Federal contract award
75N99025F00005
THE REQUIREMENT IS FOR A MODIFICATION TO CONDUCT A C-LEVEL INSPECTION OF THE COGEN REDUCTION GEARBOX. THE CONTRACTOR WILL PROVIDE A TURNKEY PACKAGE TO SWAP THE EXISTING GEARBOX, REFURBISH THE OLD GEARSET, AND TRANSPORT IT, IN ACCORDANCE WITH THE STAT
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Health and Human Services |
| Office | NIH A E CONSTRUCTION |
| NAICS | 561210 — Facilities Support Services |
| PSC | J028 — Maintenance, Repair and Rebuilding of Equipment: Engines, Turbines, and Components |
| Parent award / vehicle | 75N99020D00022 |
| Set-aside | Not reported |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $939.9K |
| Current contract value | $939.9K |
| Potential contract value / ceiling | $939.9K |
| Start date | Sep 26, 2025 |
| Current end date | Oct 31, 2025 |
| Potential end date | Nov 28, 2025 |
| Latest award activity | Dec 10, 2025 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 2 of 2 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Dec 10, 2025 | P00001 | $40.0K | THE REQUIREMENT IS FOR A MODIFICATION TO CONDUCT A C-LEVEL INSPECTION OF THE COGEN REDUCTION GEARBOX. THE CONTRACTOR WILL PROVIDE A TURNKEY PACKAGE TO SWAP THE EXISTING GEARBOX, REFURBISH THE OLD GEARSET, AND TRANSPORT IT, IN ACCORDANCE WITH THE STAT |
| Sep 30, 2025 | 0 | $899.9K | THE REQUIREMENT IS FOR A MODIFICATION TO CONDUCT A C-LEVEL INSPECTION OF THE COGEN REDUCTION GEARBOX. THE CONTRACTOR WILL PROVIDE A TURNKEY PACKAGE TO SWAP THE EXISTING GEARBOX, REFURBISH THE OLD GEARSET, AND TRANSPORT IT, IN ACCORDANCE WITH THE STAT |
Research next steps
- Verify whether remaining options may extend performance beyond the current end date.
- Confirm the ordering vehicle and your eligibility or a qualified teaming route.
- Review the award scope and buyer evidence before making a bid/no-bid decision.