BAYTOWN TOWNSHIP GROUND WATER PLUME SUPERFUND SITE: REMEDIAL ACQUISITION FRAMEWORK (RAF), DESIGN AND ENGINEERING SERVICES (DES), CLIN 0002, REMEDIAL INVESTIGATION/FEASIBILITY STUDY (RI/FS) TASK ORDER

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyEnvironmental Protection Agency
OfficeREGION 5 CONTRACTING OFFICE
NAICS562910 — Remediation Services
PSCF108 — Hazardous Substance Removal, Cleanup, and Disposal Services and Operational Support
Parent award / vehicle68HE0318D0005
Set-asideSMALL BUSINESS SET ASIDE - TOTAL
Pricing typeCOST PLUS FIXED FEE
Obligations$4.6M
Current contract value$4.6M
Potential contract value / ceiling$5.5M
Start dateJun 8, 2023
Current end dateSep 29, 2027
Potential end dateSep 29, 2028
Latest award activityJun 24, 2025
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 6 of 6 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jun 24, 2025P00005$0BAYTOWN TOWNSHIP GROUND WATER PLUME SUPERFUND SITE: REMEDIAL ACQUISITION FRAMEWORK (RAF), DESIGN AND ENGINEERING SERVICES (DES), CLIN 0002, REMEDIAL INVESTIGATION/FEASIBILITY STUDY (RI/FS) UPDATE SPM. APPROVE RFI 002 FOR WELLS
Dec 2, 2024P00004$0UPDATE TOCOR
Nov 4, 2024P00003$13.2KBAYTOWN TOWNSHIP GROUND WATER PLUME SUPERFUND SITE: REMEDIAL ACQUISITION FRAMEWORK (RAF), DESIGN AND ENGINEERING SERVICES (DES), CLIN 0002, REMEDIAL INVESTIGATION/FEASIBILITY STUDY (RI/FS) MONITORING WELL REPAIRS. ADMIN UPDATES.
Jun 25, 2024P00002$0BAYTOWN TOWNSHIP GROUND WATER PLUME SUPERFUND SITE: REMEDIAL ACQUISITION FRAMEWORK (RAF), DESIGN AND ENGINEERING SERVICES (DES), CLIN 0002, REMEDIAL INVESTIGATION/FEASIBILITY STUDY (RI/FS) TASK ORDER 1) UPDATE SENIOR PROJECT MANAGER
Dec 28, 2023P00001$4.6KBAYTOWN:RAF,DES,CLIN2,RI/FS TO,P1: 1)TRANSFER ELECTRIC PAYMENT RESPONSIBILITY OF TREATMENT BUILDING TO EPA 2)OBLIGATE $4,649.67 TO FUND ELECTRIC COSTS; 3)EXPAND TASK 2.1.3, CUT UP/DISPOSAL OF POLY TANK 4)CHANGE PFAS ANALYSIS METHOD AT TIER 4 LAB
Jun 8, 20230$4.6MBAYTOWN TOWNSHIP GROUND WATER PLUME SUPERFUND SITE: REMEDIAL ACQUISITION FRAMEWORK (RAF), DESIGN AND ENGINEERING SERVICES (DES), CLIN 0002, REMEDIAL INVESTIGATION/FEASIBILITY STUDY (RI/FS) TASK ORDER

Estimated positioning window

Sep 29, 2027 – Mar 29, 2028

Recompete signal:
70/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 70/100. Available recorded signals: 65 points.

Contract end 2028-09-29 (698 days from calculation)
+25 points
291 historical awards in this buyer and category group
+15 points
6 recorded award transactions
+10 points
Latest award action: 2025-06-24
+0 points
Parent award identifier recorded
+5 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-11-01 10:17:53.997580+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Nov 1, 2026.

Buyer contacts from matching notices

Matched on exact award/solicitation identifier and awarding agency. Source dates describe the notice, not current contact verification.

ContactRolePublished contact methodsEvidenceSource date
Haman, LanceContacthaman.lance@epa.gov
(312) 353-1505
SourceOct 14, 2022

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Verify whether remaining options may extend performance beyond the current end date.
  3. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  4. Check the stated set-aside against the solicitation and current certifications.
  5. Review the award scope and buyer evidence before making a bid/no-bid decision.