Federal contract award
N0002409C2116
TAS::17 1611::TAS CVN79 CONSTRUCTION PREPARATION EFFORTS FY09
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | SUP OF SHIPBUILDING CONV AND REPAIR |
| NAICS | 336611 — Ship Building and Repairing |
| PSC | 1901 — AIRCRAFT CARRIERS |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | COST PLUS FIXED FEE |
| Obligations | $4.5B |
| Current contract value | $4.5B |
| Potential contract value / ceiling | $4.5B |
| Start date | Jan 15, 2009 |
| Current end date | Jul 31, 2025 |
| Potential end date | Jul 31, 2025 |
| Latest award activity | Jun 3, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 200 of 940 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Jun 10, 2026 | AZ0119 | $94.6K | CVN 79 ADVANCE CONSTRUCTION, SUPSHIPNN COMMAND PIO 0045 - PROVISIONED ITEMS ORDER, JET BLAST DEFLECTOR (JBD) ELECTROMAGNETIC ACTUATORS (EMAS) SPARES. |
| Jun 3, 2026 | A00643 | $657.9K | CVN 79 ADVANCE CONSTRUCTION, SUPSHIPNN COMMAND - CLOSEOUT OF 0039 SERIES SMALL VALUE CHANGES. |
| Jun 3, 2026 | A00644 | $25.0K | THIS MODIFICATION IS TO ISSUE FMR 1051.03 FOR SECURITY SERVICES IN SUPPORT ON CVN 79 NEW CONSTRUCTION. |
| May 27, 2026 | AZ0118 | $-180.6K | THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE FMR 1051.02 AGAINST THE CVN 79 ADVANCE CONSTRUCTION CONTRACT. |
| May 19, 2026 | A00642 | $75.0K | THIS MODIFICATION IS TO ISSUE HMR 1502.01 FOR FATHOMETER CABLE UPGRADES IN SUPPORT OF CVN 79 NEW CONSTRUCTION. |
| May 15, 2026 | A00641 | $32.5K | ISSUE FMR 1089 AGAINST THE CVN 79 ADVANCE CONSTRUCTION CONTRACT FOR EMALS LAUNCH MOTOR MODULE CONNECTION INSPECTIONS. |
| May 15, 2026 | AZ0117 | $149.3K | THIS MODIFICATION IS TO DEFINITIZE FMR 1084.00 PREVIOUSLY AUTHORIZED UNDER A00613 IN SUPPORT OF CVN 79 NEW CONSTRUCTION. |
| May 6, 2026 | A00639 | $240.0K | THIS MODIFICATION IS TO ISSUE PIO 0052 FOR CLOSURE MATERIAL FABRICATION IN SUPPORT OF CVN 79 NEW CONSTRUCTION. |
| May 6, 2026 | A00640 | $30.0K | THIS MODIFICATION IS TO ISSUE FMR 1088 FOR MOTOR MODULE REPLACEMENT IN SUPPORT OF CVN 79 NEW CONSTRUCTION. |
| May 4, 2026 | A00638 | $12.5K | CVN 79 ADVANCE CONSTRUCTION, SUPSHIPNN COMMAND PIO 0051 - PROVISIONED ITEMS ORDER, SUPPORT AVIATION ARMAMENT GUN SYSTEM SHOP |
| Apr 30, 2026 | A00637 | $1.6M | CVN 79 ADVANCE CONSTRUCTION, SUPSHIPNN COMMAND - LOST, DAMAGED & DESTROYED BATCH 20 FUNDING ADJUSTMENT |
| Apr 16, 2026 | A00636 | $24.2K | THE PURPOSE OF THIS MODIFICATION IS TO ISSUE AN UNPRICED CHANGE ORDER FOR HMR 1078.01 AGAINST THE CVN 79 ADVANCE CONSTRUCTION CONTRACT. |
| Apr 15, 2026 | AZ0116 | $22.4K | CVN 79 ADVANCE CONSTRUCTION, SUPSHIPNN COMMAND DEFINITIZE HMR 1514.02 - VOYAGE MANAGEMENT SYSTEM (VMS) SOFTWARE UPGRADE |
| Apr 10, 2026 | AZ0115 | $-94.8K | THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE FMR 1086.00 AGAINST THE CVN 79 ADVANCE CONSTRUCTION CONTRACT. |
| Apr 3, 2026 | A00634 | $50.0K | THE PURPOSE OF THIS MODIFICATION IS TO ISSUE AN UNPRICED CHANGE ORDER FOR FMR 1087.00 AGAINST THE CVN 79 ADVANCE CONSTRUCTION CONTRACT. |
| Apr 3, 2026 | A00635 | $225.0K | CVN 79 ADVANCE CONSTRUCTION, SUPSHIPNN COMMAND - HMR 1119.11, ELECTROMAGNETIC AIRCRAFT LAUNCH SYSTEM (EMALS) LUBRICATING OIL (ELO) SYSTEM. |
| Mar 31, 2026 | A00633 | $30.0K | THE PURPOSE OF THIS MODIFICATION IS TO ISSUE AN UNPRICED CHANGE ORDER FOR HMR 1084.05 AGAINST THE CVN 79 ADVANCE CONSTRUCTION CONTRACT. |
| Mar 25, 2026 | AZ0114 | $18.1K | THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE PIO 0041 N303 CONTROLLERS AGAINST THE CVN 79 ADVANCE CONSTRUCTION CONTRACT. |
| Mar 23, 2026 | A00632 | $0 | CVN 79 ADVANCE CONSTRUCTION, SUPSHIPNN COMMAND - HMR 1228 ADMINISTRATIVE MODIFICATION. |
| Mar 20, 2026 | AZ0113 | $30.7K | DEFINITIZE FMR 1016.09 FOR BERTHING TRAILER EXTENSIONS AGAINST THE CVN 79 ADVANCE CONSTRUCTION CONTRACT. |
| Mar 18, 2026 | A00631 | $247.0K | THIS MODIFICATION IS TO ISSUE PIO 050 FOR CMBRE MAGOPS IN SUPPORT OF CVN 79 NEW CONSTRUCTION. |
| Mar 16, 2026 | A00630 | $451.8K | CVN 79 ADVANCE CONSTRUCTION, SUPSHIPNN COMMAND - CLOSEOUT OF 0038 SERIES SMALL VALUE CHANGES. |
| Mar 16, 2026 | P00184 | $0 | CVN 79 ADVANCE CONSTRUCTION |
| Feb 23, 2026 | AZ0112 | $38.2K | THIS MODIFICATION IS TO DEFINITIZE FMR 1016.08 FOR BERTHING TRAILERS IN SUPPORT OF CVN 79 NEW CONSTRUCTION. |
| Feb 17, 2026 | A00628 | $90.0K | CVN 79 ADVANCE CONSTRUCTION, SUPSHIPNN COMMAND, HMR 1084.04 - ENGRAVING SHOP EQUIPMENT. |
| Feb 17, 2026 | A00629 | $500.0K | THIS MODIFICATION IS TO ISSUE FMR 1085 FOR EMALS NETWORK UPGRADES IN SUPPORT OF CVN 79 NEW CONSTRUCTION. |
| Feb 17, 2026 | AZ0111 | $61.5K | DEFINITIZE FMR 1051.01 FOR EVENING SECURITY PATROL ON THE CP CONTRACT. |
| Feb 10, 2026 | A00627 | $1.1M | CVN 79 ADVANCE CONSTRUCTION, SUPSHIPNN COMMAND - LOST, DAMAGED, AND DESTROYED BATCH 20. |
| Jan 30, 2026 | P00183 | $14.0M | FY26 COST TO COMPLETE FUNDING FOR CVN 79 CLIN 1303 |
| Jan 28, 2026 | AZ0110 | $48.1K | CVN 79 ADVANCE CONSTRUCTION, SUPSHIPNN COMMAND - PROVISIONED ITEMS ORDER (PIO)0048, MK38 MOD 3 READY SERVICE LOCKER |
| Dec 11, 2025 | A00626 | $624.5K | CVN 79 ADVANCE CONSTRUCTION, SUPSHIPNN COMMAND - CLOSEOUT OF 0037 SERIES SMALL VALUE CHANGES. |
| Dec 3, 2025 | P00181 | $60.0M | CVN 79 ADVANCE CONSTRUCTION |
| Dec 2, 2025 | P00180 | $52.0M | CVN 79 INCREMENTAL FUNDING FOR CLIN 1303 |
| Nov 24, 2025 | A00625 | $40.0K | CVN 79 ADVANCE CONSTRUCTION ISSUANCE OF UNPRICED CHANGE ORDER FOR FMR 1016.09. |
| Nov 19, 2025 | PZ0003 | $0 | CVN 79 ADVANCE CONSTRUCTION |
| Nov 17, 2025 | A00624 | $0 | THIS MODIFICATION IS FOR SCHEDULE A UPDATES IN SUPPORT OF CVN 79 NEW CONSTRUCTION. |
| Nov 12, 2025 | A00623 | $0 | ISSUE PIO 033 ROUND 4 HOBART SHIPPING INSTRUCTIONS AGAINST CVN 79 CONTRACT |
| Oct 24, 2025 | A00622 | $113.9K | CVN 79 ADVANCE CONSTRUCTION, SUPSHIPNN COMMAND - CLOSEOUT OF 0036 SERIES SMALL VALUE CHANGES. |
| Oct 20, 2025 | A00621 | $175.0K | THIS MODIFICATION IS TO ISSUE HMR 1111.01 FOR GROUND POWER UNITS IN SUPPORT OF CVN 79 NEW CONSTRUCTION. |
| Oct 15, 2025 | A00620 | $300.0K | THIS MODIFICATION IS TO ISSUE FMR 1051.02 FOR SECURITY SERVICES IN SUPPORT OF CVN 79 NEW CONSTRUCTION. |
| Oct 3, 2025 | A00619 | $0 | CVN 79 ADVANCE CONSTRUCTION, SUPSHIPNN COMMAND HMR 1133 SPECIFICATION CHANGE ONLY (SCO) PORTABLE AFFF FIRE EXTINGUISHERS |
| Oct 2, 2025 | A00618 | $100.0K | THIS MODIFICATION IS TO ISSUE FMR 1086 FOR EMALS UPGRADES IN SUPPORT OF CVN 79 NEW CONSTRUCTION. |
| Sep 30, 2025 | AZ0109 | $394.3K | THIS MODIFICATION IS TO DEFINITIZE FMR 1072.02 FOR TRANSPORTATION BETWEEN NET CENTER AND BLDG 608 IN SUPPORT OF CVN 79 NEW CONSTRUCTION. |
| Sep 29, 2025 | A00617 | $0 | CVN 79 ADVANCE CONSTRUCTION,SUPSHIPNN COMMAND GPA-24-059, ANNUAL MATERIAL TRANSFER TO FACILITIES USE CONTRACT. |
| Sep 18, 2025 | AZ0108 | $50.8K | DEFINITIZE PIO 047 FOR THERMAL OVERLOADS IN SUPPORT OF CVN 79 NEW CONSTRUCTION |
| Sep 11, 2025 | A00616 | $22.6K | CVN 79 ADVANCE CONSTRUCTION, SUPSHIPNN COMMAND - CLOSEOUT OF 0035 SERIES SMALL VALUE CHANGES. |
| Sep 9, 2025 | A00615 | $0 | AWARD HMR 1130 SPEC CHANGE ONLY FOR TV REQUIREMENTS. |
| Sep 8, 2025 | A00614 | $0 | COST TO COMPLETE YEAR END COMMITMENT UPDATES FOR THE CVN 79 CP CONTRACT. |
| Sep 3, 2025 | A00613 | $5.0K | CVN 79 ADVANCE CONSTRUCTION ISSUANCE OF FMR 1084 AIRCRAFT ARRESTING GEAR POWER CONTROL SYSTEM UPGRADE. |
| Aug 25, 2025 | A00612 | $25.0K | CVN 79 ADVANCE CONSTRUCTION, SUPSHIPNN COMMAND HMR 1514.02 - UPGRADE OF VOYAGE MANAGEMENT SYSTEM (VMS) SOFTWARE. |
| Aug 7, 2025 | AZ0107 | $62.9K | THIS MODIFICATION IS TO DEFINITIZE FMR 1072.01 FOR TRANSPORTATION BETWEEN NET CENTER AND BLDG 608 IN SUPPORT OF CVN 79 NEW CONSTRUCTION. |
| Jul 30, 2025 | A00609 | $35.9K | CVN 79 ADVANCE CONSTRUCTION, SUPSHIPNN COMMAND FMR 1051.01 - EVENING SECURITY PATROL EXTENSION 30 JUNE 2026 |
| Jul 30, 2025 | A00610 | $33.0K | THIS MODIFICATION IS TO ISSUE FMR 1016.08 FOR BERTHING TRAILERS IN SUPPORT OF CVN 79 NEW CONSTRUCTION. |
| Jul 30, 2025 | A00611 | $6.2K | THIS MODIFICATION IS TO ISSUE FMR 1083 TO INSTALL CONDUIT SHIELDING FOR THE I-STALKER SYSTEM IN SUPPORT OF CVN 79 NEW CONSTRUCTION. |
| Jul 25, 2025 | A00608 | $340.2K | ISSUE CHANGE FOR CREW TRANSPORTATION SERVICES AGAINST CVN 79 ADVANCE CONSTRUCTION CONTRACT. |
| Jul 24, 2025 | A00607 | $0 | CVN 79 ADVANCE CONSTRUCTION, SUPSHIPNN COMMAND - HMR 1226 ADMINISTRATIVE MODIFICATION. |
| Jul 21, 2025 | A00606 | $81.7K | CVN 79 ADVANCE CONSTRUCTION, SUPSHIPNN COMMAND - CLOSEOUT OF 0034 SERIES SMALL VALUE CHANGES. |
| Jul 11, 2025 | A00605 | $27.6K | ISSUE CVN 79 ADVANCE CONSTRUCTION PIO 0048 FOR MK38 MOD 3 RSLS. |
| Jul 10, 2025 | A00604 | $72.5K | ISSUE FMR 1072.01 FOR TRANSPORTATION BETWEEN NET CENTER AND BLDG 608 ON THE CVN 79 ADVANCE CONSTRUCTION PLANNING CONTRACT. |
| Jul 1, 2025 | A00603 | $50.8K | CVN 79 ADVANCE CONSTRUCTION SUPSHIP COMMAND, PIO 047 - PROVISIONED ITEMS ORDER, THERMAL OVERLOADS |
| Jun 30, 2025 | A00602 | $11.6K | THIS MODIFICATION IS TO ISSUE PIO 046 FOR LONG LEAD TIME MATERIAL IN SUPPORT OF CVN 79 NEW CONSTRUCTION. |
| Jun 30, 2025 | AZ0106 | $24.7K | THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE FMR 1016.07 FOR BERTHING TRAILERS. |
| Jun 26, 2025 | P00177 | $-2.4M | CVN 79 ADVANCE CONSTRUCTION |
| Jun 25, 2025 | A00601 | $94.6K | CVN 79 ADVANCE CONSTRUCTION, SUPSHIPNN COMMAND PIO 0045 - PROVISIONED ITEMS ORDER, JET BLAST DEFLECTOR (JBD) ELECTROMAGNETIC ACTUATORS (EMAS) SPARES. |
| Jun 24, 2025 | A00600 | $0 | CVN 79 ADVANCE CONSTRUCTION ISSUANCE OF FMR 1081 EMALS L3&4 FORCE SPIKE. |
| Jun 18, 2025 | A00599 | $0 | AWARD HMR 1129 SCO FOR DTMB DRAWING APPLICABILITY FOR FORD CLASS SHIP TRIALS. |
| Jun 13, 2025 | A00598 | $397.0K | CVN 79 ADVANCE CONSTRUCTION TO AWARD LOST, DAMAGED, AND DESTROYED BATCH 19 MODIFICATION. |
| Jun 3, 2025 | A00597 | $25.0K | THE PURPOSE OF THIS MOD IS TO ISSUE HMR 1132 ON CVN 79 FOR DRADIS. |
| May 30, 2025 | A00595 | $80.0K | CVN 79 ADVANCE CONSTRUCTION, SUPSHIPNN COMMAND HMR 1084.09 - UPDATED GOVERNMENT FURNISHED INFORMATION (GFI) FOR PRINT SHOP AND PHOTO LAB EQUIPMENT AND MODIFICATION OF REQUIREMENTS FOR SELECT EQUIPMENT FROM CABLES AND FOUNDATIONS. |
| May 30, 2025 | A00596 | $0 | THIS MODIFICATION IS TO ISSUE HMR 1131.00 FOR AWE HMIS IN SUPPORT OF CVN 79 NEW CONSTRUCTION. |
| May 29, 2025 | A00594 | $0 | THIS MODIFICATION IS TO AWARD HMR 1225 IN SUPPORT OF CVN 79 NEW CONSTRUCTION. |
| May 22, 2025 | A00590 | $0 | CVN 79 ADVANCE CONSTRUCTION, SHPSHIPNN COMMAND HMR 1127.01 REV 1 - REPLACEMENT OF EXITING CONTRACTOR FURNISHED SAFES AND SECURE FILING CABINETS WITH COMPLIANT GOVERNMENT FURNISHED SECURE FILING CABINETS. |
| May 22, 2025 | A00591 | $24.8K | THIS MODIFICATION IS TO ISSUE FMR 1016.07 FOR BERTHING TRAILERS IN SUPPORT OF CVN 79 NEW CONSTRUCTION. |
| May 22, 2025 | A00592 | $400.0K | THIS MODIFICATION IS TO ISSUE HMR 1511.01 FOR UPDATES TO THE CANES VIDEO WALL IN SUPPORT OF CVN 79 NEW CONSTRUCTION. |
| May 22, 2025 | A00593 | $24.0K | THE PURPOSE OF THIS MODIFICATION IS TO ISSUE FMR 1078 FOR FIRE EXTINGUISHER DELIVERY. |
| May 21, 2025 | A00589 | $173.9K | CVN 79 ADVANCE CONSTRUCTION, SUPSHIPNN COMMAND HMR 1127.01 - REPLACEMENT OF EXITING CONTRACTOR FURNISHED SAFES AND SECURE FILING CABINETS WITH COMPLIANT GOVERNMENT FURNISHED SECURE FILING CABINETS. |
| May 15, 2025 | A00586 | $25.0K | THE PURPOSE OF THIS MODIFICATION IS TO UPDATE PRC DECKING. |
| May 15, 2025 | A00587 | $20.0K | THIS MODIFICATION IS TO ISSUE HMR 1112.01 FOR THE FUEL AT SEA BLOCK IN SUPPORT OF CVN 79 NEW CONSTRUCTION. |
| May 15, 2025 | A00588 | $200.0K | CVN 79 ADVANCE CONSTRUCTION, SUPSHIPNN COMMAND HMR 1542 - GOVERNMENT FURNISHED INFORMATION (GFI) FOR THE MODIFIED CABLES AND FOUNDATIONS INSTALLATION OF COLLABORATIVE BRIEFING SYSTEM (CBS) FOR THE CVN 79 READY ROOM. |
| May 14, 2025 | A00584 | $56.8K | CVN 79 ADVANCE CONSTRUCTION, SUPSHIPNN COMMAND - CLOSEOUT OF 0033 SERIES SMALL VALUE CHANGES. |
| May 14, 2025 | A00585 | $35.1K | THE PURPOSE OF THIS MODIFICATION IS TO ISSUE AN UNPRICED CHANGE ORDER TO REPAIR DAMAGED BREAKERS. |
| May 6, 2025 | A00583 | $5.0K | THIS MODIFICATION IS TO ISSUE FMR 1077 TO REPLACE THE CBSP RADIO FREQUENCY CABLE IN SUPPORT OF CVN 79 NEW CONSTRUCTION. |
| May 6, 2025 | AZ0105 | $309.3K | CVN 79 ADVANCE CONSTRUCTION FMR 1072 MOD TO DEFINITIZE FMR 1072 FOR CVN 79 CREW BUS SERVICES. |
| Apr 28, 2025 | AZ0104 | $107.2K | CVN 79 ADVANCE CONSTRUCTION DEFINITIZATION OF FMR 1051 REV 2. (SECURITY DETAIL EXTENSION) |
| Apr 22, 2025 | AZ0103 | $115.4K | CVN 79 BERTHING TRAILER EXTENSION (FMR 1016.06) |
| Apr 15, 2025 | A00582 | $0 | CVN 79 ADVANCE CONSTRUCTION AWARD OF HMR 1224 ADMINISTRATIVE CHANGE |
| Apr 15, 2025 | AZ0102 | $7.2K | CVN 79 ADVANCE CONSTRUCTION, SUPSHIPNN COMMAND FMR 1048.01 - WIFI FOR ONBOARD DINING TRAILERS |
| Apr 10, 2025 | AZ0101 | $139.3K | CVN 79 ADVANCE CONSTRUCTION DEFINITIZE FMR 1048 FOR DINING AREA OPTIONS |
| Apr 4, 2025 | A00581 | $5.1K | CVN 79 ADVANCE CONSTRUCTION, SUPSHIPNN COMMAND - CLOSEOUT OF 0032 SERIES SMALL VALUE CHANGES. |
| Mar 26, 2025 | A00579 | $2.5K | CVN 79 ADVANCE CONSTRUCTION ISSUE FMR 1076 FOR AAG WATER TWISTER SHIP-OUT FOR REPAIRS |
| Mar 26, 2025 | A00580 | $0 | CVN 79 ADVANCE CONSTRUCTION, SUPSHIPNN COMMAND HMR 1120.21 REV 1 - REPLACEMENT OF ADVANCED ARRESTING GEAR (AAG) WATER TWISTERS (WT) MOD I UNITS WITH MOD II UNITS WITH THE ADDITION OF SUPPLEMENTAL THERMAL VOLUME COMPENSATORS (TVC). |
| Mar 19, 2025 | A00577 | $5.0K | CVN 79 ADVANCE CONSTRUCTION ISSUE FMR 1074 FOR AIMD RUBBER MATTING |
| Mar 19, 2025 | A00578 | $0 | CVN 79 ADVANCE CONSTRUCTION ISSUE UCO FOR FMR 1068 REV 3 VENDING MACHINES & COOLERS |
| Mar 18, 2025 | A00576 | $0 | CVN 79 ADVANCE CONSTRUCTION ISSUANCE OF PIO 33 ROUND 3 HOBART SHIPPING INSTRUCTIONS |
| Mar 13, 2025 | A00575 | $21.1K | CVN 79 ADVANCE CONSTRUCTION ISSUE FMR 7058 BREAKER REPAIR MODIFICATION. |
| Feb 28, 2025 | AZ0100 | $0 | CVN 79 ADVANCE CONSTRUCTION, SUPSHIPNN COMMAND FMR 1071 - MATERIAL AND REPAIRS TO THE PORT SECURITY BARRIER (PSB) IAW PSB MEMO 3-56A |
| Feb 25, 2025 | A00574 | $0 | CVN 79 ADVANCE CONSTRUCTION ISSUE FMR 1073 FOR PSB MEMO 3-68 |
| Feb 20, 2025 | A00573 | $0 | CVN 79 ADVANCE CONSTRUCTION ISSUE FMR 1068 REV 2 FOR SHIP'S VENDING AND STORE COOLERS PERMANENT INSTALLATION |
| Feb 18, 2025 | A00572 | $348.8K | CVN 79 ADVANCE CONSTRUCTION AWARD LDD BATCH 18 |
| Feb 13, 2025 | A00570 | $10.0K | CVN 79 ADVANCE CONSTRUCTION, SUPSHIPNN COMMAND HMR 1055.12 - SD STOREROOM NAE REPAIR PARTS LADDER INSTALLATION. |
| Feb 13, 2025 | A00571 | $0 | CVN 79 ADVANCE CONSTRUCTION ISSUE FMR 1072 FOR CVN 79 TRANSPORTATION BETWEEN NETCENTER AND B608 |
| Feb 11, 2025 | A00569 | $27.7K | THIS MODIFICATION IS TO AWARD PIO 0044 FOR PLC SHOCK TESTING IN SUPPORT OF CVN 79 NEW CONSTRUCTION. |
| Feb 6, 2025 | A00568 | $25.0K | CVN 79 ADVANCE CONSTRUCTION ISSUE HMR 1037 FOR ARMORY DOORS |
| Jan 29, 2025 | A00567 | $532.3K | CVN 79 ADVANCE CONSTRUCTION ISSUE PIO 043 FOR THERMOCOUPLER HEATER CONTROLLERS |
| Jan 28, 2025 | A00566 | $0 | CVN 79 ADVANCE CONSTRUCTION ISSUE HMR 1518.04 REV 1 |
| Jan 28, 2025 | P00175 | $0 | CVN 79 ADVANCE CONSTRUCTION |
| Jan 23, 2025 | A00565 | $106.4K | CVN 79 ADVANCE CONSTRUCTION, SUPSHIPNN COMMAND - CLOSEOUT OF 0031 SERIES SMALL VALUE CHANGES |
| Jan 17, 2025 | A00564 | $500.0K | THIS MODIFICATION IS FOR CHANGES TO THE REQUIREMENTS OF THE ADVANCED ARRESTING GEAR (AAG) WATER TWISTERS IN SUPPORT OF CVN 79 NEW CONSTRUCTION. |
| Jan 14, 2025 | A00563 | $0 | CVN 79 ADVANCE CONSTRUCTION ISSUE FMR 1071 FOR PSB REPAIRS |
| Dec 30, 2024 | A00562 | $14.0K | CVN 79 ADVANCE CONSTRUCTION ISSUE HMR 1518.04 - TACTICAL VARIANT SWITCH |
| Dec 19, 2024 | AZ0099 | $-100.0K | CVN 79 ADVANCE CONSTRUCTION DEFINITIZE FMR 1016.05 FOR BERTHING TRAILER EXTENSION |
| Dec 18, 2024 | A00561 | $0 | CVN 79 ADVANCE CONSTRUCTION - SUPSHIPNN COMMAND HMR 1125 SPECIFICATION CHANGE ONLY (SCO) - PIPING PENETRATIONS IN THE SIDE PROTECTIVE SYSTEM |
| Dec 16, 2024 | A00560 | $0 | CVN 79 ADVANCE CONSTRUCTION, SUPSHIPNN COMMAND GPA-24-057, MATERIAL TRANSFER OF GOVERNMENT PROPERTY FROM CVN 79 TO CVN 80/81 |
| Dec 12, 2024 | A00559 | $10.0K | CVN 79 ADVANCE CONSTRUCTION ISSUE HMR 1541 FOR PAPA WATCH STATION |
| Dec 10, 2024 | A00558 | $2.5K | THIS MODIFICATION IS TO ISSUE FMR 1068 REV 1 FOR UPDATES TO THE VENDING MACHINE INSTILLATION REQUIREMENTS IN SUPPORT OF CVN 79 NEW CONSTRUCTION. |
| Dec 6, 2024 | AZ0098 | $691.6K | CVN 79 ADVANCE CONSTRUCTION, SUPSHIPNN COMMAND - PROVISIONED ITEMS ORDER (PIO)0036, JET BLAST DEFLECTOR EMA ANGULAR CONTACT BALL BEARINGS |
| Dec 3, 2024 | A00557 | $1.2M | CVN 79 ADVANCE CONSTRUCTION ISSUANCE OF PIO 042 - HEAVYWEIGHT SHOCK TESTING. |
| Nov 26, 2024 | A00556 | $0 | CVN 79 ADVANCE CONSTRUCTION AWARD HMR 1223 FOR SKED A CHANGES |
| Nov 22, 2024 | A00555 | $4.0K | CVN 79 ADVANCE CONSTRUCTION ISSUE FMR 1070 FOR EMALS PSB BOW SWAP |
| Nov 21, 2024 | A00554 | $17.5K | CVN 79 ADVANCE CONSTRUCTION ISSUE FMR 1068 |
| Nov 12, 2024 | A00553 | $13.3K | CVN 79 ADVANCE CONSTRUCTION, SUPSHIPNN COMMAND - CLOSEOUT OF 0030 SERIES SMALL VALUE CHANGES |
| Nov 7, 2024 | A00552 | $15.0K | CVN 79 ADVANCE CONSTRUCTION, SUPSHIPNN COMMAND - HMR 1540, THEATER MISSION PLANNING CENTER (TMPC)REPLACING THE TOMAHAWK COMMAND AND CONTROL SYSTEM (TC2S) |
| Nov 6, 2024 | A00550 | $488.8K | CVN 79 ADVANCE CONSTRUCTION, SUPSHIPNN COMMAND - AWARD LDD BATCH 17 |
| Nov 6, 2024 | A00551 | $0 | ISSUE FMR 1066 REV 1 TO ADD/UPDATE ADDITIONAL CABLES FOR REPAIR IN SUPPORT OF CVN 79 NEW CONSTRUCTION |
| Oct 25, 2024 | A00547 | $0 | CVN 79 ADVANCE CONSTRUCTION CHANGE ORDER FMR 1051.00 REV 2 |
| Oct 25, 2024 | A00548 | $0 | CVN 79 ADVANCE CONSTRUCTION ISSUE FMR 1065 REV 1 FOR EMALS S20 LM CABLE REORIENTATION |
| Oct 25, 2024 | A00549 | $5.0K | THIS MODIFICATION IS TO ISSUE FMR 1066 FOR EMALS CABLE REPAIRS IN SUPPORT OF CVN 79 NEW CONSTRUCTION |
| Oct 17, 2024 | A00546 | $111.0K | CVN 79 ADVANCE CONSTRUCTION ISSUE HMR 1127 FOR SECURE FILING CABINETS PRIORITY 1 AND 2 ONLY |
| Oct 3, 2024 | A00545 | $5.0K | THIS MODIFICATION IS FOR EMALS REPAIRS TO CAT 3 AND 4 IN ACCORDANCE WITH FMR 1065 TO SUPPORT CVN 79 NEW CONSTRUCTION. |
| Sep 30, 2024 | A00544 | $0 | CVN 79 ADVANCE CONSTRUCTION ISSUE FMR 1016.06 FOR BERTHING TRAILER EXTENSION. |
| Sep 17, 2024 | A00543 | $0 | CVN 79 - PIO 33 SHIPPING INSTRUCTIONS |
| Aug 28, 2024 | A00542 | $14.4K | CVN 79 ADVANCE CONSTRUCTION - SUPSHIPNN COMMAND - CLOSEOUT OF 0029 SERIES SMALL VALUE CHANGES |
| Aug 15, 2024 | A00541 | $0 | DEVELOPMENT OF N303 CONTROLLER IN SUPPORT OF CVN 79 NEW CONSTRUCTION. |
| Aug 2, 2024 | A00540 | $0 | ADMIN MOD TO CORRECT DISCREPANCIES ON A00538 IN SUPPORT OF CVN 79 NEW CONSTRUCTION |
| Aug 1, 2024 | A00539 | $75.0K | CVN 79 ADVANCE CONSTRUCTION, SUPSHIPNN COMMAND, FMR 1055.11 - PROVIDE GOVERNMENT FURNISHED INFORMATION (GFI) FOR ELECTRONIC CONSOLIDATED AUTOMATED SUPPORT SYSTEM (ECASS)AND MODIFY INSTALLATION REQUIREMENTS FROM CABLES AND FOUNDATIONS TO FULL INSTALLATION. |
| Jul 30, 2024 | A00538 | $18.1K | DEVELOPMENT OF N303 CONTROLLER IN SUPPORT OF CVN 79 NEW CONSTRUCTION. |
| Jul 19, 2024 | AZ0097 | $-2.5K | CVN 79 ADVANCE CONSTRUCTION, SUPSHIP COMMAND - MATERIAL AND REPAIR OF PORT SECURITY BARRIER IAW PSB MEMO 3-56, FMR 1061 |
| Jul 16, 2024 | A00537 | $44.6K | CVN 79 ADVANCE CONSTRUCTION -SUPSHIPNN COMMAND - CLOSEOUT OF 0028 SERIES SMALL VALUE CHANGES |
| Jul 12, 2024 | A00536 | $18.5K | CVN 79 ADVANCE CONSTRUCTION ISSUE FMR 7055 |
| Jul 11, 2024 | A00535 | $0 | CVN 79 ADVANCE CONSTRUCTION AWARD HMR 1126 SCO |
| Jul 10, 2024 | A00534 | $2.5K | PROVIDE UPDATED MOBILE CRANE SPECIFICATIONS AND INSTALL RECEPTACLES TO SUPPORT CVN 79 NEW CONSTRUCTION |
| Jun 28, 2024 | A00533 | $0 | CVN 79 ADVANCE CONSTRUCTION - FMR 1051 REV 1 UCO |
| May 30, 2024 | A00532 | $2.5K | PSB REPAIRS - FMR 1061 |
| May 22, 2024 | A00531 | $0 | CVN 79 ADVANCE CONSTRUCTION AWARD HMR 1222 |
| May 16, 2024 | AZ0096 | $128.9K | CVN 79 ADVANCE CONSTRUCTION AWARD PIO 040 |
| May 15, 2024 | A00529 | $3.8K | CVN 79 ADVANCE CONSTRUCTION - FMR 1059 (UCO) |
| May 15, 2024 | A00530 | $0 | CVN 79 ADVANCE CONSTRUCTION - FMR 1058 REV 1 (UCO) |
| May 14, 2024 | A00526 | $0 | CVN 79 ADVANCE CONSTRUCTION - UPDATE ATTACHMENT 4 PER APPROVED ISP DATED 01/26/2024 |
| May 14, 2024 | A00527 | $374.1K | CVN 79 ADVANCE CONSTRUCTION LDD BATCH 16 |
| May 14, 2024 | A00528 | $5.0K | CVN 79 ADVANCE CONSTRUCTION ISSUE FMR 1060 |
| May 3, 2024 | A00525 | $0 | CVN 79 ADVANCE CONSTRUCTION AWARD HMR 1124 SCO |
| Apr 26, 2024 | A00523 | $15.0K | CVN 79 ADVANCE CONSTRUCTION ISSUE FMR 1058 |
| Apr 26, 2024 | A00524 | $0 | CVN 79 ADVANCE CONSTRUCTION AWARD FMR 3115 |
| Apr 24, 2024 | A00522 | $600.0K | CVN 79 ADVANCE CONSTRUCTION ISSUE HMR 1111 |
| Apr 22, 2024 | A00521 | $19.0K | CVN 79 ADVANCE CONSTRUCTION |
| Apr 17, 2024 | A00520 | $0 | CVN 79 ADVANCE CONSTRUCTION |
| Apr 5, 2024 | A00519 | $12.5K | CVN 79 ADVANCE CONSTRUCTION HMR 1110.01 ISSUANCE |
| Apr 1, 2024 | A00518 | $45.0K | CVN 79 ADVANCE CONSTRUCTION |
| Mar 28, 2024 | A00517 | $0 | CVN 79 ADVANCE CONSTRUCTION |
| Mar 27, 2024 | A00516 | $105.0K | CVN 79 ADVANCE CONSTRUCTION |
| Mar 22, 2024 | A00515 | $5.1K | CVN 79 ADVANCE CONSTRUCTION |
| Mar 18, 2024 | A00514 | $10.0K | CVN 79 ADVANCE CONSTRUCTION ISSUE FMR 1053.01 |
| Mar 13, 2024 | AZ0095 | $-7.5K | CVN 79 ADVANCE CONSTRUCTION - FMR 1057 |
| Mar 11, 2024 | A00513 | $0 | CVN 79 ADVANCE CONSTRUCTION |
| Mar 8, 2024 | AZ0094 | $1.8M | INSTALLATION OF THE CONSOLIDATED AFLOAT NETWORKS AND ENTERPRISE SERVICES (CANES) LOCAL AREA NETWORK (LAN) DROPS |
| Feb 27, 2024 | AZ0093 | $54.3K | CVN 79 ADVANCE CONSTRUCTION |
| Feb 22, 2024 | A00511 | $15.6K | CVN 79 ADVANCE CONSTRUCTION |
| Feb 22, 2024 | A00512 | $0 | CVN 79 ADVANCE CONSTRUCTION |
| Feb 16, 2024 | A00510 | $0 | CVN 79 ADVANCE CONSTRUCTION |
| Feb 14, 2024 | A00509 | $7.5K | CVN 79 ADVANCE CONSTRUCTION |
| Feb 7, 2024 | A00508 | $5.0K | CVN 79 ADVANCE CONSTRUCTION |
| Feb 5, 2024 | A00507 | $75.2K | CVN 79 ADVANCE CONSTRUCTION |
| Jan 31, 2024 | A00506 | $7.5K | CVN 79 ADVANCE CONSTRUCTION |
| Jan 26, 2024 | A00504 | $5.0K | CVN 79 ADVANCE CONSTRUCTION |
| Jan 26, 2024 | A00505 | $25.0K | CVN 79 ADVANCE CONSTRUCTION |
| Jan 25, 2024 | A00503 | $20.0K | CVN 79 ADVANCE CONSTRUCTION |
| Jan 23, 2024 | A00501 | $0 | CVN 79 ADVANCE CONSTRUCTION |
| Jan 23, 2024 | A00502 | $0 | CVN 79 ADVANCE CONSTRUCTION |
| Jan 22, 2024 | A00500 | $0 | CVN 79 ADVANCE CONSTRUCTION |
| Jan 19, 2024 | A00499 | $5.0K | CVN 79 ADVANCE CONSTRUCTION |
| Jan 9, 2024 | A00498 | $12.5K | CVN 79 ADVANCE CONSTRUCTION |
| Jan 8, 2024 | P00171 | $95.1K | PIO 35 - EWEB MATERIAL |
| Jan 5, 2024 | A00497 | $150.0K | CVN 79 ADVANCE CONSTRUCTION |
| Dec 12, 2023 | A00495 | $7.2K | CVN 79 ADVANCE CONSTRUCTION |
| Dec 12, 2023 | A00496 | $408.5K | CVN 79 ADVANCE CONSTRUCTION |
| Dec 5, 2023 | A00494 | $0 | CVN 79 ADVANCE CONSTRUCTION |
| Nov 28, 2023 | A00493 | $690.0K | CVN 79 ADVANCE CONSTRUCTION |
| Nov 13, 2023 | A00492 | $0 | CVN 79 ADVANCE CONSTRUCTION |
| Nov 13, 2023 | AZ0092 | $1.1M | CVN 79 ADVANCE CONSTRUCTION |
| Nov 8, 2023 | AZ0091 | $-2.9K | CVN 79 ADVANCE CONSTRUCTION |
| Nov 1, 2023 | A00490 | $0 | CVN 79 ADVANCE CONSTRUCTION |
| Nov 1, 2023 | A00491 | $0 | CVN 79 ADVANCE CONSTRUCTION |
| Oct 31, 2023 | A00489 | $0 | CVN 79 ADVANCE CONSTRUCTION |
| Oct 31, 2023 | AZ0090 | $211.2K | CVN 79 ADVANCE CONSTRUCTION |
| Oct 30, 2023 | P00170 | $39.0M | CVN 79 ADVANCE CONSTRUCTION INSTALLMENT FUNDING |
| Oct 20, 2023 | A00487 | $0 | CVN 79 ADVANCE CONSTRUCTION |
| Oct 20, 2023 | A00488 | $0 | CVN 79 ADVANCE CONSTRUCTION |
| Oct 18, 2023 | A00486 | $67.7K | CVN 79 ADVANCE CONSTRUCTION |
| Oct 17, 2023 | P00169 | $136.6K | CVN 79 ADVANCE CONSTRUCTION |
| Oct 11, 2023 | AZ0089 | $0 | CVN 79 ADVANCE CONSTRUCTION |
Research next steps
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.