Federal contract award
75N99024F00006
C200102 BUILDING 4 REPLACE LABORATORY EXHAUST FANS AE SERVICES COR: FERDINAND REYES
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Health and Human Services |
| Office | NIH A E CONSTRUCTION |
| NAICS | 541330 — Engineering Services |
| PSC | C219 — Other Architect and Engineering Services |
| Parent award / vehicle | 75N99020D00023 |
| Set-aside | Not reported |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $525.4K |
| Current contract value | $525.4K |
| Potential contract value / ceiling | $525.4K |
| Start date | Oct 15, 2024 |
| Current end date | Dec 31, 2026 |
| Potential end date | Dec 31, 2026 |
| Latest award activity | May 11, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 7 of 7 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| May 11, 2026 | P00006 | $0 | C200102 - MOD. IS TO EXTEND THE CONTRACT COMPLETION AT NO COST EITHER TO GOVERNMENT OR CONTRACTOR FROM 05/15/2026 TO 12/31/2026. |
| Mar 16, 2026 | P00005 | $5.6K | C200102 - MOD. FOR CO #4 IS FINAL WIND STUDY. WITHOUT THIS CHANGE TO THE CONTRACT, IT WILL LEAD TO A NON-FUNCTIONAL AND NON-COMPLIANT BUILDING. |
| Dec 8, 2025 | P00004 | $10.1K | C200102 - MOD. FOR CO #3 IS EXERCISING CONTRACT OPTIONS FROM MOD. P00003 (1A, 2A, AND 3A) FOR ADDITIONAL BLDG. 4 WIND STUDY TO LOWER THE EXHAUST STACKS. WITHOUT THIS CHANGE TO THE CONTRACT, IT WILL LEAD TO A NON-FUNCTIONAL AND NON-COMPLIANT BUILDING. |
| Sep 26, 2025 | P00003 | $50.0K | C200102, MOD. IS TO ADD A COMPUTATIONAL FLUID DYNAMICS WIND STUDY AND ADDITIONAL DESIGN PRESENTATION REVIEWS (ADRB, NCPC, SHPO) TO SCOPE. WITHOUT THESE CHANGES TO THE CONTRACT, THE PROJECT WILL NOT BE COMPLETE, USEABLE, AND NOT IN COMPLIANCE. |
| Jun 27, 2025 | P00002 | $64.6K | THE FACILITY IS REQUIRED TO COMPLY WITH THE HHS FACILITIES PROGRAM MANUAL. WITHOUT THIS CHANGE TO THE CONTRACT, THE PROJECT WILL NOT BE COMPLETE, USEABLE, AND NOT IN COMPLIANCE. |
| Mar 25, 2025 | P00001 | $0 | C200102 BUILDING 4 REPLACE LABORATORY EXHAUST FANS AE SERVICES NO COST TIME EXTENSION. COR: FERDINAND REYES |
| Sep 25, 2024 | 0 | $395.2K | C200102 BUILDING 4 REPLACE LABORATORY EXHAUST FANS AE SERVICES COR: FERDINAND REYES |
Estimated positioning window
Nov 1, 2026 – Jan 30, 2027
75/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 75/100. Available recorded signals: 70 points.
- Contract end 2026-12-31 (60 days from calculation)
- +35 points
- 277 historical awards in this buyer and category group
- +15 points
- 7 recorded award transactions
- +10 points
- Latest award action: 2026-05-11
- +5 points
- Parent award identifier recorded
- +5 points
- Solicitation identifier recorded
- +0 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-11-01 10:17:53.997580+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Nov 1, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Confirm the ordering vehicle and your eligibility or a qualified teaming route.
- Review the award scope and buyer evidence before making a bid/no-bid decision.