| Field | Reported value |
|---|---|
| Agency | General Services Administration |
| Office | PBS R11 CONSTRUCTION SERVICES DIVSION CENTER 1 |
| NAICS | 541310 — Architectural Services |
| PSC | C1AZ — ARCHITECT AND ENGINEERING- CONSTRUCTION: OTHER ADMINISTRATIVE FACILITIES/SERVICE BUILDINGS |
| Parent award / vehicle | GS07P16UCD7000 |
| Set-aside | Not reported |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $9.4M |
| Current contract value | $9.4M |
| Potential contract value / ceiling | $9.4M |
| Start date | Oct 30, 2019 |
| Current end date | Apr 30, 2027 |
| Potential end date | Jun 30, 2027 |
| Latest award activity | Sep 3, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 29 of 29 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Sep 3, 2026 | PS0028 | $1.5M | MODIFICATION PS0028 FOR THE DEPT. OF ENERGY RELOCATION TO THE LYNDON B. JOHNSON BLDG. IN WASHINGTON, DC. |
| Jun 11, 2026 | PS0027 | $31.6K | MODIFICATION PS0027 FOR THE DEPT. OF ENERGY RELOCATION TO THE LYNDON B. JOHNSON BLDG. IN WASHINGTON, DC. |
| May 14, 2026 | PS0026 | $0 | NO COST TIME EXTENSION |
| Feb 24, 2026 | PA0025 | $0 | 47PM0520F0002, MOD PA0025 - AE DESIGN FOR LBJ CONSOLIDATION - ADMIN MOD TO CORRECT POP EXTENSION TO 5/5/2026 |
| Dec 11, 2025 | PS0024 | $-11.8K | 47PM0520F0002, MOD PS0024 - AE DESIGN FOR LBJ CONSOLIDATION - DESCOPE CONSTRUCTION ADMINISTRATION SERVICES OF -11,800.74. |
| Jun 4, 2025 | PS0023 | $146.7K | AE DESIGN FOR LBJ CONSOLIDATION - 6TH FLOOR ADDITIONAL CA AND POP EXTENSION |
| Feb 20, 2025 | PO0022 | $511.1K | MOD TO EXERCISE OPTIONS FOR CA SERVICES 6TH FLOOR. |
| Jan 8, 2025 | PS0021 | $530.2K | 47PM0520F0002, MOD PS0021 - AE DESIGN FOR LBJ CONSOLIDATION - AE-18 6TH FLOOR, BATHROOMS, UPS AND ANTENNA SURVEY RWA# N3443648 RWA# N3451083 |
| Aug 28, 2024 | PS0020 | $0 | MOD TO EXTEND POP 163 DAYS |
| Mar 13, 2024 | PS0019 | $32.8K | 47PM0520F0002, MOD PS0019 - AE DESIGN FOR LBJ CONSOLIDATION. RWA# N2621717 |
| Jan 18, 2024 | PS0018 | $90.6K | 47PM0520F0002, MOD PS0018 - AE DESIGN FOR LBJ CONSOLIDATION - PROVIDE ADDITIONAL DESIGN SERVICES OF THE LBJ ROOFTOP PV PROJECT. (IRA FUNDED) |
| Oct 12, 2023 | PS0017 | $17.2K | MOD PS0017 ADD 3RD FLOOR SCANNING SERVICES AT LBJ. (NOTE: BAOV CORRECTED TO REFLECT ACTUAL AMOUNT) |
| Aug 23, 2023 | PS0016 | $496.2K | 47PM0520F0002, MOD PS0016 - AE DESIGN FOR LBJ CONSOLIDATION EXERCISING OPTION 3 FOR AE SERVICES FOR THE 3RD FLOOR |
| Mar 14, 2023 | PS0015 | $145.2K | MOD PS0015 AE SERVICES TO CONDUCT A FEASIBILITY STUDY FOR A ROOFTOP PATIO THAT WOULD BE LOCATED ON THE 7TH FLOOR OF LBJ (DURATION 20 WEEKS) |
| Oct 17, 2022 | PS0014 | $586.2K | MOD PS0014 AE DESIGN FOR LBJ CONSOLIDATION |
| Sep 6, 2022 | PA0013 | $-12.9K | ADMIN MOD PA0013 - AE DESIGN FOR LBJ CONSOLIDATION TO FINALIZE COST TRANSFER |
| Aug 29, 2022 | PA0012 | $12.9K | 47PM0520F0002, MOD PA0012 ADMIN MOD, COST TRANSFER |
| Aug 26, 2022 | PS0011 | $148.3K | MOD PS0011 - AE DESIGN FOR LBJ CONSOLIDATION |
| Jun 13, 2022 | PS0010 | $295.5K | PS0010 DESIGN A PHOTOVOLTAIC ARRAY SYSTEM TO PROVIDE THE ABILITY TO PRODUCE RENEWABLE ENERGY FOR THE BUILDING. A/E DESIGN FOR LBJ CONSOLIDATION & SWITCHGEAR PROJECT. |
| May 10, 2022 | PS0009 | $45.7K | PS0009 CHANGES TO DESIGN |
| Dec 28, 2021 | PS0008 | $244.9K | MOD PS0008 CHANGES TO THE DESIGN OF THE LBJ CONSOLIDATION & SWITCHGEAR PROJECT |
| Nov 19, 2021 | PS0007 | $0 | EO 14042 47PM0520F0002 MOD PS0007 - COVID-19 SAFETY PROTOCOLS |
| Sep 10, 2021 | PS0006 | $733.4K | MOD PS0006 TO EXERCISE OPTIONS 2 & 6 - AE DESIGN LBJ CONSOLIDATION |
| Feb 26, 2021 | PS0005 | $146.4K | MOD PS0005 - SUPPLEMENTAL WORK WITHIN SCOPE |
| Sep 22, 2020 | PS0004 | $0 | NO-COST MOD PS0004 47PM0520F0002 - AE DESIGN LBJ CONSOLIDATION TO EXTEND POP |
| Jun 15, 2020 | PA0003 | $0 | ADMINISTRATIVE MOD PA0003 TO CHANGE COR |
| May 1, 2020 | PS0001 | $258.6K | MOD PS0001 - EXERCISE OPTION FOR SWITCHGEAR DESIGN |
| Mar 24, 2020 | PS0002 | $0 | MOD PS0002 - IMPLEMENTATION OF SECTION 889 |
| Oct 31, 2019 | 0 | $3.4M | TASK ORDER AGAINST SPD A/E IDIQ FOR THE DESIGN OF THE LBJ CONSOLIDATION PROJECT |
Estimated positioning window
Oct 25, 2026 – Jan 23, 2027
80/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 80/100. Available recorded signals: 75 points.
- Contract end 2027-06-30 (248 days from calculation)
- +35 points
- 2 historical awards in this buyer and category group
- +10 points
- 29 recorded award transactions
- +10 points
- Latest award action: 2026-09-03
- +5 points
- Parent award identifier recorded
- +5 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-10-25 10:18:04.631876+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Oct 25, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Verify whether remaining options may extend performance beyond the current end date.
- Confirm the ordering vehicle and your eligibility or a qualified teaming route.
- Review the award scope and buyer evidence before making a bid/no-bid decision.