Federal contract award

6973GH24P04755

THE FEDERAL AVIATION ADMINISTRATION (FAA) HAS DETERMINED IT NECESSARY TO REPLACE THE EXISTING SEMI-RIGID CABLES USED IN THE ASR-9 WITH A SEMI-FLEX ALTERNATIVE. AS PART OF AN ENGINEERING STUDY FROM 2017, AJW-1434 DETERMINED THAT DEGRADATION OF THE LEG

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Transportation
Office6973GH FRANCHISE ACQUISITION SVCS
NAICS332618 — Other Fabricated Wire Product Manufacturing
PSC5995 — Cable, Cord, and Wire Assemblies: Communication Equipment
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$266.7K
Current contract value$266.7K
Potential contract value / ceiling$266.7K
Start dateSep 6, 2024
Current end dateMar 31, 2025
Potential end dateMar 31, 2025
Latest award activityFeb 25, 2025
Source loadedAug 15, 2026

Funding and modification history

Showing the latest 1 of 1 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Feb 25, 2025P00001$0THE FEDERAL AVIATION ADMINISTRATION (FAA) HAS DETERMINED IT NECESSARY TO REPLACE THE EXISTING SEMI-RIGID CABLES USED IN THE ASR-9 WITH A SEMI-FLEX ALTERNATIVE. AS PART OF AN ENGINEERING STUDY FROM 2017, AJW-1434 DETERMINED THAT DEGRADATION OF THE LEG

Research next steps

  1. Check the stated set-aside against the solicitation and current certifications.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.