| Field | Reported value |
|---|---|
| Agency | Department of Labor |
| Office | DOL - JCAS EAST PROCUREMENT |
| NAICS | 611519 — Other Technical and Trade Schools |
| PSC | M1CZ — OPERATION OF OTHER EDUCATIONAL BUILDINGS |
| Parent award / vehicle | Not reported |
| Set-aside | SMALL BUSINESS SET ASIDE - TOTAL |
| Pricing type | COST PLUS INCENTIVE FEE |
| Obligations | $50.0M |
| Current contract value | $59.6M |
| Potential contract value / ceiling | $59.6M |
| Start date | Dec 23, 2016 |
| Current end date | Jan 31, 2022 |
| Potential end date | Aug 25, 2026 |
| Latest award activity | Sep 1, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 53 of 53 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Sep 1, 2026 | 52 | $1.2M | MUHLENBERG/5357/INSIGHTS EXPIRED/DOLETA17C0034/MOD 52 |
| Jun 4, 2025 | 51 | $-16.8K | MUHLENBERG/5357/INSIGHTS, EXPIRED/DOLETA17C0034/MOD 50 |
| Jun 5, 2024 | 50 | $-114.7K | MUHLENBERG/5357/INSIGHTS, EXPIRED/DOLETA17C0034/MOD 50 |
| Apr 2, 2024 | 49 | $-17.5K | MUHLENBERG/5357/INSIGHTS, EXPIRED/DOLETA17C0034/MOD 46 THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE FUNDING IN THE AMOUNT OF $-475.00 UNDER THE BELOW LINE OF ACCOUNTING WITH ASSOCIATED AMOUNT. |
| Apr 26, 2023 | 48 | $-362.8K | MUHLENBERG/5357/INSIGHTS, EXPIRED/DOLETA17C0034/MOD 46 THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE FUNDING IN THE AMOUNT OF $-475.00 UNDER THE BELOW LINE OF ACCOUNTING WITH ASSOCIATED AMOUNT. |
| Mar 17, 2023 | 47 | $-40.0K | MUHLENBERG/5357/INSIGHTS, EXPIRED/DOLETA17C0034/MOD 46 THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE FUNDING IN THE AMOUNT OF $-475.00 UNDER THE BELOW LINE OF ACCOUNTING WITH ASSOCIATED AMOUNT. |
| Feb 8, 2023 | 46 | $-475 | MUHLENBERG/5357/INSIGHTS, EXPIRED/DOLETA17C0034/MOD 46 THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE FUNDING IN THE AMOUNT OF $-475.00 UNDER THE BELOW LINE OF ACCOUNTING WITH ASSOCIATED AMOUNT. |
| Jan 19, 2023 | 45 | $-1.6M | MUHLENBERG/5357/INSIGHTS, DOLETA17C0034, MOD 0045 THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE FUNDING IN THE AMOUNT OF $-1,570,422.31 |
| Jun 14, 2022 | 44 | $-137.3K | MUHLENBERG/5357/INSIGHTS, DOLETA17C0034, MOD 0044 - PY20/21 1% TECHNICAL PERFORMANCE INCENTIVE FEE RECONCILIATION FOR OY2 & OY3 |
| Apr 19, 2022 | 43 | $0 | MUHLENBERG/5357/INSIGHTS, DOLETA17C0034, MOD 0043 - CY5 PBSC COST INCENTIVE FEE RECONCILIATION; NO CHANGE TO COST OR FUNDING |
| Apr 6, 2022 | 42 | $-2.0M | MUHLENBERG/5357/INSIGHTS, DOLETA17C0034, MOD 0042 - UDO DEOBLIGATION OF UNUSED/UNBILLED OPS, OA, CTS, CRA, AND CTST |
| Nov 9, 2021 | 41 | $2.7K | MUHLENBERG/5357/INSIGHTS, CY5/ DOLETA17C0034, MOD 41 THE PURPOSE OF THIS MODIFICATION IS TO FUND CRA. 1. INCREASE CLIN 5001 CONSTRUCTION REHAB AND ACQUISITION ESTIMATED COST AND FUNDING BY $2,703 ---FOP 173, JFK DORM FIRE ALARM TROUBLESHOOT - SUPP |
| Oct 26, 2021 | 40 | $0 | MUHLENBERG/5357/INSIGHTS, DOL-ETA-17-C-0034, MOD 0040 THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE FAR CLAUSE 52.223-99 ENSURING ADEQUATE COVID-19 SAFETY PROTOCOLS FOR FEDERAL CONTRACTORS (OCT 2021) (DEVIATION). INCORPORATION OF THIS CLAUS |
| Sep 9, 2021 | 39 | $30.1K | MUHLENBERG/5357/INSIGHTS, DOL-ETA-17-C-0034, MOD 0039 1. INCREASE CLIN 5001 CONSTRUCTION REHAB AND ACQUISITION ESTIMATED COST AND FUNDING BY $30,100 ---FOP 144, JFK DORM FIRE ALARM, $30,100 |
| Aug 26, 2021 | 38 | $11.3K | MUHLENBERG/5357/INSIGHTS, DOL-ETA-17-C-0034, MOD 0038 INCREASE CLIN 5002 EQUIPMENT ESTIMATED COST AND FUNDING BY $11,255 |
| Aug 4, 2021 | 37 | $6.1M | MUHLENBERG/5357/INSIGHTS, DOL-ETA-17-C-0034, MOD 0037 CY5 |
| Jun 15, 2021 | 36 | $-133.7K | MUHLENBERG/5357/INSIGHTS, DOLETA17C0034, MOD 0036 - DEOBLIGATE TECHNICAL PERFORMANCE INCENTIVE FEE FUNDING ONLY (CLIN 2003) |
| Jun 11, 2021 | 35 | $211.1K | MUHLENBERG/5357/INSIGHTS, DOLETA17C0034, MOD 0035 - DEFINITIZE CHANGE ORDERS WHICH INCORPORATED PROGRAM INSTRUCTION NOTICES (PIN) 19-14, 19-15, 19-16, 19-17, 19-18, 19-19, 20-01, 20-02, 20-03, 20-04, 20-05, 20-06, 20-07, 20-08, 20-11, AND 20-12, AS W |
| May 5, 2021 | 34 | $2.7K | MUHLENBERG/5357/INSIGHTS, DOLETA17C0034, MOD 0034 - CY4 COST INCENTIVE FEE RECONCILIATION |
| Apr 19, 2021 | 33 | $-15.5K | MUHLENBERG/5357/INSIGHTS, DOLETA17C0034, MOD 0033 - DEOBLIGATE UNUSED CRA FUNDS |
| Apr 14, 2021 | 32 | $104.3K | MUHLENBERG/5357/INSIGHTS, DOLETA17C0034, MOD 0032 - CRA AND EQUIPMENT FUNDING; INCORPORATION OF CTT CHANGES |
| Jan 20, 2021 | 31 | $6.0M | MUHLENBERG/5357/INSIGHTS, DOLETA17C0034, MOD 0031 - EXERCISE OY3 2/1/2021-1/31/2022 |
| Dec 14, 2020 | 30 | $0 | MUHLENBERG/5357/INSIGHTS, DOLETA17C0034, MOD 0030 - CY3 PBSC FEE RECONCILIATION |
| Oct 26, 2020 | 29 | $11.3K | MUHLENBERG/5357/INSIGHTS, DOLETA17C0034, MOD 0029 - ADD CLIN 5002 EQUIPMENT FUNDING (PY20 RESERVE ALLOCATION) |
| Sep 3, 2020 | 28 | $6.4K | MUHLENBERG/5357/INSIGHTS, DOLETA17C0034, MOD 0028 - (1) PBSC RECONCILIATION; (2) INCREASE CRA FUNDING |
| Aug 28, 2020 | 27 | $7.5K | MUHLENBERG/5357/INSIGHTS, DOLETA17C0034, MOD 0027 - INCREASE CRA COST AND FUNDING |
| Jul 24, 2020 | 26 | $6.0M | MUHLENBERG/5357/INSIGHTS, DOLETA17C0034, MOD 0026 - INCREMENTAL FUNDING FOR CY4 |
| Jun 4, 2020 | 25 | $15.9K | MUHLENBERG/5357/INSIGHTS, DOLETA17C0034, MOD 0025 - INCREASE CLIN 5001 CONSTRUCTION/REHAB COST AND FUNDING |
| Apr 17, 2020 | 24 | $-11.5K | MUHLENBERG/5357/INSIGHTS, DOLETA17C0034, MOD 0024 - DECREASE CONSTRUCTION/REHAB COST AND FUNDING BY ($11,532) [UNUSED 1619/1720 FUND BALANCE]. |
| Mar 23, 2020 | 23 | $4.8K | MUHLENBERG/5357/INSIGHTS, DOLETA17C0034, MOD 0023 - INCREASE CLIN 2002 CENTER OPERATIONS ESTIMATED COST AND FUNDING (IXL EDU. RESOURCES); AND DECREASE CLIN 2004 CENTER OPERATIONS COST INCENTIVE FEE ESTIMATED COST AND FUNDING (LIQUIDATED DAMAGES) |
| Feb 27, 2020 | 22 | $80.8K | MUHLENBERG/5357/INSIGHTS, DOLETA17C0034, MOD 0022 - INCREASE CLIN 5001 CONSTRUCTION/REHAB ESTIMATED COST AND FUNDING BY $80,785 |
| Dec 19, 2019 | 21 | $964.5K | MUHLENBERG/5357/INSIGHTS, DOLETA17C0034, MOD 0021 - DEFINITIZE OA/CTS CHANGE ORDER DATED 10/3/2019 |
| Nov 19, 2019 | 20 | $7.3M | MUHLENBERG/5357/INSIGHTS, CY3/DOLETA17C0034, MOD 0020 - (1) EXERCISE OPTION PERIOD 2 (CONTRACT YEAR 4), 2/1/2020--1/31/2021; (2) PROVIDE CY3 INCREMENTAL FUNDING; (3) PROVIDE CY4 INCREMENTAL FUNDING; AND (4) INCREASE CLINS 5001 CRA AND 5002 EQUI |
| Nov 14, 2019 | 19 | $-177.5K | MUHLENBERG/5357/INSIGHTS, CY3/DOLETA17C0034, MOD 0019 - (1) ADMIN ACTION TO INCORPORATE CTT CHANGES; (2) CY2 PBSC FEE RECONCILIATIONS |
| Sep 11, 2019 | 18 | $0 | MUHLENBERG/5357/INSIGHTS, CY3/DOLETA17C0034, MOD 0018 - INCORPORATE CHANGE ORDER MEMO DATED 7/29/2019, SAFETY AND SECURITY UPDATES TO SECTION C, STATEMENT OF WORK |
| Jul 18, 2019 | 17 | $1.7M | MUHLENBERG/5357/INSIGHTS, CY3/DOLETA17C0034, MOD 0017 - INCREASE CLIN 1002 CENTER OPS INCREMENTAL FUNDING; INCREASE CLIN 5003 CTST ESTIMATED COST AND FUNDING (PY19 ALLOCATION) |
| Mar 18, 2019 | 16 | $52.9K | MUHLENBERG/5357/INSIGHTS, CY3/DOLETA17C0034, MOD 0016 - (1) INCREASE CLIN 0002&CLIN 1002 CENTER OPS ESTIMATED COST AND FUNDING FOR FOP #241, EQUITABLE ADJUSTMENT FOR INCREASE IN TEAP HOURS; (2) INCREASE CLIN 5002 ESTIMATED COST AND FUNDING FOR FOP #228 PY18 EQUIPMENT ALLOCATION |
| Feb 7, 2019 | 15 | $0 | MUHLENBERG/5357/INSIGHTS, CY2/DOLETA17C0034, MOD 0015 - THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE OPTION YEAR 1 (CONTRACT YEAR 3) FOR THE PERIOD FEBRUARY 1, 2019 THROUGH JANUARY 31, 2020. |
| Jan 7, 2019 | 14 | $6.6M | MUHLENBERG/5357/INSIGHTS, CY2/DOLETA17C0034, MOD 0014 - THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE OPTION YEAR 1 (CONTRACT YEAR 3) FOR THE PERIOD FEBRUARY 1, 2019 THROUGH JANUARY 31, 2020. |
| Dec 26, 2018 | 13 | $9.5K | MUHLENBERG/5357/INSIGHTS, CY2/DOLETA17C0034, MOD 0013 - PBSC FEE RECONCILIATION FOR CY 1: INCREASE CLIN 0003 CENTER OPERATIONS TECHNICAL PERFORMANCE INCENTIVE FEE ESTIMATED COST AND FUNDING BY $9,487; DECREASE CLIN 0004 CENTER OPERATIONS COST INCENTIVE FEE ESTIMATED COST ONLY BY ($43,129) |
| Aug 31, 2018 | 12 | $11.7K | MUHLENBERG/5357/INSIGHTS, CY2/DOLETA17C0034, MOD 0012 INCREASE CY2 CLIN 5002 EQUIPMENT (B2) ESTIMATED COST AND FUNDING (PY 18 ALLOCATION) |
| Aug 2, 2018 | 11 | $3.4M | MUHLENBERG/5357/INSIGHTS, CY2/DOLETA17C0034, MOD 0011 1. INCREASE CY2 CENTER OPERATIONS (A) FUNDING BY $3,275,480 [INCREMENTAL FUNDING IS PROVIDED FOR CY2. THERE IS A CURRENT NEED FOR FUNDS]. 2. INCREASE CY2 CTST (B4) ESTIMATED COST AND FUNDING BY $80,000 [FOP #8 - PY18 ALLOCATION]. |
| Jun 22, 2018 | 10 | $-477.4K | MUHLENBERG/5357/INSIGHTS, CY2/DOLETA17C0034, MOD 0010 DECREASE CY1 CENTER OPERATIONS (A) FUNDING BY ($477,405) [DE-OBLIGATION OF UNUSED 1718 FUNDS] |
| May 25, 2018 | 9 | $126.0K | MUHLENBERG/5357/INSIGHTS, CY2/DOLETA17C0034, MOD 09 (1) INCREASE CY2 CONSTRUCTION/REHAB (B1) ESTIMATED COST AND FUNDING FOR FOP #345 - B1B REPLENISHMENT; (2) INCREASE CY2 EQUIPMENT (B2) ESTIMATED COST AND FUNDING FOR FOP #348 - INNOVATION FUNDING FOR REGIONALLY APPROVED EQUIPMENT (WELDING) |
| Jan 19, 2018 | 8 | $4.9M | MUHLENBERG/5357/INSIGHTS, CY1/DOLETA17C0034, MOD 08 - (1) INCREASE CY2 CENTER OPERATIONS (A) FUNDING BY $4,899,685 (CY2 INCREMENTAL FUNDING); (2) INCREASE CY1 CONSTRUCTION/REHAB (B1) ESTIMATED COST AND FUNDING BY $11,598 [FOP #208 - DEF #120941 SUPPLEMENTAL FUNDING FOR DEF #11774 EGRESS DOORS AND FRAMES]; (3) INCREASE CY1 EQUIPMENT (B2) ESTIMATED COST AND FUNDING BY $15,242 [FOP #198 - PY17 EQUIPMENT LIFE CYCLE REPLACEMENT]. |
| Dec 11, 2017 | 7 | $14.2K | MUHLENBERG/5357/INSIGHTS, CY1/DOLETA17C0034, MOD 07 - (1) INCREASE CY1 CONSTRUCTION/REHAB (B1) ESTIMATED COST AND FUNDING BY $2,558 [FOP #186 - DEF #120973 SUPPLEMENTAL FUNDING FOR DEF #117754 AND 117752 RISER REPLACEMENT]; (2) INCREASE CY1 EQUIPMENT (B2) ESTIMATED COST AND FUNDING BY $11,686 [FOP #177 - PY17 ALLOCATION]. |
| Oct 30, 2017 | 6 | $3.5K | IGF::CT::IGF MUHLENBERG/5357/INSIGHTS, CY1/DOLETA17C0034, MOD 06 - INCREASE CY1/B1 CONSTRUCTION REHAB ESTIMATED COST AND FUNDING BY $3,500 [FOP #108 DEF #118833 SUPPLEMENTAL FUNDING TO DEF #116418 FOR DOOR LINTEL INSTALLATION]. |
| Aug 23, 2017 | 5 | $17.7K | IGF::CT::IGF MUHLENBERG/5357/INSIGHTS, CY1/DOLETA17C0034, MOD 05 - (1) INCREASE CY1/A CENTER OPS ESTIMATED COST AND FUNDING FOR CENTER MENTAL HEALTH CONSULTANT HOURS INCREASE (PRH CHANGE NOTICE 17-03); (2) INCREASE CY2/A CENTER OPS ESTIMATED COST ONLY BY $30,000 FOR CMHC HOURS INCREASE |
| Aug 11, 2017 | 4 | $5.1M | IGF::CT::IGF MUHLENBERG/5357/INSIGHTS, CY1/DOLETA17C0034, MOD 04 - (1) INCREASE CY1/A CENTER OPERATIONS FUNDING (INCR. FUNDS FOR CY1); (2) INCREASE CY1/B1 CONSTRUCTION/REHAB ESTIMATED COST AND FUNDING; AND (3) INCREASE CY1/B4 CTST ESTIMATED COST AND FUNDING. |
| May 3, 2017 | 3 | $3.3M | IGF::CT::IGF MUHLENBERG/5357/INSIGHTS, CY1/DOLETA17C0034, MOD 03 - (1) INCREASE CY1/B1 CONSTRUCTION/REHAB ESTIMATED COST&FUNDING; (2) INCREASE CY1/A CENTER OPERATIONS FUNDING |
| Mar 28, 2017 | 2 | $57.1K | IGF::CT::IGF MUHLENBERG/5357/INSIGHTS, CY1/DOLETA17C0034, MOD 02 - (1) INCREASE CY1/A CENTER OPERATIONS ESTIMATED COST AND FUNDING FOR FOP #373, TRANSITION-IN COSTS; (2) INCREASE CY1/B2 EQUIPMENT ESTIMATED COST AND FUNDING FOR FOP #375 PY16 FUNDS TRANSFERRED; AND (3) INCREASE CY1/B4 CTST ESTIMATED COSTS AND FUNDING FOR FOP #377 PY16 FUNDS TRANSFERRED. |
| Feb 21, 2017 | 1 | $176.0K | IGF::CT::IGF MUHLENBERG/5357/INSIGHTS, CY1/DOLETA17C0034, MOD 01 - (1) INCREASE CY1/B2 EQUIPMENT ESTIMATED COST AND FUNDING BY $28,548.00; (2) INCREASE CY1/B1 CONSTRUCTION REHAB ESTIMATED COST AND FUNDING BY $114,593.00; (3) INCREASE CY1/B4 CTST ESTIMATED COST AND FUNDING BY $32,877.00 |
| Dec 23, 2016 | 0 | $1.6M | IGF::CT::IGF CENTER OPERATIONS - MUHLENBERG JOB CORPS CENTER |
Research next steps
- Verify whether remaining options may extend performance beyond the current end date.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.