Federal contract award

N0002409C2116

TAS::17 1611::TAS CVN79 CONSTRUCTION PREPARATION EFFORTS FY09

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeSUP OF SHIPBUILDING CONV AND REPAIR
NAICS336611 — Ship Building and Repairing
PSC1901 — AIRCRAFT CARRIERS
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeCOST PLUS FIXED FEE
Obligations$4.5B
Current contract value$4.5B
Potential contract value / ceiling$4.5B
Start dateJan 15, 2009
Current end dateJul 31, 2025
Potential end dateJul 31, 2025
Latest award activityJun 3, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 200 of 940 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jun 10, 2026AZ0119$94.6KCVN 79 ADVANCE CONSTRUCTION, SUPSHIPNN COMMAND PIO 0045 - PROVISIONED ITEMS ORDER, JET BLAST DEFLECTOR (JBD) ELECTROMAGNETIC ACTUATORS (EMAS) SPARES.
Jun 3, 2026A00643$657.9KCVN 79 ADVANCE CONSTRUCTION, SUPSHIPNN COMMAND - CLOSEOUT OF 0039 SERIES SMALL VALUE CHANGES.
Jun 3, 2026A00644$25.0KTHIS MODIFICATION IS TO ISSUE FMR 1051.03 FOR SECURITY SERVICES IN SUPPORT ON CVN 79 NEW CONSTRUCTION.
May 27, 2026AZ0118$-180.6KTHE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE FMR 1051.02 AGAINST THE CVN 79 ADVANCE CONSTRUCTION CONTRACT.
May 19, 2026A00642$75.0KTHIS MODIFICATION IS TO ISSUE HMR 1502.01 FOR FATHOMETER CABLE UPGRADES IN SUPPORT OF CVN 79 NEW CONSTRUCTION.
May 15, 2026A00641$32.5KISSUE FMR 1089 AGAINST THE CVN 79 ADVANCE CONSTRUCTION CONTRACT FOR EMALS LAUNCH MOTOR MODULE CONNECTION INSPECTIONS.
May 15, 2026AZ0117$149.3KTHIS MODIFICATION IS TO DEFINITIZE FMR 1084.00 PREVIOUSLY AUTHORIZED UNDER A00613 IN SUPPORT OF CVN 79 NEW CONSTRUCTION.
May 6, 2026A00639$240.0KTHIS MODIFICATION IS TO ISSUE PIO 0052 FOR CLOSURE MATERIAL FABRICATION IN SUPPORT OF CVN 79 NEW CONSTRUCTION.
May 6, 2026A00640$30.0KTHIS MODIFICATION IS TO ISSUE FMR 1088 FOR MOTOR MODULE REPLACEMENT IN SUPPORT OF CVN 79 NEW CONSTRUCTION.
May 4, 2026A00638$12.5KCVN 79 ADVANCE CONSTRUCTION, SUPSHIPNN COMMAND PIO 0051 - PROVISIONED ITEMS ORDER, SUPPORT AVIATION ARMAMENT GUN SYSTEM SHOP
Apr 30, 2026A00637$1.6MCVN 79 ADVANCE CONSTRUCTION, SUPSHIPNN COMMAND - LOST, DAMAGED & DESTROYED BATCH 20 FUNDING ADJUSTMENT
Apr 16, 2026A00636$24.2KTHE PURPOSE OF THIS MODIFICATION IS TO ISSUE AN UNPRICED CHANGE ORDER FOR HMR 1078.01 AGAINST THE CVN 79 ADVANCE CONSTRUCTION CONTRACT.
Apr 15, 2026AZ0116$22.4KCVN 79 ADVANCE CONSTRUCTION, SUPSHIPNN COMMAND DEFINITIZE HMR 1514.02 - VOYAGE MANAGEMENT SYSTEM (VMS) SOFTWARE UPGRADE
Apr 10, 2026AZ0115$-94.8KTHE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE FMR 1086.00 AGAINST THE CVN 79 ADVANCE CONSTRUCTION CONTRACT.
Apr 3, 2026A00634$50.0KTHE PURPOSE OF THIS MODIFICATION IS TO ISSUE AN UNPRICED CHANGE ORDER FOR FMR 1087.00 AGAINST THE CVN 79 ADVANCE CONSTRUCTION CONTRACT.
Apr 3, 2026A00635$225.0KCVN 79 ADVANCE CONSTRUCTION, SUPSHIPNN COMMAND - HMR 1119.11, ELECTROMAGNETIC AIRCRAFT LAUNCH SYSTEM (EMALS) LUBRICATING OIL (ELO) SYSTEM.
Mar 31, 2026A00633$30.0KTHE PURPOSE OF THIS MODIFICATION IS TO ISSUE AN UNPRICED CHANGE ORDER FOR HMR 1084.05 AGAINST THE CVN 79 ADVANCE CONSTRUCTION CONTRACT.
Mar 25, 2026AZ0114$18.1KTHE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE PIO 0041 N303 CONTROLLERS AGAINST THE CVN 79 ADVANCE CONSTRUCTION CONTRACT.
Mar 23, 2026A00632$0CVN 79 ADVANCE CONSTRUCTION, SUPSHIPNN COMMAND - HMR 1228 ADMINISTRATIVE MODIFICATION.
Mar 20, 2026AZ0113$30.7KDEFINITIZE FMR 1016.09 FOR BERTHING TRAILER EXTENSIONS AGAINST THE CVN 79 ADVANCE CONSTRUCTION CONTRACT.
Mar 18, 2026A00631$247.0KTHIS MODIFICATION IS TO ISSUE PIO 050 FOR CMBRE MAGOPS IN SUPPORT OF CVN 79 NEW CONSTRUCTION.
Mar 16, 2026A00630$451.8KCVN 79 ADVANCE CONSTRUCTION, SUPSHIPNN COMMAND - CLOSEOUT OF 0038 SERIES SMALL VALUE CHANGES.
Mar 16, 2026P00184$0CVN 79 ADVANCE CONSTRUCTION
Feb 23, 2026AZ0112$38.2KTHIS MODIFICATION IS TO DEFINITIZE FMR 1016.08 FOR BERTHING TRAILERS IN SUPPORT OF CVN 79 NEW CONSTRUCTION.
Feb 17, 2026A00628$90.0KCVN 79 ADVANCE CONSTRUCTION, SUPSHIPNN COMMAND, HMR 1084.04 - ENGRAVING SHOP EQUIPMENT.
Feb 17, 2026A00629$500.0KTHIS MODIFICATION IS TO ISSUE FMR 1085 FOR EMALS NETWORK UPGRADES IN SUPPORT OF CVN 79 NEW CONSTRUCTION.
Feb 17, 2026AZ0111$61.5KDEFINITIZE FMR 1051.01 FOR EVENING SECURITY PATROL ON THE CP CONTRACT.
Feb 10, 2026A00627$1.1MCVN 79 ADVANCE CONSTRUCTION, SUPSHIPNN COMMAND - LOST, DAMAGED, AND DESTROYED BATCH 20.
Jan 30, 2026P00183$14.0MFY26 COST TO COMPLETE FUNDING FOR CVN 79 CLIN 1303
Jan 28, 2026AZ0110$48.1KCVN 79 ADVANCE CONSTRUCTION, SUPSHIPNN COMMAND - PROVISIONED ITEMS ORDER (PIO)0048, MK38 MOD 3 READY SERVICE LOCKER
Dec 11, 2025A00626$624.5KCVN 79 ADVANCE CONSTRUCTION, SUPSHIPNN COMMAND - CLOSEOUT OF 0037 SERIES SMALL VALUE CHANGES.
Dec 3, 2025P00181$60.0MCVN 79 ADVANCE CONSTRUCTION
Dec 2, 2025P00180$52.0MCVN 79 INCREMENTAL FUNDING FOR CLIN 1303
Nov 24, 2025A00625$40.0KCVN 79 ADVANCE CONSTRUCTION ISSUANCE OF UNPRICED CHANGE ORDER FOR FMR 1016.09.
Nov 19, 2025PZ0003$0CVN 79 ADVANCE CONSTRUCTION
Nov 17, 2025A00624$0THIS MODIFICATION IS FOR SCHEDULE A UPDATES IN SUPPORT OF CVN 79 NEW CONSTRUCTION.
Nov 12, 2025A00623$0ISSUE PIO 033 ROUND 4 HOBART SHIPPING INSTRUCTIONS AGAINST CVN 79 CONTRACT
Oct 24, 2025A00622$113.9KCVN 79 ADVANCE CONSTRUCTION, SUPSHIPNN COMMAND - CLOSEOUT OF 0036 SERIES SMALL VALUE CHANGES.
Oct 20, 2025A00621$175.0KTHIS MODIFICATION IS TO ISSUE HMR 1111.01 FOR GROUND POWER UNITS IN SUPPORT OF CVN 79 NEW CONSTRUCTION.
Oct 15, 2025A00620$300.0KTHIS MODIFICATION IS TO ISSUE FMR 1051.02 FOR SECURITY SERVICES IN SUPPORT OF CVN 79 NEW CONSTRUCTION.
Oct 3, 2025A00619$0CVN 79 ADVANCE CONSTRUCTION, SUPSHIPNN COMMAND HMR 1133 SPECIFICATION CHANGE ONLY (SCO) PORTABLE AFFF FIRE EXTINGUISHERS
Oct 2, 2025A00618$100.0KTHIS MODIFICATION IS TO ISSUE FMR 1086 FOR EMALS UPGRADES IN SUPPORT OF CVN 79 NEW CONSTRUCTION.
Sep 30, 2025AZ0109$394.3KTHIS MODIFICATION IS TO DEFINITIZE FMR 1072.02 FOR TRANSPORTATION BETWEEN NET CENTER AND BLDG 608 IN SUPPORT OF CVN 79 NEW CONSTRUCTION.
Sep 29, 2025A00617$0CVN 79 ADVANCE CONSTRUCTION,SUPSHIPNN COMMAND GPA-24-059, ANNUAL MATERIAL TRANSFER TO FACILITIES USE CONTRACT.
Sep 18, 2025AZ0108$50.8KDEFINITIZE PIO 047 FOR THERMAL OVERLOADS IN SUPPORT OF CVN 79 NEW CONSTRUCTION
Sep 11, 2025A00616$22.6KCVN 79 ADVANCE CONSTRUCTION, SUPSHIPNN COMMAND - CLOSEOUT OF 0035 SERIES SMALL VALUE CHANGES.
Sep 9, 2025A00615$0AWARD HMR 1130 SPEC CHANGE ONLY FOR TV REQUIREMENTS.
Sep 8, 2025A00614$0COST TO COMPLETE YEAR END COMMITMENT UPDATES FOR THE CVN 79 CP CONTRACT.
Sep 3, 2025A00613$5.0KCVN 79 ADVANCE CONSTRUCTION ISSUANCE OF FMR 1084 AIRCRAFT ARRESTING GEAR POWER CONTROL SYSTEM UPGRADE.
Aug 25, 2025A00612$25.0KCVN 79 ADVANCE CONSTRUCTION, SUPSHIPNN COMMAND HMR 1514.02 - UPGRADE OF VOYAGE MANAGEMENT SYSTEM (VMS) SOFTWARE.
Aug 7, 2025AZ0107$62.9KTHIS MODIFICATION IS TO DEFINITIZE FMR 1072.01 FOR TRANSPORTATION BETWEEN NET CENTER AND BLDG 608 IN SUPPORT OF CVN 79 NEW CONSTRUCTION.
Jul 30, 2025A00609$35.9KCVN 79 ADVANCE CONSTRUCTION, SUPSHIPNN COMMAND FMR 1051.01 - EVENING SECURITY PATROL EXTENSION 30 JUNE 2026
Jul 30, 2025A00610$33.0KTHIS MODIFICATION IS TO ISSUE FMR 1016.08 FOR BERTHING TRAILERS IN SUPPORT OF CVN 79 NEW CONSTRUCTION.
Jul 30, 2025A00611$6.2KTHIS MODIFICATION IS TO ISSUE FMR 1083 TO INSTALL CONDUIT SHIELDING FOR THE I-STALKER SYSTEM IN SUPPORT OF CVN 79 NEW CONSTRUCTION.
Jul 25, 2025A00608$340.2KISSUE CHANGE FOR CREW TRANSPORTATION SERVICES AGAINST CVN 79 ADVANCE CONSTRUCTION CONTRACT.
Jul 24, 2025A00607$0CVN 79 ADVANCE CONSTRUCTION, SUPSHIPNN COMMAND - HMR 1226 ADMINISTRATIVE MODIFICATION.
Jul 21, 2025A00606$81.7KCVN 79 ADVANCE CONSTRUCTION, SUPSHIPNN COMMAND - CLOSEOUT OF 0034 SERIES SMALL VALUE CHANGES.
Jul 11, 2025A00605$27.6KISSUE CVN 79 ADVANCE CONSTRUCTION PIO 0048 FOR MK38 MOD 3 RSLS.
Jul 10, 2025A00604$72.5KISSUE FMR 1072.01 FOR TRANSPORTATION BETWEEN NET CENTER AND BLDG 608 ON THE CVN 79 ADVANCE CONSTRUCTION PLANNING CONTRACT.
Jul 1, 2025A00603$50.8KCVN 79 ADVANCE CONSTRUCTION SUPSHIP COMMAND, PIO 047 - PROVISIONED ITEMS ORDER, THERMAL OVERLOADS
Jun 30, 2025A00602$11.6KTHIS MODIFICATION IS TO ISSUE PIO 046 FOR LONG LEAD TIME MATERIAL IN SUPPORT OF CVN 79 NEW CONSTRUCTION.
Jun 30, 2025AZ0106$24.7KTHE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE FMR 1016.07 FOR BERTHING TRAILERS.
Jun 26, 2025P00177$-2.4MCVN 79 ADVANCE CONSTRUCTION
Jun 25, 2025A00601$94.6KCVN 79 ADVANCE CONSTRUCTION, SUPSHIPNN COMMAND PIO 0045 - PROVISIONED ITEMS ORDER, JET BLAST DEFLECTOR (JBD) ELECTROMAGNETIC ACTUATORS (EMAS) SPARES.
Jun 24, 2025A00600$0CVN 79 ADVANCE CONSTRUCTION ISSUANCE OF FMR 1081 EMALS L3&4 FORCE SPIKE.
Jun 18, 2025A00599$0AWARD HMR 1129 SCO FOR DTMB DRAWING APPLICABILITY FOR FORD CLASS SHIP TRIALS.
Jun 13, 2025A00598$397.0KCVN 79 ADVANCE CONSTRUCTION TO AWARD LOST, DAMAGED, AND DESTROYED BATCH 19 MODIFICATION.
Jun 3, 2025A00597$25.0KTHE PURPOSE OF THIS MOD IS TO ISSUE HMR 1132 ON CVN 79 FOR DRADIS.
May 30, 2025A00595$80.0KCVN 79 ADVANCE CONSTRUCTION, SUPSHIPNN COMMAND HMR 1084.09 - UPDATED GOVERNMENT FURNISHED INFORMATION (GFI) FOR PRINT SHOP AND PHOTO LAB EQUIPMENT AND MODIFICATION OF REQUIREMENTS FOR SELECT EQUIPMENT FROM CABLES AND FOUNDATIONS.
May 30, 2025A00596$0THIS MODIFICATION IS TO ISSUE HMR 1131.00 FOR AWE HMIS IN SUPPORT OF CVN 79 NEW CONSTRUCTION.
May 29, 2025A00594$0THIS MODIFICATION IS TO AWARD HMR 1225 IN SUPPORT OF CVN 79 NEW CONSTRUCTION.
May 22, 2025A00590$0CVN 79 ADVANCE CONSTRUCTION, SHPSHIPNN COMMAND HMR 1127.01 REV 1 - REPLACEMENT OF EXITING CONTRACTOR FURNISHED SAFES AND SECURE FILING CABINETS WITH COMPLIANT GOVERNMENT FURNISHED SECURE FILING CABINETS.
May 22, 2025A00591$24.8KTHIS MODIFICATION IS TO ISSUE FMR 1016.07 FOR BERTHING TRAILERS IN SUPPORT OF CVN 79 NEW CONSTRUCTION.
May 22, 2025A00592$400.0KTHIS MODIFICATION IS TO ISSUE HMR 1511.01 FOR UPDATES TO THE CANES VIDEO WALL IN SUPPORT OF CVN 79 NEW CONSTRUCTION.
May 22, 2025A00593$24.0KTHE PURPOSE OF THIS MODIFICATION IS TO ISSUE FMR 1078 FOR FIRE EXTINGUISHER DELIVERY.
May 21, 2025A00589$173.9KCVN 79 ADVANCE CONSTRUCTION, SUPSHIPNN COMMAND HMR 1127.01 - REPLACEMENT OF EXITING CONTRACTOR FURNISHED SAFES AND SECURE FILING CABINETS WITH COMPLIANT GOVERNMENT FURNISHED SECURE FILING CABINETS.
May 15, 2025A00586$25.0KTHE PURPOSE OF THIS MODIFICATION IS TO UPDATE PRC DECKING.
May 15, 2025A00587$20.0KTHIS MODIFICATION IS TO ISSUE HMR 1112.01 FOR THE FUEL AT SEA BLOCK IN SUPPORT OF CVN 79 NEW CONSTRUCTION.
May 15, 2025A00588$200.0KCVN 79 ADVANCE CONSTRUCTION, SUPSHIPNN COMMAND HMR 1542 - GOVERNMENT FURNISHED INFORMATION (GFI) FOR THE MODIFIED CABLES AND FOUNDATIONS INSTALLATION OF COLLABORATIVE BRIEFING SYSTEM (CBS) FOR THE CVN 79 READY ROOM.
May 14, 2025A00584$56.8KCVN 79 ADVANCE CONSTRUCTION, SUPSHIPNN COMMAND - CLOSEOUT OF 0033 SERIES SMALL VALUE CHANGES.
May 14, 2025A00585$35.1KTHE PURPOSE OF THIS MODIFICATION IS TO ISSUE AN UNPRICED CHANGE ORDER TO REPAIR DAMAGED BREAKERS.
May 6, 2025A00583$5.0KTHIS MODIFICATION IS TO ISSUE FMR 1077 TO REPLACE THE CBSP RADIO FREQUENCY CABLE IN SUPPORT OF CVN 79 NEW CONSTRUCTION.
May 6, 2025AZ0105$309.3KCVN 79 ADVANCE CONSTRUCTION FMR 1072 MOD TO DEFINITIZE FMR 1072 FOR CVN 79 CREW BUS SERVICES.
Apr 28, 2025AZ0104$107.2KCVN 79 ADVANCE CONSTRUCTION DEFINITIZATION OF FMR 1051 REV 2. (SECURITY DETAIL EXTENSION)
Apr 22, 2025AZ0103$115.4KCVN 79 BERTHING TRAILER EXTENSION (FMR 1016.06)
Apr 15, 2025A00582$0CVN 79 ADVANCE CONSTRUCTION AWARD OF HMR 1224 ADMINISTRATIVE CHANGE
Apr 15, 2025AZ0102$7.2KCVN 79 ADVANCE CONSTRUCTION, SUPSHIPNN COMMAND FMR 1048.01 - WIFI FOR ONBOARD DINING TRAILERS
Apr 10, 2025AZ0101$139.3KCVN 79 ADVANCE CONSTRUCTION DEFINITIZE FMR 1048 FOR DINING AREA OPTIONS
Apr 4, 2025A00581$5.1KCVN 79 ADVANCE CONSTRUCTION, SUPSHIPNN COMMAND - CLOSEOUT OF 0032 SERIES SMALL VALUE CHANGES.
Mar 26, 2025A00579$2.5KCVN 79 ADVANCE CONSTRUCTION ISSUE FMR 1076 FOR AAG WATER TWISTER SHIP-OUT FOR REPAIRS
Mar 26, 2025A00580$0CVN 79 ADVANCE CONSTRUCTION, SUPSHIPNN COMMAND HMR 1120.21 REV 1 - REPLACEMENT OF ADVANCED ARRESTING GEAR (AAG) WATER TWISTERS (WT) MOD I UNITS WITH MOD II UNITS WITH THE ADDITION OF SUPPLEMENTAL THERMAL VOLUME COMPENSATORS (TVC).
Mar 19, 2025A00577$5.0KCVN 79 ADVANCE CONSTRUCTION ISSUE FMR 1074 FOR AIMD RUBBER MATTING
Mar 19, 2025A00578$0CVN 79 ADVANCE CONSTRUCTION ISSUE UCO FOR FMR 1068 REV 3 VENDING MACHINES & COOLERS
Mar 18, 2025A00576$0CVN 79 ADVANCE CONSTRUCTION ISSUANCE OF PIO 33 ROUND 3 HOBART SHIPPING INSTRUCTIONS
Mar 13, 2025A00575$21.1KCVN 79 ADVANCE CONSTRUCTION ISSUE FMR 7058 BREAKER REPAIR MODIFICATION.
Feb 28, 2025AZ0100$0CVN 79 ADVANCE CONSTRUCTION, SUPSHIPNN COMMAND FMR 1071 - MATERIAL AND REPAIRS TO THE PORT SECURITY BARRIER (PSB) IAW PSB MEMO 3-56A
Feb 25, 2025A00574$0CVN 79 ADVANCE CONSTRUCTION ISSUE FMR 1073 FOR PSB MEMO 3-68
Feb 20, 2025A00573$0CVN 79 ADVANCE CONSTRUCTION ISSUE FMR 1068 REV 2 FOR SHIP'S VENDING AND STORE COOLERS PERMANENT INSTALLATION
Feb 18, 2025A00572$348.8KCVN 79 ADVANCE CONSTRUCTION AWARD LDD BATCH 18
Feb 13, 2025A00570$10.0KCVN 79 ADVANCE CONSTRUCTION, SUPSHIPNN COMMAND HMR 1055.12 - SD STOREROOM NAE REPAIR PARTS LADDER INSTALLATION.
Feb 13, 2025A00571$0CVN 79 ADVANCE CONSTRUCTION ISSUE FMR 1072 FOR CVN 79 TRANSPORTATION BETWEEN NETCENTER AND B608
Feb 11, 2025A00569$27.7KTHIS MODIFICATION IS TO AWARD PIO 0044 FOR PLC SHOCK TESTING IN SUPPORT OF CVN 79 NEW CONSTRUCTION.
Feb 6, 2025A00568$25.0KCVN 79 ADVANCE CONSTRUCTION ISSUE HMR 1037 FOR ARMORY DOORS
Jan 29, 2025A00567$532.3KCVN 79 ADVANCE CONSTRUCTION ISSUE PIO 043 FOR THERMOCOUPLER HEATER CONTROLLERS
Jan 28, 2025A00566$0CVN 79 ADVANCE CONSTRUCTION ISSUE HMR 1518.04 REV 1
Jan 28, 2025P00175$0CVN 79 ADVANCE CONSTRUCTION
Jan 23, 2025A00565$106.4KCVN 79 ADVANCE CONSTRUCTION, SUPSHIPNN COMMAND - CLOSEOUT OF 0031 SERIES SMALL VALUE CHANGES
Jan 17, 2025A00564$500.0KTHIS MODIFICATION IS FOR CHANGES TO THE REQUIREMENTS OF THE ADVANCED ARRESTING GEAR (AAG) WATER TWISTERS IN SUPPORT OF CVN 79 NEW CONSTRUCTION.
Jan 14, 2025A00563$0CVN 79 ADVANCE CONSTRUCTION ISSUE FMR 1071 FOR PSB REPAIRS
Dec 30, 2024A00562$14.0KCVN 79 ADVANCE CONSTRUCTION ISSUE HMR 1518.04 - TACTICAL VARIANT SWITCH
Dec 19, 2024AZ0099$-100.0KCVN 79 ADVANCE CONSTRUCTION DEFINITIZE FMR 1016.05 FOR BERTHING TRAILER EXTENSION
Dec 18, 2024A00561$0CVN 79 ADVANCE CONSTRUCTION - SUPSHIPNN COMMAND HMR 1125 SPECIFICATION CHANGE ONLY (SCO) - PIPING PENETRATIONS IN THE SIDE PROTECTIVE SYSTEM
Dec 16, 2024A00560$0CVN 79 ADVANCE CONSTRUCTION, SUPSHIPNN COMMAND GPA-24-057, MATERIAL TRANSFER OF GOVERNMENT PROPERTY FROM CVN 79 TO CVN 80/81
Dec 12, 2024A00559$10.0KCVN 79 ADVANCE CONSTRUCTION ISSUE HMR 1541 FOR PAPA WATCH STATION
Dec 10, 2024A00558$2.5KTHIS MODIFICATION IS TO ISSUE FMR 1068 REV 1 FOR UPDATES TO THE VENDING MACHINE INSTILLATION REQUIREMENTS IN SUPPORT OF CVN 79 NEW CONSTRUCTION.
Dec 6, 2024AZ0098$691.6KCVN 79 ADVANCE CONSTRUCTION, SUPSHIPNN COMMAND - PROVISIONED ITEMS ORDER (PIO)0036, JET BLAST DEFLECTOR EMA ANGULAR CONTACT BALL BEARINGS
Dec 3, 2024A00557$1.2MCVN 79 ADVANCE CONSTRUCTION ISSUANCE OF PIO 042 - HEAVYWEIGHT SHOCK TESTING.
Nov 26, 2024A00556$0CVN 79 ADVANCE CONSTRUCTION AWARD HMR 1223 FOR SKED A CHANGES
Nov 22, 2024A00555$4.0KCVN 79 ADVANCE CONSTRUCTION ISSUE FMR 1070 FOR EMALS PSB BOW SWAP
Nov 21, 2024A00554$17.5KCVN 79 ADVANCE CONSTRUCTION ISSUE FMR 1068
Nov 12, 2024A00553$13.3KCVN 79 ADVANCE CONSTRUCTION, SUPSHIPNN COMMAND - CLOSEOUT OF 0030 SERIES SMALL VALUE CHANGES
Nov 7, 2024A00552$15.0KCVN 79 ADVANCE CONSTRUCTION, SUPSHIPNN COMMAND - HMR 1540, THEATER MISSION PLANNING CENTER (TMPC)REPLACING THE TOMAHAWK COMMAND AND CONTROL SYSTEM (TC2S)
Nov 6, 2024A00550$488.8KCVN 79 ADVANCE CONSTRUCTION, SUPSHIPNN COMMAND - AWARD LDD BATCH 17
Nov 6, 2024A00551$0ISSUE FMR 1066 REV 1 TO ADD/UPDATE ADDITIONAL CABLES FOR REPAIR IN SUPPORT OF CVN 79 NEW CONSTRUCTION
Oct 25, 2024A00547$0CVN 79 ADVANCE CONSTRUCTION CHANGE ORDER FMR 1051.00 REV 2
Oct 25, 2024A00548$0CVN 79 ADVANCE CONSTRUCTION ISSUE FMR 1065 REV 1 FOR EMALS S20 LM CABLE REORIENTATION
Oct 25, 2024A00549$5.0KTHIS MODIFICATION IS TO ISSUE FMR 1066 FOR EMALS CABLE REPAIRS IN SUPPORT OF CVN 79 NEW CONSTRUCTION
Oct 17, 2024A00546$111.0KCVN 79 ADVANCE CONSTRUCTION ISSUE HMR 1127 FOR SECURE FILING CABINETS PRIORITY 1 AND 2 ONLY
Oct 3, 2024A00545$5.0KTHIS MODIFICATION IS FOR EMALS REPAIRS TO CAT 3 AND 4 IN ACCORDANCE WITH FMR 1065 TO SUPPORT CVN 79 NEW CONSTRUCTION.
Sep 30, 2024A00544$0CVN 79 ADVANCE CONSTRUCTION ISSUE FMR 1016.06 FOR BERTHING TRAILER EXTENSION.
Sep 17, 2024A00543$0CVN 79 - PIO 33 SHIPPING INSTRUCTIONS
Aug 28, 2024A00542$14.4KCVN 79 ADVANCE CONSTRUCTION - SUPSHIPNN COMMAND - CLOSEOUT OF 0029 SERIES SMALL VALUE CHANGES
Aug 15, 2024A00541$0DEVELOPMENT OF N303 CONTROLLER IN SUPPORT OF CVN 79 NEW CONSTRUCTION.
Aug 2, 2024A00540$0ADMIN MOD TO CORRECT DISCREPANCIES ON A00538 IN SUPPORT OF CVN 79 NEW CONSTRUCTION
Aug 1, 2024A00539$75.0KCVN 79 ADVANCE CONSTRUCTION, SUPSHIPNN COMMAND, FMR 1055.11 - PROVIDE GOVERNMENT FURNISHED INFORMATION (GFI) FOR ELECTRONIC CONSOLIDATED AUTOMATED SUPPORT SYSTEM (ECASS)AND MODIFY INSTALLATION REQUIREMENTS FROM CABLES AND FOUNDATIONS TO FULL INSTALLATION.
Jul 30, 2024A00538$18.1KDEVELOPMENT OF N303 CONTROLLER IN SUPPORT OF CVN 79 NEW CONSTRUCTION.
Jul 19, 2024AZ0097$-2.5KCVN 79 ADVANCE CONSTRUCTION, SUPSHIP COMMAND - MATERIAL AND REPAIR OF PORT SECURITY BARRIER IAW PSB MEMO 3-56, FMR 1061
Jul 16, 2024A00537$44.6KCVN 79 ADVANCE CONSTRUCTION -SUPSHIPNN COMMAND - CLOSEOUT OF 0028 SERIES SMALL VALUE CHANGES
Jul 12, 2024A00536$18.5KCVN 79 ADVANCE CONSTRUCTION ISSUE FMR 7055
Jul 11, 2024A00535$0CVN 79 ADVANCE CONSTRUCTION AWARD HMR 1126 SCO
Jul 10, 2024A00534$2.5KPROVIDE UPDATED MOBILE CRANE SPECIFICATIONS AND INSTALL RECEPTACLES TO SUPPORT CVN 79 NEW CONSTRUCTION
Jun 28, 2024A00533$0CVN 79 ADVANCE CONSTRUCTION - FMR 1051 REV 1 UCO
May 30, 2024A00532$2.5KPSB REPAIRS - FMR 1061
May 22, 2024A00531$0CVN 79 ADVANCE CONSTRUCTION AWARD HMR 1222
May 16, 2024AZ0096$128.9KCVN 79 ADVANCE CONSTRUCTION AWARD PIO 040
May 15, 2024A00529$3.8KCVN 79 ADVANCE CONSTRUCTION - FMR 1059 (UCO)
May 15, 2024A00530$0CVN 79 ADVANCE CONSTRUCTION - FMR 1058 REV 1 (UCO)
May 14, 2024A00526$0CVN 79 ADVANCE CONSTRUCTION - UPDATE ATTACHMENT 4 PER APPROVED ISP DATED 01/26/2024
May 14, 2024A00527$374.1KCVN 79 ADVANCE CONSTRUCTION LDD BATCH 16
May 14, 2024A00528$5.0KCVN 79 ADVANCE CONSTRUCTION ISSUE FMR 1060
May 3, 2024A00525$0CVN 79 ADVANCE CONSTRUCTION AWARD HMR 1124 SCO
Apr 26, 2024A00523$15.0KCVN 79 ADVANCE CONSTRUCTION ISSUE FMR 1058
Apr 26, 2024A00524$0CVN 79 ADVANCE CONSTRUCTION AWARD FMR 3115
Apr 24, 2024A00522$600.0KCVN 79 ADVANCE CONSTRUCTION ISSUE HMR 1111
Apr 22, 2024A00521$19.0KCVN 79 ADVANCE CONSTRUCTION
Apr 17, 2024A00520$0CVN 79 ADVANCE CONSTRUCTION
Apr 5, 2024A00519$12.5KCVN 79 ADVANCE CONSTRUCTION HMR 1110.01 ISSUANCE
Apr 1, 2024A00518$45.0KCVN 79 ADVANCE CONSTRUCTION
Mar 28, 2024A00517$0CVN 79 ADVANCE CONSTRUCTION
Mar 27, 2024A00516$105.0KCVN 79 ADVANCE CONSTRUCTION
Mar 22, 2024A00515$5.1KCVN 79 ADVANCE CONSTRUCTION
Mar 18, 2024A00514$10.0KCVN 79 ADVANCE CONSTRUCTION ISSUE FMR 1053.01
Mar 13, 2024AZ0095$-7.5KCVN 79 ADVANCE CONSTRUCTION - FMR 1057
Mar 11, 2024A00513$0CVN 79 ADVANCE CONSTRUCTION
Mar 8, 2024AZ0094$1.8MINSTALLATION OF THE CONSOLIDATED AFLOAT NETWORKS AND ENTERPRISE SERVICES (CANES) LOCAL AREA NETWORK (LAN) DROPS
Feb 27, 2024AZ0093$54.3KCVN 79 ADVANCE CONSTRUCTION
Feb 22, 2024A00511$15.6KCVN 79 ADVANCE CONSTRUCTION
Feb 22, 2024A00512$0CVN 79 ADVANCE CONSTRUCTION
Feb 16, 2024A00510$0CVN 79 ADVANCE CONSTRUCTION
Feb 14, 2024A00509$7.5KCVN 79 ADVANCE CONSTRUCTION
Feb 7, 2024A00508$5.0KCVN 79 ADVANCE CONSTRUCTION
Feb 5, 2024A00507$75.2KCVN 79 ADVANCE CONSTRUCTION
Jan 31, 2024A00506$7.5KCVN 79 ADVANCE CONSTRUCTION
Jan 26, 2024A00504$5.0KCVN 79 ADVANCE CONSTRUCTION
Jan 26, 2024A00505$25.0KCVN 79 ADVANCE CONSTRUCTION
Jan 25, 2024A00503$20.0KCVN 79 ADVANCE CONSTRUCTION
Jan 23, 2024A00501$0CVN 79 ADVANCE CONSTRUCTION
Jan 23, 2024A00502$0CVN 79 ADVANCE CONSTRUCTION
Jan 22, 2024A00500$0CVN 79 ADVANCE CONSTRUCTION
Jan 19, 2024A00499$5.0KCVN 79 ADVANCE CONSTRUCTION
Jan 9, 2024A00498$12.5KCVN 79 ADVANCE CONSTRUCTION
Jan 8, 2024P00171$95.1KPIO 35 - EWEB MATERIAL
Jan 5, 2024A00497$150.0KCVN 79 ADVANCE CONSTRUCTION
Dec 12, 2023A00495$7.2KCVN 79 ADVANCE CONSTRUCTION
Dec 12, 2023A00496$408.5KCVN 79 ADVANCE CONSTRUCTION
Dec 5, 2023A00494$0CVN 79 ADVANCE CONSTRUCTION
Nov 28, 2023A00493$690.0KCVN 79 ADVANCE CONSTRUCTION
Nov 13, 2023A00492$0CVN 79 ADVANCE CONSTRUCTION
Nov 13, 2023AZ0092$1.1MCVN 79 ADVANCE CONSTRUCTION
Nov 8, 2023AZ0091$-2.9KCVN 79 ADVANCE CONSTRUCTION
Nov 1, 2023A00490$0CVN 79 ADVANCE CONSTRUCTION
Nov 1, 2023A00491$0CVN 79 ADVANCE CONSTRUCTION
Oct 31, 2023A00489$0CVN 79 ADVANCE CONSTRUCTION
Oct 31, 2023AZ0090$211.2KCVN 79 ADVANCE CONSTRUCTION
Oct 30, 2023P00170$39.0MCVN 79 ADVANCE CONSTRUCTION INSTALLMENT FUNDING
Oct 20, 2023A00487$0CVN 79 ADVANCE CONSTRUCTION
Oct 20, 2023A00488$0CVN 79 ADVANCE CONSTRUCTION
Oct 18, 2023A00486$67.7KCVN 79 ADVANCE CONSTRUCTION
Oct 17, 2023P00169$136.6KCVN 79 ADVANCE CONSTRUCTION
Oct 11, 2023AZ0089$0CVN 79 ADVANCE CONSTRUCTION