Federal contract award

19AQMM22C0145

DESIGN AND CONSTRUCTION SERVICES FOR NEW EMBASSY COMPOUND IN PORT LOUIS, MAURITIUS.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of State
OfficeACQUISITIONS - AQM MOMENTUM
NAICS236220 — Commercial and Institutional Building Construction
PSCY1AA — CONSTRUCTION OF OFFICE BUILDINGS
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$229.0M
Current contract value$229.0M
Potential contract value / ceiling$229.0M
Start dateNov 1, 2022
Current end dateNov 27, 2026
Potential end dateNov 27, 2026
Latest award activitySep 11, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 17 of 17 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Sep 11, 2026P00015$2.0MEPA 004 FOR NEC PORT LOUIS, MAURITIUS.
Sep 11, 2026P00016$0NO COST MOD ASSOCIATED WITH RFP 015 AMENDMENT 1 - PCO-008- STORMWATER CONVEYANCE REDESIGN, PCO-045 - WAREHOUSE WATER STORAGE AND ACCESS ENHANCEMENTS, PCO-056 - WAREHOUSE WINDOW CLADDING REVISION, AND RFI-338 -REPLACEMENT OF FLUID-APPLIED WATERPROOFIN
Apr 1, 2026P00014$200.2KTHE CONTRACTOR REQUESTED TO ELIMINATE THE CONTRACT REQUIREMENT FOR OFFSITE INTEGRATED SYSTEMS TESTING. SPECIFICATION SECTION 263214 CALLS FOR INDIVIDUAL FACTORY WITNESS TEST OF GENERATORS AND PARALLELING SWITCHGEAR, AS WELL AS A FULL OFFSITE INTEGRAT
Mar 10, 2026P00013$93.6KTHE CONTRACTOR REQUESTED TO ELIMINATE THE CONTRACT REQUIREMENT FOR OFFSITE INTEGRATED SYSTEMS TESTING. SPECIFICATION SECTION 263214 CALLS FOR INDIVIDUAL FACTORY WITNESS TEST OF GENERATORS AND PARALLELING SWITCHGEAR, AS WELL AS A FULL OFFSITE INTEGRAT
Feb 11, 2026P00012$115.0KTHE CONTRACTOR REQUESTED TO ELIMINATE THE CONTRACT REQUIREMENT FOR OFFSITE INTEGRATED SYSTEMS TESTING. SPECIFICATION SECTION 263214 CALLS FOR INDIVIDUAL FACTORY WITNESS TEST OF GENERATORS AND PARALLELING SWITCHGEAR, AS WELL AS A FULL OFFSITE INTEGRAT
Jan 29, 2026P00011$628.3KTHE CONTRACTOR REQUESTED TO ELIMINATE THE CONTRACT REQUIREMENT FOR OFFSITE INTEGRATED SYSTEMS TESTING. SPECIFICATION SECTION 263214 CALLS FOR INDIVIDUAL FACTORY WITNESS TEST OF GENERATORS AND PARALLELING SWITCHGEAR, AS WELL AS A FULL OFFSITE INTEGRAT
Jan 26, 2026P00010$226.0KTHE CONTRACTOR REQUESTED TO ELIMINATE THE CONTRACT REQUIREMENT FOR OFFSITE INTEGRATED SYSTEMS TESTING. SPECIFICATION SECTION 263214 CALLS FOR INDIVIDUAL FACTORY WITNESS TEST OF GENERATORS AND PARALLELING SWITCHGEAR, AS WELL AS A FULL OFFSITE INTEGRAT
Aug 12, 2025P00009$0THE CONTRACTOR REQUESTED TO ELIMINATE THE CONTRACT REQUIREMENT FOR OFFSITE INTEGRATED SYSTEMS TESTING. SPECIFICATION SECTION 263214 CALLS FOR INDIVIDUAL FACTORY WITNESS TEST OF GENERATORS AND PARALLELING SWITCHGEAR, AS WELL AS A FULL OFFSITE INTEGRAT
Aug 1, 2025P00008$3.2MFUNDS ARE REQUIRED FOR CLIN 04 FOR ECONOMICAL PRICE ADJUSTMENTS (EPA) - PER THE CONSTRUCTION CONTRACT SECTION H.58, THE CONTRACTOR IS PERMITTED TO REQUEST AN ECONOMIC PRICE ADJUSTMENT FOR MATERIAL, EQUIPMENT, AND LABOR NOT ORDERED/PROCURED/PURCHASED
May 22, 2025P00007$28.4KFUNDS ARE REQUIRED FOR NEW CLIN FOR ECONOMICAL PRICE ADJUSTMENT (EPA) - PER THE CONSTRUCTION CONTRACT SECTION H.58, THE CONTRACTOR IS PERMITTED TO REQUEST AN ECONOMIC PRICE ADJUSTMENT FOR MATERIAL, EQUIPMENT, AND LABOR NOT ORDERED/PROCURED/PURCHASED
Sep 27, 2024P00005$0THIS MODIFICATION ESTABLISHES THAT THE U.S. DEPARTMENT OF STATE OBO KAHUA PLATFORM (OBO KAHUA) IS APPROVED AS A GOVERNMENT-PROVIDED APPLICATION FOR THE EXCHANGE OF UNCLASSIFIED AND SENSITIVE BUT UNCLASSIFIED (SBU) INFORMATION ACROSS THE INTERNET.
Sep 27, 2024P00006$4.0MFUNDS ARE REQUIRED FOR NEW CLIN FOR ECONOMICAL PRICE ADJUSTMENT (EPA) - PER THE CONSTRUCTION CONTRACT SECTION H.58, THE CONTRACTOR IS PERMITTED TO REQUEST AN ECONOMIC PRICE ADJUSTMENT FOR MATERIAL, EQUIPMENT, AND LABOR NOT ORDERED/PROCURED/PURCHASED
Sep 13, 2024P00001$0THIS MODIFICATION ESTABLISHES THAT THE U.S. DEPARTMENT OF STATE OBO KAHUA PLATFORM (OBO KAHUA) IS APPROVED AS A GOVERNMENT-PROVIDED APPLICATION FOR THE EXCHANGE OF UNCLASSIFIED AND SENSITIVE BUT UNCLASSIFIED (SBU) INFORMATION ACROSS THE INTERNET. I
Aug 15, 2023P00004$163.1KADDING PARTNERING AGREEMENT TO CONTRACT AND INCORPORATE IPP INVOICING INSTRUCTIONS.
Mar 30, 2023P00003$0CLARIFICATIONS IN VARIOUS SPECIFICATIONS AND DRAWINGS FOR NEW EMBASSY COMPOUND IN PORT LOUIS, MAURITIUS. WITH REGARDS TO THE SPECIFICATION 044000 REFER TO RFI 010 RESPONSE
Feb 9, 2023P00002$0ADDING IPP BILLING CLAUSE.
Sep 26, 20220$218.3MDESIGN AND CONSTRUCTION SERVICES FOR NEW EMBASSY COMPOUND IN PORT LOUIS, MAURITIUS.

Estimated positioning window

Oct 25, 2026 – Jan 23, 2027

Recompete signal:
80/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 80/100. Available recorded signals: 75 points.

Contract end 2026-11-27 (33 days from calculation)
+35 points
276 historical awards in this buyer and category group
+15 points
17 recorded award transactions
+10 points
Latest award action: 2026-09-11
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Buyer contacts from matching notices

Matched on exact award/solicitation identifier and awarding agency. Source dates describe the notice, not current contact verification.

ContactRolePublished contact methodsEvidenceSource date
Frank CannonContactCannonF@state.govSourceDec 14, 2021
Sharon MacauleyContactMacauleyS1@state.govSourceDec 14, 2021

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.