IDV vehicle

W56HZV17D0008

THIS REQUIREMENT IS FOR A FIVE YEAR FIRM FIXED PRICE (FFP), LONG TERM, INDEFINITE DELIVERY/INDEFINITE QUANTITY (ID/IQ) CONTRACT TO PROCURE A MINIMUM QUANTITY OF ONE EACH, WITH A MAXIMUM OF 12 EACH, OF THE EARLY ENTRY FLUID DISTRIBUTION SYSTEM (E2FDS).

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW6QK ACC- DTA
NAICS333911
PSC3835 — Petroleum Production and Distribution Equipment
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeORDER DEPENDENT (IDV ALLOWS PRICING ARRANGEMENT TO BE DETERMINED SEPARATELY FOR EACH ORDER)
Obligations$0
Current contract valueNot reported
Potential contract value / ceiling$87.3M
Start dateOct 27, 2016
Current end dateNot available
Potential end dateNot available
Latest award activityMay 27, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 44 of 44 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
May 27, 2026P00040$0EARLY ENTRY FLUID DISTRIBUTION SYSTEM (E2FDS) MODIFICATION TO THE BASE CONTRACT TO ADD CONSIDERATION REGARDING HEX CHROME.
Apr 17, 2026P00039$0EARLY ENTRY FLUID DISTRIBUTION SYSTEM: 10-YEAR, FIRM FIXED PRICE, REQUIREMENTS CONTRACT. MODIFICATION TO INCORPORATE THE REQUEST FOR EQUITABLE ADJUSTMENT DUE TO THE GOVERNMENT SHUTDOWN DURING THE INSTRUCTOR AND KEY PERSONNEL TRAINING EVENT.
Feb 17, 2026P00037$0EARLY ENTRY FLUID DISTRIBUTION SYSTEM (E2FDS) BASE ADMINISTRATIVE MODIFICATION - TECHNICAL DATA PACKAGE DELIVERY AND ENGINEERING CHANGE PROPOSAL 6303
Sep 9, 2025P00036$0E2FDS - I&KPT LOCATION CHANGE BASE MOD & CD25 COMPLIANCE UPDATE
Jun 17, 2025P00034$0E2FDS - RFV, HAZARDOUS WAIVER, GFP UPDATE
Jun 17, 2025P00035$0THIS ACTION IS THE REMOVAL AND REVISION OF FOUR CLAUSES IN ACCORDANCE WITH THE EXECUTIVE ORDER 14148
Apr 10, 2025P00032$0EARLY ENTRY FLUID DISTRIBUTION SYSTEM (E2FDS) BASE CONTRACT W56HZV-17-D-0008 MODIFICATION P00032 TO ADD CLINS FOR TEST ASSET REFURB/REPLACEMENT.
Nov 26, 2024P00031$0EARLY ENTRY FLUID DISTRIBUTION SYSTEM (E2FDS) BASE MODIFICATION P00031 TO INCREASE I&KPT HOURS.
Nov 14, 2024P00030$0EARLY ENTRY FLUID DISTRIBUTION SYSTEM (E2FDS) - INCORPORATING FIVE RFV'S AND 2 GFP CLAUSES.
Oct 1, 2024ARZ995$0THIS REQUIREMENT IS FOR A FIVE YEAR FIRM FIXED PRICE (FFP), LONG TERM, INDEFINITE DELIVERY/INDEFINITE QUANTITY (ID/IQ) CONTRACT TO PROCURE A MINIMUM QUANTITY OF ONE EACH, WITH A MAXIMUM OF 12 EACH, OF THE EARLY ENTRY FLUID DISTRIBUTION SYSTEM (E2FDS).
Sep 5, 2024P00033$0EARLY ENTRY FLUID DISTRIBUTION SYSTEM (E2FDS) PRODUCTION
Jun 12, 2024P00029$0EARLY ENTRY FLUID DISTRIBUTION SYSTEM (E2FDS) - TM DELTA VERIFICATION TRAVEL COSTS
May 23, 2024P00028$0EARLY ENTRY FLUID DISTRIBUTION SYSTEM (E2FDS)
Mar 11, 2024P00027$0EARLY ENTRY FLUID DISTRIBUTION SYSTEM (E2FDS) - SOFTWARE INTEGRATION LAB (SIL)
Oct 18, 2023P00026$0THE PURPOSE OF THIS NO-COST, BILATERAL MODIFICATION P00026 IS TO: EXERCISE THE OPTION FOR THE EIGHTH ORDERING PERIOD UNDER FAR 52.217-9, OPTION TO EXTEND THE TERM OF CONTRACT CORRECT THE CONTRACT EXPIRATION DATE TO MATCH THE TERM AGREED TO IN P00024 AND REVISE FAR CLAUSE 52.217-9 TO REFLECT A POTENTIAL 10-YEAR TERM AGREED TO IN P00024.
Sep 13, 2023P00024$0EARLY ENTRY FLUID DISTRIBUTION SYSTEM (E2FDS) CONTRACT EXTENSION PRICING EFFORT.
Sep 13, 2023P00025$0THE PURPOSE OF THIS BILATERAL MODIFICATION P00025 IS TO INCORPORATE ATTACHMENT 0043 - GOVERNMENT FURNISHED PROPERTY VERSION 4 (V4), WHICH ADDS NON-SERIALLY MANAGED ITEMS.
Aug 8, 2023P00023$0THE PURPOSE OF THIS BILATERAL MODIFICATION P00023 IS TO ADD FAR CLAUSE 52.207-27 (PROHIBITION ON A BYTEDANCE COVERED APPLICATION) AND FAR CLAUSE 52.216-18 (ORDERING) WITHIN SECTION I. ADDITIONALLY, THIS MODIFICATION INCORPORATES A CONFORMED COPY OF EXHIBIT A (CONTRACT DATA REQUIREMENTS LIST A001-A092 (A050 REMOVED)) WITHIN SECTION J (LIST OF ATTACHMENTS).
Feb 15, 2023P00022$0EARLY ENTRY FLUID DISTRIBUTION SYSTEM (E2FDS). MODIFICATION TO THE BASE CONTRACT TO INCORPORATE GOVERNMENT FURNISHED PROPERTY (GFP).
Nov 17, 2022P00021$0EARLY ENTRY FLUID DISTRIBUTION SYSTEM (E2FDS). MODIFICATION TO THE BASE CONTRACT TO CHANGE THE INSPECTION AND ACCEPTANCE ON CLINS 2021 AND 2025.
Sep 20, 2022P00020$0EARLY ENTRY FLUID DISTRIBUTION SYSTEM (E2FDS) AWARD FOR INTERACTIVE ELECTRONIC TRAINING MANUALS (IETM) TO ELECTRONIC TRAINING MANUALS (ETM).
Jul 18, 2022P00019$0EARLY ENTRY FLUID DISTRIBUTION SYSTEM (E2FDS) BILATERAL NO COST MODIFICATION TO CONTRACT W56HZV-17-D-0008 TO UPDATE THE CONTRACT EXPIRATION DATE IN SECTION A, UPDATE THE PRICING OF CLINS 2006 AND 2022, AND UPDATE FAR 52.216-19 IAW W56HZV-17-D-0008 MODIFICATION P00018.
May 17, 2022P00018$0EARLY ENTRY FLUID DISTRIBUTION SYSTEM (E2FDS) BILATERAL NO COST MODIFICATION TO CONTRACT W56HZV-17-D-0008 TO ADD 3 YEARS TO THE CONTRACT, ADMINISTRATIVE CLEANUP OF SECTION B, C, E, AND F NARRATIVES, UPDATE OF VENDOR NAME AND POINT OF CONTACT (POC) FOR CDRLS IN SECTION J, AND UPDATE FAR CLAUSE 52.215-13.
May 9, 2022P00016$0EARLY ENTRY FLUID DISTRIBUTION SYSTEM (E2FDS) MODIFICATION TO UPDATE THE ITEM UNIQUE IDENTIFICATION (IUID) REQUIREMENTS ESTABLISHED UNDER THE BASE CONTRACT.
Dec 15, 2021P00017$0EARLY ENTRY FLUID DISTRIBUTION SYSTEM (E2FDS) MODIFICATION TO INCORPORATE A LINE ITEM THAT WAS MUTUALLY AGREED TO VIA MODIFICATION P00012 NARRATIVE A00013.
Sep 15, 2021P00014$0EARLY ENTRY FLUID DISTRIBUTION SYSTEM PRODUCTION
Sep 14, 2021P00012$0EARLY ENTRY FLUID DISTRIBUTION SYSTEM (E2FDS) PRODUCTION.
Sep 11, 2021P00015$0EARLY ENTRY FLUID DISTRIBUTION SYSTEM (E2FDS) EXERCISE OPTION IN SECOND ORDERING PERIOD.
Jan 15, 2021P00013$05-YEAR FIRM FIXED PRICE (FFP),ID/IQ CONTRACT TO PROCURE A CURRENT: 250 MINIMUM QUANTITY OF ONE EACH, WITH A MAXIMUM OF 12 EACH, OF THE EARLY ENTRY FLUID DISTRIBUTION PROCUREMENT.
Sep 24, 2020P00011$05-YEAR FIRM FIXED PRICE (FFP),ID/IQ CONTRACT TO PROCURE A CURRENT: 250 MINIMUM QUANTITY OF ONE EACH, WITH A MAXIMUM OF 12 EACH, OF THE EARLY ENTRY FLUID DISTRIBUTION PROCUREMENT. THIS MODIFICATION IS ADD A BITTERANT FIBER CABLE CLIN.
Jul 13, 2020ARZ997$0THIS REQUIREMENT IS FOR A FIVE YEAR FIRM FIXED PRICE (FFP), LONG TERM, INDEFINITE DELIVERY/INDEFINITE QUANTITY (ID/IQ) CONTRACT TO PROCURE A MINIMUM QUANTITY OF ONE EACH, WITH A MAXIMUM OF 12 EACH, OF THE EARLY ENTRY FLUID DISTRIBUTION SYSTEM (E2FDS).
May 14, 2020P00010$05-YEAR FIRM FIXED PRICE (FFP),ID/IQ CONTRACT TO PROCURE A CURRENT: 250 MINIMUM QUANTITY OF ONE EACH, WITH A MAXIMUM OF 12 EACH, OF THE EARLY ENTRY FLUID DISTRIBUTION PROCUREMENT.
Mar 27, 2020ARZ998$0COVID-19 DIB. 5-YEAR FIRM FIXED PRICE (FFP),ID/IQ CONTRACT TO PROCURE A CURRENT: 250 MINIMUM QUANTITY OF ONE EACH, WITH A MAXIMUM OF 12 EACH, OF THE EARLY ENTRY FLUID DISTRIBUTION PROCUREMENT.
Mar 27, 2020ARZ999$0COVID-19 DIB. 5-YEAR FIRM FIXED PRICE (FFP),ID/IQ CONTRACT TO PROCURE A CURRENT: 250 MINIMUM QUANTITY OF ONE EACH, WITH A MAXIMUM OF 12 EACH, OF THE EARLY ENTRY FLUID DISTRIBUTION PROCUREMENT.
Mar 25, 2020P00009$06 YEAR IDIQ CONTRACT FOR E2FDS. FIRST ORDERING PERIOD IS FOR EMD AND THE SECOND ORDERING PERIOD IS FOR PRODUCTION. THIS MOD&#57360 INCORPORATES UPDATES TO LOGISTICS ITEMS ALONG WITH VARIOUS ADMINISTRATIVE CHANGES.
Sep 12, 2019P00008$05 YEAR IDIQ CONTRACT FOR E2FDS. FIRST ORDERING PERIOD IS FOR EMD AND THE SECOND ORDERING PERIOD IS FOR PRODUCTION. THIS MOD INCORPORATES CONSIDERATION FOR A THREE MONTH CONTRACTOR DELAY.
Jan 22, 2019P00007$05 YEAR IDIQ CONTRACT FOR E2FDS. FIRST ORDERING PERIOD IS FOR EMD AND THE SECOND ORDERING PERIOD IS FOR PRODUCTION. THIS MOD INCORPORATES UPDATED PUBLICATIONS SCOPE, CDRLS AND ATTACHMENTS.
Dec 20, 2018P00006$05 YEAR IDIQ CONTRACT FOR E2FDS. FIRST ORDERING PERIOD IS FOR MED AND THE SECOND ORDERING PERIOD IS FOR PRODUCTION. THE MOD INCORPORATES PRICING AND SCHEDULE IMPACTED FROM ATPD CHANGES AND THE CDR CHANGE.
May 29, 2018P00005$05 YEAR IDIQ CONTRACT FOR E2FDS, FIRST ORDERING PERIOD IS FOR EMD AND SECOND ORDERING PERIOD IS FOR PRODUCTION. THIS MOD INCORPORATED THE UPDATED ATPD, CDRLS AND ADD GFP ATTACHMENT
Apr 16, 2018P00004$05 YEAR IDIQ CONTRACT FOR E2FDS, FIRST ORDERING PERIOD IS FOR EMD AND SECOND ORDERING PERIOD IS FOR PRODUCTION. THIS MOD INCORPORATED THE UPDATED ATPD.
Mar 5, 2018P00003$05 YEAR IDIQ CONTRACT FOR E2FDS, FIRST ORDERING PERIOD IS FOR EMD AND SECOND ORDERING PERIOD IS FOR PRODUCTION. THIS MOD SETTLES THE REA DUE TO THE STOP-WORK ISSUED FROM TWO PROTESTS.
Feb 1, 2018P00002$05 YEAR IDIQ CONTRACT FOR THE E2FDS, FIRST ORDERING PERIOD IS EMD AND THE SECOND ORDERING PERIOD IS FOR PRODUCTION. THIS MOD MAKES NO-COST REVISIONS TO THE ATPD AND UPDATES TO THE CDRLS.
Sep 7, 2017P00001$0THIS MODIFICATION UPDATES THE SCOPE OF WORK AND ADDS AN ATTACHMENT.
Oct 27, 20160$0THIS REQUIREMENT IS FOR A FIVE YEAR FIRM FIXED PRICE (FFP), LONG TERM, INDEFINITE DELIVERY/INDEFINITE QUANTITY (ID/IQ) CONTRACT TO PROCURE A MINIMUM QUANTITY OF ONE EACH, WITH A MAXIMUM OF 12 EACH, OF THE EARLY ENTRY FLUID DISTRIBUTION SYSTEM (E2FDS).

Research next steps

  1. Check the stated set-aside against the solicitation and current certifications.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.