Federal contract award

DEAC0909SR22505

NEW CONTRACT AWARD FOR MANAGEMENT OF THE LIQUID WASTE SYSTEM AT SRS

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Energy
OfficeSAVANNAH RIVER OPERATIONS OFFICE
NAICS562211 — Hazardous Waste Treatment and Disposal
PSCM294 — Operation of Waste Treatment and Storage Facilities
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeCOST PLUS AWARD FEE
Obligations$6.6B
Current contract value$6.8B
Potential contract value / ceiling$7.5B
Start dateMar 30, 2009
Current end dateFeb 26, 2022
Potential end dateFeb 26, 2022
Latest award activityMar 18, 2025
Source loadedAug 15, 2026

Funding and modification history

Showing the latest 200 of 697 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Mar 18, 2025698$-76.7KTHE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE FUNDING FROM THE CONTRACT.
Mar 11, 2025697$0THE PURPOSE OF THIS MODIFICATION IS TO CHANGE THE PROGRAM OFFICIAL AND DE-OBLIGATE FUNDING FROM THE CONTRACT.
Aug 16, 2024696$-70.7KTHE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE FUNDING FROM THE CONTRACT.
Nov 21, 2022695$-12.2MTHE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE FUNDING FROM THE CONTRACT.
Jun 28, 2022694$0THE PURPOSE OF THIS MODIFICATION IS TO MAKE ADMINISTRATIVE CHANGES TO THE CONTRACT.
Jun 14, 2022693$-49.0MTHE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE FUNDING FROM THE CONTRACT.
Apr 6, 2022692$-529.5KTHE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE FUNDING FROM THE CONTRACT.
Mar 30, 2022691$-9.2MTHE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE FUNDING FROM THE CONTRACT.
Feb 25, 2022690$-6.2MTHE PURPOSE OF THIS MOD IS TO DEOBLIGATE FUNDING FROM THE CONTRACT.
Feb 17, 2022688$0THE PURPOSE OF THIS MOD IS TO INCORPORATE THE FISCAL YEAR 2022 PERFORMANCE EVALUATION AND MEASUREMENT PLAN REVISION I INTO THE CONTRACT.
Feb 17, 2022689$39.0MTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING TO THE CONTRACT.
Jan 28, 2022686$1.5MTHE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE OF THE CONTRACT (PARAGRAPH A), ESTABLISH THE ESTIMATED COST AND FIXED FEE FOR THE PERIOD FEBRUARY 1, 2022 THROUGH FEBRUARY 26, 2022 (PARAGRAPH B AND C), AUTHORIZE CONTRACT LINE-
Jan 25, 2022685$0THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE THE SALT WASTE PROCESSING FACILITY SCOPE SWAP PROPOSAL.
Jan 13, 2022687$0THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE SERVICE CONTRACT AGE WAGE DETERMINATION IN THE CONTRACT.
Dec 28, 2021684$0THE PURPOSE OF THIS MODIFICATION IS TO CORRECT MOD 683 BLOCK 14, PARAGRAPH E AS FOLLOWS: CONTRACT LINE ITEM NUMBER 11 FROM $475,000.00 TO $4,875,000.00 AND CONTRACT LINE ITEM NUMBER 12 FROM $775,000.00 TO $3,775,000.00.
Dec 16, 2021683$75.2MTHE PURPOSE OF THIS MODIFICATION IS TO INCREMENTAL FUND CR#2 PERIOD (DECEMBER 4, 2021 THROUGH FEBRUARY 18, 2022 FOR SDU 8/9 AND LIQUID WASTE FUNDS.
Nov 22, 2021682$0THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE SERVICE CONTRACT AGE WAGE DETERMINATION IN THE CONTRACT.
Nov 15, 2021681$0THIS MODIFICATION REVISES PARAGRAPH B OF MOD 674 TO INCLUDE WASTE REMOVAL EQUIPMENT FOR TANKS 34, 36, AND 46.
Oct 28, 2021679$7.4MTHE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE FOR CONTRACT LINE ITEMS 11 & 12 AND TO OBLIGATE FUNDS IN THE AMOUNT OF $7,400,000.00 TO THE CONTRACT.
Oct 20, 2021678$95.2MTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDS IN THE AMOUNT OF $95,180,669.00 TO THE CONTRACT.
Oct 7, 2021677$0EO14042 THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE FEDERAL ACQUISITION REGULATION CLAUSE 52.223-99 ENSURING ADEQUATE CORONAVIRUS SAFETY PROTOCOLS FOR FEDERAL CONTRACTORS INTO THE CONTRACT.
Oct 6, 2021675$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE U. S. DEPARTMENT OF LABOR (DOL) WAGE/GENERAL DECISION NO. SC20210002, DATED 10/1/2021, WHICH IS ATTACHED HERE TO.
Oct 6, 2021676$0THE PURPOSE OF THIS MODIFICATION IS TO CORRECT MODIFICATION 674.
Oct 5, 2021674$0THE PURPOSE OF THIS MODIFICATION IS TO ISSUE A CHANGE ORDER REVISING THE STATEMENT OF WORK AND TO CLARIFY ANY ASSOCIATED CHANGES TO THE CONTRACT TERMS.
Sep 30, 2021666$0THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE ADVANCE AGREEMENT IN THE CONTRACT.
Sep 29, 2021673$193.0KTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING TO THE CONTRACT.
Sep 28, 2021668$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE FISCAL YEAR 2022 PERFORMANCE EVALUATION MANAGEMENT PLAN (EXTENSION #5, OPTION I) INTO THE CONTRACT.
Sep 28, 2021671$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE A REVISED FISCAL YEAR 2021 PERFORMANCE EVALUATION AND MEASUREMENT PLAN INTO THE CONTRACT.
Sep 28, 2021672$364.6KTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING TO THE CONTRACT.
Sep 22, 2021669$6.3MTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING TO THE CONTRACT.
Sep 22, 2021670$906.4KTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING TO THE CONTRACT.
Sep 10, 2021667$250.0KTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING TO THE CONTRACT.
Sep 7, 2021665$0THE PURPOSE OF THIS MODIFICATION IS TO CORRECT THE ACCOUNTING CODE ON MODIFICATION 664.
Aug 31, 2021664$542.4KTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING TO THE CONTRACT.
Aug 27, 2021663$0THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE SMALL BUSINESS PLAN IN THE CONTRACT.
Aug 26, 2021662$73.9KTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING TO THE CONTRACT.
Aug 24, 2021661$-60.0KTHE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE FUNDING FROM THE CONTRACT.
Aug 17, 2021659$0THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE THE TANK 48 ANALYSIS CHANGE ORDER.
Aug 16, 2021660$0THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE SMALL BUSINESS PLAN IN THE CONTRACT.
Aug 5, 2021658$0THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE SERVICE CONTRACT ACT WAGE DETERMINATION IN THE CONTRACT.
Jul 30, 2021657$0THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE EXTENSION 5, OPTION I.
Jul 28, 2021655$0THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE THE ACCELERATED BASIN DEINVENTORY CHANGE ORDER.
Jul 28, 2021656$141.6MTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDS TO THE CONTRACT.
Jul 21, 2021654$28.4MTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDS TO THE CONTRACT.
Jul 1, 2021653$0THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE GOVERNMENT FURNISHED SERVICES AND ITEMS LIST IN THE CONTRACT WITH A REVISED LIST.
Jun 14, 2021651$0THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE THE CONTRACTOR'S REQUEST FOR APPROVAL OF THE SALTSTONE DISPOSAL UNIT 8 & 9 SCOPE ACCELERATION MINI PROPOSAL.
Jun 14, 2021652$0THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE SERVICE CONTRACT ACT WAGE DETERMINATION IN THE CONTRACT.
Jun 8, 2021650$155.5KTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDS TO THE CONTRACT.
May 27, 2021649$0THE PURPOSE OF THIS MODIFICATION IS TO REALIGN CYBERSECURITY FUNDING ON THE CONTRACT.
May 19, 2021647$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE ATTACHED PERFORMANCE EVALUATION AND MEASUREMENT PLAN REVISION 0 FOR THE EVALUATION PERIOD OF OCTOBER 1, 2020, THROUGH SEPTEMBER 30, 2021.
May 19, 2021648$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE AN UPDATED SMALL BUSINESS SUBCONTRACTING PLAN INTO THE CONTRACT.
May 14, 2021646$300.0KTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDS TO THE CONTRACT.
May 13, 2021645$200.0KTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDS TO THE CONTRACT.
May 5, 2021641$0THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE KEY PERSONNEL LIST IN THE CONTRACT.
May 5, 2021644$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE AN UPDATED SERVICE CONTRACT ACT WAGE DETERMINATION INTO THE CONTRACT.
Apr 28, 2021642$0THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE THE CONTRACTING OFFICERS AUTHORIZATION TO PROCEED WITH THE EFFORT ENTITLED IMPLEMENT NEXT GENERATION SOLVENT AT THE SALT WASTE PROCESSING FACILITY.
Apr 28, 2021643$0THE PURPOSE OF THIS MODIFICATION IS TO REVISE THE CONTRACT TO ACKNOWLEDGE THE TRANSITION OF SERVICES FROM SAVANNAH RIVER NUCLEAR SOLUTIONS (SRNS) TO BATTELLE SAVANNAH RIVER ALLIANCE (BSRA).
Apr 16, 2021640$145.0MTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDS TO THE CONTRACT.
Apr 15, 2021639$100.0KTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDS TO THE CONTRACT.
Apr 13, 2021638$1.0MTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDS TO THE CONTRACT.
Apr 8, 2021636$0THE PURPOSE OF THIS MODIFICATION IS TO UPDATE CLAUSES IN THE CONTRACT.
Apr 8, 2021637$16.4MTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDS TO THE CONTRACT.
Mar 24, 2021635$407.7KTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDS TO THE CONTRACT.
Mar 23, 2021634$0THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE CARES ACT CLAUSE IN THE CONTRACT.
Mar 11, 2021632$-7.7KTHE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE FUNDS FROM THE CONTRACT.
Mar 11, 2021633$64.4MTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDS TO THE CONTRACT.
Feb 25, 2021629$-73.9KTHE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE FUNDS FROM THE CONTRACT.
Feb 25, 2021631$54.0MTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDS TO THE CONTRACT.
Feb 19, 2021630$0THE PURPOSE OF THIS MODIFICATION IS TO REVISE THE ADVANCE AGREEMENT IN THE CONTRACT.
Feb 12, 2021627$0THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE COVID-19 ADVANCE AGREEMENT INCORPORATED UNDER MODIFICATION 579.
Feb 12, 2021628$5.0MTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDS TO THE CONTRACT.
Feb 11, 2021624$0THE PURPOSE OF THIS MODIFICATION IS TO REPLACE THE GOVERNMENT FURNISHED SERVICES AND ITEMS (GFS/I) LIST WITH A REVISED GFS/I LIST.
Feb 10, 2021626$5.5MTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDS TO THE CONTRACT.
Feb 5, 2021625$-5.2MTHE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE FUNDS FROM THE CONTRACT.
Jan 27, 2021623$9.3MTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDS TO THE CONTRACT.
Jan 19, 2021622$0THE PURPOSE OF THIS MODIFICATION IS TO CORRECT MODIFICATION 621 BLOCK 14, PARAGRAPH C., TOTAL AMOUNT OF FUNDS OBLIGATED TO THE CONTRACT.
Jan 15, 2021621$75.2MTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING TO THE CONTRACT.
Jan 5, 2021620$0THE PURPOSE OF THIS MODIFICATION IS TO UPDATE CLAUSE H.67 OF THE CONTRACT.
Dec 23, 2020619$0THE PURPOSE OF THIS MODIFICATION IS TO UPDATE CLAUSE H.67 OF THE CONTRACT.
Dec 22, 2020617$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE ATTACHED PERFORMANCE EVALUATION AND MEASUREMENT PLAN REVISION 0 FOR THE EVALUATION PERIOD OF OCTOBER 1, 2020, THROUGH SEPTEMBER 30, 2021.
Dec 22, 2020618$1.2KTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING TO THE CONTRACT.
Dec 17, 2020616$0THE PURPOSE OF THIS MODIFICATION IS TO REALIGN TO THE CORONAVIRUS DISEASE OF 2019 LINE OF ACCOUNTING.
Dec 15, 2020614$-2.3MTHE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE FUNDS FROM THE CONTRACT.
Dec 15, 2020615$0COVID-19 - THE PURPOSE OF THIS MODIFICATION IS TO UPDATE CLAUSE H.67 OF THE CONTRACT.
Nov 13, 2020610$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE DEPARTMENT OF ENERGY ORDER 486.1A INTO THE CONTRACT.
Nov 13, 2020612$0THE PURPOSE OF THIS MODIFICATION IS TO REPLACE THE GOVERNMENT FURNISHED SERVICES AND ITEMS (GFS/I) LIST WITH A REVISED GFS/I LIST.
Nov 5, 2020613$0THE PURPOSE OF THIS MODIFICATION IS TO INCREASE THE TOTAL ESTIMATED COST OF THE CONTRACT.
Oct 27, 2020611$0THE PURPOSE OF THIS MODIFICATION IS TO ALIGN FUNDING ON THE CONTRACT.
Oct 21, 2020605$132.8MTHE PURPOSE OF THIS MODIFICATION IS TO AUTHORIZE THE CONTRACTOR TO PERFORM PRE-PRICED CONTRACT LINE ITEMS 00011 AND 00012 AND TO OBLIGATE FUNDING.
Oct 21, 2020609$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE AN UPDATED SMALL BUSINESS SUBCONTRACTING PLAN INTO THE CONTRACT
Oct 13, 2020606$0THE PURPOSE OF THIS MODIFICATION IS TO UPDATE CLAUSE H.67, COVID-19 3610 - PAID LEAVE UNDER SECTION 3610 OF THE CORONAVIRUS AID, RELIEF, AND ECONOMIC SECURITY ACT TO MAINTAIN EMPLOYEES AND SUBCONTRACTORS IN A READY STATE, IN THE CONTRACT.
Oct 13, 2020608$0THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE DAVIS BACON WAGE DETERMINATION IN THE CONTRACT.
Oct 6, 2020607$0THE PURPOSE OF THE MODIFICATION IS TO UPDATE THE DAVIS BACON WAGE DETERMINATION IN THE CONTRACT.
Sep 30, 2020604$0THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE CONTRACTING OFFICER'S REPRESENTATIVE LISTING IN THE CONTRACT.
Sep 29, 2020603$5.9MTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING TO THE CONTRACT.
Sep 28, 2020602$0THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE OF THE CONTRACT.
Sep 17, 2020601$0THE PURPOSE OF THIS MODIFICATION IS TO CORRECT FUNDING CODES ON MODIFICATION 567.
Sep 16, 2020600$100.0KTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING TO THE CONTRACT.
Sep 3, 2020599$-3.7KTHE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE FUNDING FROM THE CONTRACT.
Aug 21, 2020598$17.4MTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING TO THE CONTRACT.
Aug 19, 2020596$-17.4MTHE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE FUNDING FROM THE CONTRACT.
Aug 19, 2020597$0THE PURPOSE OF THIS MODIFICATION IS TO CORRECT THE PROJECT VALUE CODE FROM 0001764 TO 3013735.
Jul 31, 2020594$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE ATTACHED PERFORMANCE EVALUATION AND MEASURE PLAN REVISION 1 FOR THE PERIOD APRIL 1, 2019 THROUGH SEPTEMBER 30, 2020.
Jul 31, 2020595$120.0KTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING TO THE CONTRACT.
Jul 21, 2020593$14.9MTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING TO THE CONTRACT.
Jul 17, 2020592$129.6MTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING TO THE CONTRACT.
Jul 9, 2020591$525.0KTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING TO THE CONTRACT.
Jul 8, 2020590$0THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE KEY PERSONNEL LIST IN THE CONTRACT.
Jun 24, 2020589$0CORONAVIRUS DISEASE (COVID-19) THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PARTIAL STOP WORK ORDER ISSUED ON THE CONTRACT.
Jun 16, 2020588$0THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE MODIFICATION 571.
May 29, 2020587$270.8KTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDS TO THE CONTRACT.
May 27, 2020586$0THE PURPOSE OF THIS MODIFICATION IS TO UPDATE LIST B IN THE CONTRACT.
May 19, 2020584$0THE PURPOSE OF THIS MODIFICATION IS TO REVISE THE CONTRACT KEY PERSONNEL LIST IN THE CONTRACT.
May 15, 2020585$590.0KTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDS TO THE CONTRACT.
May 6, 2020581$-216.8KTHE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE FUNDING FROM THE CONTRACT.
May 6, 2020583$0THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE THE DEFENSE WASTE PROCESSING FACILITY (DWPF) RECYCLE OFFSITE DISPOSITION PHASE 1 PROOF OF PRINCIPLE EFFORT.
May 1, 2020582$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE ADVANCE AGREEMENT INTO THE CONTRACT. THE PURPOSE OF THIS MODIFICATION IS TO ADD CLAUSE H.67, COVID-19 3610 - PAID LEAVE UNDER SECTION 3610 OF THE CORONAVIRUS AID, RELIEF, AND ECONOMIC SECURIT
Apr 13, 2020579$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE ADVANCE AGREEMENT INTO THE CONTRACT.
Apr 13, 2020580$17.4MTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING TO THE CONTRACT.
Apr 8, 2020578$1.0MTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING TO THE CONTRACT.
Apr 7, 2020577$140.0MTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING TO THE CONTRACT.
Mar 30, 2020576$8.0MTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING TO THE CONTRACT.
Mar 20, 2020575$0THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE DAVIS BACON WAGE DETERMINATION IN THE CONTRACT.
Mar 17, 2020574$1.0MTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING TO THE CONTRACT.
Mar 16, 2020573$0THE PURPOSE OF THIS MODIFICATION IS TO ADD AN ACCOUNTING CODE TO MOD 570.
Mar 11, 2020572$88.0MTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDS TO THE CONTRACT.
Mar 6, 2020570$4.5MTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDS TO THE CONTRACT.
Mar 6, 2020571$0THE PURPOSE OF THIS MODIFICATION IS TO ISSUE A CHANGE ORDER.
Feb 5, 2020568$0THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE DAVIS BACON ACT WAGE DETERMINATION IN THE CONTRACT.
Feb 4, 2020569$52.0MTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDS TO THE CONTRACT.
Jan 23, 2020565$0THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE GOVERNMENT FURNISHED SERVICES AND ITEMS LIST.
Jan 23, 2020567$-153.9KTHE PURPOSE OF THIS MODIFICATION IS TO DE OBLIGATE FUNDS TO THE CONTRACT.
Jan 16, 2020566$52.9MTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDS TO THE CONTRACT.
Jan 15, 2020564$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE AN UPDATED SERVICE CONTRACT ACT WAGE DETERMINATION.
Dec 10, 2019563$1.7MTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDS TO THE CONTRACT.
Dec 2, 2019562$41.5MTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDS TO THE CONTRACT.
Oct 24, 2019561$0THE PURPOSE OF THIS MODIFICATION IS ADD THE ACCOUNTING AND CLASSIFICATION CODES FOR MOD 560, BLOCK 14C.
Oct 17, 2019560$7.0MTHE PURPOSE OF THIS MODIFICATION IS OBLIGATE FUNDING TO THE CONTRACT.
Oct 11, 2019559$66.4MTHE PURPOSE OF THIS MODIFICATION IS OBLIGATE FUNDING TO THE CONTRACT.
Oct 2, 2019558$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE FEDERAL ACQUISITION REGULATION 52.222-62 PAID SICK LEAVE UNDER EXECUTIVE ORDER 13706.
Sep 26, 2019557$5.0MTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING TO THE CONTRACT.
Sep 25, 2019555$1.0MTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING TO THE CONTRACT.
Sep 25, 2019556$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE A REVISED SECTION J, APPENDIX Q - CONTRACTING OFFICER'S REPRESENTATIVES.
Sep 23, 2019554$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE PERFORMANCE EVALUATION AND MEASUREMENT PLAN FOR THE EIGHTEEN-MONTH EXTENSION.
Sep 5, 2019553$900.0KTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING TO THE CONTRACT.
Aug 15, 2019552$66.2MTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING TO THE CONTRACT.
Aug 14, 2019544$0THE PURPOSE OF THIS MODIFICATION IS TO REVISE CONTRACT SECTION H, SPECIAL CONTRACT REQUIREMENTS, TO ADD H.66, WORKFORCE RESTRUCTURING.
Aug 14, 2019551$0THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE THE CONTRACTING OFFICER'S JULY 24, 2019, AUTHORIZATION TO PROCEED WITH THE WASTEWATER ENVIRONMENTAL ASSESSMENT SUPPORT.
Aug 8, 2019549$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE AN UPDATED SERVICE CONTRACT ACT WAGE DETERMINATION.
Aug 8, 2019550$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE AN UPDATED SMALL BUSINESS SUBCONTRACTING PLAN.
Aug 1, 2019548$1.9MTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING TO THE CONTRACT.
Jul 18, 2019547$13.6MTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING TO THE CONTRACT.
Jul 17, 2019546$0THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE MODIFICATION 538.
Jul 11, 2019545$75.0MTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING TO THE CONTRACT.
Jun 24, 2019543$450.0KTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING TO THE CONTRACT.
Jun 4, 2019542$0THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE LIST B IN THE CONTRACT.
May 7, 2019540$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE AN UPDATED SERVICE CONTRACT ACT WAGE DETERMINATION.
May 7, 2019541$17.5MTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDS TO THE CONTRACT.
Apr 9, 2019539$129.7MTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDS TO THE CONTRACT.
Mar 29, 2019538$0THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE BY 18 MONTHS.
Mar 12, 2019537$0THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE DAVIS BACON ACT WAGE DETERMINATION IN THE CONTRACT.
Feb 15, 2019536$7.6MTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING TO THE CONTRACT.
Jan 22, 2019535$117.3MTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING TO THE CONTRACT.
Dec 18, 2018534$550.0KTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING TO THE CONTRACT.
Dec 13, 2018533$0THE PURPOSE OF THIS MODIFICATION IS TO CORRECT THE ACCOUNTING CODES.
Dec 12, 2018530$0THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE GOVERNMENT FURNISHED SERVICES AND ITEMS LIST.
Dec 12, 2018531$-550.0KTHE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE FUNDING FROM THE CONTRACT.
Dec 12, 2018532$52.0MTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING TO THE CONTRACT.
Nov 19, 2018528$0THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE CONTRACTING OFFICER'S REPRESENTATIVE LISTING IN THE CONTRACT.
Nov 19, 2018529$500.0KTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING TO THE CONTRACT.
Nov 15, 2018526$-7.5MTHE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE FUNDING FROM THE CONTRACT.
Nov 14, 2018527$40.2MTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING TO THE CONTRACT.
Nov 5, 2018525$622.8KTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING TO THE CONTRACT.
Oct 31, 2018523$-622.8KTHE PURPOSE OF THIS MODIFICATION DEOBLIGATE FUNDING FROM THE CONTRACT.
Oct 31, 2018524$0THE PURPOSE OF THIS MODIFICATION IS TO CHANGE A COMPANY'S NAME LISTED IN H.32 CRITICAL SUBCONTRACTS - DESIGNATION AND CONSENT.
Oct 23, 2018521$0THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE DAVIS BACON ACT WAGE DETERMINATION IN THE CONTRACT.
Oct 22, 2018522$4.0MTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING TO THE CONTRACT.
Oct 17, 2018519$0THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE LIST B IN THE CONTRACT.
Oct 12, 2018520$40.8MTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING TO THE CONTRACT.
Oct 3, 2018518$0THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE DAVIS BACON ACT WAGE DETERMINATION IN THE CONTRACT.
Sep 17, 2018517$0THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE FUNDING FROM THE CONTRACT.
Sep 6, 2018515$5.4MTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDS IN THE AMOUNT OF $5,863,895.00 TO THE CONTRACT AND DEOBLIGATE FUNDS IN THE AMOUNT OF $442,571.00 FROM THE CONTRACT.
Sep 6, 2018516$0THE PURPOSE OF THIS MODIFICATION IS TO ALIGN FUNDING ON THE CONTRACT
Aug 29, 2018514$1.0MTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING TO THE CONTRACT FOR CYBER SECURITY REQUIREMENTS.
Aug 21, 2018513$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE CORRECTED SMALL BUSINESS SUBCONTRACTING PLAN INTO THE CONTRACT.
Aug 10, 2018512$17.9MTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDS TO THE CONTRACT.
Aug 9, 2018511$114.1MTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDS TO THE CONTRACT.
Aug 2, 2018509$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE PERFORMANCE EVALUATION AND MEASUREMENT PLAN FOR THE EVALUATION PERIOD OF JUNE 1, 2018, THROUGH MARCH 31, 2019.
Aug 1, 2018510$41.1KTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING TO THE CONTRACT.
Jul 20, 2018505$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE UPDATED SERVICE CONTRACT ACT WAGE DETERMINATIONS INTO THE CONTRACT.
Jul 20, 2018507$-41.1KTHE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE FUNDING FROM THE CONTRACT.
Jul 20, 2018508$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE AN UPDATED SMALL BUSINESS SUBCONTRACTING PLAN INTO THE CONTRACT.
Jul 19, 2018504$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE FEDERAL ACQUISITION REGULATION CLAUSE 52.203-17.
Jul 16, 2018506$41.1KTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING TO THE CONTRACT.
Jul 11, 2018502$0THE PURPOSE OF THIS MODIFICATION IS TO ALIGN FUNDING ON THE CONTRACT.
Jul 11, 2018503$2.5MTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING TO THE CONTRACT.
Jul 3, 2018498$0THE PURPOSE OF THIS MODIFICATION IS TO REVISE CLAUSES I.73 AND I.92 TO INCORPORATE DEPARTMENT OF ENERGY FEDERAL ACQUISITION REGULATION CLASS DEVIATION ENTITLED "INCREASE IN THRESHOLD FOR REQUIRING CERTIFIED COST OR PRICING DATA."
Jul 3, 2018500$38.2MTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING TO THIS CONTRACT.
Jul 3, 2018501$0THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE UPDATED SERVICE CONTRACT ACT WAGE DETERMINATIONS INTO THE CONTRACT.
Jun 27, 2018499$1.7MTHE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING TO THIS CONTRACT.