Federal contract award

68HE0925F0097

SELMA PRESSURE TREATING SUPERFUND SITE THROUGH SITE-SPECIFIC TECHNICAL ASSISTANCE TO CONDUCT EPA-LEAD REMEDIAL INVESTIGATION/FEASIBILITY STUDY, ENGINEERING EVALUATION AND COST ANALYSIS, AND/OR REMOVAL ACTION PHASES AS REQUIRED BY THE COMPREHENSIVE EN

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyEnvironmental Protection Agency
OfficeREGION 9 CONTRACTING OFFICE
NAICS562910 — Remediation Services
PSCF999 — Other Environmental Services, Studies, and Analytical Support
Parent award / vehicle68HE0118D0004
Set-asideSMALL BUSINESS SET ASIDE - TOTAL
Pricing typeFIRM FIXED PRICE
Obligations$1.2M
Current contract value$4.7M
Potential contract value / ceiling$6.4M
Start dateSep 29, 2025
Current end dateJul 29, 2027
Potential end dateJul 29, 2029
Latest award activityJul 29, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 6 of 6 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jul 29, 2026P00005$0THE PURPOSE OF THE MODIFICATION IS TO CORRECT THE PERIOD OF PERFORMANCE FROM THE PREVIOUS.
Jun 17, 2026P00004$0THE PURPOSE OF THE MODIFICATION IS TO DE-OBLIGATED FUNDING, OBLIGATE FUNDING AND EXERCISE THE NEXT OPTION PERIOD.
Feb 6, 2026P00002$775.1KTHE PURPOSE OF THE MODIFICATION IS TO OBLIGATE FUNDING DE-OBLIGATED ON THE PREVIOUS MODIFICATION.
Feb 6, 2026P00003$0THE PURPOSE OF THE MODIFICATION IS TO OBLIGATE FUNDING DE-OBLIGATED ON THE PREVIOUS MODIFICATION.
Jan 21, 2026P00001$-775.1KTHE PURPOSE OF THE MODIFICATION IS TO DE-OBLIGATE FUNDING INCORRECTLY OBLIGATED AT AWARD TO BE RE-OBLIGATED.
Sep 29, 20250$1.2MSELMA PRESSURE TREATING SUPERFUND SITE THROUGH SITE-SPECIFIC TECHNICAL ASSISTANCE TO CONDUCT EPA-LEAD REMEDIAL INVESTIGATION/FEASIBILITY STUDY, ENGINEERING EVALUATION AND COST ANALYSIS, AND/OR REMOVAL ACTION PHASES AS REQUIRED BY THE COMPREHENSIVE EN

Estimated positioning window

Jul 29, 2028 – Jan 29, 2029

Recompete signal:
65/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 65/100. Available recorded signals: 60 points.

Contract end 2029-07-29 (1001 days from calculation)
+15 points
23 historical awards in this buyer and category group
+15 points
6 recorded award transactions
+10 points
Latest award action: 2026-07-29
+5 points
Parent award identifier recorded
+5 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-11-01 10:17:53.997580+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Nov 1, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Verify whether remaining options may extend performance beyond the current end date.
  3. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  4. Check the stated set-aside against the solicitation and current certifications.
  5. Review the award scope and buyer evidence before making a bid/no-bid decision.