Federal contract award

N4008520F6537

RM17-2119 VA CLASS WATERFRONT SUPPORT FACILITY, B178, PORTSMOUTH NAVAL SHIPYARD, KITTERY, MAINE.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeNAVFACSYSCOM ATLANTIC
NAICS236220 — Commercial and Institutional Building Construction
PSCY1JZ — CONSTRUCTION OF MISCELLANEOUS BUILDINGS
Parent award / vehicleN4008520D0036
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$98.7M
Current contract value$98.7M
Potential contract value / ceiling$98.7M
Start dateSep 17, 2020
Current end dateDec 31, 2026
Potential end dateDec 31, 2026
Latest award activityMay 19, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 48 of 48 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
May 19, 2026P00047$0P00047 - EXTEND CONTRACT COMPLETION DATE TO 12/31/2026.
Aug 20, 2025P00046$0P00046 - PCO'S 128, 129,& 130
May 6, 2025P00045$0P00045 - PCS GRP 12
Mar 12, 2025P00044$0P00044 - PCS 102, 105, 110
Feb 13, 2025P00043$0P00043 - PCS 103, 113, 114, 117
Jan 8, 2025P00042$0P00042 - PCS 106 & 109
Dec 19, 2024P00041$0P00041 - PCS 83 & 111
Dec 10, 2024P00040$0P00040 - PC 108
Nov 25, 2024P00039$0P00039 - PCS 87 & 98
Nov 20, 2024P00038$0P00038 - PCS 101 & 107
Oct 28, 2024P00037$0P00037 - PC GROUP (4)_69, 77, 99, & 104
Oct 10, 2024P00036$0PCS 91, 97, & 100
Oct 7, 2024P00035$0P00035 PCS 66 & 96
Sep 23, 2024P00034$0P00034 - PCS 71, 72, 81, 85, 86
Sep 4, 2024P00033$0P00033 - PC GROUP (5)_65, 68, 70, 78, & 89
Aug 15, 2024P00032$76.4KP00032 - PC58_EXT WALL CURB ALIGN & PC74_ALT VALVES
Aug 14, 2024P00031$0P00031 - PC GRP (7)_75, 79, 88, 92, 93, 94, 95
Aug 6, 2024P00030$0P00030 PC 80_ASI 022 ^ PC90 REC RFI 326
Jul 25, 2024P00029$0P00029 - PC 082
Jul 23, 2024P00028$0P00028 - PCS 61, 64, 73, 76, AND 84
May 30, 2024P00027$0INCORPORATE PCS 052, 053, 063
May 14, 2024P00026$0ADD THE SPECIFIC FUNITURE, FIXTURES, AND EQUIPMENT REQUIREMENTS TO THE CONTRACT AS DELINEATED IN THE AUTHORIZATION LETTER DATED 09 APRIL 2024.
Apr 1, 2024P00025$0P00025 - PC GROUP (6)_40,49,55,60,62 & 67
Mar 12, 2024P00024$0RM17-2119 WSF, B178, REMOVAL OF SPRINKLER HEADS AT WINDOWS.
Feb 9, 2024P00023$0INCORPORATE PCS 056 AND 057
Jan 30, 2024P00022$0P00022 - GOVT SAFETY SPEC CHANGE
Oct 12, 2023P00021$0FIRE ALARM EXIT COMPONENT ALTERNATE CEILING TILE EMERGENCY POWER FOR ELEVATOR
Sep 25, 2023P00020$0VA CLASS WATERFRONT SUPPORT FACILITY, B178, DUCT MOUNTED DEVICES
Aug 3, 2023P00019$0VA CLASS WATERFRONT SUPPORT FACILITY, REMOVE EXISTING TRANSITE PIPE
Apr 17, 2023P00018$0P00018 - PC32 (RFI 265) EXTERIOR CONCRETE REMOVAL, WSF B178
Apr 3, 2023P00017$3.9MRM17-2119 VA CLASS WATERFRONT SUPPORT FACILITY, SHIFT CHANGE
Mar 20, 2023P00016$0ELEVATOR AND STEEL IMPACTS
Jan 17, 2023P00015$0X003 RM17-2119 VA CLASS WATERFRONT SUPPORT FACILITY, B178, PORTSM ELEVATOR PIT CONCRETE REMOVAL
Nov 7, 2022P00014$0X003 RM17-2119 VA CLASS WATERFRONT SUPPORT FACILITY, B178, PORTSM ELEVATOR PIT TEST/MV SWITCH EQUIP.
Sep 26, 2022P00013$2.8MMODIFICATION IS FOR THE ADDITION OF PC0014.2 SHIPYARD BID OPTION RENEWAL #2 - CLIN 00012, 0013, 0015, AND 0021
Sep 23, 2022P00012$5.7MMODIFICATION IS TO AWARD SHIPYARD FUNDED OPTION REPRICING CLINS 0007, 0008, 0009, 0010.
Sep 19, 2022P00011$178.6KMODIFICATION IS TO ADD PC00015 WATERLINE REPAIR TO THE CONTRACT.
Sep 15, 2022P00010$0MODIFICATION TO ADD PCS 0007 AND 0009-0013 TO THE CONTRACT. B178 WATERFRONT SUPPORT FACILITY AT PNSY.
Jun 14, 2022P00009$0MODIFICATION IS TO ADD PCS 0005, 0006, AND 0008 TO PROJECT B178 WATERFRONT SUPPORT FACILITY AT PNSY.
May 2, 2022P00008$18.1MX003 RM17-2119 VA CLASS WATERFRONT SUPPORT FACILITY, B178, PNSY MODIFICATION IS FOR THE ADDITION OF 4TH FLOOR & WEST ELEVATOR.
Mar 28, 2022P00007$388.6KX003 RM17-2119 VA CLASS WATERFRONT SUPPORT FACILITY, B178, PORTSMOUTH- VARIOUS ASI ACTIONS RESOLVING DESIGN CLARIFICATIONS & CUSTOMER REQUIREMENTS.
Nov 15, 2021P00006$0MODIFICATION IS TO APPOINT COR, UPDATE WAWF CLAUSE, AND CHANGE ADMINISTRATION OFFICE. X003 RM17-2119 VA CLASS WATERFRONT SUPPORT FACILITY, B178, PORTSM
Oct 12, 2021P00005$0X003 RM17-2119 VA CLASS WATERFRONT SUPPORT FACILITY, B178, CORRECTION OF CCD TO 10/23/23
Sep 27, 2021P00004$334.2KEXERCISE OPTION CLIN 0016
Sep 24, 2021P00003$5.7MMOD P00003 - EXERCISING PRE-PRICED OPTIONS
Sep 13, 2021P00002$2.8MX003 RM17-2119 VA CLASS WATERFRONT SUPPORT FACILITY, B178, PORTSM
Jul 30, 2021P00001$58.5MEXERCISE CONSTRUCTION SERVICES OPTION RM17-2119 VA CLASS WATERFRONT SUPPORT FACILITY, B178, PORTSMOUTH NAVAL SHIPYARD, KITTERY, ME
Sep 18, 20200$154.6KRM17-2119 VA CLASS WATERFRONT SUPPORT FACILITY, B178, PORTSMOUTH NAVAL SHIPYARD, KITTERY, MAINE.

Estimated positioning window

Oct 25, 2026 – Jan 23, 2027

Recompete signal:
85/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 85/100. Available recorded signals: 80 points.

Contract end 2026-12-31 (67 days from calculation)
+35 points
22 historical awards in this buyer and category group
+15 points
48 recorded award transactions
+10 points
Latest award action: 2026-05-19
+5 points
Parent award identifier recorded
+5 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.