Federal contract award
NNG10EK25C
SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | National Aeronautics and Space Administration |
| Office | NASA GODDARD SPACE FLIGHT CENTER |
| NAICS | 541720 — Research and Development in the Social Sciences and Humanities |
| PSC | 1820 — Space Vehicle Components |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | COST PLUS FIXED FEE |
| Obligations | $54.6M |
| Current contract value | $63.4M |
| Potential contract value / ceiling | $63.4M |
| Start date | Dec 22, 2009 |
| Current end date | Apr 30, 2028 |
| Potential end date | Apr 30, 2028 |
| Latest award activity | Jul 14, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 69 of 69 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Jul 14, 2026 | 68 | $0 | SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING. |
| Jun 17, 2025 | 67 | $1.4M | SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING. |
| May 14, 2025 | 66 | $0 | SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING. |
| Feb 28, 2025 | 65 | $0 | SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING. |
| Jul 6, 2023 | 63 | $0 | SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING. |
| Jul 6, 2023 | 64 | $0 | SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING. |
| Apr 20, 2023 | 62 | $0 | SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING. |
| Nov 7, 2022 | 61 | $-1.0M | SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING. |
| Aug 30, 2022 | 60 | $-909.0K | SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING. |
| Jul 29, 2022 | 59 | $4.2M | SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING. |
| Dec 17, 2021 | 58 | $3.3M | SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING. |
| Oct 14, 2021 | 57 | $0 | EO14042 SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING. |
| Sep 27, 2021 | 56 | $1.5M | SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING. |
| Feb 1, 2021 | 55 | $900.0K | SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING. |
| Oct 19, 2020 | 54 | $500.0K | SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING. |
| Aug 27, 2020 | 52 | $0 | SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING. |
| Aug 27, 2020 | 53 | $1.0M | SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING. |
| Apr 29, 2020 | 51 | $0 | SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING. |
| Apr 28, 2020 | 50 | $500.0K | SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING. |
| Jan 6, 2020 | 49 | $400.0K | SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING. |
| Oct 21, 2019 | 48 | $122.7K | SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING. |
| Aug 28, 2019 | 47 | $0 | SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING. |
| Aug 22, 2019 | 46 | $400.0K | SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING. |
| Oct 4, 2018 | 45 | $0 | SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING. |
| Sep 18, 2018 | 44 | $0 | SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING. |
| Mar 22, 2018 | 43 | $0 | SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING. |
| Aug 15, 2017 | 42 | $0 | SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING. |
| Aug 10, 2017 | 41 | $2.7M | SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING. |
| May 8, 2017 | 40 | $500.0K | SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING. |
| Mar 27, 2017 | 39 | $500.0K | SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING. |
| Mar 2, 2017 | 38 | $0 | SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING. |
| Jan 12, 2017 | 37 | $500.0K | SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING. |
| Oct 18, 2016 | 36 | $1.4M | SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING. |
| Oct 3, 2016 | 35 | $0 | SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING. |
| Sep 28, 2016 | 34 | $0 | SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING. |
| Jun 15, 2016 | 33 | $3.3M | SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING. |
| May 11, 2016 | 32 | $500.0K | SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING. |
| Jan 14, 2016 | 31 | $2.5M | SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING. |
| Jan 8, 2016 | 30 | $0 | SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING. |
| Sep 28, 2015 | 29 | $1.7M | SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING. |
| Mar 4, 2015 | 28 | $2.6M | SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING. |
| Oct 10, 2014 | 27 | $-2.4M | SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING. |
| Sep 17, 2014 | 26 | $3.5M | SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING. |
| Sep 4, 2014 | 25 | $3.5M | SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING. |
| Sep 3, 2014 | 24 | $0 | SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING. |
| Aug 4, 2014 | 23 | $624.5K | SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING. |
| Jun 18, 2014 | 22 | $0 | SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING. |
| Mar 27, 2014 | 21 | $0 | SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING. |
| Mar 7, 2014 | 20 | $3.0M | SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING. |
| Jul 26, 2013 | 19 | $0 | SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING. |
| May 7, 2013 | 18 | $0 | SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING. |
| Jan 31, 2013 | 17 | $0 | SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING. |
| Dec 19, 2012 | 16 | $5.6M | SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING. |
| Aug 13, 2012 | 15 | $1.4M | SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING. |
| May 31, 2012 | 14 | $5.7M | SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING. |
| May 1, 2012 | 13 | $0 | SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING. |
| Feb 9, 2012 | 12 | $2.3M | SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING. |
| Dec 30, 2011 | 11 | $0 | SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING. |
| Jun 10, 2011 | 10 | $1.1M | SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING. |
| Mar 31, 2011 | 9 | $295.2K | SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING. |
| Mar 1, 2011 | 8 | $226.5K | SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING. |
| Jan 25, 2011 | 7 | $163.6K | SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING. |
| Dec 9, 2010 | 6 | $0 | SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING. |
| Sep 8, 2010 | 5 | $0 | SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING. |
| May 10, 2010 | 4 | $405.0K | SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING. |
| Apr 21, 2010 | 3 | $0 | SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING. |
| Jan 31, 2010 | 2 | $213.0K | SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING. |
| Jan 20, 2010 | 1 | $120.0K | SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING. |
| Dec 22, 2009 | 0 | $450.0K | SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING. |
Estimated positioning window
Apr 30, 2027 – Oct 30, 2027
55/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 55/100. Available recorded signals: 50 points.
- Contract end 2028-04-30 (553 days from calculation)
- +25 points
- 0 historical awards in this buyer and category group
- +0 points
- 69 recorded award transactions
- +10 points
- Latest award action: 2026-07-14
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-10-25 10:18:04.631876+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Oct 25, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.