Federal contract award

N0002412C2115

SSN 792 LONG LEAD TIME MATERIAL

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeSUP OF SHIPBUILDING GROTON
NAICS336611 — Ship Building and Repairing
PSC1905 — Combat Ships and Landing Vessels
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIXED PRICE INCENTIVE
Obligations$20.4B
Current contract value$20.6B
Potential contract value / ceiling$20.6B
Start dateApr 13, 2012
Current end dateApr 12, 2019
Potential end dateApr 12, 2019
Latest award activityJun 4, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 200 of 1,555 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jun 9, 2026A01330$3.1MFURNISH GUARANTY EFFORT
Jun 4, 2026A01329$0DESCOPE OF DEPARTURE FROM SPECIFICATION ITEMS
Jun 3, 2026A01328$515.0KFUNDING MODIFICATION TO EXERCISE OPTION 5 ON GUARANTY.
May 29, 2026A01327$4.3MEXECUTION OF CONTRACT LINE ITEM NUMBER 5800
May 28, 2026A01325$0COMPLETE REPAIRS
May 28, 2026A01326$0REPAIR AND TEST VALVES
May 21, 2026A01324$0ACCOMPLISH ADDITIONAL INSPECTION
May 19, 2026A01323$0UPDATE REVISED BILLING PRICES THROUGH FOURTH QUARTER 2025.
May 14, 2026A01322$4.5MFURNISH GUARANTY EFFORT
May 13, 2026A01321$0REMOVE EXCESS ELECTROLYTE FROM BATTERY.
May 12, 2026A01320$0DELETION/CHANGES/ADDS OF GOVERNMENT FURNISHED SPECIAL STOWAGE
May 7, 2026A01319$0CANCEL SOFTWARE UPGRADE
May 5, 2026A01318$0DELETION/CHANGES/ADDITIONS OF GOVERNMENT FURNISHED EQUIPMENT
Apr 30, 2026P00102$540.0KSSN 792 CONSTRUCTION (BOAT 1, FY14)
Apr 24, 2026P00101$1.5MSSN 792 CONSTRUCTION (BOAT 1, FY14)
Apr 23, 2026A01317$0GASKET REPLACEMENT, VARIOUS COMPONENT MODIFICATIONS, FIELD CHANGES, AND TESTING
Apr 23, 2026AZ0146$0REMOVE, MODIFY, AND REINSTALL DIGITAL CARD
Apr 20, 2026A01316$221.9KPRE-PRICED EMERGENT GOVERNMENT RESPONSIBLE SCOPE CHANGES
Apr 17, 2026P00099$0SSN 792 CONSTRUCTION (BOAT 1, FY14)
Apr 17, 2026P00100$0SSN 792 CONSTRUCTION (BOAT 1, FY14)
Apr 15, 2026A01315$12.5KEXTEND PERIOD OF PERFORMANCE FOR HUNTINGTON HALLS CREW BERTHING THROUGH MAY 2026
Apr 9, 2026A01311$1.5MFUNDING MODIFICATION TO EXERCISE OPTION 3 AND 4 ON GUARANTY.
Apr 9, 2026A01312$1.1MFUNDING MODIFICATION TO ADDING INCREMENTAL FUNDING FOR THE POST DELIVERY WORK PERIOD.
Apr 9, 2026A01313$6.5MEXERCISE FUNDING MODIFICATION FOR ADDING WARRANTY OPTIONS 4-8 FUNDING FOR THE POST DELIVERY WORK PERIOD.
Apr 9, 2026A01314$4.6MADDING COST GROWTH FUNDING FOR THE POST DELIVERY WORK PERIOD
Apr 2, 2026AZ0145$0DIESEL GENERATOR TRANSFER
Apr 1, 2026AZ0144$116.3K1. REPLACEMENT OF SAIL MODULES #1, #3 & #7. 2. REPLACE THE SHIP CONTROL SYSTEM JOYSTICKS.
Mar 26, 2026A01310$0DATA ENTRY/DISPLAY TERMINAL TESTING
Mar 26, 2026AZ0142$3.5MPLANNING AND EXECUTION OF CONTRACT LINE ITEM NUMBER 5800
Mar 26, 2026AZ0143$148.1KPROVIDING UNDER 50K COUPONS TO REDUCE DELAYS WHILST COMPLETING WORK WITHIN SCOPE.
Mar 23, 2026AZ0141$859.3KPROCURE AND INSTALL TWO SHIP SETS OF REDESIGN LAB ARRAY CABLE ASSEMBLIES IN ACCORDANCE WITH THE SPEC.
Mar 19, 2026A01308$0REMOVAL OF AIR PARTICLE DETECTOR
Mar 19, 2026A01309$0THIS MODIFICATION TO CANCEL UNPRICED CHANGE ORDER (UCO)- EFFORT TO REPLACE THE STARBOARD ROD METER PIT SWORD THAT IS NOT OPERATIONAL
Mar 19, 2026P00097$228.9MSSN 792 CONSTRUCTION (BOAT 1, FY14)
Mar 12, 2026AZ0140$268.8KREPLACEMENT OF HYDROPHONES
Mar 11, 2026A01306$0NO COST MODIFICATION FOR PROPOSAL PREPARATIONS
Mar 11, 2026A01307$0COMPENSATION ADJUSTMENTS THROUGH DECEMBER 2025
Mar 6, 2026AZ0138$10.9KTHIS MODIFICATION IS FOR REPAIRS TO THE #2 MULTI-FUNCTION MAST.
Mar 6, 2026AZ0139$203.1KPROVIDE TRADES SUPPORT AND MATERIAL FOR FAST START
Mar 3, 2026A01304$0NO COST MODIFICATION FOR FLEET DIRECTED WORK
Mar 3, 2026A01305$0NO COST MODIFICATION FOR FLEET DIRECTED WORK
Feb 18, 2026A01303$3.9MADDITIONAL GUARANTY HOURS AND ESTABLISHMENT OF OPTIONS
Feb 17, 2026A01302$0CORRECT TYPOGRAPHICAL ERROR ON MODIFICATION A01296
Feb 13, 2026A01300$0ADMINISTRATIVE MODIFICATION TO A01295
Feb 13, 2026A01301$0THIS EFFORT IS TO REPLACE THE STARBOARD ROD METER PIT SWORD THAT IS NOT OPERATIONAL
Feb 13, 2026AZ0136$1.4KINCORPORATE CHANGES TO VALVE DUPLEX FILTER ELEMENTS
Feb 13, 2026AZ0137$499.8KTHIN LINE TOWED ARRAY HANDLING SYSTEM REDUCED WRAP CAPSTAN ADDITIONAL ACTIONS
Feb 3, 2026A01299$2.1MFUNDING MODIFICATION TO EXERCISE OPTION 1 ON GUARANTY.
Feb 3, 2026AZ0135$19.4KINCORPORATE CHANGES TO VALVE DUPLEX FILTER ELEMENTS
Feb 2, 2026A01297$0NO COST MODIFICATION FOR DESIGN DISCLOSURE
Feb 2, 2026A01298$0NO COST MODIFICATION FOR MAJOR DEVIATIONS
Feb 2, 2026P00096$5.0MSSN 792 CONSTRUCTION (BOAT 1, FY14)
Jan 30, 2026A01295$717.2KVA CLASS OFF-SHIP CREW BERTHING AND MESSING FACILITY (GROTON)
Jan 30, 2026A01296$1.1MCHANGE PERIOD OF PERFORMANCE FOR PORT SECURITY AT NEWPORT NEWS SHIPBUILDING SITE.
Jan 29, 2026A01294$03Q25 REVISED BILLING
Jan 29, 2026P00095$46.9MSSN 792 CONSTRUCTION (BOAT 1, FY14)
Jan 26, 2026AZ0134$173.1KREMOVE, REPLACE, AND MODIFY BERTHING DOOR
Jan 20, 2026A01293$1.2MUNDEFINITIZED CONTRACT ACTION AUTHORIZING PRE-PLANNING EFFORTS FOR THE POST DELIVERY WORK PERIOD
Dec 23, 2025A01291$0INCORPORATION OF PERVIOUSLY AUTHORIZED CHANGES UNDER COUPON FPROCESS FOR VIRGINIA CLASS AUTHORIZING MOD A01044
Dec 23, 2025A01292$3.6MADDING INCREMENT FUNDING - LIMITATION OF COST INCREASE
Dec 22, 2025A01288$3.6MINCREMENTAL FUNDING TO INCREASE COST
Dec 22, 2025A01289$0DELETION/CHANGES/ADDS OF GOVERNMENT FURNISHED SPECIAL STOWAGE
Dec 22, 2025A01290$5.4MADDING COST GROWTH FUNDING FOR THE POST DELIVERY WORK PERIOD
Dec 22, 2025AZ0133$3.0MADJUDICATED MODIFICATION FOR 3 CONTRACT CHANGES: (1) LOCK OUT TRUNK INSPECTIONS AND RESTORATION. (2) CUTBACK AND FAIRING WORK OF DAMAGED SPECIAL HULL TREATMENT. (3) PROPULSOR PAINT REPAIRS TO DAMAGED AREAS.
Dec 18, 2025A01285$0THIS NO COST MODIFICATION IS FOR THE KEY EVENT 520 TO BE USED FOR AN ENGINEERING REPORT (ER)
Dec 18, 2025A01286$0ADMINISTRATIVE MODIFICATION TO INCREASE THE OVERTIME PREMIUMS.
Dec 18, 2025A01287$4.0MADDING INCREMENTAL FUNDING FOR THE POST DELIVERY WORK PERIOD
Dec 16, 2025A01284$221.0KBERTHING AND MESSING
Dec 8, 2025A01283$2.0MNO COST PERIOD OF PERFORMANCE EXTENSION MODIFICATION FOR THE AIR CONDITIONING UNIT DEVELOPMENT FY14 EFFORT
Dec 8, 2025AZ0131$82.7KREPLACEMENT OF OUTBOARD SENSOR ASSEMBLY STUFFING TUBE
Dec 8, 2025AZ0132$91.8KINSPECT AND REPAIR WATERTIGHT DOORS
Dec 8, 2025P00093$238.6MSSN 792 CONSTRUCTION (BOAT 1, FY14)
Dec 2, 2025A01281$6.8MADDING INCREMENTAL FUNDING FOR THE POST DELIVERY WORK PERIOD
Dec 2, 2025A01282$2.2MFURNISH GUARANTY EFFORT
Nov 26, 2025A01280$4.1MADDING INCREMENTAL FUNDING FOR THE POST DELIVERY WORK PERIOD.
Nov 21, 2025A01279$0THE CONTRACTOR IS REQUESTED TO IMPLEMENT THE FOLLOWING VIRGINIA CLASS SPECIFICATION CHANGE PROPOSALS
Nov 19, 2025AZ0130$14.1KSEND MATERIAL TO HUNTINGTON INGALLS INDUSTRIES-NEWPORT NEWS SHIPBUILDING TO MANUFACTURE POWER CABLE ASSEMBLY AND INSTRUMENT CONTROL CABLE ASSEMBLY CABLE FOR THE CAPSTAN.
Nov 17, 2025A01277$0TRANSFER OF CONSTRUCTION DESIGN SUPPORT HOURS AND MATERIAL COST
Nov 17, 2025A01278$0INSTALL COFFERDAM
Nov 5, 2025AZ0129$31.9KREPLACE WEAPONS SHIPPING TRUNK AND LOGISTICS PLUG TRUNK LOWER HATCH GASKETS.
Nov 4, 2025AZ0128$349.6KESTABLISH PROCESS FOR SHIP FORCE WORK CONTROLS DURING NEW CONSTRUCTION
Nov 3, 2025AZ0127$489.8KPLANT PROTECTION WATERBORNE NEWPORT NEWS FROM FEBRUARY 2025 THROUGH JANUARY 2026
Oct 27, 2025A01276$0PERIODIC RELEASE 30 JUNE 24
Oct 21, 2025A01275$0CHANGE HULL APPLICABILITY FOR FIELD CHANGE E-2583 (DESIGN UPGRADE).
Oct 21, 2025AZ0126$0HIGH FREQUENCY CHIN ARRAY PROJECTOR
Oct 16, 2025AZ0125$0UPDATE TEST PROCEDURE FOR HYDRAULICALLY OPERATED VALVES OPERATING TIMES
Sep 25, 2025AZ0124$267.5KREPLACE LAB ARRAY DIRECT CURRENT POWER CABLES.
Sep 24, 2025A01274$586.3KADDING INCREMENTAL FUNDING FOR THE POST DELIVERY WORK PERIOD
Sep 23, 2025AZ0123$2.2MFLEET DIRECTED WORK
Sep 19, 2025AZ0122$3.7MFLEET DIRECTED WORK: TASK #1: SPECIAL HULL TREATMENT (SHT) SEAM SPLIT REPAIRS TASK #2: FAT LINE TOWED ARRAY (FLTA) FAIRING REPAIRS TASK #3: REMOVAL AND REQUIRED RETEST OF LOCK-OUT TRUNK (LOT) HYDRO TASK #4: REPLACE MULTI-FUNCTION MAST (MFM) #1 CYLINDER ASSEMBLY
Sep 18, 2025AZ0121$1.4MINCORPORATE NAVY IMPOSED PLANT PROTECTION STANDARDS
Sep 17, 2025A01272$0DELETION/CHANGES/ADDS OF GOVERNMENT FURNISHED SPECIAL STOWAGE ON BOARD REPAIR PARTS
Sep 17, 2025A01273$0STOWAGE REQUIREMENTS
Sep 15, 2025A01271$02Q25 REVISED BILLING
Sep 10, 2025A01270$0NPES SYSTEM TEST
Sep 10, 2025AZ0120$5.8KREMOVES, MODIFIES, REINSTALLS, AND TESTS THE DIGITAL CONTROL CARD (DCC) ASSEMBLY OF THE MAGNETIC BEARING CONTROL CABINETS (MBCC)
Sep 8, 2025A01269$0THIN LINE TOWED ARRAY HANDLING SYSTEM REDUCED WRAP CAPSTAN ASSEMBLY MODIFIED DESIGN IMPLEMENTATION
Sep 5, 2025A01267$0NO COST MODIFICATION TO CHANGE AVAILABILITY FROM MAJOR TO MINOR.
Sep 5, 2025A01268$0UNPRICED CHANGE ORDER (UCO)- REPLACE THE SHIP CONTROL SYSTEM JOYSTICKS.
Sep 4, 2025A01266$0DATA ENTRY/DISPLAY TERMINAL REFRESH
Aug 29, 2025A01265$0WEAPONS SHIPPING TRUNK ALIGNMENT OF UPPER HATCH FAIRING
Aug 28, 2025A01261$0UNPRICED CHANGE ORDER - FIELD CHANGE E-2841
Aug 28, 2025A01262$0UNPRICED CHANGE ORDER - SAIL MODULE #7 REPLACEMENT
Aug 28, 2025A01263$0UNPRICED CHANGE ORDER - PROPULSOR PAINT REPAIRS
Aug 28, 2025A01264$0UNPRICED CHANGE ORDER - MULTI-FUNCTION MAST #2 REPAIR
Aug 25, 2025AZ0119$0INVOKES PROCEDURAL UPDATE FOR PROCESSING DEPARTURES FROM SPECIFICATIONS
Aug 20, 2025A01259$0CHANGE FROM MAJOR TO MINOR AVAILABILITY
Aug 20, 2025A01260$2.1MADDING INCREMENTAL FUNDING FOR THE POST DELIVERY WORK PERIOD
Aug 18, 2025A01258$1.3MFUNDING FOR THE CONTRACT LINE ITEM NUMBER (CLIN) 3800.
Aug 18, 2025AZ0118$68.5KADJUDICATED MODIFICATION FOR PREFORMING A POST DELIVERY WORK PERIOD TRIM DIVE.
Aug 11, 2025A01256$1.7MLARGE VERTICAL ARRAY ELECTRICAL HULL PENETRATOR AND CABLE INSTALLATION
Aug 11, 2025A01257$2.0MIMPLEMENT DEFENSE INFORMATION SYSTEMS AGENCY COMPLIANT PRE-COMMISSIONING UNIT LOCAL AREA NETWORKS.
Aug 7, 2025A01254$0UNPRICED CHANGE ORDER AUTHORIZING JOYSTICK REPAIRS
Aug 7, 2025A01255$0REPLACE FLIGHT CONTROL JOYSTICK
Aug 7, 2025AZ0116$380.1KADJUDICATED MODIFICATION FOR WATERTIGHT DOOR INSTALLATION
Aug 7, 2025AZ0117$453.2KADJUDICATED MODIFICATION FOR REMOVING SOLID BALLAST FROM MAIN BALLAST TANK.
Jul 22, 2025A01252$0REPLACE FLIGHT CONTROL JOYSTICK
Jul 22, 2025AZ0113$287.1KADJUDICATED MODIFICATION FOR PROPUSLION PLANT FRESH WATER (PPFW) HEAT EXCHANGER (HX) BOLT REPLACEMENT
Jul 22, 2025AZ0114$314.4KADJUDICATED MODIFICATION FOR CAPSTAN ROTATIONAL POSITION SENSOR
Jul 22, 2025AZ0115$114.8KADJUDICATED MODIFICATION FOR MAST CHANGE OUT (MFM)
Jul 21, 2025A01251$2.2MUNDEFINITIZED CONTRACT ACTION AUTHORIZING FLEET DIRECTED WORK
Jul 14, 2025A01246$25.0KBROW SWING GATE MANUFATURE AND INSTALLATION
Jul 14, 2025A01249$0REPLACEMENT OF DIFFERENTIAL TRANSMITTER HYDROPHONES
Jul 14, 2025A01250$3.8MPOST DELIVERY WORK PERIOD - FLEET DIRECTED WORK
Jul 7, 2025A01247$0POST DELIVERY WORK PERIOD VALVE REPLACEMENT, FILTER ELEMENT CHANGES, BREAKER UPGRADE, AND CATHODIC PROTECTION
Jul 7, 2025A01248$2.0MINCREMENTAL FUNDING FOR THE CONTRACT LINE ITEM NUMBER (CLIN) 3800.
Jul 7, 2025AZ0112$259.2KADJUDICATED MULTIFUNCTION MAST (MFM) #1 HOIST CYLINDER
Jun 26, 2025A01244$0UNPRICED CHANGE ORDER AUTHORIZING PAINT REPAIRS
Jun 26, 2025A01245$360.8KWATERTIGHT DOOR INSPECTIONS
Jun 25, 2025A01242$0UNPRICED CHANGE ORDER AUTHORIZING LOWER HATCH GASKET
Jun 25, 2025A01243$0DELETION/CHANGES/ADDITION OF GOVERNMENT FURNISHED SPECIAL STOWAGE ON BOARD REPAIR PARTS
Jun 18, 2025A01241$0UNPRICED CHANGE ORDER AUTHORIZING STEERING AND DIVING GROWTH WORK
Jun 17, 2025A01239$0DELETION/CHANGES/ADDS OF GOVERNMENT FURNISHED SPECIAL STOWAGE
Jun 17, 2025A01240$01ST QUARTER 2025 REVISED BILLING PRICE
Jun 11, 2025A01238$2.2MFURNISH GUARANTY EFFORT
Jun 10, 2025A01234$2.0MADDING INCREMENTAL FUNDING FOR THE POST DELIVERY WORK PERIOD.
Jun 10, 2025A01235$458.8KREPLACE OUTBOARD SENSOR ASSEMBLY STUFFING TUBE.
Jun 10, 2025A01236$13.3KIMPROVE POWERED HATCH OPEN INTENSIFIER
Jun 10, 2025A01237$44.5KPROCURE CAMERA COMPONENTS
Jun 5, 2025A01233$0DELETION/CHANGES/ADDS OF GOVERNMENT FURNISHED SPECIAL STOWAGE OBRP
Jun 4, 2025A01231$0DELETION/CHANGES/ADDITION OF GOVERNMENT FURNISHED SPECIAL STOWAGE ON BOARD REPAIR PARTS (LETTER #125)
Jun 4, 2025A01232$0DELETION/CHANGES/ADDS OF GOVERNMENT FURNISHED SPECIAL STOWAGE ON BOARD REPAIR PARTS
Jun 4, 2025AZ0111$608.4KPORT SECURITY BARRIER
Jun 3, 2025P00091$18.8MSSN 792 CONSTRUCTION (BOAT 1, FY14)
May 30, 2025A01230$4.5MFUNDING FOR POST DELIVERY WORK PERIOD
May 29, 2025A01228$0UNPRICED CHANGE ORDER AUTHORIZING HATCH GASKET REPLACEMENTS
May 29, 2025A01229$0ADMIN CORRECTION OF THE CLAUSE IN 13C FOR AZ0107
May 29, 2025AZ0110$70.4KADJUDICATED MODIFICATION FOR REDUCED WRAP CAPSTAN
May 22, 2025P00090$7.6MSSN 792 CONSTRUCTION (BOAT 1, FY14)
May 21, 2025A01227$0ADMINISTRATIVE MODIFICATION TO CORRECT A00745 WEIGHT AND MOMENT DATA.
May 19, 2025AZ0109$506.8KTHIN LINE HANDLING SYSTEM UPGRADES
May 15, 2025A01226$0UNPRICED CHANGE ORDER - TACTICAL CABLE REPLACEMENT.
May 14, 2025A01225$0UNPRICED CHANGE ORDER AUTHORIZING CUT AND FAIR OF HULL
May 12, 2025A01224$4.4MFURNISH GUARANTY EFFORT
May 9, 2025A01223$-280.3KDE-OBLIGATION OF EXCESS FUNDING RELATED TO MODIFICATION A00723, WHICH ESTABLISHED A MAXIMUM PRICE FOR A HIGH FREQUENCY CHIN ARRAY PROJECTOR.
May 7, 2025A01221$0SPECIAL HULL TREATMENT REPAIRS.
May 7, 2025A01222$0RELEASE OF CLAIMS THROUGH 31 DECEMBER 2023
May 6, 2025A01220$0UNPRICED CHANGE ORDER 3800F.014 - REPLACEMENT OF LOWER HATCH GASKETS.
May 5, 2025A01219$5.2KADJUDICATION FOR THE TROUBLESHOOT POWER CONDITIONING MODULE POINT CHANGE.
May 5, 2025P00089$54.6MSSN 792 CONSTRUCTION (BOAT 1, FY14)
May 2, 2025A01215$4.1MFUNDING MODIFICATION TO EXERCISE BASE OPTION.
May 2, 2025A01216$0UNPRICED CHANGE ORDER AUTHORIZING A FIELD CHANGE
May 2, 2025A01217$2.2MFURNISH GUARANTY EFFORT
May 2, 2025A01218$0NO COST MODIFICATION AUTHORIZING A FIELD CHANGE
Apr 30, 2025A01214$0OFF-SHIP CREW BERTHING AND MESSING FACILITY
Apr 30, 2025P00088$344.8MSSN 792 CONSTRUCTION (BOAT 1, FY14)
Apr 28, 2025A01213$-7.6MSPECIAL INCENTIVE DE-OBLIGATION MODIFICATION
Apr 24, 2025A01207$0UNPRICED CHANGE ORDER AUTHORIZING REPLACEMENT OF A STUFFING TUBE
Apr 24, 2025A01208$0MANUFACTURE CAPSTAN CABLES.
Apr 24, 2025A01209$0PERFORM LOCK OUT TRUNK INSPECTION.
Apr 24, 2025A01210$0NO COST MODIFICATION TO UPDATE THE JOINT FLEET MAINTENANCE MANUAL.
Apr 24, 2025A01211$0INVOKES THE LATEST REVISION OF THE JOINT FLEET MAINTENANCE MANUAL
Apr 24, 2025A01212$0REMOVE, MODIFY, REINSTALL, AND TEST DIGITAL CONTROL CARDS
Apr 23, 2025A01206$0ADMINISTRATIVE MODIFICATION TO CORRECT A01199
Apr 14, 2025A01201$1.1MACCOMPLISH POST DELIVERY WORK PERIOD EFFORTS
Apr 14, 2025A01202$0UNPRICED CHANGE ORDER AUTHORIZING WATERTIGHT DOOR INSPECTIONS
Apr 14, 2025A01203$0UNPRICED CHANGE ORDER AUTHORIZING REPLACEMENT OF POWER CABLES
Apr 14, 2025A01204$279.1KTRADES SUPPORT AND MATERIALS PRE-PRICED EMERGENT GOVERNMENT WORK ITEMS.
Apr 9, 2025A01199$233.3KBERTHING AND MESSING
Apr 9, 2025A01200$0UNPRICED CHANGE ORDER (UCO) FOR ORDER 4800F.002 FILTER CHANGE
Apr 4, 2025A01196$0FIELD CHANGE E-2900A
Apr 4, 2025A01197$0UNPRICED CHANGE ORDER (UCO) FOR ORDER 4800F.012 BERTHING DOOR
Apr 4, 2025A01198$15.0MCONTRACT LINE ITEM NUMBER (CLIN) 3800 FUNDING MODIFICATION
Mar 31, 2025AZ0108$249.1KTHIN LINE HANDLING SYSTEM UPGRADES
Mar 27, 2025A01194$0INCORPORATE FEED DEVICE.
Mar 27, 2025A01195$0REBALLAST
Mar 26, 2025A01190$0TRIM DRIVE
Mar 26, 2025A01191$0NO COST MODIFICATION FOR ORDER 4800F.010 FIELD CHANGE
Mar 26, 2025A01192$320.0KORDER 4800D.000 COUPONS FOR EMERGENT WORK ITEMS
Mar 26, 2025A01193$0DIRECT CURRENT POWER CABLE REPLACEMENT
Mar 25, 2025A01186$0UPDATE TEST PROCEDURE FOR HYDRAULICALLY OPERATED VALVE TIMING
Mar 21, 2025A01189$25.0MCONTRACT LINE ITEM NUMBER (CLIN) 4800 FUNDING INCREMENT 1, AND ADMINISTRATIVE CORRECTION TO BLOCK 16C OF MODIFICATION A01155 UNDER CONTRACT N0002412C2115.
Mar 20, 2025P00087$194.9MSSN 792 CONSTRUCTION (BOAT 1, FY14)
Mar 18, 2025A01188$04TH QUARTER 2024 REVISED BILLING
Mar 17, 2025A01187$1.0MORDER 4801 WARRANTY
Mar 13, 2025A01184$0RETIRE IN PLACE LEGACY ANTENNA EQUIPMENT
Mar 13, 2025A01185$0COMPENSATION ADJUSTMENTS THROUGH JANUARY 2025
Mar 10, 2025A01183$0DELETION/CHANGES/ADDITION OF GOVERNMENT FURNISHED SPECIAL STOWAGE ON BOARD REPAIR PARTS
Mar 7, 2025A01180$0OVERTIME PREMIUM INCREASES
Mar 7, 2025A01181$0ADMINISTRATIVE MODIFICATION TO ADJUST PERIOD OF PERFORMANCE SHIFT AT NO COST