Federal contract award
NNG08FD60C
NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT FROM MARCH 1, 2008 TO JUNE 30, 2008. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | National Aeronautics and Space Administration |
| Office | NASA GODDARD SPACE FLIGHT CENTER |
| NAICS | 611310 — Colleges, Universities, and Professional Schools |
| PSC | AR93 — R&D-OTHER SPACE - ADVANCED DEVELOPMENT |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | COST NO FEE |
| Obligations | $139.4M |
| Current contract value | $149.3M |
| Potential contract value / ceiling | $149.3M |
| Start date | Feb 29, 2008 |
| Current end date | May 31, 2028 |
| Potential end date | May 31, 2028 |
| Latest award activity | May 29, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 99 of 99 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| May 29, 2026 | 98 | $0 | COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. NUSTAR IS A PRINCIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED. 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Jan 21, 2026 | 97 | $1.8M | INCREMENTAL FUNDING REMOVAL OF CLAUSES/DRDS IAW EXECUTIVE ORDERS (E.O.) 14173, 14168, 14148 AND 14057 NUSTAR PHASE E TASK 6 NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED. 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Jul 16, 2025 | 96 | $1.6M | INCREMENTAL FUNDING REMOVAL OF CLAUSES/DRDS IAW EXECUTIVE ORDERS (E.O.) 14173, 14168, 14148 AND 14057 NUSTAR PHASE E TASK 6 NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED. 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| May 7, 2025 | 95 | $0 | REMOVAL OF CLAUSES/DRDS IAW EXECUTIVE ORDERS (E.O.) 14173, 14168, 14148 AND 14057 NUSTAR PHASE E TASK 6 NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED. 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Apr 17, 2025 | 94 | $800.0K | NUSTAR PHASE E TASK 6 NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED. 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Apr 10, 2025 | 93 | $120.0K | THIS MOD INCORPORATES NUSTAR PHASE E TASK 6. NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED. 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Jan 24, 2025 | 92 | $0 | REMOVAL OF CLAUSES/DRDS IAW EO 14035 - NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Jan 7, 2025 | 91 | $1.4M | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Jul 15, 2024 | 90 | $1.8M | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Jun 21, 2024 | 89 | $1.0M | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Mar 7, 2024 | 88 | $500.0K | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Sep 18, 2023 | P00087 | $316.2K | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| May 4, 2023 | P00086 | $1.7M | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Jan 18, 2023 | 85 | $762.2K | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Sep 21, 2022 | 84 | $701.0K | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Aug 9, 2022 | 82 | $0 | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Aug 9, 2022 | 83 | $1.2M | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Jul 27, 2022 | 81 | $760.0K | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Feb 2, 2022 | 80 | $1.5M | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Oct 18, 2021 | 79 | $0 | EO14042 NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Aug 4, 2021 | 78 | $1.4M | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| May 18, 2021 | 77 | $1.5M | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Jul 13, 2020 | 76 | $45.8K | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Jun 22, 2020 | 75 | $2.5M | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Sep 25, 2019 | 74 | $600.0K | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Aug 13, 2019 | 72 | $-2.1M | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Aug 13, 2019 | 73 | $2.1M | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| May 13, 2019 | 71 | $404.0K | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Apr 23, 2019 | 70 | $855.6K | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Apr 18, 2019 | 69 | $-855.6K | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Mar 19, 2019 | 68 | $2.5M | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Feb 11, 2019 | 67 | $200.0K | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Feb 1, 2019 | 66 | $855.6K | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Mar 15, 2018 | 65 | $0 | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Feb 27, 2018 | 64 | $900.0K | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Oct 24, 2017 | 63 | $1.2M | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Apr 25, 2017 | 62 | $254.7K | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Mar 21, 2017 | 61 | $300.0K | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Sep 12, 2016 | 60 | $1.4M | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Sep 7, 2016 | 59 | $0 | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Jul 7, 2016 | 58 | $2.0M | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Jun 20, 2016 | 57 | $0 | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Apr 28, 2016 | 56 | $675.0K | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Apr 18, 2016 | 55 | $0 | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Feb 17, 2016 | 54 | $1.1M | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Jul 9, 2015 | 53 | $0 | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Jun 3, 2015 | 52 | $2.4M | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Jan 28, 2015 | 51 | $-0 | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Jan 22, 2015 | 50 | $900.0K | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Dec 3, 2014 | 49 | $0 | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Nov 24, 2014 | 48 | $0 | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Oct 2, 2014 | 47 | $0 | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Sep 4, 2014 | 46 | $0 | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Jul 18, 2014 | 45 | $900.0K | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Apr 7, 2014 | 44 | $900.0K | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Mar 14, 2014 | 43 | $78.4K | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Jan 16, 2014 | 42 | $0 | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Sep 24, 2013 | 41 | $714.0K | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Dec 19, 2012 | 40 | $62.0K | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Sep 27, 2012 | 39 | $3.8M | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Sep 25, 2012 | 38 | $1.8M | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Jun 29, 2012 | 37 | $1.3M | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Apr 12, 2012 | 36 | $1.6M | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Dec 1, 2011 | 35 | $0 | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Sep 15, 2011 | 34 | $2.6M | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Aug 17, 2011 | 33 | $6.3M | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Jun 16, 2011 | 32 | $2.0M | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| May 2, 2011 | 31 | $3.0M | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Apr 8, 2011 | 30 | $1.0M | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Mar 23, 2011 | 29 | $3.0M | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Mar 4, 2011 | 28 | $540.1K | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Jan 11, 2011 | 27 | $2.6M | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Dec 21, 2010 | 26 | $1.4M | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Oct 21, 2010 | 25 | $2.1M | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Sep 2, 2010 | 24 | $2.5M | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Mar 9, 2010 | 23 | $16.3M | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Jan 21, 2010 | 22 | $1.1M | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Dec 22, 2009 | 21 | $3.0M | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Nov 23, 2009 | 20 | $0 | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Oct 23, 2009 | 19 | $3.5M | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Aug 14, 2009 | 18 | $511.8K | THIS MODIFICATION PROVIDES FOR INCREMENTAL FUNDING FOR CONTINUED CONTRACT PERFORMANCE. THE PERIOD OF ALLOTMENT FOR THIS INCREMENT OF FUNDING IS EXTENDED THROUGH APRIL 17, 2009 FOR THE FOLLOWING: NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT FROM MARCH 1, 2008 TO JUNE 30, 2008. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Jul 10, 2009 | 17 | $0 | THIS MODIFICATION PROVIDES FOR INCREMENTAL FUNDING FOR CONTINUED CONTRACT PERFORMANCE. THE PERIOD OF ALLOTMENT FOR THIS INCREMENT OF FUNDING IS EXTENDED THROUGH APRIL 17, 2009 FOR THE FOLLOWING: NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT FROM MARCH 1, 2008 TO JUNE 30, 2008. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Jun 25, 2009 | 16 | $4.4M | THIS MODIFICATION PROVIDES FOR INCREMENTAL FUNDING FOR CONTINUED CONTRACT PERFORMANCE. THE PERIOD OF ALLOTMENT FOR THIS INCREMENT OF FUNDING IS EXTENDED THROUGH APRIL 17, 2009 FOR THE FOLLOWING: NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT FROM MARCH 1, 2008 TO JUNE 30, 2008. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Jun 3, 2009 | 15 | $0 | THIS MODIFICATION PROVIDES FOR INCREMENTAL FUNDING FOR CONTINUED CONTRACT PERFORMANCE. THE PERIOD OF ALLOTMENT FOR THIS INCREMENT OF FUNDING IS EXTENDED THROUGH APRIL 17, 2009 FOR THE FOLLOWING: NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT FROM MARCH 1, 2008 TO JUNE 30, 2008. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| May 26, 2009 | 14 | $0 | THIS MODIFICATION PROVIDES FOR INCREMENTAL FUNDING FOR CONTINUED CONTRACT PERFORMANCE. THE PERIOD OF ALLOTMENT FOR THIS INCREMENT OF FUNDING IS EXTENDED THROUGH APRIL 17, 2009 FOR THE FOLLOWING: NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT FROM MARCH 1, 2008 TO JUNE 30, 2008. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| May 4, 2009 | 13 | $10.2M | THIS MODIFICATION PROVIDES FOR INCREMENTAL FUNDING FOR CONTINUED CONTRACT PERFORMANCE. THE PERIOD OF ALLOTMENT FOR THIS INCREMENT OF FUNDING IS EXTENDED THROUGH APRIL 17, 2009 FOR THE FOLLOWING: NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT FROM MARCH 1, 2008 TO JUNE 30, 2008. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Apr 9, 2009 | 12 | $3.3M | THIS MODIFICATION PROVIDES FOR INCREMENTAL FUNDING FOR CONTINUED CONTRACT PERFORMANCE. THE PERIOD OF ALLOTMENT FOR THIS INCREMENT OF FUNDING IS EXTENDED THROUGH APRIL 17, 2009 FOR THE FOLLOWING: NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT FROM MARCH 1, 2008 TO JUNE 30, 2008. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Mar 23, 2009 | 11 | $800.0K | THIS MODIFICATION PROVIDES FOR INCREMENTAL FUNDING FOR CONTINUED CONTRACT PERFORMANCE. THE PERIOD OF ALLOTMENT FOR THIS INCREMENT OF FUNDING IS EXTENDED THROUGH APRIL 17, 2009 FOR THE FOLLOWING: NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT FROM MARCH 1, 2008 TO JUNE 30, 2008. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Mar 11, 2009 | 10 | $500.0K | THIS MODIFICATION PROVIDES FOR INCREMENTAL FUNDING FOR CONTINUED CONTRACT PERFORMANCE. THE PERIOD OF ALLOTMENT FOR THIS INCREMENT OF FUNDING IS EXTENDED THROUGH APRIL 17, 2009 FOR THE FOLLOWING: NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT FROM MARCH 1, 2008 TO JUNE 30, 2008. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Mar 4, 2009 | 9 | $815.4K | THIS MODIFICATION PROVIDES FOR INCREMENTAL FUNDING FOR CONTINUED CONTRACT PERFORMANCE. THE PERIOD OF ALLOTMENT FOR THIS INCREMENT OF FUNDING IS EXTENDED THROUGH APRIL 17, 2009 FOR THE FOLLOWING: NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT FROM MARCH 1, 2008 TO JUNE 30, 2008. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Feb 6, 2009 | 8 | $0 | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT FROM MARCH 1, 2008 TO JUNE 30, 2008. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Jan 22, 2009 | 7 | $2.8M | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT FROM MARCH 1, 2008 TO JUNE 30, 2008. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Dec 29, 2008 | 6 | $2.2M | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT FROM MARCH 1, 2008 TO JUNE 30, 2008. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Nov 25, 2008 | 5 | $1.1M | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT FROM MARCH 1, 2008 TO JUNE 30, 2008. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Aug 13, 2008 | 4 | $1.4M | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT FROM MARCH 1, 2008 TO JUNE 30, 2008. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Jul 18, 2008 | 3 | $7.6M | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT FROM MARCH 1, 2008 TO JUNE 30, 2008. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Jun 24, 2008 | 2 | $0 | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT FROM MARCH 1, 2008 TO JUNE 30, 2008. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Apr 23, 2008 | 1 | $2.9M | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT FROM MARCH 1, 2008 TO JUNE 30, 2008. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
| Feb 29, 2008 | 0 | $1.6M | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT FROM MARCH 1, 2008 TO JUNE 30, 2008. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. |
Estimated positioning window
May 31, 2027 – Nov 30, 2027
45/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 45/100. Available recorded signals: 40 points.
- Contract end 2028-05-31 (577 days from calculation)
- +25 points
- 0 historical awards in this buyer and category group
- +0 points
- 99 recorded award transactions
- +10 points
- Latest award action: 2026-05-29
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +0 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-11-01 10:17:53.997580+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Nov 1, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.