Federal contract award

80GSFC18C0061

GLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO ACCOMPLISH THE GOLD MISSION AS DESCRIBED IN THE GOLD CONCEPT STUDY REPORT. THE CONTRACTOR SHALL PROVIDE REPORTS, REVIEWS, AND DOCUMENTATION FOR ALL ASPECTS OF THE PROGRAM. THE CONTRACTOR SHALL MANAGE THE ACTIVITIES OF THE SCIENCE TEAM. THE CONTRACTOR SHALL MAINTAIN THE GOLD SCIENCE DATA CENTER (SDC) AT UCF, AND SHALL PERFORM DATA REDUCTION AND ANALYSIS FOR THREE YEARS AFTER THE COMPLETION OF COMMISSIONING THE GOLD INSTRUMENT. THE CONTRACTOR SHALL PRESENT THE SCIENTIFIC RESULTS IN PRESENTATIONS AND PUBLISHED PAPERS, AND PROVIDE RAW DATA AND DATA PRODUCTS FOR ARCHIVING TO AN APPROVED DATA ARCHIVE. THE CONTRACTOR IS RESPONSIBLE FOR ALGORITHM DEVELOPMENT AND SCIENCE PLANNING AND ANALYSIS OF MISSION DATA AND THE PUBLICATION OF RESULTS. THE GOLD PROJECT SHALL FOLLOW THE GUIDELINES OF A MISSION OF OPPORTUNITY AND THE GOLD CONTRACT. THE GOLD PRINCIPAL INVESTIGATOR (PI) SHALL HAVE SOLE RESPONSIBILITY FOR THE SUCCESSFUL COMPLETION OF THIS PROJECT. THE PI SHALL DELEGATE PROJECT MANAGEMENT TASKS TO THE PROJECT MANAGER (PM) AS APPROPRIATE. THE PM SHALL DIRECT THE GOLD PROJECT AND HAVE THE RESPONSIBILITY FOR OVERALL TECHNICAL PERFORMANCE AND RESOURCE MANAGEMENT OF THE CONTRACT AND ALL SUBCONTRACTS. THE PI/PM SHALL BE THE FOCAL POINT FOR ALL CONTACT WITH THE GOVERNMENT. THE PM AND STAFF SHALL SUPPORT THE PI AS REQUIRED INCLUDING THE SCHEDULING AND COORDINATING OF MEETINGS AND REVIEWS, SCHEDULE CONTROL AND REPORTING, FINANCIAL CONTROL AND REPORTING, SUBCONTRACT MANAGEMENT, CONFIGURATION MANAGEMENT AND DOCUMENTATION, PROGRESS REPORTS AND REVIEWS AS WELL AS ALL ANOMALY REPORTING ACTIVITIES.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyNational Aeronautics and Space Administration
OfficeNASA GODDARD SPACE FLIGHT CENTER
NAICS541720 — Research and Development in the Social Sciences and Humanities
PSCAZ12 — OTHER RESEARCH AND DEVELOPMENT - APPLIED RESEARCH/EXPLORATORY DEVELOPMENT
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeCOST NO FEE
Obligations$39.1M
Current contract value$42.9M
Potential contract value / ceiling$51.5M
Start dateMar 1, 2018
Current end dateApr 30, 2027
Potential end dateApr 30, 2029
Latest award activityMay 27, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 38 of 38 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
May 27, 2026P00038$0GLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION. MAINTAIN SCIENCE OPERATIONS, PROCESS DATA, PRODUCE ALGORITHMS, MODELING AND SIMULATION.
Apr 7, 2026P00037$490.0KGLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION. MAINTAIN SCIENCE OPERATIONS, PROCESS DATA, PRODUCE ALGORITHMS, MODELING AND SIMULATION.
Mar 26, 2026P00036$2.4MGLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION. MAINTAIN SCIENCE OPERATIONS, PROCESS DATA, PRODUCE ALGORITHMS, MODELING AND SIMULATION.
Sep 15, 2025P00035$1.4MGLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION. MAINTAIN SCIENCE OPERATIONS, PROCESS DATA, PRODUCE ALGORITHMS, MODELING AND SIMULATION.
Jul 29, 2025P00034$330.0KGLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION..THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO ACCOMPLISH THE GOLD MISSION AS DESCRIBED IN THE GOLD CONCEPT STUDY REPORT. THE CONTRACTOR SHALL PROVIDE REPORTS, REVIEWS, AND DOCUMENTATION FOR ALL ASPECTS OF THE PROGRAM. THE CONTRACTOR SHALL MANAGE THE ACTIVITIES OF THE SCIENCE TEAM. THE CONTRACTOR SHALL MAINTAIN THE GOLD SCIENCE DATA CENTER (SDC) AT UCF, AND SHALL PERFORM DATA REDUCTION AND ANALYSIS FOR THREE YEARS AFTER THE COMPLETION OF COMMISSIONING THE GOLD INSTRUMENT. THE CONTRACTOR SHALL PRESENT THE SCIENTIFIC RESULTS IN PRESENTATIONS AND PUBLISHED PAPERS, AND PROVIDE RAW DATA AND DATA PRODUCTS FOR ARCHIVING TO AN APPROVED DATA ARCHIVE. THE CONTRACTOR IS RESPONSIBLE FOR ALGORITHM DEVELOPMENT AND SCIENCE PLANNING AND ANALYSIS OF MISSION DATA AND THE PUBLICATION OF RESULTS..THE GOLD PROJECT SHALL FOLLOW THE GUIDELINES OF A MISSION OF OPPORTUNITY AND THE GOLD CONTRACT. THE GOLD PRINCIPAL INVESTIGATOR (PI) SHALL HAVE SOLE RESPONSIBILITY FOR THE SUCCESSFUL COMPLETION OF THIS PROJECT. THE PI SHALL DELEGATE PROJECT MANAGEMENT TASKS TO THE PROJECT MANAGER (PM) AS APPROPRIATE. THE PM SHALL DIRECT THE GOLD PROJECT AND HAVE THE RESPONSIBILITY FOR OVERALL TECHNICAL PERFORMANCE AND RESOURCE MANAGEMENT OF THE CONTRACT AND ALL SUBCONTRACTS. THE PI/PM SHALL BE THE FOCAL POINT FOR ALL CONTACT WITH THE GOVERNMENT. THE PM AND STAFF SHALL SUPPORT THE PI AS REQUIRED INCLUDING THE SCHEDULING AND COORDINATING OF MEETINGS AND REVIEWS, SCHEDULE CONTROL AND REPORTING, FINANCIAL CONTROL AND REPORTING, SUBCONTRACT MANAGEMENT, CONFIGURATION MANAGEMENT AND DOCUMENTATION, PROGRESS REPORTS AND REVIEWS AS WELL AS ALL ANOMALY REPORTING ACTIVITIES.
Jul 10, 2025P00033$12.4KGLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION..THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO ACCOMPLISH THE GOLD MISSION AS DESCRIBED IN THE GOLD CONCEPT STUDY REPORT. THE CONTRACTOR SHALL PROVIDE REPORTS, REVIEWS, AND DOCUMENTATION FOR ALL ASPECTS OF THE PROGRAM. THE CONTRACTOR SHALL MANAGE THE ACTIVITIES OF THE SCIENCE TEAM. THE CONTRACTOR SHALL MAINTAIN THE GOLD SCIENCE DATA CENTER (SDC) AT UCF, AND SHALL PERFORM DATA REDUCTION AND ANALYSIS FOR THREE YEARS AFTER THE COMPLETION OF COMMISSIONING THE GOLD INSTRUMENT. THE CONTRACTOR SHALL PRESENT THE SCIENTIFIC RESULTS IN PRESENTATIONS AND PUBLISHED PAPERS, AND PROVIDE RAW DATA AND DATA PRODUCTS FOR ARCHIVING TO AN APPROVED DATA ARCHIVE. THE CONTRACTOR IS RESPONSIBLE FOR ALGORITHM DEVELOPMENT AND SCIENCE PLANNING AND ANALYSIS OF MISSION DATA AND THE PUBLICATION OF RESULTS..THE GOLD PROJECT SHALL FOLLOW THE GUIDELINES OF A MISSION OF OPPORTUNITY AND THE GOLD CONTRACT. THE GOLD PRINCIPAL INVESTIGATOR (PI) SHALL HAVE SOLE RESPONSIBILITY FOR THE SUCCESSFUL COMPLETION OF THIS PROJECT. THE PI SHALL DELEGATE PROJECT MANAGEMENT TASKS TO THE PROJECT MANAGER (PM) AS APPROPRIATE. THE PM SHALL DIRECT THE GOLD PROJECT AND HAVE THE RESPONSIBILITY FOR OVERALL TECHNICAL PERFORMANCE AND RESOURCE MANAGEMENT OF THE CONTRACT AND ALL SUBCONTRACTS. THE PI/PM SHALL BE THE FOCAL POINT FOR ALL CONTACT WITH THE GOVERNMENT. THE PM AND STAFF SHALL SUPPORT THE PI AS REQUIRED INCLUDING THE SCHEDULING AND COORDINATING OF MEETINGS AND REVIEWS, SCHEDULE CONTROL AND REPORTING, FINANCIAL CONTROL AND REPORTING, SUBCONTRACT MANAGEMENT, CONFIGURATION MANAGEMENT AND DOCUMENTATION, PROGRESS REPORTS AND REVIEWS AS WELL AS ALL ANOMALY REPORTING ACTIVITIES.
Jun 9, 2025P00032$400.0KGLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION..THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO ACCOMPLISH THE GOLD MISSION AS DESCRIBED IN THE GOLD CONCEPT STUDY REPORT. THE CONTRACTOR SHALL PROVIDE REPORTS, REVIEWS, AND DOCUMENTATION FOR ALL ASPECTS OF THE PROGRAM. THE CONTRACTOR SHALL MANAGE THE ACTIVITIES OF THE SCIENCE TEAM. THE CONTRACTOR SHALL MAINTAIN THE GOLD SCIENCE DATA CENTER (SDC) AT UCF, AND SHALL PERFORM DATA REDUCTION AND ANALYSIS FOR THREE YEARS AFTER THE COMPLETION OF COMMISSIONING THE GOLD INSTRUMENT. THE CONTRACTOR SHALL PRESENT THE SCIENTIFIC RESULTS IN PRESENTATIONS AND PUBLISHED PAPERS, AND PROVIDE RAW DATA AND DATA PRODUCTS FOR ARCHIVING TO AN APPROVED DATA ARCHIVE. THE CONTRACTOR IS RESPONSIBLE FOR ALGORITHM DEVELOPMENT AND SCIENCE PLANNING AND ANALYSIS OF MISSION DATA AND THE PUBLICATION OF RESULTS..THE GOLD PROJECT SHALL FOLLOW THE GUIDELINES OF A MISSION OF OPPORTUNITY AND THE GOLD CONTRACT. THE GOLD PRINCIPAL INVESTIGATOR (PI) SHALL HAVE SOLE RESPONSIBILITY FOR THE SUCCESSFUL COMPLETION OF THIS PROJECT. THE PI SHALL DELEGATE PROJECT MANAGEMENT TASKS TO THE PROJECT MANAGER (PM) AS APPROPRIATE. THE PM SHALL DIRECT THE GOLD PROJECT AND HAVE THE RESPONSIBILITY FOR OVERALL TECHNICAL PERFORMANCE AND RESOURCE MANAGEMENT OF THE CONTRACT AND ALL SUBCONTRACTS. THE PI/PM SHALL BE THE FOCAL POINT FOR ALL CONTACT WITH THE GOVERNMENT. THE PM AND STAFF SHALL SUPPORT THE PI AS REQUIRED INCLUDING THE SCHEDULING AND COORDINATING OF MEETINGS AND REVIEWS, SCHEDULE CONTROL AND REPORTING, FINANCIAL CONTROL AND REPORTING, SUBCONTRACT MANAGEMENT, CONFIGURATION MANAGEMENT AND DOCUMENTATION, PROGRESS REPORTS AND REVIEWS AS WELL AS ALL ANOMALY REPORTING ACTIVITIES.
Apr 30, 2025P00031$0REMOVAL/UPDATED CLAUSES IAW E.O. 14148, 14057, 14173 AND 14168. GLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION..THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO ACCOMPLISH THE GOLD MISSION AS DESCRIBED IN THE GOLD CONCEPT STUDY REPORT. THE CONTRACTOR SHALL PROVIDE REPORTS, REVIEWS, AND DOCUMENTATION FOR ALL ASPECTS OF THE PROGRAM. THE CONTRACTOR SHALL MANAGE THE ACTIVITIES OF THE SCIENCE TEAM. THE CONTRACTOR SHALL MAINTAIN THE GOLD SCIENCE DATA CENTER (SDC) AT UCF, AND SHALL PERFORM DATA REDUCTION AND ANALYSIS FOR THREE YEARS AFTER THE COMPLETION OF COMMISSIONING THE GOLD INSTRUMENT. THE CONTRACTOR SHALL PRESENT THE SCIENTIFIC RESULTS IN PRESENTATIONS AND PUBLISHED PAPERS, AND PROVIDE RAW DATA AND DATA PRODUCTS FOR ARCHIVING TO AN APPROVED DATA ARCHIVE. THE CONTRACTOR IS RESPONSIBLE FOR ALGORITHM DEVELOPMENT AND SCIENCE PLANNING AND ANALYSIS OF MISSION DATA AND THE PUBLICATION OF RESULTS..THE GOLD PROJECT SHALL FOLLOW THE GUIDELINES OF A MISSION OF OPPORTUNITY AND THE GOLD CONTRACT. THE GOLD PRINCIPAL INVESTIGATOR (PI) SHALL HAVE SOLE RESPONSIBILITY FOR THE SUCCESSFUL COMPLETION OF THIS PROJECT. THE PI SHALL DELEGATE PROJECT MANAGEMENT TASKS TO THE PROJECT MANAGER (PM) AS APPROPRIATE. THE PM SHALL DIRECT THE GOLD PROJECT AND HAVE THE RESPONSIBILITY FOR OVERALL TECHNICAL PERFORMANCE AND RESOURCE MANAGEMENT OF THE CONTRACT AND ALL SUBCONTRACTS. THE PI/PM SHALL BE THE FOCAL POINT FOR ALL CONTACT WITH THE GOVERNMENT. THE PM AND STAFF SHALL SUPPORT THE PI AS REQUIRED INCLUDING THE SCHEDULING AND COORDINATING OF MEETINGS AND REVIEWS, SCHEDULE CONTROL AND REPORTING, FINANCIAL CONTROL AND REPORTING, SUBCONTRACT MANAGEMENT, CONFIGURATION MANAGEMENT AND DOCUMENTATION, PROGRESS REPORTS AND REVIEWS AS WELL AS ALL ANOMALY REPORTING ACTIVITIES.
Mar 12, 2025P00030$350.0KGLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION..THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO ACCOMPLISH THE GOLD MISSION AS DESCRIBED IN THE GOLD CONCEPT STUDY REPORT. THE CONTRACTOR SHALL PROVIDE REPORTS, REVIEWS, AND DOCUMENTATION FOR ALL ASPECTS OF THE PROGRAM. THE CONTRACTOR SHALL MANAGE THE ACTIVITIES OF THE SCIENCE TEAM. THE CONTRACTOR SHALL MAINTAIN THE GOLD SCIENCE DATA CENTER (SDC) AT UCF, AND SHALL PERFORM DATA REDUCTION AND ANALYSIS FOR THREE YEARS AFTER THE COMPLETION OF COMMISSIONING THE GOLD INSTRUMENT. THE CONTRACTOR SHALL PRESENT THE SCIENTIFIC RESULTS IN PRESENTATIONS AND PUBLISHED PAPERS, AND PROVIDE RAW DATA AND DATA PRODUCTS FOR ARCHIVING TO AN APPROVED DATA ARCHIVE. THE CONTRACTOR IS RESPONSIBLE FOR ALGORITHM DEVELOPMENT AND SCIENCE PLANNING AND ANALYSIS OF MISSION DATA AND THE PUBLICATION OF RESULTS..THE GOLD PROJECT SHALL FOLLOW THE GUIDELINES OF A MISSION OF OPPORTUNITY AND THE GOLD CONTRACT. THE GOLD PRINCIPAL INVESTIGATOR (PI) SHALL HAVE SOLE RESPONSIBILITY FOR THE SUCCESSFUL COMPLETION OF THIS PROJECT. THE PI SHALL DELEGATE PROJECT MANAGEMENT TASKS TO THE PROJECT MANAGER (PM) AS APPROPRIATE. THE PM SHALL DIRECT THE GOLD PROJECT AND HAVE THE RESPONSIBILITY FOR OVERALL TECHNICAL PERFORMANCE AND RESOURCE MANAGEMENT OF THE CONTRACT AND ALL SUBCONTRACTS. THE PI/PM SHALL BE THE FOCAL POINT FOR ALL CONTACT WITH THE GOVERNMENT. THE PM AND STAFF SHALL SUPPORT THE PI AS REQUIRED INCLUDING THE SCHEDULING AND COORDINATING OF MEETINGS AND REVIEWS, SCHEDULE CONTROL AND REPORTING, FINANCIAL CONTROL AND REPORTING, SUBCONTRACT MANAGEMENT, CONFIGURATION MANAGEMENT AND DOCUMENTATION, PROGRESS REPORTS AND REVIEWS AS WELL AS ALL ANOMALY REPORTING ACTIVITIES.
Mar 10, 2025P00029$750.0KGLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION..THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO ACCOMPLISH THE GOLD MISSION AS DESCRIBED IN THE GOLD CONCEPT STUDY REPORT. THE CONTRACTOR SHALL PROVIDE REPORTS, REVIEWS, AND DOCUMENTATION FOR ALL ASPECTS OF THE PROGRAM. THE CONTRACTOR SHALL MANAGE THE ACTIVITIES OF THE SCIENCE TEAM. THE CONTRACTOR SHALL MAINTAIN THE GOLD SCIENCE DATA CENTER (SDC) AT UCF, AND SHALL PERFORM DATA REDUCTION AND ANALYSIS FOR THREE YEARS AFTER THE COMPLETION OF COMMISSIONING THE GOLD INSTRUMENT. THE CONTRACTOR SHALL PRESENT THE SCIENTIFIC RESULTS IN PRESENTATIONS AND PUBLISHED PAPERS, AND PROVIDE RAW DATA AND DATA PRODUCTS FOR ARCHIVING TO AN APPROVED DATA ARCHIVE. THE CONTRACTOR IS RESPONSIBLE FOR ALGORITHM DEVELOPMENT AND SCIENCE PLANNING AND ANALYSIS OF MISSION DATA AND THE PUBLICATION OF RESULTS..THE GOLD PROJECT SHALL FOLLOW THE GUIDELINES OF A MISSION OF OPPORTUNITY AND THE GOLD CONTRACT. THE GOLD PRINCIPAL INVESTIGATOR (PI) SHALL HAVE SOLE RESPONSIBILITY FOR THE SUCCESSFUL COMPLETION OF THIS PROJECT. THE PI SHALL DELEGATE PROJECT MANAGEMENT TASKS TO THE PROJECT MANAGER (PM) AS APPROPRIATE. THE PM SHALL DIRECT THE GOLD PROJECT AND HAVE THE RESPONSIBILITY FOR OVERALL TECHNICAL PERFORMANCE AND RESOURCE MANAGEMENT OF THE CONTRACT AND ALL SUBCONTRACTS. THE PI/PM SHALL BE THE FOCAL POINT FOR ALL CONTACT WITH THE GOVERNMENT. THE PM AND STAFF SHALL SUPPORT THE PI AS REQUIRED INCLUDING THE SCHEDULING AND COORDINATING OF MEETINGS AND REVIEWS, SCHEDULE CONTROL AND REPORTING, FINANCIAL CONTROL AND REPORTING, SUBCONTRACT MANAGEMENT, CONFIGURATION MANAGEMENT AND DOCUMENTATION, PROGRESS REPORTS AND REVIEWS AS WELL AS ALL ANOMALY REPORTING ACTIVITIES.
Jan 23, 2025P00028$0REMOVAL OF CLAUSES/DRDS IAW EO 14035 - GLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) FOR SMD DIRECTORATE
Dec 17, 2024P00027$0GLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION..THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO ACCOMPLISH THE GOLD MISSION AS DESCRIBED IN THE GOLD CONCEPT STUDY REPORT. THE CONTRACTOR SHALL PROVIDE REPORTS, REVIEWS, AND DOCUMENTATION FOR ALL ASPECTS OF THE PROGRAM. THE CONTRACTOR SHALL MANAGE THE ACTIVITIES OF THE SCIENCE TEAM. THE CONTRACTOR SHALL MAINTAIN THE GOLD SCIENCE DATA CENTER (SDC) AT UCF, AND SHALL PERFORM DATA REDUCTION AND ANALYSIS FOR THREE YEARS AFTER THE COMPLETION OF COMMISSIONING THE GOLD INSTRUMENT. THE CONTRACTOR SHALL PRESENT THE SCIENTIFIC RESULTS IN PRESENTATIONS AND PUBLISHED PAPERS, AND PROVIDE RAW DATA AND DATA PRODUCTS FOR ARCHIVING TO AN APPROVED DATA ARCHIVE. THE CONTRACTOR IS RESPONSIBLE FOR ALGORITHM DEVELOPMENT AND SCIENCE PLANNING AND ANALYSIS OF MISSION DATA AND THE PUBLICATION OF RESULTS..THE GOLD PROJECT SHALL FOLLOW THE GUIDELINES OF A MISSION OF OPPORTUNITY AND THE GOLD CONTRACT. THE GOLD PRINCIPAL INVESTIGATOR (PI) SHALL HAVE SOLE RESPONSIBILITY FOR THE SUCCESSFUL COMPLETION OF THIS PROJECT. THE PI SHALL DELEGATE PROJECT MANAGEMENT TASKS TO THE PROJECT MANAGER (PM) AS APPROPRIATE. THE PM SHALL DIRECT THE GOLD PROJECT AND HAVE THE RESPONSIBILITY FOR OVERALL TECHNICAL PERFORMANCE AND RESOURCE MANAGEMENT OF THE CONTRACT AND ALL SUBCONTRACTS. THE PI/PM SHALL BE THE FOCAL POINT FOR ALL CONTACT WITH THE GOVERNMENT. THE PM AND STAFF SHALL SUPPORT THE PI AS REQUIRED INCLUDING THE SCHEDULING AND COORDINATING OF MEETINGS AND REVIEWS, SCHEDULE CONTROL AND REPORTING, FINANCIAL CONTROL AND REPORTING, SUBCONTRACT MANAGEMENT, CONFIGURATION MANAGEMENT AND DOCUMENTATION, PROGRESS REPORTS AND REVIEWS AS WELL AS ALL ANOMALY REPORTING ACTIVITIES.
Jun 27, 2024P00026$0GLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION..THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO ACCOMPLISH THE GOLD MISSION AS DESCRIBED IN THE GOLD CONCEPT STUDY REPORT. THE CONTRACTOR SHALL PROVIDE REPORTS, REVIEWS, AND DOCUMENTATION FOR ALL ASPECTS OF THE PROGRAM. THE CONTRACTOR SHALL MANAGE THE ACTIVITIES OF THE SCIENCE TEAM. THE CONTRACTOR SHALL MAINTAIN THE GOLD SCIENCE DATA CENTER (SDC) AT UCF, AND SHALL PERFORM DATA REDUCTION AND ANALYSIS FOR THREE YEARS AFTER THE COMPLETION OF COMMISSIONING THE GOLD INSTRUMENT. THE CONTRACTOR SHALL PRESENT THE SCIENTIFIC RESULTS IN PRESENTATIONS AND PUBLISHED PAPERS, AND PROVIDE RAW DATA AND DATA PRODUCTS FOR ARCHIVING TO AN APPROVED DATA ARCHIVE. THE CONTRACTOR IS RESPONSIBLE FOR ALGORITHM DEVELOPMENT AND SCIENCE PLANNING AND ANALYSIS OF MISSION DATA AND THE PUBLICATION OF RESULTS..THE GOLD PROJECT SHALL FOLLOW THE GUIDELINES OF A MISSION OF OPPORTUNITY AND THE GOLD CONTRACT. THE GOLD PRINCIPAL INVESTIGATOR (PI) SHALL HAVE SOLE RESPONSIBILITY FOR THE SUCCESSFUL COMPLETION OF THIS PROJECT. THE PI SHALL DELEGATE PROJECT MANAGEMENT TASKS TO THE PROJECT MANAGER (PM) AS APPROPRIATE. THE PM SHALL DIRECT THE GOLD PROJECT AND HAVE THE RESPONSIBILITY FOR OVERALL TECHNICAL PERFORMANCE AND RESOURCE MANAGEMENT OF THE CONTRACT AND ALL SUBCONTRACTS. THE PI/PM SHALL BE THE FOCAL POINT FOR ALL CONTACT WITH THE GOVERNMENT. THE PM AND STAFF SHALL SUPPORT THE PI AS REQUIRED INCLUDING THE SCHEDULING AND COORDINATING OF MEETINGS AND REVIEWS, SCHEDULE CONTROL AND REPORTING, FINANCIAL CONTROL AND REPORTING, SUBCONTRACT MANAGEMENT, CONFIGURATION MANAGEMENT AND DOCUMENTATION, PROGRESS REPORTS AND REVIEWS AS WELL AS ALL ANOMALY REPORTING ACTIVITIES.
May 13, 2024P00025$3.5MGLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION..THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO ACCOMPLISH THE GOLD MISSION AS DESCRIBED IN THE GOLD CONCEPT STUDY REPORT. THE CONTRACTOR SHALL PROVIDE REPORTS, REVIEWS, AND DOCUMENTATION FOR ALL ASPECTS OF THE PROGRAM. THE CONTRACTOR SHALL MANAGE THE ACTIVITIES OF THE SCIENCE TEAM. THE CONTRACTOR SHALL MAINTAIN THE GOLD SCIENCE DATA CENTER (SDC) AT UCF, AND SHALL PERFORM DATA REDUCTION AND ANALYSIS FOR THREE YEARS AFTER THE COMPLETION OF COMMISSIONING THE GOLD INSTRUMENT. THE CONTRACTOR SHALL PRESENT THE SCIENTIFIC RESULTS IN PRESENTATIONS AND PUBLISHED PAPERS, AND PROVIDE RAW DATA AND DATA PRODUCTS FOR ARCHIVING TO AN APPROVED DATA ARCHIVE. THE CONTRACTOR IS RESPONSIBLE FOR ALGORITHM DEVELOPMENT AND SCIENCE PLANNING AND ANALYSIS OF MISSION DATA AND THE PUBLICATION OF RESULTS..THE GOLD PROJECT SHALL FOLLOW THE GUIDELINES OF A MISSION OF OPPORTUNITY AND THE GOLD CONTRACT. THE GOLD PRINCIPAL INVESTIGATOR (PI) SHALL HAVE SOLE RESPONSIBILITY FOR THE SUCCESSFUL COMPLETION OF THIS PROJECT. THE PI SHALL DELEGATE PROJECT MANAGEMENT TASKS TO THE PROJECT MANAGER (PM) AS APPROPRIATE. THE PM SHALL DIRECT THE GOLD PROJECT AND HAVE THE RESPONSIBILITY FOR OVERALL TECHNICAL PERFORMANCE AND RESOURCE MANAGEMENT OF THE CONTRACT AND ALL SUBCONTRACTS. THE PI/PM SHALL BE THE FOCAL POINT FOR ALL CONTACT WITH THE GOVERNMENT. THE PM AND STAFF SHALL SUPPORT THE PI AS REQUIRED INCLUDING THE SCHEDULING AND COORDINATING OF MEETINGS AND REVIEWS, SCHEDULE CONTROL AND REPORTING, FINANCIAL CONTROL AND REPORTING, SUBCONTRACT MANAGEMENT, CONFIGURATION MANAGEMENT AND DOCUMENTATION, PROGRESS REPORTS AND REVIEWS AS WELL AS ALL ANOMALY REPORTING ACTIVITIES.
May 1, 2024P00024$0GLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION
Mar 7, 2024P00023$0GLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION
Nov 16, 2023P00022$0GLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION..THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO ACCOMPLISH THE GOLD MISSION AS DESCRIBED IN THE GOLD CONCEPT STUDY REPORT. THE CONTRACTOR SHALL PROVIDE REPORTS, REVIEWS, AND DOCUMENTATION FOR ALL ASPECTS OF THE PROGRAM. THE CONTRACTOR SHALL MANAGE THE ACTIVITIES OF THE SCIENCE TEAM. THE CONTRACTOR SHALL MAINTAIN THE GOLD SCIENCE DATA CENTER (SDC) AT UCF, AND SHALL PERFORM DATA REDUCTION AND ANALYSIS FOR THREE YEARS AFTER THE COMPLETION OF COMMISSIONING THE GOLD INSTRUMENT. THE CONTRACTOR SHALL PRESENT THE SCIENTIFIC RESULTS IN PRESENTATIONS AND PUBLISHED PAPERS, AND PROVIDE RAW DATA AND DATA PRODUCTS FOR ARCHIVING TO AN APPROVED DATA ARCHIVE. THE CONTRACTOR IS RESPONSIBLE FOR ALGORITHM DEVELOPMENT AND SCIENCE PLANNING AND ANALYSIS OF MISSION DATA AND THE PUBLICATION OF RESULTS..THE GOLD PROJECT SHALL FOLLOW THE GUIDELINES OF A MISSION OF OPPORTUNITY AND THE GOLD CONTRACT. THE GOLD PRINCIPAL INVESTIGATOR (PI) SHALL HAVE SOLE RESPONSIBILITY FOR THE SUCCESSFUL COMPLETION OF THIS PROJECT. THE PI SHALL DELEGATE PROJECT MANAGEMENT TASKS TO THE PROJECT MANAGER (PM) AS APPROPRIATE. THE PM SHALL DIRECT THE GOLD PROJECT AND HAVE THE RESPONSIBILITY FOR OVERALL TECHNICAL PERFORMANCE AND RESOURCE MANAGEMENT OF THE CONTRACT AND ALL SUBCONTRACTS. THE PI/PM SHALL BE THE FOCAL POINT FOR ALL CONTACT WITH THE GOVERNMENT. THE PM AND STAFF SHALL SUPPORT THE PI AS REQUIRED INCLUDING THE SCHEDULING AND COORDINATING OF MEETINGS AND REVIEWS, SCHEDULE CONTROL AND REPORTING, FINANCIAL CONTROL AND REPORTING, SUBCONTRACT MANAGEMENT, CONFIGURATION MANAGEMENT AND DOCUMENTATION, PROGRESS REPORTS AND REVIEWS AS WELL AS ALL ANOMALY REPORTING ACTIVITIES.
Jun 22, 2023P00021$0GLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION..THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO ACCOMPLISH THE GOLD MISSION AS DESCRIBED IN THE GOLD CONCEPT STUDY REPORT. THE CONTRACTOR SHALL PROVIDE REPORTS, REVIEWS, AND DOCUMENTATION FOR ALL ASPECTS OF THE PROGRAM. THE CONTRACTOR SHALL MANAGE THE ACTIVITIES OF THE SCIENCE TEAM. THE CONTRACTOR SHALL MAINTAIN THE GOLD SCIENCE DATA CENTER (SDC) AT UCF, AND SHALL PERFORM DATA REDUCTION AND ANALYSIS FOR THREE YEARS AFTER THE COMPLETION OF COMMISSIONING THE GOLD INSTRUMENT. THE CONTRACTOR SHALL PRESENT THE SCIENTIFIC RESULTS IN PRESENTATIONS AND PUBLISHED PAPERS, AND PROVIDE RAW DATA AND DATA PRODUCTS FOR ARCHIVING TO AN APPROVED DATA ARCHIVE. THE CONTRACTOR IS RESPONSIBLE FOR ALGORITHM DEVELOPMENT AND SCIENCE PLANNING AND ANALYSIS OF MISSION DATA AND THE PUBLICATION OF RESULTS..THE GOLD PROJECT SHALL FOLLOW THE GUIDELINES OF A MISSION OF OPPORTUNITY AND THE GOLD CONTRACT. THE GOLD PRINCIPAL INVESTIGATOR (PI) SHALL HAVE SOLE RESPONSIBILITY FOR THE SUCCESSFUL COMPLETION OF THIS PROJECT. THE PI SHALL DELEGATE PROJECT MANAGEMENT TASKS TO THE PROJECT MANAGER (PM) AS APPROPRIATE. THE PM SHALL DIRECT THE GOLD PROJECT AND HAVE THE RESPONSIBILITY FOR OVERALL TECHNICAL PERFORMANCE AND RESOURCE MANAGEMENT OF THE CONTRACT AND ALL SUBCONTRACTS. THE PI/PM SHALL BE THE FOCAL POINT FOR ALL CONTACT WITH THE GOVERNMENT. THE PM AND STAFF SHALL SUPPORT THE PI AS REQUIRED INCLUDING THE SCHEDULING AND COORDINATING OF MEETINGS AND REVIEWS, SCHEDULE CONTROL AND REPORTING, FINANCIAL CONTROL AND REPORTING, SUBCONTRACT MANAGEMENT, CONFIGURATION MANAGEMENT AND DOCUMENTATION, PROGRESS REPORTS AND REVIEWS AS WELL AS ALL ANOMALY REPORTING ACTIVITIES.
Jun 5, 2023P00020$0GLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION..THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO ACCOMPLISH THE GOLD MISSION AS DESCRIBED IN THE GOLD CONCEPT STUDY REPORT. THE CONTRACTOR SHALL PROVIDE REPORTS, REVIEWS, AND DOCUMENTATION FOR ALL ASPECTS OF THE PROGRAM. THE CONTRACTOR SHALL MANAGE THE ACTIVITIES OF THE SCIENCE TEAM. THE CONTRACTOR SHALL MAINTAIN THE GOLD SCIENCE DATA CENTER (SDC) AT UCF, AND SHALL PERFORM DATA REDUCTION AND ANALYSIS FOR THREE YEARS AFTER THE COMPLETION OF COMMISSIONING THE GOLD INSTRUMENT. THE CONTRACTOR SHALL PRESENT THE SCIENTIFIC RESULTS IN PRESENTATIONS AND PUBLISHED PAPERS, AND PROVIDE RAW DATA AND DATA PRODUCTS FOR ARCHIVING TO AN APPROVED DATA ARCHIVE. THE CONTRACTOR IS RESPONSIBLE FOR ALGORITHM DEVELOPMENT AND SCIENCE PLANNING AND ANALYSIS OF MISSION DATA AND THE PUBLICATION OF RESULTS..THE GOLD PROJECT SHALL FOLLOW THE GUIDELINES OF A MISSION OF OPPORTUNITY AND THE GOLD CONTRACT. THE GOLD PRINCIPAL INVESTIGATOR (PI) SHALL HAVE SOLE RESPONSIBILITY FOR THE SUCCESSFUL COMPLETION OF THIS PROJECT. THE PI SHALL DELEGATE PROJECT MANAGEMENT TASKS TO THE PROJECT MANAGER (PM) AS APPROPRIATE. THE PM SHALL DIRECT THE GOLD PROJECT AND HAVE THE RESPONSIBILITY FOR OVERALL TECHNICAL PERFORMANCE AND RESOURCE MANAGEMENT OF THE CONTRACT AND ALL SUBCONTRACTS. THE PI/PM SHALL BE THE FOCAL POINT FOR ALL CONTACT WITH THE GOVERNMENT. THE PM AND STAFF SHALL SUPPORT THE PI AS REQUIRED INCLUDING THE SCHEDULING AND COORDINATING OF MEETINGS AND REVIEWS, SCHEDULE CONTROL AND REPORTING, FINANCIAL CONTROL AND REPORTING, SUBCONTRACT MANAGEMENT, CONFIGURATION MANAGEMENT AND DOCUMENTATION, PROGRESS REPORTS AND REVIEWS AS WELL AS ALL ANOMALY REPORTING ACTIVITIES.
May 2, 2023P00019$3.7MGLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION..THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO ACCOMPLISH THE GOLD MISSION AS DESCRIBED IN THE GOLD CONCEPT STUDY REPORT. THE CONTRACTOR SHALL PROVIDE REPORTS, REVIEWS, AND DOCUMENTATION FOR ALL ASPECTS OF THE PROGRAM. THE CONTRACTOR SHALL MANAGE THE ACTIVITIES OF THE SCIENCE TEAM. THE CONTRACTOR SHALL MAINTAIN THE GOLD SCIENCE DATA CENTER (SDC) AT UCF, AND SHALL PERFORM DATA REDUCTION AND ANALYSIS FOR THREE YEARS AFTER THE COMPLETION OF COMMISSIONING THE GOLD INSTRUMENT. THE CONTRACTOR SHALL PRESENT THE SCIENTIFIC RESULTS IN PRESENTATIONS AND PUBLISHED PAPERS, AND PROVIDE RAW DATA AND DATA PRODUCTS FOR ARCHIVING TO AN APPROVED DATA ARCHIVE. THE CONTRACTOR IS RESPONSIBLE FOR ALGORITHM DEVELOPMENT AND SCIENCE PLANNING AND ANALYSIS OF MISSION DATA AND THE PUBLICATION OF RESULTS..THE GOLD PROJECT SHALL FOLLOW THE GUIDELINES OF A MISSION OF OPPORTUNITY AND THE GOLD CONTRACT. THE GOLD PRINCIPAL INVESTIGATOR (PI) SHALL HAVE SOLE RESPONSIBILITY FOR THE SUCCESSFUL COMPLETION OF THIS PROJECT. THE PI SHALL DELEGATE PROJECT MANAGEMENT TASKS TO THE PROJECT MANAGER (PM) AS APPROPRIATE. THE PM SHALL DIRECT THE GOLD PROJECT AND HAVE THE RESPONSIBILITY FOR OVERALL TECHNICAL PERFORMANCE AND RESOURCE MANAGEMENT OF THE CONTRACT AND ALL SUBCONTRACTS. THE PI/PM SHALL BE THE FOCAL POINT FOR ALL CONTACT WITH THE GOVERNMENT. THE PM AND STAFF SHALL SUPPORT THE PI AS REQUIRED INCLUDING THE SCHEDULING AND COORDINATING OF MEETINGS AND REVIEWS, SCHEDULE CONTROL AND REPORTING, FINANCIAL CONTROL AND REPORTING, SUBCONTRACT MANAGEMENT, CONFIGURATION MANAGEMENT AND DOCUMENTATION, PROGRESS REPORTS AND REVIEWS AS WELL AS ALL ANOMALY REPORTING ACTIVITIES.
Aug 29, 2022P00018$4.0MGLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION..THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO ACCOMPLISH THE GOLD MISSION AS DESCRIBED IN THE GOLD CONCEPT STUDY REPORT. THE CONTRACTOR SHALL PROVIDE REPORTS, REVIEWS, AND DOCUMENTATION FOR ALL ASPECTS OF THE PROGRAM. THE CONTRACTOR SHALL MANAGE THE ACTIVITIES OF THE SCIENCE TEAM. THE CONTRACTOR SHALL MAINTAIN THE GOLD SCIENCE DATA CENTER (SDC) AT UCF, AND SHALL PERFORM DATA REDUCTION AND ANALYSIS FOR THREE YEARS AFTER THE COMPLETION OF COMMISSIONING THE GOLD INSTRUMENT. THE CONTRACTOR SHALL PRESENT THE SCIENTIFIC RESULTS IN PRESENTATIONS AND PUBLISHED PAPERS, AND PROVIDE RAW DATA AND DATA PRODUCTS FOR ARCHIVING TO AN APPROVED DATA ARCHIVE. THE CONTRACTOR IS RESPONSIBLE FOR ALGORITHM DEVELOPMENT AND SCIENCE PLANNING AND ANALYSIS OF MISSION DATA AND THE PUBLICATION OF RESULTS..THE GOLD PROJECT SHALL FOLLOW THE GUIDELINES OF A MISSION OF OPPORTUNITY AND THE GOLD CONTRACT. THE GOLD PRINCIPAL INVESTIGATOR (PI) SHALL HAVE SOLE RESPONSIBILITY FOR THE SUCCESSFUL COMPLETION OF THIS PROJECT. THE PI SHALL DELEGATE PROJECT MANAGEMENT TASKS TO THE PROJECT MANAGER (PM) AS APPROPRIATE. THE PM SHALL DIRECT THE GOLD PROJECT AND HAVE THE RESPONSIBILITY FOR OVERALL TECHNICAL PERFORMANCE AND RESOURCE MANAGEMENT OF THE CONTRACT AND ALL SUBCONTRACTS. THE PI/PM SHALL BE THE FOCAL POINT FOR ALL CONTACT WITH THE GOVERNMENT. THE PM AND STAFF SHALL SUPPORT THE PI AS REQUIRED INCLUDING THE SCHEDULING AND COORDINATING OF MEETINGS AND REVIEWS, SCHEDULE CONTROL AND REPORTING, FINANCIAL CONTROL AND REPORTING, SUBCONTRACT MANAGEMENT, CONFIGURATION MANAGEMENT AND DOCUMENTATION, PROGRESS REPORTS AND REVIEWS AS WELL AS ALL ANOMALY REPORTING ACTIVITIES.
Apr 28, 2022P00017$1.6MGLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION. PHASE E 2-YEAR EXTENSION
Dec 3, 2021P00015$377.6KGLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION..THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO ACCOMPLISH THE GOLD MISSION AS DESCRIBED IN THE GOLD CONCEPT STUDY REPORT. THE CONTRACTOR SHALL PROVIDE REPORTS, REVIEWS, AND DOCUMENTATION FOR ALL ASPECTS OF THE PROGRAM. THE CONTRACTOR SHALL MANAGE THE ACTIVITIES OF THE SCIENCE TEAM. THE CONTRACTOR SHALL MAINTAIN THE GOLD SCIENCE DATA CENTER (SDC) AT UCF, AND SHALL PERFORM DATA REDUCTION AND ANALYSIS FOR THREE YEARS AFTER THE COMPLETION OF COMMISSIONING THE GOLD INSTRUMENT. THE CONTRACTOR SHALL PRESENT THE SCIENTIFIC RESULTS IN PRESENTATIONS AND PUBLISHED PAPERS, AND PROVIDE RAW DATA AND DATA PRODUCTS FOR ARCHIVING TO AN APPROVED DATA ARCHIVE. THE CONTRACTOR IS RESPONSIBLE FOR ALGORITHM DEVELOPMENT AND SCIENCE PLANNING AND ANALYSIS OF MISSION DATA AND THE PUBLICATION OF RESULTS..THE GOLD PROJECT SHALL FOLLOW THE GUIDELINES OF A MISSION OF OPPORTUNITY AND THE GOLD CONTRACT. THE GOLD PRINCIPAL INVESTIGATOR (PI) SHALL HAVE SOLE RESPONSIBILITY FOR THE SUCCESSFUL COMPLETION OF THIS PROJECT. THE PI SHALL DELEGATE PROJECT MANAGEMENT TASKS TO THE PROJECT MANAGER (PM) AS APPROPRIATE. THE PM SHALL DIRECT THE GOLD PROJECT AND HAVE THE RESPONSIBILITY FOR OVERALL TECHNICAL PERFORMANCE AND RESOURCE MANAGEMENT OF THE CONTRACT AND ALL SUBCONTRACTS. THE PI/PM SHALL BE THE FOCAL POINT FOR ALL CONTACT WITH THE GOVERNMENT. THE PM AND STAFF SHALL SUPPORT THE PI AS REQUIRED INCLUDING THE SCHEDULING AND COORDINATING OF MEETINGS AND REVIEWS, SCHEDULE CONTROL AND REPORTING, FINANCIAL CONTROL AND REPORTING, SUBCONTRACT MANAGEMENT, CONFIGURATION MANAGEMENT AND DOCUMENTATION, PROGRESS REPORTS AND REVIEWS AS WELL AS ALL ANOMALY REPORTING ACTIVITIES.
Oct 20, 2021P00014$0EO14042 GLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO ACCOMPLISH THE GOLD MISSION AS DESCRIBED IN THE GOLD CONCEPT STUDY REPORT. THE CONTRACTOR SHALL PROVIDE REPORTS, REVIEWS, AND DOCUMENTATION FOR ALL ASPECTS OF THE PROGRAM. THE CONTRACTOR SHALL MANAGE THE ACTIVITIES OF THE SCIENCE TEAM. THE CONTRACTOR SHALL MAINTAIN THE GOLD SCIENCE DATA CENTER (SDC) AT UCF, AND SHALL PERFORM DATA REDUCTION AND ANALYSIS FOR THREE YEARS AFTER THE COMPLETION OF COMMISSIONING THE GOLD INSTRUMENT. THE CONTRACTOR SHALL PRESENT THE SCIENTIFIC RESULTS IN PRESENTATIONS AND PUBLISHED PAPERS, AND PROVIDE RAW DATA AND DATA PRODUCTS FOR ARCHIVING TO AN APPROVED DATA ARCHIVE. THE CONTRACTOR IS RESPONSIBLE FOR ALGORITHM DEVELOPMENT AND SCIENCE PLANNING AND ANALYSIS OF MISSION DATA AND THE PUBLICATION OF RESULTS. THE GOLD PROJECT SHALL FOLLOW THE GUIDELINES OF A MISSION OF OPPORTUNITY AND THE GOLD CONTRACT. THE GOLD PRINCIPAL INVESTIGATOR (PI) SHALL HAVE SOLE RESPONSIBILITY FOR THE SUCCESSFUL COMPLETION OF THIS PROJECT. THE PI SHALL DELEGATE PROJECT MANAGEMENT TASKS TO THE PROJECT MANAGER (PM) AS APPROPRIATE. THE PM SHALL DIRECT THE GOLD PROJECT AND HAVE THE RESPONSIBILITY FOR OVERALL TECHNICAL PERFORMANCE AND RESOURCE MANAGEMENT OF THE CONTRACT AND ALL SUBCONTRACTS. THE PI/PM SHALL BE THE FOCAL POINT FOR ALL CONTACT WITH THE GOVERNMENT. THE PM AND STAFF SHALL SUPPORT THE PI AS REQUIRED INCLUDING THE SCHEDULING AND COORDINATING OF MEETINGS AND REVIEWS, SCHEDULE CONTROL AND REPORTING, FINANCIAL CONTROL AND REPORTING, SUBCONTRACT MANAGEMENT, CONFIGURATION MANAGEMENT AND DOCUMENTATION, PROGRESS REPORTS AND REVIEWS AS WELL AS ALL ANOMALY REPORTING ACTIVITIES.
Aug 27, 2021P00013$2.9MGLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION..THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO ACCOMPLISH THE GOLD MISSION AS DESCRIBED IN THE GOLD CONCEPT STUDY REPORT. THE CONTRACTOR SHALL PROVIDE REPORTS, REVIEWS, AND DOCUMENTATION FOR ALL ASPECTS OF THE PROGRAM. THE CONTRACTOR SHALL MANAGE THE ACTIVITIES OF THE SCIENCE TEAM. THE CONTRACTOR SHALL MAINTAIN THE GOLD SCIENCE DATA CENTER (SDC) AT UCF, AND SHALL PERFORM DATA REDUCTION AND ANALYSIS FOR THREE YEARS AFTER THE COMPLETION OF COMMISSIONING THE GOLD INSTRUMENT. THE CONTRACTOR SHALL PRESENT THE SCIENTIFIC RESULTS IN PRESENTATIONS AND PUBLISHED PAPERS, AND PROVIDE RAW DATA AND DATA PRODUCTS FOR ARCHIVING TO AN APPROVED DATA ARCHIVE. THE CONTRACTOR IS RESPONSIBLE FOR ALGORITHM DEVELOPMENT AND SCIENCE PLANNING AND ANALYSIS OF MISSION DATA AND THE PUBLICATION OF RESULTS..THE GOLD PROJECT SHALL FOLLOW THE GUIDELINES OF A MISSION OF OPPORTUNITY AND THE GOLD CONTRACT. THE GOLD PRINCIPAL INVESTIGATOR (PI) SHALL HAVE SOLE RESPONSIBILITY FOR THE SUCCESSFUL COMPLETION OF THIS PROJECT. THE PI SHALL DELEGATE PROJECT MANAGEMENT TASKS TO THE PROJECT MANAGER (PM) AS APPROPRIATE. THE PM SHALL DIRECT THE GOLD PROJECT AND HAVE THE RESPONSIBILITY FOR OVERALL TECHNICAL PERFORMANCE AND RESOURCE MANAGEMENT OF THE CONTRACT AND ALL SUBCONTRACTS. THE PI/PM SHALL BE THE FOCAL POINT FOR ALL CONTACT WITH THE GOVERNMENT. THE PM AND STAFF SHALL SUPPORT THE PI AS REQUIRED INCLUDING THE SCHEDULING AND COORDINATING OF MEETINGS AND REVIEWS, SCHEDULE CONTROL AND REPORTING, FINANCIAL CONTROL AND REPORTING, SUBCONTRACT MANAGEMENT, CONFIGURATION MANAGEMENT AND DOCUMENTATION, PROGRESS REPORTS AND REVIEWS AS WELL AS ALL ANOMALY REPORTING ACTIVITIES.
Apr 29, 2021P00012$1.7MGLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION..THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO ACCOMPLISH THE GOLD MISSION AS DESCRIBED IN THE GOLD CONCEPT STUDY REPORT. THE CONTRACTOR SHALL PROVIDE REPORTS, REVIEWS, AND DOCUMENTATION FOR ALL ASPECTS OF THE PROGRAM. THE CONTRACTOR SHALL MANAGE THE ACTIVITIES OF THE SCIENCE TEAM. THE CONTRACTOR SHALL MAINTAIN THE GOLD SCIENCE DATA CENTER (SDC) AT UCF, AND SHALL PERFORM DATA REDUCTION AND ANALYSIS FOR THREE YEARS AFTER THE COMPLETION OF COMMISSIONING THE GOLD INSTRUMENT. THE CONTRACTOR SHALL PRESENT THE SCIENTIFIC RESULTS IN PRESENTATIONS AND PUBLISHED PAPERS, AND PROVIDE RAW DATA AND DATA PRODUCTS FOR ARCHIVING TO AN APPROVED DATA ARCHIVE. THE CONTRACTOR IS RESPONSIBLE FOR ALGORITHM DEVELOPMENT AND SCIENCE PLANNING AND ANALYSIS OF MISSION DATA AND THE PUBLICATION OF RESULTS..THE GOLD PROJECT SHALL FOLLOW THE GUIDELINES OF A MISSION OF OPPORTUNITY AND THE GOLD CONTRACT. THE GOLD PRINCIPAL INVESTIGATOR (PI) SHALL HAVE SOLE RESPONSIBILITY FOR THE SUCCESSFUL COMPLETION OF THIS PROJECT. THE PI SHALL DELEGATE PROJECT MANAGEMENT TASKS TO THE PROJECT MANAGER (PM) AS APPROPRIATE. THE PM SHALL DIRECT THE GOLD PROJECT AND HAVE THE RESPONSIBILITY FOR OVERALL TECHNICAL PERFORMANCE AND RESOURCE MANAGEMENT OF THE CONTRACT AND ALL SUBCONTRACTS. THE PI/PM SHALL BE THE FOCAL POINT FOR ALL CONTACT WITH THE GOVERNMENT. THE PM AND STAFF SHALL SUPPORT THE PI AS REQUIRED INCLUDING THE SCHEDULING AND COORDINATING OF MEETINGS AND REVIEWS, SCHEDULE CONTROL AND REPORTING, FINANCIAL CONTROL AND REPORTING, SUBCONTRACT MANAGEMENT, CONFIGURATION MANAGEMENT AND DOCUMENTATION, PROGRESS REPORTS AND REVIEWS AS WELL AS ALL ANOMALY REPORTING ACTIVITIES.
Jan 29, 2021P00011$851.6KGLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION..THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO ACCOMPLISH THE GOLD MISSION AS DESCRIBED IN THE GOLD CONCEPT STUDY REPORT. THE CONTRACTOR SHALL PROVIDE REPORTS, REVIEWS, AND DOCUMENTATION FOR ALL ASPECTS OF THE PROGRAM. THE CONTRACTOR SHALL MANAGE THE ACTIVITIES OF THE SCIENCE TEAM. THE CONTRACTOR SHALL MAINTAIN THE GOLD SCIENCE DATA CENTER (SDC) AT UCF, AND SHALL PERFORM DATA REDUCTION AND ANALYSIS FOR THREE YEARS AFTER THE COMPLETION OF COMMISSIONING THE GOLD INSTRUMENT. THE CONTRACTOR SHALL PRESENT THE SCIENTIFIC RESULTS IN PRESENTATIONS AND PUBLISHED PAPERS, AND PROVIDE RAW DATA AND DATA PRODUCTS FOR ARCHIVING TO AN APPROVED DATA ARCHIVE. THE CONTRACTOR IS RESPONSIBLE FOR ALGORITHM DEVELOPMENT AND SCIENCE PLANNING AND ANALYSIS OF MISSION DATA AND THE PUBLICATION OF RESULTS..THE GOLD PROJECT SHALL FOLLOW THE GUIDELINES OF A MISSION OF OPPORTUNITY AND THE GOLD CONTRACT. THE GOLD PRINCIPAL INVESTIGATOR (PI) SHALL HAVE SOLE RESPONSIBILITY FOR THE SUCCESSFUL COMPLETION OF THIS PROJECT. THE PI SHALL DELEGATE PROJECT MANAGEMENT TASKS TO THE PROJECT MANAGER (PM) AS APPROPRIATE. THE PM SHALL DIRECT THE GOLD PROJECT AND HAVE THE RESPONSIBILITY FOR OVERALL TECHNICAL PERFORMANCE AND RESOURCE MANAGEMENT OF THE CONTRACT AND ALL SUBCONTRACTS. THE PI/PM SHALL BE THE FOCAL POINT FOR ALL CONTACT WITH THE GOVERNMENT. THE PM AND STAFF SHALL SUPPORT THE PI AS REQUIRED INCLUDING THE SCHEDULING AND COORDINATING OF MEETINGS AND REVIEWS, SCHEDULE CONTROL AND REPORTING, FINANCIAL CONTROL AND REPORTING, SUBCONTRACT MANAGEMENT, CONFIGURATION MANAGEMENT AND DOCUMENTATION, PROGRESS REPORTS AND REVIEWS AS WELL AS ALL ANOMALY REPORTING ACTIVITIES.
Oct 14, 2020P00010$0GLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION..THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO ACCOMPLISH THE GOLD MISSION AS DESCRIBED IN THE GOLD CONCEPT STUDY REPORT. THE CONTRACTOR SHALL PROVIDE REPORTS, REVIEWS, AND DOCUMENTATION FOR ALL ASPECTS OF THE PROGRAM. THE CONTRACTOR SHALL MANAGE THE ACTIVITIES OF THE SCIENCE TEAM. THE CONTRACTOR SHALL MAINTAIN THE GOLD SCIENCE DATA CENTER (SDC) AT UCF, AND SHALL PERFORM DATA REDUCTION AND ANALYSIS FOR THREE YEARS AFTER THE COMPLETION OF COMMISSIONING THE GOLD INSTRUMENT. THE CONTRACTOR SHALL PRESENT THE SCIENTIFIC RESULTS IN PRESENTATIONS AND PUBLISHED PAPERS, AND PROVIDE RAW DATA AND DATA PRODUCTS FOR ARCHIVING TO AN APPROVED DATA ARCHIVE. THE CONTRACTOR IS RESPONSIBLE FOR ALGORITHM DEVELOPMENT AND SCIENCE PLANNING AND ANALYSIS OF MISSION DATA AND THE PUBLICATION OF RESULTS..THE GOLD PROJECT SHALL FOLLOW THE GUIDELINES OF A MISSION OF OPPORTUNITY AND THE GOLD CONTRACT. THE GOLD PRINCIPAL INVESTIGATOR (PI) SHALL HAVE SOLE RESPONSIBILITY FOR THE SUCCESSFUL COMPLETION OF THIS PROJECT. THE PI SHALL DELEGATE PROJECT MANAGEMENT TASKS TO THE PROJECT MANAGER (PM) AS APPROPRIATE. THE PM SHALL DIRECT THE GOLD PROJECT AND HAVE THE RESPONSIBILITY FOR OVERALL TECHNICAL PERFORMANCE AND RESOURCE MANAGEMENT OF THE CONTRACT AND ALL SUBCONTRACTS. THE PI/PM SHALL BE THE FOCAL POINT FOR ALL CONTACT WITH THE GOVERNMENT. THE PM AND STAFF SHALL SUPPORT THE PI AS REQUIRED INCLUDING THE SCHEDULING AND COORDINATING OF MEETINGS AND REVIEWS, SCHEDULE CONTROL AND REPORTING, FINANCIAL CONTROL AND REPORTING, SUBCONTRACT MANAGEMENT, CONFIGURATION MANAGEMENT AND DOCUMENTATION, PROGRESS REPORTS AND REVIEWS AS WELL AS ALL ANOMALY REPORTING ACTIVITIES.
Jul 7, 2020P00009$2.8MGLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO ACCOMPLISH THE GOLD MISSION AS DESCRIBED IN THE GOLD CONCEPT STUDY REPORT. THE CONTRACTOR SHALL PROVIDE REPORTS, REVIEWS, AND DOCUMENTATION FOR ALL ASPECTS OF THE PROGRAM. THE CONTRACTOR SHALL MANAGE THE ACTIVITIES OF THE SCIENCE TEAM. THE CONTRACTOR SHALL MAINTAIN THE GOLD SCIENCE DATA CENTER (SDC) AT UCF, AND SHALL PERFORM DATA REDUCTION AND ANALYSIS FOR THREE YEARS AFTER THE COMPLETION OF COMMISSIONING THE GOLD INSTRUMENT. THE CONTRACTOR SHALL PRESENT THE SCIENTIFIC RESULTS IN PRESENTATIONS AND PUBLISHED PAPERS, AND PROVIDE RAW DATA AND DATA PRODUCTS FOR ARCHIVING TO AN APPROVED DATA ARCHIVE. THE CONTRACTOR IS RESPONSIBLE FOR ALGORITHM DEVELOPMENT AND SCIENCE PLANNING AND ANALYSIS OF MISSION DATA AND THE PUBLICATION OF RESULTS. THE GOLD PROJECT SHALL FOLLOW THE GUIDELINES OF A MISSION OF OPPORTUNITY AND THE GOLD CONTRACT. THE GOLD PRINCIPAL INVESTIGATOR (PI) SHALL HAVE SOLE RESPONSIBILITY FOR THE SUCCESSFUL COMPLETION OF THIS PROJECT. THE PI SHALL DELEGATE PROJECT MANAGEMENT TASKS TO THE PROJECT MANAGER (PM) AS APPROPRIATE. THE PM SHALL DIRECT THE GOLD PROJECT AND HAVE THE RESPONSIBILITY FOR OVERALL TECHNICAL PERFORMANCE AND RESOURCE MANAGEMENT OF THE CONTRACT AND ALL SUBCONTRACTS. THE PI/PM SHALL BE THE FOCAL POINT FOR ALL CONTACT WITH THE GOVERNMENT. THE PM AND STAFF SHALL SUPPORT THE PI AS REQUIRED INCLUDING THE SCHEDULING AND COORDINATING OF MEETINGS AND REVIEWS, SCHEDULE CONTROL AND REPORTING, FINANCIAL CONTROL AND REPORTING, SUBCONTRACT MANAGEMENT, CONFIGURATION MANAGEMENT AND DOCUMENTATION, PROGRESS REPORTS AND REVIEWS AS WELL AS ALL ANOMALY REPORTING ACTIVITIES.
Mar 10, 2020P00008$1.5MGLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO ACCOMPLISH THE GOLD MISSION AS DESCRIBED IN THE GOLD CONCEPT STUDY REPORT. THE CONTRACTOR SHALL PROVIDE REPORTS, REVIEWS, AND DOCUMENTATION FOR ALL ASPECTS OF THE PROGRAM. THE CONTRACTOR SHALL MANAGE THE ACTIVITIES OF THE SCIENCE TEAM. THE CONTRACTOR SHALL MAINTAIN THE GOLD SCIENCE DATA CENTER (SDC) AT UCF, AND SHALL PERFORM DATA REDUCTION AND ANALYSIS FOR THREE YEARS AFTER THE COMPLETION OF COMMISSIONING THE GOLD INSTRUMENT. THE CONTRACTOR SHALL PRESENT THE SCIENTIFIC RESULTS IN PRESENTATIONS AND PUBLISHED PAPERS, AND PROVIDE RAW DATA AND DATA PRODUCTS FOR ARCHIVING TO AN APPROVED DATA ARCHIVE. THE CONTRACTOR IS RESPONSIBLE FOR ALGORITHM DEVELOPMENT AND SCIENCE PLANNING AND ANALYSIS OF MISSION DATA AND THE PUBLICATION OF RESULTS. THE GOLD PROJECT SHALL FOLLOW THE GUIDELINES OF A MISSION OF OPPORTUNITY AND THE GOLD CONTRACT. THE GOLD PRINCIPAL INVESTIGATOR (PI) SHALL HAVE SOLE RESPONSIBILITY FOR THE SUCCESSFUL COMPLETION OF THIS PROJECT. THE PI SHALL DELEGATE PROJECT MANAGEMENT TASKS TO THE PROJECT MANAGER (PM) AS APPROPRIATE. THE PM SHALL DIRECT THE GOLD PROJECT AND HAVE THE RESPONSIBILITY FOR OVERALL TECHNICAL PERFORMANCE AND RESOURCE MANAGEMENT OF THE CONTRACT AND ALL SUBCONTRACTS. THE PI/PM SHALL BE THE FOCAL POINT FOR ALL CONTACT WITH THE GOVERNMENT. THE PM AND STAFF SHALL SUPPORT THE PI AS REQUIRED INCLUDING THE SCHEDULING AND COORDINATING OF MEETINGS AND REVIEWS, SCHEDULE CONTROL AND REPORTING, FINANCIAL CONTROL AND REPORTING, SUBCONTRACT MANAGEMENT, CONFIGURATION MANAGEMENT AND DOCUMENTATION, PROGRESS REPORTS AND REVIEWS AS WELL AS ALL ANOMALY REPORTING ACTIVITIES.
Jan 13, 2020P00007$1.0MGLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO ACCOMPLISH THE GOLD MISSION AS DESCRIBED IN THE GOLD CONCEPT STUDY REPORT. THE CONTRACTOR SHALL PROVIDE REPORTS, REVIEWS, AND DOCUMENTATION FOR ALL ASPECTS OF THE PROGRAM. THE CONTRACTOR SHALL MANAGE THE ACTIVITIES OF THE SCIENCE TEAM. THE CONTRACTOR SHALL MAINTAIN THE GOLD SCIENCE DATA CENTER (SDC) AT UCF, AND SHALL PERFORM DATA REDUCTION AND ANALYSIS FOR THREE YEARS AFTER THE COMPLETION OF COMMISSIONING THE GOLD INSTRUMENT. THE CONTRACTOR SHALL PRESENT THE SCIENTIFIC RESULTS IN PRESENTATIONS AND PUBLISHED PAPERS, AND PROVIDE RAW DATA AND DATA PRODUCTS FOR ARCHIVING TO AN APPROVED DATA ARCHIVE. THE CONTRACTOR IS RESPONSIBLE FOR ALGORITHM DEVELOPMENT AND SCIENCE PLANNING AND ANALYSIS OF MISSION DATA AND THE PUBLICATION OF RESULTS. THE GOLD PROJECT SHALL FOLLOW THE GUIDELINES OF A MISSION OF OPPORTUNITY AND THE GOLD CONTRACT. THE GOLD PRINCIPAL INVESTIGATOR (PI) SHALL HAVE SOLE RESPONSIBILITY FOR THE SUCCESSFUL COMPLETION OF THIS PROJECT. THE PI SHALL DELEGATE PROJECT MANAGEMENT TASKS TO THE PROJECT MANAGER (PM) AS APPROPRIATE. THE PM SHALL DIRECT THE GOLD PROJECT AND HAVE THE RESPONSIBILITY FOR OVERALL TECHNICAL PERFORMANCE AND RESOURCE MANAGEMENT OF THE CONTRACT AND ALL SUBCONTRACTS. THE PI/PM SHALL BE THE FOCAL POINT FOR ALL CONTACT WITH THE GOVERNMENT. THE PM AND STAFF SHALL SUPPORT THE PI AS REQUIRED INCLUDING THE SCHEDULING AND COORDINATING OF MEETINGS AND REVIEWS, SCHEDULE CONTROL AND REPORTING, FINANCIAL CONTROL AND REPORTING, SUBCONTRACT MANAGEMENT, CONFIGURATION MANAGEMENT AND DOCUMENTATION, PROGRESS REPORTS AND REVIEWS AS WELL AS ALL ANOMALY REPORTING ACTIVITIES.
May 20, 2019P00006$3.4MGLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO ACCOMPLISH THE GOLD MISSION AS DESCRIBED IN THE GOLD CONCEPT STUDY REPORT. THE CONTRACTOR SHALL PROVIDE REPORTS, REVIEWS, AND DOCUMENTATION FOR ALL ASPECTS OF THE PROGRAM. THE CONTRACTOR SHALL MANAGE THE ACTIVITIES OF THE SCIENCE TEAM. THE CONTRACTOR SHALL MAINTAIN THE GOLD SCIENCE DATA CENTER (SDC) AT UCF, AND SHALL PERFORM DATA REDUCTION AND ANALYSIS FOR THREE YEARS AFTER THE COMPLETION OF COMMISSIONING THE GOLD INSTRUMENT. THE CONTRACTOR SHALL PRESENT THE SCIENTIFIC RESULTS IN PRESENTATIONS AND PUBLISHED PAPERS, AND PROVIDE RAW DATA AND DATA PRODUCTS FOR ARCHIVING TO AN APPROVED DATA ARCHIVE. THE CONTRACTOR IS RESPONSIBLE FOR ALGORITHM DEVELOPMENT AND SCIENCE PLANNING AND ANALYSIS OF MISSION DATA AND THE PUBLICATION OF RESULTS. THE GOLD PROJECT SHALL FOLLOW THE GUIDELINES OF A MISSION OF OPPORTUNITY AND THE GOLD CONTRACT. THE GOLD PRINCIPAL INVESTIGATOR (PI) SHALL HAVE SOLE RESPONSIBILITY FOR THE SUCCESSFUL COMPLETION OF THIS PROJECT. THE PI SHALL DELEGATE PROJECT MANAGEMENT TASKS TO THE PROJECT MANAGER (PM) AS APPROPRIATE. THE PM SHALL DIRECT THE GOLD PROJECT AND HAVE THE RESPONSIBILITY FOR OVERALL TECHNICAL PERFORMANCE AND RESOURCE MANAGEMENT OF THE CONTRACT AND ALL SUBCONTRACTS. THE PI/PM SHALL BE THE FOCAL POINT FOR ALL CONTACT WITH THE GOVERNMENT. THE PM AND STAFF SHALL SUPPORT THE PI AS REQUIRED INCLUDING THE SCHEDULING AND COORDINATING OF MEETINGS AND REVIEWS, SCHEDULE CONTROL AND REPORTING, FINANCIAL CONTROL AND REPORTING, SUBCONTRACT MANAGEMENT, CONFIGURATION MANAGEMENT AND DOCUMENTATION, PROGRESS REPORTS AND REVIEWS AS WELL AS ALL ANOMALY REPORTING ACTIVITIES.
Nov 27, 2018P00005$3.9MGLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO ACCOMPLISH THE GOLD MISSION AS DESCRIBED IN THE GOLD CONCEPT STUDY REPORT. THE CONTRACTOR SHALL PROVIDE REPORTS, REVIEWS, AND DOCUMENTATION FOR ALL ASPECTS OF THE PROGRAM. THE CONTRACTOR SHALL MANAGE THE ACTIVITIES OF THE SCIENCE TEAM. THE CONTRACTOR SHALL MAINTAIN THE GOLD SCIENCE DATA CENTER (SDC) AT UCF, AND SHALL PERFORM DATA REDUCTION AND ANALYSIS FOR THREE YEARS AFTER THE COMPLETION OF COMMISSIONING THE GOLD INSTRUMENT. THE CONTRACTOR SHALL PRESENT THE SCIENTIFIC RESULTS IN PRESENTATIONS AND PUBLISHED PAPERS, AND PROVIDE RAW DATA AND DATA PRODUCTS FOR ARCHIVING TO AN APPROVED DATA ARCHIVE. THE CONTRACTOR IS RESPONSIBLE FOR ALGORITHM DEVELOPMENT AND SCIENCE PLANNING AND ANALYSIS OF MISSION DATA AND THE PUBLICATION OF RESULTS. THE GOLD PROJECT SHALL FOLLOW THE GUIDELINES OF A MISSION OF OPPORTUNITY AND THE GOLD CONTRACT. THE GOLD PRINCIPAL INVESTIGATOR (PI) SHALL HAVE SOLE RESPONSIBILITY FOR THE SUCCESSFUL COMPLETION OF THIS PROJECT. THE PI SHALL DELEGATE PROJECT MANAGEMENT TASKS TO THE PROJECT MANAGER (PM) AS APPROPRIATE. THE PM SHALL DIRECT THE GOLD PROJECT AND HAVE THE RESPONSIBILITY FOR OVERALL TECHNICAL PERFORMANCE AND RESOURCE MANAGEMENT OF THE CONTRACT AND ALL SUBCONTRACTS. THE PI/PM SHALL BE THE FOCAL POINT FOR ALL CONTACT WITH THE GOVERNMENT. THE PM AND STAFF SHALL SUPPORT THE PI AS REQUIRED INCLUDING THE SCHEDULING AND COORDINATING OF MEETINGS AND REVIEWS, SCHEDULE CONTROL AND REPORTING, FINANCIAL CONTROL AND REPORTING, SUBCONTRACT MANAGEMENT, CONFIGURATION MANAGEMENT AND DOCUMENTATION, PROGRESS REPORTS AND REVIEWS AS WELL AS ALL ANOMALY REPORTING ACTIVITIES.
Sep 28, 2018P00004$250.4KEO14042 GLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO ACCOMPLISH THE GOLD MISSION AS DESCRIBED IN THE GOLD CONCEPT STUDY REPORT. THE CONTRACTOR SHALL PROVIDE REPORTS, REVIEWS, AND DOCUMENTATION FOR ALL ASPECTS OF THE PROGRAM. THE CONTRACTOR SHALL MANAGE THE ACTIVITIES OF THE SCIENCE TEAM. THE CONTRACTOR SHALL MAINTAIN THE GOLD SCIENCE DATA CENTER (SDC) AT UCF, AND SHALL PERFORM DATA REDUCTION AND ANALYSIS FOR THREE YEARS AFTER THE COMPLETION OF COMMISSIONING THE GOLD INSTRUMENT. THE CONTRACTOR SHALL PRESENT THE SCIENTIFIC RESULTS IN PRESENTATIONS AND PUBLISHED PAPERS, AND PROVIDE RAW DATA AND DATA PRODUCTS FOR ARCHIVING TO AN APPROVED DATA ARCHIVE. THE CONTRACTOR IS RESPONSIBLE FOR ALGORITHM DEVELOPMENT AND SCIENCE PLANNING AND ANALYSIS OF MISSION DATA AND THE PUBLICATION OF RESULTS. THE GOLD PROJECT SHALL FOLLOW THE GUIDELINES OF A MISSION OF OPPORTUNITY AND THE GOLD CONTRACT. THE GOLD PRINCIPAL INVESTIGATOR (PI) SHALL HAVE SOLE RESPONSIBILITY FOR THE SUCCESSFUL COMPLETION OF THIS PROJECT. THE PI SHALL DELEGATE PROJECT MANAGEMENT TASKS TO THE PROJECT MANAGER (PM) AS APPROPRIATE. THE PM SHALL DIRECT THE GOLD PROJECT AND HAVE THE RESPONSIBILITY FOR OVERALL TECHNICAL PERFORMANCE AND RESOURCE MANAGEMENT OF THE CONTRACT AND ALL SUBCONTRACTS. THE PI/PM SHALL BE THE FOCAL POINT FOR ALL CONTACT WITH THE GOVERNMENT. THE PM AND STAFF SHALL SUPPORT THE PI AS REQUIRED INCLUDING THE SCHEDULING AND COORDINATING OF MEETINGS AND REVIEWS, SCHEDULE CONTROL AND REPORTING, FINANCIAL CONTROL AND REPORTING, SUBCONTRACT MANAGEMENT, CONFIGURATION MANAGEMENT AND DOCUMENTATION, PROGRESS REPORTS AND REVIEWS AS WELL AS ALL ANOMALY REPORTING ACTIVITIES.
Aug 31, 2018P00003$1.0MGLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO ACCOMPLISH THE GOLD MISSION AS DESCRIBED IN THE GOLD CONCEPT STUDY REPORT. THE CONTRACTOR SHALL PROVIDE REPORTS, REVIEWS, AND DOCUMENTATION FOR ALL ASPECTS OF THE PROGRAM. THE CONTRACTOR SHALL MANAGE THE ACTIVITIES OF THE SCIENCE TEAM. THE CONTRACTOR SHALL MAINTAIN THE GOLD SCIENCE DATA CENTER (SDC) AT UCF, AND SHALL PERFORM DATA REDUCTION AND ANALYSIS FOR THREE YEARS AFTER THE COMPLETION OF COMMISSIONING THE GOLD INSTRUMENT. THE CONTRACTOR SHALL PRESENT THE SCIENTIFIC RESULTS IN PRESENTATIONS AND PUBLISHED PAPERS, AND PROVIDE RAW DATA AND DATA PRODUCTS FOR ARCHIVING TO AN APPROVED DATA ARCHIVE. THE CONTRACTOR IS RESPONSIBLE FOR ALGORITHM DEVELOPMENT AND SCIENCE PLANNING AND ANALYSIS OF MISSION DATA AND THE PUBLICATION OF RESULTS. THE GOLD PROJECT SHALL FOLLOW THE GUIDELINES OF A MISSION OF OPPORTUNITY AND THE GOLD CONTRACT. THE GOLD PRINCIPAL INVESTIGATOR (PI) SHALL HAVE SOLE RESPONSIBILITY FOR THE SUCCESSFUL COMPLETION OF THIS PROJECT. THE PI SHALL DELEGATE PROJECT MANAGEMENT TASKS TO THE PROJECT MANAGER (PM) AS APPROPRIATE. THE PM SHALL DIRECT THE GOLD PROJECT AND HAVE THE RESPONSIBILITY FOR OVERALL TECHNICAL PERFORMANCE AND RESOURCE MANAGEMENT OF THE CONTRACT AND ALL SUBCONTRACTS. THE PI/PM SHALL BE THE FOCAL POINT FOR ALL CONTACT WITH THE GOVERNMENT. THE PM AND STAFF SHALL SUPPORT THE PI AS REQUIRED INCLUDING THE SCHEDULING AND COORDINATING OF MEETINGS AND REVIEWS, SCHEDULE CONTROL AND REPORTING, FINANCIAL CONTROL AND REPORTING, SUBCONTRACT MANAGEMENT, CONFIGURATION MANAGEMENT AND DOCUMENTATION, PROGRESS REPORTS AND REVIEWS AS WELL AS ALL ANOMALY REPORTING ACTIVITIES.
Jul 23, 2018P00002$79.3KGLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO ACCOMPLISH THE GOLD MISSION AS DESCRIBED IN THE GOLD CONCEPT STUDY REPORT. THE CONTRACTOR SHALL PROVIDE REPORTS, REVIEWS, AND DOCUMENTATION FOR ALL ASPECTS OF THE PROGRAM. THE CONTRACTOR SHALL MANAGE THE ACTIVITIES OF THE SCIENCE TEAM. THE CONTRACTOR SHALL MAINTAIN THE GOLD SCIENCE DATA CENTER (SDC) AT UCF, AND SHALL PERFORM DATA REDUCTION AND ANALYSIS FOR THREE YEARS AFTER THE COMPLETION OF COMMISSIONING THE GOLD INSTRUMENT. THE CONTRACTOR SHALL PRESENT THE SCIENTIFIC RESULTS IN PRESENTATIONS AND PUBLISHED PAPERS, AND PROVIDE RAW DATA AND DATA PRODUCTS FOR ARCHIVING TO AN APPROVED DATA ARCHIVE. THE CONTRACTOR IS RESPONSIBLE FOR ALGORITHM DEVELOPMENT AND SCIENCE PLANNING AND ANALYSIS OF MISSION DATA AND THE PUBLICATION OF RESULTS. THE GOLD PROJECT SHALL FOLLOW THE GUIDELINES OF A MISSION OF OPPORTUNITY AND THE GOLD CONTRACT. THE GOLD PRINCIPAL INVESTIGATOR (PI) SHALL HAVE SOLE RESPONSIBILITY FOR THE SUCCESSFUL COMPLETION OF THIS PROJECT. THE PI SHALL DELEGATE PROJECT MANAGEMENT TASKS TO THE PROJECT MANAGER (PM) AS APPROPRIATE. THE PM SHALL DIRECT THE GOLD PROJECT AND HAVE THE RESPONSIBILITY FOR OVERALL TECHNICAL PERFORMANCE AND RESOURCE MANAGEMENT OF THE CONTRACT AND ALL SUBCONTRACTS. THE PI/PM SHALL BE THE FOCAL POINT FOR ALL CONTACT WITH THE GOVERNMENT. THE PM AND STAFF SHALL SUPPORT THE PI AS REQUIRED INCLUDING THE SCHEDULING AND COORDINATING OF MEETINGS AND REVIEWS, SCHEDULE CONTROL AND REPORTING, FINANCIAL CONTROL AND REPORTING, SUBCONTRACT MANAGEMENT, CONFIGURATION MANAGEMENT AND DOCUMENTATION, PROGRESS REPORTS AND REVIEWS AS WELL AS ALL ANOMALY REPORTING ACTIVITIES.
Mar 2, 2018P00001$218.0KGLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO ACCOMPLISH THE GOLD MISSION AS DESCRIBED IN THE GOLD CONCEPT STUDY REPORT. THE CONTRACTOR SHALL PROVIDE REPORTS, REVIEWS, AND DOCUMENTATION FOR ALL ASPECTS OF THE PROGRAM. THE CONTRACTOR SHALL MANAGE THE ACTIVITIES OF THE SCIENCE TEAM. THE CONTRACTOR SHALL MAINTAIN THE GOLD SCIENCE DATA CENTER (SDC) AT UCF, AND SHALL PERFORM DATA REDUCTION AND ANALYSIS FOR THREE YEARS AFTER THE COMPLETION OF COMMISSIONING THE GOLD INSTRUMENT. THE CONTRACTOR SHALL PRESENT THE SCIENTIFIC RESULTS IN PRESENTATIONS AND PUBLISHED PAPERS, AND PROVIDE RAW DATA AND DATA PRODUCTS FOR ARCHIVING TO AN APPROVED DATA ARCHIVE. THE CONTRACTOR IS RESPONSIBLE FOR ALGORITHM DEVELOPMENT AND SCIENCE PLANNING AND ANALYSIS OF MISSION DATA AND THE PUBLICATION OF RESULTS. THE GOLD PROJECT SHALL FOLLOW THE GUIDELINES OF A MISSION OF OPPORTUNITY AND THE GOLD CONTRACT. THE GOLD PRINCIPAL INVESTIGATOR (PI) SHALL HAVE SOLE RESPONSIBILITY FOR THE SUCCESSFUL COMPLETION OF THIS PROJECT. THE PI SHALL DELEGATE PROJECT MANAGEMENT TASKS TO THE PROJECT MANAGER (PM) AS APPROPRIATE. THE PM SHALL DIRECT THE GOLD PROJECT AND HAVE THE RESPONSIBILITY FOR OVERALL TECHNICAL PERFORMANCE AND RESOURCE MANAGEMENT OF THE CONTRACT AND ALL SUBCONTRACTS. THE PI/PM SHALL BE THE FOCAL POINT FOR ALL CONTACT WITH THE GOVERNMENT. THE PM AND STAFF SHALL SUPPORT THE PI AS REQUIRED INCLUDING THE SCHEDULING AND COORDINATING OF MEETINGS AND REVIEWS, SCHEDULE CONTROL AND REPORTING, FINANCIAL CONTROL AND REPORTING, SUBCONTRACT MANAGEMENT, CONFIGURATION MANAGEMENT AND DOCUMENTATION, PROGRESS REPORTS AND REVIEWS AS WELL AS ALL ANOMALY REPORTING ACTIVITIES.
Mar 1, 20180$0GLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO ACCOMPLISH THE GOLD MISSION AS DESCRIBED IN THE GOLD CONCEPT STUDY REPORT. THE CONTRACTOR SHALL PROVIDE REPORTS, REVIEWS, AND DOCUMENTATION FOR ALL ASPECTS OF THE PROGRAM. THE CONTRACTOR SHALL MANAGE THE ACTIVITIES OF THE SCIENCE TEAM. THE CONTRACTOR SHALL MAINTAIN THE GOLD SCIENCE DATA CENTER (SDC) AT UCF, AND SHALL PERFORM DATA REDUCTION AND ANALYSIS FOR THREE YEARS AFTER THE COMPLETION OF COMMISSIONING THE GOLD INSTRUMENT. THE CONTRACTOR SHALL PRESENT THE SCIENTIFIC RESULTS IN PRESENTATIONS AND PUBLISHED PAPERS, AND PROVIDE RAW DATA AND DATA PRODUCTS FOR ARCHIVING TO AN APPROVED DATA ARCHIVE. THE CONTRACTOR IS RESPONSIBLE FOR ALGORITHM DEVELOPMENT AND SCIENCE PLANNING AND ANALYSIS OF MISSION DATA AND THE PUBLICATION OF RESULTS. THE GOLD PROJECT SHALL FOLLOW THE GUIDELINES OF A MISSION OF OPPORTUNITY AND THE GOLD CONTRACT. THE GOLD PRINCIPAL INVESTIGATOR (PI) SHALL HAVE SOLE RESPONSIBILITY FOR THE SUCCESSFUL COMPLETION OF THIS PROJECT. THE PI SHALL DELEGATE PROJECT MANAGEMENT TASKS TO THE PROJECT MANAGER (PM) AS APPROPRIATE. THE PM SHALL DIRECT THE GOLD PROJECT AND HAVE THE RESPONSIBILITY FOR OVERALL TECHNICAL PERFORMANCE AND RESOURCE MANAGEMENT OF THE CONTRACT AND ALL SUBCONTRACTS. THE PI/PM SHALL BE THE FOCAL POINT FOR ALL CONTACT WITH THE GOVERNMENT. THE PM AND STAFF SHALL SUPPORT THE PI AS REQUIRED INCLUDING THE SCHEDULING AND COORDINATING OF MEETINGS AND REVIEWS, SCHEDULE CONTROL AND REPORTING, FINANCIAL CONTROL AND REPORTING, SUBCONTRACT MANAGEMENT, CONFIGURATION MANAGEMENT AND DOCUMENTATION, PROGRESS REPORTS AND REVIEWS AS WELL AS ALL ANOMALY REPORTING ACTIVITIES.

Estimated positioning window

Apr 30, 2028 – Oct 30, 2028

Recompete signal:
45/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 45/100. Available recorded signals: 40 points.

Contract end 2029-04-30 (918 days from calculation)
+15 points
1 historical awards in this buyer and category group
+0 points
38 recorded award transactions
+10 points
Latest award action: 2026-05-27
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Verify whether remaining options may extend performance beyond the current end date.
  3. Check the stated set-aside against the solicitation and current certifications.
  4. Review the award scope and buyer evidence before making a bid/no-bid decision.