Federal contract award

80GRC017C0007

THIS EFFORT CONSISTS OF UP TO THREE PHASES THAT ENCOMPASS STIRLING POWER CONVERTOR DESIGN, FABRICATION, AND PERFORMANCE VERIFICATION. IN ADDITION TO STIRLING CONVERTOR DESIGN AND HARDWARE, THE CONTRACTOR SHALL PROVIDE SUPPORTING ANALYSES, MODELS, MANUFACTURING DRAWINGS, DESIGN REVIEW DOCUMENTS, TEST SUPPORT EQUIPMENT (TSE), LOG BOOKS, EXPERIMENTAL DATA, AND PLANS FOR PERFORMANCE VERIFICATION AND FLIGHT MATURATION.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyNational Aeronautics and Space Administration
OfficeNASA GLENN RESEARCH CENTER
NAICS541712
PSCAJ91 — OTHER SCIENCES NOT ELSEWHERE CLASSIFIED - BASIC RESEARCH
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeCOST PLUS FIXED FEE
Obligations$3.6M
Current contract value$4.1M
Potential contract value / ceiling$4.1M
Start dateJul 3, 2017
Current end dateSep 2, 2022
Potential end dateSep 2, 2022
Latest award activityJul 18, 2022
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 34 of 34 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jul 18, 2022P00032$0STIRLING POWER CONVERTOR DESIGN, FABRICATION, AND PERFORMANCE VERIFICATION.
Jul 18, 2022P00033$-264.7KSTIRLING POWER CONVERTOR DESIGN, FABRICATION, AND PERFORMANCE VERIFICATION.
Jul 28, 2021P00031$279.7KSTIRLING POWER CONVERTOR DESIGN,FABRICATION,PERFORMANCE VERIFICATION, SUPPORTING ANALYSES,MODELS,MANUFACTURING DRAWINGS, DESIGN REVIEW DOCUMENTS,TEST SUPPORT EQUIPMENT, LOG BOOKS,EXPERIMENTAL DATA,&PLANS FOR PERFORMANCE VERIFICATION&FLIGHT MATURATION
Jun 1, 2021P00030$0STIRLING POWER CONVERTOR DESIGN, FABRICATION & PERFORMANCE VERIFICATION. SUPPORTING ANALYSES, MODELS, MANUFACTURING DRAWINGS, DESIGN REVIEW DOCUMENT, TEST SUPPORT EQUIPMENT, EXPERIMENTAL DATA & PLAN FOR PERFORMANCE VERIFICATION & FLIGHT MATURATION.
May 21, 2021P00029$13.3KTHREE PHASES THAT ENCOMPASS STIRLING POWER CONVERTOR DESIGN, FABRICATION, AND PERFORMANCE VERIFICATION. IN ADDITION TO STIRLING CONVERTOR DESIGN AND HARDWARE, SUPPORTING ANALYSES, MODELS, MANUFACTURING DRAWINGS, DESIGN REVIEW DOCUMENTS, TEST SUPPORT
Apr 27, 2021P00028$0DEVELOP AND TEST A FLIGHT-READY VERSION OF GE GLOBAL RESEARCH CENTER'S MEGAWATT INVERTER DEVELOPED UNDER A PREVIOUS NASA RESEARCH ANNOUNCEMENT (NRA) SILICON CARBIDE LIGHTWEIGHT INVERTER FOR MEGAWATT POWER (SLIM) CONTRACT
Apr 12, 2021P00027$0MOD 27 EXTENDS PERIOD OF PERFORMANCE
Dec 18, 2020P00026$0MODIFICATION 21 ADDING $500,000.00 OF FUNDING TO CONTRACT
Sep 30, 2020P00025$0MODIFICATION 25 EXTENDS THE WITH A NO CONTRACT EXTENSION TO DEC 31, 2020.
Aug 3, 2020P00024$0MODIFICATION 24 IS A NO COST EXTENSION
May 21, 2020P00023$0THIS EFFORT CONSISTS OF UP TO THREE PHASES THAT ENCOMPASS STIRLING POWER CONVERTOR DESIGN, FABRICATION, AND PERFORMANCE VERIFICATION. IN ADDITION TO STIRLING CONVERTOR DESIGN AND HARDWARE, THE CONTRACTOR SHALL PROVIDE SUPPORTING ANALYSES, MODELS, MANUFACTURING DRAWINGS, DESIGN REVIEW DOCUMENTS, TEST SUPPORT EQUIPMENT (TSE), LOG BOOKS, EXPERIMENTAL DATA, AND PLANS FOR PERFORMANCE VERIFICATION AND FLIGHT MATURATION.
Dec 12, 2019P00022$0THIS EFFORT CONSISTS OF UP TO THREE PHASES THAT ENCOMPASS STIRLING POWER CONVERTOR DESIGN, FABRICATION, AND PERFORMANCE VERIFICATION. IN ADDITION TO STIRLING CONVERTOR DESIGN AND HARDWARE, THE CONTRACTOR SHALL PROVIDE SUPPORTING ANALYSES, MODELS, MANUFACTURING DRAWINGS, DESIGN REVIEW DOCUMENTS, TEST SUPPORT EQUIPMENT (TSE), LOG BOOKS, EXPERIMENTAL DATA, AND PLANS FOR PERFORMANCE VERIFICATION AND FLIGHT MATURATION.
Oct 28, 2019P00021$500.0KTHIS EFFORT CONSISTS OF UP TO THREE PHASES THAT ENCOMPASS STIRLING POWER CONVERTOR DESIGN, FABRICATION, AND PERFORMANCE VERIFICATION. IN ADDITION TO STIRLING CONVERTOR DESIGN AND HARDWARE, THE CONTRACTOR SHALL PROVIDE SUPPORTING ANALYSES, MODELS, MANUFACTURING DRAWINGS, DESIGN REVIEW DOCUMENTS, TEST SUPPORT EQUIPMENT (TSE), LOG BOOKS, EXPERIMENTAL DATA, AND PLANS FOR PERFORMANCE VERIFICATION AND FLIGHT MATURATION.
Aug 29, 2019P00020$0THIS EFFORT CONSISTS OF UP TO THREE PHASES THAT ENCOMPASS STIRLING POWER CONVERTOR DESIGN, FABRICATION, AND PERFORMANCE VERIFICATION. IN ADDITION TO STIRLING CONVERTOR DESIGN AND HARDWARE, THE CONTRACTOR SHALL PROVIDE SUPPORTING ANALYSES, MODELS, MANUFACTURING DRAWINGS, DESIGN REVIEW DOCUMENTS, TEST SUPPORT EQUIPMENT (TSE), LOG BOOKS, EXPERIMENTAL DATA, AND PLANS FOR PERFORMANCE VERIFICATION AND FLIGHT MATURATION.
Aug 12, 2019P00019$100.0KTHIS EFFORT CONSISTS OF UP TO THREE PHASES THAT ENCOMPASS STIRLING POWER CONVERTOR DESIGN, FABRICATION, AND PERFORMANCE VERIFICATION. IN ADDITION TO STIRLING CONVERTOR DESIGN AND HARDWARE, THE CONTRACTOR SHALL PROVIDE SUPPORTING ANALYSES, MODELS, MANUFACTURING DRAWINGS, DESIGN REVIEW DOCUMENTS, TEST SUPPORT EQUIPMENT (TSE), LOG BOOKS, EXPERIMENTAL DATA, AND PLANS FOR PERFORMANCE VERIFICATION AND FLIGHT MATURATION.
Jul 17, 2019P00017$513.6KTHIS CONVERTOR DEVELOPMENT EFFORT IS IN SUPPORT OF NASA'S SCIENCE MISSION DIRECTORATE AND ITS NEED FOR HIGHER-EFFICIENCY RADIOISOTOPE POWER SYSTEMS. THE AGENCY SEEKS TO DEVELOP POWER SYSTEMS WITH A CONVERSION EFFICIENCY OF AT LEAST 20% AT THE GENERATOR LEVEL, WHICH WOULD OFFER A SIGNIFICANT IMPROVEMENT OVER THE CURRENT STATE-OF-THE-ART RPS. SUCH A POWER SYSTEM WOULD REQUIRE LESS RADIOISOTOPE FUEL TO PRODUCE THE ELECTRICITY REQUIRED BY THE MISSION. THE MAJORITY OF SCIENCE MISSIONS ARE MANY YEARS IN DURATION, AND SUBJECT TO HARSH ENVIRONMENTS ASSOCIATED WITH SPACEFLIGHT. THUS, RELIABILITY AND ROBUSTNESS OF THE POWER SYSTEM ARE OF UTMOST IMPORTANCE. DYNAMIC CONVERTORS, SUCH AS A STIRLING-CYCLE MACHINE, OFFER THE POTENTIAL TO ACHIEVE THIS CONVERSION EFFICIENCY, ROBUSTNESS, AND RELIABILITY. THIS CONTRACT SPECIFICALLY IS FOCUSED ON REALIZING SUCH A STIRLING-CYCLE POWER CONVERTOR...ADDED WORK.THIS EFFORT CONSISTS OF UP TO THREE PHASES THAT ENCOMPASS STIRLING POWER CONVERTOR DESIGN, FABRICATION, AND PERFORMANCE VERIFICATION. IN ADDITION TO STIRLING CONVERTOR DESIGN AND HARDWARE, THE CONTRACTOR SHALL PROVIDE SUPPORTING ANALYSES, MODELS, MANUFACTURING DRAWINGS, DESIGN REVIEW DOCUMENTS, TEST SUPPORT EQUIPMENT (TSE), LOG BOOKS, EXPERIMENTAL DATA, AND PLANS FOR PERFORMANCE VERIFICATION AND FLIGHT MATURATION.
Jul 17, 2019P00018$50.0KTHIS EFFORT CONSISTS OF UP TO THREE PHASES THAT ENCOMPASS STIRLING POWER CONVERTOR DESIGN, FABRICATION, AND PERFORMANCE VERIFICATION. IN ADDITION TO STIRLING CONVERTOR DESIGN AND HARDWARE, THE CONTRACTOR SHALL PROVIDE SUPPORTING ANALYSES, MODELS, MANUFACTURING DRAWINGS, DESIGN REVIEW DOCUMENTS, TEST SUPPORT EQUIPMENT (TSE), LOG BOOKS, EXPERIMENTAL DATA, AND PLANS FOR PERFORMANCE VERIFICATION AND FLIGHT MATURATION.
Jul 16, 2019P00016$0THIS CONVERTOR DEVELOPMENT EFFORT IS IN SUPPORT OF NASA'S SCIENCE MISSION DIRECTORATE AND ITS NEED FOR HIGHER-EFFICIENCY RADIOISOTOPE POWER SYSTEMS. THE AGENCY SEEKS TO DEVELOP POWER SYSTEMS WITH A CONVERSION EFFICIENCY OF AT LEAST 20% AT THE GENERATOR LEVEL, WHICH WOULD OFFER A SIGNIFICANT IMPROVEMENT OVER THE CURRENT STATE-OF-THE-ART RPS. SUCH A POWER SYSTEM WOULD REQUIRE LESS RADIOISOTOPE FUEL TO PRODUCE THE ELECTRICITY REQUIRED BY THE MISSION. THE MAJORITY OF SCIENCE MISSIONS ARE MANY YEARS IN DURATION, AND SUBJECT TO HARSH ENVIRONMENTS ASSOCIATED WITH SPACEFLIGHT. THUS, RELIABILITY AND ROBUSTNESS OF THE POWER SYSTEM ARE OF UTMOST IMPORTANCE. DYNAMIC CONVERTORS, SUCH AS A STIRLING-CYCLE MACHINE, OFFER THE POTENTIAL TO ACHIEVE THIS CONVERSION EFFICIENCY, ROBUSTNESS, AND RELIABILITY. THIS CONTRACT SPECIFICALLY IS FOCUSED ON REALIZING SUCH A STIRLING-CYCLE POWER CONVERTOR...ADDED WORK.THIS EFFORT CONSISTS OF UP TO THREE PHASES THAT ENCOMPASS STIRLING POWER CONVERTOR DESIGN, FABRICATION, AND PERFORMANCE VERIFICATION. IN ADDITION TO STIRLING CONVERTOR DESIGN AND HARDWARE, THE CONTRACTOR SHALL PROVIDE SUPPORTING ANALYSES, MODELS, MANUFACTURING DRAWINGS, DESIGN REVIEW DOCUMENTS, TEST SUPPORT EQUIPMENT (TSE), LOG BOOKS, EXPERIMENTAL DATA, AND PLANS FOR PERFORMANCE VERIFICATION AND FLIGHT MATURATION.
Mar 5, 2019P00014$500.0KTHIS CONVERTOR DEVELOPMENT EFFORT IS IN SUPPORT OF NASA'S SCIENCE MISSION DIRECTORATE AND ITS NEED FOR HIGHER-EFFICIENCY RADIOISOTOPE POWER SYSTEMS. THE AGENCY SEEKS TO DEVELOP POWER SYSTEMS WITH A CONVERSION EFFICIENCY OF AT LEAST 20% AT THE GENERATOR LEVEL, WHICH WOULD OFFER A SIGNIFICANT IMPROVEMENT OVER THE CURRENT STATE-OF-THE-ART RPS. SUCH A POWER SYSTEM WOULD REQUIRE LESS RADIOISOTOPE FUEL TO PRODUCE THE ELECTRICITY REQUIRED BY THE MISSION. THE MAJORITY OF SCIENCE MISSIONS ARE MANY YEARS IN DURATION, AND SUBJECT TO HARSH ENVIRONMENTS ASSOCIATED WITH SPACEFLIGHT. THUS, RELIABILITY AND ROBUSTNESS OF THE POWER SYSTEM ARE OF UTMOST IMPORTANCE. DYNAMIC CONVERTORS, SUCH AS A STIRLING-CYCLE MACHINE, OFFER THE POTENTIAL TO ACHIEVE THIS CONVERSION EFFICIENCY, ROBUSTNESS, AND RELIABILITY. THIS CONTRACT SPECIFICALLY IS FOCUSED ON REALIZING SUCH A STIRLING-CYCLE POWER CONVERTOR.
Dec 10, 2018P00013$0THIS CONVERTOR DEVELOPMENT EFFORT IS IN SUPPORT OF NASA'S SCIENCE MISSION DIRECTORATE AND ITS NEED FOR HIGHER-EFFICIENCY RADIOISOTOPE POWER SYSTEMS. THE AGENCY SEEKS TO DEVELOP POWER SYSTEMS WITH A CONVERSION EFFICIENCY OF AT LEAST 20% AT THE GENERATOR LEVEL, WHICH WOULD OFFER A SIGNIFICANT IMPROVEMENT OVER THE CURRENT STATE-OF-THE-ART RPS. SUCH A POWER SYSTEM WOULD REQUIRE LESS RADIOISOTOPE FUEL TO PRODUCE THE ELECTRICITY REQUIRED BY THE MISSION. THE MAJORITY OF SCIENCE MISSIONS ARE MANY YEARS IN DURATION, AND SUBJECT TO HARSH ENVIRONMENTS ASSOCIATED WITH SPACEFLIGHT. THUS, RELIABILITY AND ROBUSTNESS OF THE POWER SYSTEM ARE OF UTMOST IMPORTANCE. DYNAMIC CONVERTORS, SUCH AS A STIRLING-CYCLE MACHINE, OFFER THE POTENTIAL TO ACHIEVE THIS CONVERSION EFFICIENCY, ROBUSTNESS, AND RELIABILITY. THIS CONTRACT SPECIFICALLY IS FOCUSED ON REALIZING SUCH A STIRLING-CYCLE POWER CONVERTOR.
Oct 30, 2018P00012$-10.5KTHIS CONVERTOR DEVELOPMENT EFFORT IS IN SUPPORT OF NASA'S SCIENCE MISSION DIRECTORATE AND ITS NEED FOR HIGHER-EFFICIENCY RADIOISOTOPE POWER SYSTEMS. THE AGENCY SEEKS TO DEVELOP POWER SYSTEMS WITH A CONVERSION EFFICIENCY OF AT LEAST 20% AT THE GENERATOR LEVEL, WHICH WOULD OFFER A SIGNIFICANT IMPROVEMENT OVER THE CURRENT STATE-OF-THE-ART RPS. SUCH A POWER SYSTEM WOULD REQUIRE LESS RADIOISOTOPE FUEL TO PRODUCE THE ELECTRICITY REQUIRED BY THE MISSION. THE MAJORITY OF SCIENCE MISSIONS ARE MANY YEARS IN DURATION, AND SUBJECT TO HARSH ENVIRONMENTS ASSOCIATED WITH SPACEFLIGHT. THUS, RELIABILITY AND ROBUSTNESS OF THE POWER SYSTEM ARE OF UTMOST IMPORTANCE. DYNAMIC CONVERTORS, SUCH AS A STIRLING-CYCLE MACHINE, OFFER THE POTENTIAL TO ACHIEVE THIS CONVERSION EFFICIENCY, ROBUSTNESS, AND RELIABILITY. THIS CONTRACT SPECIFICALLY IS FOCUSED ON REALIZING SUCH A STIRLING-CYCLE POWER CONVERTOR.
Aug 27, 2018P00011$600.0KTHIS CONVERTOR DEVELOPMENT EFFORT IS IN SUPPORT OF NASA'S SCIENCE MISSION DIRECTORATE AND ITS NEED FOR HIGHER-EFFICIENCY RADIOISOTOPE POWER SYSTEMS. THE AGENCY SEEKS TO DEVELOP POWER SYSTEMS WITH A CONVERSION EFFICIENCY OF AT LEAST 20% AT THE GENERATOR LEVEL, WHICH WOULD OFFER A SIGNIFICANT IMPROVEMENT OVER THE CURRENT STATE-OF-THE-ART RPS. SUCH A POWER SYSTEM WOULD REQUIRE LESS RADIOISOTOPE FUEL TO PRODUCE THE ELECTRICITY REQUIRED BY THE MISSION. THE MAJORITY OF SCIENCE MISSIONS ARE MANY YEARS IN DURATION, AND SUBJECT TO HARSH ENVIRONMENTS ASSOCIATED WITH SPACEFLIGHT. THUS, RELIABILITY AND ROBUSTNESS OF THE POWER SYSTEM ARE OF UTMOST IMPORTANCE. DYNAMIC CONVERTORS, SUCH AS A STIRLING-CYCLE MACHINE, OFFER THE POTENTIAL TO ACHIEVE THIS CONVERSION EFFICIENCY, ROBUSTNESS, AND RELIABILITY. THIS CONTRACT SPECIFICALLY IS FOCUSED ON REALIZING SUCH A STIRLING-CYCLE POWER CONVERTOR.
Apr 3, 2018P00009$0THIS CONVERTOR DEVELOPMENT EFFORT IS IN SUPPORT OF NASA'S SCIENCE MISSION DIRECTORATE AND ITS NEED FOR HIGHER-EFFICIENCY RADIOISOTOPE POWER SYSTEMS. THE AGENCY SEEKS TO DEVELOP POWER SYSTEMS WITH A CONVERSION EFFICIENCY OF AT LEAST 20% AT THE GENERATOR LEVEL, WHICH WOULD OFFER A SIGNIFICANT IMPROVEMENT OVER THE CURRENT STATE-OF-THE-ART RPS. SUCH A POWER SYSTEM WOULD REQUIRE LESS RADIOISOTOPE FUEL TO PRODUCE THE ELECTRICITY REQUIRED BY THE MISSION. THE MAJORITY OF SCIENCE MISSIONS ARE MANY YEARS IN DURATION, AND SUBJECT TO HARSH ENVIRONMENTS ASSOCIATED WITH SPACEFLIGHT. THUS, RELIABILITY AND ROBUSTNESS OF THE POWER SYSTEM ARE OF UTMOST IMPORTANCE. DYNAMIC CONVERTORS, SUCH AS A STIRLING-CYCLE MACHINE, OFFER THE POTENTIAL TO ACHIEVE THIS CONVERSION EFFICIENCY, ROBUSTNESS, AND RELIABILITY. THIS CONTRACT SPECIFICALLY IS FOCUSED ON REALIZING SUCH A STIRLING-CYCLE POWER CONVERTOR.
Sep 8, 2017P00006$0THIS CONVERTOR DEVELOPMENT EFFORT IS IN SUPPORT OF NASA'S SCIENCE MISSION DIRECTORATE AND ITS NEED FOR HIGHER-EFFICIENCY RADIOISOTOPE POWER SYSTEMS. THE AGENCY SEEKS TO DEVELOP POWER SYSTEMS WITH A CONVERSION EFFICIENCY OF AT LEAST 20% AT THE GENERATOR LEVEL, WHICH WOULD OFFER A SIGNIFICANT IMPROVEMENT OVER THE CURRENT STATE-OF-THE-ART RPS. SUCH A POWER SYSTEM WOULD REQUIRE LESS RADIOISOTOPE FUEL TO PRODUCE THE ELECTRICITY REQUIRED BY THE MISSION. THE MAJORITY OF SCIENCE MISSIONS ARE MANY YEARS IN DURATION, AND SUBJECT TO HARSH ENVIRONMENTS ASSOCIATED WITH SPACEFLIGHT. THUS, RELIABILITY AND ROBUSTNESS OF THE POWER SYSTEM ARE OF UTMOST IMPORTANCE. DYNAMIC CONVERTORS, SUCH AS A STIRLING-CYCLE MACHINE, OFFER THE POTENTIAL TO ACHIEVE THIS CONVERSION EFFICIENCY, ROBUSTNESS, AND RELIABILITY. THIS CONTRACT SPECIFICALLY IS FOCUSED ON REALIZING SUCH A STIRLING-CYCLE POWER CONVERTOR.
Jul 3, 2017P00015$0THIS CONVERTOR DEVELOPMENT EFFORT IS IN SUPPORT OF NASA'S SCIENCE MISSION DIRECTORATE AND ITS NEED FOR HIGHER-EFFICIENCY RADIOISOTOPE POWER SYSTEMS. THE AGENCY SEEKS TO DEVELOP POWER SYSTEMS WITH A CONVERSION EFFICIENCY OF AT LEAST 20% AT THE GENERATOR LEVEL, WHICH WOULD OFFER A SIGNIFICANT IMPROVEMENT OVER THE CURRENT STATE-OF-THE-ART RPS. SUCH A POWER SYSTEM WOULD REQUIRE LESS RADIOISOTOPE FUEL TO PRODUCE THE ELECTRICITY REQUIRED BY THE MISSION. THE MAJORITY OF SCIENCE MISSIONS ARE MANY YEARS IN DURATION, AND SUBJECT TO HARSH ENVIRONMENTS ASSOCIATED WITH SPACEFLIGHT. THUS, RELIABILITY AND ROBUSTNESS OF THE POWER SYSTEM ARE OF UTMOST IMPORTANCE. DYNAMIC CONVERTORS, SUCH AS A STIRLING-CYCLE MACHINE, OFFER THE POTENTIAL TO ACHIEVE THIS CONVERSION EFFICIENCY, ROBUSTNESS, AND RELIABILITY. THIS CONTRACT SPECIFICALLY IS FOCUSED ON REALIZING SUCH A STIRLING-CYCLE POWER CONVERTOR.
Jun 30, 20170$0THIS EFFORT CONSISTS OF UP TO THREE PHASES THAT ENCOMPASS STIRLING POWER CONVERTOR DESIGN, FABRICATION, AND PERFORMANCE VERIFICATION. IN ADDITION TO STIRLING CONVERTOR DESIGN AND HARDWARE, THE CONTRACTOR SHALL PROVIDE SUPPORTING ANALYSES, MODELS, MANUFACTURING DRAWINGS, DESIGN REVIEW DOCUMENTS, TEST SUPPORT EQUIPMENT (TSE), LOG BOOKS, EXPERIMENTAL DATA, AND PLANS FOR PERFORMANCE VERIFICATION AND FLIGHT MATURATION.
Jun 30, 2017P00001$0DYNAMIC POWER NRA
Jun 30, 2017P00002$0DYNAMIC POWER NRA
Jun 30, 2017P00003$0DYNAMIC POWER NRA
Jun 30, 2017P00004$0DYNAMIC POWER NRA
Jun 30, 2017P00005$803.0KTHIS MOD CONSTITUTES THE BASE AWARD. ALL SUBSEQUENT MODS WILL OPERATE AS FOLLOWS: MOD 6= MOD 1 AND SO ON.
Jun 30, 2017P00007$27.0KDYNAMIC POWER NRA
Jun 30, 2017P00008$0DYNAMIC POWER NRA
Jun 30, 2017P00010$500.0KDYNAMIC POWER NRA

Research next steps

  1. Check the stated set-aside against the solicitation and current certifications.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.