Federal contract award

N4008025F0487

CNIC-11 NRW908 REPLACE 2 FAILED DOMESTIC ISOLATION VALVES - LOTO ISOLATION VALVES, DRAIN DOWN PIPING, REMOVED FAILED ISOLATION VALVES, INSTALL NEW ISOLATION VALVES. RESTORE WATER TO SYSTEM, CHECK VALVES FOR LEAKS, RETURN SYSTEM TO REGULAR OPERATION.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeNAVFACSYSCOM WASHINGTON
NAICS561210 — Facilities Support Services
PSCZ2JZ — REPAIR OR ALTERATION OF MISCELLANEOUS BUILDINGS
Parent award / vehicleN4008019D0311
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$10.8K
Current contract value$28.0K
Potential contract value / ceiling$28.0K
Start dateSep 24, 2025
Current end dateJan 30, 2026
Potential end dateJan 30, 2026
Latest award activityApr 10, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 3 of 3 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Apr 10, 2026P00002$0CNIC-11 NRW908 REPLACE 2 FAILED DOMESTIC ISOLATION VALVES - LOTO ISOLATION VALVES, DRAIN DOWN PIPING, REMOVED FAILED ISOLATION VALVES, INSTALL NEW ISOLATION VALVES. RESTORE WATER TO SYSTEM, CHECK VALVES FOR LEAKS, RETURN SYSTEM TO REGULAR OPERATION.
Dec 18, 2025P00001$0CNIC-11 NRW908 REPLACE 2 FAILED DOMESTIC ISOLATION VALVES - LOTO ISOLATION VALVES, DRAIN DOWN PIPING, REMOVED FAILED ISOLATION VALVES, INSTALL NEW ISOLATION VALVES. RESTORE WATER TO SYSTEM, CHECK VALVES FOR LEAKS, RETURN SYSTEM TO REGULAR OPERATION.
Sep 24, 20250$10.8KCNIC-11 NRW908 REPLACE 2 FAILED DOMESTIC ISOLATION VALVES - LOTO ISOLATION VALVES, DRAIN DOWN PIPING, REMOVED FAILED ISOLATION VALVES, INSTALL NEW ISOLATION VALVES. RESTORE WATER TO SYSTEM, CHECK VALVES FOR LEAKS, RETURN SYSTEM TO REGULAR OPERATION.