Federal contract award
NNG05EC87C
LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | National Aeronautics and Space Administration |
| Office | NASA GODDARD SPACE FLIGHT CENTER |
| NAICS | 541710 |
| PSC | AR21 — SPACE SCIENCE AND APPLICATIONS - BASIC RESEARCH |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | COST PLUS FIXED FEE |
| Obligations | $39.1M |
| Current contract value | $41.7M |
| Potential contract value / ceiling | $41.7M |
| Start date | Mar 16, 2005 |
| Current end date | Sep 30, 2028 |
| Potential end date | Sep 30, 2028 |
| Latest award activity | Aug 24, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 106 of 106 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Aug 24, 2026 | 108 | $1.0M | LUNAR RECONNAISSANCE ORBITER (LRO) LYMAN ALPHA MAPPING PROJECT (LAMP) INSTRUMENT |
| Jun 8, 2026 | 107 | $0 | LUNAR RECONNAISSANCE ORBITER (LRO) LYMAN ALPHA MAPPING PROJECT (LAMP) INSTRUMENT |
| Mar 24, 2026 | 106 | $450.0K | LUNAR RECONNAISSANCE ORBITER (LRO) LYMAN ALPHA MAPPING PROJECT (LAMP) INSTRUMENT |
| Mar 3, 2026 | 105 | $150.0K | LUNAR RECONNAISSANCE ORBITER (LRO) LYMAN ALPHA MAPPING PROJECT (LAMP) INSTRUMENT |
| Feb 2, 2026 | 104 | $300.0K | LUNAR RECONNAISSANCE ORBITER (LRO) LYMAN ALPHA MAPPING PROJECT (LAMP) INSTRUMENT |
| Jan 7, 2026 | 103 | $350.0K | LUNAR RECONNAISSANCE ORBITER (LRO) LYMAN ALPHA MAPPING PROJECT (LAMP) INSTRUMENT |
| Sep 11, 2025 | 102 | $100.0K | LUNAR RECONNAISSANCE ORBITER (LRO) LYMAN ALPHA MAPPING PROJECT (LAMP) INSTRUMENT |
| Aug 14, 2025 | 101 | $250.0K | LUNAR RECONNAISSANCE ORBITER (LRO) LYMAN ALPHA MAPPING PROJECT (LAMP) INSTRUMENT |
| Jun 5, 2025 | 100 | $250.0K | LUNAR RECONNAISSANCE ORBITER (LRO) LYMAN ALPHA MAPPING PROJECT (LAMP) INSTRUMENT |
| Mar 14, 2025 | 99 | $0 | LUNAR RECONNAISSANCE ORBITER (LRO) LYMAN ALPHA MAPPING PROJECT (LAMP) INSTRUMENT |
| Feb 6, 2025 | 98 | $700.0K | LUNAR RECONNAISSANCE ORBITER (LRO) LYMAN ALPHA MAPPING PROJECT (LAMP) INSTRUMENT |
| Jan 23, 2025 | 97 | $0 | LUNAR RECONNAISSANCE ORBITER (LRO) LYMAN ALPHA MAPPING PROJECT (LAMP) INSTRUMENT |
| Dec 11, 2024 | 96 | $0 | LUNAR RECONNAISSANCE ORBITER (LRO) LYMAN ALPHA MAPPING PROJECT (LAMP) INSTRUMENT |
| Nov 6, 2024 | 95 | $700.0K | LUNAR RECONNAISSANCE ORBITER (LRO) LYMAN ALPHA MAPPING PROJECT (LAMP) INSTRUMENT |
| Sep 24, 2024 | 94 | $300.0K | LUNAR RECONNAISSANCE ORBITER (LRO) LYMAN ALPHA MAPPING PROJECT (LAMP) INSTRUMENT |
| Jun 3, 2024 | 93 | $173.3K | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE |
| Jan 22, 2024 | 92 | $600.0K | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE |
| Nov 13, 2023 | 91 | $300.0K | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE |
| Oct 6, 2023 | 90 | $350.0K | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE |
| Sep 18, 2023 | 89 | $150.0K | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE |
| Jun 20, 2023 | 88 | $0 | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE |
| Jun 2, 2023 | 87 | $120.0K | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE |
| Mar 30, 2023 | 86 | $800.0K | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE |
| Mar 27, 2023 | 85 | $0 | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE |
| Jan 18, 2023 | 84 | $500.0K | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE |
| Dec 5, 2022 | 83 | $400.0K | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE |
| Aug 15, 2022 | 82 | $150.0K | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE |
| May 6, 2022 | 81 | $500.0K | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE |
| Jan 21, 2022 | 80 | $500.0K | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE |
| Dec 3, 2021 | 79 | $600.0K | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE |
| Oct 26, 2021 | 78 | $0 | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE |
| Oct 14, 2021 | 77 | $0 | EO14042 LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE |
| Sep 1, 2021 | 76 | $150.0K | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE |
| Mar 3, 2021 | 75 | $1.1M | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE |
| Nov 18, 2020 | 74 | $450.0K | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE |
| Sep 9, 2020 | 73 | $0 | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE |
| Jun 30, 2020 | 72 | $751.8K | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE |
| Apr 13, 2020 | 71 | $0 | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE |
| Mar 30, 2020 | 70 | $310.7K | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE |
| Feb 10, 2020 | 69 | $310.7K | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE |
| Nov 26, 2019 | 68 | $126.8K | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE |
| Nov 14, 2019 | 67 | $0 | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE |
| Sep 25, 2019 | 66 | $226.8K | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE |
| Aug 28, 2019 | 65 | $400.0K | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE |
| Jun 18, 2019 | 64 | $400.0K | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE |
| Apr 25, 2019 | 63 | $0 | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE |
| Feb 26, 2019 | 62 | $547.0K | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE |
| May 24, 2018 | 61 | $953.0K | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE |
| Mar 22, 2018 | 60 | $0 | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE |
| Mar 20, 2018 | 59 | $300.0K | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE |
| Aug 22, 2017 | 58 | $1.0M | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE |
| Mar 27, 2017 | 57 | $300.0K | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE |
| Dec 7, 2016 | 56 | $750.0K | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE |
| Oct 26, 2016 | 55 | $368.0K | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE |
| Oct 3, 2016 | 54 | $0 | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE |
| Apr 28, 2016 | 53 | $634.0K | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE |
| Nov 10, 2015 | 52 | $825.0K | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE. |
| Sep 23, 2015 | 51 | $250.0K | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE. |
| Jun 3, 2015 | 50 | $873.0K | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE. |
| Jan 22, 2015 | 49 | $452.0K | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE. |
| Jan 13, 2015 | 48 | $0 | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE. |
| Dec 1, 2014 | 47 | $0 | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE. |
| Nov 17, 2014 | 46 | $375.0K | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE. |
| Aug 26, 2014 | 45 | $340.0K | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE. |
| Aug 11, 2014 | 44 | $250.0K | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE. |
| May 6, 2014 | 43 | $500.0K | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE. |
| Feb 26, 2014 | 42 | $350.0K | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE. |
| Dec 6, 2013 | 41 | $110.0K | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE. |
| Nov 6, 2013 | 40 | $500.0K | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE. |
| Jul 31, 2013 | 39 | $0 | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE. |
| May 23, 2013 | 38 | $873.0K | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE. |
| Apr 15, 2013 | 37 | $200.0K | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE |
| Mar 11, 2013 | 36 | $0 | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE |
| Sep 20, 2012 | 35 | $84.2K | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE |
| Jun 19, 2012 | 34 | $0 | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE |
| Feb 23, 2012 | 33 | $1.2M | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE |
| Jul 15, 2011 | 32 | $470.0K | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE |
| Jun 15, 2011 | 31 | $840.0K | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE |
| May 23, 2011 | 30 | $650.0K | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE |
| Mar 2, 2011 | 29 | $718.5K | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE |
| Nov 15, 2010 | 28 | $300.0K | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE |
| Apr 26, 2010 | 27 | $988.6K | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE |
| Jan 5, 2010 | 26 | $0 | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE |
| Dec 2, 2009 | 25 | $259.6K | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE |
| Oct 2, 2009 | 24 | $0 | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE |
| Aug 11, 2009 | 23 | $646.2K | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE |
| Aug 7, 2009 | 22 | $242.5K | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE |
| May 18, 2009 | 21 | $0 | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE |
| Apr 14, 2009 | 20 | $400.0K | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE |
| Mar 31, 2009 | 19 | $150.0K | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE |
| Sep 19, 2008 | 18 | $391.6K | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE |
| Jul 7, 2008 | 17 | $0 | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE |
| Jun 16, 2008 | 16 | $412.2K | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE |
| Mar 4, 2008 | 15 | $220.0K | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE |
| Feb 27, 2008 | 14 | $300.0K | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE |
| Nov 9, 2007 | 13 | $400.0K | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE |
| Oct 22, 2007 | 12 | $0 | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE |
| Aug 20, 2007 | 11 | $350.0K | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE |
| Jul 12, 2007 | 10 | $161.1K | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE |
| Sep 29, 2006 | 8 | $1.4M | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE |
| Sep 14, 2006 | 7 | $0 | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE |
| Jun 7, 2006 | 6 | $554.0K | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE |
| Mar 10, 2006 | 5 | $600.0K | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE |
| Oct 31, 2005 | 4 | $900.0K | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE |
| Sep 29, 2005 | 3 | $0 | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE |
| Mar 16, 2005 | 0 | $1.7M | LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE |
Estimated positioning window
Sep 30, 2027 – Mar 30, 2028
55/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 55/100. Available recorded signals: 50 points.
- Contract end 2028-09-30 (706 days from calculation)
- +25 points
- 0 historical awards in this buyer and category group
- +0 points
- 106 recorded award transactions
- +10 points
- Latest award action: 2026-08-24
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-10-25 10:18:04.631876+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Oct 25, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.