Federal contract award
HHSN292201700010C
IGF::OT::IGF::C100663 - BUILDING 10 E-WING RENOVATION
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Health and Human Services |
| Office | NIH A E CONSTRUCTION |
| NAICS | 236220 — Commercial and Institutional Building Construction |
| PSC | Z2DZ — REPAIR OR ALTERATION OF OTHER HOSPITAL BUILDINGS |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $302.1M |
| Current contract value | $302.4M |
| Potential contract value / ceiling | $302.4M |
| Start date | Oct 10, 2017 |
| Current end date | Sep 19, 2024 |
| Potential end date | Sep 19, 2024 |
| Latest award activity | Jul 14, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 117 of 117 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Jul 14, 2026 | P00116 | $363.4K | C100663: THE SUBJECT CONTRACT IS HEREBY MODIFIED TO INCORPORATED MULTIPLE CNS REQUIRED TO ACCOMMODATE EXISTING CONDITIONS AND DESIGN CHANGES NECESSARY TO ENSURE THE PROJECT IS CONDUCTED TO NIH REQUIREMENTS. |
| Sep 26, 2025 | P00115 | $241.0K | C100663: THE SUBJECT CONTRACT IS HEREBY MODIFIED TO INCORPORATED MULTIPLE CNS REQUIRED TO ACCOMMODATE EXISTING CONDITIONS AND DESIGN CHANGES NECESSARY TO ENSURE THE PROJECT IS CONDUCTED TO NIH REQUIREMENTS. |
| Sep 19, 2025 | P00114 | $0 | THE SUBJECT CONTRACT IS HEREBY MODIFIED TO INCORPORATED MULTIPLE CNS TO DEFINITIZE MOD. P.00109 AND TO ADDITIONAL REQUIREMENTS DUE TO CUSTOMER REQUEST OF CHANGES TO MEET THE CUSTOMER'S MISSION. |
| Sep 27, 2024 | P00113 | $2.1M | BUILDING 10 E-WING RENOVATION, NIH CAMPUS, BETHESDA, MARYLAND |
| Jul 16, 2024 | P00112 | $2.3M | BUILDING 10 E-WING RENOVATION, NIH CAMPUS, BETHESDA, MARYLAND |
| May 1, 2024 | P00111 | $598.6K | BUILDING 10 E-WING RENOVATION, NIH CAMPUS, BETHESDA, MARYLAND |
| Apr 8, 2024 | P00110 | $398.3K | C100663 - E-WING RENOVATION CO: CHRIS POSTEK (CHRIS.POSTEK@NIH.GOV) COR: JEANNE KEEGAN (JEANNE.KEEGAN2@NIH.GOV) CONTRACTOR PAST PERFORMANCE POC: STACY PERCOSKI (STACY.PERCOSKI@WHITING-TURNER.COM) |
| Sep 28, 2023 | P00109 | $1.4M | C100663 - E-WING RENOVATION CO: CHRIS POSTEK (CHRIS.POSTEK@NIH.GOV) COR: JEANNE KEEGAN (JEANNE.KEEGAN2@NIH.GOV) CONTRACTOR PAST PERFORMANCE POC: STACY PERCOSKI (STACY.PERCOSKI@WHITING-TURNER.COM) |
| Sep 26, 2023 | P00108 | $1.3M | C100663 - E-WING RENOVATION CO: CHRIS POSTEK (CHRIS.POSTEK@NIH.GOV) COR: JEANNE KEEGAN (JEANNE.KEEGAN2@NIH.GOV) CONTRACTOR PAST PERFORMANCE POC: STACY PERCOSKI (STACY.PERCOSKI@WHITING-TURNER.COM) |
| Sep 21, 2023 | P00107 | $1.6M | C100663 - E-WING RENOVATION CO: CHRIS POSTEK (CHRIS.POSTEK@NIH.GOV) COR: JEANNE KEEGAN (JEANNE.KEEGAN2@NIH.GOV) CONTRACTOR PAST PERFORMANCE POC: STACY PERCOSKI (STACY.PERCOSKI@WHITING-TURNER.COM) |
| Sep 7, 2023 | P00106 | $2.0M | C100663 - E-WING RENOVATION CO: CHRIS POSTEK (CHRIS.POSTEK@NIH.GOV) COR: JEANNE KEEGAN (JEANNE.KEEGAN2@NIH.GOV) CONTRACTOR PAST PERFORMANCE POC: STACY PERCOSKI (STACY.PERCOSKI@WHITING-TURNER.COM) |
| Jul 19, 2023 | P00105 | $795.1K | C100663 - E-WING RENOVATION CO: CHRIS POSTEK (CHRIS.POSTEK@NIH.GOV) COR: JEANNE KEEGAN (JEANNE.KEEGAN2@NIH.GOV) CONTRACTOR PAST PERFORMANCE POC: STACY PERCOSKI (STACY.PERCOSKI@WHITING-TURNER.COM) |
| Jun 30, 2023 | P00104 | $42.8M | C100663 - E-WING RENOVATION CO: CHRIS POSTEK (CHRIS.POSTEK@NIH.GOV) COR: JEANNE KEEGAN (JEANNE.KEEGAN2@NIH.GOV) CONTRACTOR PAST PERFORMANCE POC: STACY PERCOSKI (STACY.PERCOSKI@WHITING-TURNER.COM) |
| Mar 30, 2023 | P00103 | $0 | C100663 - E-WING RENOVATION CO: CHRIS POSTEK (CHRIS.POSTEK@NIH.GOV) COR: JEANNE KEEGAN (JEANNE.KEEGAN2@NIH.GOV) CONTRACTOR PAST PERFORMANCE POC: STACY PERCOSKI (STACY.PERCOSKI@WHITING-TURNER.COM) |
| Feb 1, 2023 | P00102 | $177.6K | C100663 - E-WING RENOVATION CO: CHRIS POSTEK (CHRIS.POSTEK@NIH.GOV) COR: JEANNE KEEGAN (JEANNE.KEEGAN2@NIH.GOV) CONTRACTOR PAST PERFORMANCE POC: STACY PERCOSKI (STACY.PERCOSKI@WHITING-TURNER.COM) |
| Jan 31, 2023 | P00101 | $0 | C100663 - E-WING RENOVATION CO: CHRIS POSTEK (CHRIS.POSTEK@NIH.GOV) COR: JEANNE KEEGAN (JEANNE.KEEGAN2@NIH.GOV) CONTRACTOR PAST PERFORMANCE POC: STACY PERCOSKI (STACY.PERCOSKI@WHITING-TURNER.COM) |
| Nov 18, 2022 | P00100 | $549.7K | C100663 - E-WING RENOVATION CO: CHRIS POSTEK (CHRIS.POSTEK@NIH.GOV) COR: JEANNE KEEGAN (JEANNE.KEEGAN2@NIH.GOV) CONTRACTOR PAST PERFORMANCE POC: STACY PERCOSKI (STACY.PERCOSKI@WHITING-TURNER.COM) |
| Oct 27, 2022 | P00099 | $0 | C100663 - E-WING RENOVATION CO: CHRIS POSTEK (CHRIS.POSTEK@NIH.GOV) COR: JEANNE KEEGAN (JEANNE.KEEGAN2@NIH.GOV) CONTRACTOR PAST PERFORMANCE POC: STACY PERCOSKI (STACY.PERCOSKI@WHITING-TURNER.COM) |
| Sep 29, 2022 | P00097 | $2.2M | C100663 - P00094 BUILDING 10 E-WING RENOVATION AT NIH BETHESDA, MD CAMPUS |
| Sep 29, 2022 | P00098 | $252.3K | C100663 - P00094 BUILDING 10 E-WING RENOVATION AT NIH BETHESDA, MD CAMPUS |
| Sep 26, 2022 | P00096 | $2.1M | C100663 - P00094 BUILDING 10 E-WING RENOVATION AT NIH BETHESDA, MD CAMPUS |
| Jul 8, 2022 | P00095 | $807.5K | C100663 - P00094 BUILDING 10 E-WING RENOVATION AT NIH BETHESDA, MD CAMPUS |
| Jul 6, 2022 | P00094 | $0 | C100663 - P00094 BUILDING 10 E-WING RENOVATION AT NIH BETHESDA, MD CAMPUS |
| Jun 28, 2022 | P00093 | $0 | C100663 - P00093 BUILDING 10 E-WING RENOVATION AT NIH BETHESDA, MD CAMPUS |
| May 4, 2022 | P00092 | $960.9K | C100663 - P00092 BUILDING 10 E-WING RENOVATION AT NIH BETHESDA, MD CAMPUS |
| May 2, 2022 | P00091 | $1.1M | C100663 - P00091 BUILDING 10 E-WING RENOVATION AT NIH BETHESDA, MD CAMPUS |
| Apr 12, 2022 | P00090 | $513.9K | C100663 - BUILDING 10 E-WING RENOVATION AT NIH BETHESDA, MD CAMPUS |
| Jan 18, 2022 | P00089 | $0 | C100663 - BUILDING 10 E-WING RENOVATION AT NIH BETHESDA, MD CAMPUS |
| Nov 8, 2021 | P00088 | $0 | EO14042 - C100663: BUILDING 10 E-WING RENOVATION AT NIH BETHESDA, MD CAMPUS |
| Sep 29, 2021 | P00086 | $1.8M | C100663 - BUILDING 10 E-WING RENOVATION AT NIH BETHESDA, MD CAMPUS CN-41S-R1 ADDITIONAL CUT / CAP / MAKE SAFE OF EXISTING - EXISTING CONDITIONS CN-41U EXISTING CONDITIONS ADDITIONAL CUT / CAP / MAKE SAFE - EXISTING CONDITIONS CN-146R1 RFI #671 - EQ |
| Sep 29, 2021 | P00087 | $6.0M | C100663 - BUILDING 10 E-WING RENOVATION AT NIH BETHESDA, MD CAMPUS |
| Aug 25, 2021 | P00085 | $385.1K | C100663 - BUILDING 10 E-WING RENOVATION AT NIH BETHESDA, MD CAMPUS |
| Jul 7, 2021 | P00084 | $66.0K | C100663 - BUILDING 10 E-WING RENOVATION AT NIH BETHESDA, MD CAMPUS |
| Jun 7, 2021 | P00083 | $347.3K | C100663 - BUILDING 10 E-WING RENOVATION AT NIH BETHESDA, MD CAMPUS |
| Jun 2, 2021 | P00082 | $416.5K | C100663 - BUILDING 10 E-WING RENOVATION AT NIH BETHESDA, MD CAMPUS |
| Jun 1, 2021 | P00080 | $47.5K | C100663 - BUILDING 10 E-WING RENOVATION |
| Jun 1, 2021 | P00081 | $469.1K | LIST OF CHANGES: REASON FOR MODIFICATION: CHANGE ORDER TOTAL AMOUNT FOR THIS MODIFICATION: $469,099.00 NEW TOTAL AMOUNT FOR THIS VERSION: $469,099.00 NEW TOTAL AMOUNT FOR THIS AWARD: $228,666,047.36 OBLIGATED AMOUNT FOR THIS MODIFICATION: $469,099.0 |
| May 26, 2021 | P00079 | $37.0K | C100663 - BUILDING 10 E-WING RENOVATION |
| May 25, 2021 | P00078 | $20.8K | C100663 - BUILDING 10 E-WING RENOVATION |
| May 24, 2021 | P00076 | $4.5K | C100663 - BUILDING 10 E-WING RENOVATION |
| May 24, 2021 | P00077 | $2.5K | C100663 - BUILDING 10 E-WING RENOVATION |
| May 21, 2021 | P00074 | $31.0K | C100663 - BUILDING 10 E-WING RENOVATION |
| May 21, 2021 | P00075 | $9.5K | C100663 - BUILDING 10 E-WING RENOVATION |
| May 12, 2021 | P00071 | $27.9K | C100663 - BUILDING 10 E-WING RENOVATION |
| May 12, 2021 | P00072 | $21.7K | C100663 - BUILDING 10 E-WING RENOVATION |
| May 12, 2021 | P00073 | $140.2K | C100663 - BUILDING 10 E-WING RENOVATION |
| May 3, 2021 | P00070 | $63.0K | C100663 - BUILDING 10 E-WING RENOVATION |
| Apr 19, 2021 | P00069 | $750.0K | C100663 - BUILDING 10 E-WING RENOVATION |
| Apr 14, 2021 | P00068 | $12.2K | C100663 - BUILDING 10 E-WING RENOVATION |
| Mar 16, 2021 | P00067 | $36.3K | C100663 - BUILDING 10 E-WING RENOVATION |
| Mar 8, 2021 | P00066 | $13.4K | C100663 - BUILDING 10 E-WING RENOVATION |
| Feb 22, 2021 | P00065 | $7.0M | C100663 - BUILDING 10 E-WING RENOVATION |
| Feb 4, 2021 | P00064 | $53.9K | C100663 - BUILDING 10 E-WING RENOVATION |
| Jan 25, 2021 | P00063 | $1.0M | C100663 - BUILDING 10 E-WING RENOVATION |
| Jan 21, 2021 | P00062 | $77.7K | C100663 - BUILDING 10 E-WING RENOVATION |
| Dec 28, 2020 | P00061 | $129.9K | C100663 - BUILDING 10 E-WING RENOVATION |
| Dec 17, 2020 | P00059 | $3.7K | C100663 - BUILDING 10 E-WING RENOVATION |
| Dec 17, 2020 | P00060 | $32.2K | C100663 - BUILDING 10 E-WING RENOVATION |
| Dec 3, 2020 | P00058 | $3.0K | C100663 - BUILDING 10 E-WING RENOVATION |
| Nov 16, 2020 | P00057 | $6.1K | C100663 - BUILDING 10 E-WING RENOVATION |
| Nov 13, 2020 | P00055 | $113.2K | C100663 - BUILDING 10 E-WING RENOVATION |
| Nov 13, 2020 | P00056 | $2.5K | C100663 - BUILDING 10 E-WING RENOVATION |
| Nov 12, 2020 | P00053 | $632.0K | C100663 - BUILDING 10 E-WING RENOVATION |
| Nov 12, 2020 | P00054 | $13.6K | C100663 - BUILDING 10 E-WING RENOVATION |
| Nov 10, 2020 | P00052 | $3.7K | C100663 - BUILDING 10 E-WING RENOVATION |
| Sep 22, 2020 | P00050 | $104.4K | C100663 - BUILDING 10 E-WING RENOVATION |
| Sep 22, 2020 | P00051 | $-11.6K | C100663 - BUILDING 10 E-WING RENOVATION |
| Sep 17, 2020 | P00049 | $26.5K | C100663 - BUILDING 10 E-WING RENOVATION |
| Sep 16, 2020 | P00048 | $1.2K | C100663 - BUILDING 10 E-WING RENOVATION |
| Sep 15, 2020 | P00047 | $-31.5K | C100663 - BUILDING 10 E-WING RENOVATION |
| Aug 25, 2020 | P00046 | $229.9K | C100663 - BUILDING 10 E-WING RENOVATION |
| Aug 18, 2020 | P00045 | $-49.0K | C100663 - BUILDING 10 E-WING RENOVATION |
| Jul 27, 2020 | P00044 | $-28.5K | C100663 - BUILDING 10 E-WING RENOVATION |
| Jul 10, 2020 | P00043 | $-1.8K | C100663 - BUILDING 10 E-WING RENOVATION |
| Jul 7, 2020 | P00042 | $13.7K | C100663 - BUILDING 10 E-WING RENOVATION |
| Jun 3, 2020 | P00041 | $308.3K | C100663 - BUILDING 10 E-WING RENOVATION |
| May 13, 2020 | P00040 | $-42.5K | C100663 - BUILDING 10 E-WING RENOVATION |
| May 11, 2020 | P00039 | $15.2K | C100663 - BUILDING 10 E-WING RENOVATION |
| May 1, 2020 | P00038 | $16.6K | C100663 - BUILDING 10 E-WING RENOVATION |
| Apr 30, 2020 | P00037 | $807 | C100663 - BUILDING 10 E-WING RENOVATION |
| Apr 21, 2020 | P00036 | $2.2K | C100663 - BUILDING 10 E-WING RENOVATION |
| Apr 2, 2020 | P00035 | $1.8K | C100663 - BUILDING 10 E-WING RENOVATION |
| Mar 10, 2020 | P00034 | $1.9M | C100663 - BUILDING 10 E-WING RENOVATION |
| Feb 26, 2020 | P00033 | $0 | C100663 - BUILDING 10 E-WING RENOVATION |
| Jan 23, 2020 | P00032 | $119.7K | C100663 - BUILDING 10 E-WING RENOVATION |
| Jan 21, 2020 | P00031 | $63.0K | C100663 - BUILDING 10 E-WING RENOVATION |
| Jan 17, 2020 | P00030 | $0 | C100663 - BUILDING 10 E-WING RENOVATION |
| Jan 8, 2020 | P00029 | $116.5K | C100663 - BUILDING 10 E-WING RENOVATION |
| Dec 20, 2019 | P00028 | $271.4K | C100663 - BUILDING 10 E-WING RENOVATION |
| Nov 22, 2019 | P00027 | $5.5K | C100663 - BUILDING 10 E-WING RENOVATION |
| Sep 27, 2019 | P00026 | $58.0K | C100663 - BUILDING 10 E-WING RENOVATION |
| Sep 26, 2019 | P00025 | $3.8M | C100663 - BUILDING 10 E-WING RENOVATION |
| Sep 25, 2019 | P00024 | $20.5K | C100663 - BUILDING 10 E-WING RENOVATION |
| Sep 12, 2019 | P00023 | $0 | C100663 - BUILDING 10 E-WING RENOVATION |
| Sep 4, 2019 | P00022 | $0 | C100663 - BUILDING 10 E-WING RENOVATION |
| Aug 26, 2019 | P00021 | $1.4M | C100663 - BUILDING 10 E-WING RENOVATION |
| Aug 20, 2019 | P00020 | $-40.4K | C100663 - BUILDING 10 E-WING RENOVATION |
| Aug 19, 2019 | P00019 | $-46.1K | C100663 - BUILDING 10 E-WING RENOVATION |
| Aug 15, 2019 | P00018 | $2.0M | C100663 - BUILDING 10 E-WING RENOVATION |
| Aug 14, 2019 | P00017 | $17.0K | C100663 - BUILDING 10 E-WING RENOVATION |
| Jul 11, 2019 | P00016 | $27.1K | C100663 - BUILDING 10 E-WING RENOVATION |
| Jul 1, 2019 | P00014 | $20.1M | C100663 - BUILDING 10 E-WING RENOVATION |
| Jul 1, 2019 | P00015 | $1.7M | C100663 - BUILDING 10 E-WING RENOVATION |
| Jun 21, 2019 | P00011 | $-105.9K | C100663 - BUILDING 10 E-WING RENOVATION |
| Jun 21, 2019 | P00012 | $1.1M | C100663 - BUILDING 10 E-WING RENOVATION |
| Jun 21, 2019 | P00013 | $0 | C100663 - BUILDING 10 E-WING RENOVATION |
| Jun 20, 2019 | P00010 | $722.2K | C100663 - BUILDING 10 E-WING RENOVATION |
| May 9, 2019 | P00009 | $-12.6K | C100663 - BUILDING 10 E-WING RENOVATION |
| Feb 5, 2019 | P00008 | $1.6M | C100663 - BUILDING 10 E-WING RENOVATION |
| Jan 25, 2019 | P00007 | $494.7K | C100663 - BUILDING 10 E-WING RENOVATION |
| Jan 17, 2019 | P00006 | $17.6K | C100663 - BUILDING 10 E-WING RENOVATION |
| Dec 21, 2018 | P00005 | $1.1M | C100663 - BUILDING 10 E-WING RENOVATION |
| Nov 2, 2018 | P00004 | $-243.4K | C100663 - BUILDING 10 E-WING RENOVATION |
| Sep 23, 2018 | 3 | $35.7K | IGF::OT::IGF::C100663 - BUILDING 10 E-WING RENOVATION |
| Aug 29, 2018 | 2 | $42.7K | IGF::OT::IGF::C100663 - BUILDING 10 E-WING RENOVATION |
| Aug 24, 2018 | 1 | $254.2K | IGF::OT::IGF::C100663 - BUILDING 10 E-WING RENOVATION |
| Sep 28, 2017 | 0 | $181.0M | IGF::OT::IGF::C100663 - BUILDING 10 E-WING RENOVATION |