693C7325C000003

PROJECT NP SER PMS FY24(1): THE PROJECT CONSISTS OF THE PAVEMENT PRESERVATION OF IDENTIFIED ROADWAYS AND PARKING AREAS. THE WORK INCLUDES TYPE 2 MICRO SURFACING, SAMI, THIN LIFT OVERLAY OF ASPHALT CONCRETE PAVEMENT, FULL DEPTH PATCHING, AND OTHER MI

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Transportation
Office693C73 EASTERN FED LANDS DIVISION
NAICS237310 — Highway, Street, and Bridge Construction
PSCY1LB — CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
Parent award / vehicleNot reported
Set-asideSMALL BUSINESS SET ASIDE - TOTAL
Pricing typeFIRM FIXED PRICE
Obligations$6.5M
Current contract value$6.5M
Potential contract value / ceiling$6.5M
Start dateNov 14, 2024
Current end dateJan 31, 2028
Potential end dateJan 31, 2028
Latest award activityAug 3, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 5 of 5 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Aug 3, 2026P00004$168.6KNP SER PMS FY24(1) - CM #4: 693C7325C000003 THE PURPOSE OF THIS CONTRACT MODIFICATION (CM) IS TO: 1) INCREASE CONTRACT AMOUNT BY $168,592.05 FROM $6,311,395.09 TO $6,479,987.14. 2) EXTEND THE CONTRACT BY 71 CALENDAR DAYS, CHANGING THE COMPLETI
Mar 5, 2026P00003$252.3KTHE PURPOSE OF THIS CONTRACT MODIFICATION IS TO: 1) INCREASE CONTRACT AMOUNT BY $252,252.49 FROM $6,059,142.60 TO $6,311,395.09. 2) EXTEND CONTRACT TIME BY 158 CALENDAR DAYS. 3) ADD FOUR NEW PAY ITEMS 4) INCORPORATE THE NEW FAR INVOICE CERTIFICA
Jan 14, 2026P00002$0NP SER PMS FY24(1) CM #2 NO CHANGE TO CONTRACT AMOUNT NO CHANGE TO CONTRACT TIME EXTEND PERIOD OF PERFORMANCE TO JANUARY 31, 2028
Sep 11, 2025P00001$500.8KNP SER PMS FY24(1) CM #1 INCREASE CONTRACT AMOUNT BY $500,810.35 EXTEND CONTRACT TIME BY 30 CALENDAR DAYS ADDITIONAL WORK AND TIME EXTENSION
Nov 14, 20240$5.6MPROJECT NP SER PMS FY24(1): THE PROJECT CONSISTS OF THE PAVEMENT PRESERVATION OF IDENTIFIED ROADWAYS AND PARKING AREAS. THE WORK INCLUDES TYPE 2 MICRO SURFACING, SAMI, THIN LIFT OVERLAY OF ASPHALT CONCRETE PAVEMENT, FULL DEPTH PATCHING, AND OTHER MI

Estimated positioning window

Jan 31, 2027 – Jul 31, 2027

Recompete signal:
70/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 70/100. Available recorded signals: 65 points.

Contract end 2028-01-31 (456 days from calculation)
+25 points
221 historical awards in this buyer and category group
+15 points
5 recorded award transactions
+10 points
Latest award action: 2026-08-03
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-11-01 10:17:53.997580+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Nov 1, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.