Federal contract award

NNG05EC87C

LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyNational Aeronautics and Space Administration
OfficeNASA GODDARD SPACE FLIGHT CENTER
NAICS541710
PSCAR21 — SPACE SCIENCE AND APPLICATIONS - BASIC RESEARCH
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeCOST PLUS FIXED FEE
Obligations$39.1M
Current contract value$41.7M
Potential contract value / ceiling$41.7M
Start dateMar 16, 2005
Current end dateSep 30, 2028
Potential end dateSep 30, 2028
Latest award activityAug 24, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 106 of 106 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Aug 24, 2026108$1.0MLUNAR RECONNAISSANCE ORBITER (LRO) LYMAN ALPHA MAPPING PROJECT (LAMP) INSTRUMENT
Jun 8, 2026107$0LUNAR RECONNAISSANCE ORBITER (LRO) LYMAN ALPHA MAPPING PROJECT (LAMP) INSTRUMENT
Mar 24, 2026106$450.0KLUNAR RECONNAISSANCE ORBITER (LRO) LYMAN ALPHA MAPPING PROJECT (LAMP) INSTRUMENT
Mar 3, 2026105$150.0KLUNAR RECONNAISSANCE ORBITER (LRO) LYMAN ALPHA MAPPING PROJECT (LAMP) INSTRUMENT
Feb 2, 2026104$300.0KLUNAR RECONNAISSANCE ORBITER (LRO) LYMAN ALPHA MAPPING PROJECT (LAMP) INSTRUMENT
Jan 7, 2026103$350.0KLUNAR RECONNAISSANCE ORBITER (LRO) LYMAN ALPHA MAPPING PROJECT (LAMP) INSTRUMENT
Sep 11, 2025102$100.0KLUNAR RECONNAISSANCE ORBITER (LRO) LYMAN ALPHA MAPPING PROJECT (LAMP) INSTRUMENT
Aug 14, 2025101$250.0KLUNAR RECONNAISSANCE ORBITER (LRO) LYMAN ALPHA MAPPING PROJECT (LAMP) INSTRUMENT
Jun 5, 2025100$250.0KLUNAR RECONNAISSANCE ORBITER (LRO) LYMAN ALPHA MAPPING PROJECT (LAMP) INSTRUMENT
Mar 14, 202599$0LUNAR RECONNAISSANCE ORBITER (LRO) LYMAN ALPHA MAPPING PROJECT (LAMP) INSTRUMENT
Feb 6, 202598$700.0KLUNAR RECONNAISSANCE ORBITER (LRO) LYMAN ALPHA MAPPING PROJECT (LAMP) INSTRUMENT
Jan 23, 202597$0LUNAR RECONNAISSANCE ORBITER (LRO) LYMAN ALPHA MAPPING PROJECT (LAMP) INSTRUMENT
Dec 11, 202496$0LUNAR RECONNAISSANCE ORBITER (LRO) LYMAN ALPHA MAPPING PROJECT (LAMP) INSTRUMENT
Nov 6, 202495$700.0KLUNAR RECONNAISSANCE ORBITER (LRO) LYMAN ALPHA MAPPING PROJECT (LAMP) INSTRUMENT
Sep 24, 202494$300.0KLUNAR RECONNAISSANCE ORBITER (LRO) LYMAN ALPHA MAPPING PROJECT (LAMP) INSTRUMENT
Jun 3, 202493$173.3KLUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE
Jan 22, 202492$600.0KLUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE
Nov 13, 202391$300.0KLUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE
Oct 6, 202390$350.0KLUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE
Sep 18, 202389$150.0KLUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE
Jun 20, 202388$0LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE
Jun 2, 202387$120.0KLUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE
Mar 30, 202386$800.0KLUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE
Mar 27, 202385$0LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE
Jan 18, 202384$500.0KLUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE
Dec 5, 202283$400.0KLUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE
Aug 15, 202282$150.0KLUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE
May 6, 202281$500.0KLUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE
Jan 21, 202280$500.0KLUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE
Dec 3, 202179$600.0KLUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE
Oct 26, 202178$0LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE
Oct 14, 202177$0EO14042 LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE
Sep 1, 202176$150.0KLUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE
Mar 3, 202175$1.1MLUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE
Nov 18, 202074$450.0KLUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE
Sep 9, 202073$0LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE
Jun 30, 202072$751.8KLUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE
Apr 13, 202071$0LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE
Mar 30, 202070$310.7KLUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE
Feb 10, 202069$310.7KLUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE
Nov 26, 201968$126.8KLUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE
Nov 14, 201967$0LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE
Sep 25, 201966$226.8KLUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE
Aug 28, 201965$400.0KLUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE
Jun 18, 201964$400.0KLUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE
Apr 25, 201963$0LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE
Feb 26, 201962$547.0KLUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE
May 24, 201861$953.0KLUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE
Mar 22, 201860$0LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE
Mar 20, 201859$300.0KLUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE
Aug 22, 201758$1.0MLUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE
Mar 27, 201757$300.0KLUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE
Dec 7, 201656$750.0KLUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE
Oct 26, 201655$368.0KLUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE
Oct 3, 201654$0LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE
Apr 28, 201653$634.0KLUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE
Nov 10, 201552$825.0KLUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE.
Sep 23, 201551$250.0KLUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE.
Jun 3, 201550$873.0KLUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE.
Jan 22, 201549$452.0KLUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE.
Jan 13, 201548$0LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE.
Dec 1, 201447$0LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE.
Nov 17, 201446$375.0KLUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE.
Aug 26, 201445$340.0KLUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE.
Aug 11, 201444$250.0KLUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE.
May 6, 201443$500.0KLUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE.
Feb 26, 201442$350.0KLUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE.
Dec 6, 201341$110.0KLUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE.
Nov 6, 201340$500.0KLUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE.
Jul 31, 201339$0LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE.
May 23, 201338$873.0KLUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE.
Apr 15, 201337$200.0KLUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE
Mar 11, 201336$0LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE
Sep 20, 201235$84.2KLUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE
Jun 19, 201234$0LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE
Feb 23, 201233$1.2MLUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE
Jul 15, 201132$470.0KLUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE
Jun 15, 201131$840.0KLUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE
May 23, 201130$650.0KLUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE
Mar 2, 201129$718.5KLUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE
Nov 15, 201028$300.0KLUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE
Apr 26, 201027$988.6KLUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE
Jan 5, 201026$0LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE
Dec 2, 200925$259.6KLUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE
Oct 2, 200924$0LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE
Aug 11, 200923$646.2KLUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE
Aug 7, 200922$242.5KLUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE
May 18, 200921$0LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE
Apr 14, 200920$400.0KLUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE
Mar 31, 200919$150.0KLUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE
Sep 19, 200818$391.6KLUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE
Jul 7, 200817$0LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE
Jun 16, 200816$412.2KLUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE
Mar 4, 200815$220.0KLUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE
Feb 27, 200814$300.0KLUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE
Nov 9, 200713$400.0KLUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE
Oct 22, 200712$0LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE
Aug 20, 200711$350.0KLUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE
Jul 12, 200710$161.1KLUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE
Sep 29, 20068$1.4MLUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE
Sep 14, 20067$0LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE
Jun 7, 20066$554.0KLUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE
Mar 10, 20065$600.0KLUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE
Oct 31, 20054$900.0KLUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE
Sep 29, 20053$0LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE
Mar 16, 20050$1.7MLUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE

Estimated positioning window

Sep 30, 2027 – Mar 30, 2028

Recompete signal:
55/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 55/100. Available recorded signals: 50 points.

Contract end 2028-09-30 (706 days from calculation)
+25 points
0 historical awards in this buyer and category group
+0 points
106 recorded award transactions
+10 points
Latest award action: 2026-08-24
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.