Federal contract award
80GSFC18C0061
GLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO ACCOMPLISH THE GOLD MISSION AS DESCRIBED IN THE GOLD CONCEPT STUDY REPORT. THE CONTRACTOR SHALL PROVIDE REPORTS, REVIEWS, AND DOCUMENTATION FOR ALL ASPECTS OF THE PROGRAM. THE CONTRACTOR SHALL MANAGE THE ACTIVITIES OF THE SCIENCE TEAM. THE CONTRACTOR SHALL MAINTAIN THE GOLD SCIENCE DATA CENTER (SDC) AT UCF, AND SHALL PERFORM DATA REDUCTION AND ANALYSIS FOR THREE YEARS AFTER THE COMPLETION OF COMMISSIONING THE GOLD INSTRUMENT. THE CONTRACTOR SHALL PRESENT THE SCIENTIFIC RESULTS IN PRESENTATIONS AND PUBLISHED PAPERS, AND PROVIDE RAW DATA AND DATA PRODUCTS FOR ARCHIVING TO AN APPROVED DATA ARCHIVE. THE CONTRACTOR IS RESPONSIBLE FOR ALGORITHM DEVELOPMENT AND SCIENCE PLANNING AND ANALYSIS OF MISSION DATA AND THE PUBLICATION OF RESULTS. THE GOLD PROJECT SHALL FOLLOW THE GUIDELINES OF A MISSION OF OPPORTUNITY AND THE GOLD CONTRACT. THE GOLD PRINCIPAL INVESTIGATOR (PI) SHALL HAVE SOLE RESPONSIBILITY FOR THE SUCCESSFUL COMPLETION OF THIS PROJECT. THE PI SHALL DELEGATE PROJECT MANAGEMENT TASKS TO THE PROJECT MANAGER (PM) AS APPROPRIATE. THE PM SHALL DIRECT THE GOLD PROJECT AND HAVE THE RESPONSIBILITY FOR OVERALL TECHNICAL PERFORMANCE AND RESOURCE MANAGEMENT OF THE CONTRACT AND ALL SUBCONTRACTS. THE PI/PM SHALL BE THE FOCAL POINT FOR ALL CONTACT WITH THE GOVERNMENT. THE PM AND STAFF SHALL SUPPORT THE PI AS REQUIRED INCLUDING THE SCHEDULING AND COORDINATING OF MEETINGS AND REVIEWS, SCHEDULE CONTROL AND REPORTING, FINANCIAL CONTROL AND REPORTING, SUBCONTRACT MANAGEMENT, CONFIGURATION MANAGEMENT AND DOCUMENTATION, PROGRESS REPORTS AND REVIEWS AS WELL AS ALL ANOMALY REPORTING ACTIVITIES.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | National Aeronautics and Space Administration |
| Office | NASA GODDARD SPACE FLIGHT CENTER |
| NAICS | 541720 — Research and Development in the Social Sciences and Humanities |
| PSC | AZ12 — OTHER RESEARCH AND DEVELOPMENT - APPLIED RESEARCH/EXPLORATORY DEVELOPMENT |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | COST NO FEE |
| Obligations | $39.1M |
| Current contract value | $42.9M |
| Potential contract value / ceiling | $51.5M |
| Start date | Mar 1, 2018 |
| Current end date | Apr 30, 2027 |
| Potential end date | Apr 30, 2029 |
| Latest award activity | May 27, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 38 of 38 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| May 27, 2026 | P00038 | $0 | GLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION. MAINTAIN SCIENCE OPERATIONS, PROCESS DATA, PRODUCE ALGORITHMS, MODELING AND SIMULATION. |
| Apr 7, 2026 | P00037 | $490.0K | GLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION. MAINTAIN SCIENCE OPERATIONS, PROCESS DATA, PRODUCE ALGORITHMS, MODELING AND SIMULATION. |
| Mar 26, 2026 | P00036 | $2.4M | GLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION. MAINTAIN SCIENCE OPERATIONS, PROCESS DATA, PRODUCE ALGORITHMS, MODELING AND SIMULATION. |
| Sep 15, 2025 | P00035 | $1.4M | GLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION. MAINTAIN SCIENCE OPERATIONS, PROCESS DATA, PRODUCE ALGORITHMS, MODELING AND SIMULATION. |
| Jul 29, 2025 | P00034 | $330.0K | GLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION..THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO ACCOMPLISH THE GOLD MISSION AS DESCRIBED IN THE GOLD CONCEPT STUDY REPORT. THE CONTRACTOR SHALL PROVIDE REPORTS, REVIEWS, AND DOCUMENTATION FOR ALL ASPECTS OF THE PROGRAM. THE CONTRACTOR SHALL MANAGE THE ACTIVITIES OF THE SCIENCE TEAM. THE CONTRACTOR SHALL MAINTAIN THE GOLD SCIENCE DATA CENTER (SDC) AT UCF, AND SHALL PERFORM DATA REDUCTION AND ANALYSIS FOR THREE YEARS AFTER THE COMPLETION OF COMMISSIONING THE GOLD INSTRUMENT. THE CONTRACTOR SHALL PRESENT THE SCIENTIFIC RESULTS IN PRESENTATIONS AND PUBLISHED PAPERS, AND PROVIDE RAW DATA AND DATA PRODUCTS FOR ARCHIVING TO AN APPROVED DATA ARCHIVE. THE CONTRACTOR IS RESPONSIBLE FOR ALGORITHM DEVELOPMENT AND SCIENCE PLANNING AND ANALYSIS OF MISSION DATA AND THE PUBLICATION OF RESULTS..THE GOLD PROJECT SHALL FOLLOW THE GUIDELINES OF A MISSION OF OPPORTUNITY AND THE GOLD CONTRACT. THE GOLD PRINCIPAL INVESTIGATOR (PI) SHALL HAVE SOLE RESPONSIBILITY FOR THE SUCCESSFUL COMPLETION OF THIS PROJECT. THE PI SHALL DELEGATE PROJECT MANAGEMENT TASKS TO THE PROJECT MANAGER (PM) AS APPROPRIATE. THE PM SHALL DIRECT THE GOLD PROJECT AND HAVE THE RESPONSIBILITY FOR OVERALL TECHNICAL PERFORMANCE AND RESOURCE MANAGEMENT OF THE CONTRACT AND ALL SUBCONTRACTS. THE PI/PM SHALL BE THE FOCAL POINT FOR ALL CONTACT WITH THE GOVERNMENT. THE PM AND STAFF SHALL SUPPORT THE PI AS REQUIRED INCLUDING THE SCHEDULING AND COORDINATING OF MEETINGS AND REVIEWS, SCHEDULE CONTROL AND REPORTING, FINANCIAL CONTROL AND REPORTING, SUBCONTRACT MANAGEMENT, CONFIGURATION MANAGEMENT AND DOCUMENTATION, PROGRESS REPORTS AND REVIEWS AS WELL AS ALL ANOMALY REPORTING ACTIVITIES. |
| Jul 10, 2025 | P00033 | $12.4K | GLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION..THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO ACCOMPLISH THE GOLD MISSION AS DESCRIBED IN THE GOLD CONCEPT STUDY REPORT. THE CONTRACTOR SHALL PROVIDE REPORTS, REVIEWS, AND DOCUMENTATION FOR ALL ASPECTS OF THE PROGRAM. THE CONTRACTOR SHALL MANAGE THE ACTIVITIES OF THE SCIENCE TEAM. THE CONTRACTOR SHALL MAINTAIN THE GOLD SCIENCE DATA CENTER (SDC) AT UCF, AND SHALL PERFORM DATA REDUCTION AND ANALYSIS FOR THREE YEARS AFTER THE COMPLETION OF COMMISSIONING THE GOLD INSTRUMENT. THE CONTRACTOR SHALL PRESENT THE SCIENTIFIC RESULTS IN PRESENTATIONS AND PUBLISHED PAPERS, AND PROVIDE RAW DATA AND DATA PRODUCTS FOR ARCHIVING TO AN APPROVED DATA ARCHIVE. THE CONTRACTOR IS RESPONSIBLE FOR ALGORITHM DEVELOPMENT AND SCIENCE PLANNING AND ANALYSIS OF MISSION DATA AND THE PUBLICATION OF RESULTS..THE GOLD PROJECT SHALL FOLLOW THE GUIDELINES OF A MISSION OF OPPORTUNITY AND THE GOLD CONTRACT. THE GOLD PRINCIPAL INVESTIGATOR (PI) SHALL HAVE SOLE RESPONSIBILITY FOR THE SUCCESSFUL COMPLETION OF THIS PROJECT. THE PI SHALL DELEGATE PROJECT MANAGEMENT TASKS TO THE PROJECT MANAGER (PM) AS APPROPRIATE. THE PM SHALL DIRECT THE GOLD PROJECT AND HAVE THE RESPONSIBILITY FOR OVERALL TECHNICAL PERFORMANCE AND RESOURCE MANAGEMENT OF THE CONTRACT AND ALL SUBCONTRACTS. THE PI/PM SHALL BE THE FOCAL POINT FOR ALL CONTACT WITH THE GOVERNMENT. THE PM AND STAFF SHALL SUPPORT THE PI AS REQUIRED INCLUDING THE SCHEDULING AND COORDINATING OF MEETINGS AND REVIEWS, SCHEDULE CONTROL AND REPORTING, FINANCIAL CONTROL AND REPORTING, SUBCONTRACT MANAGEMENT, CONFIGURATION MANAGEMENT AND DOCUMENTATION, PROGRESS REPORTS AND REVIEWS AS WELL AS ALL ANOMALY REPORTING ACTIVITIES. |
| Jun 9, 2025 | P00032 | $400.0K | GLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION..THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO ACCOMPLISH THE GOLD MISSION AS DESCRIBED IN THE GOLD CONCEPT STUDY REPORT. THE CONTRACTOR SHALL PROVIDE REPORTS, REVIEWS, AND DOCUMENTATION FOR ALL ASPECTS OF THE PROGRAM. THE CONTRACTOR SHALL MANAGE THE ACTIVITIES OF THE SCIENCE TEAM. THE CONTRACTOR SHALL MAINTAIN THE GOLD SCIENCE DATA CENTER (SDC) AT UCF, AND SHALL PERFORM DATA REDUCTION AND ANALYSIS FOR THREE YEARS AFTER THE COMPLETION OF COMMISSIONING THE GOLD INSTRUMENT. THE CONTRACTOR SHALL PRESENT THE SCIENTIFIC RESULTS IN PRESENTATIONS AND PUBLISHED PAPERS, AND PROVIDE RAW DATA AND DATA PRODUCTS FOR ARCHIVING TO AN APPROVED DATA ARCHIVE. THE CONTRACTOR IS RESPONSIBLE FOR ALGORITHM DEVELOPMENT AND SCIENCE PLANNING AND ANALYSIS OF MISSION DATA AND THE PUBLICATION OF RESULTS..THE GOLD PROJECT SHALL FOLLOW THE GUIDELINES OF A MISSION OF OPPORTUNITY AND THE GOLD CONTRACT. THE GOLD PRINCIPAL INVESTIGATOR (PI) SHALL HAVE SOLE RESPONSIBILITY FOR THE SUCCESSFUL COMPLETION OF THIS PROJECT. THE PI SHALL DELEGATE PROJECT MANAGEMENT TASKS TO THE PROJECT MANAGER (PM) AS APPROPRIATE. THE PM SHALL DIRECT THE GOLD PROJECT AND HAVE THE RESPONSIBILITY FOR OVERALL TECHNICAL PERFORMANCE AND RESOURCE MANAGEMENT OF THE CONTRACT AND ALL SUBCONTRACTS. THE PI/PM SHALL BE THE FOCAL POINT FOR ALL CONTACT WITH THE GOVERNMENT. THE PM AND STAFF SHALL SUPPORT THE PI AS REQUIRED INCLUDING THE SCHEDULING AND COORDINATING OF MEETINGS AND REVIEWS, SCHEDULE CONTROL AND REPORTING, FINANCIAL CONTROL AND REPORTING, SUBCONTRACT MANAGEMENT, CONFIGURATION MANAGEMENT AND DOCUMENTATION, PROGRESS REPORTS AND REVIEWS AS WELL AS ALL ANOMALY REPORTING ACTIVITIES. |
| Apr 30, 2025 | P00031 | $0 | REMOVAL/UPDATED CLAUSES IAW E.O. 14148, 14057, 14173 AND 14168. GLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION..THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO ACCOMPLISH THE GOLD MISSION AS DESCRIBED IN THE GOLD CONCEPT STUDY REPORT. THE CONTRACTOR SHALL PROVIDE REPORTS, REVIEWS, AND DOCUMENTATION FOR ALL ASPECTS OF THE PROGRAM. THE CONTRACTOR SHALL MANAGE THE ACTIVITIES OF THE SCIENCE TEAM. THE CONTRACTOR SHALL MAINTAIN THE GOLD SCIENCE DATA CENTER (SDC) AT UCF, AND SHALL PERFORM DATA REDUCTION AND ANALYSIS FOR THREE YEARS AFTER THE COMPLETION OF COMMISSIONING THE GOLD INSTRUMENT. THE CONTRACTOR SHALL PRESENT THE SCIENTIFIC RESULTS IN PRESENTATIONS AND PUBLISHED PAPERS, AND PROVIDE RAW DATA AND DATA PRODUCTS FOR ARCHIVING TO AN APPROVED DATA ARCHIVE. THE CONTRACTOR IS RESPONSIBLE FOR ALGORITHM DEVELOPMENT AND SCIENCE PLANNING AND ANALYSIS OF MISSION DATA AND THE PUBLICATION OF RESULTS..THE GOLD PROJECT SHALL FOLLOW THE GUIDELINES OF A MISSION OF OPPORTUNITY AND THE GOLD CONTRACT. THE GOLD PRINCIPAL INVESTIGATOR (PI) SHALL HAVE SOLE RESPONSIBILITY FOR THE SUCCESSFUL COMPLETION OF THIS PROJECT. THE PI SHALL DELEGATE PROJECT MANAGEMENT TASKS TO THE PROJECT MANAGER (PM) AS APPROPRIATE. THE PM SHALL DIRECT THE GOLD PROJECT AND HAVE THE RESPONSIBILITY FOR OVERALL TECHNICAL PERFORMANCE AND RESOURCE MANAGEMENT OF THE CONTRACT AND ALL SUBCONTRACTS. THE PI/PM SHALL BE THE FOCAL POINT FOR ALL CONTACT WITH THE GOVERNMENT. THE PM AND STAFF SHALL SUPPORT THE PI AS REQUIRED INCLUDING THE SCHEDULING AND COORDINATING OF MEETINGS AND REVIEWS, SCHEDULE CONTROL AND REPORTING, FINANCIAL CONTROL AND REPORTING, SUBCONTRACT MANAGEMENT, CONFIGURATION MANAGEMENT AND DOCUMENTATION, PROGRESS REPORTS AND REVIEWS AS WELL AS ALL ANOMALY REPORTING ACTIVITIES. |
| Mar 12, 2025 | P00030 | $350.0K | GLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION..THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO ACCOMPLISH THE GOLD MISSION AS DESCRIBED IN THE GOLD CONCEPT STUDY REPORT. THE CONTRACTOR SHALL PROVIDE REPORTS, REVIEWS, AND DOCUMENTATION FOR ALL ASPECTS OF THE PROGRAM. THE CONTRACTOR SHALL MANAGE THE ACTIVITIES OF THE SCIENCE TEAM. THE CONTRACTOR SHALL MAINTAIN THE GOLD SCIENCE DATA CENTER (SDC) AT UCF, AND SHALL PERFORM DATA REDUCTION AND ANALYSIS FOR THREE YEARS AFTER THE COMPLETION OF COMMISSIONING THE GOLD INSTRUMENT. THE CONTRACTOR SHALL PRESENT THE SCIENTIFIC RESULTS IN PRESENTATIONS AND PUBLISHED PAPERS, AND PROVIDE RAW DATA AND DATA PRODUCTS FOR ARCHIVING TO AN APPROVED DATA ARCHIVE. THE CONTRACTOR IS RESPONSIBLE FOR ALGORITHM DEVELOPMENT AND SCIENCE PLANNING AND ANALYSIS OF MISSION DATA AND THE PUBLICATION OF RESULTS..THE GOLD PROJECT SHALL FOLLOW THE GUIDELINES OF A MISSION OF OPPORTUNITY AND THE GOLD CONTRACT. THE GOLD PRINCIPAL INVESTIGATOR (PI) SHALL HAVE SOLE RESPONSIBILITY FOR THE SUCCESSFUL COMPLETION OF THIS PROJECT. THE PI SHALL DELEGATE PROJECT MANAGEMENT TASKS TO THE PROJECT MANAGER (PM) AS APPROPRIATE. THE PM SHALL DIRECT THE GOLD PROJECT AND HAVE THE RESPONSIBILITY FOR OVERALL TECHNICAL PERFORMANCE AND RESOURCE MANAGEMENT OF THE CONTRACT AND ALL SUBCONTRACTS. THE PI/PM SHALL BE THE FOCAL POINT FOR ALL CONTACT WITH THE GOVERNMENT. THE PM AND STAFF SHALL SUPPORT THE PI AS REQUIRED INCLUDING THE SCHEDULING AND COORDINATING OF MEETINGS AND REVIEWS, SCHEDULE CONTROL AND REPORTING, FINANCIAL CONTROL AND REPORTING, SUBCONTRACT MANAGEMENT, CONFIGURATION MANAGEMENT AND DOCUMENTATION, PROGRESS REPORTS AND REVIEWS AS WELL AS ALL ANOMALY REPORTING ACTIVITIES. |
| Mar 10, 2025 | P00029 | $750.0K | GLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION..THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO ACCOMPLISH THE GOLD MISSION AS DESCRIBED IN THE GOLD CONCEPT STUDY REPORT. THE CONTRACTOR SHALL PROVIDE REPORTS, REVIEWS, AND DOCUMENTATION FOR ALL ASPECTS OF THE PROGRAM. THE CONTRACTOR SHALL MANAGE THE ACTIVITIES OF THE SCIENCE TEAM. THE CONTRACTOR SHALL MAINTAIN THE GOLD SCIENCE DATA CENTER (SDC) AT UCF, AND SHALL PERFORM DATA REDUCTION AND ANALYSIS FOR THREE YEARS AFTER THE COMPLETION OF COMMISSIONING THE GOLD INSTRUMENT. THE CONTRACTOR SHALL PRESENT THE SCIENTIFIC RESULTS IN PRESENTATIONS AND PUBLISHED PAPERS, AND PROVIDE RAW DATA AND DATA PRODUCTS FOR ARCHIVING TO AN APPROVED DATA ARCHIVE. THE CONTRACTOR IS RESPONSIBLE FOR ALGORITHM DEVELOPMENT AND SCIENCE PLANNING AND ANALYSIS OF MISSION DATA AND THE PUBLICATION OF RESULTS..THE GOLD PROJECT SHALL FOLLOW THE GUIDELINES OF A MISSION OF OPPORTUNITY AND THE GOLD CONTRACT. THE GOLD PRINCIPAL INVESTIGATOR (PI) SHALL HAVE SOLE RESPONSIBILITY FOR THE SUCCESSFUL COMPLETION OF THIS PROJECT. THE PI SHALL DELEGATE PROJECT MANAGEMENT TASKS TO THE PROJECT MANAGER (PM) AS APPROPRIATE. THE PM SHALL DIRECT THE GOLD PROJECT AND HAVE THE RESPONSIBILITY FOR OVERALL TECHNICAL PERFORMANCE AND RESOURCE MANAGEMENT OF THE CONTRACT AND ALL SUBCONTRACTS. THE PI/PM SHALL BE THE FOCAL POINT FOR ALL CONTACT WITH THE GOVERNMENT. THE PM AND STAFF SHALL SUPPORT THE PI AS REQUIRED INCLUDING THE SCHEDULING AND COORDINATING OF MEETINGS AND REVIEWS, SCHEDULE CONTROL AND REPORTING, FINANCIAL CONTROL AND REPORTING, SUBCONTRACT MANAGEMENT, CONFIGURATION MANAGEMENT AND DOCUMENTATION, PROGRESS REPORTS AND REVIEWS AS WELL AS ALL ANOMALY REPORTING ACTIVITIES. |
| Jan 23, 2025 | P00028 | $0 | REMOVAL OF CLAUSES/DRDS IAW EO 14035 - GLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) FOR SMD DIRECTORATE |
| Dec 17, 2024 | P00027 | $0 | GLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION..THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO ACCOMPLISH THE GOLD MISSION AS DESCRIBED IN THE GOLD CONCEPT STUDY REPORT. THE CONTRACTOR SHALL PROVIDE REPORTS, REVIEWS, AND DOCUMENTATION FOR ALL ASPECTS OF THE PROGRAM. THE CONTRACTOR SHALL MANAGE THE ACTIVITIES OF THE SCIENCE TEAM. THE CONTRACTOR SHALL MAINTAIN THE GOLD SCIENCE DATA CENTER (SDC) AT UCF, AND SHALL PERFORM DATA REDUCTION AND ANALYSIS FOR THREE YEARS AFTER THE COMPLETION OF COMMISSIONING THE GOLD INSTRUMENT. THE CONTRACTOR SHALL PRESENT THE SCIENTIFIC RESULTS IN PRESENTATIONS AND PUBLISHED PAPERS, AND PROVIDE RAW DATA AND DATA PRODUCTS FOR ARCHIVING TO AN APPROVED DATA ARCHIVE. THE CONTRACTOR IS RESPONSIBLE FOR ALGORITHM DEVELOPMENT AND SCIENCE PLANNING AND ANALYSIS OF MISSION DATA AND THE PUBLICATION OF RESULTS..THE GOLD PROJECT SHALL FOLLOW THE GUIDELINES OF A MISSION OF OPPORTUNITY AND THE GOLD CONTRACT. THE GOLD PRINCIPAL INVESTIGATOR (PI) SHALL HAVE SOLE RESPONSIBILITY FOR THE SUCCESSFUL COMPLETION OF THIS PROJECT. THE PI SHALL DELEGATE PROJECT MANAGEMENT TASKS TO THE PROJECT MANAGER (PM) AS APPROPRIATE. THE PM SHALL DIRECT THE GOLD PROJECT AND HAVE THE RESPONSIBILITY FOR OVERALL TECHNICAL PERFORMANCE AND RESOURCE MANAGEMENT OF THE CONTRACT AND ALL SUBCONTRACTS. THE PI/PM SHALL BE THE FOCAL POINT FOR ALL CONTACT WITH THE GOVERNMENT. THE PM AND STAFF SHALL SUPPORT THE PI AS REQUIRED INCLUDING THE SCHEDULING AND COORDINATING OF MEETINGS AND REVIEWS, SCHEDULE CONTROL AND REPORTING, FINANCIAL CONTROL AND REPORTING, SUBCONTRACT MANAGEMENT, CONFIGURATION MANAGEMENT AND DOCUMENTATION, PROGRESS REPORTS AND REVIEWS AS WELL AS ALL ANOMALY REPORTING ACTIVITIES. |
| Jun 27, 2024 | P00026 | $0 | GLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION..THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO ACCOMPLISH THE GOLD MISSION AS DESCRIBED IN THE GOLD CONCEPT STUDY REPORT. THE CONTRACTOR SHALL PROVIDE REPORTS, REVIEWS, AND DOCUMENTATION FOR ALL ASPECTS OF THE PROGRAM. THE CONTRACTOR SHALL MANAGE THE ACTIVITIES OF THE SCIENCE TEAM. THE CONTRACTOR SHALL MAINTAIN THE GOLD SCIENCE DATA CENTER (SDC) AT UCF, AND SHALL PERFORM DATA REDUCTION AND ANALYSIS FOR THREE YEARS AFTER THE COMPLETION OF COMMISSIONING THE GOLD INSTRUMENT. THE CONTRACTOR SHALL PRESENT THE SCIENTIFIC RESULTS IN PRESENTATIONS AND PUBLISHED PAPERS, AND PROVIDE RAW DATA AND DATA PRODUCTS FOR ARCHIVING TO AN APPROVED DATA ARCHIVE. THE CONTRACTOR IS RESPONSIBLE FOR ALGORITHM DEVELOPMENT AND SCIENCE PLANNING AND ANALYSIS OF MISSION DATA AND THE PUBLICATION OF RESULTS..THE GOLD PROJECT SHALL FOLLOW THE GUIDELINES OF A MISSION OF OPPORTUNITY AND THE GOLD CONTRACT. THE GOLD PRINCIPAL INVESTIGATOR (PI) SHALL HAVE SOLE RESPONSIBILITY FOR THE SUCCESSFUL COMPLETION OF THIS PROJECT. THE PI SHALL DELEGATE PROJECT MANAGEMENT TASKS TO THE PROJECT MANAGER (PM) AS APPROPRIATE. THE PM SHALL DIRECT THE GOLD PROJECT AND HAVE THE RESPONSIBILITY FOR OVERALL TECHNICAL PERFORMANCE AND RESOURCE MANAGEMENT OF THE CONTRACT AND ALL SUBCONTRACTS. THE PI/PM SHALL BE THE FOCAL POINT FOR ALL CONTACT WITH THE GOVERNMENT. THE PM AND STAFF SHALL SUPPORT THE PI AS REQUIRED INCLUDING THE SCHEDULING AND COORDINATING OF MEETINGS AND REVIEWS, SCHEDULE CONTROL AND REPORTING, FINANCIAL CONTROL AND REPORTING, SUBCONTRACT MANAGEMENT, CONFIGURATION MANAGEMENT AND DOCUMENTATION, PROGRESS REPORTS AND REVIEWS AS WELL AS ALL ANOMALY REPORTING ACTIVITIES. |
| May 13, 2024 | P00025 | $3.5M | GLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION..THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO ACCOMPLISH THE GOLD MISSION AS DESCRIBED IN THE GOLD CONCEPT STUDY REPORT. THE CONTRACTOR SHALL PROVIDE REPORTS, REVIEWS, AND DOCUMENTATION FOR ALL ASPECTS OF THE PROGRAM. THE CONTRACTOR SHALL MANAGE THE ACTIVITIES OF THE SCIENCE TEAM. THE CONTRACTOR SHALL MAINTAIN THE GOLD SCIENCE DATA CENTER (SDC) AT UCF, AND SHALL PERFORM DATA REDUCTION AND ANALYSIS FOR THREE YEARS AFTER THE COMPLETION OF COMMISSIONING THE GOLD INSTRUMENT. THE CONTRACTOR SHALL PRESENT THE SCIENTIFIC RESULTS IN PRESENTATIONS AND PUBLISHED PAPERS, AND PROVIDE RAW DATA AND DATA PRODUCTS FOR ARCHIVING TO AN APPROVED DATA ARCHIVE. THE CONTRACTOR IS RESPONSIBLE FOR ALGORITHM DEVELOPMENT AND SCIENCE PLANNING AND ANALYSIS OF MISSION DATA AND THE PUBLICATION OF RESULTS..THE GOLD PROJECT SHALL FOLLOW THE GUIDELINES OF A MISSION OF OPPORTUNITY AND THE GOLD CONTRACT. THE GOLD PRINCIPAL INVESTIGATOR (PI) SHALL HAVE SOLE RESPONSIBILITY FOR THE SUCCESSFUL COMPLETION OF THIS PROJECT. THE PI SHALL DELEGATE PROJECT MANAGEMENT TASKS TO THE PROJECT MANAGER (PM) AS APPROPRIATE. THE PM SHALL DIRECT THE GOLD PROJECT AND HAVE THE RESPONSIBILITY FOR OVERALL TECHNICAL PERFORMANCE AND RESOURCE MANAGEMENT OF THE CONTRACT AND ALL SUBCONTRACTS. THE PI/PM SHALL BE THE FOCAL POINT FOR ALL CONTACT WITH THE GOVERNMENT. THE PM AND STAFF SHALL SUPPORT THE PI AS REQUIRED INCLUDING THE SCHEDULING AND COORDINATING OF MEETINGS AND REVIEWS, SCHEDULE CONTROL AND REPORTING, FINANCIAL CONTROL AND REPORTING, SUBCONTRACT MANAGEMENT, CONFIGURATION MANAGEMENT AND DOCUMENTATION, PROGRESS REPORTS AND REVIEWS AS WELL AS ALL ANOMALY REPORTING ACTIVITIES. |
| May 1, 2024 | P00024 | $0 | GLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION |
| Mar 7, 2024 | P00023 | $0 | GLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION |
| Nov 16, 2023 | P00022 | $0 | GLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION..THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO ACCOMPLISH THE GOLD MISSION AS DESCRIBED IN THE GOLD CONCEPT STUDY REPORT. THE CONTRACTOR SHALL PROVIDE REPORTS, REVIEWS, AND DOCUMENTATION FOR ALL ASPECTS OF THE PROGRAM. THE CONTRACTOR SHALL MANAGE THE ACTIVITIES OF THE SCIENCE TEAM. THE CONTRACTOR SHALL MAINTAIN THE GOLD SCIENCE DATA CENTER (SDC) AT UCF, AND SHALL PERFORM DATA REDUCTION AND ANALYSIS FOR THREE YEARS AFTER THE COMPLETION OF COMMISSIONING THE GOLD INSTRUMENT. THE CONTRACTOR SHALL PRESENT THE SCIENTIFIC RESULTS IN PRESENTATIONS AND PUBLISHED PAPERS, AND PROVIDE RAW DATA AND DATA PRODUCTS FOR ARCHIVING TO AN APPROVED DATA ARCHIVE. THE CONTRACTOR IS RESPONSIBLE FOR ALGORITHM DEVELOPMENT AND SCIENCE PLANNING AND ANALYSIS OF MISSION DATA AND THE PUBLICATION OF RESULTS..THE GOLD PROJECT SHALL FOLLOW THE GUIDELINES OF A MISSION OF OPPORTUNITY AND THE GOLD CONTRACT. THE GOLD PRINCIPAL INVESTIGATOR (PI) SHALL HAVE SOLE RESPONSIBILITY FOR THE SUCCESSFUL COMPLETION OF THIS PROJECT. THE PI SHALL DELEGATE PROJECT MANAGEMENT TASKS TO THE PROJECT MANAGER (PM) AS APPROPRIATE. THE PM SHALL DIRECT THE GOLD PROJECT AND HAVE THE RESPONSIBILITY FOR OVERALL TECHNICAL PERFORMANCE AND RESOURCE MANAGEMENT OF THE CONTRACT AND ALL SUBCONTRACTS. THE PI/PM SHALL BE THE FOCAL POINT FOR ALL CONTACT WITH THE GOVERNMENT. THE PM AND STAFF SHALL SUPPORT THE PI AS REQUIRED INCLUDING THE SCHEDULING AND COORDINATING OF MEETINGS AND REVIEWS, SCHEDULE CONTROL AND REPORTING, FINANCIAL CONTROL AND REPORTING, SUBCONTRACT MANAGEMENT, CONFIGURATION MANAGEMENT AND DOCUMENTATION, PROGRESS REPORTS AND REVIEWS AS WELL AS ALL ANOMALY REPORTING ACTIVITIES. |
| Jun 22, 2023 | P00021 | $0 | GLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION..THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO ACCOMPLISH THE GOLD MISSION AS DESCRIBED IN THE GOLD CONCEPT STUDY REPORT. THE CONTRACTOR SHALL PROVIDE REPORTS, REVIEWS, AND DOCUMENTATION FOR ALL ASPECTS OF THE PROGRAM. THE CONTRACTOR SHALL MANAGE THE ACTIVITIES OF THE SCIENCE TEAM. THE CONTRACTOR SHALL MAINTAIN THE GOLD SCIENCE DATA CENTER (SDC) AT UCF, AND SHALL PERFORM DATA REDUCTION AND ANALYSIS FOR THREE YEARS AFTER THE COMPLETION OF COMMISSIONING THE GOLD INSTRUMENT. THE CONTRACTOR SHALL PRESENT THE SCIENTIFIC RESULTS IN PRESENTATIONS AND PUBLISHED PAPERS, AND PROVIDE RAW DATA AND DATA PRODUCTS FOR ARCHIVING TO AN APPROVED DATA ARCHIVE. THE CONTRACTOR IS RESPONSIBLE FOR ALGORITHM DEVELOPMENT AND SCIENCE PLANNING AND ANALYSIS OF MISSION DATA AND THE PUBLICATION OF RESULTS..THE GOLD PROJECT SHALL FOLLOW THE GUIDELINES OF A MISSION OF OPPORTUNITY AND THE GOLD CONTRACT. THE GOLD PRINCIPAL INVESTIGATOR (PI) SHALL HAVE SOLE RESPONSIBILITY FOR THE SUCCESSFUL COMPLETION OF THIS PROJECT. THE PI SHALL DELEGATE PROJECT MANAGEMENT TASKS TO THE PROJECT MANAGER (PM) AS APPROPRIATE. THE PM SHALL DIRECT THE GOLD PROJECT AND HAVE THE RESPONSIBILITY FOR OVERALL TECHNICAL PERFORMANCE AND RESOURCE MANAGEMENT OF THE CONTRACT AND ALL SUBCONTRACTS. THE PI/PM SHALL BE THE FOCAL POINT FOR ALL CONTACT WITH THE GOVERNMENT. THE PM AND STAFF SHALL SUPPORT THE PI AS REQUIRED INCLUDING THE SCHEDULING AND COORDINATING OF MEETINGS AND REVIEWS, SCHEDULE CONTROL AND REPORTING, FINANCIAL CONTROL AND REPORTING, SUBCONTRACT MANAGEMENT, CONFIGURATION MANAGEMENT AND DOCUMENTATION, PROGRESS REPORTS AND REVIEWS AS WELL AS ALL ANOMALY REPORTING ACTIVITIES. |
| Jun 5, 2023 | P00020 | $0 | GLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION..THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO ACCOMPLISH THE GOLD MISSION AS DESCRIBED IN THE GOLD CONCEPT STUDY REPORT. THE CONTRACTOR SHALL PROVIDE REPORTS, REVIEWS, AND DOCUMENTATION FOR ALL ASPECTS OF THE PROGRAM. THE CONTRACTOR SHALL MANAGE THE ACTIVITIES OF THE SCIENCE TEAM. THE CONTRACTOR SHALL MAINTAIN THE GOLD SCIENCE DATA CENTER (SDC) AT UCF, AND SHALL PERFORM DATA REDUCTION AND ANALYSIS FOR THREE YEARS AFTER THE COMPLETION OF COMMISSIONING THE GOLD INSTRUMENT. THE CONTRACTOR SHALL PRESENT THE SCIENTIFIC RESULTS IN PRESENTATIONS AND PUBLISHED PAPERS, AND PROVIDE RAW DATA AND DATA PRODUCTS FOR ARCHIVING TO AN APPROVED DATA ARCHIVE. THE CONTRACTOR IS RESPONSIBLE FOR ALGORITHM DEVELOPMENT AND SCIENCE PLANNING AND ANALYSIS OF MISSION DATA AND THE PUBLICATION OF RESULTS..THE GOLD PROJECT SHALL FOLLOW THE GUIDELINES OF A MISSION OF OPPORTUNITY AND THE GOLD CONTRACT. THE GOLD PRINCIPAL INVESTIGATOR (PI) SHALL HAVE SOLE RESPONSIBILITY FOR THE SUCCESSFUL COMPLETION OF THIS PROJECT. THE PI SHALL DELEGATE PROJECT MANAGEMENT TASKS TO THE PROJECT MANAGER (PM) AS APPROPRIATE. THE PM SHALL DIRECT THE GOLD PROJECT AND HAVE THE RESPONSIBILITY FOR OVERALL TECHNICAL PERFORMANCE AND RESOURCE MANAGEMENT OF THE CONTRACT AND ALL SUBCONTRACTS. THE PI/PM SHALL BE THE FOCAL POINT FOR ALL CONTACT WITH THE GOVERNMENT. THE PM AND STAFF SHALL SUPPORT THE PI AS REQUIRED INCLUDING THE SCHEDULING AND COORDINATING OF MEETINGS AND REVIEWS, SCHEDULE CONTROL AND REPORTING, FINANCIAL CONTROL AND REPORTING, SUBCONTRACT MANAGEMENT, CONFIGURATION MANAGEMENT AND DOCUMENTATION, PROGRESS REPORTS AND REVIEWS AS WELL AS ALL ANOMALY REPORTING ACTIVITIES. |
| May 2, 2023 | P00019 | $3.7M | GLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION..THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO ACCOMPLISH THE GOLD MISSION AS DESCRIBED IN THE GOLD CONCEPT STUDY REPORT. THE CONTRACTOR SHALL PROVIDE REPORTS, REVIEWS, AND DOCUMENTATION FOR ALL ASPECTS OF THE PROGRAM. THE CONTRACTOR SHALL MANAGE THE ACTIVITIES OF THE SCIENCE TEAM. THE CONTRACTOR SHALL MAINTAIN THE GOLD SCIENCE DATA CENTER (SDC) AT UCF, AND SHALL PERFORM DATA REDUCTION AND ANALYSIS FOR THREE YEARS AFTER THE COMPLETION OF COMMISSIONING THE GOLD INSTRUMENT. THE CONTRACTOR SHALL PRESENT THE SCIENTIFIC RESULTS IN PRESENTATIONS AND PUBLISHED PAPERS, AND PROVIDE RAW DATA AND DATA PRODUCTS FOR ARCHIVING TO AN APPROVED DATA ARCHIVE. THE CONTRACTOR IS RESPONSIBLE FOR ALGORITHM DEVELOPMENT AND SCIENCE PLANNING AND ANALYSIS OF MISSION DATA AND THE PUBLICATION OF RESULTS..THE GOLD PROJECT SHALL FOLLOW THE GUIDELINES OF A MISSION OF OPPORTUNITY AND THE GOLD CONTRACT. THE GOLD PRINCIPAL INVESTIGATOR (PI) SHALL HAVE SOLE RESPONSIBILITY FOR THE SUCCESSFUL COMPLETION OF THIS PROJECT. THE PI SHALL DELEGATE PROJECT MANAGEMENT TASKS TO THE PROJECT MANAGER (PM) AS APPROPRIATE. THE PM SHALL DIRECT THE GOLD PROJECT AND HAVE THE RESPONSIBILITY FOR OVERALL TECHNICAL PERFORMANCE AND RESOURCE MANAGEMENT OF THE CONTRACT AND ALL SUBCONTRACTS. THE PI/PM SHALL BE THE FOCAL POINT FOR ALL CONTACT WITH THE GOVERNMENT. THE PM AND STAFF SHALL SUPPORT THE PI AS REQUIRED INCLUDING THE SCHEDULING AND COORDINATING OF MEETINGS AND REVIEWS, SCHEDULE CONTROL AND REPORTING, FINANCIAL CONTROL AND REPORTING, SUBCONTRACT MANAGEMENT, CONFIGURATION MANAGEMENT AND DOCUMENTATION, PROGRESS REPORTS AND REVIEWS AS WELL AS ALL ANOMALY REPORTING ACTIVITIES. |
| Aug 29, 2022 | P00018 | $4.0M | GLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION..THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO ACCOMPLISH THE GOLD MISSION AS DESCRIBED IN THE GOLD CONCEPT STUDY REPORT. THE CONTRACTOR SHALL PROVIDE REPORTS, REVIEWS, AND DOCUMENTATION FOR ALL ASPECTS OF THE PROGRAM. THE CONTRACTOR SHALL MANAGE THE ACTIVITIES OF THE SCIENCE TEAM. THE CONTRACTOR SHALL MAINTAIN THE GOLD SCIENCE DATA CENTER (SDC) AT UCF, AND SHALL PERFORM DATA REDUCTION AND ANALYSIS FOR THREE YEARS AFTER THE COMPLETION OF COMMISSIONING THE GOLD INSTRUMENT. THE CONTRACTOR SHALL PRESENT THE SCIENTIFIC RESULTS IN PRESENTATIONS AND PUBLISHED PAPERS, AND PROVIDE RAW DATA AND DATA PRODUCTS FOR ARCHIVING TO AN APPROVED DATA ARCHIVE. THE CONTRACTOR IS RESPONSIBLE FOR ALGORITHM DEVELOPMENT AND SCIENCE PLANNING AND ANALYSIS OF MISSION DATA AND THE PUBLICATION OF RESULTS..THE GOLD PROJECT SHALL FOLLOW THE GUIDELINES OF A MISSION OF OPPORTUNITY AND THE GOLD CONTRACT. THE GOLD PRINCIPAL INVESTIGATOR (PI) SHALL HAVE SOLE RESPONSIBILITY FOR THE SUCCESSFUL COMPLETION OF THIS PROJECT. THE PI SHALL DELEGATE PROJECT MANAGEMENT TASKS TO THE PROJECT MANAGER (PM) AS APPROPRIATE. THE PM SHALL DIRECT THE GOLD PROJECT AND HAVE THE RESPONSIBILITY FOR OVERALL TECHNICAL PERFORMANCE AND RESOURCE MANAGEMENT OF THE CONTRACT AND ALL SUBCONTRACTS. THE PI/PM SHALL BE THE FOCAL POINT FOR ALL CONTACT WITH THE GOVERNMENT. THE PM AND STAFF SHALL SUPPORT THE PI AS REQUIRED INCLUDING THE SCHEDULING AND COORDINATING OF MEETINGS AND REVIEWS, SCHEDULE CONTROL AND REPORTING, FINANCIAL CONTROL AND REPORTING, SUBCONTRACT MANAGEMENT, CONFIGURATION MANAGEMENT AND DOCUMENTATION, PROGRESS REPORTS AND REVIEWS AS WELL AS ALL ANOMALY REPORTING ACTIVITIES. |
| Apr 28, 2022 | P00017 | $1.6M | GLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION. PHASE E 2-YEAR EXTENSION |
| Dec 3, 2021 | P00015 | $377.6K | GLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION..THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO ACCOMPLISH THE GOLD MISSION AS DESCRIBED IN THE GOLD CONCEPT STUDY REPORT. THE CONTRACTOR SHALL PROVIDE REPORTS, REVIEWS, AND DOCUMENTATION FOR ALL ASPECTS OF THE PROGRAM. THE CONTRACTOR SHALL MANAGE THE ACTIVITIES OF THE SCIENCE TEAM. THE CONTRACTOR SHALL MAINTAIN THE GOLD SCIENCE DATA CENTER (SDC) AT UCF, AND SHALL PERFORM DATA REDUCTION AND ANALYSIS FOR THREE YEARS AFTER THE COMPLETION OF COMMISSIONING THE GOLD INSTRUMENT. THE CONTRACTOR SHALL PRESENT THE SCIENTIFIC RESULTS IN PRESENTATIONS AND PUBLISHED PAPERS, AND PROVIDE RAW DATA AND DATA PRODUCTS FOR ARCHIVING TO AN APPROVED DATA ARCHIVE. THE CONTRACTOR IS RESPONSIBLE FOR ALGORITHM DEVELOPMENT AND SCIENCE PLANNING AND ANALYSIS OF MISSION DATA AND THE PUBLICATION OF RESULTS..THE GOLD PROJECT SHALL FOLLOW THE GUIDELINES OF A MISSION OF OPPORTUNITY AND THE GOLD CONTRACT. THE GOLD PRINCIPAL INVESTIGATOR (PI) SHALL HAVE SOLE RESPONSIBILITY FOR THE SUCCESSFUL COMPLETION OF THIS PROJECT. THE PI SHALL DELEGATE PROJECT MANAGEMENT TASKS TO THE PROJECT MANAGER (PM) AS APPROPRIATE. THE PM SHALL DIRECT THE GOLD PROJECT AND HAVE THE RESPONSIBILITY FOR OVERALL TECHNICAL PERFORMANCE AND RESOURCE MANAGEMENT OF THE CONTRACT AND ALL SUBCONTRACTS. THE PI/PM SHALL BE THE FOCAL POINT FOR ALL CONTACT WITH THE GOVERNMENT. THE PM AND STAFF SHALL SUPPORT THE PI AS REQUIRED INCLUDING THE SCHEDULING AND COORDINATING OF MEETINGS AND REVIEWS, SCHEDULE CONTROL AND REPORTING, FINANCIAL CONTROL AND REPORTING, SUBCONTRACT MANAGEMENT, CONFIGURATION MANAGEMENT AND DOCUMENTATION, PROGRESS REPORTS AND REVIEWS AS WELL AS ALL ANOMALY REPORTING ACTIVITIES. |
| Oct 20, 2021 | P00014 | $0 | EO14042 GLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO ACCOMPLISH THE GOLD MISSION AS DESCRIBED IN THE GOLD CONCEPT STUDY REPORT. THE CONTRACTOR SHALL PROVIDE REPORTS, REVIEWS, AND DOCUMENTATION FOR ALL ASPECTS OF THE PROGRAM. THE CONTRACTOR SHALL MANAGE THE ACTIVITIES OF THE SCIENCE TEAM. THE CONTRACTOR SHALL MAINTAIN THE GOLD SCIENCE DATA CENTER (SDC) AT UCF, AND SHALL PERFORM DATA REDUCTION AND ANALYSIS FOR THREE YEARS AFTER THE COMPLETION OF COMMISSIONING THE GOLD INSTRUMENT. THE CONTRACTOR SHALL PRESENT THE SCIENTIFIC RESULTS IN PRESENTATIONS AND PUBLISHED PAPERS, AND PROVIDE RAW DATA AND DATA PRODUCTS FOR ARCHIVING TO AN APPROVED DATA ARCHIVE. THE CONTRACTOR IS RESPONSIBLE FOR ALGORITHM DEVELOPMENT AND SCIENCE PLANNING AND ANALYSIS OF MISSION DATA AND THE PUBLICATION OF RESULTS. THE GOLD PROJECT SHALL FOLLOW THE GUIDELINES OF A MISSION OF OPPORTUNITY AND THE GOLD CONTRACT. THE GOLD PRINCIPAL INVESTIGATOR (PI) SHALL HAVE SOLE RESPONSIBILITY FOR THE SUCCESSFUL COMPLETION OF THIS PROJECT. THE PI SHALL DELEGATE PROJECT MANAGEMENT TASKS TO THE PROJECT MANAGER (PM) AS APPROPRIATE. THE PM SHALL DIRECT THE GOLD PROJECT AND HAVE THE RESPONSIBILITY FOR OVERALL TECHNICAL PERFORMANCE AND RESOURCE MANAGEMENT OF THE CONTRACT AND ALL SUBCONTRACTS. THE PI/PM SHALL BE THE FOCAL POINT FOR ALL CONTACT WITH THE GOVERNMENT. THE PM AND STAFF SHALL SUPPORT THE PI AS REQUIRED INCLUDING THE SCHEDULING AND COORDINATING OF MEETINGS AND REVIEWS, SCHEDULE CONTROL AND REPORTING, FINANCIAL CONTROL AND REPORTING, SUBCONTRACT MANAGEMENT, CONFIGURATION MANAGEMENT AND DOCUMENTATION, PROGRESS REPORTS AND REVIEWS AS WELL AS ALL ANOMALY REPORTING ACTIVITIES. |
| Aug 27, 2021 | P00013 | $2.9M | GLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION..THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO ACCOMPLISH THE GOLD MISSION AS DESCRIBED IN THE GOLD CONCEPT STUDY REPORT. THE CONTRACTOR SHALL PROVIDE REPORTS, REVIEWS, AND DOCUMENTATION FOR ALL ASPECTS OF THE PROGRAM. THE CONTRACTOR SHALL MANAGE THE ACTIVITIES OF THE SCIENCE TEAM. THE CONTRACTOR SHALL MAINTAIN THE GOLD SCIENCE DATA CENTER (SDC) AT UCF, AND SHALL PERFORM DATA REDUCTION AND ANALYSIS FOR THREE YEARS AFTER THE COMPLETION OF COMMISSIONING THE GOLD INSTRUMENT. THE CONTRACTOR SHALL PRESENT THE SCIENTIFIC RESULTS IN PRESENTATIONS AND PUBLISHED PAPERS, AND PROVIDE RAW DATA AND DATA PRODUCTS FOR ARCHIVING TO AN APPROVED DATA ARCHIVE. THE CONTRACTOR IS RESPONSIBLE FOR ALGORITHM DEVELOPMENT AND SCIENCE PLANNING AND ANALYSIS OF MISSION DATA AND THE PUBLICATION OF RESULTS..THE GOLD PROJECT SHALL FOLLOW THE GUIDELINES OF A MISSION OF OPPORTUNITY AND THE GOLD CONTRACT. THE GOLD PRINCIPAL INVESTIGATOR (PI) SHALL HAVE SOLE RESPONSIBILITY FOR THE SUCCESSFUL COMPLETION OF THIS PROJECT. THE PI SHALL DELEGATE PROJECT MANAGEMENT TASKS TO THE PROJECT MANAGER (PM) AS APPROPRIATE. THE PM SHALL DIRECT THE GOLD PROJECT AND HAVE THE RESPONSIBILITY FOR OVERALL TECHNICAL PERFORMANCE AND RESOURCE MANAGEMENT OF THE CONTRACT AND ALL SUBCONTRACTS. THE PI/PM SHALL BE THE FOCAL POINT FOR ALL CONTACT WITH THE GOVERNMENT. THE PM AND STAFF SHALL SUPPORT THE PI AS REQUIRED INCLUDING THE SCHEDULING AND COORDINATING OF MEETINGS AND REVIEWS, SCHEDULE CONTROL AND REPORTING, FINANCIAL CONTROL AND REPORTING, SUBCONTRACT MANAGEMENT, CONFIGURATION MANAGEMENT AND DOCUMENTATION, PROGRESS REPORTS AND REVIEWS AS WELL AS ALL ANOMALY REPORTING ACTIVITIES. |
| Apr 29, 2021 | P00012 | $1.7M | GLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION..THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO ACCOMPLISH THE GOLD MISSION AS DESCRIBED IN THE GOLD CONCEPT STUDY REPORT. THE CONTRACTOR SHALL PROVIDE REPORTS, REVIEWS, AND DOCUMENTATION FOR ALL ASPECTS OF THE PROGRAM. THE CONTRACTOR SHALL MANAGE THE ACTIVITIES OF THE SCIENCE TEAM. THE CONTRACTOR SHALL MAINTAIN THE GOLD SCIENCE DATA CENTER (SDC) AT UCF, AND SHALL PERFORM DATA REDUCTION AND ANALYSIS FOR THREE YEARS AFTER THE COMPLETION OF COMMISSIONING THE GOLD INSTRUMENT. THE CONTRACTOR SHALL PRESENT THE SCIENTIFIC RESULTS IN PRESENTATIONS AND PUBLISHED PAPERS, AND PROVIDE RAW DATA AND DATA PRODUCTS FOR ARCHIVING TO AN APPROVED DATA ARCHIVE. THE CONTRACTOR IS RESPONSIBLE FOR ALGORITHM DEVELOPMENT AND SCIENCE PLANNING AND ANALYSIS OF MISSION DATA AND THE PUBLICATION OF RESULTS..THE GOLD PROJECT SHALL FOLLOW THE GUIDELINES OF A MISSION OF OPPORTUNITY AND THE GOLD CONTRACT. THE GOLD PRINCIPAL INVESTIGATOR (PI) SHALL HAVE SOLE RESPONSIBILITY FOR THE SUCCESSFUL COMPLETION OF THIS PROJECT. THE PI SHALL DELEGATE PROJECT MANAGEMENT TASKS TO THE PROJECT MANAGER (PM) AS APPROPRIATE. THE PM SHALL DIRECT THE GOLD PROJECT AND HAVE THE RESPONSIBILITY FOR OVERALL TECHNICAL PERFORMANCE AND RESOURCE MANAGEMENT OF THE CONTRACT AND ALL SUBCONTRACTS. THE PI/PM SHALL BE THE FOCAL POINT FOR ALL CONTACT WITH THE GOVERNMENT. THE PM AND STAFF SHALL SUPPORT THE PI AS REQUIRED INCLUDING THE SCHEDULING AND COORDINATING OF MEETINGS AND REVIEWS, SCHEDULE CONTROL AND REPORTING, FINANCIAL CONTROL AND REPORTING, SUBCONTRACT MANAGEMENT, CONFIGURATION MANAGEMENT AND DOCUMENTATION, PROGRESS REPORTS AND REVIEWS AS WELL AS ALL ANOMALY REPORTING ACTIVITIES. |
| Jan 29, 2021 | P00011 | $851.6K | GLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION..THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO ACCOMPLISH THE GOLD MISSION AS DESCRIBED IN THE GOLD CONCEPT STUDY REPORT. THE CONTRACTOR SHALL PROVIDE REPORTS, REVIEWS, AND DOCUMENTATION FOR ALL ASPECTS OF THE PROGRAM. THE CONTRACTOR SHALL MANAGE THE ACTIVITIES OF THE SCIENCE TEAM. THE CONTRACTOR SHALL MAINTAIN THE GOLD SCIENCE DATA CENTER (SDC) AT UCF, AND SHALL PERFORM DATA REDUCTION AND ANALYSIS FOR THREE YEARS AFTER THE COMPLETION OF COMMISSIONING THE GOLD INSTRUMENT. THE CONTRACTOR SHALL PRESENT THE SCIENTIFIC RESULTS IN PRESENTATIONS AND PUBLISHED PAPERS, AND PROVIDE RAW DATA AND DATA PRODUCTS FOR ARCHIVING TO AN APPROVED DATA ARCHIVE. THE CONTRACTOR IS RESPONSIBLE FOR ALGORITHM DEVELOPMENT AND SCIENCE PLANNING AND ANALYSIS OF MISSION DATA AND THE PUBLICATION OF RESULTS..THE GOLD PROJECT SHALL FOLLOW THE GUIDELINES OF A MISSION OF OPPORTUNITY AND THE GOLD CONTRACT. THE GOLD PRINCIPAL INVESTIGATOR (PI) SHALL HAVE SOLE RESPONSIBILITY FOR THE SUCCESSFUL COMPLETION OF THIS PROJECT. THE PI SHALL DELEGATE PROJECT MANAGEMENT TASKS TO THE PROJECT MANAGER (PM) AS APPROPRIATE. THE PM SHALL DIRECT THE GOLD PROJECT AND HAVE THE RESPONSIBILITY FOR OVERALL TECHNICAL PERFORMANCE AND RESOURCE MANAGEMENT OF THE CONTRACT AND ALL SUBCONTRACTS. THE PI/PM SHALL BE THE FOCAL POINT FOR ALL CONTACT WITH THE GOVERNMENT. THE PM AND STAFF SHALL SUPPORT THE PI AS REQUIRED INCLUDING THE SCHEDULING AND COORDINATING OF MEETINGS AND REVIEWS, SCHEDULE CONTROL AND REPORTING, FINANCIAL CONTROL AND REPORTING, SUBCONTRACT MANAGEMENT, CONFIGURATION MANAGEMENT AND DOCUMENTATION, PROGRESS REPORTS AND REVIEWS AS WELL AS ALL ANOMALY REPORTING ACTIVITIES. |
| Oct 14, 2020 | P00010 | $0 | GLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION..THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO ACCOMPLISH THE GOLD MISSION AS DESCRIBED IN THE GOLD CONCEPT STUDY REPORT. THE CONTRACTOR SHALL PROVIDE REPORTS, REVIEWS, AND DOCUMENTATION FOR ALL ASPECTS OF THE PROGRAM. THE CONTRACTOR SHALL MANAGE THE ACTIVITIES OF THE SCIENCE TEAM. THE CONTRACTOR SHALL MAINTAIN THE GOLD SCIENCE DATA CENTER (SDC) AT UCF, AND SHALL PERFORM DATA REDUCTION AND ANALYSIS FOR THREE YEARS AFTER THE COMPLETION OF COMMISSIONING THE GOLD INSTRUMENT. THE CONTRACTOR SHALL PRESENT THE SCIENTIFIC RESULTS IN PRESENTATIONS AND PUBLISHED PAPERS, AND PROVIDE RAW DATA AND DATA PRODUCTS FOR ARCHIVING TO AN APPROVED DATA ARCHIVE. THE CONTRACTOR IS RESPONSIBLE FOR ALGORITHM DEVELOPMENT AND SCIENCE PLANNING AND ANALYSIS OF MISSION DATA AND THE PUBLICATION OF RESULTS..THE GOLD PROJECT SHALL FOLLOW THE GUIDELINES OF A MISSION OF OPPORTUNITY AND THE GOLD CONTRACT. THE GOLD PRINCIPAL INVESTIGATOR (PI) SHALL HAVE SOLE RESPONSIBILITY FOR THE SUCCESSFUL COMPLETION OF THIS PROJECT. THE PI SHALL DELEGATE PROJECT MANAGEMENT TASKS TO THE PROJECT MANAGER (PM) AS APPROPRIATE. THE PM SHALL DIRECT THE GOLD PROJECT AND HAVE THE RESPONSIBILITY FOR OVERALL TECHNICAL PERFORMANCE AND RESOURCE MANAGEMENT OF THE CONTRACT AND ALL SUBCONTRACTS. THE PI/PM SHALL BE THE FOCAL POINT FOR ALL CONTACT WITH THE GOVERNMENT. THE PM AND STAFF SHALL SUPPORT THE PI AS REQUIRED INCLUDING THE SCHEDULING AND COORDINATING OF MEETINGS AND REVIEWS, SCHEDULE CONTROL AND REPORTING, FINANCIAL CONTROL AND REPORTING, SUBCONTRACT MANAGEMENT, CONFIGURATION MANAGEMENT AND DOCUMENTATION, PROGRESS REPORTS AND REVIEWS AS WELL AS ALL ANOMALY REPORTING ACTIVITIES. |
| Jul 7, 2020 | P00009 | $2.8M | GLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO ACCOMPLISH THE GOLD MISSION AS DESCRIBED IN THE GOLD CONCEPT STUDY REPORT. THE CONTRACTOR SHALL PROVIDE REPORTS, REVIEWS, AND DOCUMENTATION FOR ALL ASPECTS OF THE PROGRAM. THE CONTRACTOR SHALL MANAGE THE ACTIVITIES OF THE SCIENCE TEAM. THE CONTRACTOR SHALL MAINTAIN THE GOLD SCIENCE DATA CENTER (SDC) AT UCF, AND SHALL PERFORM DATA REDUCTION AND ANALYSIS FOR THREE YEARS AFTER THE COMPLETION OF COMMISSIONING THE GOLD INSTRUMENT. THE CONTRACTOR SHALL PRESENT THE SCIENTIFIC RESULTS IN PRESENTATIONS AND PUBLISHED PAPERS, AND PROVIDE RAW DATA AND DATA PRODUCTS FOR ARCHIVING TO AN APPROVED DATA ARCHIVE. THE CONTRACTOR IS RESPONSIBLE FOR ALGORITHM DEVELOPMENT AND SCIENCE PLANNING AND ANALYSIS OF MISSION DATA AND THE PUBLICATION OF RESULTS. THE GOLD PROJECT SHALL FOLLOW THE GUIDELINES OF A MISSION OF OPPORTUNITY AND THE GOLD CONTRACT. THE GOLD PRINCIPAL INVESTIGATOR (PI) SHALL HAVE SOLE RESPONSIBILITY FOR THE SUCCESSFUL COMPLETION OF THIS PROJECT. THE PI SHALL DELEGATE PROJECT MANAGEMENT TASKS TO THE PROJECT MANAGER (PM) AS APPROPRIATE. THE PM SHALL DIRECT THE GOLD PROJECT AND HAVE THE RESPONSIBILITY FOR OVERALL TECHNICAL PERFORMANCE AND RESOURCE MANAGEMENT OF THE CONTRACT AND ALL SUBCONTRACTS. THE PI/PM SHALL BE THE FOCAL POINT FOR ALL CONTACT WITH THE GOVERNMENT. THE PM AND STAFF SHALL SUPPORT THE PI AS REQUIRED INCLUDING THE SCHEDULING AND COORDINATING OF MEETINGS AND REVIEWS, SCHEDULE CONTROL AND REPORTING, FINANCIAL CONTROL AND REPORTING, SUBCONTRACT MANAGEMENT, CONFIGURATION MANAGEMENT AND DOCUMENTATION, PROGRESS REPORTS AND REVIEWS AS WELL AS ALL ANOMALY REPORTING ACTIVITIES. |
| Mar 10, 2020 | P00008 | $1.5M | GLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO ACCOMPLISH THE GOLD MISSION AS DESCRIBED IN THE GOLD CONCEPT STUDY REPORT. THE CONTRACTOR SHALL PROVIDE REPORTS, REVIEWS, AND DOCUMENTATION FOR ALL ASPECTS OF THE PROGRAM. THE CONTRACTOR SHALL MANAGE THE ACTIVITIES OF THE SCIENCE TEAM. THE CONTRACTOR SHALL MAINTAIN THE GOLD SCIENCE DATA CENTER (SDC) AT UCF, AND SHALL PERFORM DATA REDUCTION AND ANALYSIS FOR THREE YEARS AFTER THE COMPLETION OF COMMISSIONING THE GOLD INSTRUMENT. THE CONTRACTOR SHALL PRESENT THE SCIENTIFIC RESULTS IN PRESENTATIONS AND PUBLISHED PAPERS, AND PROVIDE RAW DATA AND DATA PRODUCTS FOR ARCHIVING TO AN APPROVED DATA ARCHIVE. THE CONTRACTOR IS RESPONSIBLE FOR ALGORITHM DEVELOPMENT AND SCIENCE PLANNING AND ANALYSIS OF MISSION DATA AND THE PUBLICATION OF RESULTS. THE GOLD PROJECT SHALL FOLLOW THE GUIDELINES OF A MISSION OF OPPORTUNITY AND THE GOLD CONTRACT. THE GOLD PRINCIPAL INVESTIGATOR (PI) SHALL HAVE SOLE RESPONSIBILITY FOR THE SUCCESSFUL COMPLETION OF THIS PROJECT. THE PI SHALL DELEGATE PROJECT MANAGEMENT TASKS TO THE PROJECT MANAGER (PM) AS APPROPRIATE. THE PM SHALL DIRECT THE GOLD PROJECT AND HAVE THE RESPONSIBILITY FOR OVERALL TECHNICAL PERFORMANCE AND RESOURCE MANAGEMENT OF THE CONTRACT AND ALL SUBCONTRACTS. THE PI/PM SHALL BE THE FOCAL POINT FOR ALL CONTACT WITH THE GOVERNMENT. THE PM AND STAFF SHALL SUPPORT THE PI AS REQUIRED INCLUDING THE SCHEDULING AND COORDINATING OF MEETINGS AND REVIEWS, SCHEDULE CONTROL AND REPORTING, FINANCIAL CONTROL AND REPORTING, SUBCONTRACT MANAGEMENT, CONFIGURATION MANAGEMENT AND DOCUMENTATION, PROGRESS REPORTS AND REVIEWS AS WELL AS ALL ANOMALY REPORTING ACTIVITIES. |
| Jan 13, 2020 | P00007 | $1.0M | GLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO ACCOMPLISH THE GOLD MISSION AS DESCRIBED IN THE GOLD CONCEPT STUDY REPORT. THE CONTRACTOR SHALL PROVIDE REPORTS, REVIEWS, AND DOCUMENTATION FOR ALL ASPECTS OF THE PROGRAM. THE CONTRACTOR SHALL MANAGE THE ACTIVITIES OF THE SCIENCE TEAM. THE CONTRACTOR SHALL MAINTAIN THE GOLD SCIENCE DATA CENTER (SDC) AT UCF, AND SHALL PERFORM DATA REDUCTION AND ANALYSIS FOR THREE YEARS AFTER THE COMPLETION OF COMMISSIONING THE GOLD INSTRUMENT. THE CONTRACTOR SHALL PRESENT THE SCIENTIFIC RESULTS IN PRESENTATIONS AND PUBLISHED PAPERS, AND PROVIDE RAW DATA AND DATA PRODUCTS FOR ARCHIVING TO AN APPROVED DATA ARCHIVE. THE CONTRACTOR IS RESPONSIBLE FOR ALGORITHM DEVELOPMENT AND SCIENCE PLANNING AND ANALYSIS OF MISSION DATA AND THE PUBLICATION OF RESULTS. THE GOLD PROJECT SHALL FOLLOW THE GUIDELINES OF A MISSION OF OPPORTUNITY AND THE GOLD CONTRACT. THE GOLD PRINCIPAL INVESTIGATOR (PI) SHALL HAVE SOLE RESPONSIBILITY FOR THE SUCCESSFUL COMPLETION OF THIS PROJECT. THE PI SHALL DELEGATE PROJECT MANAGEMENT TASKS TO THE PROJECT MANAGER (PM) AS APPROPRIATE. THE PM SHALL DIRECT THE GOLD PROJECT AND HAVE THE RESPONSIBILITY FOR OVERALL TECHNICAL PERFORMANCE AND RESOURCE MANAGEMENT OF THE CONTRACT AND ALL SUBCONTRACTS. THE PI/PM SHALL BE THE FOCAL POINT FOR ALL CONTACT WITH THE GOVERNMENT. THE PM AND STAFF SHALL SUPPORT THE PI AS REQUIRED INCLUDING THE SCHEDULING AND COORDINATING OF MEETINGS AND REVIEWS, SCHEDULE CONTROL AND REPORTING, FINANCIAL CONTROL AND REPORTING, SUBCONTRACT MANAGEMENT, CONFIGURATION MANAGEMENT AND DOCUMENTATION, PROGRESS REPORTS AND REVIEWS AS WELL AS ALL ANOMALY REPORTING ACTIVITIES. |
| May 20, 2019 | P00006 | $3.4M | GLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO ACCOMPLISH THE GOLD MISSION AS DESCRIBED IN THE GOLD CONCEPT STUDY REPORT. THE CONTRACTOR SHALL PROVIDE REPORTS, REVIEWS, AND DOCUMENTATION FOR ALL ASPECTS OF THE PROGRAM. THE CONTRACTOR SHALL MANAGE THE ACTIVITIES OF THE SCIENCE TEAM. THE CONTRACTOR SHALL MAINTAIN THE GOLD SCIENCE DATA CENTER (SDC) AT UCF, AND SHALL PERFORM DATA REDUCTION AND ANALYSIS FOR THREE YEARS AFTER THE COMPLETION OF COMMISSIONING THE GOLD INSTRUMENT. THE CONTRACTOR SHALL PRESENT THE SCIENTIFIC RESULTS IN PRESENTATIONS AND PUBLISHED PAPERS, AND PROVIDE RAW DATA AND DATA PRODUCTS FOR ARCHIVING TO AN APPROVED DATA ARCHIVE. THE CONTRACTOR IS RESPONSIBLE FOR ALGORITHM DEVELOPMENT AND SCIENCE PLANNING AND ANALYSIS OF MISSION DATA AND THE PUBLICATION OF RESULTS. THE GOLD PROJECT SHALL FOLLOW THE GUIDELINES OF A MISSION OF OPPORTUNITY AND THE GOLD CONTRACT. THE GOLD PRINCIPAL INVESTIGATOR (PI) SHALL HAVE SOLE RESPONSIBILITY FOR THE SUCCESSFUL COMPLETION OF THIS PROJECT. THE PI SHALL DELEGATE PROJECT MANAGEMENT TASKS TO THE PROJECT MANAGER (PM) AS APPROPRIATE. THE PM SHALL DIRECT THE GOLD PROJECT AND HAVE THE RESPONSIBILITY FOR OVERALL TECHNICAL PERFORMANCE AND RESOURCE MANAGEMENT OF THE CONTRACT AND ALL SUBCONTRACTS. THE PI/PM SHALL BE THE FOCAL POINT FOR ALL CONTACT WITH THE GOVERNMENT. THE PM AND STAFF SHALL SUPPORT THE PI AS REQUIRED INCLUDING THE SCHEDULING AND COORDINATING OF MEETINGS AND REVIEWS, SCHEDULE CONTROL AND REPORTING, FINANCIAL CONTROL AND REPORTING, SUBCONTRACT MANAGEMENT, CONFIGURATION MANAGEMENT AND DOCUMENTATION, PROGRESS REPORTS AND REVIEWS AS WELL AS ALL ANOMALY REPORTING ACTIVITIES. |
| Nov 27, 2018 | P00005 | $3.9M | GLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO ACCOMPLISH THE GOLD MISSION AS DESCRIBED IN THE GOLD CONCEPT STUDY REPORT. THE CONTRACTOR SHALL PROVIDE REPORTS, REVIEWS, AND DOCUMENTATION FOR ALL ASPECTS OF THE PROGRAM. THE CONTRACTOR SHALL MANAGE THE ACTIVITIES OF THE SCIENCE TEAM. THE CONTRACTOR SHALL MAINTAIN THE GOLD SCIENCE DATA CENTER (SDC) AT UCF, AND SHALL PERFORM DATA REDUCTION AND ANALYSIS FOR THREE YEARS AFTER THE COMPLETION OF COMMISSIONING THE GOLD INSTRUMENT. THE CONTRACTOR SHALL PRESENT THE SCIENTIFIC RESULTS IN PRESENTATIONS AND PUBLISHED PAPERS, AND PROVIDE RAW DATA AND DATA PRODUCTS FOR ARCHIVING TO AN APPROVED DATA ARCHIVE. THE CONTRACTOR IS RESPONSIBLE FOR ALGORITHM DEVELOPMENT AND SCIENCE PLANNING AND ANALYSIS OF MISSION DATA AND THE PUBLICATION OF RESULTS. THE GOLD PROJECT SHALL FOLLOW THE GUIDELINES OF A MISSION OF OPPORTUNITY AND THE GOLD CONTRACT. THE GOLD PRINCIPAL INVESTIGATOR (PI) SHALL HAVE SOLE RESPONSIBILITY FOR THE SUCCESSFUL COMPLETION OF THIS PROJECT. THE PI SHALL DELEGATE PROJECT MANAGEMENT TASKS TO THE PROJECT MANAGER (PM) AS APPROPRIATE. THE PM SHALL DIRECT THE GOLD PROJECT AND HAVE THE RESPONSIBILITY FOR OVERALL TECHNICAL PERFORMANCE AND RESOURCE MANAGEMENT OF THE CONTRACT AND ALL SUBCONTRACTS. THE PI/PM SHALL BE THE FOCAL POINT FOR ALL CONTACT WITH THE GOVERNMENT. THE PM AND STAFF SHALL SUPPORT THE PI AS REQUIRED INCLUDING THE SCHEDULING AND COORDINATING OF MEETINGS AND REVIEWS, SCHEDULE CONTROL AND REPORTING, FINANCIAL CONTROL AND REPORTING, SUBCONTRACT MANAGEMENT, CONFIGURATION MANAGEMENT AND DOCUMENTATION, PROGRESS REPORTS AND REVIEWS AS WELL AS ALL ANOMALY REPORTING ACTIVITIES. |
| Sep 28, 2018 | P00004 | $250.4K | EO14042 GLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO ACCOMPLISH THE GOLD MISSION AS DESCRIBED IN THE GOLD CONCEPT STUDY REPORT. THE CONTRACTOR SHALL PROVIDE REPORTS, REVIEWS, AND DOCUMENTATION FOR ALL ASPECTS OF THE PROGRAM. THE CONTRACTOR SHALL MANAGE THE ACTIVITIES OF THE SCIENCE TEAM. THE CONTRACTOR SHALL MAINTAIN THE GOLD SCIENCE DATA CENTER (SDC) AT UCF, AND SHALL PERFORM DATA REDUCTION AND ANALYSIS FOR THREE YEARS AFTER THE COMPLETION OF COMMISSIONING THE GOLD INSTRUMENT. THE CONTRACTOR SHALL PRESENT THE SCIENTIFIC RESULTS IN PRESENTATIONS AND PUBLISHED PAPERS, AND PROVIDE RAW DATA AND DATA PRODUCTS FOR ARCHIVING TO AN APPROVED DATA ARCHIVE. THE CONTRACTOR IS RESPONSIBLE FOR ALGORITHM DEVELOPMENT AND SCIENCE PLANNING AND ANALYSIS OF MISSION DATA AND THE PUBLICATION OF RESULTS. THE GOLD PROJECT SHALL FOLLOW THE GUIDELINES OF A MISSION OF OPPORTUNITY AND THE GOLD CONTRACT. THE GOLD PRINCIPAL INVESTIGATOR (PI) SHALL HAVE SOLE RESPONSIBILITY FOR THE SUCCESSFUL COMPLETION OF THIS PROJECT. THE PI SHALL DELEGATE PROJECT MANAGEMENT TASKS TO THE PROJECT MANAGER (PM) AS APPROPRIATE. THE PM SHALL DIRECT THE GOLD PROJECT AND HAVE THE RESPONSIBILITY FOR OVERALL TECHNICAL PERFORMANCE AND RESOURCE MANAGEMENT OF THE CONTRACT AND ALL SUBCONTRACTS. THE PI/PM SHALL BE THE FOCAL POINT FOR ALL CONTACT WITH THE GOVERNMENT. THE PM AND STAFF SHALL SUPPORT THE PI AS REQUIRED INCLUDING THE SCHEDULING AND COORDINATING OF MEETINGS AND REVIEWS, SCHEDULE CONTROL AND REPORTING, FINANCIAL CONTROL AND REPORTING, SUBCONTRACT MANAGEMENT, CONFIGURATION MANAGEMENT AND DOCUMENTATION, PROGRESS REPORTS AND REVIEWS AS WELL AS ALL ANOMALY REPORTING ACTIVITIES. |
| Aug 31, 2018 | P00003 | $1.0M | GLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO ACCOMPLISH THE GOLD MISSION AS DESCRIBED IN THE GOLD CONCEPT STUDY REPORT. THE CONTRACTOR SHALL PROVIDE REPORTS, REVIEWS, AND DOCUMENTATION FOR ALL ASPECTS OF THE PROGRAM. THE CONTRACTOR SHALL MANAGE THE ACTIVITIES OF THE SCIENCE TEAM. THE CONTRACTOR SHALL MAINTAIN THE GOLD SCIENCE DATA CENTER (SDC) AT UCF, AND SHALL PERFORM DATA REDUCTION AND ANALYSIS FOR THREE YEARS AFTER THE COMPLETION OF COMMISSIONING THE GOLD INSTRUMENT. THE CONTRACTOR SHALL PRESENT THE SCIENTIFIC RESULTS IN PRESENTATIONS AND PUBLISHED PAPERS, AND PROVIDE RAW DATA AND DATA PRODUCTS FOR ARCHIVING TO AN APPROVED DATA ARCHIVE. THE CONTRACTOR IS RESPONSIBLE FOR ALGORITHM DEVELOPMENT AND SCIENCE PLANNING AND ANALYSIS OF MISSION DATA AND THE PUBLICATION OF RESULTS. THE GOLD PROJECT SHALL FOLLOW THE GUIDELINES OF A MISSION OF OPPORTUNITY AND THE GOLD CONTRACT. THE GOLD PRINCIPAL INVESTIGATOR (PI) SHALL HAVE SOLE RESPONSIBILITY FOR THE SUCCESSFUL COMPLETION OF THIS PROJECT. THE PI SHALL DELEGATE PROJECT MANAGEMENT TASKS TO THE PROJECT MANAGER (PM) AS APPROPRIATE. THE PM SHALL DIRECT THE GOLD PROJECT AND HAVE THE RESPONSIBILITY FOR OVERALL TECHNICAL PERFORMANCE AND RESOURCE MANAGEMENT OF THE CONTRACT AND ALL SUBCONTRACTS. THE PI/PM SHALL BE THE FOCAL POINT FOR ALL CONTACT WITH THE GOVERNMENT. THE PM AND STAFF SHALL SUPPORT THE PI AS REQUIRED INCLUDING THE SCHEDULING AND COORDINATING OF MEETINGS AND REVIEWS, SCHEDULE CONTROL AND REPORTING, FINANCIAL CONTROL AND REPORTING, SUBCONTRACT MANAGEMENT, CONFIGURATION MANAGEMENT AND DOCUMENTATION, PROGRESS REPORTS AND REVIEWS AS WELL AS ALL ANOMALY REPORTING ACTIVITIES. |
| Jul 23, 2018 | P00002 | $79.3K | GLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO ACCOMPLISH THE GOLD MISSION AS DESCRIBED IN THE GOLD CONCEPT STUDY REPORT. THE CONTRACTOR SHALL PROVIDE REPORTS, REVIEWS, AND DOCUMENTATION FOR ALL ASPECTS OF THE PROGRAM. THE CONTRACTOR SHALL MANAGE THE ACTIVITIES OF THE SCIENCE TEAM. THE CONTRACTOR SHALL MAINTAIN THE GOLD SCIENCE DATA CENTER (SDC) AT UCF, AND SHALL PERFORM DATA REDUCTION AND ANALYSIS FOR THREE YEARS AFTER THE COMPLETION OF COMMISSIONING THE GOLD INSTRUMENT. THE CONTRACTOR SHALL PRESENT THE SCIENTIFIC RESULTS IN PRESENTATIONS AND PUBLISHED PAPERS, AND PROVIDE RAW DATA AND DATA PRODUCTS FOR ARCHIVING TO AN APPROVED DATA ARCHIVE. THE CONTRACTOR IS RESPONSIBLE FOR ALGORITHM DEVELOPMENT AND SCIENCE PLANNING AND ANALYSIS OF MISSION DATA AND THE PUBLICATION OF RESULTS. THE GOLD PROJECT SHALL FOLLOW THE GUIDELINES OF A MISSION OF OPPORTUNITY AND THE GOLD CONTRACT. THE GOLD PRINCIPAL INVESTIGATOR (PI) SHALL HAVE SOLE RESPONSIBILITY FOR THE SUCCESSFUL COMPLETION OF THIS PROJECT. THE PI SHALL DELEGATE PROJECT MANAGEMENT TASKS TO THE PROJECT MANAGER (PM) AS APPROPRIATE. THE PM SHALL DIRECT THE GOLD PROJECT AND HAVE THE RESPONSIBILITY FOR OVERALL TECHNICAL PERFORMANCE AND RESOURCE MANAGEMENT OF THE CONTRACT AND ALL SUBCONTRACTS. THE PI/PM SHALL BE THE FOCAL POINT FOR ALL CONTACT WITH THE GOVERNMENT. THE PM AND STAFF SHALL SUPPORT THE PI AS REQUIRED INCLUDING THE SCHEDULING AND COORDINATING OF MEETINGS AND REVIEWS, SCHEDULE CONTROL AND REPORTING, FINANCIAL CONTROL AND REPORTING, SUBCONTRACT MANAGEMENT, CONFIGURATION MANAGEMENT AND DOCUMENTATION, PROGRESS REPORTS AND REVIEWS AS WELL AS ALL ANOMALY REPORTING ACTIVITIES. |
| Mar 2, 2018 | P00001 | $218.0K | GLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO ACCOMPLISH THE GOLD MISSION AS DESCRIBED IN THE GOLD CONCEPT STUDY REPORT. THE CONTRACTOR SHALL PROVIDE REPORTS, REVIEWS, AND DOCUMENTATION FOR ALL ASPECTS OF THE PROGRAM. THE CONTRACTOR SHALL MANAGE THE ACTIVITIES OF THE SCIENCE TEAM. THE CONTRACTOR SHALL MAINTAIN THE GOLD SCIENCE DATA CENTER (SDC) AT UCF, AND SHALL PERFORM DATA REDUCTION AND ANALYSIS FOR THREE YEARS AFTER THE COMPLETION OF COMMISSIONING THE GOLD INSTRUMENT. THE CONTRACTOR SHALL PRESENT THE SCIENTIFIC RESULTS IN PRESENTATIONS AND PUBLISHED PAPERS, AND PROVIDE RAW DATA AND DATA PRODUCTS FOR ARCHIVING TO AN APPROVED DATA ARCHIVE. THE CONTRACTOR IS RESPONSIBLE FOR ALGORITHM DEVELOPMENT AND SCIENCE PLANNING AND ANALYSIS OF MISSION DATA AND THE PUBLICATION OF RESULTS. THE GOLD PROJECT SHALL FOLLOW THE GUIDELINES OF A MISSION OF OPPORTUNITY AND THE GOLD CONTRACT. THE GOLD PRINCIPAL INVESTIGATOR (PI) SHALL HAVE SOLE RESPONSIBILITY FOR THE SUCCESSFUL COMPLETION OF THIS PROJECT. THE PI SHALL DELEGATE PROJECT MANAGEMENT TASKS TO THE PROJECT MANAGER (PM) AS APPROPRIATE. THE PM SHALL DIRECT THE GOLD PROJECT AND HAVE THE RESPONSIBILITY FOR OVERALL TECHNICAL PERFORMANCE AND RESOURCE MANAGEMENT OF THE CONTRACT AND ALL SUBCONTRACTS. THE PI/PM SHALL BE THE FOCAL POINT FOR ALL CONTACT WITH THE GOVERNMENT. THE PM AND STAFF SHALL SUPPORT THE PI AS REQUIRED INCLUDING THE SCHEDULING AND COORDINATING OF MEETINGS AND REVIEWS, SCHEDULE CONTROL AND REPORTING, FINANCIAL CONTROL AND REPORTING, SUBCONTRACT MANAGEMENT, CONFIGURATION MANAGEMENT AND DOCUMENTATION, PROGRESS REPORTS AND REVIEWS AS WELL AS ALL ANOMALY REPORTING ACTIVITIES. |
| Mar 1, 2018 | 0 | $0 | GLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO ACCOMPLISH THE GOLD MISSION AS DESCRIBED IN THE GOLD CONCEPT STUDY REPORT. THE CONTRACTOR SHALL PROVIDE REPORTS, REVIEWS, AND DOCUMENTATION FOR ALL ASPECTS OF THE PROGRAM. THE CONTRACTOR SHALL MANAGE THE ACTIVITIES OF THE SCIENCE TEAM. THE CONTRACTOR SHALL MAINTAIN THE GOLD SCIENCE DATA CENTER (SDC) AT UCF, AND SHALL PERFORM DATA REDUCTION AND ANALYSIS FOR THREE YEARS AFTER THE COMPLETION OF COMMISSIONING THE GOLD INSTRUMENT. THE CONTRACTOR SHALL PRESENT THE SCIENTIFIC RESULTS IN PRESENTATIONS AND PUBLISHED PAPERS, AND PROVIDE RAW DATA AND DATA PRODUCTS FOR ARCHIVING TO AN APPROVED DATA ARCHIVE. THE CONTRACTOR IS RESPONSIBLE FOR ALGORITHM DEVELOPMENT AND SCIENCE PLANNING AND ANALYSIS OF MISSION DATA AND THE PUBLICATION OF RESULTS. THE GOLD PROJECT SHALL FOLLOW THE GUIDELINES OF A MISSION OF OPPORTUNITY AND THE GOLD CONTRACT. THE GOLD PRINCIPAL INVESTIGATOR (PI) SHALL HAVE SOLE RESPONSIBILITY FOR THE SUCCESSFUL COMPLETION OF THIS PROJECT. THE PI SHALL DELEGATE PROJECT MANAGEMENT TASKS TO THE PROJECT MANAGER (PM) AS APPROPRIATE. THE PM SHALL DIRECT THE GOLD PROJECT AND HAVE THE RESPONSIBILITY FOR OVERALL TECHNICAL PERFORMANCE AND RESOURCE MANAGEMENT OF THE CONTRACT AND ALL SUBCONTRACTS. THE PI/PM SHALL BE THE FOCAL POINT FOR ALL CONTACT WITH THE GOVERNMENT. THE PM AND STAFF SHALL SUPPORT THE PI AS REQUIRED INCLUDING THE SCHEDULING AND COORDINATING OF MEETINGS AND REVIEWS, SCHEDULE CONTROL AND REPORTING, FINANCIAL CONTROL AND REPORTING, SUBCONTRACT MANAGEMENT, CONFIGURATION MANAGEMENT AND DOCUMENTATION, PROGRESS REPORTS AND REVIEWS AS WELL AS ALL ANOMALY REPORTING ACTIVITIES. |
Estimated positioning window
Apr 30, 2028 – Oct 30, 2028
45/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 45/100. Available recorded signals: 40 points.
- Contract end 2029-04-30 (918 days from calculation)
- +15 points
- 1 historical awards in this buyer and category group
- +0 points
- 38 recorded award transactions
- +10 points
- Latest award action: 2026-05-27
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-10-25 10:18:04.631876+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Oct 25, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Verify whether remaining options may extend performance beyond the current end date.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.