Federal contract award

NNG08FD60C

NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT FROM MARCH 1, 2008 TO JUNE 30, 2008. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyNational Aeronautics and Space Administration
OfficeNASA GODDARD SPACE FLIGHT CENTER
NAICS611310 — Colleges, Universities, and Professional Schools
PSCAR93 — R&D-OTHER SPACE - ADVANCED DEVELOPMENT
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeCOST NO FEE
Obligations$139.4M
Current contract value$149.3M
Potential contract value / ceiling$149.3M
Start dateFeb 29, 2008
Current end dateMay 31, 2028
Potential end dateMay 31, 2028
Latest award activityMay 29, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 99 of 99 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
May 29, 202698$0COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. NUSTAR IS A PRINCIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED. 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Jan 21, 202697$1.8MINCREMENTAL FUNDING REMOVAL OF CLAUSES/DRDS IAW EXECUTIVE ORDERS (E.O.) 14173, 14168, 14148 AND 14057 NUSTAR PHASE E TASK 6 NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED. 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Jul 16, 202596$1.6MINCREMENTAL FUNDING REMOVAL OF CLAUSES/DRDS IAW EXECUTIVE ORDERS (E.O.) 14173, 14168, 14148 AND 14057 NUSTAR PHASE E TASK 6 NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED. 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
May 7, 202595$0REMOVAL OF CLAUSES/DRDS IAW EXECUTIVE ORDERS (E.O.) 14173, 14168, 14148 AND 14057 NUSTAR PHASE E TASK 6 NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED. 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Apr 17, 202594$800.0KNUSTAR PHASE E TASK 6 NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED. 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Apr 10, 202593$120.0KTHIS MOD INCORPORATES NUSTAR PHASE E TASK 6. NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED. 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Jan 24, 202592$0REMOVAL OF CLAUSES/DRDS IAW EO 14035 - NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Jan 7, 202591$1.4MNUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Jul 15, 202490$1.8MNUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Jun 21, 202489$1.0MNUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Mar 7, 202488$500.0KNUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Sep 18, 2023P00087$316.2KNUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
May 4, 2023P00086$1.7MNUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Jan 18, 202385$762.2KNUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Sep 21, 202284$701.0KNUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Aug 9, 202282$0NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Aug 9, 202283$1.2MNUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Jul 27, 202281$760.0KNUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Feb 2, 202280$1.5MNUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Oct 18, 202179$0EO14042 NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Aug 4, 202178$1.4MNUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
May 18, 202177$1.5MNUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Jul 13, 202076$45.8KNUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Jun 22, 202075$2.5MNUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Sep 25, 201974$600.0KNUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Aug 13, 201972$-2.1MNUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Aug 13, 201973$2.1MNUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
May 13, 201971$404.0KNUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Apr 23, 201970$855.6KNUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Apr 18, 201969$-855.6KNUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Mar 19, 201968$2.5MNUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Feb 11, 201967$200.0KNUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Feb 1, 201966$855.6KNUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Mar 15, 201865$0NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Feb 27, 201864$900.0KNUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Oct 24, 201763$1.2MNUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Apr 25, 201762$254.7KNUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Mar 21, 201761$300.0KNUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Sep 12, 201660$1.4MNUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Sep 7, 201659$0NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Jul 7, 201658$2.0MNUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Jun 20, 201657$0NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Apr 28, 201656$675.0KNUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Apr 18, 201655$0NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Feb 17, 201654$1.1MNUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Jul 9, 201553$0NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Jun 3, 201552$2.4MNUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Jan 28, 201551$-0NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Jan 22, 201550$900.0KNUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Dec 3, 201449$0NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Nov 24, 201448$0NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Oct 2, 201447$0NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Sep 4, 201446$0NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Jul 18, 201445$900.0KNUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Apr 7, 201444$900.0KNUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Mar 14, 201443$78.4KNUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Jan 16, 201442$0NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Sep 24, 201341$714.0KNUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Dec 19, 201240$62.0KNUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Sep 27, 201239$3.8MNUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Sep 25, 201238$1.8MNUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Jun 29, 201237$1.3MNUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Apr 12, 201236$1.6MNUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Dec 1, 201135$0NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Sep 15, 201134$2.6MNUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Aug 17, 201133$6.3MNUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Jun 16, 201132$2.0MNUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
May 2, 201131$3.0MNUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Apr 8, 201130$1.0MNUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Mar 23, 201129$3.0MNUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Mar 4, 201128$540.1KNUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Jan 11, 201127$2.6MNUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Dec 21, 201026$1.4MNUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Oct 21, 201025$2.1MNUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Sep 2, 201024$2.5MNUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Mar 9, 201023$16.3MNUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Jan 21, 201022$1.1MNUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Dec 22, 200921$3.0MNUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Nov 23, 200920$0NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Oct 23, 200919$3.5MNUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Aug 14, 200918$511.8KTHIS MODIFICATION PROVIDES FOR INCREMENTAL FUNDING FOR CONTINUED CONTRACT PERFORMANCE. THE PERIOD OF ALLOTMENT FOR THIS INCREMENT OF FUNDING IS EXTENDED THROUGH APRIL 17, 2009 FOR THE FOLLOWING: NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT FROM MARCH 1, 2008 TO JUNE 30, 2008. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Jul 10, 200917$0THIS MODIFICATION PROVIDES FOR INCREMENTAL FUNDING FOR CONTINUED CONTRACT PERFORMANCE. THE PERIOD OF ALLOTMENT FOR THIS INCREMENT OF FUNDING IS EXTENDED THROUGH APRIL 17, 2009 FOR THE FOLLOWING: NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT FROM MARCH 1, 2008 TO JUNE 30, 2008. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Jun 25, 200916$4.4MTHIS MODIFICATION PROVIDES FOR INCREMENTAL FUNDING FOR CONTINUED CONTRACT PERFORMANCE. THE PERIOD OF ALLOTMENT FOR THIS INCREMENT OF FUNDING IS EXTENDED THROUGH APRIL 17, 2009 FOR THE FOLLOWING: NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT FROM MARCH 1, 2008 TO JUNE 30, 2008. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Jun 3, 200915$0THIS MODIFICATION PROVIDES FOR INCREMENTAL FUNDING FOR CONTINUED CONTRACT PERFORMANCE. THE PERIOD OF ALLOTMENT FOR THIS INCREMENT OF FUNDING IS EXTENDED THROUGH APRIL 17, 2009 FOR THE FOLLOWING: NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT FROM MARCH 1, 2008 TO JUNE 30, 2008. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
May 26, 200914$0THIS MODIFICATION PROVIDES FOR INCREMENTAL FUNDING FOR CONTINUED CONTRACT PERFORMANCE. THE PERIOD OF ALLOTMENT FOR THIS INCREMENT OF FUNDING IS EXTENDED THROUGH APRIL 17, 2009 FOR THE FOLLOWING: NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT FROM MARCH 1, 2008 TO JUNE 30, 2008. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
May 4, 200913$10.2MTHIS MODIFICATION PROVIDES FOR INCREMENTAL FUNDING FOR CONTINUED CONTRACT PERFORMANCE. THE PERIOD OF ALLOTMENT FOR THIS INCREMENT OF FUNDING IS EXTENDED THROUGH APRIL 17, 2009 FOR THE FOLLOWING: NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT FROM MARCH 1, 2008 TO JUNE 30, 2008. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Apr 9, 200912$3.3MTHIS MODIFICATION PROVIDES FOR INCREMENTAL FUNDING FOR CONTINUED CONTRACT PERFORMANCE. THE PERIOD OF ALLOTMENT FOR THIS INCREMENT OF FUNDING IS EXTENDED THROUGH APRIL 17, 2009 FOR THE FOLLOWING: NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT FROM MARCH 1, 2008 TO JUNE 30, 2008. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Mar 23, 200911$800.0KTHIS MODIFICATION PROVIDES FOR INCREMENTAL FUNDING FOR CONTINUED CONTRACT PERFORMANCE. THE PERIOD OF ALLOTMENT FOR THIS INCREMENT OF FUNDING IS EXTENDED THROUGH APRIL 17, 2009 FOR THE FOLLOWING: NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT FROM MARCH 1, 2008 TO JUNE 30, 2008. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Mar 11, 200910$500.0KTHIS MODIFICATION PROVIDES FOR INCREMENTAL FUNDING FOR CONTINUED CONTRACT PERFORMANCE. THE PERIOD OF ALLOTMENT FOR THIS INCREMENT OF FUNDING IS EXTENDED THROUGH APRIL 17, 2009 FOR THE FOLLOWING: NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT FROM MARCH 1, 2008 TO JUNE 30, 2008. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Mar 4, 20099$815.4KTHIS MODIFICATION PROVIDES FOR INCREMENTAL FUNDING FOR CONTINUED CONTRACT PERFORMANCE. THE PERIOD OF ALLOTMENT FOR THIS INCREMENT OF FUNDING IS EXTENDED THROUGH APRIL 17, 2009 FOR THE FOLLOWING: NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT FROM MARCH 1, 2008 TO JUNE 30, 2008. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Feb 6, 20098$0NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT FROM MARCH 1, 2008 TO JUNE 30, 2008. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Jan 22, 20097$2.8MNUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT FROM MARCH 1, 2008 TO JUNE 30, 2008. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Dec 29, 20086$2.2MNUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT FROM MARCH 1, 2008 TO JUNE 30, 2008. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Nov 25, 20085$1.1MNUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT FROM MARCH 1, 2008 TO JUNE 30, 2008. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Aug 13, 20084$1.4MNUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT FROM MARCH 1, 2008 TO JUNE 30, 2008. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Jul 18, 20083$7.6MNUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT FROM MARCH 1, 2008 TO JUNE 30, 2008. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Jun 24, 20082$0NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT FROM MARCH 1, 2008 TO JUNE 30, 2008. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Apr 23, 20081$2.9MNUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT FROM MARCH 1, 2008 TO JUNE 30, 2008. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
Feb 29, 20080$1.6MNUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT FROM MARCH 1, 2008 TO JUNE 30, 2008. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.

Estimated positioning window

May 31, 2027 – Nov 30, 2027

Recompete signal:
45/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 45/100. Available recorded signals: 40 points.

Contract end 2028-05-31 (577 days from calculation)
+25 points
0 historical awards in this buyer and category group
+0 points
99 recorded award transactions
+10 points
Latest award action: 2026-05-29
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+0 points
Linked official forecast
+0 points
Calculated on
2026-11-01 10:17:53.997580+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Nov 1, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.