Date filters select awards with transaction activity in the period. Amounts below are lifetime award obligations. IDV values remain separate.
FY23 PROJECT NO. WNHQ18-2201, REPAIR POL TANK 2662, SUWON AIR BASE (PACAF), KOREA.Department of Defense$4.5M obligationsEnds Dec 31, 2026
REPAIR AC PAVEMENTS, SIDEWALKS AND STORM DRAINAGE ON HQ LOOP AND UTAH ROAD, OSAN AB IAW STATEMENT OF WORK AND DRAWINGS.Department of Defense$242.6K obligationsEnds Jan 27, 2027
FY24 OMAF SMYU23-1012, REPAIR AIRMEN DORMITORY B1458, OSAN ABDepartment of Defense$13.6M obligationsEnds Dec 10, 2026
REPAIR FAILED OR FAILING B5211 (WORK PLAN), FOS CARROLLDepartment of Defense$537.5K obligationsEnds Dec 14, 2026
REPAIR DETERIORATED AND FAILING STORY FIELD, CAMP CARROLL (PROJECT NO. HR-10011-1J)Department of Defense$1.2M obligationsEnds May 30, 2026
SMYU 26-1028 DEMO ABANDON B918 AND B942, OSAN ABDepartment of Defense$504.2K obligationsEnds Dec 31, 2026
THE WORK UNDER MLWR 23-1014 REPLACE SEQUENCED FLASHING LIGHTS, KUNSAN AB CONSISTS OF PROJECT DESIGN, FURNISHING ALL LABOR, EQUIPMENT, MATERIALS, TRANSPORTATION, AND SUPERVISION…Department of Defense$350.1K obligationsEnds Oct 26, 2026
THE WORK UNDER MLWR 27-1008 REPLACE ILS CRITICAL AREA WARNING LIGHTS, KUNSAN AB CONSISTS OF PROJECT DESIGN, FURNISHING ALL LABOR, EQUIPMENT, MATERIALS, TRANSPORTATION, AND…Department of Defense$293.1K obligationsEnds Sep 26, 2026
REPAIR THREE SWIMMING POOLS, USAG HUMPHREYS, KOREADepartment of Defense$10.2M obligationsEnds May 6, 2026
FEWR NO. HS-00180-5J, REPLACE 2EA SETS OF ENTRANCE DOORS IN B308, CAMP CARROLLDepartment of Defense$36.8K obligationsEnds Sep 11, 2026
FY24 OMAF PROJECT NO. WNHQ24-5103, REPAIR MECHANICAL SUBSTATION, B2115, SUWON AIR BASE, KOREA (PACAF).Department of Defense$1.5M obligationsEnds Dec 20, 2027
REPLACE 22.9KV TRANSFORMER AND UNDERGROUND CABLE (WORK PLAN), CAMP CARROLL (HS-00161-4J)Department of Defense$156.2K obligationsEnds Aug 13, 2026
MLWR 25-1020 REPAIR HANGAR DOORS AT VARIOUS FACILITIES, KUNSAN ABDepartment of Defense$355.8K obligationsEnds Feb 15, 2026
REPLACE DETERIORATED GRAVEL PAVED BARKER FIELD WITH RESILIENT SURFACE AND CONCRETE HELIPAD, S-12415Department of Defense$1.9M obligationsEnds Jul 10, 2026
REPLACE WOODEN POLES WITH NEW CONCRETE POLES NEAR B841Department of Defense$46.2K obligationsEnds Mar 23, 2026
MLWR20-1018, INSTALL GUARD LIGHTS ALONG TAXIWAY C, KUNSAN AFB.Department of Defense$186.4K obligationsEnds May 1, 2026
REPAIR RETAINING WALLDepartment of Defense$527.1K obligationsEnds Feb 6, 2026
(MA IDIQ) REPLACE WITH NEW ROLL UP DOOR IN 10A, B835, CAMP CARROLLDepartment of Defense$63.3K obligationsEnds Apr 20, 2026
MINIMUM GUARANTEE UNDER $400M IDIQ MATOC DB CONSTRUCTION SERVICESDepartment of Defense$0 obligationsEnds Dec 27, 2029
REPAIR DETERIORATED INTERIOR AND EXTERIOR OF BLDG. NO. S-1317, BUSAN STORAGE FACILITY (BSF)Department of Defense$583.5K obligationsEnds Mar 9, 2026
REPAIR OUTDOOR SWIMMING POOL, BLDG NO. S-162 AT CAMP CARROLL (WORK PLAN)Department of Defense$848.5K obligationsEnds Mar 30, 2026
(MA IDIQ) EXTERIOR REPAIR OF B335 (CAC), CAMP WALKERDepartment of Defense$76.4K obligationsEnds Nov 30, 2025
THE WORK UNDER MLWR 18-1002 INSTALL HV BACKFEEDING CABLES ACROSS SOUTH LOOP, KUNSAN AB CONSISTS OF PROJECT DESIGN, FURNISHING ALL LABOR, EQUIPMENT, MATERIALS, TRANSPORTATION, AND…Department of Defense$803.2K obligationsEnds Jul 7, 2026
REPAIR STORM DRAIN LINES ON C DIAMOND AIRCRAFT SHELTERS BLDG#1142, #1151, #1161, OSAN AB IAW STATEMENT OF WORK AND DRAWING.Department of Defense$207.4K obligationsEnds Oct 31, 2026
REPAIR JOINT SEALS & CRACKS ON TAXIWAYSDepartment of Defense$155.3K obligationsEnds Dec 15, 2025