Federal contract award
19AQMM22C0145
DESIGN AND CONSTRUCTION SERVICES FOR NEW EMBASSY COMPOUND IN PORT LOUIS, MAURITIUS.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of State |
| Office | ACQUISITIONS - AQM MOMENTUM |
| NAICS | 236220 — Commercial and Institutional Building Construction |
| PSC | Y1AA — CONSTRUCTION OF OFFICE BUILDINGS |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $229.0M |
| Current contract value | $229.0M |
| Potential contract value / ceiling | $229.0M |
| Start date | Nov 1, 2022 |
| Current end date | Nov 27, 2026 |
| Potential end date | Nov 27, 2026 |
| Latest award activity | Sep 11, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 17 of 17 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Sep 11, 2026 | P00015 | $2.0M | EPA 004 FOR NEC PORT LOUIS, MAURITIUS. |
| Sep 11, 2026 | P00016 | $0 | NO COST MOD ASSOCIATED WITH RFP 015 AMENDMENT 1 - PCO-008- STORMWATER CONVEYANCE REDESIGN, PCO-045 - WAREHOUSE WATER STORAGE AND ACCESS ENHANCEMENTS, PCO-056 - WAREHOUSE WINDOW CLADDING REVISION, AND RFI-338 -REPLACEMENT OF FLUID-APPLIED WATERPROOFIN |
| Apr 1, 2026 | P00014 | $200.2K | THE CONTRACTOR REQUESTED TO ELIMINATE THE CONTRACT REQUIREMENT FOR OFFSITE INTEGRATED SYSTEMS TESTING. SPECIFICATION SECTION 263214 CALLS FOR INDIVIDUAL FACTORY WITNESS TEST OF GENERATORS AND PARALLELING SWITCHGEAR, AS WELL AS A FULL OFFSITE INTEGRAT |
| Mar 10, 2026 | P00013 | $93.6K | THE CONTRACTOR REQUESTED TO ELIMINATE THE CONTRACT REQUIREMENT FOR OFFSITE INTEGRATED SYSTEMS TESTING. SPECIFICATION SECTION 263214 CALLS FOR INDIVIDUAL FACTORY WITNESS TEST OF GENERATORS AND PARALLELING SWITCHGEAR, AS WELL AS A FULL OFFSITE INTEGRAT |
| Feb 11, 2026 | P00012 | $115.0K | THE CONTRACTOR REQUESTED TO ELIMINATE THE CONTRACT REQUIREMENT FOR OFFSITE INTEGRATED SYSTEMS TESTING. SPECIFICATION SECTION 263214 CALLS FOR INDIVIDUAL FACTORY WITNESS TEST OF GENERATORS AND PARALLELING SWITCHGEAR, AS WELL AS A FULL OFFSITE INTEGRAT |
| Jan 29, 2026 | P00011 | $628.3K | THE CONTRACTOR REQUESTED TO ELIMINATE THE CONTRACT REQUIREMENT FOR OFFSITE INTEGRATED SYSTEMS TESTING. SPECIFICATION SECTION 263214 CALLS FOR INDIVIDUAL FACTORY WITNESS TEST OF GENERATORS AND PARALLELING SWITCHGEAR, AS WELL AS A FULL OFFSITE INTEGRAT |
| Jan 26, 2026 | P00010 | $226.0K | THE CONTRACTOR REQUESTED TO ELIMINATE THE CONTRACT REQUIREMENT FOR OFFSITE INTEGRATED SYSTEMS TESTING. SPECIFICATION SECTION 263214 CALLS FOR INDIVIDUAL FACTORY WITNESS TEST OF GENERATORS AND PARALLELING SWITCHGEAR, AS WELL AS A FULL OFFSITE INTEGRAT |
| Aug 12, 2025 | P00009 | $0 | THE CONTRACTOR REQUESTED TO ELIMINATE THE CONTRACT REQUIREMENT FOR OFFSITE INTEGRATED SYSTEMS TESTING. SPECIFICATION SECTION 263214 CALLS FOR INDIVIDUAL FACTORY WITNESS TEST OF GENERATORS AND PARALLELING SWITCHGEAR, AS WELL AS A FULL OFFSITE INTEGRAT |
| Aug 1, 2025 | P00008 | $3.2M | FUNDS ARE REQUIRED FOR CLIN 04 FOR ECONOMICAL PRICE ADJUSTMENTS (EPA) - PER THE CONSTRUCTION CONTRACT SECTION H.58, THE CONTRACTOR IS PERMITTED TO REQUEST AN ECONOMIC PRICE ADJUSTMENT FOR MATERIAL, EQUIPMENT, AND LABOR NOT ORDERED/PROCURED/PURCHASED |
| May 22, 2025 | P00007 | $28.4K | FUNDS ARE REQUIRED FOR NEW CLIN FOR ECONOMICAL PRICE ADJUSTMENT (EPA) - PER THE CONSTRUCTION CONTRACT SECTION H.58, THE CONTRACTOR IS PERMITTED TO REQUEST AN ECONOMIC PRICE ADJUSTMENT FOR MATERIAL, EQUIPMENT, AND LABOR NOT ORDERED/PROCURED/PURCHASED |
| Sep 27, 2024 | P00005 | $0 | THIS MODIFICATION ESTABLISHES THAT THE U.S. DEPARTMENT OF STATE OBO KAHUA PLATFORM (OBO KAHUA) IS APPROVED AS A GOVERNMENT-PROVIDED APPLICATION FOR THE EXCHANGE OF UNCLASSIFIED AND SENSITIVE BUT UNCLASSIFIED (SBU) INFORMATION ACROSS THE INTERNET. |
| Sep 27, 2024 | P00006 | $4.0M | FUNDS ARE REQUIRED FOR NEW CLIN FOR ECONOMICAL PRICE ADJUSTMENT (EPA) - PER THE CONSTRUCTION CONTRACT SECTION H.58, THE CONTRACTOR IS PERMITTED TO REQUEST AN ECONOMIC PRICE ADJUSTMENT FOR MATERIAL, EQUIPMENT, AND LABOR NOT ORDERED/PROCURED/PURCHASED |
| Sep 13, 2024 | P00001 | $0 | THIS MODIFICATION ESTABLISHES THAT THE U.S. DEPARTMENT OF STATE OBO KAHUA PLATFORM (OBO KAHUA) IS APPROVED AS A GOVERNMENT-PROVIDED APPLICATION FOR THE EXCHANGE OF UNCLASSIFIED AND SENSITIVE BUT UNCLASSIFIED (SBU) INFORMATION ACROSS THE INTERNET. I |
| Aug 15, 2023 | P00004 | $163.1K | ADDING PARTNERING AGREEMENT TO CONTRACT AND INCORPORATE IPP INVOICING INSTRUCTIONS. |
| Mar 30, 2023 | P00003 | $0 | CLARIFICATIONS IN VARIOUS SPECIFICATIONS AND DRAWINGS FOR NEW EMBASSY COMPOUND IN PORT LOUIS, MAURITIUS. WITH REGARDS TO THE SPECIFICATION 044000 REFER TO RFI 010 RESPONSE |
| Feb 9, 2023 | P00002 | $0 | ADDING IPP BILLING CLAUSE. |
| Sep 26, 2022 | 0 | $218.3M | DESIGN AND CONSTRUCTION SERVICES FOR NEW EMBASSY COMPOUND IN PORT LOUIS, MAURITIUS. |
Estimated positioning window
Oct 25, 2026 – Jan 23, 2027
80/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 80/100. Available recorded signals: 75 points.
- Contract end 2026-11-27 (33 days from calculation)
- +35 points
- 276 historical awards in this buyer and category group
- +15 points
- 17 recorded award transactions
- +10 points
- Latest award action: 2026-09-11
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-10-25 10:18:04.631876+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Oct 25, 2026.
Buyer contacts from matching notices
Matched on exact award/solicitation identifier and awarding agency. Source dates describe the notice, not current contact verification.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.