Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeNAVFACSYSCOM SOUTHEAST
NAICS236220 — Commercial and Institutional Building Construction
PSCY1JB — CONSTRUCTION OF TESTING AND MEASUREMENT BUILDINGS
Parent award / vehicleN6945022D0013
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$32.5M
Current contract value$32.5M
Potential contract value / ceiling$32.5M
Start dateSep 16, 2024
Current end dateAug 6, 2027
Potential end dateAug 6, 2027
Latest award activityJun 11, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 9 of 9 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jun 11, 2026P00008$10.2KTHE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE CHANGES RESULTING FROM REQUESTS FOR INFORMATION (RFI) 032, 098, AND 111 SUBMITTED BY THE CONTRACTOR.
Apr 23, 2026P00007$6.8KTHE PURPOSE OF THIS MODIFICATION IS TO ADDRESS A CONFLICT BETWEEN EXISTING FOUNDATION STRUCTURES AND THE PLANNED RETAINING WALL FOUNDATION, AS IDENTIFIED IN RFI 102.
Mar 17, 2026P00006$22.1KTHE PURPOSE OF THIS MODIFICATION IS TO PROVIDE ADDITIONAL FUNDING FOR ALL LABOR, MATERIALS, AND EQUIPMENT ASSOCIATED WITH THE REMOVAL OF THE UNFORESEEN SLAB.
Sep 26, 2025P00005$872.5KTHE PURPOSE OF THIS MODIFICATION IS TO PROVIDE ADDITIONAL FUNDING FOR ALL LABOR, MATERIALS, AND EQUIPMENT ASSOCIATED WITH PC000001 PFAS REQUIREMENTS AND PC000006 VALUE CHANGE GLAZED BLOCK AND TO EXTEND THE CCD BY 140 CALENDAR DAYS.
Aug 8, 2025P00004$5.2KTHE PURPOSE OF THIS CONTRACT MODIFICATION IS TO ADD FUNDING FOR THE CONTRACTOR TO PROVIDE THE ADDITIONAL LENGTH OF UNDERGROUND ELECTRICAL LINE AND PROVIDE 2 POLE 20A BREAKER PER RFI 009 RESPONSE.
Jul 30, 2025P00003$84.4KTHE PURPOSE OF THIS CONTRACT MODIFICATION IS TO ADD FUNDING FOR THE CONTRACTOR TO DEMOLISH THE EXISTING SLAB IN THE LIMITS SHOWN PER RFI 023 RESPONSE.
Jul 25, 2025P00002$3.5KTHE PURPOSE OF THIS CONTRACT MODIFICATION IS TO ADD FUNDING FOR THE CABLE TRAY IN CORRIDOR 101B BETWEEN ROOM 120 AND ROOM 118, APPROXIMATELY 40 FT. OF ADDITIONAL CABLE TRAY NOT ORIGINALLY SHOWN IN THE DESIGN PLANS.
Jun 20, 2025P00001$31.8KTHE PURPOSE OF THIS MODIFICATION IS TO ADD FUNDING FOR ALL MATERIALS, LABOR, AND EQUIPMENT RELATED TO PC 02 UNFORESEEN FOUNDATION STRUCTURES.
Sep 16, 20240$31.4MP408 SUBSEA AND SEABED WARFARE RDT&E FACILITY

Estimated positioning window

Oct 25, 2026 – Feb 6, 2027

Recompete signal:
80/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 80/100. Available recorded signals: 75 points.

Contract end 2027-08-06 (285 days from calculation)
+35 points
2 historical awards in this buyer and category group
+10 points
9 recorded award transactions
+10 points
Latest award action: 2026-06-11
+5 points
Parent award identifier recorded
+5 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.