Date filters select awards with transaction activity in the period. Amounts below are lifetime award obligations. IDV values remain separate.
BUILDING 24 CHILLER REPLACEMENTNational Aeronautics and Space Administration$7.5M obligationsEnds Nov 12, 2026
DEMOLITION OF BUILDING 1209National Aeronautics and Space Administration$1.7M obligationsEnds Jan 31, 2027
REPLACEMENT OF LOAD BREAK SWITCHES AND VACUUM FAULT INTERRUPTERS THROUGHOUT KENNEDY SPACE CENTER.National Aeronautics and Space Administration$24.8M obligationsEnds Jan 5, 2031
BUILDING 31X ARES ANNEX - CONSTRUCTIONNational Aeronautics and Space Administration$25.6M obligationsEnds Sep 30, 2026
WETLANDS MITIGATIONNational Aeronautics and Space Administration$8.9M obligationsEnds Sep 6, 2027
UTILITY TUNNEL REPAIRS, PHASE 1National Aeronautics and Space Administration$9.2M obligationsEnds Sep 30, 2026
DESIGN-BUILD CONSTRUCTION CONSOLIDATED LABORATORY FACILITY AT STENNIS SPACE CENTERNational Aeronautics and Space Administration$33.7M obligationsEnds Mar 9, 2028
REPAIR OF THE MECHANICAL SYSTEMS IN BUILDING 7- CREW SYSTEMS LABORATORYNational Aeronautics and Space Administration$9.3M obligationsEnds Jan 4, 2027
REPAIR/UPGRADE SEWAGE CONVEYANCE SYSTEM, PHASE 1 AT KENNEDY SPACE CENTERNational Aeronautics and Space Administration$33.1M obligationsEnds Nov 6, 2029
THIS PROJECT REPLACES AND UPDATES MSFC UTILITY CONTROL SYSTEM (UCS), WHICH SUPPORTS SITE-WIDE CAPABILITIES AND OPERATIONS.National Aeronautics and Space Administration$4.5M obligationsEnds Jan 12, 2027
PROJECT TITLE: MSFC UTILITY CONTROL SYSTEM RISK REDUCTION PHASE 2National Aeronautics and Space Administration$6.1M obligationsEnds Jul 13, 2027
TAINTER VALVE REHABILITATIONNational Aeronautics and Space Administration$6.3M obligationsEnds Apr 21, 2027
DESIGN BUILD TO MODIFY PUMPHOUSE (ORBITAL PROCESSING FACILITY) AND DISTRIBUTION CENTER.National Aeronautics and Space Administration$20.0M obligationsEnds Nov 3, 2028
CONSTRUCTION PROJECT TO UPGRADE THE 22 KV ELECTRICAL DISTRIBUTION SYSTEM. ELECTRICAL INFRASTRUCTURE UPGRADESNational Aeronautics and Space Administration$15.9M obligationsEnds Sep 30, 2026
EMERGENCY EGRESS LIGHTING COMPLIANCE UPGRADE. THIS PROJECT WILL REPLACE MSFC EMERGENCY LIGHTING SYSTEMS BRINGING THEM UP TO THE CURRENT NASA AND INDUSTRY CODES AND WILL FOCUS ON…National Aeronautics and Space Administration$4.2M obligationsEnds Sep 16, 2026
REFURBISHMENT BASCULE BRIDGENational Aeronautics and Space Administration$9.3M obligationsEnds Dec 6, 2027
EAST SIDE DEMOLITION B644, 645, 645A, 646.National Aeronautics and Space Administration$3.5M obligationsEnds Mar 3, 2028
AVIATION LOGISTICS OPERATIONS FACILITY (ALOF) DESIGN-BUILDNational Aeronautics and Space Administration$22.7M obligationsEnds Sep 11, 2027
CONSTRUCTION OF CENTER FACILITY SUPPORT BUILDING - BUILDING 22National Aeronautics and Space Administration$23.2M obligationsEnds Apr 23, 2027
SEWER REHAB AND OPTIMIZATION OF E-COMPLEX AND CRYOGENICS AT STENNIS SPACE CENTER, MSNational Aeronautics and Space Administration$2.7M obligationsEnds Nov 19, 2026
ENVIRONMENTAL CONTROL SYSTEM (ECS) IN HIGH BAY THREE (HB-3) OF THE VEHICLE ASSEMBLY BUILDING (VAB).National Aeronautics and Space Administration$39.4M obligationsEnds Apr 30, 2026
SAFETY AND RELIABILITY POWER UPGRADES PHASE 4A AT KENNEDY SPACE CENTER, FL.National Aeronautics and Space Administration$2.8M obligationsEnds Dec 26, 2025
SAFETY AND RELIABILITY UPGRADE OF INSTITUTIONAL POWER SYSTEMS, PHASE 5, COMMUNICATIONS DISTRIBUTION AND SWITCHING CENTER SUBSTATION 138A/B REPLACEMENT AT KENNEDY SPACE CENTER…National Aeronautics and Space Administration$6.3M obligationsEnds Mar 4, 2028
REPLACE MEDIUM AND LOW VOLTAGE ELECTRICAL EQUIPMENT, SUCH AS 13.8KV LOADBREAK SWITCHES, PAD-MOUNT SWITCHES, MEDIUM AND LOW VOLTAGE FEEDERS, OIL & DRY TYPE TRANSFORMERS, LOW…National Aeronautics and Space Administration$3.0M obligationsEnds Aug 15, 2025
A-COMPLEX HIGH PRESSURE INDUSTRIAL WATER (HPIW) REFURBISHMENTNational Aeronautics and Space Administration$15.9M obligationsEnds Oct 10, 2024