Federal contract award

FA449724C0024

ONE-TIME CONSTRUCTION REQUIREMENT TO REPLACE THE LIGHTNING PROTECTION AIR TERMINAL MASTS AND AIRFIELD OBSTRUCTION LIGHTS ON THE ROOF OF THE AIR TRAFFIC CONTROL (ATC) CAB OF BUILDING 502 (B502) AT DOVER AFB IAW THE STATEMENT OF WORK (SOW).

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeFA4497 436 CONS LGC
NAICS238210 — Electrical Contractors and Other Wiring Installation Contractors
PSCJ059 — Maintenance, Repair and Rebuilding of Equipment: Electrical and Electronic Equipment Components
Parent award / vehicleNot reported
Set-asideSMALL BUSINESS SET ASIDE - TOTAL
Pricing typeFIRM FIXED PRICE
Obligations$199.9K
Current contract value$199.9K
Potential contract value / ceiling$199.9K
Start dateJul 31, 2024
Current end dateSep 19, 2025
Potential end dateSep 19, 2025
Latest award activitySep 23, 2025
Source loadedAug 15, 2026

Funding and modification history

Showing the latest 5 of 5 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Sep 23, 2025P00005$-1.2KONE-TIME CONSTRUCTION REQUIREMENT TO REPLACE THE LIGHTNING PROTECTION AIR TERMINAL MASTS AND AIRFIELD OBSTRUCTION LIGHTS ON THE ROOF OF THE AIR TRAFFIC CONTROL (ATC) CAB OF BUILDING 502 (B502) AT DOVER AFB IAW THE STATEMENT OF WORK (SOW).
Aug 21, 2025P00004$0ONE-TIME CONSTRUCTION REQUIREMENT TO REPLACE THE LIGHTNING PROTECTION AIR TERMINAL MASTS AND AIRFIELD OBSTRUCTION LIGHTS ON THE ROOF OF THE AIR TRAFFIC CONTROL (ATC) CAB OF BUILDING 502 (B502) AT DOVER AFB IAW THE STATEMENT OF WORK (SOW).
Jun 25, 2025P00003$16.1KONE-TIME CONSTRUCTION REQUIREMENT TO REPLACE THE LIGHTNING PROTECTION AIR TERMINAL MASTS AND AIRFIELD OBSTRUCTION LIGHTS ON THE ROOF OF THE AIR TRAFFIC CONTROL (ATC) CAB OF BUILDING 502 (B502) AT DOVER AFB IAW THE STATEMENT OF WORK (SOW).
May 23, 2025P00002$0ONE-TIME CONSTRUCTION REQUIREMENT TO REPLACE THE LIGHTNING PROTECTION AIR TERMINAL MASTS AND AIRFIELD OBSTRUCTION LIGHTS ON THE ROOF OF THE AIR TRAFFIC CONTROL (ATC) CAB OF BUILDING 502 (B502) AT DOVER AFB IAW THE STATEMENT OF WORK (SOW).
Jan 23, 2025P00001$0ONE-TIME CONSTRUCTION REQUIREMENT TO REPLACE THE LIGHTNING PROTECTION AIR TERMINAL MASTS AND AIRFIELD OBSTRUCTION LIGHTS ON THE ROOF OF THE AIR TRAFFIC CONTROL (ATC) CAB OF BUILDING 502 (B502) AT DOVER AFB IAW THE STATEMENT OF WORK (SOW).

Research next steps

  1. Check the stated set-aside against the solicitation and current certifications.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.