Explore federal awards
Date filters select awards with transaction activity in the period. Amounts below are lifetime award obligations. IDV values remain separate.
Export these results to CSV · 12 matching records
COMMODITY PURCHASE AND INSTALLATION OF TWO 115/230VAC, 4-WIRE, 3-PHASE, 60 AMP RECEPTACLES DESIGNED TO MATE WITH THE PURGE UNIT PLUG CPH-6034BC WITH INCLUDED INSTALLATION FOR BOTH.Department of Defense$17.6K obligationsEnds Jul 10, 2026
THE 55TH RESCUE GENERATION SQUADRON IS REQUESTING THE MODIFICATION OF FIVE FREQUENCY CONVERTER CARTS. THIS MODIFICATION IS NECESSARY TO ENSURE THE CARTS ARE COMPATIBLE WITH…Department of Defense$10.5K obligationsEnds Sep 7, 2026
REPAIR SON OF BEAST CHILLER PLANT AT B4834Department of Defense$3.9M obligationsEnds Jan 24, 2027
THE PURPOSE OF THIS REPAIR EFFORT IS TO PROVIDE ALL DESIGN, PLANS, SPECIFICATIONS, INSTALLATION, TESTING FUNCTION, LABOR, EQUIPMENT, MATERIALS, SERVICES, PERMITS AND SUPERVISION…Department of Defense$372.1K obligationsEnds Jul 17, 2026
SERVICE THE BASE AND 309TH AEROSPACE MAINTENANCE AND REGENERATION GROUP (309 AMARG) GROUNDS MAINTENANCE AREAS FOR THE 355TH CIVIL ENGINEER SQUADRON (355 CES) AT DAVIS-MONTHAN AFB…Department of Defense$858.2K obligationsEnds Feb 28, 2027
RENO IWWTP (FACILITY 83106) IN THE AMARG AREA PER THE SOW PROVIDED IN THIS PROJECT FBNV 250033 AT THE IWWTP LOCATED AT 309TH AMARG AT DAVIS MONTHAN AFB (DMAFB), AZ.Department of Defense$2.1M obligationsEnds Feb 20, 2027
SERVICE THE BASE AND 309TH AEROSPACE MAINTENANCE AND REGENERATION GROUP (309 AMARG) GROUNDS MAINTENANCE AREAS FOR THE 355TH CIVIL ENGINEER SQUADRON (355 CES) AT DAVIS-MONTHAN AFB…Department of Defense$168.1K obligationsEnds Feb 28, 2027
THIS PROJECT WILL RENOVATE THE COMMAND POST ON THE NORTHEAST CORNER OF THE FIRST FLOOR OF BUILDING 2300. THIS ACQUISITION IS A WOMEN-OWNED SMALL BUSINESS SET ASIDENAICS: 236220…Department of Defense$2.2M obligationsEnds Jan 30, 2026
DESIGN AND REPAIR THE 309TH AEROSPACE MAINTENANCE AND REGENERATION GROUP 1010 OIL DISPENSING AND FUEL RECOVERY UNIT. THIS REQUIREMENT INCLUDES THE THREE BID OPTIONS AND SOIL…Department of Defense$4.4M obligationsEnds Feb 4, 2026
THE CONTRACTOR SHALL REPAIR THE RISERS AT FACILITIES 1619, 1634 AND REPACK TWO (2) FIRE PUMPS AT FACILITY 148 IN ACCORDANCE WITH THE STATEMENT OF WORK (SOW).Department of Defense$26.6K obligationsEnds May 19, 2025
A. THE MACC IS DESIGNED TO PROVIDE A FLEXIBLE, COMPETITIVE, AND RESPONSIVE CONTRACTUAL CAPABILITY TO PERFORM DESIGN-BUILD AND BID-BUILD CONSTRUCTION WORK AT DAVIS-MONTHAN AFB…Department of Defense$250 obligationsEnds Jan 29, 2025
PAINT INTERIOR AND EXTERIOR OF DORM 3509Department of Defense$186.2K obligationsEnds Nov 15, 2024