Federal contract award
FA452823F0105
CONTRACTOR SHALL PROVIDE ALL MANAGEMENT, TOOLS, SUPPLIES, EQUIPMENT, AND LABOR NECESSARY TO PERFORM ALL WORK IN ACCORDANCE WITH THESE SPECIFICATIONS. WORK INCLUDES REMOVAL AND DISPOSAL OF EXISTING CONTROLS SYSTEM IN B867 (DOCK 1)
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | FA4528 5 CONS |
| NAICS | 236220 — Commercial and Institutional Building Construction |
| PSC | C1BZ — ARCHITECT AND ENGINEERING- CONSTRUCTION: OTHER AIRFIELD STRUCTURES |
| Parent award / vehicle | FA452820D0005 |
| Set-aside | Not reported |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $963.5K |
| Current contract value | $963.5K |
| Potential contract value / ceiling | $963.5K |
| Start date | Jul 24, 2023 |
| Current end date | Aug 14, 2026 |
| Potential end date | Aug 14, 2026 |
| Latest award activity | Mar 19, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 7 of 7 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Mar 19, 2026 | P00007 | $8.8K | REPLACE FUEL TANK PURGE AND SCBA HOSE REEL CONTROL PANEL. PANELS WILL BE CLASS 1 DIVISION 1 (ZONE 1) GROUP B C D; EXPLOSION-PROOF CONTROL ENCLOSURE. PANELS WILL OPERATE/CONTROL SAME FUNCTIONS AS EXISTING PANELS. |
| Oct 1, 2025 | P00006 | $0 | THE CONTRACTOR SHALL PROVIDE ALL MANAGEMENT, TOOLS, SUPPLIES, EQUIPMENT, AND LABOR NECESSARY TO PERFORM ALL WORK IN ACCORDANCE WITH THESE SPECIFICATIONS. WORK INCLUDES REMOVAL AND DISPOSAL OF EXISTING CONTROLS SYSTEM IN B867 (DOCK 1). |
| Aug 1, 2025 | P00005 | $0 | THE CONTRACTOR SHALL PROVIDE ALL MANAGEMENT, TOOLS, SUPPLIES, EQUIPMENT, AND LABOR NECESSARY TO PERFORM ALL WORK IN ACCORDANCE WITH THESE SPECIFICATIONS. WORK INCLUDES REMOVAL AND DISPOSAL OF EXISTING CONTROLS SYSTEM IN B867 (DOCK 1). |
| Jun 16, 2025 | P00004 | $0 | THE CONTRACTOR SHALL PROVIDE ALL MANAGEMENT, TOOLS, SUPPLIES, EQUIPMENT, AND LABOR NECESSARY TO PERFORM ALL WORK IN ACCORDANCE WITH THESE SPECIFICATIONS. WORK INCLUDES REMOVAL AND DISPOSAL OF EXISTING CONTROLS SYSTEM IN B867 (DOCK 1). |
| Feb 27, 2025 | P00003 | $100.8K | THE CONTRACTOR SHALL PROVIDE ALL MANAGEMENT, TOOLS, SUPPLIES, EQUIPMENT, AND LABOR NECESSARY TO PERFORM ALL WORK IN ACCORDANCE WITH THESE SPECIFICATIONS. WORK INCLUDES REMOVAL AND DISPOSAL OF EXISTING CONTROLS SYSTEM IN B867 (DOCK 1). |
| Feb 26, 2025 | P00002 | $0 | THE CONTRACTOR SHALL PROVIDE ALL MANAGEMENT, TOOLS, SUPPLIES, EQUIPMENT, AND LABOR NECESSARY TO PERFORM ALL WORK IN ACCORDANCE WITH THESE SPECIFICATIONS. WORK INCLUDES REMOVAL AND DISPOSAL OF EXISTING CONTROLS SYSTEM IN B867 (DOCK 1). |
| Dec 10, 2024 | P00001 | $0 | THE CONTRACTOR SHALL PROVIDE ALL MANAGEMENT, TOOLS, SUPPLIES, EQUIPMENT, AND LABOR NECESSARY TO PERFORM ALL WORK IN ACCORDANCE WITH THESE SPECIFICATIONS. WORK INCLUDES REMOVAL AND DISPOSAL OF EXISTING CONTROLS SYSTEM IN B867 (DOCK 1), ON BASE PURCHAS |
Research next steps
- Confirm the ordering vehicle and your eligibility or a qualified teaming route.
- Review the award scope and buyer evidence before making a bid/no-bid decision.