Date filters select awards with transaction activity in the period. Amounts below are lifetime award obligations. IDV values remain separate.
REPAIR A SINKHOLE/DEPRESSION LOCATED NEXT TO BARRACKS BUILDING 7935 AND REPAIR A HOLE IN THE PARKING LOT ENTRANCE TO BARRACKS 7939.Department of Defense$160.7K obligationsEnds Dec 28, 2026
THIS REQUIREMENT IS TO INSPECT AND REMEDIATE SINKHOLE.Department of Defense$37.8K obligationsEnds Jul 31, 2026
THE CONTRACTOR SHALL PERFORM FULL-DEPTH REPAIR (REMOVAL AND REPLACEMENT) OF 15-INCH CONCRETE PADS EXHIBITING HIGH-SEVERITY CORNER CRACKING LOCATED ON ALPHA AND GOLF TAXIWAY.Department of Defense$1.5M obligationsEnds Nov 25, 2026
THIS REQUIREMENT IS TO REPAIR TENNESSEE AVE.Department of Defense$94.4K obligationsEnds Sep 20, 2026
THE CONTRACTOR WILL INCREASE THE SIZE OF THE GRAVEL OVERFLOW PARKING LOT AT THE SABALAUSKI AIR ASSAULT SCHOOL (TSAAS).Department of Defense$497.5K obligationsEnds Oct 15, 2026
THIS SCOPE OF WORK OUTLINES THE NECESSARY REPAIRS FOR CRITICAL PAVEMENT DEFICIENCIES AT SABRE ARMY AIRFIELD. THE PROJECT ADDRESSES ISSUES ON TAXIWAYS DELTA, FOXTROT, THE THUNDER…Department of Defense$69.5K obligationsEnds Jul 29, 2026
THIS REQUIREMENT WILL CONDUCT ROADWAY REPAIRS, LANE EXTENSION AND REPAVING OF BASTOGNE AND AND AIR ASSAULT ROAD INTERSECTION.Department of Defense$623.8K obligationsEnds Oct 2, 2026
RELOCATE UAS TIE-DOWNS ON FLIGHT APRON OUTSIDE B66002. THE TIE-TOWNS ADHERE TO THE APPLICABLE STANDARDS FOR MOORING AND GROUNDING POINTS FOR AN MQ-1C PARKING APRON PER THE UFC.Department of Defense$137.0K obligationsEnds May 15, 2026
CONSTRUCTION OF APPROX. 80-FOOT CONCRETE SIDEWALK, INCLUDING ALL NECESSARY EARTHWORK, SUBGRADE PREPARATION, FORMING, CONCRETE PLACEMENT, AND FINISHING NEAR BLDG 2992, TO INCLUDE…Department of Defense$38.1K obligationsEnds Nov 1, 2025
ROADWAY REPAIRS ON PERIMETER ROAD (MCCONVILLE ROAD). REPAIRS ALSO INCLUDE DRAINAGE, SIGNAGE, STRIPING AND PEDESTRIAN FACILITIES.Department of Defense$1.6M obligationsEnds Feb 18, 2027
REPAIR AND REPLACE MULTIPLE DAMAGED CULVERTS IN THE BACK AREA OF FORT CAMPBELL.Department of Defense$299.4K obligationsEnds Aug 5, 2026
ROADWAY REPAIRS AND REPAVING OF KENTUCKY AVE. SHALL INCLUDE MILL AND OVERLAY, FULL-DEEP PAVEMENT RECONSTRUCTS, DRAINAGE, STRIPING, AND PEDESTRIAN FACILITIES IMPROVEMENTS IN…Department of Defense$1.1M obligationsEnds Jun 18, 2026
THIS PROJECT IS TO REPAVE AND REPAIR ASPHALT ROAD AT GATE 7.Department of Defense$3.0M obligationsEnds Jun 29, 2026
CONSTRUCT ADDITIONAL ASPHALT PAVEMENT IN THE VICINITY OF BLDG 7257Department of Defense$85.7K obligationsEnds Mar 14, 2026
REPAIR THE MANHOLE AT THE INTERSECTION OF 16TH ST AND GEORGIA AVE, WHERE THE EXISTING COLLAR AND SURROUNDING ASPHALT HAVE FAILED.Department of Defense$5.8K obligationsEnds Sep 22, 2025
REPAINT CAAFDepartment of Defense$1.6M obligationsEnds Aug 27, 2025
REMOVE OLD CONCRETE FENCE POSTS AND INSTALL NEW TYPE 7 FENCING. INSTALL ROCK AROUND THE PERIMETER OF THE NEW FENCING TO MEET UFC REQUIREMENTS.Department of Defense$41.9K obligationsEnds Sep 28, 2025
THIS PROJECT ENTAILS PAVEMENT REPAIRS ON THE PASSENGER RAMP, INCLUDING FULL-DEPTH CONCRETE REPLACEMENT TO ADDRESS HIGH-SEVERITY CORNER CRACKING AND JOINT DAMAGE, UTILIZING NEW…Department of Defense$479.2K obligationsEnds Mar 9, 2026
THIS PROJECT, LOCATED AT THE INTERSECTION OF POLK RD AND MONTILO ST, REQUIRES THE PERMANENT ASPHALT REPAIR OF A PATCH AREA CREATED BY A FORMER CONCRETE MEDIAN.Department of Defense$3.5K obligationsEnds Aug 16, 2025
THIS PROJECT IS TO REPLACE A DAMAGED STORM DRAIN THAT IS CAUSING CONSISTENT FLOODING DUE TO FAILURE.Department of Defense$45.6K obligationsEnds Sep 7, 2025
THE CONTRACTOR SHALL REPAIR FALCON LOOP ROAD PROJECT, WHICH INCLUDES MILLING AND OVERLAYING ASPHALT, INSTALLING NEW CURB AND GUTTER TO A LEVEL FULLY FUNCTIONALLY AND CAPABLE OF…Department of Defense$140.9K obligationsEnds Aug 30, 2025
REPAIR GARRETTSBURG GATE IMPGDDepartment of Defense$43.8K obligationsEnds Jul 31, 2025
CONSTRUCT RV LOTDepartment of Defense$2.4M obligationsEnds Jul 1, 2025
REPAIR OUTBOUND LANE ACCESS CONTROL POINT (ACP) 4Department of Defense$596.5K obligationsEnds Jun 30, 2025
IMPROVE RUNNING TRACK DRAINAGEDepartment of Defense$449.8K obligationsEnds Jun 20, 2025