IDV vehicle
GS21F0015W
FEDERAL SUPPLY SCHEDULE CONTRACT
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | General Services Administration |
| Office | GSA/FAS/GSS/QSCA, MULTIPLE AWARD SCHEDULE CONTRACTING DIVISION |
| NAICS | 423710 — Hardware Merchant Wholesalers |
| PSC | 5120 — Hand Tools, Nonedged, Nonpowered |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIXED PRICE WITH ECONOMIC PRICE ADJUSTMENT |
| Obligations | $0 |
| Current contract value | Not reported |
| Potential contract value / ceiling | $1.3M |
| Start date | Oct 16, 2009 |
| Current end date | Not available |
| Potential end date | Not available |
| Latest award activity | Aug 7, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 125 of 125 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Aug 7, 2026 | PSA919 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Jun 7, 2026 | PSA917 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| May 21, 2026 | PS0082 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| May 5, 2026 | PA0080 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Apr 5, 2026 | PSA914 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Nov 26, 2025 | PSA907 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Sep 15, 2025 | PS0079 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Sep 8, 2025 | PSA905 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Jul 22, 2025 | PSA904 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Jul 9, 2025 | PA0078 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Apr 28, 2025 | PSA897 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Mar 31, 2025 | PSA893 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Feb 21, 2025 | PA0077 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Jan 21, 2025 | PSA888 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Dec 31, 2024 | PSA887 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Aug 14, 2024 | PSA885 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Aug 5, 2024 | PO0071 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Jun 4, 2024 | PSA883 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| May 30, 2024 | PS0075 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| May 23, 2024 | PA0076 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| May 22, 2024 | PA0074 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| May 14, 2024 | PSA882 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Apr 13, 2024 | PSA881 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Mar 30, 2024 | PSA874 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Mar 28, 2024 | PS0072 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Feb 26, 2024 | PS0070 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Jan 13, 2024 | PSA869 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Dec 14, 2023 | PSA870 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Nov 14, 2023 | PA0069 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Aug 16, 2023 | PSA865 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Aug 10, 2023 | PSA863 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| May 25, 2023 | PSA856 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| May 20, 2023 | PA0068 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| May 4, 2023 | PSA855 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| May 2, 2023 | PA0067 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Apr 7, 2023 | PA0066 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Mar 1, 2023 | PA0065 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Jan 24, 2023 | PSA853 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Nov 2, 2022 | PSA850 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Jul 14, 2022 | PSA847 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Jun 29, 2022 | PA0064 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| May 27, 2022 | PA0063 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Apr 3, 2022 | PSA842 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Jan 12, 2022 | PA0061 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Dec 21, 2021 | PSA840 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Oct 11, 2021 | PSA837 | $0 | EO14042 THIS CONTRACT IS HEREBY MODIFIED TO INCORPORATE FEDERAL ACQUISITION REGULATION (FAR) CLAUSE 52.223-99 ENSURING ADEQUATE COVID-19 SAFETY PROTOCOLS FOR FEDERAL CONTRACTORS - FEDERAL SUPPLY SCHEDULE CONTRACT |
| Sep 3, 2021 | PSA834 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Jul 15, 2021 | PSA833 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| May 20, 2021 | PSA832 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Nov 16, 2020 | PSA826 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Sep 4, 2020 | PA0060 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Sep 1, 2020 | PSA815 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Sep 1, 2020 | PSA824 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Aug 25, 2020 | PS0059 | $0 | SIN: 332510C 332510C HARDWARE STORE, HOME IMPROVEMENT CENTER, INDUSTRIAL OR GENERAL SUPPLY STORE, OR INDUSTRIAL MAINTENANCE REPAIR AND OPERATIONS (MRO) DISTRIBUTOR - |
| Jun 11, 2020 | PSA821 | $0 | SIN: 332510C 332510C HARDWARE STORE, HOME IMPROVEMENT CENTER, INDUSTRIAL OR GENERAL SUPPLY STORE, OR INDUSTRIAL MAINTENANCE REPAIR AND OPERATIONS (MRO) DISTRIBUTOR - |
| May 11, 2020 | PS0058 | $0 | SIN: 332510C 332510C HARDWARE STORE, HOME IMPROVEMENT CENTER, INDUSTRIAL OR GENERAL SUPPLY STORE, OR INDUSTRIAL MAINTENANCE REPAIR AND OPERATIONS (MRO) DISTRIBUTOR - |
| Apr 2, 2020 | PS0056 | $0 | SIN: 332510C 332510C HARDWARE STORE, HOME IMPROVEMENT CENTER, INDUSTRIAL OR GENERAL SUPPLY STORE, OR INDUSTRIAL MAINTENANCE REPAIR AND OPERATIONS (MRO) DISTRIBUTOR - |
| Mar 27, 2020 | PS0055 | $0 | SIN: 332510C 332510C HARDWARE STORE, HOME IMPROVEMENT CENTER, INDUSTRIAL OR GENERAL SUPPLY STORE, OR INDUSTRIAL MAINTENANCE REPAIR AND OPERATIONS (MRO) DISTRIBUTOR - |
| Jan 31, 2020 | PSA812 | $0 | SIN: 332510C 332510C HARDWARE STORE, HOME IMPROVEMENT CENTER, INDUSTRIAL OR GENERAL SUPPLY STORE, OR INDUSTRIAL MAINTENANCE REPAIR AND OPERATIONS (MRO) DISTRIBUTOR - |
| Dec 10, 2019 | PSA808 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Sep 5, 2019 | PS0052 | $0 | SIN: 105 002PRODUCTS AND EQUIPMENT INCLUDING BUT NOT LIMITED TO: FLOORING, FENCING, HARDWARE, BUILDING MATERIALS, TOOLS, APPLICATIONS, ELECTRIC, PAINT, PLUMBING, LAWN ANDGARDEN MOTORS, SHOP, MACHINING, WELDING, MATERIAL HANDLING; CARTS, TRUCKS AND DOCK; HVAC, CLEANING AND IRRIGATION, EQUIPMENT. SIN 105 002 CURRENTLY HAS EXECUTIVE ORDER 13693, FEDERAL LEADERSHIP IN ENVIRONMENTAL, ENERGY, AND ECONOMIC PERFORMANCE. EFFECTIVE IMMEDIATELY, NON-COMPLIANT ITEMS IN THE CATEGORIES LISTEDBELOW WILL NO LONGER BE ACCEPTED. "GREEN" PRODUCTS SHALL MEET THE REQUIREMENTSOF THE FAS ENVIRONMENTAL ICON STANDARDS AS LISTED IN GSA ADVANTAGE! AND ARE REQUIRED ON ALL NEW OFFERS SUBMITTED UNDER THE SOLICITATION AND MODIFICATION REQUESTS TO CURRENT CONTRACTS. VENDORS WHOSE CONTRACTS CONTAIN THIS SIN HAVE 9 MONTHS FROM DATE OF CONTRACT AWARD TO IMPLEMENT THE POINT OF SALE AND TRANSACTIONAL DATA REQUIREMENTS. THIS LIST OF REQUIRED DATA FIELDS SUPERSEDES PREVIOUS TRANSACTIONAL DATA LISTS FROM GSA. |
| Aug 22, 2019 | PS0051 | $0 | SIN: 105 002PRODUCTS AND EQUIPMENT INCLUDING BUT NOT LIMITED TO: FLOORING, FENCING, HARDWARE, BUILDING MATERIALS, TOOLS, APPLICATIONS, ELECTRIC, PAINT, PLUMBING, LAWN ANDGARDEN MOTORS, SHOP, MACHINING, WELDING, MATERIAL HANDLING; CARTS, TRUCKS AND DOCK; HVAC, CLEANING AND IRRIGATION, EQUIPMENT. SIN 105 002 CURRENTLY HAS EXECUTIVE ORDER 13693, FEDERAL LEADERSHIP IN ENVIRONMENTAL, ENERGY, AND ECONOMIC PERFORMANCE. EFFECTIVE IMMEDIATELY, NON-COMPLIANT ITEMS IN THE CATEGORIES LISTEDBELOW WILL NO LONGER BE ACCEPTED. "GREEN" PRODUCTS SHALL MEET THE REQUIREMENTSOF THE FAS ENVIRONMENTAL ICON STANDARDS AS LISTED IN GSA ADVANTAGE! AND ARE REQUIRED ON ALL NEW OFFERS SUBMITTED UNDER THE SOLICITATION AND MODIFICATION REQUESTS TO CURRENT CONTRACTS. VENDORS WHOSE CONTRACTS CONTAIN THIS SIN HAVE 9 MONTHS FROM DATE OF CONTRACT AWARD TO IMPLEMENT THE POINT OF SALE AND TRANSACTIONAL DATA REQUIREMENTS. THIS LIST OF REQUIRED DATA FIELDS SUPERSEDES PREVIOUS TRANSACTIONAL DATA LISTS FROM GSA. |
| Jan 2, 2019 | PMA724 | $0 | SIN: 105 002PRODUCTS AND EQUIPMENT INCLUDING BUT NOT LIMITED TO: FLOORING, FENCING, HARDWARE, BUILDING MATERIALS, TOOLS, APPLICATIONS, ELECTRIC, PAINT, PLUMBING, LAWN ANDGARDEN MOTORS, SHOP, MACHINING, WELDING, MATERIAL HANDLING; CARTS, TRUCKS AND DOCK; HVAC, CLEANING AND IRRIGATION, EQUIPMENT. SIN 105 002 CURRENTLY HAS EXECUTIVE ORDER 13693, FEDERAL LEADERSHIP IN ENVIRONMENTAL, ENERGY, AND ECONOMIC PERFORMANCE. EFFECTIVE IMMEDIATELY, NON-COMPLIANT ITEMS IN THE CATEGORIES LISTEDBELOW WILL NO LONGER BE ACCEPTED. "GREEN" PRODUCTS SHALL MEET THE REQUIREMENTSOF THE FAS ENVIRONMENTAL ICON STANDARDS AS LISTED IN GSA ADVANTAGE! AND ARE REQUIRED ON ALL NEW OFFERS SUBMITTED UNDER THE SOLICITATION AND MODIFICATION REQUESTS TO CURRENT CONTRACTS. VENDORS WHOSE CONTRACTS CONTAIN THIS SIN HAVE 9 MONTHS FROM DATE OF CONTRACT AWARD TO IMPLEMENT THE POINT OF SALE AND TRANSACTIONAL DATA REQUIREMENTS. THIS LIST OF REQUIRED DATA FIELDS SUPERSEDES PREVIOUS TRANSACTIONAL DATA LISTS FROM GSA. |
| May 17, 2018 | PMA626 | $0 | SIN: 105 002PRODUCTS AND EQUIPMENT INCLUDING BUT NOT LIMITED TO: FLOORING, FENCING, HARDWARE, BUILDING MATERIALS, TOOLS, APPLICATIONS, ELECTRIC, PAINT, PLUMBING, LAWN ANDGARDEN MOTORS, SHOP, MACHINING, WELDING, MATERIAL HANDLING; CARTS, TRUCKS AND DOCK; HVAC, CLEANING AND IRRIGATION, EQUIPMENT. SIN 105 002 CURRENTLY HAS EXECUTIVE ORDER 13693, FEDERAL LEADERSHIP IN ENVIRONMENTAL, ENERGY, AND ECONOMIC PERFORMANCE. EFFECTIVE IMMEDIATELY, NON-COMPLIANT ITEMS IN THE CATEGORIES LISTEDBELOW WILL NO LONGER BE ACCEPTED. "GREEN" PRODUCTS SHALL MEET THE REQUIREMENTSOF THE FAS ENVIRONMENTAL ICON STANDARDS AS LISTED IN GSA ADVANTAGE! AND ARE REQUIRED ON ALL NEW OFFERS SUBMITTED UNDER THE SOLICITATION AND MODIFICATION REQUESTS TO CURRENT CONTRACTS. VENDORS WHOSE CONTRACTS CONTAIN THIS SIN HAVE 9 MONTHS FROM DATE OF CONTRACT AWARD TO IMPLEMENT THE POINT OF SALE AND TRANSACTIONAL DATA REQUIREMENTS. THIS LIST OF REQUIRED DATA FIELDS SUPERSEDES PREVIOUS TRANSACTIONAL DATA LISTS FROM GSA. |
| May 17, 2018 | PMA652 | $0 | SIN: 105 002PRODUCTS AND EQUIPMENT INCLUDING BUT NOT LIMITED TO: FLOORING, FENCING, HARDWARE, BUILDING MATERIALS, TOOLS, APPLICATIONS, ELECTRIC, PAINT, PLUMBING, LAWN ANDGARDEN MOTORS, SHOP, MACHINING, WELDING, MATERIAL HANDLING; CARTS, TRUCKS AND DOCK; HVAC, CLEANING AND IRRIGATION, EQUIPMENT. SIN 105 002 CURRENTLY HAS EXECUTIVE ORDER 13693, FEDERAL LEADERSHIP IN ENVIRONMENTAL, ENERGY, AND ECONOMIC PERFORMANCE. EFFECTIVE IMMEDIATELY, NON-COMPLIANT ITEMS IN THE CATEGORIES LISTEDBELOW WILL NO LONGER BE ACCEPTED. "GREEN" PRODUCTS SHALL MEET THE REQUIREMENTSOF THE FAS ENVIRONMENTAL ICON STANDARDS AS LISTED IN GSA ADVANTAGE! AND ARE REQUIRED ON ALL NEW OFFERS SUBMITTED UNDER THE SOLICITATION AND MODIFICATION REQUESTS TO CURRENT CONTRACTS. VENDORS WHOSE CONTRACTS CONTAIN THIS SIN HAVE 9 MONTHS FROM DATE OF CONTRACT AWARD TO IMPLEMENT THE POINT OF SALE AND TRANSACTIONAL DATA REQUIREMENTS. THIS LIST OF REQUIRED DATA FIELDS SUPERSEDES PREVIOUS TRANSACTIONAL DATA LISTS FROM GSA. |
| Mar 14, 2018 | PSA617REVTERMCOND | $0 | SIN: 105 002PRODUCTS AND EQUIPMENT INCLUDING BUT NOT LIMITED TO: FLOORING, FENCING, HARDWARE, BUILDING MATERIALS, TOOLS, APPLICATIONS, ELECTRIC, PAINT, PLUMBING, LAWN ANDGARDEN MOTORS, SHOP, MACHINING, WELDING, MATERIAL HANDLING; CARTS, TRUCKS AND DOCK; HVAC, CLEANING AND IRRIGATION, EQUIPMENT. SIN 105 002 CURRENTLY HAS EXECUTIVE ORDER 13693, FEDERAL LEADERSHIP IN ENVIRONMENTAL, ENERGY, AND ECONOMIC PERFORMANCE. EFFECTIVE IMMEDIATELY, NON-COMPLIANT ITEMS IN THE CATEGORIES LISTEDBELOW WILL NO LONGER BE ACCEPTED. "GREEN" PRODUCTS SHALL MEET THE REQUIREMENTSOF THE FAS ENVIRONMENTAL ICON STANDARDS AS LISTED IN GSA ADVANTAGE! AND ARE REQUIRED ON ALL NEW OFFERS SUBMITTED UNDER THE SOLICITATION AND MODIFICATION REQUESTS TO CURRENT CONTRACTS. VENDORS WHOSE CONTRACTS CONTAIN THIS SIN HAVE 9 MONTHS FROM DATE OF CONTRACT AWARD TO IMPLEMENT THE POINT OF SALE AND TRANSACTIONAL DATA REQUIREMENTS. THIS LIST OF REQUIRED DATA FIELDS SUPERSEDES PREVIOUS TRANSACTIONAL DATA LISTS FROM GSA. |
| Jan 23, 2018 | PSA580REVTERMCOND | $0 | SIN: 105 002PRODUCTS AND EQUIPMENT INCLUDING BUT NOT LIMITED TO: FLOORING, FENCING, HARDWARE, BUILDING MATERIALS, TOOLS, APPLICATIONS, ELECTRIC, PAINT, PLUMBING, LAWN ANDGARDEN MOTORS, SHOP, MACHINING, WELDING, MATERIAL HANDLING; CARTS, TRUCKS AND DOCK; HVAC, CLEANING AND IRRIGATION, EQUIPMENT. SIN 105 002 CURRENTLY HAS EXECUTIVE ORDER 13693, FEDERAL LEADERSHIP IN ENVIRONMENTAL, ENERGY, AND ECONOMIC PERFORMANCE. EFFECTIVE IMMEDIATELY, NON-COMPLIANT ITEMS IN THE CATEGORIES LISTEDBELOW WILL NO LONGER BE ACCEPTED. "GREEN" PRODUCTS SHALL MEET THE REQUIREMENTSOF THE FAS ENVIRONMENTAL ICON STANDARDS AS LISTED IN GSA ADVANTAGE! AND ARE REQUIRED ON ALL NEW OFFERS SUBMITTED UNDER THE SOLICITATION AND MODIFICATION REQUESTS TO CURRENT CONTRACTS. VENDORS WHOSE CONTRACTS CONTAIN THIS SIN HAVE 9 MONTHS FROM DATE OF CONTRACT AWARD TO IMPLEMENT THE POINT OF SALE AND TRANSACTIONAL DATA REQUIREMENTS. THIS LIST OF REQUIRED DATA FIELDS SUPERSEDES PREVIOUS TRANSACTIONAL DATA LISTS FROM GSA. |
| Jul 14, 2017 | PSA509REVTERMCOND | $0 | SIN: 105 002PRODUCTS AND EQUIPMENT INCLUDING BUT NOT LIMITED TO: FLOORING, FENCING, HARDWARE, BUILDING MATERIALS, TOOLS, APPLICATIONS, ELECTRIC, PAINT, PLUMBING, LAWN ANDGARDEN MOTORS, SHOP, MACHINING, WELDING, MATERIAL HANDLING; CARTS, TRUCKS AND DOCK; HVAC, CLEANING AND IRRIGATION, EQUIPMENT. SIN 105 002 CURRENTLY HAS BOTHEXECUTIVE ORDER 13514 COMPLIANT AND NON COMPLIANT ITEMS; EFFECTIVE IMMEDIATELY, NON-COMPLIANT ITEMS IN THE CATEGORIES LISTED BELOW WILL NO LONGER BE ACCEPTED. "GREEN" PRODUCTS SHALL MEET THE REQUIREMENTS OF THE FAS ENVIRONMENTAL ICON STANDARDS AS LISTED IN GSA ADVANTAGE! AND ARE REQUIRED ON ALL NEW OFFERS SUBMITTED UNDER THE SOLICITATION AND MODIFICATION REQUESTS TO CURRENT CONTRACTS. VENDORS WHOSE CONTRACTS CONTAIN THIS SIN HAVE 9 MONTHS FROM DATE OF CONTRACT AWARD TO IMPLEMENT THE POINT OF SALE AND TRANSACTIONAL DATA REQUIREMENTS. THIS LIST OFREQUIRED DATA FIELDS SUPERSEDES PREVIOUS TRANSACTIONAL DATA LISTS FROM GSA. TRANSACTIONAL DATA PROGRAM: |
| May 6, 2017 | PA0046REASSIGNMENT | $0 | SIN: 105 002PRODUCTS AND EQUIPMENT INCLUDING BUT NOT LIMITED TO: FLOORING, FENCING, HARDWARE, BUILDING MATERIALS, TOOLS, APPLICATIONS, ELECTRIC, PAINT, PLUMBING, LAWN ANDGARDEN MOTORS, SHOP, MACHINING, WELDING, MATERIAL HANDLING; CARTS, TRUCKS AND DOCK; HVAC, CLEANING AND IRRIGATION, EQUIPMENT. SIN 105 002 CURRENTLY HAS BOTHEXECUTIVE ORDER 13514 COMPLIANT AND NON COMPLIANT ITEMS; EFFECTIVE IMMEDIATELY, NON-COMPLIANT ITEMS IN THE CATEGORIES LISTED BELOW WILL NO LONGER BE ACCEPTED. "GREEN" PRODUCTS SHALL MEET THE REQUIREMENTS OF THE FAS ENVIRONMENTAL ICON STANDARDS AS LISTED IN GSA ADVANTAGE! AND ARE REQUIRED ON ALL NEW OFFERS SUBMITTED UNDER THE SOLICITATION AND MODIFICATION REQUESTS TO CURRENT CONTRACTS. VENDORS WHOSE CONTRACTS CONTAIN THIS SIN HAVE 9 MONTHS FROM DATE OF CONTRACT AWARD TO IMPLEMENT THE POINT OF SALE AND TRANSACTIONAL DATA REQUIREMENTS. THIS LIST OFREQUIRED DATA FIELDS SUPERSEDES PREVIOUS TRANSACTIONAL DATA LISTS FROM GSA. TRANSACTIONAL DATA PROGRAM: |
| Apr 18, 2017 | PA0045REASSIGNMENT | $0 | SIN: 105 002PRODUCTS AND EQUIPMENT INCLUDING BUT NOT LIMITED TO: FLOORING, FENCING, HARDWARE, BUILDING MATERIALS, TOOLS, APPLICATIONS, ELECTRIC, PAINT, PLUMBING, LAWN ANDGARDEN MOTORS, SHOP, MACHINING, WELDING, MATERIAL HANDLING; CARTS, TRUCKS AND DOCK; HVAC, CLEANING AND IRRIGATION, EQUIPMENT. SIN 105 002 CURRENTLY HAS BOTHEXECUTIVE ORDER 13514 COMPLIANT AND NON COMPLIANT ITEMS; EFFECTIVE IMMEDIATELY, NON-COMPLIANT ITEMS IN THE CATEGORIES LISTED BELOW WILL NO LONGER BE ACCEPTED. "GREEN" PRODUCTS SHALL MEET THE REQUIREMENTS OF THE FAS ENVIRONMENTAL ICON STANDARDS AS LISTED IN GSA ADVANTAGE! AND ARE REQUIRED ON ALL NEW OFFERS SUBMITTED UNDER THE SOLICITATION AND MODIFICATION REQUESTS TO CURRENT CONTRACTS. VENDORS WHOSE CONTRACTS CONTAIN THIS SIN HAVE 9 MONTHS FROM DATE OF CONTRACT AWARD TO IMPLEMENT THE POINT OF SALE AND TRANSACTIONAL DATA REQUIREMENTS. THIS LIST OFREQUIRED DATA FIELDS SUPERSEDES PREVIOUS TRANSACTIONAL DATA LISTS FROM GSA. TRANSACTIONAL DATA PROGRAM: |
| Mar 10, 2017 | PA0044AUTHNEG | $0 | SIN: 105 002PRODUCTS AND EQUIPMENT INCLUDING BUT NOT LIMITED TO: FLOORING, FENCING, HARDWARE, BUILDING MATERIALS, TOOLS, APPLICATIONS, ELECTRIC, PAINT, PLUMBING, LAWN ANDGARDEN MOTORS, SHOP, MACHINING, WELDING, MATERIAL HANDLING; CARTS, TRUCKS AND DOCK; HVAC, CLEANING AND IRRIGATION, EQUIPMENT. SIN 105 002 CURRENTLY HAS BOTHEXECUTIVE ORDER 13514 COMPLIANT AND NON COMPLIANT ITEMS; EFFECTIVE IMMEDIATELY, NON-COMPLIANT ITEMS IN THE CATEGORIES LISTED BELOW WILL NO LONGER BE ACCEPTED. "GREEN" PRODUCTS SHALL MEET THE REQUIREMENTS OF THE FAS ENVIRONMENTAL ICON STANDARDS AS LISTED IN GSA ADVANTAGE! AND ARE REQUIRED ON ALL NEW OFFERS SUBMITTED UNDER THE SOLICITATION AND MODIFICATION REQUESTS TO CURRENT CONTRACTS. VENDORS WHOSE CONTRACTS CONTAIN THIS SIN HAVE 9 MONTHS FROM DATE OF CONTRACT AWARD TO IMPLEMENT THE POINT OF SALE AND TRANSACTIONAL DATA REQUIREMENTS. THIS LIST OFREQUIRED DATA FIELDS SUPERSEDES PREVIOUS TRANSACTIONAL DATA LISTS FROM GSA. TRANSACTIONAL DATA PROGRAM: |
| May 13, 2016 | PS0043DELPROD | $0 | SIN: 105 002PRODUCTS AND EQUIPMENT INCLUDING BUT NOT LIMITED TO: FLOORING, FENCING, HARDWARE, BUILDING MATERIALS, TOOLS, APPLICATIONS, ELECTRIC, PAINT, PLUMBING, LAWN ANDGARDEN MOTORS, SHOP, MACHINING, WELDING, MATERIAL HANDLING; CARTS, TRUCKS AND DOCK; HVAC, CLEANING AND IRRIGATION, EQUIPMENT. SIN 105 002 CURRENTLY HAS BOTHEXECUTIVE ORDER 13514 COMPLIANT AND NON COMPLIANT ITEMS; EFFECTIVE IMMEDIATELY, NON-COMPLIANT ITEMS IN THE CATEGORIES LISTED BELOW WILL NO LONGER BE ACCEPTED. "GREEN" PRODUCTS SHALL MEET THE REQUIREMENTS OF THE FAS ENVIRONMENTAL ICON STANDARDS AS LISTED IN GSA ADVANTAGE! AND ARE REQUIRED ON ALL NEW OFFERS SUBMITTED UNDER THE SOLICITATION AND MODIFICATION REQUESTS TO CURRENT CONTRACTS. VENDORS WHOSE CONTRACTS CONTAIN THIS SIN HAVE 9 MONTHS FROM DATE OF CONTRACT AWARD TO IMPLEMENT THE POINT OF SALE AND TRANSACTIONAL DATA REQUIREMENTS. THIS LIST OFREQUIRED DATA FIELDS SUPERSEDES PREVIOUS TRANSACTIONAL DATA LISTS FROM GSA. TRANSACTIONAL DATA PROGRAM: |
| Feb 8, 2016 | PS0042DELPROD | $0 | SIN: 105 002PRODUCTS AND EQUIPMENT INCLUDING BUT NOT LIMITED TO: FLOORING, FENCING, HARDWARE, BUILDING MATERIALS, TOOLS, APPLICATIONS, ELECTRIC, PAINT, PLUMBING, LAWN ANDGARDEN MOTORS, SHOP, MACHINING, WELDING, MATERIAL HANDLING; CARTS, TRUCKS AND DOCK; HVAC, CLEANING AND IRRIGATION, EQUIPMENT. SIN 105 002 CURRENTLY HAS BOTHEXECUTIVE ORDER 13514 COMPLIANT AND NON COMPLIANT ITEMS; EFFECTIVE IMMEDIATELY, NON-COMPLIANT ITEMS IN THE CATEGORIES LISTED BELOW WILL NO LONGER BE ACCEPTED. "GREEN" PRODUCTS SHALL MEET THE REQUIREMENTS OF THE FAS ENVIRONMENTAL ICON STANDARDS AS LISTED IN GSA ADVANTAGE! AND ARE REQUIRED ON ALL NEW OFFERS SUBMITTED UNDER THE SOLICITATION AND MODIFICATION REQUESTS TO CURRENT CONTRACTS. VENDORS WHOSE CONTRACTS CONTAIN THIS SIN HAVE 9 MONTHS FROM DATE OF CONTRACT AWARD TO IMPLEMENT THE POINT OF SALE AND TRANSACTIONAL DATA REQUIREMENTS. THIS LIST OFREQUIRED DATA FIELDS SUPERSEDES PREVIOUS TRANSACTIONAL DATA LISTS FROM GSA. TRANSACTIONAL DATA PROGRAM: |
| Dec 14, 2015 | CMA476REVTERMCOND | $0 | SIN: 105 002PRODUCTS AND EQUIPMENT INCLUDING BUT NOT LIMITED TO: FLOORING, FENCING, HARDWARE, BUILDING MATERIALS, TOOLS, APPLICATIONS, ELECTRIC, PAINT, PLUMBING, LAWN ANDGARDEN MOTORS, SHOP, MACHINING, WELDING, MATERIAL HANDLING; CARTS, TRUCKS AND DOCK; HVAC, CLEANING AND IRRIGATION, EQUIPMENT. SIN 105 002 CURRENTLY HAS BOTHEXECUTIVE ORDER 13514 COMPLIANT AND NON COMPLIANT ITEMS; EFFECTIVE IMMEDIATELY, NON-COMPLIANT ITEMS IN THE CATEGORIES LISTED BELOW WILL NO LONGER BE ACCEPTED. "GREEN" PRODUCTS SHALL MEET THE REQUIREMENTS OF THE FAS ENVIRONMENTAL ICON STANDARDS AS LISTED IN GSA ADVANTAGE! AND ARE REQUIRED ON ALL NEW OFFERS SUBMITTED UNDER THE SOLICITATION AND MODIFICATION REQUESTS TO CURRENT CONTRACTS. VENDORS WHOSE CONTRACTS CONTAIN THIS SIN HAVE 9 MONTHS FROM DATE OF CONTRACT AWARD TO IMPLEMENT THE POINT OF SALE AND TRANSACTIONAL DATA REQUIREMENTS. THIS LIST OFREQUIRED DATA FIELDS SUPERSEDES PREVIOUS TRANSACTIONAL DATA LISTS FROM GSA. TRANSACTIONAL DATA PROGRAM: |
| Aug 18, 2015 | PS0041ADDPROD | $0 | SIN: 105 002PRODUCTS AND EQUIPMENT INCLUDING BUT NOT LIMITED TO: FLOORING, FENCING, HARDWARE, BUILDING MATERIALS, TOOLS, APPLICATIONS, ELECTRIC, PAINT, PLUMBING, LAWN ANDGARDEN MOTORS, SHOP, MACHINING, WELDING, MATERIAL HANDLING; CARTS, TRUCKS AND DOCK; HVAC, CLEANING AND IRRIGATION, EQUIPMENT. SIN 105 002 CURRENTLY HAS BOTHEXECUTIVE ORDER 13514 COMPLIANT AND NON COMPLIANT ITEMS; EFFECTIVE IMMEDIATELY, NON-COMPLIANT ITEMS IN THE CATEGORIES LISTED BELOW WILL NO LONGER BE ACCEPTED. "GREEN" PRODUCTS SHALL MEET THE REQUIREMENTS OF THE FAS ENVIRONMENTAL ICON STANDARDS AS LISTED IN GSA ADVANTAGE! AND ARE REQUIRED ON ALL NEW OFFERS SUBMITTED UNDER THE SOLICITATION AND MODIFICATION REQUESTS TO CURRENT CONTRACTS. VENDORS WHOSE CONTRACTS CONTAIN THIS SIN HAVE 9 MONTHS FROM DATE OF CONTRACT AWARD TO IMPLEMENT THE POINT OF SALE AND TRANSACTIONAL DATA REQUIREMENTS. THIS LIST OFREQUIRED DATA FIELDS SUPERSEDES PREVIOUS TRANSACTIONAL DATA LISTS FROM GSA. TRANSACTIONAL DATA PROGRAM: |
| Aug 18, 2015 | PS0041EPACPL | $0 | SIN: 105 002PRODUCTS AND EQUIPMENT INCLUDING BUT NOT LIMITED TO: FLOORING, FENCING, HARDWARE, BUILDING MATERIALS, TOOLS, APPLICATIONS, ELECTRIC, PAINT, PLUMBING, LAWN ANDGARDEN MOTORS, SHOP, MACHINING, WELDING, MATERIAL HANDLING; CARTS, TRUCKS AND DOCK; HVAC, CLEANING AND IRRIGATION, EQUIPMENT. SIN 105 002 CURRENTLY HAS BOTHEXECUTIVE ORDER 13514 COMPLIANT AND NON COMPLIANT ITEMS; EFFECTIVE IMMEDIATELY, NON-COMPLIANT ITEMS IN THE CATEGORIES LISTED BELOW WILL NO LONGER BE ACCEPTED. "GREEN" PRODUCTS SHALL MEET THE REQUIREMENTS OF THE FAS ENVIRONMENTAL ICON STANDARDS AS LISTED IN GSA ADVANTAGE! AND ARE REQUIRED ON ALL NEW OFFERS SUBMITTED UNDER THE SOLICITATION AND MODIFICATION REQUESTS TO CURRENT CONTRACTS. VENDORS WHOSE CONTRACTS CONTAIN THIS SIN HAVE 9 MONTHS FROM DATE OF CONTRACT AWARD TO IMPLEMENT THE POINT OF SALE AND TRANSACTIONAL DATA REQUIREMENTS. THIS LIST OFREQUIRED DATA FIELDS SUPERSEDES PREVIOUS TRANSACTIONAL DATA LISTS FROM GSA. TRANSACTIONAL DATA PROGRAM: |
| Apr 10, 2015 | CMA432REVTERMCOND | $0 | SIN: 105 002PRODUCTS AND EQUIPMENT INCLUDING BUT NOT LIMITED TO: FLOORING, FENCING, HARDWARE, BUILDING MATERIALS, TOOLS, APPLICATIONS, ELECTRIC, PAINT, PLUMBING, LAWN ANDGARDEN MOTORS, SHOP, MACHINING, WELDING, MATERIAL HANDLING; CARTS, TRUCKS AND DOCK; HVAC, CLEANING AND IRRIGATION, EQUIPMENT. SIN 105 002 CURRENTLY HAS BOTHEXECUTIVE ORDER 13514 COMPLIANT AND NON COMPLIANT ITEMS; EFFECTIVE IMMEDIATELY, NON-COMPLIANT ITEMS IN THE CATEGORIES LISTED BELOW WILL NO LONGER BE ACCEPTED. "GREEN" PRODUCTS SHALL MEET THE REQUIREMENTS OF THE FAS ENVIRONMENTAL ICON STANDARDS AS LISTED IN GSA ADVANTAGE! AND ARE REQUIRED ON ALL NEW OFFERS SUBMITTED UNDER THE SOLICITATION AND MODIFICATION REQUESTS TO CURRENT CONTRACTS. VENDORS WHOSE CONTRACTS CONTAIN THIS SIN HAVE 9 MONTHS FROM DATE OF CONTRACT AWARD TO IMPLEMENT THE POINT OF SALE AND TRANSACTIONAL DATA REQUIREMENTS. THIS LIST OFREQUIRED DATA FIELDS SUPERSEDES PREVIOUS TRANSACTIONAL DATA LISTS FROM GSA. TRANSACTIONAL DATA PROGRAM: |
| Aug 15, 2014 | PO0037EXERCISEOPTION | $0 | SIN: 105 002PRODUCTS AND EQUIPMENT INCLUDING BUT NOT LIMITED TO: FLOORING, FENCING, HARDWARE, BUILDING MATERIALS, TOOLS, APPLICATIONS, ELECTRIC, PAINT, PLUMBING, LAWN ANDGARDEN MOTORS, SHOP, MACHINING, WELDING, MATERIAL HANDLING; CARTS, TRUCKS AND DOCK; HVAC, CLEANING AND IRRIGATION, EQUIPMENT. SIN 105 002 CURRENTLY HAS BOTHEXECUTIVE ORDER 13514 COMPLIANT AND NON COMPLIANT ITEMS; EFFECTIVE IMMEDIATELY, NON-COMPLIANT ITEMS IN THE CATEGORIES LISTED BELOW WILL NO LONGER BE ACCEPTED. "GREEN" PRODUCTS SHALL MEET THE REQUIREMENTS OF THE FAS ENVIRONMENTAL ICON STANDARDS AS LISTED IN GSA ADVANTAGE! AND ARE REQUIRED ON ALL NEW OFFERS SUBMITTED UNDER THE SOLICITATION AND MODIFICATION REQUESTS TO CURRENT CONTRACTS. VENDORS WHOSE CONTRACTS CONTAIN THIS SIN HAVE 9 MONTHS FROM DATE OF CONTRACT AWARD TO IMPLEMENT THE POINT OF SALE AND TRANSACTIONAL DATA REQUIREMENTS. THIS LIST OFREQUIRED DATA FIELDS SUPERSEDES PREVIOUS TRANSACTIONAL DATA LISTS FROM GSA. TRANSACTIONAL DATA PROGRAM: |
| Aug 15, 2014 | PS0040DELPROD | $0 | SIN: 105 002PRODUCTS AND EQUIPMENT INCLUDING BUT NOT LIMITED TO: FLOORING, FENCING, HARDWARE, BUILDING MATERIALS, TOOLS, APPLICATIONS, ELECTRIC, PAINT, PLUMBING, LAWN ANDGARDEN MOTORS, SHOP, MACHINING, WELDING, MATERIAL HANDLING; CARTS, TRUCKS AND DOCK; HVAC, CLEANING AND IRRIGATION, EQUIPMENT. SIN 105 002 CURRENTLY HAS BOTHEXECUTIVE ORDER 13514 COMPLIANT AND NON COMPLIANT ITEMS; EFFECTIVE IMMEDIATELY, NON-COMPLIANT ITEMS IN THE CATEGORIES LISTED BELOW WILL NO LONGER BE ACCEPTED. "GREEN" PRODUCTS SHALL MEET THE REQUIREMENTS OF THE FAS ENVIRONMENTAL ICON STANDARDS AS LISTED IN GSA ADVANTAGE! AND ARE REQUIRED ON ALL NEW OFFERS SUBMITTED UNDER THE SOLICITATION AND MODIFICATION REQUESTS TO CURRENT CONTRACTS. VENDORS WHOSE CONTRACTS CONTAIN THIS SIN HAVE 9 MONTHS FROM DATE OF CONTRACT AWARD TO IMPLEMENT THE POINT OF SALE AND TRANSACTIONAL DATA REQUIREMENTS. THIS LIST OFREQUIRED DATA FIELDS SUPERSEDES PREVIOUS TRANSACTIONAL DATA LISTS FROM GSA. TRANSACTIONAL DATA PROGRAM: |
| Aug 14, 2014 | PS0039REVTERMCOND | $0 | SIN: 105 002PRODUCTS AND EQUIPMENT INCLUDING BUT NOT LIMITED TO: FLOORING, FENCING, HARDWARE, BUILDING MATERIALS, TOOLS, APPLICATIONS, ELECTRIC, PAINT, PLUMBING, LAWN ANDGARDEN MOTORS, SHOP, MACHINING, WELDING, MATERIAL HANDLING; CARTS, TRUCKS AND DOCK; HVAC, CLEANING AND IRRIGATION, EQUIPMENT. SIN 105 002 CURRENTLY HAS BOTHEXECUTIVE ORDER 13514 COMPLIANT AND NON COMPLIANT ITEMS; EFFECTIVE IMMEDIATELY, NON-COMPLIANT ITEMS IN THE CATEGORIES LISTED BELOW WILL NO LONGER BE ACCEPTED. "GREEN" PRODUCTS SHALL MEET THE REQUIREMENTS OF THE FAS ENVIRONMENTAL ICON STANDARDS AS LISTED IN GSA ADVANTAGE! AND ARE REQUIRED ON ALL NEW OFFERS SUBMITTED UNDER THE SOLICITATION AND MODIFICATION REQUESTS TO CURRENT CONTRACTS. VENDORS WHOSE CONTRACTS CONTAIN THIS SIN HAVE 9 MONTHS FROM DATE OF CONTRACT AWARD TO IMPLEMENT THE POINT OF SALE AND TRANSACTIONAL DATA REQUIREMENTS. THIS LIST OFREQUIRED DATA FIELDS SUPERSEDES PREVIOUS TRANSACTIONAL DATA LISTS FROM GSA. TRANSACTIONAL DATA PROGRAM: |
| Jul 8, 2014 | CMA388REVTERMCOND | $0 | SIN: 105 002PRODUCTS AND EQUIPMENT INCLUDING BUT NOT LIMITED TO: FLOORING, FENCING, HARDWARE, BUILDING MATERIALS, TOOLS, APPLICATIONS, ELECTRIC, PAINT, PLUMBING, LAWN ANDGARDEN MOTORS, SHOP, MACHINING, WELDING, MATERIAL HANDLING; CARTS, TRUCKS AND DOCK; HVAC, CLEANING AND IRRIGATION, EQUIPMENT. SIN 105 002 CURRENTLY HAS BOTHEXECUTIVE ORDER 13514 COMPLIANT AND NON COMPLIANT ITEMS; EFFECTIVE IMMEDIATELY, NON-COMPLIANT ITEMS IN THE CATEGORIES LISTED BELOW WILL NO LONGER BE ACCEPTED. "GREEN" PRODUCTS SHALL MEET THE REQUIREMENTS OF THE FAS ENVIRONMENTAL ICON STANDARDS AS LISTED IN GSA ADVANTAGE! AND ARE REQUIRED ON ALL NEW OFFERS SUBMITTED UNDER THE SOLICITATION AND MODIFICATION REQUESTS TO CURRENT CONTRACTS. VENDORS WHOSE CONTRACTS CONTAIN THIS SIN HAVE 9 MONTHS FROM DATE OF CONTRACT AWARD TO IMPLEMENT THE POINT OF SALE AND TRANSACTIONAL DATA REQUIREMENTS. THIS LIST OFREQUIRED DATA FIELDS SUPERSEDES PREVIOUS TRANSACTIONAL DATA LISTS FROM GSA. TRANSACTIONAL DATA PROGRAM: |
| Mar 24, 2014 | PS0035ADDPROD | $0 | SIN: 105 002PRODUCTS AND EQUIPMENT INCLUDING BUT NOT LIMITED TO: FLOORING, FENCING, HARDWARE, BUILDING MATERIALS, TOOLS, APPLICATIONS, ELECTRIC, PAINT, PLUMBING, LAWN ANDGARDEN MOTORS, SHOP, MACHINING, WELDING, MATERIAL HANDLING; CARTS, TRUCKS AND DOCK; HVAC, CLEANING AND IRRIGATION, EQUIPMENT. SIN 105 002 CURRENTLY HAS BOTHEXECUTIVE ORDER 13514 COMPLIANT AND NON COMPLIANT ITEMS; EFFECTIVE IMMEDIATELY, NON-COMPLIANT ITEMS IN THE CATEGORIES LISTED BELOW WILL NO LONGER BE ACCEPTED. "GREEN" PRODUCTS SHALL MEET THE REQUIREMENTS OF THE FAS ENVIRONMENTAL ICON STANDARDS AS LISTED IN GSA ADVANTAGE! AND ARE REQUIRED ON ALL NEW OFFERS SUBMITTED UNDER THE SOLICITATION AND MODIFICATION REQUESTS TO CURRENT CONTRACTS. VENDORS WHOSE CONTRACTS CONTAIN THIS SIN HAVE 9 MONTHS FROM DATE OF CONTRACT AWARD TO IMPLEMENT THE POINT OF SALE AND TRANSACTIONAL DATA REQUIREMENTS. THIS LIST OFREQUIRED DATA FIELDS SUPERSEDES PREVIOUS TRANSACTIONAL DATA LISTS FROM GSA. TRANSACTIONAL DATA PROGRAM: |
| Mar 24, 2014 | PS0035EPACPL | $0 | SIN: 105 002PRODUCTS AND EQUIPMENT INCLUDING BUT NOT LIMITED TO: FLOORING, FENCING, HARDWARE, BUILDING MATERIALS, TOOLS, APPLICATIONS, ELECTRIC, PAINT, PLUMBING, LAWN ANDGARDEN MOTORS, SHOP, MACHINING, WELDING, MATERIAL HANDLING; CARTS, TRUCKS AND DOCK; HVAC, CLEANING AND IRRIGATION, EQUIPMENT. SIN 105 002 CURRENTLY HAS BOTHEXECUTIVE ORDER 13514 COMPLIANT AND NON COMPLIANT ITEMS; EFFECTIVE IMMEDIATELY, NON-COMPLIANT ITEMS IN THE CATEGORIES LISTED BELOW WILL NO LONGER BE ACCEPTED. "GREEN" PRODUCTS SHALL MEET THE REQUIREMENTS OF THE FAS ENVIRONMENTAL ICON STANDARDS AS LISTED IN GSA ADVANTAGE! AND ARE REQUIRED ON ALL NEW OFFERS SUBMITTED UNDER THE SOLICITATION AND MODIFICATION REQUESTS TO CURRENT CONTRACTS. VENDORS WHOSE CONTRACTS CONTAIN THIS SIN HAVE 9 MONTHS FROM DATE OF CONTRACT AWARD TO IMPLEMENT THE POINT OF SALE AND TRANSACTIONAL DATA REQUIREMENTS. THIS LIST OFREQUIRED DATA FIELDS SUPERSEDES PREVIOUS TRANSACTIONAL DATA LISTS FROM GSA. TRANSACTIONAL DATA PROGRAM: |
| Mar 10, 2014 | PS0036DELPROD | $0 | SIN: 105 002PRODUCTS AND EQUIPMENT INCLUDING BUT NOT LIMITED TO: FLOORING, FENCING, HARDWARE, BUILDING MATERIALS, TOOLS, APPLICATIONS, ELECTRIC, PAINT, PLUMBING, LAWN ANDGARDEN MOTORS, SHOP, MACHINING, WELDING, MATERIAL HANDLING; CARTS, TRUCKS AND DOCK; HVAC, CLEANING AND IRRIGATION, EQUIPMENT. SIN 105 002 CURRENTLY HAS BOTHEXECUTIVE ORDER 13514 COMPLIANT AND NON COMPLIANT ITEMS; EFFECTIVE IMMEDIATELY, NON-COMPLIANT ITEMS IN THE CATEGORIES LISTED BELOW WILL NO LONGER BE ACCEPTED. "GREEN" PRODUCTS SHALL MEET THE REQUIREMENTS OF THE FAS ENVIRONMENTAL ICON STANDARDS AS LISTED IN GSA ADVANTAGE! AND ARE REQUIRED ON ALL NEW OFFERS SUBMITTED UNDER THE SOLICITATION AND MODIFICATION REQUESTS TO CURRENT CONTRACTS. VENDORS WHOSE CONTRACTS CONTAIN THIS SIN HAVE 9 MONTHS FROM DATE OF CONTRACT AWARD TO IMPLEMENT THE POINT OF SALE AND TRANSACTIONAL DATA REQUIREMENTS. THIS LIST OFREQUIRED DATA FIELDS SUPERSEDES PREVIOUS TRANSACTIONAL DATA LISTS FROM GSA. TRANSACTIONAL DATA PROGRAM: |
| Feb 11, 2014 | PS0034DELPROD | $0 | SIN: 105 002PRODUCTS AND EQUIPMENT INCLUDING BUT NOT LIMITED TO: FLOORING, FENCING, HARDWARE, BUILDING MATERIALS, TOOLS, APPLICATIONS, ELECTRIC, PAINT, PLUMBING, LAWN ANDGARDEN MOTORS, SHOP, MACHINING, WELDING, MATERIAL HANDLING; CARTS, TRUCKS AND DOCK; HVAC, CLEANING AND IRRIGATION, EQUIPMENT. SIN 105 002 CURRENTLY HAS BOTHEXECUTIVE ORDER 13514 COMPLIANT AND NON COMPLIANT ITEMS; EFFECTIVE IMMEDIATELY, NON-COMPLIANT ITEMS IN THE CATEGORIES LISTED BELOW WILL NO LONGER BE ACCEPTED. "GREEN" PRODUCTS SHALL MEET THE REQUIREMENTS OF THE FAS ENVIRONMENTAL ICON STANDARDS AS LISTED IN GSA ADVANTAGE! AND ARE REQUIRED ON ALL NEW OFFERS SUBMITTED UNDER THE SOLICITATION AND MODIFICATION REQUESTS TO CURRENT CONTRACTS. VENDORS WHOSE CONTRACTS CONTAIN THIS SIN HAVE 9 MONTHS FROM DATE OF CONTRACT AWARD TO IMPLEMENT THE POINT OF SALE AND TRANSACTIONAL DATA REQUIREMENTS. THIS LIST OFREQUIRED DATA FIELDS SUPERSEDES PREVIOUS TRANSACTIONAL DATA LISTS FROM GSA. TRANSACTIONAL DATA PROGRAM: |
| Nov 8, 2013 | CMA346REVTERMCOND | $0 | SIN: 105 002PRODUCTS AND EQUIPMENT INCLUDING BUT NOT LIMITED TO: FLOORING, FENCING, HARDWARE, BUILDING MATERIALS, TOOLS, APPLICATIONS, ELECTRIC, PAINT, PLUMBING, LAWN ANDGARDEN MOTORS, SHOP, MACHINING, WELDING, MATERIAL HANDLING; CARTS, TRUCKS AND DOCK; HVAC, CLEANING AND IRRIGATION, EQUIPMENT. SIN 105 002 CURRENTLY HAS BOTHEXECUTIVE ORDER 13514 COMPLIANT AND NON COMPLIANT ITEMS; EFFECTIVE IMMEDIATELY, NON-COMPLIANT ITEMS IN THE CATEGORIES LISTED BELOW WILL NO LONGER BE ACCEPTED. "GREEN" PRODUCTS SHALL MEET THE REQUIREMENTS OF THE FAS ENVIRONMENTAL ICON STANDARDS AS LISTED IN GSA ADVANTAGE! AND ARE REQUIRED ON ALL NEW OFFERS SUBMITTED UNDER THE SOLICITATION AND MODIFICATION REQUESTS TO CURRENT CONTRACTS. VENDORS WHOSE CONTRACTS CONTAIN THIS SIN HAVE 9 MONTHS FROM DATE OF CONTRACT AWARD TO IMPLEMENT THE POINT OF SALE AND TRANSACTIONAL DATA REQUIREMENTS. THIS LIST OFREQUIRED DATA FIELDS SUPERSEDES PREVIOUS TRANSACTIONAL DATA LISTS FROM GSA. TRANSACTIONAL DATA PROGRAM: |
| Oct 11, 2013 | PS0032ADDPROD | $0 | SIN: 105 002PRODUCTS AND EQUIPMENT INCLUDING BUT NOT LIMITED TO: FLOORING, FENCING, HARDWARE, BUILDING MATERIALS, TOOLS, APPLICATIONS, ELECTRIC, PAINT, PLUMBING, LAWN ANDGARDEN MOTORS, SHOP, MACHINING, WELDING, MATERIAL HANDLING; CARTS, TRUCKS AND DOCK; HVAC, CLEANING AND IRRIGATION, EQUIPMENT. SIN 105 002 CURRENTLY HAS BOTHEXECUTIVE ORDER 13514 COMPLIANT AND NON COMPLIANT ITEMS; EFFECTIVE IMMEDIATELY, NON-COMPLIANT ITEMS IN THE CATEGORIES LISTED BELOW WILL NO LONGER BE ACCEPTED. "GREEN" PRODUCTS SHALL MEET THE REQUIREMENTS OF THE FAS ENVIRONMENTAL ICON STANDARDS AS LISTED IN GSA ADVANTAGE! AND ARE REQUIRED ON ALL NEW OFFERS SUBMITTED UNDER THE SOLICITATION AND MODIFICATION REQUESTS TO CURRENT CONTRACTS. VENDORS WHOSE CONTRACTS CONTAIN THIS SIN HAVE 9 MONTHS FROM DATE OF CONTRACT AWARD TO IMPLEMENT THE POINT OF SALE AND TRANSACTIONAL DATA REQUIREMENTS. THIS LIST OFREQUIRED DATA FIELDS SUPERSEDES PREVIOUS TRANSACTIONAL DATA LISTS FROM GSA. TRANSACTIONAL DATA PROGRAM: |
| Oct 11, 2013 | PS0032EPACPL | $0 | SIN: 105 002PRODUCTS AND EQUIPMENT INCLUDING BUT NOT LIMITED TO: FLOORING, FENCING, HARDWARE, BUILDING MATERIALS, TOOLS, APPLICATIONS, ELECTRIC, PAINT, PLUMBING, LAWN ANDGARDEN MOTORS, SHOP, MACHINING, WELDING, MATERIAL HANDLING; CARTS, TRUCKS AND DOCK; HVAC, CLEANING AND IRRIGATION, EQUIPMENT. SIN 105 002 CURRENTLY HAS BOTHEXECUTIVE ORDER 13514 COMPLIANT AND NON COMPLIANT ITEMS; EFFECTIVE IMMEDIATELY, NON-COMPLIANT ITEMS IN THE CATEGORIES LISTED BELOW WILL NO LONGER BE ACCEPTED. "GREEN" PRODUCTS SHALL MEET THE REQUIREMENTS OF THE FAS ENVIRONMENTAL ICON STANDARDS AS LISTED IN GSA ADVANTAGE! AND ARE REQUIRED ON ALL NEW OFFERS SUBMITTED UNDER THE SOLICITATION AND MODIFICATION REQUESTS TO CURRENT CONTRACTS. VENDORS WHOSE CONTRACTS CONTAIN THIS SIN HAVE 9 MONTHS FROM DATE OF CONTRACT AWARD TO IMPLEMENT THE POINT OF SALE AND TRANSACTIONAL DATA REQUIREMENTS. THIS LIST OFREQUIRED DATA FIELDS SUPERSEDES PREVIOUS TRANSACTIONAL DATA LISTS FROM GSA. TRANSACTIONAL DATA PROGRAM: |
| Aug 28, 2013 | PA0031REASSIGNMENT | $0 | SIN: 105 002PRODUCTS AND EQUIPMENT INCLUDING BUT NOT LIMITED TO: FLOORING, FENCING, HARDWARE, BUILDING MATERIALS, TOOLS, APPLICATIONS, ELECTRIC, PAINT, PLUMBING, LAWN ANDGARDEN MOTORS, SHOP, MACHINING, WELDING, MATERIAL HANDLING; CARTS, TRUCKS AND DOCK; HVAC, CLEANING AND IRRIGATION, EQUIPMENT. SIN 105 002 CURRENTLY HAS BOTHEXECUTIVE ORDER 13514 COMPLIANT AND NON COMPLIANT ITEMS; EFFECTIVE IMMEDIATELY, NON-COMPLIANT ITEMS IN THE CATEGORIES LISTED BELOW WILL NO LONGER BE ACCEPTED. "GREEN" PRODUCTS SHALL MEET THE REQUIREMENTS OF THE FAS ENVIRONMENTAL ICON STANDARDS AS LISTED IN GSA ADVANTAGE! AND ARE REQUIRED ON ALL NEW OFFERS SUBMITTED UNDER THE SOLICITATION AND MODIFICATION REQUESTS TO CURRENT CONTRACTS. VENDORS WHOSE CONTRACTS CONTAIN THIS SIN HAVE 9 MONTHS FROM DATE OF CONTRACT AWARD TO IMPLEMENT THE POINT OF SALE AND TRANSACTIONAL DATA REQUIREMENTS. THIS LIST OFREQUIRED DATA FIELDS SUPERSEDES PREVIOUS TRANSACTIONAL DATA LISTS FROM GSA. TRANSACTIONAL DATA PROGRAM: |
| Aug 22, 2013 | PA0030DELPROD | $0 | SIN: 105 002PRODUCTS AND EQUIPMENT INCLUDING BUT NOT LIMITED TO: FLOORING, FENCING, HARDWARE, BUILDING MATERIALS, TOOLS, APPLICATIONS, ELECTRIC, PAINT, PLUMBING, LAWN ANDGARDEN MOTORS, SHOP, MACHINING, WELDING, MATERIAL HANDLING; CARTS, TRUCKS AND DOCK; HVAC, CLEANING AND IRRIGATION, EQUIPMENT. SIN 105 002 CURRENTLY HAS BOTHEXECUTIVE ORDER 13514 COMPLIANT AND NON COMPLIANT ITEMS; EFFECTIVE IMMEDIATELY, NON-COMPLIANT ITEMS IN THE CATEGORIES LISTED BELOW WILL NO LONGER BE ACCEPTED. "GREEN" PRODUCTS SHALL MEET THE REQUIREMENTS OF THE FAS ENVIRONMENTAL ICON STANDARDS AS LISTED IN GSA ADVANTAGE! AND ARE REQUIRED ON ALL NEW OFFERS SUBMITTED UNDER THE SOLICITATION AND MODIFICATION REQUESTS TO CURRENT CONTRACTS. VENDORS WHOSE CONTRACTS CONTAIN THIS SIN HAVE 9 MONTHS FROM DATE OF CONTRACT AWARD TO IMPLEMENT THE POINT OF SALE AND TRANSACTIONAL DATA REQUIREMENTS. THIS LIST OFREQUIRED DATA FIELDS SUPERSEDES PREVIOUS TRANSACTIONAL DATA LISTS FROM GSA. TRANSACTIONAL DATA PROGRAM: |
| Aug 8, 2013 | 31 | $0 | SIN: 105 002PRODUCTS AND EQUIPMENT INCLUDING BUT NOT LIMITED TO: FLOORING, FENCING, HARDWARE, BUILDING MATERIALS, TOOLS, APPLICATIONS, ELECTRIC, PAINT, PLUMBING, LAWN ANDGARDEN MOTORS, SHOP, MACHINING, WELDING, MATERIAL HANDLING; CARTS, TRUCKS AND DOCK; HVAC, CLEANING AND IRRIGATION, EQUIPMENT. SIN 105 002 CURRENTLY HAS BOTHEXECUTIVE ORDER 13514 COMPLIANT AND NON COMPLIANT ITEMS; EFFECTIVE IMMEDIATELY, NON-COMPLIANT ITEMS IN THE CATEGORIES LISTED BELOW WILL NO LONGER BE ACCEPTED. "GREEN" PRODUCTS SHALL MEET THE REQUIREMENTS OF THE FAS ENVIRONMENTAL ICON STANDARDS AS LISTED IN GSA ADVANTAGE! AND ARE REQUIRED ON ALL NEW OFFERS SUBMITTED UNDER THE SOLICITATION AND MODIFICATION REQUESTS TO CURRENT CONTRACTS. VENDORS WHOSE CONTRACTS CONTAIN THIS SIN HAVE 9 MONTHS FROM DATE OF CONTRACT AWARD TO IMPLEMENT THE POINT OF SALE AND TRANSACTIONAL DATA REQUIREMENTS. THIS LIST OFREQUIRED DATA FIELDS SUPERSEDES PREVIOUS TRANSACTIONAL DATA LISTS FROM GSA. TRANSACTIONAL DATA PROGRAM: |
| Aug 8, 2013 | 32 | $0 | SIN: 105 002PRODUCTS AND EQUIPMENT INCLUDING BUT NOT LIMITED TO: FLOORING, FENCING, HARDWARE, BUILDING MATERIALS, TOOLS, APPLICATIONS, ELECTRIC, PAINT, PLUMBING, LAWN ANDGARDEN MOTORS, SHOP, MACHINING, WELDING, MATERIAL HANDLING; CARTS, TRUCKS AND DOCK; HVAC, CLEANING AND IRRIGATION, EQUIPMENT. SIN 105 002 CURRENTLY HAS BOTHEXECUTIVE ORDER 13514 COMPLIANT AND NON COMPLIANT ITEMS; EFFECTIVE IMMEDIATELY, NON-COMPLIANT ITEMS IN THE CATEGORIES LISTED BELOW WILL NO LONGER BE ACCEPTED. "GREEN" PRODUCTS SHALL MEET THE REQUIREMENTS OF THE FAS ENVIRONMENTAL ICON STANDARDS AS LISTED IN GSA ADVANTAGE! AND ARE REQUIRED ON ALL NEW OFFERS SUBMITTED UNDER THE SOLICITATION AND MODIFICATION REQUESTS TO CURRENT CONTRACTS. VENDORS WHOSE CONTRACTS CONTAIN THIS SIN HAVE 9 MONTHS FROM DATE OF CONTRACT AWARD TO IMPLEMENT THE POINT OF SALE AND TRANSACTIONAL DATA REQUIREMENTS. THIS LIST OFREQUIRED DATA FIELDS SUPERSEDES PREVIOUS TRANSACTIONAL DATA LISTS FROM GSA. TRANSACTIONAL DATA PROGRAM: |
| Aug 8, 2013 | 33 | $0 | SIN: 105 002PRODUCTS AND EQUIPMENT INCLUDING BUT NOT LIMITED TO: FLOORING, FENCING, HARDWARE, BUILDING MATERIALS, TOOLS, APPLICATIONS, ELECTRIC, PAINT, PLUMBING, LAWN ANDGARDEN MOTORS, SHOP, MACHINING, WELDING, MATERIAL HANDLING; CARTS, TRUCKS AND DOCK; HVAC, CLEANING AND IRRIGATION, EQUIPMENT. SIN 105 002 CURRENTLY HAS BOTHEXECUTIVE ORDER 13514 COMPLIANT AND NON COMPLIANT ITEMS; EFFECTIVE IMMEDIATELY, NON-COMPLIANT ITEMS IN THE CATEGORIES LISTED BELOW WILL NO LONGER BE ACCEPTED. "GREEN" PRODUCTS SHALL MEET THE REQUIREMENTS OF THE FAS ENVIRONMENTAL ICON STANDARDS AS LISTED IN GSA ADVANTAGE! AND ARE REQUIRED ON ALL NEW OFFERS SUBMITTED UNDER THE SOLICITATION AND MODIFICATION REQUESTS TO CURRENT CONTRACTS. VENDORS WHOSE CONTRACTS CONTAIN THIS SIN HAVE 9 MONTHS FROM DATE OF CONTRACT AWARD TO IMPLEMENT THE POINT OF SALE AND TRANSACTIONAL DATA REQUIREMENTS. THIS LIST OFREQUIRED DATA FIELDS SUPERSEDES PREVIOUS TRANSACTIONAL DATA LISTS FROM GSA. TRANSACTIONAL DATA PROGRAM: |
| Aug 8, 2013 | 34 | $0 | SIN: 105 002PRODUCTS AND EQUIPMENT INCLUDING BUT NOT LIMITED TO: FLOORING, FENCING, HARDWARE, BUILDING MATERIALS, TOOLS, APPLICATIONS, ELECTRIC, PAINT, PLUMBING, LAWN ANDGARDEN MOTORS, SHOP, MACHINING, WELDING, MATERIAL HANDLING; CARTS, TRUCKS AND DOCK; HVAC, CLEANING AND IRRIGATION, EQUIPMENT. SIN 105 002 CURRENTLY HAS BOTHEXECUTIVE ORDER 13514 COMPLIANT AND NON COMPLIANT ITEMS; EFFECTIVE IMMEDIATELY, NON-COMPLIANT ITEMS IN THE CATEGORIES LISTED BELOW WILL NO LONGER BE ACCEPTED. "GREEN" PRODUCTS SHALL MEET THE REQUIREMENTS OF THE FAS ENVIRONMENTAL ICON STANDARDS AS LISTED IN GSA ADVANTAGE! AND ARE REQUIRED ON ALL NEW OFFERS SUBMITTED UNDER THE SOLICITATION AND MODIFICATION REQUESTS TO CURRENT CONTRACTS. VENDORS WHOSE CONTRACTS CONTAIN THIS SIN HAVE 9 MONTHS FROM DATE OF CONTRACT AWARD TO IMPLEMENT THE POINT OF SALE AND TRANSACTIONAL DATA REQUIREMENTS. THIS LIST OFREQUIRED DATA FIELDS SUPERSEDES PREVIOUS TRANSACTIONAL DATA LISTS FROM GSA. TRANSACTIONAL DATA PROGRAM: |
| Jun 27, 2013 | 30 | $0 | SIN: 105 002PRODUCTS AND EQUIPMENT INCLUDING BUT NOT LIMITED TO: FLOORING, FENCING, HARDWARE, BUILDING MATERIALS, TOOLS, APPLICATIONS, ELECTRIC, PAINT, PLUMBING, LAWN ANDGARDEN MOTORS, SHOP, MACHINING, WELDING, MATERIAL HANDLING; CARTS, TRUCKS AND DOCK; HVAC, CLEANING AND IRRIGATION, EQUIPMENT. SIN 105 002 CURRENTLY HAS BOTHEXECUTIVE ORDER 13514 COMPLIANT AND NON COMPLIANT ITEMS; EFFECTIVE IMMEDIATELY, NON-COMPLIANT ITEMS IN THE CATEGORIES LISTED BELOW WILL NO LONGER BE ACCEPTED. "GREEN" PRODUCTS SHALL MEET THE REQUIREMENTS OF THE FAS ENVIRONMENTAL ICON STANDARDS AS LISTED IN GSA ADVANTAGE! AND ARE REQUIRED ON ALL NEW OFFERS SUBMITTED UNDER THE SOLICITATION AND MODIFICATION REQUESTS TO CURRENT CONTRACTS. VENDORS WHOSE CONTRACTS CONTAIN THIS SIN HAVE 9 MONTHS FROM DATE OF CONTRACT AWARD TO IMPLEMENT THE POINT OF SALE AND TRANSACTIONAL DATA REQUIREMENTS. THIS LIST OFREQUIRED DATA FIELDS SUPERSEDES PREVIOUS TRANSACTIONAL DATA LISTS FROM GSA. TRANSACTIONAL DATA PROGRAM: |
| Jun 11, 2013 | 29 | $0 | SIN: 105 002PRODUCTS AND EQUIPMENT INCLUDING BUT NOT LIMITED TO: FLOORING, FENCING, HARDWARE, BUILDING MATERIALS, TOOLS, APPLICATIONS, ELECTRIC, PAINT, PLUMBING, LAWN ANDGARDEN MOTORS, SHOP, MACHINING, WELDING, MATERIAL HANDLING; CARTS, TRUCKS AND DOCK; HVAC, CLEANING AND IRRIGATION, EQUIPMENT. SIN 105 002 CURRENTLY HAS BOTHEXECUTIVE ORDER 13514 COMPLIANT AND NON COMPLIANT ITEMS; EFFECTIVE IMMEDIATELY, NON-COMPLIANT ITEMS IN THE CATEGORIES LISTED BELOW WILL NO LONGER BE ACCEPTED. "GREEN" PRODUCTS SHALL MEET THE REQUIREMENTS OF THE FAS ENVIRONMENTAL ICON STANDARDS AS LISTED IN GSA ADVANTAGE! AND ARE REQUIRED ON ALL NEW OFFERS SUBMITTED UNDER THE SOLICITATION AND MODIFICATION REQUESTS TO CURRENT CONTRACTS. VENDORS WHOSE CONTRACTS CONTAIN THIS SIN HAVE 9 MONTHS FROM DATE OF CONTRACT AWARD TO IMPLEMENT THE POINT OF SALE AND TRANSACTIONAL DATA REQUIREMENTS. THIS LIST OFREQUIRED DATA FIELDS SUPERSEDES PREVIOUS TRANSACTIONAL DATA LISTS FROM GSA. TRANSACTIONAL DATA PROGRAM: |
| Apr 26, 2013 | 28 | $0 | SIN: 105 002PRODUCTS AND EQUIPMENT INCLUDING BUT NOT LIMITED TO: FLOORING, FENCING, HARDWARE, BUILDING MATERIALS, TOOLS, APPLICATIONS, ELECTRIC, PAINT, PLUMBING, LAWN ANDGARDEN MOTORS, SHOP, MACHINING, WELDING, MATERIAL HANDLING; CARTS, TRUCKS AND DOCK; HVAC, CLEANING AND IRRIGATION, EQUIPMENT. SIN 105 002 CURRENTLY HAS BOTHEXECUTIVE ORDER 13514 COMPLIANT AND NON COMPLIANT ITEMS; EFFECTIVE IMMEDIATELY, NON-COMPLIANT ITEMS IN THE CATEGORIES LISTED BELOW WILL NO LONGER BE ACCEPTED. "GREEN" PRODUCTS SHALL MEET THE REQUIREMENTS OF THE FAS ENVIRONMENTAL ICON STANDARDS AS LISTED IN GSA ADVANTAGE! AND ARE REQUIRED ON ALL NEW OFFERS SUBMITTED UNDER THE SOLICITATION AND MODIFICATION REQUESTS TO CURRENT CONTRACTS. VENDORS WHOSE CONTRACTS CONTAIN THIS SIN HAVE 9 MONTHS FROM DATE OF CONTRACT AWARD TO IMPLEMENT THE POINT OF SALE AND TRANSACTIONAL DATA REQUIREMENTS. THIS LIST OFREQUIRED DATA FIELDS SUPERSEDES PREVIOUS TRANSACTIONAL DATA LISTS FROM GSA. TRANSACTIONAL DATA PROGRAM: |
| Jan 17, 2013 | 27 | $0 | SIN: 105 002PRODUCTS AND EQUIPMENT INCLUDING BUT NOT LIMITED TO: FLOORING, FENCING, HARDWARE, BUILDING MATERIALS, TOOLS, APPLICATIONS, ELECTRIC, PAINT, PLUMBING, LAWN ANDGARDEN MOTORS, SHOP, MACHINING, WELDING, MATERIAL HANDLING; CARTS, TRUCKS AND DOCK; HVAC, CLEANING AND IRRIGATION, EQUIPMENT. SIN 105 002 CURRENTLY HAS BOTHEXECUTIVE ORDER 13514 COMPLIANT AND NON COMPLIANT ITEMS; EFFECTIVE IMMEDIATELY, NON-COMPLIANT ITEMS IN THE CATEGORIES LISTED BELOW WILL NO LONGER BE ACCEPTED. "GREEN" PRODUCTS SHALL MEET THE REQUIREMENTS OF THE FAS ENVIRONMENTAL ICON STANDARDS AS LISTED IN GSA ADVANTAGE! AND ARE REQUIRED ON ALL NEW OFFERS SUBMITTED UNDER THE SOLICITATION AND MODIFICATION REQUESTS TO CURRENT CONTRACTS. VENDORS WHOSE CONTRACTS CONTAIN THIS SIN HAVE 9 MONTHS FROM DATE OF CONTRACT AWARD TO IMPLEMENT THE POINT OF SALE AND TRANSACTIONAL DATA REQUIREMENTS. THIS LIST OFREQUIRED DATA FIELDS SUPERSEDES PREVIOUS TRANSACTIONAL DATA LISTS FROM GSA. TRANSACTIONAL DATA PROGRAM: |
| Jul 20, 2012 | 25 | $0 | SIN: 105 002PRODUCTS AND EQUIPMENT INCLUDING BUT NOT LIMITED TO: FLOORING, FENCING, HARDWARE, BUILDING MATERIALS, TOOLS, APPLICATIONS, ELECTRIC, PAINT, PLUMBING, LAWN ANDGARDEN MOTORS, SHOP, MACHINING, WELDING, MATERIAL HANDLING; CARTS, TRUCKS AND DOCK; HVAC, CLEANING AND IRRIGATION, EQUIPMENT. SIN 105 002 CURRENTLY HAS BOTHEXECUTIVE ORDER 13514 COMPLIANT AND NON COMPLIANT ITEMS; EFFECTIVE IMMEDIATELY, NON-COMPLIANT ITEMS IN THE CATEGORIES LISTED BELOW WILL NO LONGER BE ACCEPTED. "GREEN" PRODUCTS SHALL MEET THE REQUIREMENTS OF THE FAS ENVIRONMENTAL ICON STANDARDS AS LISTED IN GSA ADVANTAGE! AND ARE REQUIRED ON ALL NEW OFFERS SUBMITTED UNDER THE SOLICITATION AND MODIFICATION REQUESTS TO CURRENT CONTRACTS. VENDORS WHOSE CONTRACTS CONTAIN THIS SIN HAVE 9 MONTHS FROM DATE OF CONTRACT AWARD TO IMPLEMENT THE POINT OF SALE AND TRANSACTIONAL DATA REQUIREMENTS. THIS LIST OFREQUIRED DATA FIELDS SUPERSEDES PREVIOUS TRANSACTIONAL DATA LISTS FROM GSA. TRANSACTIONAL DATA PROGRAM: |
| Jul 20, 2012 | 26 | $0 | SIN: 105 002PRODUCTS AND EQUIPMENT INCLUDING BUT NOT LIMITED TO: FLOORING, FENCING, HARDWARE, BUILDING MATERIALS, TOOLS, APPLICATIONS, ELECTRIC, PAINT, PLUMBING, LAWN ANDGARDEN MOTORS, SHOP, MACHINING, WELDING, MATERIAL HANDLING; CARTS, TRUCKS AND DOCK; HVAC, CLEANING AND IRRIGATION, EQUIPMENT. SIN 105 002 CURRENTLY HAS BOTHEXECUTIVE ORDER 13514 COMPLIANT AND NON COMPLIANT ITEMS; EFFECTIVE IMMEDIATELY, NON-COMPLIANT ITEMS IN THE CATEGORIES LISTED BELOW WILL NO LONGER BE ACCEPTED. "GREEN" PRODUCTS SHALL MEET THE REQUIREMENTS OF THE FAS ENVIRONMENTAL ICON STANDARDS AS LISTED IN GSA ADVANTAGE! AND ARE REQUIRED ON ALL NEW OFFERS SUBMITTED UNDER THE SOLICITATION AND MODIFICATION REQUESTS TO CURRENT CONTRACTS. VENDORS WHOSE CONTRACTS CONTAIN THIS SIN HAVE 9 MONTHS FROM DATE OF CONTRACT AWARD TO IMPLEMENT THE POINT OF SALE AND TRANSACTIONAL DATA REQUIREMENTS. THIS LIST OFREQUIRED DATA FIELDS SUPERSEDES PREVIOUS TRANSACTIONAL DATA LISTS FROM GSA. TRANSACTIONAL DATA PROGRAM: |
| Jul 9, 2012 | 24 | $0 | SIN: 105 002PRODUCTS AND EQUIPMENT INCLUDING BUT NOT LIMITED TO: FLOORING, FENCING, HARDWARE, BUILDING MATERIALS, TOOLS, APPLICATIONS, ELECTRIC, PAINT, PLUMBING, LAWN ANDGARDEN MOTORS, SHOP, MACHINING, WELDING, MATERIAL HANDLING; CARTS, TRUCKS AND DOCK; HVAC, CLEANING AND IRRIGATION, EQUIPMENT. SIN 105 002 CURRENTLY HAS BOTHEXECUTIVE ORDER 13514 COMPLIANT AND NON COMPLIANT ITEMS; EFFECTIVE IMMEDIATELY, NON-COMPLIANT ITEMS IN THE CATEGORIES LISTED BELOW WILL NO LONGER BE ACCEPTED. "GREEN" PRODUCTS SHALL MEET THE REQUIREMENTS OF THE FAS ENVIRONMENTAL ICON STANDARDS AS LISTED IN GSA ADVANTAGE! AND ARE REQUIRED ON ALL NEW OFFERS SUBMITTED UNDER THE SOLICITATION AND MODIFICATION REQUESTS TO CURRENT CONTRACTS. VENDORS WHOSE CONTRACTS CONTAIN THIS SIN HAVE 9 MONTHS FROM DATE OF CONTRACT AWARD TO IMPLEMENT THE POINT OF SALE AND TRANSACTIONAL DATA REQUIREMENTS. THIS LIST OFREQUIRED DATA FIELDS SUPERSEDES PREVIOUS TRANSACTIONAL DATA LISTS FROM GSA. TRANSACTIONAL DATA PROGRAM: |
| Jun 29, 2012 | 23 | $0 | SIN: 105 002PRODUCTS AND EQUIPMENT INCLUDING BUT NOT LIMITED TO: FLOORING, FENCING, HARDWARE, BUILDING MATERIALS, TOOLS, APPLICATIONS, ELECTRIC, PAINT, PLUMBING, LAWN ANDGARDEN MOTORS, SHOP, MACHINING, WELDING, MATERIAL HANDLING; CARTS, TRUCKS AND DOCK; HVAC, CLEANING AND IRRIGATION, EQUIPMENT. SIN 105 002 CURRENTLY HAS BOTHEXECUTIVE ORDER 13514 COMPLIANT AND NON COMPLIANT ITEMS; EFFECTIVE IMMEDIATELY, NON-COMPLIANT ITEMS IN THE CATEGORIES LISTED BELOW WILL NO LONGER BE ACCEPTED. "GREEN" PRODUCTS SHALL MEET THE REQUIREMENTS OF THE FAS ENVIRONMENTAL ICON STANDARDS AS LISTED IN GSA ADVANTAGE! AND ARE REQUIRED ON ALL NEW OFFERS SUBMITTED UNDER THE SOLICITATION AND MODIFICATION REQUESTS TO CURRENT CONTRACTS. VENDORS WHOSE CONTRACTS CONTAIN THIS SIN HAVE 9 MONTHS FROM DATE OF CONTRACT AWARD TO IMPLEMENT THE POINT OF SALE AND TRANSACTIONAL DATA REQUIREMENTS. THIS LIST OFREQUIRED DATA FIELDS SUPERSEDES PREVIOUS TRANSACTIONAL DATA LISTS FROM GSA. TRANSACTIONAL DATA PROGRAM: |
| Oct 18, 2011 | 22 | $0 | SIN: 105 002PRODUCTS AND EQUIPMENT INCLUDING BUT NOT LIMITED TO: FLOORING, FENCING, HARDWARE, BUILDING MATERIALS, TOOLS, APPLICATIONS, ELECTRIC, PAINT, PLUMBING, LAWN ANDGARDEN MOTORS, SHOP, MACHINING, WELDING, MATERIAL HANDLING; CARTS, TRUCKS AND DOCK; HVAC, CLEANING AND IRRIGATION, EQUIPMENT. SIN 105 002 CURRENTLY HAS BOTHEXECUTIVE ORDER 13514 COMPLIANT AND NON COMPLIANT ITEMS; EFFECTIVE IMMEDIATELY, NON-COMPLIANT ITEMS IN THE CATEGORIES LISTED BELOW WILL NO LONGER BE ACCEPTED. "GREEN" PRODUCTS SHALL MEET THE REQUIREMENTS OF THE FAS ENVIRONMENTAL ICON STANDARDS AS LISTED IN GSA ADVANTAGE! AND ARE REQUIRED ON ALL NEW OFFERS SUBMITTED UNDER THE SOLICITATION AND MODIFICATION REQUESTS TO CURRENT CONTRACTS. VENDORS WHOSE CONTRACTS CONTAIN THIS SIN HAVE 9 MONTHS FROM DATE OF CONTRACT AWARD, OR MODIFICATION TO IMPLEMENT THE POINT OF SALE AND TRANSACTIONAL DATA REQUIREMENTS LISTED BELOW. TRANSACTIONAL DATA PROGRAM: THE CONTRACTOR MUST HAVE THE CAPABILITY TO CAPTURE AND PROVID |
| Oct 4, 2011 | 21 | $0 | SIN: 105 002PRODUCTS AND EQUIPMENT INCLUDING BUT NOT LIMITED TO: FLOORING, FENCING, HARDWARE, BUILDING MATERIALS, TOOLS, APPLICATIONS, ELECTRIC, PAINT, PLUMBING, LAWN ANDGARDEN MOTORS, SHOP, MACHINING, WELDING, MATERIAL HANDLING; CARTS, TRUCKS AND DOCK; HVAC, CLEANING AND IRRIGATION, EQUIPMENT. SIN 105 002 CURRENTLY HAS BOTHEXECUTIVE ORDER 13514 COMPLIANT AND NON COMPLIANT ITEMS; EFFECTIVE IMMEDIATELY, NON-COMPLIANT ITEMS IN THE CATEGORIES LISTED BELOW WILL NO LONGER BE ACCEPTED. "GREEN" PRODUCTS SHALL MEET THE REQUIREMENTS OF THE FAS ENVIRONMENTAL ICON STANDARDS AS LISTED IN GSA ADVANTAGE! AND ARE REQUIRED ON ALL NEW OFFERS SUBMITTED UNDER THE SOLICITATION AND MODIFICATION REQUESTS TO CURRENT CONTRACTS. VENDORS WHOSE CONTRACTS CONTAIN THIS SIN HAVE 9 MONTHS FROM DATE OF CONTRACT AWARD, OR MODIFICATION TO IMPLEMENT THE POINT OF SALE AND TRANSACTIONAL DATA REQUIREMENTS LISTED BELOW. TRANSACTIONAL DATA PROGRAM: THE CONTRACTOR MUST HAVE THE CAPABILITY TO CAPTURE AND PROVID |
| Sep 27, 2011 | 19 | $0 | SIN: 105 002PRODUCTS AND EQUIPMENT INCLUDING BUT NOT LIMITED TO: FLOORING, FENCING, HARDWARE, BUILDING MATERIALS, TOOLS, APPLICATIONS, ELECTRIC, PAINT, PLUMBING, LAWN ANDGARDEN MOTORS, SHOP, MACHINING, WELDING, MATERIAL HANDLING; CARTS, TRUCKS AND DOCK; HVAC, CLEANING AND IRRIGATION, EQUIPMENT. SIN 105 002 CURRENTLY HAS BOTHEXECUTIVE ORDER 13514 COMPLIANT AND NON COMPLIANT ITEMS; EFFECTIVE IMMEDIATELY, NON-COMPLIANT ITEMS IN THE CATEGORIES LISTED BELOW WILL NO LONGER BE ACCEPTED. "GREEN" PRODUCTS SHALL MEET THE REQUIREMENTS OF THE FAS ENVIRONMENTAL ICON STANDARDS AS LISTED IN GSA ADVANTAGE! AND ARE REQUIRED ON ALL NEW OFFERS SUBMITTED UNDER THE SOLICITATION AND MODIFICATION REQUESTS TO CURRENT CONTRACTS. VENDORS WHOSE CONTRACTS CONTAIN THIS SIN HAVE 9 MONTHS FROM DATE OF CONTRACT AWARD, OR MODIFICATION TO IMPLEMENT THE POINT OF SALE AND TRANSACTIONAL DATA REQUIREMENTS LISTED BELOW. TRANSACTIONAL DATA PROGRAM: THE CONTRACTOR MUST HAVE THE CAPABILITY TO CAPTURE AND PROVID |
| Sep 27, 2011 | 20 | $0 | SIN: 105 002PRODUCTS AND EQUIPMENT INCLUDING BUT NOT LIMITED TO: FLOORING, FENCING, HARDWARE, BUILDING MATERIALS, TOOLS, APPLICATIONS, ELECTRIC, PAINT, PLUMBING, LAWN ANDGARDEN MOTORS, SHOP, MACHINING, WELDING, MATERIAL HANDLING; CARTS, TRUCKS AND DOCK; HVAC, CLEANING AND IRRIGATION, EQUIPMENT. SIN 105 002 CURRENTLY HAS BOTHEXECUTIVE ORDER 13514 COMPLIANT AND NON COMPLIANT ITEMS; EFFECTIVE IMMEDIATELY, NON-COMPLIANT ITEMS IN THE CATEGORIES LISTED BELOW WILL NO LONGER BE ACCEPTED. "GREEN" PRODUCTS SHALL MEET THE REQUIREMENTS OF THE FAS ENVIRONMENTAL ICON STANDARDS AS LISTED IN GSA ADVANTAGE! AND ARE REQUIRED ON ALL NEW OFFERS SUBMITTED UNDER THE SOLICITATION AND MODIFICATION REQUESTS TO CURRENT CONTRACTS. VENDORS WHOSE CONTRACTS CONTAIN THIS SIN HAVE 9 MONTHS FROM DATE OF CONTRACT AWARD, OR MODIFICATION TO IMPLEMENT THE POINT OF SALE AND TRANSACTIONAL DATA REQUIREMENTS LISTED BELOW. TRANSACTIONAL DATA PROGRAM: THE CONTRACTOR MUST HAVE THE CAPABILITY TO CAPTURE AND PROVID |
| Sep 26, 2011 | 17 | $0 | SIN: 105 002PRODUCTS AND EQUIPMENT INCLUDING BUT NOT LIMITED TO: FLOORING, FENCING, HARDWARE, BUILDING MATERIALS, TOOLS, APPLICATIONS, ELECTRIC, PAINT, PLUMBING, LAWN ANDGARDEN MOTORS, SHOP, MACHINING, WELDING, MATERIAL HANDLING; CARTS, TRUCKS AND DOCK; HVAC, CLEANING AND IRRIGATION, EQUIPMENT. SIN 105 002 CURRENTLY HAS BOTHEXECUTIVE ORDER 13514 COMPLIANT AND NON COMPLIANT ITEMS; EFFECTIVE IMMEDIATELY, NON-COMPLIANT ITEMS IN THE CATEGORIES LISTED BELOW WILL NO LONGER BE ACCEPTED. "GREEN" PRODUCTS SHALL MEET THE REQUIREMENTS OF THE FAS ENVIRONMENTAL ICON STANDARDS AS LISTED IN GSA ADVANTAGE! AND ARE REQUIRED ON ALL NEW OFFERS SUBMITTED UNDER THE SOLICITATION AND MODIFICATION REQUESTS TO CURRENT CONTRACTS. VENDORS WHOSE CONTRACTS CONTAIN THIS SIN HAVE 9 MONTHS FROM DATE OF CONTRACT AWARD, OR MODIFICATION TO IMPLEMENT THE POINT OF SALE AND TRANSACTIONAL DATA REQUIREMENTS LISTED BELOW. TRANSACTIONAL DATA PROGRAM: THE CONTRACTOR MUST HAVE THE CAPABILITY TO CAPTURE AND PROVID |
| Sep 26, 2011 | 18 | $0 | SIN: 105 002PRODUCTS AND EQUIPMENT INCLUDING BUT NOT LIMITED TO: FLOORING, FENCING, HARDWARE, BUILDING MATERIALS, TOOLS, APPLICATIONS, ELECTRIC, PAINT, PLUMBING, LAWN ANDGARDEN MOTORS, SHOP, MACHINING, WELDING, MATERIAL HANDLING; CARTS, TRUCKS AND DOCK; HVAC, CLEANING AND IRRIGATION, EQUIPMENT. SIN 105 002 CURRENTLY HAS BOTHEXECUTIVE ORDER 13514 COMPLIANT AND NON COMPLIANT ITEMS; EFFECTIVE IMMEDIATELY, NON-COMPLIANT ITEMS IN THE CATEGORIES LISTED BELOW WILL NO LONGER BE ACCEPTED. "GREEN" PRODUCTS SHALL MEET THE REQUIREMENTS OF THE FAS ENVIRONMENTAL ICON STANDARDS AS LISTED IN GSA ADVANTAGE! AND ARE REQUIRED ON ALL NEW OFFERS SUBMITTED UNDER THE SOLICITATION AND MODIFICATION REQUESTS TO CURRENT CONTRACTS. VENDORS WHOSE CONTRACTS CONTAIN THIS SIN HAVE 9 MONTHS FROM DATE OF CONTRACT AWARD, OR MODIFICATION TO IMPLEMENT THE POINT OF SALE AND TRANSACTIONAL DATA REQUIREMENTS LISTED BELOW. TRANSACTIONAL DATA PROGRAM: THE CONTRACTOR MUST HAVE THE CAPABILITY TO CAPTURE AND PROVID |
| Aug 22, 2011 | 16 | $0 | SIN: 105 002PRODUCTS AND EQUIPMENT INCLUDING BUT NOT LIMITED TO: FLOORING, FENCING, HARDWARE, BUILDING MATERIALS, TOOLS, APPLICATIONS, ELECTRIC, PAINT, PLUMBING, LAWN ANDGARDEN MOTORS, SHOP, MACHINING, WELDING, MATERIAL HANDLING; CARTS, TRUCKS AND DOCK; HVAC, CLEANING AND IRRIGATION, EQUIPMENT. SIN 105 002 CURRENTLY HAS BOTHEXECUTIVE ORDER 13514 COMPLIANT AND NON COMPLIANT ITEMS; EFFECTIVE IMMEDIATELY, NON-COMPLIANT ITEMS IN THE CATEGORIES LISTED BELOW WILL NO LONGER BE ACCEPTED. "GREEN" PRODUCTS SHALL MEET THE REQUIREMENTS OF THE FAS ENVIRONMENTAL ICON STANDARDS AS LISTED IN GSA ADVANTAGE! AND ARE REQUIRED ON ALL NEW OFFERS SUBMITTED UNDER THE SOLICITATION AND MODIFICATION REQUESTS TO CURRENT CONTRACTS. VENDORS WHOSE CONTRACTS CONTAIN THIS SIN HAVE 9 MONTHS FROM DATE OF CONTRACT AWARD, OR MODIFICATION TO IMPLEMENT THE POINT OF SALE AND TRANSACTIONAL DATA REQUIREMENTS LISTED BELOW. TRANSACTIONAL DATA PROGRAM: THE CONTRACTOR MUST HAVE THE CAPABILITY TO CAPTURE AND PROVID |
| Jun 13, 2011 | 15 | $0 | SIN: 105 002PRODUCTS AND EQUIPMENT INCLUDING BUT NOT LIMITED TO: FLOORING, FENCING, HARDWARE, BUILDING MATERIALS, TOOLS, APPLICATIONS, ELECTRIC, PAINT, PLUMBING, LAWN ANDGARDEN MOTORS, SHOP, MACHINING, WELDING, MATERIAL HANDLING; CARTS, TRUCKS AND DOCK; HVAC, CLEANING AND IRRIGATION, EQUIPMENT. SIN 105 002 CURRENTLY HAS BOTHEXECUTIVE ORDER 13514 COMPLIANT AND NON COMPLIANT ITEMS; EFFECTIVE IMMEDIATELY, NON-COMPLIANT ITEMS IN THE CATEGORIES LISTED BELOW WILL NO LONGER BE ACCEPTED. "GREEN" PRODUCTS SHALL MEET THE REQUIREMENTS OF THE FAS ENVIRONMENTAL ICON STANDARDS AS LISTED IN GSA ADVANTAGE! AND ARE REQUIRED ON ALL NEW OFFERS SUBMITTED UNDER THE SOLICITATION AND MODIFICATION REQUESTS TO CURRENT CONTRACTS. VENDORS WHOSE CONTRACTS CONTAIN THIS SIN HAVE 9 MONTHS FROM DATE OF CONTRACT AWARD, OR MODIFICATION TO IMPLEMENT THE POINT OF SALE AND TRANSACTIONAL DATA REQUIREMENTS LISTED BELOW. TRANSACTIONAL DATA PROGRAM: THE CONTRACTOR MUST HAVE THE CAPABILITY TO CAPTURE AND PROVID |
| May 31, 2011 | 14 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT. |
| Feb 8, 2011 | 13 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT. |
| Oct 25, 2010 | 12 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT. |
| Jul 20, 2010 | 10 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT. |
| Jul 12, 2010 | 9 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT. |
| Jul 9, 2010 | 8 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT. |
| Jun 7, 2010 | 5 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT. |
| Jun 7, 2010 | 6 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT. |
| Jun 7, 2010 | 7 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT. |
| Apr 28, 2010 | 4 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT. |
| Apr 22, 2010 | 3 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT. |
| Mar 31, 2010 | 2 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT. |
| Nov 19, 2009 | 1 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT. |
| Oct 15, 2009 | 0 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT |
| Oct 15, 2009 | 11 | $0 | FEDERAL SUPPLY SCHEDULE CONTRACT. |
Research next steps
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.