Federal contract award
80GRC017C0007
THIS EFFORT CONSISTS OF UP TO THREE PHASES THAT ENCOMPASS STIRLING POWER CONVERTOR DESIGN, FABRICATION, AND PERFORMANCE VERIFICATION. IN ADDITION TO STIRLING CONVERTOR DESIGN AND HARDWARE, THE CONTRACTOR SHALL PROVIDE SUPPORTING ANALYSES, MODELS, MANUFACTURING DRAWINGS, DESIGN REVIEW DOCUMENTS, TEST SUPPORT EQUIPMENT (TSE), LOG BOOKS, EXPERIMENTAL DATA, AND PLANS FOR PERFORMANCE VERIFICATION AND FLIGHT MATURATION.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | National Aeronautics and Space Administration |
| Office | NASA GLENN RESEARCH CENTER |
| NAICS | 541712 |
| PSC | AJ91 — OTHER SCIENCES NOT ELSEWHERE CLASSIFIED - BASIC RESEARCH |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | COST PLUS FIXED FEE |
| Obligations | $3.6M |
| Current contract value | $4.1M |
| Potential contract value / ceiling | $4.1M |
| Start date | Jul 3, 2017 |
| Current end date | Sep 2, 2022 |
| Potential end date | Sep 2, 2022 |
| Latest award activity | Jul 18, 2022 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 34 of 34 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Jul 18, 2022 | P00032 | $0 | STIRLING POWER CONVERTOR DESIGN, FABRICATION, AND PERFORMANCE VERIFICATION. |
| Jul 18, 2022 | P00033 | $-264.7K | STIRLING POWER CONVERTOR DESIGN, FABRICATION, AND PERFORMANCE VERIFICATION. |
| Jul 28, 2021 | P00031 | $279.7K | STIRLING POWER CONVERTOR DESIGN,FABRICATION,PERFORMANCE VERIFICATION, SUPPORTING ANALYSES,MODELS,MANUFACTURING DRAWINGS, DESIGN REVIEW DOCUMENTS,TEST SUPPORT EQUIPMENT, LOG BOOKS,EXPERIMENTAL DATA,&PLANS FOR PERFORMANCE VERIFICATION&FLIGHT MATURATION |
| Jun 1, 2021 | P00030 | $0 | STIRLING POWER CONVERTOR DESIGN, FABRICATION & PERFORMANCE VERIFICATION. SUPPORTING ANALYSES, MODELS, MANUFACTURING DRAWINGS, DESIGN REVIEW DOCUMENT, TEST SUPPORT EQUIPMENT, EXPERIMENTAL DATA & PLAN FOR PERFORMANCE VERIFICATION & FLIGHT MATURATION. |
| May 21, 2021 | P00029 | $13.3K | THREE PHASES THAT ENCOMPASS STIRLING POWER CONVERTOR DESIGN, FABRICATION, AND PERFORMANCE VERIFICATION. IN ADDITION TO STIRLING CONVERTOR DESIGN AND HARDWARE, SUPPORTING ANALYSES, MODELS, MANUFACTURING DRAWINGS, DESIGN REVIEW DOCUMENTS, TEST SUPPORT |
| Apr 27, 2021 | P00028 | $0 | DEVELOP AND TEST A FLIGHT-READY VERSION OF GE GLOBAL RESEARCH CENTER'S MEGAWATT INVERTER DEVELOPED UNDER A PREVIOUS NASA RESEARCH ANNOUNCEMENT (NRA) SILICON CARBIDE LIGHTWEIGHT INVERTER FOR MEGAWATT POWER (SLIM) CONTRACT |
| Apr 12, 2021 | P00027 | $0 | MOD 27 EXTENDS PERIOD OF PERFORMANCE |
| Dec 18, 2020 | P00026 | $0 | MODIFICATION 21 ADDING $500,000.00 OF FUNDING TO CONTRACT |
| Sep 30, 2020 | P00025 | $0 | MODIFICATION 25 EXTENDS THE WITH A NO CONTRACT EXTENSION TO DEC 31, 2020. |
| Aug 3, 2020 | P00024 | $0 | MODIFICATION 24 IS A NO COST EXTENSION |
| May 21, 2020 | P00023 | $0 | THIS EFFORT CONSISTS OF UP TO THREE PHASES THAT ENCOMPASS STIRLING POWER CONVERTOR DESIGN, FABRICATION, AND PERFORMANCE VERIFICATION. IN ADDITION TO STIRLING CONVERTOR DESIGN AND HARDWARE, THE CONTRACTOR SHALL PROVIDE SUPPORTING ANALYSES, MODELS, MANUFACTURING DRAWINGS, DESIGN REVIEW DOCUMENTS, TEST SUPPORT EQUIPMENT (TSE), LOG BOOKS, EXPERIMENTAL DATA, AND PLANS FOR PERFORMANCE VERIFICATION AND FLIGHT MATURATION. |
| Dec 12, 2019 | P00022 | $0 | THIS EFFORT CONSISTS OF UP TO THREE PHASES THAT ENCOMPASS STIRLING POWER CONVERTOR DESIGN, FABRICATION, AND PERFORMANCE VERIFICATION. IN ADDITION TO STIRLING CONVERTOR DESIGN AND HARDWARE, THE CONTRACTOR SHALL PROVIDE SUPPORTING ANALYSES, MODELS, MANUFACTURING DRAWINGS, DESIGN REVIEW DOCUMENTS, TEST SUPPORT EQUIPMENT (TSE), LOG BOOKS, EXPERIMENTAL DATA, AND PLANS FOR PERFORMANCE VERIFICATION AND FLIGHT MATURATION. |
| Oct 28, 2019 | P00021 | $500.0K | THIS EFFORT CONSISTS OF UP TO THREE PHASES THAT ENCOMPASS STIRLING POWER CONVERTOR DESIGN, FABRICATION, AND PERFORMANCE VERIFICATION. IN ADDITION TO STIRLING CONVERTOR DESIGN AND HARDWARE, THE CONTRACTOR SHALL PROVIDE SUPPORTING ANALYSES, MODELS, MANUFACTURING DRAWINGS, DESIGN REVIEW DOCUMENTS, TEST SUPPORT EQUIPMENT (TSE), LOG BOOKS, EXPERIMENTAL DATA, AND PLANS FOR PERFORMANCE VERIFICATION AND FLIGHT MATURATION. |
| Aug 29, 2019 | P00020 | $0 | THIS EFFORT CONSISTS OF UP TO THREE PHASES THAT ENCOMPASS STIRLING POWER CONVERTOR DESIGN, FABRICATION, AND PERFORMANCE VERIFICATION. IN ADDITION TO STIRLING CONVERTOR DESIGN AND HARDWARE, THE CONTRACTOR SHALL PROVIDE SUPPORTING ANALYSES, MODELS, MANUFACTURING DRAWINGS, DESIGN REVIEW DOCUMENTS, TEST SUPPORT EQUIPMENT (TSE), LOG BOOKS, EXPERIMENTAL DATA, AND PLANS FOR PERFORMANCE VERIFICATION AND FLIGHT MATURATION. |
| Aug 12, 2019 | P00019 | $100.0K | THIS EFFORT CONSISTS OF UP TO THREE PHASES THAT ENCOMPASS STIRLING POWER CONVERTOR DESIGN, FABRICATION, AND PERFORMANCE VERIFICATION. IN ADDITION TO STIRLING CONVERTOR DESIGN AND HARDWARE, THE CONTRACTOR SHALL PROVIDE SUPPORTING ANALYSES, MODELS, MANUFACTURING DRAWINGS, DESIGN REVIEW DOCUMENTS, TEST SUPPORT EQUIPMENT (TSE), LOG BOOKS, EXPERIMENTAL DATA, AND PLANS FOR PERFORMANCE VERIFICATION AND FLIGHT MATURATION. |
| Jul 17, 2019 | P00017 | $513.6K | THIS CONVERTOR DEVELOPMENT EFFORT IS IN SUPPORT OF NASA'S SCIENCE MISSION DIRECTORATE AND ITS NEED FOR HIGHER-EFFICIENCY RADIOISOTOPE POWER SYSTEMS. THE AGENCY SEEKS TO DEVELOP POWER SYSTEMS WITH A CONVERSION EFFICIENCY OF AT LEAST 20% AT THE GENERATOR LEVEL, WHICH WOULD OFFER A SIGNIFICANT IMPROVEMENT OVER THE CURRENT STATE-OF-THE-ART RPS. SUCH A POWER SYSTEM WOULD REQUIRE LESS RADIOISOTOPE FUEL TO PRODUCE THE ELECTRICITY REQUIRED BY THE MISSION. THE MAJORITY OF SCIENCE MISSIONS ARE MANY YEARS IN DURATION, AND SUBJECT TO HARSH ENVIRONMENTS ASSOCIATED WITH SPACEFLIGHT. THUS, RELIABILITY AND ROBUSTNESS OF THE POWER SYSTEM ARE OF UTMOST IMPORTANCE. DYNAMIC CONVERTORS, SUCH AS A STIRLING-CYCLE MACHINE, OFFER THE POTENTIAL TO ACHIEVE THIS CONVERSION EFFICIENCY, ROBUSTNESS, AND RELIABILITY. THIS CONTRACT SPECIFICALLY IS FOCUSED ON REALIZING SUCH A STIRLING-CYCLE POWER CONVERTOR...ADDED WORK.THIS EFFORT CONSISTS OF UP TO THREE PHASES THAT ENCOMPASS STIRLING POWER CONVERTOR DESIGN, FABRICATION, AND PERFORMANCE VERIFICATION. IN ADDITION TO STIRLING CONVERTOR DESIGN AND HARDWARE, THE CONTRACTOR SHALL PROVIDE SUPPORTING ANALYSES, MODELS, MANUFACTURING DRAWINGS, DESIGN REVIEW DOCUMENTS, TEST SUPPORT EQUIPMENT (TSE), LOG BOOKS, EXPERIMENTAL DATA, AND PLANS FOR PERFORMANCE VERIFICATION AND FLIGHT MATURATION. |
| Jul 17, 2019 | P00018 | $50.0K | THIS EFFORT CONSISTS OF UP TO THREE PHASES THAT ENCOMPASS STIRLING POWER CONVERTOR DESIGN, FABRICATION, AND PERFORMANCE VERIFICATION. IN ADDITION TO STIRLING CONVERTOR DESIGN AND HARDWARE, THE CONTRACTOR SHALL PROVIDE SUPPORTING ANALYSES, MODELS, MANUFACTURING DRAWINGS, DESIGN REVIEW DOCUMENTS, TEST SUPPORT EQUIPMENT (TSE), LOG BOOKS, EXPERIMENTAL DATA, AND PLANS FOR PERFORMANCE VERIFICATION AND FLIGHT MATURATION. |
| Jul 16, 2019 | P00016 | $0 | THIS CONVERTOR DEVELOPMENT EFFORT IS IN SUPPORT OF NASA'S SCIENCE MISSION DIRECTORATE AND ITS NEED FOR HIGHER-EFFICIENCY RADIOISOTOPE POWER SYSTEMS. THE AGENCY SEEKS TO DEVELOP POWER SYSTEMS WITH A CONVERSION EFFICIENCY OF AT LEAST 20% AT THE GENERATOR LEVEL, WHICH WOULD OFFER A SIGNIFICANT IMPROVEMENT OVER THE CURRENT STATE-OF-THE-ART RPS. SUCH A POWER SYSTEM WOULD REQUIRE LESS RADIOISOTOPE FUEL TO PRODUCE THE ELECTRICITY REQUIRED BY THE MISSION. THE MAJORITY OF SCIENCE MISSIONS ARE MANY YEARS IN DURATION, AND SUBJECT TO HARSH ENVIRONMENTS ASSOCIATED WITH SPACEFLIGHT. THUS, RELIABILITY AND ROBUSTNESS OF THE POWER SYSTEM ARE OF UTMOST IMPORTANCE. DYNAMIC CONVERTORS, SUCH AS A STIRLING-CYCLE MACHINE, OFFER THE POTENTIAL TO ACHIEVE THIS CONVERSION EFFICIENCY, ROBUSTNESS, AND RELIABILITY. THIS CONTRACT SPECIFICALLY IS FOCUSED ON REALIZING SUCH A STIRLING-CYCLE POWER CONVERTOR...ADDED WORK.THIS EFFORT CONSISTS OF UP TO THREE PHASES THAT ENCOMPASS STIRLING POWER CONVERTOR DESIGN, FABRICATION, AND PERFORMANCE VERIFICATION. IN ADDITION TO STIRLING CONVERTOR DESIGN AND HARDWARE, THE CONTRACTOR SHALL PROVIDE SUPPORTING ANALYSES, MODELS, MANUFACTURING DRAWINGS, DESIGN REVIEW DOCUMENTS, TEST SUPPORT EQUIPMENT (TSE), LOG BOOKS, EXPERIMENTAL DATA, AND PLANS FOR PERFORMANCE VERIFICATION AND FLIGHT MATURATION. |
| Mar 5, 2019 | P00014 | $500.0K | THIS CONVERTOR DEVELOPMENT EFFORT IS IN SUPPORT OF NASA'S SCIENCE MISSION DIRECTORATE AND ITS NEED FOR HIGHER-EFFICIENCY RADIOISOTOPE POWER SYSTEMS. THE AGENCY SEEKS TO DEVELOP POWER SYSTEMS WITH A CONVERSION EFFICIENCY OF AT LEAST 20% AT THE GENERATOR LEVEL, WHICH WOULD OFFER A SIGNIFICANT IMPROVEMENT OVER THE CURRENT STATE-OF-THE-ART RPS. SUCH A POWER SYSTEM WOULD REQUIRE LESS RADIOISOTOPE FUEL TO PRODUCE THE ELECTRICITY REQUIRED BY THE MISSION. THE MAJORITY OF SCIENCE MISSIONS ARE MANY YEARS IN DURATION, AND SUBJECT TO HARSH ENVIRONMENTS ASSOCIATED WITH SPACEFLIGHT. THUS, RELIABILITY AND ROBUSTNESS OF THE POWER SYSTEM ARE OF UTMOST IMPORTANCE. DYNAMIC CONVERTORS, SUCH AS A STIRLING-CYCLE MACHINE, OFFER THE POTENTIAL TO ACHIEVE THIS CONVERSION EFFICIENCY, ROBUSTNESS, AND RELIABILITY. THIS CONTRACT SPECIFICALLY IS FOCUSED ON REALIZING SUCH A STIRLING-CYCLE POWER CONVERTOR. |
| Dec 10, 2018 | P00013 | $0 | THIS CONVERTOR DEVELOPMENT EFFORT IS IN SUPPORT OF NASA'S SCIENCE MISSION DIRECTORATE AND ITS NEED FOR HIGHER-EFFICIENCY RADIOISOTOPE POWER SYSTEMS. THE AGENCY SEEKS TO DEVELOP POWER SYSTEMS WITH A CONVERSION EFFICIENCY OF AT LEAST 20% AT THE GENERATOR LEVEL, WHICH WOULD OFFER A SIGNIFICANT IMPROVEMENT OVER THE CURRENT STATE-OF-THE-ART RPS. SUCH A POWER SYSTEM WOULD REQUIRE LESS RADIOISOTOPE FUEL TO PRODUCE THE ELECTRICITY REQUIRED BY THE MISSION. THE MAJORITY OF SCIENCE MISSIONS ARE MANY YEARS IN DURATION, AND SUBJECT TO HARSH ENVIRONMENTS ASSOCIATED WITH SPACEFLIGHT. THUS, RELIABILITY AND ROBUSTNESS OF THE POWER SYSTEM ARE OF UTMOST IMPORTANCE. DYNAMIC CONVERTORS, SUCH AS A STIRLING-CYCLE MACHINE, OFFER THE POTENTIAL TO ACHIEVE THIS CONVERSION EFFICIENCY, ROBUSTNESS, AND RELIABILITY. THIS CONTRACT SPECIFICALLY IS FOCUSED ON REALIZING SUCH A STIRLING-CYCLE POWER CONVERTOR. |
| Oct 30, 2018 | P00012 | $-10.5K | THIS CONVERTOR DEVELOPMENT EFFORT IS IN SUPPORT OF NASA'S SCIENCE MISSION DIRECTORATE AND ITS NEED FOR HIGHER-EFFICIENCY RADIOISOTOPE POWER SYSTEMS. THE AGENCY SEEKS TO DEVELOP POWER SYSTEMS WITH A CONVERSION EFFICIENCY OF AT LEAST 20% AT THE GENERATOR LEVEL, WHICH WOULD OFFER A SIGNIFICANT IMPROVEMENT OVER THE CURRENT STATE-OF-THE-ART RPS. SUCH A POWER SYSTEM WOULD REQUIRE LESS RADIOISOTOPE FUEL TO PRODUCE THE ELECTRICITY REQUIRED BY THE MISSION. THE MAJORITY OF SCIENCE MISSIONS ARE MANY YEARS IN DURATION, AND SUBJECT TO HARSH ENVIRONMENTS ASSOCIATED WITH SPACEFLIGHT. THUS, RELIABILITY AND ROBUSTNESS OF THE POWER SYSTEM ARE OF UTMOST IMPORTANCE. DYNAMIC CONVERTORS, SUCH AS A STIRLING-CYCLE MACHINE, OFFER THE POTENTIAL TO ACHIEVE THIS CONVERSION EFFICIENCY, ROBUSTNESS, AND RELIABILITY. THIS CONTRACT SPECIFICALLY IS FOCUSED ON REALIZING SUCH A STIRLING-CYCLE POWER CONVERTOR. |
| Aug 27, 2018 | P00011 | $600.0K | THIS CONVERTOR DEVELOPMENT EFFORT IS IN SUPPORT OF NASA'S SCIENCE MISSION DIRECTORATE AND ITS NEED FOR HIGHER-EFFICIENCY RADIOISOTOPE POWER SYSTEMS. THE AGENCY SEEKS TO DEVELOP POWER SYSTEMS WITH A CONVERSION EFFICIENCY OF AT LEAST 20% AT THE GENERATOR LEVEL, WHICH WOULD OFFER A SIGNIFICANT IMPROVEMENT OVER THE CURRENT STATE-OF-THE-ART RPS. SUCH A POWER SYSTEM WOULD REQUIRE LESS RADIOISOTOPE FUEL TO PRODUCE THE ELECTRICITY REQUIRED BY THE MISSION. THE MAJORITY OF SCIENCE MISSIONS ARE MANY YEARS IN DURATION, AND SUBJECT TO HARSH ENVIRONMENTS ASSOCIATED WITH SPACEFLIGHT. THUS, RELIABILITY AND ROBUSTNESS OF THE POWER SYSTEM ARE OF UTMOST IMPORTANCE. DYNAMIC CONVERTORS, SUCH AS A STIRLING-CYCLE MACHINE, OFFER THE POTENTIAL TO ACHIEVE THIS CONVERSION EFFICIENCY, ROBUSTNESS, AND RELIABILITY. THIS CONTRACT SPECIFICALLY IS FOCUSED ON REALIZING SUCH A STIRLING-CYCLE POWER CONVERTOR. |
| Apr 3, 2018 | P00009 | $0 | THIS CONVERTOR DEVELOPMENT EFFORT IS IN SUPPORT OF NASA'S SCIENCE MISSION DIRECTORATE AND ITS NEED FOR HIGHER-EFFICIENCY RADIOISOTOPE POWER SYSTEMS. THE AGENCY SEEKS TO DEVELOP POWER SYSTEMS WITH A CONVERSION EFFICIENCY OF AT LEAST 20% AT THE GENERATOR LEVEL, WHICH WOULD OFFER A SIGNIFICANT IMPROVEMENT OVER THE CURRENT STATE-OF-THE-ART RPS. SUCH A POWER SYSTEM WOULD REQUIRE LESS RADIOISOTOPE FUEL TO PRODUCE THE ELECTRICITY REQUIRED BY THE MISSION. THE MAJORITY OF SCIENCE MISSIONS ARE MANY YEARS IN DURATION, AND SUBJECT TO HARSH ENVIRONMENTS ASSOCIATED WITH SPACEFLIGHT. THUS, RELIABILITY AND ROBUSTNESS OF THE POWER SYSTEM ARE OF UTMOST IMPORTANCE. DYNAMIC CONVERTORS, SUCH AS A STIRLING-CYCLE MACHINE, OFFER THE POTENTIAL TO ACHIEVE THIS CONVERSION EFFICIENCY, ROBUSTNESS, AND RELIABILITY. THIS CONTRACT SPECIFICALLY IS FOCUSED ON REALIZING SUCH A STIRLING-CYCLE POWER CONVERTOR. |
| Sep 8, 2017 | P00006 | $0 | THIS CONVERTOR DEVELOPMENT EFFORT IS IN SUPPORT OF NASA'S SCIENCE MISSION DIRECTORATE AND ITS NEED FOR HIGHER-EFFICIENCY RADIOISOTOPE POWER SYSTEMS. THE AGENCY SEEKS TO DEVELOP POWER SYSTEMS WITH A CONVERSION EFFICIENCY OF AT LEAST 20% AT THE GENERATOR LEVEL, WHICH WOULD OFFER A SIGNIFICANT IMPROVEMENT OVER THE CURRENT STATE-OF-THE-ART RPS. SUCH A POWER SYSTEM WOULD REQUIRE LESS RADIOISOTOPE FUEL TO PRODUCE THE ELECTRICITY REQUIRED BY THE MISSION. THE MAJORITY OF SCIENCE MISSIONS ARE MANY YEARS IN DURATION, AND SUBJECT TO HARSH ENVIRONMENTS ASSOCIATED WITH SPACEFLIGHT. THUS, RELIABILITY AND ROBUSTNESS OF THE POWER SYSTEM ARE OF UTMOST IMPORTANCE. DYNAMIC CONVERTORS, SUCH AS A STIRLING-CYCLE MACHINE, OFFER THE POTENTIAL TO ACHIEVE THIS CONVERSION EFFICIENCY, ROBUSTNESS, AND RELIABILITY. THIS CONTRACT SPECIFICALLY IS FOCUSED ON REALIZING SUCH A STIRLING-CYCLE POWER CONVERTOR. |
| Jul 3, 2017 | P00015 | $0 | THIS CONVERTOR DEVELOPMENT EFFORT IS IN SUPPORT OF NASA'S SCIENCE MISSION DIRECTORATE AND ITS NEED FOR HIGHER-EFFICIENCY RADIOISOTOPE POWER SYSTEMS. THE AGENCY SEEKS TO DEVELOP POWER SYSTEMS WITH A CONVERSION EFFICIENCY OF AT LEAST 20% AT THE GENERATOR LEVEL, WHICH WOULD OFFER A SIGNIFICANT IMPROVEMENT OVER THE CURRENT STATE-OF-THE-ART RPS. SUCH A POWER SYSTEM WOULD REQUIRE LESS RADIOISOTOPE FUEL TO PRODUCE THE ELECTRICITY REQUIRED BY THE MISSION. THE MAJORITY OF SCIENCE MISSIONS ARE MANY YEARS IN DURATION, AND SUBJECT TO HARSH ENVIRONMENTS ASSOCIATED WITH SPACEFLIGHT. THUS, RELIABILITY AND ROBUSTNESS OF THE POWER SYSTEM ARE OF UTMOST IMPORTANCE. DYNAMIC CONVERTORS, SUCH AS A STIRLING-CYCLE MACHINE, OFFER THE POTENTIAL TO ACHIEVE THIS CONVERSION EFFICIENCY, ROBUSTNESS, AND RELIABILITY. THIS CONTRACT SPECIFICALLY IS FOCUSED ON REALIZING SUCH A STIRLING-CYCLE POWER CONVERTOR. |
| Jun 30, 2017 | 0 | $0 | THIS EFFORT CONSISTS OF UP TO THREE PHASES THAT ENCOMPASS STIRLING POWER CONVERTOR DESIGN, FABRICATION, AND PERFORMANCE VERIFICATION. IN ADDITION TO STIRLING CONVERTOR DESIGN AND HARDWARE, THE CONTRACTOR SHALL PROVIDE SUPPORTING ANALYSES, MODELS, MANUFACTURING DRAWINGS, DESIGN REVIEW DOCUMENTS, TEST SUPPORT EQUIPMENT (TSE), LOG BOOKS, EXPERIMENTAL DATA, AND PLANS FOR PERFORMANCE VERIFICATION AND FLIGHT MATURATION. |
| Jun 30, 2017 | P00001 | $0 | DYNAMIC POWER NRA |
| Jun 30, 2017 | P00002 | $0 | DYNAMIC POWER NRA |
| Jun 30, 2017 | P00003 | $0 | DYNAMIC POWER NRA |
| Jun 30, 2017 | P00004 | $0 | DYNAMIC POWER NRA |
| Jun 30, 2017 | P00005 | $803.0K | THIS MOD CONSTITUTES THE BASE AWARD. ALL SUBSEQUENT MODS WILL OPERATE AS FOLLOWS: MOD 6= MOD 1 AND SO ON. |
| Jun 30, 2017 | P00007 | $27.0K | DYNAMIC POWER NRA |
| Jun 30, 2017 | P00008 | $0 | DYNAMIC POWER NRA |
| Jun 30, 2017 | P00010 | $500.0K | DYNAMIC POWER NRA |
Research next steps
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.