671A4-21-160 BOILER REPLACEMENT KERRVILLE, TX KERRVILLE VAMC.Department of Veterans Affairs$42.3K obligationsEnds Aug 12, 2026
COMMODITY PURCHASE AND INSTALLATION OF TWO 115/230VAC, 4-WIRE, 3-PHASE, 60 AMP RECEPTACLES DESIGNED TO MATE WITH THE PURGE UNIT PLUG CPH-6034BC WITH INCLUDED INSTALLATION FOR BOTH.Department of Defense$17.6K obligationsEnds Jul 10, 2026
THE 55TH RESCUE GENERATION SQUADRON IS REQUESTING THE MODIFICATION OF FIVE FREQUENCY CONVERTER CARTS. THIS MODIFICATION IS NECESSARY TO ENSURE THE CARTS ARE COMPATIBLE WITH…Department of Defense$10.5K obligationsEnds Sep 7, 2026
TREE MAINTENANCE CONTRACT FOR FORT BLISS NATIONAL CEMETERY-886. COPY OF IGCE AND SOW ATTACHED. INITIAL CONTRACT OF BASE+ 4 OPTION YEARS REQUIRED. SAF FY25Department of Veterans Affairs$11.2K obligationsEnds Jan 31, 2027
REPAIR SON OF BEAST CHILLER PLANT AT B4834Department of Defense$3.9M obligationsEnds Jan 24, 2027
HANGAR AND ROLL-UP DOOR MAINTENANCE.Department of Defense$938.2K obligationsEnds Dec 31, 2026
EMERGENCY GENERATOR MAINTENANCEDepartment of Veterans Affairs$1.1M obligationsEnds Sep 30, 2023
CONTRACTOR SHALL PROVIDE ALL PERSONNEL, EQUIPMENT, AND RESOURCES NECESSARY TO SUPPORT 2026 LUKE DAYS AIR SHOW GROUND SUPPORT. SBA REQUIREMENT NUMBER: IK1694545917V.Department of Defense$499.5K obligationsEnds Mar 31, 2026
THE PURPOSE OF THIS REPAIR EFFORT IS TO PROVIDE ALL DESIGN, PLANS, SPECIFICATIONS, INSTALLATION, TESTING FUNCTION, LABOR, EQUIPMENT, MATERIALS, SERVICES, PERMITS AND SUPERVISION…Department of Defense$372.1K obligationsEnds Jul 17, 2026
EVAPORATIVE COOLER AND CHILLER MAINTENANCEDepartment of Defense$631.6K obligationsEnds Jun 30, 2026
SERVICE THE BASE AND 309TH AEROSPACE MAINTENANCE AND REGENERATION GROUP (309 AMARG) GROUNDS MAINTENANCE AREAS FOR THE 355TH CIVIL ENGINEER SQUADRON (355 CES) AT DAVIS-MONTHAN AFB…Department of Defense$858.2K obligationsEnds Feb 28, 2027
RENO IWWTP (FACILITY 83106) IN THE AMARG AREA PER THE SOW PROVIDED IN THIS PROJECT FBNV 250033 AT THE IWWTP LOCATED AT 309TH AMARG AT DAVIS MONTHAN AFB (DMAFB), AZ.Department of Defense$2.1M obligationsEnds Feb 20, 2027
SERVICE THE BASE AND 309TH AEROSPACE MAINTENANCE AND REGENERATION GROUP (309 AMARG) GROUNDS MAINTENANCE AREAS FOR THE 355TH CIVIL ENGINEER SQUADRON (355 CES) AT DAVIS-MONTHAN AFB…Department of Defense$168.1K obligationsEnds Feb 28, 2027
THE PROPOSED PROJECT IS A DESIGN BID BUILD CONSTRUCTION PROJECT TO CONSTRUCT A SINGLE-STORY 8,800 SF PRESERVATION OF THE FORCE AND FAMILY (POTFF) FACILITY.Department of Defense$6.5M obligationsEnds Jan 30, 2028
GROUNDS MAINTENANCE SERVICESDepartment of Defense$89.2K obligationsEnds Aug 14, 2024
AUTODOOR MX AT LUKE AFBDepartment of Defense$252.7K obligationsEnds Jul 12, 2026
THIS PROJECT WILL RENOVATE THE COMMAND POST ON THE NORTHEAST CORNER OF THE FIRST FLOOR OF BUILDING 2300. THIS ACQUISITION IS A WOMEN-OWNED SMALL BUSINESS SET ASIDENAICS: 236220…Department of Defense$2.2M obligationsEnds Jan 30, 2026
B408 HANGER DOORS ARE UNABLE TO BE OPENED AND CLOSED AFFECTING OPERATIONAL USE OF THE BUILDING. THIS PROJECT INCLUDES ALL NECESSARY DEMOLITION, CONSTRUCTION AND TESTING TO…Department of Defense$1.7M obligationsEnds Oct 7, 2025
DESIGN AND REPAIR THE 309TH AEROSPACE MAINTENANCE AND REGENERATION GROUP 1010 OIL DISPENSING AND FUEL RECOVERY UNIT. THIS REQUIREMENT INCLUDES THE THREE BID OPTIONS AND SOIL…Department of Defense$4.4M obligationsEnds Feb 4, 2026
8509245244!FY23 WEST_0183 TUCSON GROUNDDepartment of Defense$75.7K obligationsEnds Sep 30, 2026
COMMUNITY & REGIONAL DEVELOPMENT R&D SVCS COMMUNITY DEVELOPMENT R&D FACILITIES & MAJ EQUIPDepartment of Defense$19.9K obligationsEnds Sep 30, 2026
MCCHORD FIELD IRRIGATION SERVICES - TWCF (13 AUGUST 2025-30 SEPTEMBER 2025)Department of Defense$6.3K obligationsEnds Oct 31, 2025
REPAIR A FAILING FISHING DOCK AT THE RATTLESNAKE RECREATION SITE.Department of Agriculture$314.7K obligationsEnds Sep 30, 2026
THE TBRD WATER SYSTEMS IMPROVEMENT PROJECT INCLUDES: -REMOVING AND CAPPING 5 DRINKING WATER YARD HYDRANTS FROM THE BURNT CORRAL WATER SYSTEM. -REPLACING 5 DRINKING WATER YARD…Department of Agriculture$440.5K obligationsEnds Oct 24, 2025
TREE TRIMMING REQUIREMENT. PALM TREES TO BE ADDED 01/01/2022.Department of Veterans Affairs$183.1K obligationsEnds Dec 31, 2025