Federal contract award

80LARC19F0074

TRADE STUDY, MODELING, AND ANALYSIS OF ROBOTIC DOCKING AND BERTHING AT THE LUNAR ORBITAL PLATFORM-GATEWAY. NASA SEEKS TO CONSTRUCT THE LUNAR ORBITAL PLATFORM-GATEWAY OVER A PERIOD STARTING FROM 2020 AND ENDING IN 2028. ALTHOUGH DESIGNED TO BE A MANNED SPACE STATION, IT IS EXPECTED THAT THE GATEWAY WILL BE UNOCCUPIED FOR LONG STRETCHES TOTALING OVER 90% OF ITS LIFESPAN. TASKS SUCH AS DOCKING, BERTHING, MAINTENANCE, AND OTHER MANIPULATION TASKS DURING THE UNOCCUPIED PHASES MUST BE PERFORMED BY ROBOTS. SINCE THE ROUND-TRIP COMMUNICATION TIME IS APPROXIMATELY 3 SECONDS, FULL TELEOPERATION IS NOT FEASIBLE, AND SOME DEGREE OF SUPERVISED AUTONOMY WILL BE REQUIRED. THE OBJECTIVES OF THIS WORK ARE TO: 1) PERFORM A STUDY INCLUDING THE MODELING AND ANALYSIS OF SENSING AND CONTROLS REQUIREMENTS TO ENABLE SUPERVISED AUTONOMOUS ROBOTS TO PERFORM DOCKING, BERTHING, AND MAINTENANCE OPERATIONS, AND 2) PERFORM A TRADE STUDY WHICH WILL ASSESS THE STATE OF THE ART IN PLANNED GATEWAY ROBOTS TO INFORM THE DESIGN OF NEW ROBOTIC TOOLS TO ASSIST IN DOCKING AND BERTHING.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyNational Aeronautics and Space Administration
OfficeNASA LANGLEY RESEARCH CENTER
NAICS541712
PSCAR11 — SPACE R&D SERVICES; SPACE FLIGHT, RESEARCH AND SUPPORTING ACTIVITIES; BASIC RESEARCH
Parent award / vehicleNNL13AA08B
Set-asideNot reported
Pricing typeCOST PLUS FIXED FEE
Obligations$23.7K
Current contract value$24.9K
Potential contract value / ceiling$24.9K
Start dateMay 29, 2019
Current end dateSep 30, 2019
Potential end dateSep 30, 2019
Latest award activityNov 22, 2024
Source loadedAug 15, 2026

Funding and modification history

Showing the latest 1 of 1 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Nov 22, 2024P00001$-1.2KTRADE STUDY, MODELING, AND ANALYSIS OF ROBOTIC DOCKING AND BERTHING AT THE LUNAR ORBITAL PLATFORM-GATEWAY. NASA SEEKS TO CONSTRUCT THE LUNAR ORBITAL PLATFORM-GATEWAY OVER A PERIOD STARTING FROM 2020 AND ENDING IN 2028. ALTHOUGH DESIGNED TO BE A MANNED SPACE STATION, IT IS EXPECTED THAT THE GATEWAY WILL BE UNOCCUPIED FOR LONG STRETCHES TOTALING OVER 90% OF ITS LIFESPAN. TASKS SUCH AS DOCKING, BERTHING, MAINTENANCE, AND OTHER MANIPULATION TASKS DURING THE UNOCCUPIED PHASES MUST BE PERFORMED BY ROBOTS. SINCE THE ROUND-TRIP COMMUNICATION TIME IS APPROXIMATELY 3 SECONDS, FULL TELEOPERATION IS NOT FEASIBLE, AND SOME DEGREE OF SUPERVISED AUTONOMY WILL BE REQUIRED. THE OBJECTIVES OF THIS WORK ARE TO: 1) PERFORM A STUDY INCLUDING THE MODELING AND ANALYSIS OF SENSING AND CONTROLS REQUIREMENTS TO ENABLE SUPERVISED AUTONOMOUS ROBOTS TO PERFORM DOCKING, BERTHING, AND MAINTENANCE OPERATIONS, AND 2) PERFORM A TRADE STUDY WHICH WILL ASSESS THE STATE OF THE ART IN PLANNED GATEWAY ROBOTS TO INFORM THE DESIGN OF NEW ROBOTIC TOOLS TO ASSIST IN DOCKING AND BERTHING.

Research next steps

  1. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.