Federal contract award

FA452823F0105

CONTRACTOR SHALL PROVIDE ALL MANAGEMENT, TOOLS, SUPPLIES, EQUIPMENT, AND LABOR NECESSARY TO PERFORM ALL WORK IN ACCORDANCE WITH THESE SPECIFICATIONS. WORK INCLUDES REMOVAL AND DISPOSAL OF EXISTING CONTROLS SYSTEM IN B867 (DOCK 1)

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeFA4528 5 CONS
NAICS236220 — Commercial and Institutional Building Construction
PSCC1BZ — ARCHITECT AND ENGINEERING- CONSTRUCTION: OTHER AIRFIELD STRUCTURES
Parent award / vehicleFA452820D0005
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$963.5K
Current contract value$963.5K
Potential contract value / ceiling$963.5K
Start dateJul 24, 2023
Current end dateAug 14, 2026
Potential end dateAug 14, 2026
Latest award activityMar 19, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 7 of 7 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Mar 19, 2026P00007$8.8KREPLACE FUEL TANK PURGE AND SCBA HOSE REEL CONTROL PANEL. PANELS WILL BE CLASS 1 DIVISION 1 (ZONE 1) GROUP B C D; EXPLOSION-PROOF CONTROL ENCLOSURE. PANELS WILL OPERATE/CONTROL SAME FUNCTIONS AS EXISTING PANELS.
Oct 1, 2025P00006$0THE CONTRACTOR SHALL PROVIDE ALL MANAGEMENT, TOOLS, SUPPLIES, EQUIPMENT, AND LABOR NECESSARY TO PERFORM ALL WORK IN ACCORDANCE WITH THESE SPECIFICATIONS. WORK INCLUDES REMOVAL AND DISPOSAL OF EXISTING CONTROLS SYSTEM IN B867 (DOCK 1).
Aug 1, 2025P00005$0THE CONTRACTOR SHALL PROVIDE ALL MANAGEMENT, TOOLS, SUPPLIES, EQUIPMENT, AND LABOR NECESSARY TO PERFORM ALL WORK IN ACCORDANCE WITH THESE SPECIFICATIONS. WORK INCLUDES REMOVAL AND DISPOSAL OF EXISTING CONTROLS SYSTEM IN B867 (DOCK 1).
Jun 16, 2025P00004$0THE CONTRACTOR SHALL PROVIDE ALL MANAGEMENT, TOOLS, SUPPLIES, EQUIPMENT, AND LABOR NECESSARY TO PERFORM ALL WORK IN ACCORDANCE WITH THESE SPECIFICATIONS. WORK INCLUDES REMOVAL AND DISPOSAL OF EXISTING CONTROLS SYSTEM IN B867 (DOCK 1).
Feb 27, 2025P00003$100.8KTHE CONTRACTOR SHALL PROVIDE ALL MANAGEMENT, TOOLS, SUPPLIES, EQUIPMENT, AND LABOR NECESSARY TO PERFORM ALL WORK IN ACCORDANCE WITH THESE SPECIFICATIONS. WORK INCLUDES REMOVAL AND DISPOSAL OF EXISTING CONTROLS SYSTEM IN B867 (DOCK 1).
Feb 26, 2025P00002$0THE CONTRACTOR SHALL PROVIDE ALL MANAGEMENT, TOOLS, SUPPLIES, EQUIPMENT, AND LABOR NECESSARY TO PERFORM ALL WORK IN ACCORDANCE WITH THESE SPECIFICATIONS. WORK INCLUDES REMOVAL AND DISPOSAL OF EXISTING CONTROLS SYSTEM IN B867 (DOCK 1).
Dec 10, 2024P00001$0THE CONTRACTOR SHALL PROVIDE ALL MANAGEMENT, TOOLS, SUPPLIES, EQUIPMENT, AND LABOR NECESSARY TO PERFORM ALL WORK IN ACCORDANCE WITH THESE SPECIFICATIONS. WORK INCLUDES REMOVAL AND DISPOSAL OF EXISTING CONTROLS SYSTEM IN B867 (DOCK 1), ON BASE PURCHAS

Research next steps

  1. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.