IDV vehicle

NNK13OS02B

GN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyNational Aeronautics and Space Administration
OfficeNASA KENNEDY SPACE CENTER
NAICS325120 — Industrial Gas Manufacturing
PSC6830 — Gases: Compressed and Liquefied
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$158.2M
Current contract valueNot reported
Potential contract value / ceiling$192.3M
Start dateAug 1, 2013
Current end dateNot available
Potential end dateNot available
Latest award activityJul 29, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 200 of 214 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jul 29, 2026213$107.2KGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC
Jun 29, 2026211$0GN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC
Jun 25, 2026212$-189.9KGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC
Jun 11, 2026208$0GN2-GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC
Jun 11, 2026210$0GN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC
May 22, 2026209$298.9KGN2 GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE
May 11, 2026204$25.6KGN2-GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC
Apr 28, 2026207$694.0KGN2-GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC
Mar 23, 2026206$114.2KGN2 GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC
Mar 17, 2026205$466.0KGN2-GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC
Feb 26, 2026201$1.0MGN2 GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC
Feb 23, 2026203$718.9KGN2-GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC
Feb 20, 2026202$120.0KGN2 GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC
Jan 20, 2026200$1.7MGN2-GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC
Dec 30, 2025199$279.2KGN2-GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC
Dec 17, 2025198$583.6KGN2-GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC
Dec 1, 2025P00196$0GN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC.
Nov 24, 2025197$138.1KGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC.
Nov 13, 2025195$0GN2 GASEOUS NITROGEN AND PIPELINE MAINTENANCE AT KSC.
Sep 22, 2025194$875.3KGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC.
Sep 21, 2025193$14.9KGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC.
Sep 18, 2025192$1.1MGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC.
Sep 12, 2025190$2.4MGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC.
Sep 12, 2025191$1.4KGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC.
Aug 28, 2025187$0GN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC.
Aug 15, 2025189$13.6KGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC.
Jul 24, 2025188$385.2KGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC.
Jul 7, 2025185$8.1KGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC.
Jun 30, 2025186$640.2KGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC.
Jun 23, 2025184$48.9KGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC.
May 20, 2025183$-69.6KGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC.
May 13, 2025182$1.8MGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC.
May 5, 2025181$1.7MGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC.
Mar 13, 2025180$358.7KGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC.
Feb 25, 2025179$532.6KGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC.
Jan 28, 2025178$3.1MGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC.
Dec 20, 2024177$150.0KGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC.
Dec 18, 2024176$605.3KGN2- GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC. THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE AND INCREMENTALLY FUND THE CONTRACT.
Nov 20, 2024174$133.8KGN2- GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC. THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE IN-SCOPE WORK TO INCLUDE CONTRACT LINE ITEM NUMBER (CLIN) 16F.
Nov 20, 2024175$1.3MGN2- GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC. THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE AND INCREMENTALLY FUND THE CONTRACT.
Oct 31, 2024173$1.4MGN2- GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC.
Oct 3, 2024172$69.6KGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC.
Sep 17, 2024170$45.5KGN2-GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KENNEDY SPACE CENTER (KSC). MOD 170: INCORPORATING TASK 38: CATHODIC PROTECTION SURVEY
Sep 17, 2024171$937.8KGN2-GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC. MOD 171: TO INCORPORATE INCREMENTAL FUNDING IN THE AMOUNT OF $937789.64.
Aug 20, 2024169$1.1MGASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE FOR KSC. MOD 169: INCORPORATES INCREMENTAL FUNDING.
Jul 31, 2024168$66.2KGASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE FOR KSC. MOD 168: INCORPORATES TASK 37, SLC-36 VALVE REPAIR. CONTRACT VALUE IS INCREASED.
Jul 26, 2024166$0GASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE FOR KSC.
Jun 26, 2024165$1.3MKENNEDY GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE.
Jun 26, 2024167$781.5KGN2- GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC.
May 31, 2024164$1.6MGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC.
May 29, 2024163$-229.0KKENNEDY SPACE CENTER GASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE.
Apr 30, 2024162$1.4MGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC.
Apr 2, 2024161$154.6KGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC.
Apr 1, 2024159$-207.7KGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC.
Mar 30, 2024160$678.1KGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC.
Feb 29, 2024158$305.0KGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC.
Jan 31, 2024157$545.0KGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC. MODIFICATION TO INCREASE FUNDS.
Jan 30, 2024156$51.1KGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC.
Dec 26, 2023155$618.8KGASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE FOR KSC. ADDS INCREMENTAL FUNDING, CONTRACT VALUE REMAINS UNCHANGED. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
Dec 6, 2023154$1.0MKENNEDY SPACE CENTER GASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE. INCREASE INCREMENTAL FUNDING, CONTRACT VALUE REMAINS UNCHANGED. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
Oct 30, 2023153$559.4KGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KENNEDY. INCREASE INCREMENTAL FUNDING. IN ACCORDANCE WITH NFS 1852.232-77(C)(1) FUNDING THROUGH DATE FOR THIS ACTION BASED ON ESTIMATED ACTIVITIES IS DECEMBER 31, 2023. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
Sep 28, 2023152$1.2MGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC. MOD 152: INCREASE GASEOUS NITROGEN INCREMENTAL FUNDING. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
Sep 27, 2023151$947.8KGASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE FOR KSC. INCORPORATES TASK 34 INCREASING VALUE AND ADDS FUNDING.
Sep 5, 2023149$0GASEOUS NITROGEN AT KENNEDY SPACE CENTER. THE PURPOSE OF THE MODIFICATION IS TO ADD THREE CORRECTED STATEMENT OF WORK PAGES THAT WERE INADVERTENTLY NOT ADDED ON MODIFICATION 138, TASK 31 PIPELINE REPAIRS.
Aug 25, 2023150$2.8MGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC MOD 150: INCREASE INCREMENTAL FUNDING IN THE AMOUNT OF $2,778,464.44. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
Jul 12, 2023148$426.7KGASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE FOR KENNEDY SPACE CENTER (KSC). MOD 148: INCORPORATES FUNDING FOR ACTIVITIES THROUGH 7/31/23. EXERCISE OPTION 5 EXTENDING PERIOD OF PERFORMANCE TO 7/31/33. CONTRACT VALUE IS INCREASED.
Jun 29, 2023147$1.5MGASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE FOR KENNEDY SPACE CENTER (KSC). INCREASE VALUE AND FUNDING, VARIOUS ADMINISTRATIVE UPDATES.
May 5, 2023145$-31.6KGASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE FOR KENNEDY SPACE CENTER (KSC). DESCOPE PORTIONS OF WORK AWARDED UNDER TASK 29, MODIFICATION 121 THAT WERE NOT COMPLETED DUE TO THE ISSUANCE OF A STOP WORK ORDER BY THE CONTRACTING OFFICER.
May 5, 2023146$1.2MGASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE FOR KENNEDY SPACE CENTER (KSC). INCREASE GASEOUS NITROGEN INCREMENTAL FUNDING. THIS ACTION BASED ON ESTIMATED ACTIVITIES THROUGH JUND 30, 2023. CONTRACT VALUE REMAINS UNCHANGED.
Mar 17, 2023144$2.0MGASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE FOR KENNEDY SPACE CENTER (KSC). INCREASE GASEOUS NITROGEN INCREMENTAL FUNDING. THIS ACTION BASED ON ESTIMATED ACTIVITIES IS MAY 30, 2023. CONTRACT VALUE REMAINS UNCHANGED.
Jan 23, 2023143$38.4KGASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE FOR KENNEDY SPACE CENTER (KSC). INCORPORATES AND FUND THE NEGOTIATED AMOUNT $38,440.42 TO RESOLVE THE REQUEST FOR EQUITABLE ADJUSTMENT SUBMITTED MAY 16, 2022.
Dec 20, 2022142$2.9MGASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE FOR KENNEDY SPACE CENTER (KSC). INCREASES INCREMENTAL FUNDING $2,931,813.30. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
Nov 2, 2022141$422.3KGASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE FOR KENNEDY SPACE CENTER (KSC). ADDS CONTRACT LINE ITEM 016D INCREASING VALUE $422,297.03.
Sep 30, 2022140$153.8KGASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE FOR KENNEDY SPACE CENTER (KSC). ADDS LINE ITEM 016 FOR RECHARGER/PUMPER TRUCK SUPPORT. AWARD INCREASED $153,753.13.
Sep 26, 2022139$219.2KGASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE FOR KENNEDY SPACE CENTER (KSC). MOD 139: INCREASE TOTAL AMOUNT OF OBLIGATED FUNDS FOR GASEOUS NITROGEN SERVICES.
Sep 23, 2022137$217.4KGASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE FOR KENNEDY SPACE CENTER (KSC). MOD 137: INCORPORATES TASK 33, INSTALL LIGHTNING MITIGATION. CONTRACT VALUE IS INCREASED.
Sep 23, 2022138$422.6KGASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE FOR KENNEDY SPACE CENTER (KSC). MOD 138: INCORPORATE TASK 31, PIPELINE REPAIRS. CONTRACT VALUE IS INCREASED.
Sep 20, 2022136$472.4KGASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE FOR KENNEDY SPACE CENTER (KSC). ADDS CONTRACT LINE ITEM NUMBER 016C FOR RECHARGER/PUMPER TRUCK SUPPORT FOR ARTEMIS 1.
Sep 16, 2022135$1.6MGASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE FOR KENNEDY SPACE CENTER (KSC). MOD 135: INCREASES CONTRACT VALUE ON CONTRACT LINE ITEM NUMBERS (CLIN) 007, 011, 012, 014, 015A, 016A AND 016B INCREASING OPTION 4. ALSO ADDS REQUIRED INCREMENTAL FUNDING.
Aug 27, 2022134$1.7MGASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE FOR KENNEDY SPACE CENTER (KSC). INCREASES INCREMENTAL FUNDING $1,688,289.18. CONTRACT VALUE IS DECREASED DUE TO ADJUSTMENTS BASED ON ACTUAL COST.
Jun 25, 2022133$652.9KGASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE FOR KENNEDY SPACE CENTER (KSC). ADDS CONTRACT LINE ITEM 016B TO THE CONTRACT INCREASING VALUE $652,867.54. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
Jun 16, 2022132$599.8KGASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE FOR KENNEDY SPACE CENTER (KSC). ADDS LINE ITEMS FOR FUTURE RECHARGER/PUMPER SUPPORT. CONTRACT VALUE IS INCREASED BY $599,778.52.
Jun 3, 2022131$3.8MGASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE FOR KENNEDY SPACE CENTER (KSC). INCREASES INCREMENTAL FUNDING. APPLICABLE SLIP PAGE 28.1 IS ATTACHED FOR INCORPORATION INTO THE CONTRACT. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
May 10, 2022130$171.5KGASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE FOR KENNEDY SPACE CENTER (KSC). MOD 130: INCORPORATE TASK 29.2 GASEOUS NITROGEN (GN2) TIE-IN UNDER CONTRACT LINE ITEM (CLIN)-007. VALUE AND FUNDING ARE INCREASED.
Mar 22, 2022129$539.9KGASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE FOR KENNEDY SPACE CENTER (KSC). MOD 129: INCREASE INCREMENTAL FUNDING FOR GASEOUS NITROGEN. FUNDED THROUGH DATE FOR THIS ACTION BASED ON ESTIMATED ACTIVITIES IS 5/15/22.
Feb 22, 2022123$0GASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE FOR KENNEDY SPACE CENTER (KSC). INCREASES INCREMENTAL FUNDING IN THE AMOUNT OF $600,000.00. APPLICABLE SLIP PAGE 28.1 IS ATTACHED FOR INCORPORATION INTO THE CONTRACT. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
Feb 22, 2022128$600.0KGASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE FOR KENNEDY SPACE CENTER (KSC). MOD 128: INCREASE INCREMENTAL FUNDING FOR GASEOUS NITROGEN. FUNDED THROUGH DATE FOR THIS ACTION BASED ON ESTIMATED ACTIVITIES IS 4/15/22.
Jan 24, 2022127$1.9MGASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE FOR KENNEDY SPACE CENTER (KSC). MOD 127: INCREASE TOTAL AMOUNT OF OBLIGATED FUNDS FOR GASEOUS NITROGEN SERVICES IN THE AMOUNT OF $1,882,160.25.
Nov 23, 2021126$2.2MGASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE FOR KENNEDY SPACE CENTER (KSC).MOD 126: INCREASE TOTAL AMOUNT OF OBLIGATED FUNDS FOR GASEOUS NITROGEN SERVICES.
Nov 22, 2021125$50.1KGASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE FOR KENNEDY SPACE CENTER (KSC).MOD 125: INCORPORATE TASK 7.32 EMERGENCY GASEOUS NITROGEN (GN2) PIPELINE REPAIR INDUSTRIAL AREA, UNDER CONTRACT LINE ITEM NUMBER (CLLN)-007.
Oct 19, 2021124$-150.0KGASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE FOR KENNEDY SPACE CENTER (KSC). MOD 124: DECREASE INCREMENTAL FUNDING IN THE AMOUNT OF $150,000.00. THIS DECREASES THE TOTAL AMOUNT OF OBLIGATED FUNDS FROM $96,413,717.95 TO $96,263,717.95. 2) IN ACCORDANCE WITH NFS 1852.232-77(C)(1) FUNDING THROUGH DATE FOR THIS ACTION BASED ON ESTIMATED ACTIVITIES IS NOVEMBER 15, 2021.
Oct 14, 2021122$227.8KGASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE FOR KENNEDY SPACE CENTER (KSC). MOD 122: INCORPORATE TASK 7.27 ACTIVATE SLC-26 GHE METER STATION, UNDER CONTRACT LINE ITEM NUMBER (CLIN) 007. VALUES ARE INCREASED BY $227,816.19.
Sep 29, 2021120$456.1KGASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE FOR KENNEDY SPACE CENTER (KSC) MOD 120: INCORPORATES TASK 7.29, INSTALL TIE-INS UNDER CONTRACT LINE ITEM NUMBER (CLIN)-007. FUNDING AND VALUE ARE INCREASED.
Sep 29, 2021121$691.4KGASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE FOR KENNEDY SPACE CENTER (KSC). INCORPORTES TASK 7.29 UNDER LINE ITEM 007.
Sep 23, 2021119$646.0KGASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE FOR KENNEDY SPACE CENTER (KSC) MOD 119: PROVIDES INCREMENTAL FUNDING FOR GASEOUS NITROGEN. THE FUNDING THROUGH DATE FOR THIS ACTION BASED ON ESTIMATED ACTIVITIES IS NOVEMBER 15, 2021. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
Sep 21, 2021118$243.0KGASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE FOR KENNEDY SPACE CENTER (KSC). ADDS $243,000 INCREMENTAL FUNDING. APPLICABLE SLIP PAGE 28 IS ATTACHED FOR INCORPORATION INTO THE CONTRACT. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
Sep 13, 2021117$178.9KGASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE FOR KENNEDY SPACE CENTER (KSC). INCORPORATES TASK 7.23 INCREASING VALUE BY $178,910.79. APPLICABLE SLIP PAGES 28, AND 113.5 TO 113.6 ARE ATTACHED.
Aug 23, 2021116$397.9KGASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE FOR KENNEDY SPACE CENTER (KSC). ADDS INCREMENTAL FUNDING, APPLICABLE SLIP PAGE 28 ATTACHED FOR INCORPORATION. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
Aug 12, 2021114$110.9KGASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE FOR KENNEDY SPACE CENTER (KSC). INCORPORATES TASK 7.28 SLC-41 HIGH FLOW ADDITION,. AS CONSIDERATION CONTRACT VALUE IS INCREASED. APPLICABLE SLIP PAGES 113.1-113.5 ATTACHED, ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
Jul 30, 2021115$0GASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE FOR KENNEDY SPACE CENTER (KSC). ADDS A SINGLE 10 YEAR OPTION AT OPTION 5, IF EXERCISED, WILL BEGIN 8/1/2023 AND END 7/31/2033. UPDATES PRICING AS AGREED IN ARTICLE 3, EFFECTIVE 8/1/2021.
Jul 15, 2021113$2.0MGASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE FOR KENNEDY SPACE CENTER (KSC). ADDS INCREMENTAL FUNDING. APPLICABLE SLIP PAGE 24.1 IS ATTACHED FOR INCORPORATION INTO THE CONTRACT. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
May 28, 2021111$251.7KGASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE FOR KENNEDY SPACE CENTER (KSC). MOD 111: ADDS INCREMENTAL FUNDING IN THE AMOUNT OF $251,712.88. THIS INCREASES THE TOTAL AMOUNT OF OBLIGATED FUNDS FROM $91,202,918.07 TO $91,454,630.95. IN ACCORDANCE WITH NFS 1852.232-77(C)(1) FUNDING THROUGH DATE FOR THIS ACTION BASED ON ESTIMATED ACTIVITIES IS JUNE 30, 2021.
May 28, 2021112$31.3KGASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE FOR KENNEDY SPACE CENTER (KSC). THE GOVERNMENT IS CHOOSING TO EXERCISE THE FOURTH TWO YEAR OPTION UNDER ARTICLE 2 (PERIOD OF PERFORMANCE) OF THE CONTRACT. EXERCISING THIS OPTION WILL EXTEND THE PERIOD OF PERFORMANCE OF THE CONTRACT FROM AUG 1, 2021 TO JULY 31, 2023. AS A RESULT, THE CONTRACT VALUE IS INCREASED. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
May 18, 2021110$429.6KGASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE FOR KENNEDY SPACE CENTER (KSC). ADDS $429.586.03 INCREMENTAL FUNDING. APPLICABLE SLIP PAGE 24.1 ATTACHED FOR INCORPORATION INTO THE CONTRACT. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
Mar 31, 2021109$155.3KGASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE FOR KENNEDY SPACE CENTER (KSC). MODIFICATION ADDS $155,294.09 INCREMENTAL FUNDING. APPLICABLE SLIP PAGE 24.1 IS ATTACHED FOR INCORPORATION INTO THE CONTRACT.
Mar 8, 2021108$1.8MGASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE FOR KENNEDY SPACE CENTER (KSC). MODIFICATION TO ADMINISTRATIVELY REALIGN TABLE 9.1 TO REFLECT CURRENT INCREMENTAL FUNDING AND CONTRACT VALUES: $90,618,037.95 FUNDING & $92,848,973.2 VALUE.
Dec 21, 2020106$24.6KGASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE FOR KENNEDY SPACE CENTER (KSC). MOD 106: INCORPORATES TASK 7.24 REFURBISH HMF FLOWSERVE VALVE, UNDER (CONTRACT LINE ITEM) CLIN 007 OF THE CONTRACT. AS CONSIDERATION, THE CONTRACT VALUE IS INCREASED BY $24,555.62 FROM $88,833,805.01 TO $88,858,360.63
Dec 21, 2020107$1.7MGASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE FOR KENNEDY SPACE CENTER (KSC). ADDS INCREMENTAL FUNDING, THE ADEQUATE FUNDED THROUGH DATE IS EXTENDED TO 01/28/2021 PER CONTRACTOR EMAIL DATED 12/17/2020. APPLICABLE SLIP PAGE 24.1 ATTACHED.
Nov 24, 2020105$11.9KGASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE FOR KENNEDY SPACE CENTER (KSC). INCORPORATES TASK 7.25 REPACK 2" FLOWSERVE VALVE, UNDER CONTRACT LINE ITEM NUMBER 007 OF THE CONTRACT. AS CONSIDERATION, THE CONTRACT VALUE IS INCREASED BY $11,928.17.
Sep 29, 2020100$177.4KGASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE FOR KENNEDY SPACE CENTER (KSC). INCORPORATES TASKS 7.19 AND 7.21 UNDER CONTRACT LINE ITEM NUMBER 007 OF THE CONTRACT. AS CONSIDERATION, THE CONTRACT VALUE IS INCREASED BY $177,390.33 FROM $86,157,557.23 TO $86,334,947.56.
Sep 29, 2020101$797.0KGASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE FOR KENNEDY SPACE CENTER (KSC). INCORPORATE TASK 7.16 UNDER CONTRACT LINE ITEM NUMBER 007 OF THE CONTRACT. AS CONSIDERATION, THE CONTRACT VALUE IS INCREASED BY $797,017.33 FROM $86,334,947.56 TO $87,131,964.89.
Sep 29, 2020102$946.4KGASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE FOR KENNEDY SPACE CENTER (KSC). INCORPORATES TASK 7.17 UNDER CONTRACT LINE ITEM NUMBER 007 OF THE CONTRACT. AS CONSIDERATION, THE CONTRACT VALUE IS INCREASED BY $946,381.69 FROM $87,131,964.89 TO $88,078,346.58.
Sep 29, 2020103$743.5KGASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE FOR KENNEDY SPACE CENTER (KSC). INCORPORATES TASK 7.18 UNDER CONTRACT LINE ITEM NUMBER 007 OF THE CONTRACT. AS CONSIDERATION, THE CONTRACT VALUE IS INCREASED BY $743,530.26 FROM $88,078,346.58 TO $88,821,876.84.
Sep 29, 202098$115.6KGASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE FOR KENNEDY SPACE CENTER (KSC). THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE CONTRACT LINE ITEM NUMBER 007.22 RECHARGER FOR KSC INDUSTRIAL AREA. AS CONSIDERATION, THE CONTRACT VALUE IS INCREASED BY $115,569.01 FROM $72,097,296.06 TO $72,212,838.07.
Sep 29, 202099$13.9MGASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE FOR KENNEDY SPACE CENTER (KSC). INCORPORATES NEW CONTRACT LINE ITEM NUMBERS 011 RECHARGER STATION, 012 RECHARGER LOGISTICS SUPPORT, 014 GN2 MAXIMUM FLOW RATE 25,000 SCFM AND 015A MAXIMUM FLOW RATE 28,000 SCFM. AS CONSIDERATION, THE CONTRACT VALUE IS INCREASED BY $13,944,719.16.
Sep 28, 2020104$2.4MGASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE FOR KENNEDY SPACE CENTER (KSC). ADDS INCREMENTAL FUNDING IN THE AMOUNT OF $2,373,902.73. THE ADEQUATE FUNDED THROUGH DATE IS EXTENDED TO 12/6/2020 PER CONTRACTOR EMAIL DATED 09/25/2020.
Aug 24, 202097$1.0MGASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE FOR KENNEDY SPACE CENTER MOD 97: ADDS INCREMENTAL FUNDING IN THE AMOUNT OF $1,049,331.24. THIS INCREASES THE TOTAL AMOUNT OF OBLIGATED FUNDS FROM $66,861,132.30 TO $67,910,463.54. THE ADEQUATE FUNDED THROUGH DATE IS EXTENDED TO 09/20/2020 PER CONTRACTOR EMAIL DATED 08/21/2020. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
Jun 26, 202096$1.3MGASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE FOR KSC. MOD 96: ADDS INCREMENTAL FUNDING IN THE AMOUNT OF $1,311,335.66. THIS INCREASES THE TOTAL AMOUNT OF OBLIGATED FUNDS FROM $65,549,796.64 TO $66,861,132.30. THE ADEQUATE FUNDED THROUGH DATE IS EXTENDED TO 08/16/2020 PER CONTRACTOR EMAIL DATED 06/26/2020.
May 7, 202093$-4.2MGASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE FOR KSC. MODIFICATION DEFINITIZES MOD 87, DECREASES CONTRACT LINE ITEM NUMBER 009 $4,200,000 AND INCORPORATES SLIP PAGES 8-10 AND 12. ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
May 7, 202094$870.0KGASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE FOR KSC. ADDS $870,000 INCREMENTAL FUNDING INCREASING TOTAL AMOUNT OBLIGATED TO $64,069,796.64. THE ADEQUATE FUNDED THROUGH DATE IS EXTENDED TO 05/17/2020. APPLICABLE SLIP PAGE 24 ATTACHED, ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
May 7, 202095$1.5MGASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE FOR KSC. MODIFICATION ADDS $1,480,000 INCREMENTAL FUNDING. THE ADEQUATE FUNDED THROUGH DATE IS 7/4/20 PER CONTRACTOR EMAIL DATED 5/29/20. VENDOR'S ADDRESS UPDATED IN FPDS-NG. APPLICABLE SLIP PAGE ATTACHED. ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
Mar 17, 202092$1.1MGASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE FOR KSC MOD 92: THE PURPOSE OF THIS MODIFICATION IS TO: A) ADD INCREMENTAL FUNDING IN THE AMOUNT OF $1,138,955.81. THIS INCREASES THE TOTAL AMOUNT OF OBLIGATED FUNDS FROM $66,260,840.83 TO $67,399,796.04. B) THE ADEQUATE FUNDED THROUGH DATE IS EXTENDED TO 04/14/2020
Mar 6, 202091$21.8KGASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE FOR KSC MODIFICATION INCORPORATES CONTRACT LINE ITEM NUMBER 007.20. CONTRACT VALUE AND FUNDING IS INCREASED BY $21,771.08. APPLICABLE SLIP PAGES 24 AND 73.1 ATTACHED ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
Feb 21, 202090$0GASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE FOR KSC MOD 90: THE PURPOSE OF THIS MODIFICATION IS TO: A) ESTABLISH THE APPROPRIATE ECONOMIC PRICE ADJUSTMENT (EPA) FACTORS AND UPDATE ARTICLE 22, ECONOMIC PRICE ADJUSTMENT FACTORS, FOR THE PERIOD OF FEBRUARY 1, 2020 THROUGH JULY 31, 2020. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
Feb 18, 202089$-209.9KGASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE FOR KSC MOD 89: THIS MODIFICATION DEOBLIGATES FUNDING IN THE AMOUNT OF $209,919.02. THIS DECREASES THE TOTAL AMOUNT OF OBLIGATED FUNDS FROM $66,448,988.77 TO $66,239,069.75. CONTRACT VALUE REMAINS UNCHANGED. THE ADEQUATE FUNDED THROUGH DATE IS 03/07/2020 PER CONTRACTOR EMAIL DATED 02/17/2020.
Feb 11, 202088$1.1MGASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE FOR KSC MOD 88: THIS MODIFICATION ADD INCREMENTAL FUNDING AND EXTENDS THE FUNDED THROUGH DATE TO 3/14/20.
Dec 20, 201986$690.0KGASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE FOR KSC. MOD 86: THE PURPOSE OF THIS MODIFICATION IS TO: A) ADD INCREMENTAL FUNDING IN THE AMOUNT OF $690,000.00. THIS INCREASES THE TOTAL AMOUNT OF OBLIGATED FUNDS FROM $56,413,398.76. TO $57,103,398.76 B) THE ADEQUATE FUNDED THROUGH DATE IS EXTENDED TO 02/14/2020
Dec 19, 201987$8.2MGASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE FOR KSC MOD 86: THE PURPOSE OF THIS MODIFICATION IS TO EXECUTEAN UNDEFINITIZED CONTRACT ACTION (UCA) AUTHORIZING THE CONTRACTOR TO PERFORM THE WORK EFFORT REQUIRED TO IMPLEMENT THEIR PROPOSED SOLUTION TO INCREASE THE CONTRACT MAXIMUM QUANTITY OF GN2 AS INDICATED IN THE CONTRACT STATEMENT OF WORK CHANGE PAGES (ATTACHMENT 1 TO THIS MODIFICATION). THESE CHANGE PAGES WILL BE INCORPORATED INTO THE CONTRACT WHEN THIS UCA IS DEFINITIZED AND WILL BE EFFECTIVE 12 MONTHS FROM THE EXECUTION OF THIS MODIFICATION.
Dec 2, 201985$1.1MGASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE FOR KSC. THE PURPOSE OF THIS MODIFICATION IS TO: A) ADD INCREMENTAL FUNDING IN THE AMOUNT OF $1,096,000.00. THIS INCREASES THE TOTAL OBLIGATED FUNDS AMOUNT FROM $55,317,398.76 TO $56,413,398.76. B) THE ADEQUATE FUNDED THROUGH DATE IS EXTENDED TO 01/15/20 PER CONTRACTOR EMAIL DATED 12/2/19. C) APPLICABLE SLIP PAGE 24 IS ATTACHED. D) ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
Oct 28, 201984$538.1KGASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE. THE PURPOSE OF THIS MODIFICATION IS TO: A) ADD INCREMENTAL FUNDING IN THE AMOUNT OF $538,055.43. THIS INCREASES THE TOTAL OBLIGATED FUNDS FROM $54,779,343.33 TO $55,317,398.76. B) THE ADEQUATE FUNDED THROUGH DATE IS EXTENDED TO 11/28/19 PER CONTRACTOR EMAIL DATED 10/27/19. C) APPLICABLE SLIP PAGE 24 IS ATTACHED. D)ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
Sep 26, 201983$2.2MGASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE - THE PURPOSE OF THIS MODIFICATION IS TO: 1. INCORPORATE CLIN 007.11 UPGRADE GHE PIPELINE RECONFIGURATION. THE CONTRACT VALUE AND FUNDING INCREASED BY $319,016.85. 2. INCORPORATE CLIN 007.14 UPDATE LC40 GN2 METER STATION. THE CONTRACT VALUE AND FUNDING INCREASED BY $59,352.07. 3. THE PARTIES AGREE THIS SUPPLEMENTAL AGREEMENT REPRESENTS A COMPLETE AND EQUITABLE ADJUSTMENT FOR CLIN 007.11&CLIN 007.14. 4. INCREMENTAL FUNDING ADDED IN THE AMOUNT OF $1732,928.43. ADEQUATE THROUGH DATE IS EXTENDED TO NOVEMBER 9, 2019. 5. FUNDING ADDED IN THE AMOUNT OF $40,000 UNDER CLIN 004A AND 004B. 6. ESTABLISHES EPA FACTORS FOR AUG 1, 2019 THROUGH JAN 31, 2020. 7. MAKES CHANGES TO REFLECT CURRENT OPERATIONAL CONDITIONS AND MINOR ADMINISTRATIVE CHANGES. 8. ADMINISTRATIVELY REALIGNS CONTRACT TO PROVIDE A CURRENT CONFORMING COPY TO USE FOR THE REMAINDER OF THE CONTRACT PERIOD OF PERFORMANCE. PAGE NUMBERS ARE NOW IN SEQUENTIAL ORDER.
Jul 24, 201982$1.5MGASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE FOR KENNEDY SPACE CENTER (KSC) MOD 82: THE PURPOSE OF THIS MODIFICATION IS TO: A. EXERCISE OPTION 3 OF THE CONTRACT. AS A RESULT, THE CONTRACT VALUE IS INCREASED BY $13,800,000.00. THE PERIOD OF PERFORMANCE OF THE CONTRACT IS EXTENDED FROM JULY 31, 2019 TO JULY 31, 2021. B. ADD INCREMENTAL FUNDING IN THE AMOUNT OF $1,525,444.21. THIS INCREASES THE TOTAL AMOUNT OF OBLIGATED FUNDS FROM $51,102,601.77 TO $52,628,045.98. C. THE ADEQUATE FUNDED THROUGH DATE IS EXTENDED TO 9/13/19 PER CONTRACTOR EMAIL DATED 7/19/19. ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
Jun 28, 201981$500.0KGASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE FOR KENNEDY SPACE CENTER (KSC) MOD 81: THE PURPOSE OF THIS MODIFICATION IS TO: A) ADD INCREMENTAL FUNDING IN THE AMOUNT OF $500,000.00. THIS INCREASES THE TOTAL AMOUNT OF OBLIGATED FUNDS FROM $50,602,601.77 TO $51,102,601.77. B) THE ADEQUATE FUNDED THROUGH DATE IS EXTENDED TO 7/31/19 PER CONTRACTOR EMAIL DATED 6/26/19. C) APPLICABLE SLIP PAGE 21.2 IS ATTACHED. D) ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
May 16, 201980$1.1MGASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE FOR KSC MOD 80: THE PURPOSE OF THIS MODIFICATION IS TO: A) ADD INCREMENTAL FUNDING IN THE AMOUNT OF $1,102,500.00. THIS INCREASES THE TOTAL AMOUNT OF OBLIGATED FUNDS FROM $49,500,101 .77 TO $50,602,601.77. B) THE ADEQUATE FUNDED THROUGH DATE IS EXTENDED TO 7/9/19 PER CONTRACTOR EMAIL DATED 5/16/19. C) APPLICABLE SLIP PAGES 21.1 AND 21.2 ARE ATTACHED. D) ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
Mar 29, 201979$158.1KGASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE FOR KSC MOD 79: THE PURPOSE OF THIS MODIFICATION IS TO: A) ADD INCREMENTAL FUNDING IN THE AMOUNT OF $158,064.89. THIS INCREASES THE TOTAL AMOUNT OF OBLIGATED FUNDS FROM $49,342,036.88 TO $49,500,101.77. B) THE ADEQUATE FUNDED THROUGH DATE IS EXTENDED TO 5/22/19 PER CONTRACTOR EMAIL DATED 3/27/19. C) APPLICABLE SLIP PAGE IS ATTACHED. D) ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
Mar 8, 201978$0GASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE FOR KENNEDY SPACE CENTER (KSC) MOD 78: THE PURPOSE OF THIS MODIFICATION IS TO: A) ESTABLISH THE APPLICABLE ECONOMIC PRICE ADJUSTMENT (EPA) FACTORS FOR THE PERIOD OF FEBRUARY 1, 2019 THROUGH JULY 31; 2019. B) REPLACE THE NAME OF JAMES HAINES IN ARTICLE 5, PARAGRAPH 5.2 L. WITH THE NAME OF STACY MICHAEL. C) APPLICABLE SLIP PAGES 16, 21.1, AND 36 ARE ATTACHED. D) ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
Feb 15, 201977$2.0MGASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE FOR KENNEDY SPACE CENTER (KSC) MOD 77: THE PURPOSE OF THIS MODIFICATION IS TO: A) ADD INCREMENTAL FUNDING IN THE AMOUNT OF $2,014,511.08. THIS INCREASES THE TOTAL AMOUNT OF OBLIGATED FUNDS FROM $47,327,525.80 TO $49,342,036.88. B) THE ADEQUATE FUNDED THROUGH DATE IS EXTENDED TO 5/15/19 PER CONTRACTOR EMAIL DATED 2/13/19. ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
Dec 21, 201876$300.0KGASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE FOR KSC MOD 76: THE PURPOSE OF THIS MODIFICATION IS TO: A) ADD INCREMENTAL FUNDING IN THE AMOUNT OF $300,000.00. THIS INCREASES THE TOTAL AMOUNT OF OBLIGATED FUNDS FROM $47,027,525.80 TO $47,327,525.80. B) THE ADEQUATE FUNDED THROUGH DATE IS EXTENDED TO 2/16/19 PER CONTRACTOR EMAIL DATED 12/21/18.
Dec 20, 201875$643.6KGASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE FOR KSC MOD 75: THE PURPOSE OF THIS MODIFICATION IS TO: A) ADD INCREMENTAL FUNDING IN THE AMOUNT OF $643,632.63. THIS INCREASES THE TOTAL AMOUNT OF OBLIGATED FUNDS FROM $46,383,893.17 TO $47,027,525.80. B) THE ADEQUATE FUNDED THROUGH DATE IS EXTENDED TO 2/3/19 PER CONTRACTOR EMAIL DATED 12/20/18. C) APPLICABLE SLIP PAGE IS ATTACHED. D) ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
Nov 14, 201874$1.2MGASEOUS NITROGEN (GN2) SUPPLY AND PIPELINE MAINTENANCE FOR KSC MOD 74: THE PURPOSE OF THIS MODIFICATION IS TO: 1. INCORPORATE CLIN 007:8 CAPE GN2 PIPELINE UPGRADE. AS CONSIDERATION, THE CONTRACT VALUE IT HEREBY INCREASED BY $398,990.98. AS A RESULT, THE TOTAL CONTRACT VALUE IS INCREASED FROM $53,458,"I38.08 TO $53,857,129.08. ADDITIONALLY, CLIN 007:8 IS FUNDED IN THE AMOUNT OF $398,990.98. 2. ADD INCREMENTAL FUNDING IN THE AMOUNT OF $848,181.33. THE ADEQUATE FUND THROUGH DATE IS EXTENDED TO JANUARY 6, 2019 PER CONTRACTOR EMAIL DATED OCTOBER 31, 2018. 3. ADD CLIN 007:8 FUNDING IN THE AMOUNT OF $398,990.98. 4. INCREASE THE TOTAL OBLIGATED FUNDING AMOUNT FROM $45,136,720.86 TO $46,383,893.17. 5. PROVIDE APPLICABLE SLIP PAGES 21.1, 37.12 THROUGH 37.16 FOR INSERTION INTO THE CONTRACT. NOTE: PREVIOUS PAGES 37.12 THROUGH 37.16 ARE RENUMBERED AS 37.17 THROUGH 37.21 AND PREVIOUS PAGES 37.17 AND 37.18 ARE RENUMBERED AS 37.22 AND 37.23. THIS IS A RESULT OF ADDING CLIN 007:8 INTO ARTICLE 23 IN NUMERICAL ORDER.
Sep 21, 201872$43.1KGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC MOD 72: THE PURPOSE OF THIS MODIFICATION IS TO ESTABLISH THE APPLICABLE ECONOMIC PRICE ADJUSTMENT (EPA) FACTORS, FOR THE PERIOD OF AUGUST 1, 2018 THROUGH JANUARY 31, 2019. INCORPORATE CLIN 007. 13 UPGRADE HMF METER STATION PROJECT. AS CONSIDERATION, THE CONTRACT VALUE IS HEREBY INCREASED BY $43,108.08.
Sep 21, 201873$2.0MGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC MOD 73: THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING IN THE AMOUNT OF $2,041,750.83. THIS INCREASES THE TOTAL OBLIGATED FUNDS TO $45,136,720.86. ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
Aug 15, 201871$0GN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC MOD 71: THE PURPOSE OF THIS MODIFICATION IS TO UPDATE 52.212-4 CONTRACT TERMS AND CONDITIONS - COMMERCIAL ITEMS AND ADD PAYMENT INFORMATION. ALL OTHER TERMS AND CONDITIONS REMAIN IN FULL FORCE AND EFFECT. SEE ATTACHED SLIP PAGE 27.
Aug 2, 201870$756.2KGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC MOD 70: THE PURPOSE OF THIS MODIFICATION IS TO: A) ADD INCREMENTAL FUNDING IN THE AMOUNT OF $756,164.70. THIS INCREASES THE TOTAL OF OBLIGATED FUNDS FROM $42,295,697.25 TO $43,051,861.95. B) THE ADEQUATE FUNDED THROUGH DATE IS EXTENDED TO 9/21/18 PER CONTRACTOR EMAIL DATED 8/1/18. C) APPLICABLE SLIP PAGE IS ATTACHED. D) ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
Jun 25, 201869$395.2KGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC MOD 69: THE PURPOSE OF THIS MODIFICATION IS TO: A) ADD INCREMENTAL FUNDING IN THE AMOUNT OF $395,154.23. THIS INCREASES THE TOTAL OF OBLIGATED FUNDS FROM $41,900,543.02 TO $42,295,697.25. B) THE ADEQUATE FUNDED THROUGH DATE IS EXTENDED TO 8/18/18 PER CONTRACTOR. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
Apr 19, 201868$2.1MGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC MOD 68: THE PURPOSE OF THIS MODIFICATION IS TO: A) ADD INCREMENTAL FUNDING IN THE AMOUNT OF $2,068,936.40. THIS INCREASES THE TOTAL OF OBLIGATED FUNDS FROM $39,831,606.62 TO $41,900,543.02. B) THE ADEQUATE FUNDED THROUGH DATE IS EXTENDED TO 7/31/18 PER CONTRACTOR EMAIL DATED 4/18/18.
Feb 23, 201867$0GN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC MOD 67: THE PURPOSE OF THIS MODIFICATION IS TO ESTABLISH APPLICABLE ECONOMIC PRICE ADJUSTMENT (EPA) FOR THE PERIOD OF 2/1/18 - 7/31/18. ALL OTHER TERMS REMAIN UNCHANGED.
Feb 2, 201866$2.5MGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC MOD 66: THE PURPOSE OF THIS MODIFICATION IS TO: A) ADD INCREMENTAL FUNDING IN THE AMOUNT OF $2,510,797.59. THIS INCREASES THE TOTAL OF OBLIGATED FUNDS FROM $37,320,809.03 TO $39,831,606.62. REFERENCE PR 4200650369 AUTHORIZATION TO PROCEED EMAIL DATED 1/19/18. B) THE ADEQUATE FUNDED THROUGH DATE IS EXTENDED TO 4/30/18 PER CONTRACTOR EMAIL DATED 2/1/18.
Dec 26, 201765$620.7KGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC MOD 65: THE PURPOSE OF THIS MODIFICATION IS TO: A) ADD INCREMENTAL FUNDING IN THE AMOUNT OF $620,723.26. THIS INCREASES THE TOTAL OF OBLIGATED FUNDS FROM $36,700,085.77 TO $37,320,809.03. B) THE ADEQUATE FUNDED THROUGH DATE IS EXTENDED TO 1/11/18 PER CONTRACTOR EMAIL DATED 12/26/17.C) APPLICABLE SLIP PAGE IS ATTACHED. D) ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
Dec 1, 201764$1.5MGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC MOD 64: THE PURPOSE OF THIS MODIFICATION IS TO: A} INCORPORATE CLIN 007.12, LZ-1 METER STATION PROJECT AS CONSIDERATION, THE CONTRACT VALUE IS HEREBY INCREASED BY $47,276.91 THE PARTIES HERETO AGREE THAT THIS SUPPLEMENTAL AGREEMENT REPRESENTS A COMPLETE AND EQUITABLE ADJUSTMENT FOR CLIN 007.12, LZ-1 METER STATION PROJECT. THE CONTRACTOR HEREBY RELEASES THE GOVERNMENT FROM ANY AND ALL LIABILITY OR CLAIMS UNDER THIS CONTRACT FOR ANY FURTHER EQUITABLE ADJUSTMENTS ATTRIBUTABLE TO SUCH FACTS OR CIRCUMSTANCES GIVING RISE TO ITS PROPOSAL DATED OCTOBER 11, 2017, AND ALL REVISIONS THERETO. REFERENCE AUTHORIZATION TO PROCEED EMAIL DATED 10/30/2017. B) ADD INCREMENTAL FUNDING IN THE AMOUNT OF $1,481,608.38 THIS INCREASES THE TOTAL OF OBLIGATED FUNDS FROM $35,218,477.39 TO $36,700,085.77. C) THE ADEQUATE FUNDED THROUGH DATE IS EXTENDED TO 12/15/2017 PER CONTRACT EMAIL DATED 11/28/2017. D) APPLICABLE SLIP PAGES 21.1, 37.15, AND 37.16 ATTACHED.
Sep 27, 201763$199.9KGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC MOD 63: THE PURPOSE OF THIS MODIFICATION IS TO: A) ADD INCREMENTAL FUNDING IN THE AMOUNT OF $199,894.78. THIS INCREASES THE TOTAL OF OBLIGATED FUNDS FROM $35,018,582.58 TO $35,218,477.39. B) THE ADEQUATE FUNDED THROUGH DATE IS EXTENDED TO 10/12/2017 PER CONTRACTOR EMAIL DATED 9/27/2017. C) APPLICABLE SLIP PAGE IS ATTACHED. D) ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
Sep 5, 201762$0GN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC MOD 62: THE PURPOSE OF THIS MODIFICATION IS TO: A) ESTABLISH THE APPLICABLE ECONOMIC PRICE ADJUSTMENT (EPA) FACTORS, FOR THE PERIOD OF AUGUST 1, 2017 THROUGH JANUARY 31, 2018. B) APPLICABLE SLIP PAGE 36 ATTACHED.
Aug 29, 201761$1.8MGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC MOD 61: THE PURPOSE OF THIS MODIFICATION IS TO: A) ADD INCREMENTAL FUNDING IN THE AMOUNT OF $1,762,509.71 . THIS INCREASES THE TOTAL OF OBLIGATED FUNDS FROM $33,256,072.87 TO $35,018,582.58. B) THE ADEQUATE FUNDED THROUGH DATE IS EXTENDED TO 9/27/2017 PER CONTRACTOR EMAIL DATED 8/25/2017. C) APPLICABLE SLIP PAGE IS ATTACHED. D) ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
Jun 28, 201760$1.1MGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC MOD 60: THE PURPOSE OF THIS MODIFICATION IS TO: A) ADD INCREMENTAL FUNDING IN THE AMOUNT OF $1,088, 180.06. THIS INCREASES THE TOTAL OF OBLIGATED FUNDS FROM $32,167,892.81 TO $33,256,072.87. B) THE ADEQUATE FUNDED THROUGH DATE IS EXTENDED TO 07/12/2017 PER CONTRACTOR EMAIL DATED 6/26/2017. C) APPLICABLE SLIP PAGE IS ATTACHED. D) ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
Apr 26, 201759$55.6KGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC MOD 59: THE PURPOSE OF THIS MODIFICATION IS TO: A) ADD INCREMENTAL FUNDING IN THE AMOUNT OF $55,626.98. THIS INCREASES THE TOTAL OF OBLIGATED FUNDS FROM $32,112,265.83 TO $32,167,892.81. B) THE ADEQUATE FUNDED THROUGH DATE IS EXTENDED TO 05/15/2017 PER CONTRACTOR EMAIL DATED 4/25/2017. C) APPLICABLE SLIP PAGE IS ATTACHED. D) ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
Apr 11, 201758$28.9KGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC MOD 58: THE PURPOSE OF THIS MODIFICATION IS TO: A) INCORPORATE CLIN 007.10, LC39 FLEXIM METER INSTALLATION. AS CONSIDERATION, THE CONTRACT VALUE IS HEREBY INCREASED BY $28,881.09. THE PARTIES HERETO AGREE THAT THIS SUPPLEMENTAL AGREEMENT REPRESENTS A COMPLETE AND EQUITABLE ADJUSTMENT FOR CLIN 007.10, LC39 FLEXIM METER INSTALLATION. THE CONTRACTOR HEREBY RELEASES THE GOVERNMENT FROM ANY AND ALL LIABILITY OR CLAIMS UNDER THIS CONTRACT FOR ANY FURTHER EQUITABLE ADJUSTMENTS ATTRIBUTABLE TO SUCH FACTS OR CIRCUMSTANCES GIVING RISE TO ITS PROPOSAL DATED APRIL 10, 2017, AND ALL REVISIONS THERETO. CONTRACT FUNDED AMOUNT INCREASED $28,881.09: FROM: $32,083,384.74 TO: $32,112,265.83 CLIN 007 VALUE INCREASED $28,881.09: FROM: $165,367.74 TO: $194,248.83 B) APPLICABLE SLIP PAGES 21.1, 37.13, AND 37.14 ATTACHED. C) ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
Mar 29, 201757$802.3KGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC MOD 57: THE PURPOSE OF THIS MODIFICATION IS TO: A) EXERCISE OPTION PERIOD 2 WHICH EXTENDS THE CONTRACT PERIOD OF PERFORMANCE: FROM: 07/31/17 TO: 07/31/19 THIS ACTION INCREASES THE ESTIMATED CONTRACT VALUE BY $13,800,000.00. B) ADD INCREMENTAL FUNDING IN THE AMOUNT OF $802,330.17. THIS INCREASES THE TOTAL OF OBLIGATED FUNDS FROM $31,281,054.57 TO $32,083,384.74. THE ADEQUATE FUNDED THROUGH DATE IS EXTENDED TO 5/10/2017 PER CONTRACTOR EMAIL DATED 3/27/2017. APPLICABLE SLIP PAGE 21.1 IS ATTACHED.
Mar 7, 201756$0GN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC MOD 56;THE PURPOSE OF THIS MODIFICATION IS TO: A) ESTABLISH THE APPLICABLE ECONOMIC PRICE ADJUSTMENT (EPA) FACTORS, FOR THE PERIOD OF FEBRUARY 1, 2017 THROUGH JULY 31, 2017. B) APPLICABLE SLIP PAGE 36 ATTACHED. C) ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
Mar 1, 201755$1.4MGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC MOD 55: THE PURPOSE OF THIS MODIFICATION IS TO: A) INCORPORATE CLIN 007.9, NASA LAUNCH COMPLEX 41 GN2 FLOW METER STATION PRESSURE REGULATING VALVE REFURBISHMENT. REFERENCE AUTHORIZATION TO PROCEED DATED 1/27/17. AS CONSIDERATION, THE CONTRACT VALUE IS HEREBY INCREASED BY $10,214.18. THE PARTIES HERETO AGREE THAT THIS SUPPLEMENTAL AGREEMENT REPRESENTS A COMPLETE AND EQUITABLE ADJUSTMENT FOR CLIN 007.9, NASA LAUNCH COMPLEX 41 GN2 FLOW METER STATION PRESSURE REGULATING VALVE REFURBISHMENT. THE CONTRACTOR HEREBY RELEASES THE GOVERNMENT FROM ANY AND ALL LIABILITY OR CLAIMS UNDER THIS CONTRACT FOR ANY FURTHER EQUITABLE ADJUSTMENTS ATTRIBUTABLE TO SUCH FACTS OR CIRCUMSTANCES GIVING RISE TO ITS PROPOSAL DATED JANUARY 16, 2017, AND ALL REVISIONS THERETO. B) ADD INCREMENTAL FUNDING IN THE AMOUNT OF $1,374,338.15. THE ADEQUATE FUNDED THROUGH DATE IS EXTENDED TO 04/07/2017 PER CONTRACTOR EMAIL DATED 02/24/2017. FUNDED AMOUNT CHANGED FROM: $29,896,502.24 FUNDED AMOUNT CHANGED TO: $31,270,840.39 CONTRACT VALUE CHANGED FROM: $38,154,319.67 CONTRACT VALUE CHANGED TO: $39,538,872.00 C) PROVIDE A CLERICAL CORRECTION TO MODIFICATION 47 SLIP PAGE 37.6. THE TOTAL FIXED-PRICE REPAIR AMOUNT SHOULD BE $85,600.00. THIS CORRECTION IS ADMINISTRATIVE AND DOES NOT CHANGE THE FUNDING AMOUNT OR CONTRACT VALUE. D) APPLICABLE SLIP PAGES 21.1, 37.6, AND 37.12 ATTACHED. E) ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
Dec 20, 201654$807.4KGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC MOD 54: THE PURPOSE OF THIS MODIFICATION IS TO: A) ADD INCREMENTAL FUNDING IN THE AMOUNT OF $807,387.74. THIS INCREASES THE TOTAL OF OBLIGATED FUNDS FROM $29,089,114.50 TO $29,896,502.24. B) THE ADEQUATE FUNDED THROUGH DATE IS EXTENDED TO 02/03/2017 PER CONTRACTOR EMAIL DATED 12/20/2016. C) APPLICABLE SLIP PAGE IS ATTACHED. D) ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
Nov 22, 201653$1.4MGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC MOD 53: THE PURPOSE OF THIS MODIFICATION IS TO: A) ADD INCREMENTAL FUNDING IN THE AMOUNT OF $1,361,001.26. THIS INCREASES THE TOTAL OF OBLIGATED FUNDS FROM $27,728,113.24 TO $29,089,114.50. B) THE ADEQUATE FUNDED THROUGH DATE IS EXTENDED TO 12/27/2016 PER CONTRACTOR EMAIL DATED 11/21/2016. C) APPLICABLE SLIP PAGE IS ATTACHED. D) ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
Sep 29, 201652$45.8KGN2-GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC:: MOD 52: THE PURPOSE OF THIS MODIFICATION IS TO: A) ADD INCREMENTAL FUNDING IN THE AMOUNT OF $45,833.09. THIS INCREASES THE TOTAL OF OBLIGATED FUNDS FROM $27,682,280.15 TO $27,728,113.24. B) THE ADEQUATE FUNDED THROUGH DATE IS EXTENDED TO 10/22/2016 PER CONTRACTOR EMAIL DATED 9/29/2016. C) APPLICABLE SLIP PAGE IS ATTACHED. D) ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
Sep 23, 201651$172.2KGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC MOD 51: THE PURPOSE OF THIS MODIFICATION IS TO: A) ADD INCREMENTAL FUNDING IN THE AMOUNT OF $172,200.00. THIS INCREASES THE TOTAL OF OBLIGATED FUNDS FROM $27,510,080.15 TO $27,682,280.15. B) THE ADEQUATE FUNDED THROUGH DATE IS EXTENDED TO 10/20/2016 PER CONTRACTOR EMAIL DATED 9/23/2016. C) APPLICABLE SLIP PAGE IS ATTACHED. D) ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
Sep 22, 201650$311.2KGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC MOD 50: THE PURPOSE OF THIS MODIFICATION IS TO: A) ADD INCREMENTAL FUNDING IN THE AMOUNT OF $311,156.31. THIS INCREASES THE TOTAL OF OBLIGATED FUNDS FROM $24,198,923.84 TO $27,510,080.15. B) THE ADEQUATE FUNDED THROUGH DATE IS EXTENDED TO 10/13/2016 PER CONTRACTOR EMAIL DATED 9/22/2016. C) APPLICABLE SLIP PAGE IS ATTACHED. D) ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
Sep 8, 201649$0GN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC MOD 49: THE PURPOSE OF THIS MODIFICATION IS TO: A) ESTABLISH THE APPLICABLE ECONOMIC PRICE ADJUSTMENT (EPA) FACTORS, FOR THE PERIOD OF AUGUST 1, 2016 THROUGH JANUARY 31, 2017. B) APPLICABLE SLIP PAGE 36 ATTACHED. C) ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
Aug 26, 201648$671.7KGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC MOD 48: THE PURPOSE OF THIS MODIFICATION IS TO: A) ADD INCREMENTAL FUNDING IN THE AMOUNT OF $671,663.41. THE ADEQUATE FUNDED THROUGH DATE IS EXTENDED TO 09/30/2016 PER CONTRACTOR EMAIL DATED 8/26/2016. FUNDED AMOUNT CHANGED FROM: $26,527,260.43 FUNDED AMOUNT CHANGED TO: $27,198,923.84 CONTRACT VALUE CHANGED FROM: $34,785,077.86 CONTRACT VALUE CHANGED TO: $35,456,741.27 C) APPLICABLE SLIP PAGE 21.1 ATTACHED. D) ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
Aug 1, 201647$861.6KGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC MOD 47: THE PURPOSE OF THIS MODIFICATION IS TO: A) INCORPORATE CLIN 007.6, NASA POLARIZATION AND OVER-VOLTAGE PROTECTION PROJECT. AS CONSIDERATION, THE CONTRACT VALUE IS HEREBY INCREASED BY $85,600.00. THE PARTIES HERETO AGREE THAT THIS SUPPLEMENTAL AGREEMENT REPRESENTS A COMPLETE AND EQUITABLE ADJUSTMENT FOR CLIN 007.6, NASA POLARIZATION AND OVER-VOLTAGE PROTECTION PROJECT. THE CONTRACTOR HEREBY RELEASES THE GOVERNMENT FROM ANY AND ALL LIABILITY OR CLAIMS UNDER THIS CONTRACT FOR ANY FURTHER EQUITABLE ADJUSTMENTS ATTRIBUTABLE TO SUCH FACTS OR CIRCUMSTANCES GIVING RISE TO ITS PROPOSAL DATED JULY 12, 2016, AND ALL REVISIONS THERETO. B) ADD INCREMENTAL FUNDING IN THE AMOUNT OF $776,000.00. THE ADEQUATE FUNDED THROUGH DATE IS EXTENDED TO 08/31/2016 PER CONTRACTOR EMAIL DATED 7/25/2016. FUNDED AMOUNT CHANGED FROM: $25,665,660.43 FUNDED AMOUNT CHANGED TO: $26,527,260.43 CONTRACT VALUE CHANGED FROM: $33,923,477.86 CONTRACT VALUE CHANGED TO: $34,785,077.86 C) APPLICABLE SLIP PAGES 21.1, 37.6, 37.7, 37.8, AND 37.9 ATTACHED. D) ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
Jun 24, 201646$686.9KGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC:: MOD 46: THE PURPOSE OF THIS MODIFICATION IS TO: A) ADD INCREMENTAL FUNDING IN THE AMOUNT OF $686,880.27. THIS INCREASES THE TOTAL OF OBLIGATED FUNDS FROM $24,978,780.16 TO $25,665,660.43. B) THE ADEQUATE FUNDED THROUGH DATE IS EXTENDED TO 08/05/2016 PER CONTRACTOR EMAIL DATED 6/23/2016. C) APPLICABLE SLIP PAGE IS ATTACHED. D) ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
May 23, 201645$742.5KGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC. MOD 45: THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING IN THE AMOUNT OF $742,490.57. THIS INCREASES THE TOTAL OF OBLIGATED FUNDS FROM $24,236,289.59 TO $24,978,780.16. THE ADEQUATE FUNDED THROUGH DATE IS EXTENDED TO 07/02/2016 PER CONTRACTOR'S EMAIL DATED 05/23/2016.
Apr 27, 201644$681.0KGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC:: MOD 44: THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING IN THE AMOUNT OF $681,019.00. THIS INCREASES THE TOTAL OF OBLIGATED FUNDS FROM $23,555,270.59 TO $24,236,289.59. THE ADEQUATE FUNDED THROUGH DATE IS EXTENDED TO 06/04/2016 PER CONTRACTOR'S EMAIL DATED 04/27/2016.
Mar 28, 201643$783.2KGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC:: MOD 43: THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING IN THE AMOUNT OF $783,235.99. THIS INCREASES THE TOTAL OF OBLIGATED FUNDS FROM $22,772,034.60 TO $23,555,270.59. THE ADEQUATE FUNDED THROUGH DATE IS EXTENDED TO 05/04/2016 PER CONTRACTOR'S EMAIL DATED 03/28/2016.
Mar 3, 201642$502.4KGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC:: MOD 42: THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING IN THE AMOUNT OF $502,440.11. THIS INCREASES THE TOTAL OF OBLIGATED FUNDS FROM $22,269,594.49 TO $22,772,034.60. THE ADEQUATE FUNDED THROUGH DATE IS EXTENDED TO 03/20/2016 PER CONTRACTOR'S EMAIL DATED 02/29/2016. THE FOLLOWING REPLACEMENT PAGE IS ATTACHED HERETO AND SHOULD BE APPROPRIATELY INSERTED IN COPIES OF THE CONTRACT: 21.1
Feb 11, 201641$0GN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC MOD 41: THE PURPOSE OF THIS MODIFICATION IS TO ESTABLISH THE ECONOMIC PRICE ADJUSTMENT (EPA) FACTORS, FOR THE PERIOD OF FEBRUARY 1, 2016 THROUGH JULY 31, 2016. APPLICABLE SLIP PAGE 36 IS ATTACHED.
Jan 27, 201639$960.9KGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC:: MOD 39: THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING IN THE AMOUNT OF $960,866.04. THIS INCREASES THE TOTAL OF OBLIGATED FUNDS FROM $21,239,174.89 TO $22,200,040.93. THE ADEQUATE FUNDED THROUGH DATE IS EXTENDED TO 02/28/2016 PER CONTRACTOR'S EMAIL DATED 01/27/2016. THE FOLLOWING REPLACEMENT PAGE IS ATTACHED HERETO AND SHOULD BE APPROPRIATELY INSERTED IN COPIES OF THE CONTRACT: 21.1
Jan 27, 201640$69.6KGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC:: MOD 40: THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE CLIN 007.7, CX41 VALVE REPLACEMENT. AS CONSIDERATION, CONTRACT VALUE IS HEREBY INCREASED BY $69,553.56 FROM $31,743,534.46 TO $31,813,088.02. REPLACEMENT PAGES FOR THE ABOVE CHANGES ARE ATTACHED HERETO: 21.1, 37.6, 37.7 AND 37.8.
Dec 17, 201538$977.4KGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC MOD 38: THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING IN THE AMOUNT OF $977,444.25. THIS INCREASES THE TOTAL OF OBLIGATED FUNDS FROM $20,261,730.64 TO $21,239,174.89. THE ADEQUATE FUNDED THROUGH DATE IS EXTENDED TO 01/27/2016 PER CONTRACTOR'S EMAIL DATED 12/16/2015. THE FOLLOWING REPLACEMENT PAGE IS ATTACHED HERETO AND SHOULD BE APPROPRIATELY INSERTED IN COPIES OF THE CONTRACT: 21.1
Nov 16, 201537$957.4KGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC MOD 37: THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING IN THE AMOUNT OF $957,430.00. THIS INCREASES THE TOTAL OF OBLIGATED FUNDS FROM $19,304,300.64 TO $20,261,730.64. THE ADEQUATE FUNDED THROUGH DATE IS EXTENDED TO 12/12/2015 PER CONTRACTOR'S EMAIL DATED 11/11/2015. THE FOLLOWING REPLACEMENT PAGES ARE ATTACHED HERETO AND SHOULD BE APPROPRIATELY INSERTED IN COPIES OF THE CONTRACT: 21, 21.1
Sep 29, 201536$409.6KGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC
Sep 25, 201535$245.6KGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC
Sep 23, 201534$-83.5KGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC MOD 34: THE PURPOSE OF THIS MODIFICATION IS TO DECREASE FUNDING IN THE AMOUNT OF $83,467.19, TO REMOVE EXPIRING FUNDS. THIS DECREASES THE TOTAL OF OBLIGATED FUNDS FROM $18,732,516.08 TO $18,649,048.89. THE FOLLOWING REPLACEMENT PAGE IS ATTACHED HERETO AND SHOULD BE APPROPRIATELY INSERTED IN COPIES OF THE CONTRACT: PAGE 21.
Aug 27, 201533$481.1KGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC MOD 33: THE PURPOSE OF THIS MODIFICATION IS TO: TO ADD INCREMENTAL FUNDING IN THE AMOUNT OF $481,108.38. THIS INCREASES THE TOTAL OF OBLIGATED FUNDS FROM $18,251,407.70 TO $18,732,516.08. THE ADEQUATE FUNDED THROUGH DATE IS EXTENDED TO 09/21/2015 PER CONTRACTOR'S EMAIL DATED 08/27/2015. THE FOLLOWING REPLACEMENT PAGE IS ATTACHED HERETO AND SHOULD BE APPROPRIATELY INSERTED IN COPIES OF THE CONTRACT: PAGE 21.
Aug 19, 201532$0GN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC MOD 32: THE PURPOSE OF THIS MODIFICATION IS TO: ESTABLISH THE APPLICABLE ECONOMIC PRICE ADJUSTMENT FACTORS FOR CLINS 001, 002, AND 003, FOR THE PERIOD OF AUGUST 1, 2015 THROUGH JANUARY 31, 2016, PURSUANT TO ARTICLE 3.2, ECONOMIC PRICE ADJUSTMENT. REPLACEMENT PAGE 36 FOR THE ABOVE CHANGES ARE ATTACHED HERETO.
Jul 31, 201531$435.1KGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC MOD 31: THE PURPOSE OF THIS MODIFICATION IS TO: TO ADD INCREMENTAL FUNDING IN THE AMOUNT OF $435,134.33 THIS INCREASES TOTAL OF OBLIGATED FUNDS FROM $17,816,273.37 TO $18,251,407.70. THE FOLLOWING REPLACEMENT PAGE IS ATTACHED HERETO AND SHOULD BE APPROPRIATELY INSERTED IN COPIES OF THE CONTRACT: PAGE 21.
Jul 17, 201530$30.0KGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC:: MOD 30: THE PURPOSE OF THIS MODIFICATION IS TO: 1. EXERCISE OPTION PERIOD 1 WHICH EXTENDS THE CONTRACT PERIOD OF PERFORMANCE THROUGH 07/31/2017. THIS ACTION INCREASED THE CURRENT CONTRACT VALUE BY $13,800,000.00 FROM $17,786,273.37 TO $31,586,273.37. 2. TO ADD INCREMENTAL FUNDING IN THE AMOUNT OF $30,000.00 THIS INCREASES TOTAL OF OBLIGATED FUNDS FROM $17,786,273.37 TO $17,816,273.37. THE FOLLOWING REPLACEMENT PAGE IS ATTACHED HERETO AND SHOULD BE APPROPRIATELY INSERTED IN COPIES OF THE CONTRACT: PAGE 21.
Jul 14, 201529$46.5KGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC:: MOD 29: THE PURPOSE OF THIS MODIFICATION IS TO: 1. INCORPORATE CLIN 007.5, GHE VALVE REFURBISHMENT. AS CONSIDERATION, CONTRACT VALUE IS HEREBY INCREASED BY $46,461.46 FROM $17,739,811.91 TO $17,786,273.37. OBLIGATED AMOUNT: $ 46,461.46 FUNDED AMOUNT CHANGED FROM: $ 17,739,811.91 FUNDED AMOUNT CHANGED TO: $ 17,786,273.37 CONTRACT VALUE CHANGED FROM: $ 17,739,811.91 CONTRACT VALUE CHANGED TO: $ 17,786,273.37 REPLACEMENT PAGES FOR THE ABOVE CHANGES ARE ATTACHED HERETO: 21 AND 37.5. THE PARTIES HERETO AGREE THAT THIS SUPPLEMENTAL AGREEMENT REPRESENTS A COMPLETE AND EQUITABLE ADJUSTMENT FOR CLIN 007.5, GHE VALVE REFURBISHMENT. THE CONTRACTOR HEREBY RELEASES THE GOVERNMENT FROM ANY AND ALL LIABILITY OR CLAIMS UNDER THIS CONTRACT FOR ANY FURTHER EQUITABLE ADJUSTMENTS ATTRIBUTABLE TO SUCH FACTS OR CIRCUMSTANCES GIVING RISE TO ITS PROPOSAL DATED MAY 13, 2015, AND ANY REVISIONS THERETO.
Jun 26, 201528$875.8KGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC MOD 28: THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING IN THE AMOUNT OF $875,781.41. THIS INCREASES TOTAL OF OBLIGATED FUNDS AND CONTRACT VALUE FROM $16,864,030.50 TO $17,739,811.91. THE FOLLOWING REPLACEMENT PAGE IS ATTACHED HERETO AND SHOULD BE APPROPRIATELY INSERTED IN COPIES OF THE CONTRACT: PAGE 21.
May 29, 201527$883.6KGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC:: MOD 27: THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING IN THE AMOUNT OF $883,609.63. THIS INCREASES TOTAL OF OBLIGATED FUNDS AND CONTRACT VALUE FROM $15,980,420.87 TO $16,864,030.50. THESE FUNDS ARE CONDSIDRERED SUFFICIENT TO COVER THE CONTRACTOR'S PERFORMANCE THROUGH JUNE 28, 2015. THE FOLLOWING REPLACEMENT PAGE IS ATTACHED HERETO AND SHOULD BE APPROPRIATELY INSERTED IN COPIES OF THE CONTRACT: PAGE 21.
Apr 30, 201526$876.2KGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC:: MOD 26 THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING IN THE AMOUNT OF $876,193.19. THIS INCREASES TOTAL OF OBLIGATED FUNDS AND CONTRACT VALUE FROM $15,104,227.68 TO $15,980,420.87. THESE FUNDS ARE CONDSIDRERED SUFFICIENT TO COVER THE CONTRACTOR'S PERFORMANCE THROUGH MAY 20, 2015. THE FOLLOWING REPLACEMENT PAGE IS ATTACHED HERETO AND SHOULD BE APPROPRIATELY INSERTED IN COPIES OF THE CONTRACT: PAGE 21.
Mar 30, 201525$885.4KGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC MOD 25: THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING IN THE AMOUNT OF $885,439.09. THIS INCREASES TOTAL OF OBLIGATED FUNDS FROM $14,218,788.59 TO $15,104,227.68. THESE FUNDS ARE CONDSIDRERED SUFFICIENT TO COVER THE CONTRACTOR'S PERFORMANCE THROUGH APRIL 15, 2015. THE FOLLOWING REPLACEMENT PAGE IS ATTACHED HERETO AND SHOULD BE APPROPRIATELY INSERTED IN COPIES OF THE CONTRACT: PAGE 21.
Mar 2, 201524$20.1KGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC MOD 24: THE PURPOSE OF THIS MODIFICATION IS TO: 1. ESTABLISH THE APPLICABLE ECONOMIC PRICE ADJUSTMENT FACTORS FOR CLINS 001, 002, AND 003, FOR THE PERIOD OF FEBRUARY 1, 2015 THROUGH JULY 31, 2015, PURSUANT TO ARTICLE 3.2, ECONOMIC PRICE ADJUSTMENT. 2. INCORPORATE CLIN 007.4, CX40 GHE FM REPLACEMENT. AS CONSIDERATION, CONTRACT VALUE IS HEREBY INCREASED BY $20,146.41 FROM $14,198,642.18 TO $14,218,788.59. 3. MAKE AN ADMINISTRATIVE CHANGE TO UPDATE TOTALIZER WEBSITE. OBLIGATED AMOUNT: $ 20,146.41 FUNDED AMOUNT CHANGED FROM: $ 14,198,642.18 FUNDED AMOUNT CHANGED TO: $ 14,218,788.59 CONTRACT VALUE CHANGED FROM: $ 14,198,642.18 CONTRACT VALUE CHANGED TO: $ 14,218,788.59 REPLACEMENT PAGES FOR THE ABOVE CHANGES ARE ATTACHED HERETO: 16, 36, AND 37.4. THE PARTIES HERETO AGREE THAT THIS SUPPLEMENTAL AGREEMENT REPRESENTS A COMPLETE AND EQUITABLE ADJUSTMENT FOR CLIN 007.4, CX40 GHE FM REPLACEMENT. THE CONTRACTOR HEREBY RELEASES THE GOVERNMENT FROM ANY AND ALL LIABILITY OR CLAIMS UNDER THIS CONTRACT FOR ANY FURTHER EQUITABLE ADJUSTMENTS ATTRIBUTABLE TO SUCH FACTS OR CIRCUMSTANCES GIVING RISE TO ITS PROPOSAL DATED DECEMBER 1, 2014, AND ALL REVISIONS THERETO.
Jan 28, 201523$1.1MGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC. MOD 23: THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING IN THE AMOUNT OF $1,131,655.94. THIS INCREASES TOTAL OF OBLIGATED FUNDS FROM $13,066,986.24 TO $14,198,642.18. THESE FUNDS ARE CONDSIDRERED SUFFICIENT TO COVER THE CONTRACTOR'S PERFORMANCE THROUGH MARCH 10, 2015. THE FOLLOWING REPLACEMENT PAGE IS ATTACHED HERETO AND SHOULD BE APPROPRIATELY INSERTED IN COPIES OF THE CONTRACT: PAGE 21.
Dec 2, 201422$740.4KGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC MOD 22: THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING IN THE AMOUNT OF $740,400.00. THIS INCREASES TOTAL OF OBLIGATED FUNDS FROM $12,326,586.24 TO $13,066,986.24. THESE FUNDS ARE CONDSIDRERED SUFFICIENT TO COVER THE CONTRACTOR'S PERFORMANCE THROUGH JANUARY 26, 2015. THE FOLLOWING REPLACEMENT PAGE IS ATTACHED HERETO AND SHOULD BE APPROPRIATELY INSERTED IN COPIES OF THE CONTRACT: PAGE 21.
Nov 6, 201421$1.1MGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC MOD 21: THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING IN THE AMOUNT OF $1,116,391.06. THIS INCREASES TOTAL OF OBLIGATED FUNDS FROM $11,210,195.18 TO $12,326,586.24. THESE FUNDS ARE CONDSIDRERED SUFFICIENT TO COVER THE CONTRACTOR'S PERFORMANCE THROUGH DECEMBER 26, 2014. THE FOLLOWING REPLACEMENT PAGE IS ATTACHED HERETO AND SHOULD BE APPROPRIATELY INSERTED IN COPIES OF THE CONTRACT: PAGE 21.
Sep 25, 201420$1.1MGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC. THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING IN THE AMOUNT OF $1,073,837.01. THIS INCREASES TOTAL OF OBLIGATED FUNDS FROM $10,136,358.17 TO $11,210,195.18. THE FOLLOWING REPLACEMENT PAGE IS ATTACHED HERETO AND SHOULD BE APPROPRIATELY INSERTED IN COPIES OF THE CONTRACT: PAGE 21.
Sep 15, 201419$0GN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC MOD 19: THE PURPOSE OF THIS MODIFICATION IS TO ESTABLISH THE APPLICABLE ECONOMIC PRICE ADJUSTMENT FACTORS FOR CLINS 001, 002, AND 003, FOR THE PERIOD OF AUGUST 1, 2014 THROUGH JANUARY 31, 2015, PURSUANT TO ARTICLE 3.2, ECONOMIC PRICE ADJUSTMENT. IN ADDITION, IT CHANGES PARAGRAPH 5.2(H)(5), TEST AND LAUNCH OPERATIONS, MINIMUM AND MAXIMUM PRESSURES. THE FOLLOWING REPLACEMENT PAGES ARE ATTACHED HERETO AND SHOULD BE APPROPRIATELY INSERTED IN COPIES OF THE CONTRACT: PAGES 14 AND 36.
Aug 12, 201418$-50.4KGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC. THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE $50,361.98. THIS DECREASES THE TOTAL OF OBLIGATED FUNDS FROM $10,186,720.15 TO $10,136,358.17. THE FOLLOWING REPLACEMENT PAGE IS ATTACHED HERETO AND SHOULD BE APPROPRIATELY INSERTED IN COPIES OF THE CONTRACT: PAGE 21.
Jul 28, 201417$937.5KGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC MOD 17: THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING IN THE AMOUNT OF $937,484.74. THIS INCREASES TOTAL OF OBLIGATED FUNDS FROM $9,249,235.41 TO $10,186,720.15. THE FOLLOWING REPLACEMENT PAGE IS ATTACHED HERETO AND SHOULD BE APPROPRIATELY INSERTED IN COPIES OF THE CONTRACT: PAGE 21.
Jun 25, 201416$264.8KGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC.THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING IN THE AMOUNT OF $264,804.13. THIS INCREASES TOTAL OF OBLIGATED FUNDS FROM $8,984,431.28 TO $9,249,235.41. THE FOLLOWING REPLACEMENT PAGE IS ATTACHED HERETO AND SHOULD BE APPROPRIATELY INSERTED IN COPIES OF THE CONTRACT: PAGE 21.
Jun 11, 201414$46.0KGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC MOD 14: THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE CLIN 007.2, REPLACE HYDROCARBON ANALYZERS. AS CONSIDERATION, CONTRACT VALUE IS HEREBY INCREASED BY $46,033.68 FROM $13,825,645.56 TO $13,871,679.24. OBLIGATED AMOUNT: $ 46,033.68 FUNDED AMOUNT CHANGED FROM: $ 8,905,738.31 FUNDED AMOUNT CHANGED TO: $ 8,951,771.99 CONTRACT VALUE CHANGED FROM: $ 13,825,645.56 CONTRACT VALUE CHANGED TO: $ 13,871,679.24 REPLACEMENT PAGES FOR THE ABOVE CHANGES ARE ATTACHED HERETO: 21 AND 37.2. THE PARTIES HERETO AGREE THAT THIS SUPPLEMENTAL AGREEMENT REPRESENTS A COMPLETE AND EQUITABLE ADJUSTMENT FOR CLIN 007.2, REPLACE HYDROCARBON ANALYZERS. THE CONTRACTOR HEREBY RELEASES THE GOVERNMENT FROM ANY AND ALL LIABILITY OR CLAIMS UNDER THIS CONTRACT FOR ANY FURTHER EQUITABLE ADJUSTMENTS ATTRIBUTABLE TO SUCH FACTS OR CIRCUMSTANCES GIVING RISE TO ITS PROPOSAL DATED APRIL 16, 2014, AND ALL REVISIONS THERETO.
Jun 11, 201415$32.7KGN2 - GASEOUS NITROGEN SUPPLY AND PIPELINE MAINTENANCE FOR KSC MOD 15: THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE CLIN 007.3, REPLACE TRACE OXYGEN ANALYZERS. AS CONSIDERATION, CONTRACT VALUE IS HEREBY INCREASED BY $32,659.29 FROM $13,871,679.24 TO $13,904,338.53. OBLIGATED AMOUNT: $ 32,659.29 FUNDED AMOUNT CHANGED FROM: $ 8,951,771.99 FUNDED AMOUNT CHANGED TO: $ 8,984,431.28 CONTRACT VALUE CHANGED FROM: $ 13,871,679.24 CONTRACT VALUE CHANGED TO: $ 13,904,338.53 REPLACEMENT PAGES FOR THE ABOVE CHANGES ARE ATTACHED HERETO: 21 AND 37.3. THE PARTIES HERETO AGREE THAT THIS SUPPLEMENTAL AGREEMENT REPRESENTS A COMPLETE AND EQUITABLE ADJUSTMENT FOR CLIN 007.3, REPLACE TRACE OXYGEN ANALYZERS. THE CONTRACTOR HEREBY RELEASES THE GOVERNMENT FROM ANY AND ALL LIABILITY OR CLAIMS UNDER THIS CONTRACT FOR ANY FURTHER EQUITABLE ADJUSTMENTS ATTRIBUTABLE TO SUCH FACTS OR CIRCUMSTANCES GIVING RISE TO ITS PROPOSAL DATED APRIL 14, 2014, AND ALL REVISIONS THERETO.