Federal contract award

80MSFC19C0042

SMALL, INNOVATIVE, MISSIONS FOR PLANETARY EXPLORATION (SIMPLEX)

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyNational Aeronautics and Space Administration
OfficeNASA MARSHALL SPACE FLIGHT CENTER
NAICS541715 — Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)
PSCAZ12 — OTHER RESEARCH AND DEVELOPMENT - APPLIED RESEARCH/EXPLORATORY DEVELOPMENT
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeCOST NO FEE
Obligations$51.6M
Current contract value$58.8M
Potential contract value / ceiling$58.8M
Start dateSep 5, 2019
Current end dateSep 30, 2025
Potential end dateSep 30, 2025
Latest award activityJul 23, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 47 of 47 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jul 23, 2026P00046$-214.6KFOR LUNAR TRAILBLAZER PHASES C/D EFFORT, THE CONTRACTOR SHALL BASELINE OPERATIONAL PROCEDURES, FLIGHT SYSTEM OPERATIONS MANUALS, KEY FLIGHT SEQUENCES, AND PREPARE FOR THE PROJECT LEVEL CRITICAL DESIGN REVIEW AND SYSTEM INTEGRATION REVIEW.
Sep 26, 2025P00045$-933.6KFOR LUNAR TRAILBLAZER PHASES C/D EFFORT, THE CONTRACTOR SHALL BASELINE OPERATIONAL PROCEDURES, FLIGHT SYSTEM OPERATIONS MANUALS, KEY FLIGHT SEQUENCES, AND PREPARE FOR THE PROJECT LEVEL CRITICAL DESIGN REVIEW AND SYSTEM INTEGRATION REVIEW.
May 7, 2025P00044$-79.7KFOR LUNAR TRAILBLAZER PHASES C/D EFFORT, THE CONTRACTOR SHALL BASELINE OPERATIONAL PROCEDURES, FLIGHT SYSTEM OPERATIONS MANUALS, KEY FLIGHT SEQUENCES, AND PREPARE FOR THE PROJECT LEVEL CRITICAL DESIGN REVIEW AND SYSTEM INTEGRATION REVIEW.
Mar 25, 2025P00043$370.0KFOR LUNAR TRAILBLAZER PHASES C/D EFFORT, THE CONTRACTOR SHALL BASELINE OPERATIONAL PROCEDURES, FLIGHT SYSTEM OPERATIONS MANUALS, KEY FLIGHT SEQUENCES, AND PREPARE FOR THE PROJECT LEVEL CRITICAL DESIGN REVIEW AND SYSTEM INTEGRATION REVIEW.
Mar 6, 2025P00042$1.5MFOR LUNAR TRAILBLAZER PHASES C/D EFFORT, THE CONTRACTOR SHALL BASELINE OPERATIONAL PROCEDURES, FLIGHT SYSTEM OPERATIONS MANUALS, KEY FLIGHT SEQUENCES, AND PREPARE FOR THE PROJECT LEVEL CRITICAL DESIGN REVIEW AND SYSTEM INTEGRATION REVIEW.
Jan 29, 2025P00041$550.0KFOR LUNAR TRAILBLAZER PHASES C/D EFFORT, THE CONTRACTOR SHALL BASELINE OPERATIONAL PROCEDURES, FLIGHT SYSTEM OPERATIONS MANUALS, KEY FLIGHT SEQUENCES, AND PREPARE FOR THE PROJECT LEVEL CRITICAL DESIGN REVIEW AND SYSTEM INTEGRATION REVIEW.
Oct 31, 2024P00040$675.0KFOR LUNAR TRAILBLAZER PHASES C/D EFFORT, THE CONTRACTOR SHALL BASELINE OPERATIONAL PROCEDURES, FLIGHT SYSTEM OPERATIONS MANUALS, KEY FLIGHT SEQUENCES, AND PREPARE FOR THE PROJECT LEVEL CRITICAL DESIGN REVIEW AND SYSTEM INTEGRATION REVIEW.
Oct 16, 2024P00039$1.1MFOR LUNAR TRAILBLAZER PHASES C/D EFFORT, THE CONTRACTOR SHALL BASELINE OPERATIONAL PROCEDURES, FLIGHT SYSTEM OPERATIONS MANUALS, KEY FLIGHT SEQUENCES, AND PREPARE FOR THE PROJECT LEVEL CRITICAL DESIGN REVIEW AND SYSTEM INTEGRATION REVIEW.
Aug 30, 2024P00038$827.0KFOR LUNAR TRAILBLAZER PHASES C/D EFFORT, THE CONTRACTOR SHALL BASELINE OPERATIONAL PROCEDURES, FLIGHT SYSTEM OPERATIONS MANUALS, KEY FLIGHT SEQUENCES, AND PREPARE FOR THE PROJECT LEVEL CRITICAL DESIGN REVIEW AND SYSTEM INTEGRATION REVIEW.
Aug 9, 2024P00037$585.0KFOR LUNAR TRAILBLAZER PHASES C/D EFFORT, THE CONTRACTOR SHALL BASELINE OPERATIONAL PROCEDURES, FLIGHT SYSTEM OPERATIONS MANUALS, KEY FLIGHT SEQUENCES, AND PREPARE FOR THE PROJECT LEVEL CRITICAL DESIGN REVIEW AND SYSTEM INTEGRATION REVIEW.
Jun 27, 2024P00036$1.3MFOR LUNAR TRAILBLAZER PHASES C/D EFFORT, THE CONTRACTOR SHALL BASELINE OPERATIONAL PROCEDURES, FLIGHT SYSTEM OPERATIONS MANUALS, KEY FLIGHT SEQUENCES, AND PREPARE FOR THE PROJECT LEVEL CRITICAL DESIGN REVIEW AND SYSTEM INTEGRATION REVIEW.
May 13, 2024P00035$1.6MFOR LUNAR TRAILBLAZER PHASES C/D EFFORT, THE CONTRACTOR SHALL BASELINE OPERATIONAL PROCEDURES, FLIGHT SYSTEM OPERATIONS MANUALS, KEY FLIGHT SEQUENCES, AND PREPARE FOR THE PROJECT LEVEL CRITICAL DESIGN REVIEW AND SYSTEM INTEGRATION REVIEW.
May 2, 2024P00034$0FOR LUNAR TRAILBLAZER PHASES C/D EFFORT, THE CONTRACTOR SHALL BASELINE OPERATIONAL PROCEDURES, FLIGHT SYSTEM OPERATIONS MANUALS, KEY FLIGHT SEQUENCES, AND PREPARE FOR THE PROJECT LEVEL CRITICAL DESIGN REVIEW AND SYSTEM INTEGRATION REVIEW.
Mar 21, 2024P00033$850.0KFOR LUNAR TRAILBLAZER PHASES C/D EFFORT, THE CONTRACTOR SHALL BASELINE OPERATIONAL PROCEDURES, FLIGHT SYSTEM OPERATIONS MANUALS, KEY FLIGHT SEQUENCES, AND PREPARE FOR THE PROJECT LEVEL CRITICAL DESIGN REVIEW AND SYSTEM INTEGRATION REVIEW.
Dec 7, 2023P00032$1.6MFOR LUNAR TRAILBLAZER PHASES C/D EFFORT, THE CONTRACTOR SHALL BASELINE OPERATIONAL PROCEDURES, FLIGHT SYSTEM OPERATIONS MANUALS, KEY FLIGHT SEQUENCES, AND PREPARE FOR THE PROJECT LEVEL CRITICAL DESIGN REVIEW AND SYSTEM INTEGRATION REVIEW.
Dec 5, 2023P00031$0FOR LUNAR TRAILBLAZER PHASES C/D EFFORT, THE CONTRACTOR SHALL BASELINE OPERATIONAL PROCEDURES, FLIGHT SYSTEM OPERATIONS MANUALS, KEY FLIGHT SEQUENCES, AND PREPARE FOR THE PROJECT LEVEL CRITICAL DESIGN REVIEW AND SYSTEM INTEGRATION REVIEW.
Jul 25, 2023P00030$2.3MFOR LUNAR TRAILBLAZER PHASES C/D EFFORT, THE CONTRACTOR SHALL BASELINE OPERATIONAL PROCEDURES, FLIGHT SYSTEM OPERATIONS MANUALS, KEY FLIGHT SEQUENCES, AND PREPARE FOR THE PROJECT LEVEL CRITICAL DESIGN REVIEW AND SYSTEM INTEGRATION REVIEW.
Jul 18, 2023P00029$0FOR LUNAR TRAILBLAZER PHASES C/D EFFORT, THE CONTRACTOR SHALL BASELINE OPERATIONAL PROCEDURES, FLIGHT SYSTEM OPERATIONS MANUALS, KEY FLIGHT SEQUENCES, AND PREPARE FOR THE PROJECT LEVEL CRITICAL DESIGN REVIEW AND SYSTEM INTEGRATION REVIEW.
Jul 6, 2023P00028$0FOR LUNAR TRAILBLAZER PHASES C/D EFFORT, THE CONTRACTOR SHALL BASELINE OPERATIONAL PROCEDURES, FLIGHT SYSTEM OPERATIONS MANUALS, KEY FLIGHT SEQUENCES, AND PREPARE FOR THE PROJECT LEVEL CRITICAL DESIGN REVIEW AND SYSTEM INTEGRATION REVIEW.
Jun 12, 2023P00027$1.5MFOR LUNAR TRAILBLAZER PHASES C/D EFFORT, THE CONTRACTOR SHALL BASELINE OPERATIONAL PROCEDURES, FLIGHT SYSTEM OPERATIONS MANUALS, KEY FLIGHT SEQUENCES, AND PREPARE FOR THE PROJECT LEVEL CRITICAL DESIGN REVIEW AND SYSTEM INTEGRATION REVIEW.
Mar 17, 2023P00026$3.6MFOR LUNAR TRAILBLAZER PHASES C/D EFFORT, THE CONTRACTOR SHALL BASELINE OPERATIONAL PROCEDURES, FLIGHT SYSTEM OPERATIONS MANUALS, KEY FLIGHT SEQUENCES, AND PREPARE FOR THE PROJECT LEVEL CRITICAL DESIGN REVIEW AND SYSTEM INTEGRATION REVIEW.
Mar 3, 2023P00025$0FOR LUNAR TRAILBLAZER PHASES C/D EFFORT, THE CONTRACTOR SHALL BASELINE OPERATIONAL PROCEDURES, FLIGHT SYSTEM OPERATIONS MANUALS, KEY FLIGHT SEQUENCES, AND PREPARE FOR THE PROJECT LEVEL CRITICAL DESIGN REVIEW AND SYSTEM INTEGRATION REVIEW.
Dec 12, 2022P00024$3.5MFOR LUNAR TRAILBLAZER PHASES C/D EFFORT, THE CONTRACTOR SHALL BASELINE OPERATIONAL PROCEDURES, FLIGHT SYSTEM OPERATIONS MANUALS, KEY FLIGHT SEQUENCES, AND PREPARE FOR THE PROJECT LEVEL CRITICAL DESIGN REVIEW AND SYSTEM INTEGRATION REVIEW.
Oct 11, 2022P00023$3.7MFOR LUNAR TRAILBLAZER PHASES C/D EFFORT, THE CONTRACTOR SHALL BASELINE OPERATIONAL PROCEDURES, FLIGHT SYSTEM OPERATIONS MANUALS, KEY FLIGHT SEQUENCES, AND PREPARE FOR THE PROJECT LEVEL CRITICAL DESIGN REVIEW AND SYSTEM INTEGRATION REVIEW.
Aug 23, 2022P00022$0FOR LUNAR TRAILBLAZER PHASES C/D EFFORT, THE CONTRACTOR SHALL BASELINE OPERATIONAL PROCEDURES, FLIGHT SYSTEM OPERATIONS MANUALS, KEY FLIGHT SEQUENCES, AND PREPARE FOR THE PROJECT LEVEL CRITICAL DESIGN REVIEW AND SYSTEM INTEGRATION REVIEW.
Aug 19, 2022P00021$648.9KFOR LUNAR TRAILBLAZER PHASES C/D EFFORT, THE CONTRACTOR SHALL BASELINE OPERATIONAL PROCEDURES, FLIGHT SYSTEM OPERATIONS MANUALS, KEY FLIGHT SEQUENCES, AND PREPARE FOR THE PROJECT LEVEL CRITICAL DESIGN REVIEW AND SYSTEM INTEGRATION REVIEW.
Aug 4, 2022P00020$861.0KFOR LUNAR TRAILBLAZER PHASES C/D EFFORT, THE CONTRACTOR SHALL BASELINE OPERATIONAL PROCEDURES, FLIGHT SYSTEM OPERATIONS MANUALS, KEY FLIGHT SEQUENCES, AND PREPARE FOR THE PROJECT LEVEL CRITICAL DESIGN REVIEW AND SYSTEM INTEGRATION REVIEW.
Jun 7, 2022P00019$2.3MFOR LUNAR TRAILBLAZER PHASES C/D EFFORT, THE CONTRACTOR SHALL BASELINE OPERATIONAL PROCEDURES, FLIGHT SYSTEM OPERATIONS MANUALS, KEY FLIGHT SEQUENCES, AND PREPARE FOR THE PROJECT LEVEL CRITICAL DESIGN REVIEW AND SYSTEM INTEGRATION REVIEW.
May 20, 2022P00018$1.0MFOR LUNAR TRAILBLAZER PHASES C/D EFFORT, THE CONTRACTOR SHALL BASELINE OPERATIONAL PROCEDURES, FLIGHT SYSTEM OPERATIONS MANUALS, KEY FLIGHT SEQUENCES, AND PREPARE FOR THE PROJECT LEVEL CRITICAL DESIGN REVIEW AND SYSTEM INTEGRATION REVIEW.
Apr 21, 2022P00017$1.0MFOR LUNAR TRAILBLAZER PHASES C/D EFFORT, THE CONTRACTOR SHALL BASELINE OPERATIONAL PROCEDURES, FLIGHT SYSTEM OPERATIONS MANUALS, KEY FLIGHT SEQUENCES, AND PREPARE FOR THE PROJECT LEVEL CRITICAL DESIGN REVIEW AND SYSTEM INTEGRATION REVIEW.
Jan 18, 2022P00016$3.6MFOR LUNAR TRAILBLAZER PHASES C/D EFFORT, THE CONTRACTOR SHALL BASELINE OPERATIONAL PROCEDURES, FLIGHT SYSTEM OPERATIONS MANUALS, KEY FLIGHT SEQUENCES, AND PREPARE FOR THE PROJECT LEVEL CRITICAL DESIGN REVIEW AND SYSTEM INTEGRATION REVIEW.
Jan 13, 2022P00015$599.6KFOR LUNAR TRAILBLAZER PHASES C/D EFFORT, THE CONTRACTOR SHALL BASELINE OPERATIONAL PROCEDURES, FLIGHT SYSTEM OPERATIONS MANUALS, KEY FLIGHT SEQUENCES, AND PREPARE FOR THE PROJECT LEVEL CRITICAL DESIGN REVIEW AND SYSTEM INTEGRATION REVIEW.
Nov 2, 2021P00014$0EO14042 FOR LUNAR TRAILBLAZER PHASES C/D EFFORT, THE CONTRACTOR SHALL BASELINE OPERATIONAL PROCEDURES, FLIGHT SYSTEM OPERATIONS MANUALS, KEY FLIGHT SEQUENCES, AND PREPARE FOR THE PROJECT LEVEL CRITICAL DESIGN REVIEW AND SYSTEM INTEGRATION REVIEW.
Oct 14, 2021P00012$0FOR LUNAR TRAILBLAZER PHASES C/D EFFORT, THE CONTRACTOR SHALL BASELINE OPERATIONAL PROCEDURES, FLIGHT SYSTEM OPERATIONS MANUALS, KEY FLIGHT SEQUENCES, AND PREPARE FOR THE PROJECT LEVEL CRITICAL DESIGN REVIEW AND SYSTEM INTEGRATION REVIEW
Oct 14, 2021P00013$2.0MFOR LUNAR TRAILBLAZER PHASES C/D EFFORT, THE CONTRACTOR SHALL BASELINE OPERATIONAL PROCEDURES, FLIGHT SYSTEM OPERATIONS MANUALS, KEY FLIGHT SEQUENCES, AND PREPARE FOR THE PROJECT LEVEL CRITICAL DESIGN REVIEW AND SYSTEM INTEGRATION REVIEW.
Apr 21, 2021P00011$2.8MFOR LUNAR TRAILBLAZER PHASES C/D EFFORT, THE CONTRACTOR SHALL BASELINE OPERATIONAL PROCEDURES, FLIGHT SYSTEM OPERATIONS MANUALS, KEY FLIGHT SEQUENCES, AND PREPARE FOR THE PROJECT LEVEL CRITICAL DESIGN REVIEW AND SYSTEM INTEGRATION REVIEW.
Feb 23, 2021P00010$5.3MFOR LUNAR TRAILBLAZER PHASES C/D EFFORT, THE CONTRACTOR SHALL BASELINE OPERATIONAL PROCEDURES, FLIGHT SYSTEM OPERATIONS MANUALS, KEY FLIGHT SEQUENCES, AND PREPARE FOR THE PROJECT LEVEL CRITICAL DESIGN REVIEW AND SYSTEM INTEGRATION REVIEW.
Dec 21, 2020P00009$3.0MFOR LUNAR TRAILBLAZER PHASES C/D EFFORT, THE CONTRACTOR SHALL BASELINE OPERATIONAL PROCEDURES, FLIGHT SYSTEM OPERATIONS MANUALS, KEY FLIGHT SEQUENCES, AND PREPARE FOR THE PROJECT LEVEL CRITICAL DESIGN REVIEW AND SYSTEM INTEGRATION REVIEW.
Dec 1, 2020P00007$2.0MIN SUPPORT OF THE LUNAR TRAILBLAZER PHASES C/D EFFORT, THE CONTRACTOR BASELINE OPERATIONAL PROCEDURES, FLIGHT SYSTEM OPERATIONS MANUALS, AND KEY FLIGHT SEQUENCES, PREPARE FOR THE PROJECT- LEVEL CRITICAL DESIGN REVIEW AND SYSTEM INTEGRATION REVIEW.
Dec 1, 2020P00008$0FOR LUNAR TRAILBLAZER PHASES C/D EFFORT, THE CONTRACTOR SHALL BASELINE OPERATIONAL PROCEDURES, FLIGHT SYSTEM OPERATIONS MANUALS, KEY FLIGHT SEQUENCES, AND PREPARE FOR THE PROJECT LEVEL CRITICAL DESIGN REVIEW AND SYSTEM INTEGRATION REVIEW.
Oct 27, 2020P00006$-8.4KSMALL, INNOVATIVE, MISSIONS FOR PLANETARY EXPLORATION (SIMPLEX)
Sep 18, 2020P00005$400.0KSMALL, INNOVATIVE, MISSIONS FOR PLANETARY EXPLORATION (SIMPLEX)
Jul 22, 2020P00004$218.3KSMALL, INNOVATIVE, MISSIONS FOR PLANETARY EXPLORATION (SIMPLEX)
May 4, 2020P00003$52.5KSMALL, INNOVATIVE, MISSIONS FOR PLANETARY EXPLORATION (SIMPLEX)
Feb 10, 2020P00002$1.1MSMALL, INNOVATIVE, MISSIONS FOR PLANETARY EXPLORATION (SIMPLEX)
Nov 27, 2019P00001$0SMALL, INNOVATIVE, MISSIONS FOR PLANETARY EXPLORATION (SIMPLEX)
Sep 5, 20190$490.6KSMALL, INNOVATIVE, MISSIONS FOR PLANETARY EXPLORATION (SIMPLEX)

Buyer contacts from matching notices

Matched on exact award/solicitation identifier and awarding agency. Source dates describe the notice, not current contact verification.

ContactRolePublished contact methodsEvidenceSource date
Dr. Michael H. New - Science Mission DirectorateContactmichael.h.new@nasa.govSourceApr 19, 2022

Research next steps

  1. Check the stated set-aside against the solicitation and current certifications.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.