Federal contract award

47PH0925F0003

THIS PROJECT IS TO UPGRADE EXISTING EGRESS LIGHTING AND PROVIDE EMERGENCY POWER FOR EGRESS LIGHTING, EXISTING ELEVATORS, AND OTHER LOADS SUCH AS BASEMENT LIFT PUMPS AT THE GHW & GW BUSH & G. MAHON FEDERAL COURTHOUSE, 100 EAST WALL ST, MIDLAND, TX

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyGeneral Services Administration
OfficePBS R7 NON-PROSPECTUS - GREATER WEST
NAICS236220 — Commercial and Institutional Building Construction
PSCZ2AA — REPAIR OR ALTERATION OF OFFICE BUILDINGS
Parent award / vehicle47PH0820D0003
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$799.6K
Current contract value$799.6K
Potential contract value / ceiling$799.6K
Start dateNov 13, 2024
Current end dateNov 27, 2026
Potential end dateNov 27, 2026
Latest award activityAug 19, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 6 of 6 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Aug 19, 2026PS0005$0NO COST TIME EXTENSION MODIFICATION ON THE GENERATOR INSTALLATION, GHW & GW BUSH USCH & FOB, MIDLAND, TX - CONSTRUCTION PROJECT.
Dec 22, 2025PS0004$0NO COST TIME EXTENSION MODIFICATION ON THE GENERATOR INSTALLATION, GHW & GW BUSH USCH & FOB, MIDLAND, TX - CONSTRUCTION PROJECT.
Dec 4, 2025PA0003$0THIS MODIFICATION IS TO UPDATE THE PEGASYS VENDOR CODE FROM 271901755 TO 994318579 FOR THIS PROJECT, DUE TO THE NAME CHANGE OF THE CONTRACTOR. THE EFFECTIVE DATE FOR THIS MODIFICATION IS THURSDAY, DECEMBER 4, 2025.
Mar 3, 2025PS0002$38.9KMOD TO EXTEND THE CONTRACT DUE TO MATERIAL DELIVERY DELAYS AND CHANGES WITHIN THE REVISED SOW. THE CONTRACT COMPLETION DATE IS EXTENDED 110 DAYS FROM 9/12/25 TO 12/31/25. GHW & GW BUSH & G MAHON FEDERAL COURTHOUSE, 100 EAST WALL STREET, MIDLAND, TX
Dec 17, 2024PA0001$0NOTICE TO PROCEED MODIFICATION FOR GENERATOR INSTALLATION PROJECT AT THE GEORGE H.W. BUSH AND GEORGE W. BUSH UNITED STATES COURT HOUSE AND GEORGE MAHON FEDERAL BUILDING AND FOB, 100 EAST WALL STREET, MIDLAND, TX 79701
Nov 13, 20240$760.7KTHIS PROJECT IS TO UPGRADE EXISTING EGRESS LIGHTING AND PROVIDE EMERGENCY POWER FOR EGRESS LIGHTING, EXISTING ELEVATORS, AND OTHER LOADS SUCH AS BASEMENT LIFT PUMPS AT THE GHW & GW BUSH & G. MAHON FEDERAL COURTHOUSE, 100 EAST WALL ST, MIDLAND, TX

Estimated positioning window

Oct 25, 2026 – Jan 23, 2027

Recompete signal:
85/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 85/100. Available recorded signals: 80 points.

Contract end 2026-11-27 (33 days from calculation)
+35 points
53 historical awards in this buyer and category group
+15 points
6 recorded award transactions
+10 points
Latest award action: 2026-08-19
+5 points
Parent award identifier recorded
+5 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.