Federal contract award

NNG10EK25C

SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyNational Aeronautics and Space Administration
OfficeNASA GODDARD SPACE FLIGHT CENTER
NAICS541720 — Research and Development in the Social Sciences and Humanities
PSC1820 — Space Vehicle Components
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeCOST PLUS FIXED FEE
Obligations$54.6M
Current contract value$63.4M
Potential contract value / ceiling$63.4M
Start dateDec 22, 2009
Current end dateApr 30, 2028
Potential end dateApr 30, 2028
Latest award activityJul 14, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 69 of 69 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jul 14, 202668$0SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING.
Jun 17, 202567$1.4MSOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING.
May 14, 202566$0SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING.
Feb 28, 202565$0SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING.
Jul 6, 202363$0SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING.
Jul 6, 202364$0SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING.
Apr 20, 202362$0SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING.
Nov 7, 202261$-1.0MSOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING.
Aug 30, 202260$-909.0KSOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING.
Jul 29, 202259$4.2MSOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING.
Dec 17, 202158$3.3MSOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING.
Oct 14, 202157$0EO14042 SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING.
Sep 27, 202156$1.5MSOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING.
Feb 1, 202155$900.0KSOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING.
Oct 19, 202054$500.0KSOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING.
Aug 27, 202052$0SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING.
Aug 27, 202053$1.0MSOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING.
Apr 29, 202051$0SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING.
Apr 28, 202050$500.0KSOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING.
Jan 6, 202049$400.0KSOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING.
Oct 21, 201948$122.7KSOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING.
Aug 28, 201947$0SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING.
Aug 22, 201946$400.0KSOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING.
Oct 4, 201845$0SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING.
Sep 18, 201844$0SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING.
Mar 22, 201843$0SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING.
Aug 15, 201742$0SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING.
Aug 10, 201741$2.7MSOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING.
May 8, 201740$500.0KSOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING.
Mar 27, 201739$500.0KSOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING.
Mar 2, 201738$0SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING.
Jan 12, 201737$500.0KSOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING.
Oct 18, 201636$1.4MSOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING.
Oct 3, 201635$0SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING.
Sep 28, 201634$0SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING.
Jun 15, 201633$3.3MSOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING.
May 11, 201632$500.0KSOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING.
Jan 14, 201631$2.5MSOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING.
Jan 8, 201630$0SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING.
Sep 28, 201529$1.7MSOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING.
Mar 4, 201528$2.6MSOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING.
Oct 10, 201427$-2.4MSOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING.
Sep 17, 201426$3.5MSOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING.
Sep 4, 201425$3.5MSOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING.
Sep 3, 201424$0SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING.
Aug 4, 201423$624.5KSOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING.
Jun 18, 201422$0SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING.
Mar 27, 201421$0SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING.
Mar 7, 201420$3.0MSOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING.
Jul 26, 201319$0SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING.
May 7, 201318$0SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING.
Jan 31, 201317$0SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING.
Dec 19, 201216$5.6MSOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING.
Aug 13, 201215$1.4MSOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING.
May 31, 201214$5.7MSOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING.
May 1, 201213$0SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING.
Feb 9, 201212$2.3MSOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING.
Dec 30, 201111$0SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING.
Jun 10, 201110$1.1MSOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING.
Mar 31, 20119$295.2KSOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING.
Mar 1, 20118$226.5KSOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING.
Jan 25, 20117$163.6KSOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING.
Dec 9, 20106$0SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING.
Sep 8, 20105$0SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING.
May 10, 20104$405.0KSOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING.
Apr 21, 20103$0SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING.
Jan 31, 20102$213.0KSOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING.
Jan 20, 20101$120.0KSOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING.
Dec 22, 20090$450.0KSOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING.

Estimated positioning window

Apr 30, 2027 – Oct 30, 2027

Recompete signal:
55/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 55/100. Available recorded signals: 50 points.

Contract end 2028-04-30 (553 days from calculation)
+25 points
0 historical awards in this buyer and category group
+0 points
69 recorded award transactions
+10 points
Latest award action: 2026-07-14
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.