Federal contract award
47PF0021C0003
CONTRACTOR TO PROVIDE BRIDGING DESIGN BUILD SERVICES FOR THE ASHLEY U.S. COURTHOUSE MODERNIZATION AND NEW ANNEX PROJECT IN TOLEDO, OHIO.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | General Services Administration |
| Office | PBS PROJECT DELIVERY CAPITAL CONSTRUCTION - BRANCH EAST |
| NAICS | 236220 — Commercial and Institutional Building Construction |
| PSC | Y1AA — CONSTRUCTION OF OFFICE BUILDINGS |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $99.1M |
| Current contract value | $99.1M |
| Potential contract value / ceiling | $99.1M |
| Start date | Oct 26, 2020 |
| Current end date | Aug 17, 2026 |
| Potential end date | Nov 20, 2026 |
| Latest award activity | Aug 11, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 69 of 69 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Sep 8, 2026 | PS0071 | $168.2K | MODIFICATION PS71 ISSUED FOR MISCELLANEOUS CHANGES FOR ADDITIONAL WORK WITHIN SCOPE FOR THE ASHLEY U.S. COURTHOUSE MODERNIZATION AND NEW ANNEX IN TOLEDO, OH. |
| Aug 11, 2026 | PS0070 | $18.7K | MODIFICATION PS70 ISSUED FOR MISCELLANEOUS TENANT REQUESTED CHANGES FOR WORK WITHIN SCOPE FOR THE ASHLEY U.S. COURTHOUSE MODERNIZATION AND NEW ANNEX IN TOLEDO, OH. |
| Jul 2, 2026 | PS0069 | $107.0K | MODIFICATION PS69 ISSUED FOR SUPPLIES RELATED TO A SECOND ELECTRICAL RISER AS PART OF THE ASHLEY U.S. COURTHOUSE MODERNIZATION AND NEW ANNEX PROJECT IN TOLEDO, OH. |
| Jun 30, 2026 | PS0068 | $0 | PS68 - MODIFICATION INCORPORATING FAR 52.222-90, ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS FOR THE ASHLEY U.S. COURTHOUSE MODERNIZATION AND NEW ANNEX PROJECT IN TOLEDO, OH. |
| Jun 29, 2026 | PS0067 | $126.6K | MODIFICATION PS67 ISSUED FOR MISCELLANEOUS SUPPLEMENTAL WORK FOR THE ASHLEY U.S. COURTHOUSE MODERNIZATION AND NEW ANNEX PROJECT IN TOLEDO, OH. |
| May 18, 2026 | PS0066 | $24.6K | MODIFICATION PS66 ISSUED FOR MISCELLANEOUS ADDITIONS FOR WORK WITHIN SCOPE FOR THE ASHLEY U.S. COURTHOUSE MODERNIZATION AND NEW ANNEX PROJECT IN TOLEDO, OH. |
| Apr 17, 2026 | PC0065 | $638.4K | MODIFICATION PC65 ISSUED FOR OWNER/TENANT DESIGN ENHANCEMENTS AND SCOPE CHANGES FOR THE ASHLEY U.S. COURTHOUSE MODERNIZATION AND NEW ANNEX PROJECT IN TOLEDO, OH. |
| Apr 6, 2026 | PS0064 | $483.0K | MODIFICATION PS64 ISSUED FOR MISCELLANEOUS ADDITIONS FOR IN SCOPE WORK, FOR THE ASHLEY U.S. COURTHOUSE MODERNIZATION AND NEW ANNEX PROJECT IN TOLEDO, OH. |
| Mar 16, 2026 | PS0063 | $63.9K | MODIFICATION PS63 IS HEREBY ISSUED FOR MISCELLANEOUS CHANGES FOR ADDITIONAL WORK WITHIN SCOPE, FOR THE ASHLEY U.S. COURTHOUSE MODERNIZATION AND NEW ANNEX PROJECT IN TOLEDO, OH. |
| Feb 27, 2026 | PC0062 | $157.0K | MODIFICATION PC62 ISSUED FOR ELEVATOR INTERIOR CAB FINISHES AND DOOR FRAME REPLACEMENTS FOR THE ASHLEY U.S. COURTHOUSE MODERNIZATION AND NEW ANNEX PROJECT IN TOLEDO, OH. |
| Feb 4, 2026 | PA0061 | $3.0K | MOD PA61 ISSUED FOR ADMINISTRATIVE CHANGE TO CORRECT ACCOUNTING LINE ERROR FOR THE ASHLEY U.S. COURTHOUSE MODERNIZATION AND NEW ANNEX PROJECT IN TOLEDO, OH. |
| Dec 3, 2025 | PS0059 | $118.2K | MODIFICATION PS59 ISSUED AS A PRICE TO BE DETERMINED LATER FOR THE EQUIPMENT COSTS ASSOCIATED WITH A SECOND ELECTRICAL RISER FOR THE ASHLEY U.S. COURTHOUSE MODERNIZATION AND NEW ANNEX PROJECT IN TOLEDO, OH. |
| Nov 3, 2025 | PS0058 | $44.4K | MODIFICATION PS58 ISSUED FOR MISCELLANEOUS ADDITIONS FOR WORK WITHIN SCOPE FOR THE ASHLEY U.S. COURTHOUSE MODERNIZATION AND NEW ANNEX PROJECT IN TOLEDO, OH. |
| Sep 30, 2025 | PS0057 | $128.1K | MODIFICATION PS57 ISSUED FOR MISCELLANEOUS ADDITIONS FOR SUPPLEMENTAL WORK WITHIN SCOPE FOR THE ASHLEY U.S. COURTHOUSE MODERNIZATION AND NEW ANNEX PROJECT IN TOLEDO, OH. |
| Sep 17, 2025 | PS0056 | $216.5K | MOD PS56 ISSUED FOR MISCELLANEOUS ADDITIONAL WORK WITHIN SCOPE FOR THE ASHLEY U.S. COURTHOUSE MODERNIZATION AND NEW ANNEX PROJECT IN TOLEDO, OH. |
| Sep 8, 2025 | PC0055 | $10.0K | MODIFICATION PC55 ISSUED AS A PRICE TO BE DETERMINED LATER, FOR A STUDY TO DETERMINE IF A SLIGHTLY LARGER ELEVATOR COULD BE INSTALLED RATHER THAN THE CURRENT IN CONTRACT, FOR THE ASHLEY U.S. COURTHOUSE MODERNIZATION AND NEW ANNEX IN TOLEDO, OH. |
| Aug 28, 2025 | PS0054 | $158.3K | MODIFICATION PS54 ISSUED FOR ADDITIONAL SUPPLEMENTAL WORK WITHIN SCOPE FOR THE ASHLEY U.S. COURTHOUSE MODERNIZATION AND NEW ANNEX PROJECT IN TOLEDO, OH. |
| Aug 12, 2025 | PS0053 | $2.7K | MODIFICATION PS53 ISSUED FOR THE INCORPORATION OF THE ANNEX LIGHTING CONTROL SYSTEM FOR THE ART IN ARCHITECTURE INSTALLATION FOR THE ASHLEY U.S. COURTHOUSE MODERNIZATION AND NEW ANNEX PROJECT IN TOLEDO, OH. |
| Jun 11, 2025 | PS0052 | $216.6K | MODIFICATION PS02 ISSUED FOR IN SCOPE ADDITIONS FOR FIRST FLOOR TOPPING SLAB, PEDESTRIAN TURNSTILE, AND ADDITIONAL ASBESTOS ABATEMENT FOR THE ASHLEY U.S. COURTHOUSE MODERNIZATION AND NEW ANNEX PROJECT IN TOLEDO, OH. |
| May 5, 2025 | PS0051 | $98.4K | MODIFICATION PS51 ISSUED FOR MISCELLANEOUS CHANGES FOR ADDITIONAL WORK WITHIN SCOPE FOR THE ASHLEY U.S. COURTHOUSE MODERNIZATION AND NEW ANNEX PROJECT IN TOLEDO, OH. |
| Apr 8, 2025 | PS0050 | $0 | MODIFICATION PS50 ISSUED TO REMOVE FAR CLAUSES AND INCORPORATE FAR 52.240-1 IN RESPONSE TO RECENT EXECUTIVE ORDERS ISSUED, FOR THE ASHLEY U.S. COURTHOUSE MODERNIZATION AND NEW ANNEX PROJECT IN TOLEDO, OH. |
| Mar 31, 2025 | PS0049 | $-9.8K | MODIFICATION PS49 ISSUED FOR MISCELLANEOUS ADDITIONS FOR WORK WITHIN SCOPE FOR THE ASHLEY U.S. COURTHOUSE MODERNIZATION AND NEW ANNEX PROJECT IN TOLEDO, OH. |
| Mar 25, 2025 | PS0048 | $66.2K | MODIFICATION PS48 IS ISSUED TO INCORPORATE ADDITIONAL SUPPLEMENTAL WORK WITHIN SCOPE FOR THE ASHLEY U.S. COURTHOUSE MODERNIZATION AND NEW ANNEX PROJECT IN TOLEDO, OH. |
| Feb 27, 2025 | PS0047 | $492.2K | MODIFICATION PS47 ISSUED FOR MISCELLANEOUS ADDITIONS FOR WORK WITHIN SCOPE FOR THE ASHLEY U.S. COURTHOUSE MODERNIZATION AND NEW ANNEX, IN TOLEDO, OH. |
| Feb 19, 2025 | PS0046 | $40.5K | MODIFICATION PS46 IS HEREBY ISSUED FOR DESIGN EFFORTS RELATED TO ENHANCEMENTS FOR THE EXISTING ASHLEY BUILDING AS PART OF THE ASHLEY U.S. COURTHOUSE MODERNIZATION AND NEW ANNEX PROJECT IN TOLEDO, OH. |
| Feb 11, 2025 | PS0045 | $51.2K | MODIFICATION PS45 IS ISSUED FOR ADDITIONAL WORK RELATED TO THE ARTWORK INSTALLATION IN THE ANNEX AS PART OF THE ASHLEY U.S. COURTHOUSE MODERNIZATION AND NEW ANNEX PROJECT IN TOLEDO, OH. |
| Feb 10, 2025 | PS0044 | $13.4K | MODIFICATION PS44 - ISSUED FOR ADDITIONAL KEYCARD READERS IN THE TUNNEL FOR THE ASHLEY U.S. COURTHOUSE MODERNIZATION AND NEW ANNEX PROJECT IN TOLEDO, OH. |
| Nov 12, 2024 | PS0043 | $143.8K | MODIFICATION PS43 THIS MODIFICATION IS A SUPPLEMENTAL AGREEMENT FOR ADDITIONAL WORK WITHIN SCOPE FOR THE ASHLEY U.S. COURTHOUSE MODERNIZATION AND NEW ANNEX PROJECT IN TOLEDO, OHIO. |
| Sep 24, 2024 | PC0042 | $362.5K | MOD PC42 - ISSUED TO ADD DATA LINES, MOVE SERVICES, NUMBERING OF PARKING STALLS, COURT'S SIGNAGE ACQUISITION, AND REVISED CEILING IN THE MAGISTRATE CHAMBERS RECEPTION FOR THE ASHLEY U.S. COURTHOUSE MODERNIZATION AND NEW ANNEX PROJECT IN TOLEDO, OH. |
| May 29, 2024 | PS0040 | $269.8K | MODIFICATION PS40 IS ISSUED TO ADD MULTIPLE MISCELLANEOUS ITEMS FOR THE U.S. MARSHALLS AND THE U.S. COURTS AS PART OF THE ASHLEY U.S. COURTHOUSE MODERNIZATION AND NEW ANNEX, IN TOLEDO, OH. |
| May 7, 2024 | PS0039 | $633.0K | MODIFICATION PS39 IS ISSUED TO INCORPORATE ADDITIONAL MISCELLANEOUS SUPPLEMENTAL CHANGES, AS PART OF THE ASHLEY U.S. COURTHOUSE MODERNIZATION AND NEW ANNEX PROJECT IN TOLEDO, OH. |
| Apr 8, 2024 | PS0038 | $55.1K | MODIFICATION PS38 IS HEREBY ISSUED TO INCORPORATE TENANT REQUESTED CHANGES INTO THE ASHLEY U.S. COURTHOUSE MODERNIZATION PROJECT IN TOLEDO, OH. |
| Mar 15, 2024 | PS0037 | $1.1M | MODIFICATION PS37 IS ISSUED TO INCORPORATE A WING WALL AND THE COURTS' INFORMATION TECHNOLOGY INTO THE ASHLEY U.S. COURTHOUSE MODERNIZATION AND NEW ANNEX PROJECT IN TOLEDO, OH. |
| Feb 26, 2024 | PS0036 | $35.0K | MODIFICATION PS36- EARLY RELEASE OF PRECONSTRUCTION ACTIVITIES FOR THE COURTS INFORMATION TECHNOLOGY PROCUREMENT, FOR THE ASHLEY U.S. COURTHOUSE MODERNIZATION AND NEW ANNEX PROJECT IN TOLEDO, OH. |
| Feb 21, 2024 | PS0035 | $45.3K | MODIFICATION PS35 INCORPORATES 4TH FLOOR ATTIC STEEL, REMOVES TRUSTEES, EXTEND THE TEMPORARY GENERATOR, AND ADD BALANCING VALVES FOR THE ASHLEY U.S. COURTHOUSE MODERNIZATION AND NEW ANNEX PROJECT IN TOLEDO, OH. |
| Jan 25, 2024 | PS0034 | $33.6K | MODIFICATION PS34 IS ISSUED TO INCORPORATE GARBAGE DISPOSALS IN THE ANNEX ONLY, AS WELL AS PENDANT LIGHT FIXTURES IN BREAKROOM FOR THE ASHLEY U.S. COURTHOUSE MODERNIZATION AND NEW ANNEX PROJECT IN TOLEDO, OH. |
| Jan 10, 2024 | PS0033 | $206.6K | MODIFICATION PS33 - ISSUED FOR THE USMS TELECOM SYSTEM, ENHANCED JURY CHAIRS, UNFORESEEN UNDERGROUND OBSTRUCTION AND UNSUITABLE SOILS, AND REMAINING FLOOR DRAIN OBLIGATION FOR THE ASHLEY U.S. COURTHOUSE MODERNIZATION AND NEW ANNEX PROJECT, TOLEDO OH. |
| Dec 18, 2023 | PS0032 | $1.0M | MODIFICATION PS31 IS HEREBY ISSUED FOR THE COURTS FURNITURE ACQUISITION FOR THE ASHLEY U.S. COURTHOUSE MODERNIZATION AND NEW ANNEX PROJECT IN TOLEDO, OH. |
| Nov 6, 2023 | PS0031 | $0 | MODIFICATION PS31 -ISSUED TO EXTEND THE SUBSTANTIAL COMPLETION DATE OF THE ANNEX AND THE EXISTING ASHLEY COURTHOUSE, AS WELL AS THE ULTIMATE COMPLETION DATE BY 26 DAYS, FOR THE ASHLEY U.S. COURTHOUSE MODERNIZATION AND NEW ANNEX PROJECT IN TOLEDO, OH. |
| Oct 23, 2023 | PS0030 | $15.4K | MODIFICATION PS30 IS ISSUED FOR THE CONTRACTOR TO PERFORM ADDITIONAL DESIGN CHANGES FOR BREAKROOM 405C AND DOOR X404A-2 AND ART IN ARCHITECTURE LIGHTING DESIGN, FOR THE ASHLEY U.S. COURTHOUSE MODERNIZATION AND NEW ANNEX PROJECT IN TOLEDO, OH. |
| Sep 27, 2023 | PS0029 | $347.1K | MODIFICATION PS29 IS ISSUED FOR ADDITIONAL WORK AT THE REQUEST OF CLIENT AGENCIES FOR THE ASHLEY U.S. COURTHOUSE MODERNIZATION AND NEW ANNEX PROJECT IN TOLEDO, OH. |
| Sep 11, 2023 | PS0028 | $15.7K | MODIFICATION PS28 IS ISSUED TO INCORPORATE ADDITIONAL SERVICES FOR ELECTRIC VEHICLE CHARGERS (DESIGN ONLY) AND A BOILER ROOM FLOOR DRAIN FOR THE ASHLEY U.S. COURTHOUSE MODERNIZATION AND NEW ANNEX PROJECT IN TOLEDO, OH. |
| Aug 15, 2023 | PS0027 | $140.0K | MODIFICATION PS27 IS ISSUED TO INCORPORATE THE SIGNAGE ACQUISITION PACKAGE, AS WELL AS FLOOR DRAIN DESIGN AND INSTALLATION FOR THE ASHLEY U.S. COURTHOUSE MODERNIZATION AND NEW ANNEX PROJECT IN TOLEDO, OH. |
| Aug 2, 2023 | PS0026 | $258.9K | MODIFICATION PS26 IS HEREBY ISSUED TO INCORPORATE MISCELLANEOUS SUPPLEMENTAL AGREEMENT ADDITIONS FOR WORK WITHIN SCOPE FOR THE ASHLEY U.S. COURTHOUSE MODERNIZATION AND NEW ANNEX PROJECT IN TOLEDO, OH. |
| Jun 23, 2023 | PS0025 | $64.8K | MODIFICATION PS25 IS ISSUED FOR ADDITIONAL MILLWORK FOR THE ROBING ROOMS AND SOUND LOCKS FOR THE ASHLEY U.S. COURTHOUSE MODERNIZATION AND NEW ANNEX IN TOLEDO, OH. |
| Jun 7, 2023 | PS0024 | $141.1K | MODIFICATION PS24 HEREBY INCORPORATES ADDITIONAL SUPPLEMENTAL COOLING UNITS FOR THE JUDICIARY FOR THE ASHLEY U.S. COURTHOUSE MODERNIZATION AND NEW ANNEX PROJECT IN TOLEDO, OH. |
| May 8, 2023 | PS0023 | $166.0K | MODIFICATION PS23 - ISSUED TO INCORPORATE LEAD ABATEMENT AND CURTAINWALL TESTING ABOVE BASELINE FOR THE ASHLEY U.S. COURTHOUSE MODERNIZATION AND NEW ANNEX PROJECT IN TOLEDO, OH. |
| Apr 24, 2023 | PS0022 | $1.5M | MODIFICATION PS22 IS ISSUED TO OBLIGATE A NEGOTIATED SETTLEMENT FOR OUTSTANDING REQUESTS FOR EQUITABLE ADJUSTMENTS AND POTENTIAL CHANGE ORDERS FOR THE ASHLEY U.S. COURTHOUSE MODERNIZATION AND NEW ANNEX PROJECT, TOLEDO, OH. |
| Mar 28, 2023 | PS0021 | $164.7K | MODIFICATION PS21 IS ISSUED FOR U.S. MARSHAL SERVICE'S VARIABLE REFRIGERANT FLOW SYSTEM AND INFORMATION TECHNOLOGY DESIGN FOR THE ASHLEY U.S. COURTHOUSE MODERNIZATION AND NEW ANNEX PROJECT IN TOLEDO, OH. |
| Mar 14, 2023 | PS0020 | $191.5K | MOD PS20 - ISSUED FOR FEDERAL PROTECTIVE SERVICE VARIABLE REFRIGERANT FLOW, STORM INVESTIGATION, TEST PITS, ART IN ARCHITECTURE PLYWOOD, RAM WALLS, ROOF ENCLOSURE TESTING FOR ASHLEY U.S. COURTHOUSE MODERNIZATION AND NEW ANNEX PROJECT IN TOLEDO OH. |
| Feb 15, 2023 | PS0019 | $143.1K | MODIFICATION PS19 IS ISSUED FOR ADDITIONAL WORK AS RELATED TO THE GUARD BOOTH, EXISTING CHILLERS, RENTAL GENERATOR, JURY ORIENTATION ROOM, FOR THE ASHELY U.S. COURTHOUSE MODERNIZATION AND NEW ANNEX PROJECT IN TOLEDO, OH. |
| Dec 13, 2022 | PS0018 | $1.9M | MODIFICATION PS18 INCORPORATES CEILING, LIGHTING, ELEVATORS, AND OTHER MISCELLANEOUS ENHANCEMENTS FOR THE ASHLEY U.S. COURTHOUSE MODERNIZATION AND NEW ANNEX PROJECT IN TOLEDO, OH. |
| Nov 10, 2022 | PS0017 | $37.4K | MODIFICATION PS17 IS AWARDED TO ADD CORE DRILLS, STONE ENGRAVING, TRUSTEES, AND LOT POLE EFFORTS AS PART OF THE ASHLEY U.S. COURTHOUSE MODERNIZATION AND NEW ANNEX PROJECT IN TOLEDO, OH. |
| Oct 18, 2022 | PS0016 | $327.7K | MODIFICATION PS16 IS HEREBY ISSUED TO INCORPORATE FURNITURE ACQUISITION SERVICES FOR THE ASHLEY UNITED STATES COURTHOUSE MODERNIZATION AND NEW ANNEX PROJECT IN TOLEDO, OH. |
| Sep 30, 2022 | PS0015 | $138.8K | MODIFICATION PS15- ADDITIONAL WORK COVERING MASONRY TESTING, ADDED LIGHT POLES FOR THE EXPANDED PARKING LOT, PERIMETER STORM LOOP MODIFICATION, AND ART IN ARCHITECTURE INVESTIGATION FOR THE ASHLEY US COURTHOUSE MODERNIZATION AND NEW ANNEX, TOLEDO OH. |
| Aug 4, 2022 | PS0013 | $-371.5K | CONTRACT 47PF0021C0003, DESIGN BUILDER FOR JAMES M ASHLEY & THOMAS W L ASHLEY US COURTHOUSE MODERNIZATION AND NEW ANNEX, TOLEDO, OH - MODIFICATION PS13, REMOVE UNITED STATES MARSHAL SERVICE ELECTRONICS PACKAGE AND CONSOLE ALLOWANCE |
| Jul 15, 2022 | PS0012 | $0 | CONTRACT 47PF0021C0003 DESIGN BUILDER FOR ASHLEY US COURTHOUSE MODERNIZATION AND NEW ANNEX IN TOLEDO, OH - MODIFICATION PS12, ELECTRONIC PROJECT MANAGEMENT SOFTWARE TO KAHUA SOFTWARE TRANSITION |
| Jun 1, 2022 | PS0011 | $36.0K | MODIFICATION PS11 - REQUEST FOR EQUITABLE ADJUSTMENTS FOR UNFORESEEN CONCRETE UNDER PARKING LOT, AND STAFFING HOURS ASSOCIATED WITH THE IMPLEMENTATION OF EXECUTIVE ORDER 14042 FOR THE ASHLEY U.S. COURTHOUSE MODERNIZATION AND NEW ANNEX IN TOLEDO OH. |
| Apr 12, 2022 | PS0010 | $360.5K | MODIFICATION PS10 IS FOR DIRECT SUBCONTRACTOR COSTS ASSOCIATED WITH THE UNFORESEEN SITE CONDITION OF A GASOMETER AND SOIL REMEDIATION AS PART OF THE ASHLEY U.S. COURTHOUSE MODERNIZATION AND NEW ANNEX PROJECT IN TOLEDO, OH. |
| Mar 29, 2022 | PS0009 | $189.9K | MODIFICATION PS09 INCORPORATES CONSTRUCTION SERVICES FOR AN EXPANDED PARKING LOT AS PART OF THE ASHLEY U.S. COURTHOUSE MODERNIZATION AND NEW ANNEX PROJECT IN TOLEDO, OH. |
| Jan 27, 2022 | PS0008 | $603.5K | MODIFICATION PS08 IS ISSUED TO INCORPORATE APPROVED WAIVERS AND DESIGN CHANGES AS PART OF THE APPROVED 50% CONSTRUCTION DOCUMENT SET, FOR THE ASHELY U.S. COURTHOUSE MODERNIZATION AND NEW ANNEX PROJECT IN TOLEDO, OH. |
| Dec 6, 2021 | PS0007 | $0 | CONTRACT 47PF0021C0003, MODIFICATION PS07 - ASHLEY U.S. COURTHOUSE MODERNIZATION AND NEW ANNEX, TOLEDO, OH - PERIOD OF PERFORMANCE EXTENSION |
| Nov 8, 2021 | PS0005 | $0 | EO14042 MODIFICATION PS05 IS ISSUED TO INCORPORATE EXECUTIVE ORDER 14042 COVID SAFETY PROTOCOLS/FAR 52.223-99 INTO THE EXISTING CONTRACT FOR DESIGN BUILD SERVICES FOR THE ASHLEY U.S. COURTHOUSE MODERNIZATION AND NEW ANNEX PROJECT, TOLEDO, OH. |
| Oct 20, 2021 | PS0006 | $9.7K | MODIFICATION PS06 IS HEREBY ISSUED FOR THE CONTRACTOR TO PERFORM DESIGN SERVICES FOR AN EXPANDED PARKING LOT, AS PART OF THE ASHLEY U.S. COURTHOUSE MODERNIZATION AND NEW ANNEX PROJECT IN TOLEDO, OH. |
| Sep 9, 2021 | PS0004 | $33.8K | MODIFICATION PS04 IS ISSUED FOR ADDITIONAL SERVICES AS IT RELATES TO THE COURTROOM MOCK UP, FOR THE ASHLEY U.S. COURTHOUSE MODERNIZATION AND NEW ANNEX PROJECT IN TOLEDO, OH. |
| Jul 8, 2021 | PS0003 | $14.5K | MODIFICATION PS03 IS ISSUED TO INCORPORATE THE ADDITIONAL DESIGN SERVICES TO SUPPORT INSTALLATION OF A PREFABRICATED GUARD BOOTH FOR THE ASHLEY U.S. COURTHOUSE MODERNIZATION AND NEW ANNEX PROJECT, TOLEDO, OH. |
| Apr 2, 2021 | PS0002 | $0 | MODIFICATION PS02 IS ISSUED TO REMOVE THE REQUIREMENT FOR THE CONTRACTOR TO CREATE A PROJECT WEBSITE FOR THE ASHLEY U.S. COURTHOUSE MODERNIZATION AND NEW ANNEX PROJECT, TOLEDO, OH. |
| Mar 19, 2021 | PS0001 | $25.0K | MODIFICATION PS01 IS ISSUED TO OBLIGATE ANNEX OPTION 1 MOVE COORDINATOR SERVICES FOR THE ASHLEY U.S. COURTHOUSE MODERNIZATION AND NEW ANNEX PROJECT IN TOLEDO, OH. |
| Oct 26, 2020 | 0 | $85.5M | CONTRACTOR TO PROVIDE BRIDGING DESIGN BUILD SERVICES FOR THE ASHLEY U.S. COURTHOUSE MODERNIZATION AND NEW ANNEX PROJECT IN TOLEDO, OHIO. |
Estimated positioning window
Oct 25, 2026 – Jan 23, 2027
80/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 80/100. Available recorded signals: 75 points.
- Contract end 2026-11-20 (26 days from calculation)
- +35 points
- 6 historical awards in this buyer and category group
- +15 points
- 69 recorded award transactions
- +10 points
- Latest award action: 2026-08-11
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-10-25 10:18:04.631876+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Oct 25, 2026.
Buyer contacts from matching notices
Matched on exact award/solicitation identifier and awarding agency. Source dates describe the notice, not current contact verification.
| Contact | Role | Published contact methods | Evidence | Source date |
|---|---|---|---|---|
| Anna E. Vanko | Contract Specialist | anna.vanko@gsa.gov 614-469-2791 | Source | Nov 19, 2019 |
| Anthony W. Walton | Contract Specialist | anthony.walton@gsa.gov 312-813-9180 | Source | Nov 19, 2019 |
| Anna E. Vanko | Contract Specialist | anna.vanko@gsa.gov 614-469-2791 | Source | Sep 18, 2019 |
| Anthony W. Walton | Contract Specialist | anthony.walton@gsa.gov 312-813-9180 | Source | Sep 18, 2019 |
| Anna E. Vanko | Contract Specialist | anna.vanko@gsa.gov 614-469-2791 | Source | Sep 12, 2019 |
| Anthony W. Walton | Contract Specialist | anthony.walton@gsa.gov 312-813-9180 | Source | Sep 12, 2019 |
| Anna E. Vanko | Contract Specialist | anna.vanko@gsa.gov 614-469-2791 | Source | Sep 11, 2019 |
| Anthony W. Walton | Contract Specialist | anthony.walton@gsa.gov 312-813-9180 | Source | Sep 11, 2019 |
| Anna E. Vanko | Contract Specialist | anna.vanko@gsa.gov 614-469-2791 | Source | Sep 9, 2019 |
| Anthony W. Walton | Contract Specialist | anthony.walton@gsa.gov 312-813-9180 | Source | Sep 9, 2019 |
| Anna E. Vanko | Contract Specialist | anna.vanko@gsa.gov 614-469-2791 | Source | Aug 15, 2019 |
| Anthony W. Walton | Contract Specialist | anthony.walton@gsa.gov 312-813-9180 | Source | Aug 15, 2019 |
| Anna E. Vanko | Contract Specialist | anna.vanko@gsa.gov 614-469-2791 | Source | Jul 29, 2019 |
| Anthony W. Walton | Contract Specialist | anthony.walton@gsa.gov 312-813-9180 | Source | Jul 29, 2019 |
| Anthony W. Walton | Contract Specialist | anthony.walton@gsa.gov 3128139180 | Source | Jun 6, 2019 |
| Anna E. Vanko | Program Analyst | anna.vanko@gsa.gov 614-469-2791 | Source | Jun 6, 2019 |
| Anthony W. Walton | Contract Specialist | anthony.walton@gsa.gov 3128139180 | Source | May 30, 2019 |
| Anna E. Vanko | Program Analyst | anna.vanko@gsa.gov 614-469-2791 | Source | May 30, 2019 |
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Verify whether remaining options may extend performance beyond the current end date.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.