Customer Service GSA, FAS, PSHC, 400 15TH ST, SW RM 2757 (QRA) , AUBURN, WA 98001ContactContact method not publishedSourceJun 10, 2019

Research next steps

  1. Check the stated set-aside against the solicitation and current certifications.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.