Explore federal awards
Date filters select awards with transaction activity in the period. Amounts below are lifetime award obligations. IDV values remain separate.
Export these results to CSV · 15 matching records
DESIGN BUILD PROJECT TO MODERNIZE THE SLC ATCT, TRACON BUILDING AND BASE BUILDING.Department of Transportation$10.8M obligationsEnds Sep 30, 2027
REMOVE AND REPLACE ALL EXTERIOR CAULKING OF BASE BUILDING & TOWER OF ATCT. REPAIR AND INSTALL METAL FRAMING AND DRYWALL FROM THE FIRST LEVEL TO TENTH LEVEL OF ATCT.Department of Transportation$1.9M obligationsEnds Nov 19, 2026
IGF::CT::IGF PERFORM ALL WORK FOR THE MAJOR MECHANICAL SUSTAINMENT (MMS) PROJECT AT THE SALT LAKE CITY AIR ROUTE TRAFFIC CONTROL CENTER (ARTCC) IN SALT LAKE CITY, UTAH.Department of Transportation$10.1M obligationsEnds Jun 5, 2020
SALT LAKE CITY, UT AIR ROUTE TRAFFIC CONTROL CENTER (ZLC) UNDERGROUND UTILITIES MODERNIZATION. SCOPE: MODERNIZE THE FACILITY TO REPLACE UNDERGROUND UTILITIES, RENOVATE THE PAVED…Department of Transportation$4.8M obligationsEnds Aug 31, 2027
LCH ATCT ELECTRICAL UPGRADEDepartment of Transportation$1.9M obligationsEnds Sep 1, 2026
ESTABLISH CONSTRUCTION CONTRACT FOR THE REPLACEMENT OF THE HVAC SYSTEM AT THE BURLINGTON, VT AIRPORT TRAFFIC CONTROL TOWER IN SOUTH BURLINGTON, VT. REPLACE HVAC SYSTEM AT BTV…Department of Transportation$3.1M obligationsEnds May 5, 2027
ZLA HVAC REFURBISHMENT PROJECT (AHU 200, 300, AND 500)Department of Transportation$6.6M obligationsEnds Jan 30, 2027
CHILLER REPLACEMENT AT DTW ATCT (DETROIT, MI): 1.) REPLACE HVAC COMPONENTS ASSOCIATED WITH THE CHILLER REPLACEMENT, INCLUDING THE FOUNDATIONS, AS SHOWN ON THE DRAWINGS AND OTHER…Department of Transportation$4.2M obligationsEnds Jan 8, 2033
CONTRACTOR TO DESIGN-BUILD A STAGING AREA AS OUTLINED IN THE SCOPE OF WORK AND BY FAA APPROVED DESIGN AT THE KANSAS CITY (ZKC) AIR ROUTE TRAFFIC CONTROL CENTER IN OLATHE, KANSAS.Department of Transportation$769.1K obligationsEnds Apr 10, 2026
PROVIDE ARCHITECTURAL ENGINEERING DESIGN, CONSTRUCTION DOCUMENTATION, AND SUPPORT DURING PROCUREMENT AS WELL AS ABATEMENT AND CONSTRUCTION SERVICES NECESSARY TO COMPLETELY…Department of Transportation$2.4M obligationsEnds Jan 30, 2026
BUILDING ENVELOPE AND WATER LEAK REPAIRS SAN ANTONIO (SAT) AIRPORTDepartment of Transportation$5.1M obligationsEnds Dec 18, 2025
1) REPLACE EXISTING AHU #1 LOCATED/SERVICING THE BASE BUILDING. 2) REPLACE EXISTING AHU # 1 SERVO MOTOR CONTROLLER. 3) INTEGRATE NEW AHU#1 INTO BUILDING AUTOMATION SYSTEM (BAS)…Department of Transportation$1.2M obligationsEnds Jul 11, 2025
SALT LAKE CITY ATCT HVAC CONTROLS REPLACEMENTDepartment of Transportation$1.3M obligationsEnds Mar 13, 2025
RVS: REPLACE ATCT ELECTRICAL SYSTEM, REPLACE DOMESTIC AND SEWER PIPE, AND RESEAL ATCT TO PREVENT WATER INFILTRATION. LINE 1: 803971: REPLACE ELECTRICAL SYSTEM. LINE 2: 909316…Department of Transportation$2.8M obligationsEnds Dec 20, 2024
CONTRACTOR TO PROVIDE ALL LABOR, MATERIALS, TOOLS, TRANSPORTATION, EQUIPMENT AND SUPERVISION TO COMPLETE THE FENS ELECTRICAL SITE PREPARATION TO INCLUDE BUT NOT LIMITED TO…Department of Transportation$1.8M obligationsEnds Mar 24, 2025