Federal contract award
NNG12FA45C
PHASE A THROUGH F - ICON. THIS CONTRACT IS FOR THE UNIVERSITY OF CALIFORNIA (UCB) AT BERKELEY SPACE SCIENCES LABORATORY, THE PRIME CONTRACTUAL INTERFACE FOR NASA FOR THE IONOSPHERIC CONNECTION EXPLORER (LCON) MISSION INVESTIGATION TEAM, THAT COVERS PHASE A OF THE MISSION. THE NASA AO IS NNHIIZDA0020. UNDER THE DIRECTION OF THE PRINCIPAL INVESTIGATOR (PI) DR. THOMAS IMMEL, UCB WILL BE THE PRINCIPAL CONTRACTOR TO NASA FOR ICON. UCB SHALL CONDUCT THE PHASE A CONCEPT STUDY IN ACCORDANCE WITH THE CONCEPT STUDY GUIDELINES. IN PERFORMANCE OF THIS STUDY, THE ICON TEAM SHALL: A. CONDUCT TRADE AND RISK REDUCTION STUDIES; B. UPDATE AND REFINE THE EXISTING MISSION COST ESTIMATES AND FINANCIAL PLAN; C. INTEGRATE AND DELIVER TO NASA ALL SUBCONTRACTOR AND UCB FINANCIAL REPORTS; D. DEVELOP PLAN FOR EARNED VALUE MANAGEMENT TO BE IN PLACE DURING PHASES C AND D; E. DEVELOP THE MISSION IMPLEMENTATION PLAN FOR PHASE B/CID, AND E; F. DEFME THE RISK MANAGEMENT PLAN AND DEVELOP MITIGATION STRATEGIES; G. OUTLINE THE FABRICATION, INTEGRATION, TEST, AND OPERATION OF THE SYSTEM; H. DEFINE THE EDUCATION, OUTREACH, TECHNOLOGY, AND SMALL BUSINESS DISADVANTAGED BUSINESS PLANS; I. DEVELOP A PRELIMINARY PERFORMANCE ASSURANCE IMPLEMENTATION PLAN (PAIP); J. DEVELOP A PRELIMINARY SYSTEMS ENGINEERING MANAGEMENT PLAN; K. DOCUMENT THE RESULTS OF THE STUDIES IN THE PHASE A CONCEPT STUDY REPORT; AND L. PRESENT THE ICON CONCEPT TO THE NASA ASSOCIATE ADMINISTRATOR.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | National Aeronautics and Space Administration |
| Office | NASA GODDARD SPACE FLIGHT CENTER |
| NAICS | 541712 |
| PSC | 1820 — Space Vehicle Components |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | COST NO FEE |
| Obligations | $182.1M |
| Current contract value | $182.1M |
| Potential contract value / ceiling | $182.1M |
| Start date | Jan 11, 2012 |
| Current end date | Jun 30, 2026 |
| Potential end date | Jun 30, 2026 |
| Latest award activity | Aug 28, 2025 |
| Source loaded | Aug 15, 2026 |
Funding and modification history
Showing the latest 72 of 72 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Aug 28, 2025 | 71 | $0 | THIS MOD EXECUTES A NO COST EXTENSION THROUGH JUN 30, 2026, TO ALLOW THE CONTRACTOR TO COMPLETE PHASE F DELIVERABLES. THIS CONTRACT IS FOR THE UNIVERSITY OF CALIFORNIA (UCB) AT BERKELEY SPACE SCIENCES LABORATORY, THE PRIME CONTRACTUAL INTERFACE FOR NASA FOR THE IONOSPHERIC CONNECTION EXPLORER (LCON) MISSION INVESTIGATION TEAM, THAT COVERS PHASE A OF THE MISSION. THE NASA AO IS NNHIIZDA0020. UNDER THE DIRECTION OF THE PRINCIPAL INVESTIGATOR (PI) DR. THOMAS IMMEL, UCB WILL BE THE PRINCIPAL CONTRACTOR TO NASA FOR ICON. UCB SHALL CONDUCT THE PHASE A CONCEPT STUDY IN ACCORDANCE WITH THE CONCEPT STUDY GUIDELINES. IN PERFORMANCE OF THIS STUDY, THE ICON TEAM SHALL: A. CONDUCT TRADE AND RISK REDUCTION STUDIES B. UPDATE AND REFINE THE EXISTING MISSION COST ESTIMATES AND FINANCIAL PLAN C. INTEGRATE AND DELIVER TO NASA ALL SUBCONTRACTOR AND UCB FINANCIAL REPORTS D. DEVELOP PLAN FOR EARNED VALUE MANAGEMENT TO BE IN PLACE DURING PHASES C AND D E. DEVELOP THE MISSION IMPLEMENTATION PLAN FOR PHASE B/CID, AND E F. DEFME THE RISK MANAGEMENT PLAN AND DEVELOP MITIGATION STRATEGIES G. OUTLINE THE FABRICATION, INTEGRATION, TEST, AND OPERATION OF THE SYSTEM H. DEFINE THE EDUCATION, OUTREACH, TECHNOLOGY, AND SMALL BUSINESS DISADVANTAGED BUSINESS PLANS I. DEVELOP A PRELIMINARY PERFORMANCE ASSURANCE IMPLEMENTATION PLAN (PAIP) J. DEVELOP A PRELIMINARY SYSTEMS ENGINEERING MANAGEMENT PLAN K. DOCUMENT THE RESULTS OF THE STUDIES IN THE PHASE A CONCEPT STUDY REPORT AND L. PRESENT THE ICON CONCEPT TO THE NASA ASSOCIATE ADMINISTRATOR. |
| May 9, 2025 | 70 | $0 | SUPPLEMENTAL AGREEMENT TO REDUCE PHASE E SCOPE, ADD ADDITIONAL PHASE F SCOPE, REDUCE THE CONTRACT VALUE, AND EXTEND THE POP - ICON. THIS CONTRACT IS FOR THE UNIVERSITY OF CALIFORNIA (UCB) AT BERKELEY SPACE SCIENCES LABORATORY, THE PRIME CONTRACTUAL INTERFACE FOR NASA FOR THE IONOSPHERIC CONNECTION EXPLORER (LCON) MISSION INVESTIGATION TEAM, THAT COVERS PHASE A OF THE MISSION. THE NASA AO IS NNHIIZDA0020. UNDER THE DIRECTION OF THE PRINCIPAL INVESTIGATOR (PI) DR. THOMAS IMMEL, UCB WILL BE THE PRINCIPAL CONTRACTOR TO NASA FOR ICON. UCB SHALL CONDUCT THE PHASE A CONCEPT STUDY IN ACCORDANCE WITH THE CONCEPT STUDY GUIDELINES. IN PERFORMANCE OF THIS STUDY, THE ICON TEAM SHALL: A. CONDUCT TRADE AND RISK REDUCTION STUDIES B. UPDATE AND REFINE THE EXISTING MISSION COST ESTIMATES AND FINANCIAL PLAN C. INTEGRATE AND DELIVER TO NASA ALL SUBCONTRACTOR AND UCB FINANCIAL REPORTS D. DEVELOP PLAN FOR EARNED VALUE MANAGEMENT TO BE IN PLACE DURING PHASES C AND D E. DEVELOP THE MISSION IMPLEMENTATION PLAN FOR PHASE B/CID, AND E F. DEFME THE RISK MANAGEMENT PLAN AND DEVELOP MITIGATION STRATEGIES G. OUTLINE THE FABRICATION, INTEGRATION, TEST, AND OPERATION OF THE SYSTEM H. DEFINE THE EDUCATION, OUTREACH, TECHNOLOGY, AND SMALL BUSINESS DISADVANTAGED BUSINESS PLANS I. DEVELOP A PRELIMINARY PERFORMANCE ASSURANCE IMPLEMENTATION PLAN (PAIP) J. DEVELOP A PRELIMINARY SYSTEMS ENGINEERING MANAGEMENT PLAN K. DOCUMENT THE RESULTS OF THE STUDIES IN THE PHASE A CONCEPT STUDY REPORT AND L. PRESENT THE ICON CONCEPT TO THE NASA ASSOCIATE ADMINISTRATOR. |
| Jan 23, 2025 | 69 | $0 | REMOVAL OF CLAUSES/DRDS IAW EO 14148-PHASE A THROUGH F - ICON. THIS CONTRACT IS FOR THE UNIVERSITY OF CALIFORNIA (UCB) AT BERKELEY SPACE SCIENCES LABORATORY, THE PRIME CONTRACTUAL INTERFACE FOR NASA FOR THE IONOSPHERIC CONNECTION EXPLORER (LCON) MISSION INVESTIGATION TEAM, THAT COVERS PHASE A OF THE MISSION. THE NASA AO IS NNHIIZDA0020. UNDER THE DIRECTION OF THE PRINCIPAL INVESTIGATOR (PI) DR. THOMAS IMMEL, UCB WILL BE THE PRINCIPAL CONTRACTOR TO NASA FOR ICON. UCB SHALL CONDUCT THE PHASE A CONCEPT STUDY IN ACCORDANCE WITH THE CONCEPT STUDY GUIDELINES. IN PERFORMANCE OF THIS STUDY, THE ICON TEAM SHALL: A. CONDUCT TRADE AND RISK REDUCTION STUDIES B. UPDATE AND REFINE THE EXISTING MISSION COST ESTIMATES AND FINANCIAL PLAN C. INTEGRATE AND DELIVER TO NASA ALL SUBCONTRACTOR AND UCB FINANCIAL REPORTS D. DEVELOP PLAN FOR EARNED VALUE MANAGEMENT TO BE IN PLACE DURING PHASES C AND D E. DEVELOP THE MISSION IMPLEMENTATION PLAN FOR PHASE B/CID, AND E F. DEFME THE RISK MANAGEMENT PLAN AND DEVELOP MITIGATION STRATEGIES G. OUTLINE THE FABRICATION, INTEGRATION, TEST, AND OPERATION OF THE SYSTEM H. DEFINE THE EDUCATION, OUTREACH, TECHNOLOGY, AND SMALL BUSINESS DISADVANTAGED BUSINESS PLANS I. DEVELOP A PRELIMINARY PERFORMANCE ASSURANCE IMPLEMENTATION PLAN (PAIP) J. DEVELOP A PRELIMINARY SYSTEMS ENGINEERING MANAGEMENT PLAN K. DOCUMENT THE RESULTS OF THE STUDIES IN THE PHASE A CONCEPT STUDY REPORT AND L. PRESENT THE ICON CONCEPT TO THE NASA ASSOCIATE ADMINISTRATOR. |
| Sep 25, 2024 | 68 | $46.5K | PHASE A THROUGH F - ICON. THIS CONTRACT IS FOR THE UNIVERSITY OF CALIFORNIA (UCB) AT BERKELEY SPACE SCIENCES LABORATORY, THE PRIME CONTRACTUAL INTERFACE FOR NASA FOR THE IONOSPHERIC CONNECTION EXPLORER (LCON) MISSION INVESTIGATION TEAM, THAT COVERS PHASE A OF THE MISSION. THE NASA AO IS NNHIIZDA0020. UNDER THE DIRECTION OF THE PRINCIPAL INVESTIGATOR (PI) DR. THOMAS IMMEL, UCB WILL BE THE PRINCIPAL CONTRACTOR TO NASA FOR ICON. UCB SHALL CONDUCT THE PHASE A CONCEPT STUDY IN ACCORDANCE WITH THE CONCEPT STUDY GUIDELINES. IN PERFORMANCE OF THIS STUDY, THE ICON TEAM SHALL: A. CONDUCT TRADE AND RISK REDUCTION STUDIES B. UPDATE AND REFINE THE EXISTING MISSION COST ESTIMATES AND FINANCIAL PLAN C. INTEGRATE AND DELIVER TO NASA ALL SUBCONTRACTOR AND UCB FINANCIAL REPORTS D. DEVELOP PLAN FOR EARNED VALUE MANAGEMENT TO BE IN PLACE DURING PHASES C AND D E. DEVELOP THE MISSION IMPLEMENTATION PLAN FOR PHASE B/CID, AND E F. DEFME THE RISK MANAGEMENT PLAN AND DEVELOP MITIGATION STRATEGIES G. OUTLINE THE FABRICATION, INTEGRATION, TEST, AND OPERATION OF THE SYSTEM H. DEFINE THE EDUCATION, OUTREACH, TECHNOLOGY, AND SMALL BUSINESS DISADVANTAGED BUSINESS PLANS I. DEVELOP A PRELIMINARY PERFORMANCE ASSURANCE IMPLEMENTATION PLAN (PAIP) J. DEVELOP A PRELIMINARY SYSTEMS ENGINEERING MANAGEMENT PLAN K. DOCUMENT THE RESULTS OF THE STUDIES IN THE PHASE A CONCEPT STUDY REPORT AND L. PRESENT THE ICON CONCEPT TO THE NASA ASSOCIATE ADMINISTRATOR. |
| Aug 1, 2024 | 66 | $0 | PHASE A THROUGH F - ICON. THIS CONTRACT IS FOR THE UNIVERSITY OF CALIFORNIA (UCB) AT BERKELEY SPACE SCIENCES LABORATORY, THE PRIME CONTRACTUAL INTERFACE FOR NASA FOR THE IONOSPHERIC CONNECTION EXPLORER (LCON) MISSION INVESTIGATION TEAM, THAT COVERS PHASE A OF THE MISSION. THE NASA AO IS NNHIIZDA0020. UNDER THE DIRECTION OF THE PRINCIPAL INVESTIGATOR (PI) DR. THOMAS IMMEL, UCB WILL BE THE PRINCIPAL CONTRACTOR TO NASA FOR ICON. UCB SHALL CONDUCT THE PHASE A CONCEPT STUDY IN ACCORDANCE WITH THE CONCEPT STUDY GUIDELINES. IN PERFORMANCE OF THIS STUDY, THE ICON TEAM SHALL: A. CONDUCT TRADE AND RISK REDUCTION STUDIES B. UPDATE AND REFINE THE EXISTING MISSION COST ESTIMATES AND FINANCIAL PLAN C. INTEGRATE AND DELIVER TO NASA ALL SUBCONTRACTOR AND UCB FINANCIAL REPORTS D. DEVELOP PLAN FOR EARNED VALUE MANAGEMENT TO BE IN PLACE DURING PHASES C AND D E. DEVELOP THE MISSION IMPLEMENTATION PLAN FOR PHASE B/CID, AND E F. DEFME THE RISK MANAGEMENT PLAN AND DEVELOP MITIGATION STRATEGIES G. OUTLINE THE FABRICATION, INTEGRATION, TEST, AND OPERATION OF THE SYSTEM H. DEFINE THE EDUCATION, OUTREACH, TECHNOLOGY, AND SMALL BUSINESS DISADVANTAGED BUSINESS PLANS I. DEVELOP A PRELIMINARY PERFORMANCE ASSURANCE IMPLEMENTATION PLAN (PAIP) J. DEVELOP A PRELIMINARY SYSTEMS ENGINEERING MANAGEMENT PLAN K. DOCUMENT THE RESULTS OF THE STUDIES IN THE PHASE A CONCEPT STUDY REPORT AND L. PRESENT THE ICON CONCEPT TO THE NASA ASSOCIATE ADMINISTRATOR. |
| Jul 29, 2024 | 67 | $7.7K | PHASE A THROUGH F - ICON. THIS CONTRACT IS FOR THE UNIVERSITY OF CALIFORNIA (UCB) AT BERKELEY SPACE SCIENCES LABORATORY, THE PRIME CONTRACTUAL INTERFACE FOR NASA FOR THE IONOSPHERIC CONNECTION EXPLORER (LCON) MISSION INVESTIGATION TEAM, THAT COVERS PHASE A OF THE MISSION. THE NASA AO IS NNHIIZDA0020. UNDER THE DIRECTION OF THE PRINCIPAL INVESTIGATOR (PI) DR. THOMAS IMMEL, UCB WILL BE THE PRINCIPAL CONTRACTOR TO NASA FOR ICON. UCB SHALL CONDUCT THE PHASE A CONCEPT STUDY IN ACCORDANCE WITH THE CONCEPT STUDY GUIDELINES. IN PERFORMANCE OF THIS STUDY, THE ICON TEAM SHALL: A. CONDUCT TRADE AND RISK REDUCTION STUDIES B. UPDATE AND REFINE THE EXISTING MISSION COST ESTIMATES AND FINANCIAL PLAN C. INTEGRATE AND DELIVER TO NASA ALL SUBCONTRACTOR AND UCB FINANCIAL REPORTS D. DEVELOP PLAN FOR EARNED VALUE MANAGEMENT TO BE IN PLACE DURING PHASES C AND D E. DEVELOP THE MISSION IMPLEMENTATION PLAN FOR PHASE B/CID, AND E F. DEFME THE RISK MANAGEMENT PLAN AND DEVELOP MITIGATION STRATEGIES G. OUTLINE THE FABRICATION, INTEGRATION, TEST, AND OPERATION OF THE SYSTEM H. DEFINE THE EDUCATION, OUTREACH, TECHNOLOGY, AND SMALL BUSINESS DISADVANTAGED BUSINESS PLANS I. DEVELOP A PRELIMINARY PERFORMANCE ASSURANCE IMPLEMENTATION PLAN (PAIP) J. DEVELOP A PRELIMINARY SYSTEMS ENGINEERING MANAGEMENT PLAN K. DOCUMENT THE RESULTS OF THE STUDIES IN THE PHASE A CONCEPT STUDY REPORT AND L. PRESENT THE ICON CONCEPT TO THE NASA ASSOCIATE ADMINISTRATOR. |
| Jun 26, 2024 | 65 | $2.5M | PHASE A THROUGH F - ICON. THIS CONTRACT IS FOR THE UNIVERSITY OF CALIFORNIA (UCB) AT BERKELEY SPACE SCIENCES LABORATORY, THE PRIME CONTRACTUAL INTERFACE FOR NASA FOR THE IONOSPHERIC CONNECTION EXPLORER (LCON) MISSION INVESTIGATION TEAM, THAT COVERS PHASE A OF THE MISSION. THE NASA AO IS NNHIIZDA0020. UNDER THE DIRECTION OF THE PRINCIPAL INVESTIGATOR (PI) DR. THOMAS IMMEL, UCB WILL BE THE PRINCIPAL CONTRACTOR TO NASA FOR ICON. UCB SHALL CONDUCT THE PHASE A CONCEPT STUDY IN ACCORDANCE WITH THE CONCEPT STUDY GUIDELINES. IN PERFORMANCE OF THIS STUDY, THE ICON TEAM SHALL: A. CONDUCT TRADE AND RISK REDUCTION STUDIES B. UPDATE AND REFINE THE EXISTING MISSION COST ESTIMATES AND FINANCIAL PLAN C. INTEGRATE AND DELIVER TO NASA ALL SUBCONTRACTOR AND UCB FINANCIAL REPORTS D. DEVELOP PLAN FOR EARNED VALUE MANAGEMENT TO BE IN PLACE DURING PHASES C AND D E. DEVELOP THE MISSION IMPLEMENTATION PLAN FOR PHASE B/CID, AND E F. DEFME THE RISK MANAGEMENT PLAN AND DEVELOP MITIGATION STRATEGIES G. OUTLINE THE FABRICATION, INTEGRATION, TEST, AND OPERATION OF THE SYSTEM H. DEFINE THE EDUCATION, OUTREACH, TECHNOLOGY, AND SMALL BUSINESS DISADVANTAGED BUSINESS PLANS I. DEVELOP A PRELIMINARY PERFORMANCE ASSURANCE IMPLEMENTATION PLAN (PAIP) J. DEVELOP A PRELIMINARY SYSTEMS ENGINEERING MANAGEMENT PLAN K. DOCUMENT THE RESULTS OF THE STUDIES IN THE PHASE A CONCEPT STUDY REPORT AND L. PRESENT THE ICON CONCEPT TO THE NASA ASSOCIATE ADMINISTRATOR. |
| Feb 21, 2024 | 64 | $1.0M | PHASE A THROUGH F - ICON. THIS CONTRACT IS FOR THE UNIVERSITY OF CALIFORNIA (UCB) AT BERKELEY SPACE SCIENCES LABORATORY, THE PRIME CONTRACTUAL INTERFACE FOR NASA FOR THE IONOSPHERIC CONNECTION EXPLORER (LCON) MISSION INVESTIGATION TEAM, THAT COVERS PHASE A OF THE MISSION. THE NASA AO IS NNHIIZDA0020. UNDER THE DIRECTION OF THE PRINCIPAL INVESTIGATOR (PI) DR. THOMAS IMMEL, UCB WILL BE THE PRINCIPAL CONTRACTOR TO NASA FOR ICON. UCB SHALL CONDUCT THE PHASE A CONCEPT STUDY IN ACCORDANCE WITH THE CONCEPT STUDY GUIDELINES. IN PERFORMANCE OF THIS STUDY, THE ICON TEAM SHALL: A. CONDUCT TRADE AND RISK REDUCTION STUDIES B. UPDATE AND REFINE THE EXISTING MISSION COST ESTIMATES AND FINANCIAL PLAN C. INTEGRATE AND DELIVER TO NASA ALL SUBCONTRACTOR AND UCB FINANCIAL REPORTS D. DEVELOP PLAN FOR EARNED VALUE MANAGEMENT TO BE IN PLACE DURING PHASES C AND D E. DEVELOP THE MISSION IMPLEMENTATION PLAN FOR PHASE B/CID, AND E F. DEFME THE RISK MANAGEMENT PLAN AND DEVELOP MITIGATION STRATEGIES G. OUTLINE THE FABRICATION, INTEGRATION, TEST, AND OPERATION OF THE SYSTEM H. DEFINE THE EDUCATION, OUTREACH, TECHNOLOGY, AND SMALL BUSINESS DISADVANTAGED BUSINESS PLANS I. DEVELOP A PRELIMINARY PERFORMANCE ASSURANCE IMPLEMENTATION PLAN (PAIP) J. DEVELOP A PRELIMINARY SYSTEMS ENGINEERING MANAGEMENT PLAN K. DOCUMENT THE RESULTS OF THE STUDIES IN THE PHASE A CONCEPT STUDY REPORT AND L. PRESENT THE ICON CONCEPT TO THE NASA ASSOCIATE ADMINISTRATOR. |
| Dec 8, 2023 | 63 | $166.1K | PHASE A THROUGH F - ICON. THIS CONTRACT IS FOR THE UNIVERSITY OF CALIFORNIA (UCB) AT BERKELEY SPACE SCIENCES LABORATORY, THE PRIME CONTRACTUAL INTERFACE FOR NASA FOR THE IONOSPHERIC CONNECTION EXPLORER (LCON) MISSION INVESTIGATION TEAM, THAT COVERS PHASE A OF THE MISSION. THE NASA AO IS NNHIIZDA0020. UNDER THE DIRECTION OF THE PRINCIPAL INVESTIGATOR (PI) DR. THOMAS IMMEL, UCB WILL BE THE PRINCIPAL CONTRACTOR TO NASA FOR ICON. UCB SHALL CONDUCT THE PHASE A CONCEPT STUDY IN ACCORDANCE WITH THE CONCEPT STUDY GUIDELINES. IN PERFORMANCE OF THIS STUDY, THE ICON TEAM SHALL: A. CONDUCT TRADE AND RISK REDUCTION STUDIES B. UPDATE AND REFINE THE EXISTING MISSION COST ESTIMATES AND FINANCIAL PLAN C. INTEGRATE AND DELIVER TO NASA ALL SUBCONTRACTOR AND UCB FINANCIAL REPORTS D. DEVELOP PLAN FOR EARNED VALUE MANAGEMENT TO BE IN PLACE DURING PHASES C AND D E. DEVELOP THE MISSION IMPLEMENTATION PLAN FOR PHASE B/CID, AND E F. DEFME THE RISK MANAGEMENT PLAN AND DEVELOP MITIGATION STRATEGIES G. OUTLINE THE FABRICATION, INTEGRATION, TEST, AND OPERATION OF THE SYSTEM H. DEFINE THE EDUCATION, OUTREACH, TECHNOLOGY, AND SMALL BUSINESS DISADVANTAGED BUSINESS PLANS I. DEVELOP A PRELIMINARY PERFORMANCE ASSURANCE IMPLEMENTATION PLAN (PAIP) J. DEVELOP A PRELIMINARY SYSTEMS ENGINEERING MANAGEMENT PLAN K. DOCUMENT THE RESULTS OF THE STUDIES IN THE PHASE A CONCEPT STUDY REPORT AND L. PRESENT THE ICON CONCEPT TO THE NASA ASSOCIATE ADMINISTRATOR. |
| Jul 7, 2023 | 62 | $2.9M | PHASE A THROUGH F - ICON. THIS CONTRACT IS FOR THE UNIVERSITY OF CALIFORNIA (UCB) AT BERKELEY SPACE SCIENCES LABORATORY, THE PRIME CONTRACTUAL INTERFACE FOR NASA FOR THE IONOSPHERIC CONNECTION EXPLORER (LCON) MISSION INVESTIGATION TEAM, THAT COVERS PHASE A OF THE MISSION. THE NASA AO IS NNHIIZDA0020. UNDER THE DIRECTION OF THE PRINCIPAL INVESTIGATOR (PI) DR. THOMAS IMMEL, UCB WILL BE THE PRINCIPAL CONTRACTOR TO NASA FOR ICON. UCB SHALL CONDUCT THE PHASE A CONCEPT STUDY IN ACCORDANCE WITH THE CONCEPT STUDY GUIDELINES. IN PERFORMANCE OF THIS STUDY, THE ICON TEAM SHALL: A. CONDUCT TRADE AND RISK REDUCTION STUDIES B. UPDATE AND REFINE THE EXISTING MISSION COST ESTIMATES AND FINANCIAL PLAN C. INTEGRATE AND DELIVER TO NASA ALL SUBCONTRACTOR AND UCB FINANCIAL REPORTS D. DEVELOP PLAN FOR EARNED VALUE MANAGEMENT TO BE IN PLACE DURING PHASES C AND D E. DEVELOP THE MISSION IMPLEMENTATION PLAN FOR PHASE B/CID, AND E F. DEFME THE RISK MANAGEMENT PLAN AND DEVELOP MITIGATION STRATEGIES G. OUTLINE THE FABRICATION, INTEGRATION, TEST, AND OPERATION OF THE SYSTEM H. DEFINE THE EDUCATION, OUTREACH, TECHNOLOGY, AND SMALL BUSINESS DISADVANTAGED BUSINESS PLANS I. DEVELOP A PRELIMINARY PERFORMANCE ASSURANCE IMPLEMENTATION PLAN (PAIP) J. DEVELOP A PRELIMINARY SYSTEMS ENGINEERING MANAGEMENT PLAN K. DOCUMENT THE RESULTS OF THE STUDIES IN THE PHASE A CONCEPT STUDY REPORT AND L. PRESENT THE ICON CONCEPT TO THE NASA ASSOCIATE ADMINISTRATOR. |
| Oct 24, 2022 | 61 | $977.1K | PHASE A THROUGH F - ICON. THIS CONTRACT IS FOR THE UNIVERSITY OF CALIFORNIA (UCB) AT BERKELEY SPACE SCIENCES LABORATORY, THE PRIME CONTRACTUAL INTERFACE FOR NASA FOR THE IONOSPHERIC CONNECTION EXPLORER (LCON) MISSION INVESTIGATION TEAM, THAT COVERS PHASE A OF THE MISSION. THE NASA AO IS NNHIIZDA0020. UNDER THE DIRECTION OF THE PRINCIPAL INVESTIGATOR (PI) DR. THOMAS IMMEL, UCB WILL BE THE PRINCIPAL CONTRACTOR TO NASA FOR ICON. UCB SHALL CONDUCT THE PHASE A CONCEPT STUDY IN ACCORDANCE WITH THE CONCEPT STUDY GUIDELINES. IN PERFORMANCE OF THIS STUDY, THE ICON TEAM SHALL: A. CONDUCT TRADE AND RISK REDUCTION STUDIES B. UPDATE AND REFINE THE EXISTING MISSION COST ESTIMATES AND FINANCIAL PLAN C. INTEGRATE AND DELIVER TO NASA ALL SUBCONTRACTOR AND UCB FINANCIAL REPORTS D. DEVELOP PLAN FOR EARNED VALUE MANAGEMENT TO BE IN PLACE DURING PHASES C AND D E. DEVELOP THE MISSION IMPLEMENTATION PLAN FOR PHASE B/CID, AND E F. DEFME THE RISK MANAGEMENT PLAN AND DEVELOP MITIGATION STRATEGIES G. OUTLINE THE FABRICATION, INTEGRATION, TEST, AND OPERATION OF THE SYSTEM H. DEFINE THE EDUCATION, OUTREACH, TECHNOLOGY, AND SMALL BUSINESS DISADVANTAGED BUSINESS PLANS I. DEVELOP A PRELIMINARY PERFORMANCE ASSURANCE IMPLEMENTATION PLAN (PAIP) J. DEVELOP A PRELIMINARY SYSTEMS ENGINEERING MANAGEMENT PLAN K. DOCUMENT THE RESULTS OF THE STUDIES IN THE PHASE A CONCEPT STUDY REPORT AND L. PRESENT THE ICON CONCEPT TO THE NASA ASSOCIATE ADMINISTRATOR. |
| Aug 1, 2022 | 60 | $180.0K | PHASE A THROUGH F - ICON. THIS CONTRACT IS FOR THE UNIVERSITY OF CALIFORNIA (UCB) AT BERKELEY SPACE SCIENCES LABORATORY, THE PRIME CONTRACTUAL INTERFACE FOR NASA FOR THE IONOSPHERIC CONNECTION EXPLORER (LCON) MISSION INVESTIGATION TEAM, THAT COVERS PHASE A OF THE MISSION. THE NASA AO IS NNHIIZDA0020. UNDER THE DIRECTION OF THE PRINCIPAL INVESTIGATOR (PI) DR. THOMAS IMMEL, UCB WILL BE THE PRINCIPAL CONTRACTOR TO NASA FOR ICON. UCB SHALL CONDUCT THE PHASE A CONCEPT STUDY IN ACCORDANCE WITH THE CONCEPT STUDY GUIDELINES. IN PERFORMANCE OF THIS STUDY, THE ICON TEAM SHALL: A. CONDUCT TRADE AND RISK REDUCTION STUDIES B. UPDATE AND REFINE THE EXISTING MISSION COST ESTIMATES AND FINANCIAL PLAN C. INTEGRATE AND DELIVER TO NASA ALL SUBCONTRACTOR AND UCB FINANCIAL REPORTS D. DEVELOP PLAN FOR EARNED VALUE MANAGEMENT TO BE IN PLACE DURING PHASES C AND D E. DEVELOP THE MISSION IMPLEMENTATION PLAN FOR PHASE B/CID, AND E F. DEFME THE RISK MANAGEMENT PLAN AND DEVELOP MITIGATION STRATEGIES G. OUTLINE THE FABRICATION, INTEGRATION, TEST, AND OPERATION OF THE SYSTEM H. DEFINE THE EDUCATION, OUTREACH, TECHNOLOGY, AND SMALL BUSINESS DISADVANTAGED BUSINESS PLANS I. DEVELOP A PRELIMINARY PERFORMANCE ASSURANCE IMPLEMENTATION PLAN (PAIP) J. DEVELOP A PRELIMINARY SYSTEMS ENGINEERING MANAGEMENT PLAN K. DOCUMENT THE RESULTS OF THE STUDIES IN THE PHASE A CONCEPT STUDY REPORT AND L. PRESENT THE ICON CONCEPT TO THE NASA ASSOCIATE ADMINISTRATOR. |
| Jul 22, 2022 | 59 | $1.4M | PHASE A THROUGH F - ICON. THIS CONTRACT IS FOR THE UNIVERSITY OF CALIFORNIA (UCB) AT BERKELEY SPACE SCIENCES LABORATORY, THE PRIME CONTRACTUAL INTERFACE FOR NASA FOR THE IONOSPHERIC CONNECTION EXPLORER (LCON) MISSION INVESTIGATION TEAM, THAT COVERS PHASE A OF THE MISSION. THE NASA AO IS NNHIIZDA0020. UNDER THE DIRECTION OF THE PRINCIPAL INVESTIGATOR (PI) DR. THOMAS IMMEL, UCB WILL BE THE PRINCIPAL CONTRACTOR TO NASA FOR ICON. UCB SHALL CONDUCT THE PHASE A CONCEPT STUDY IN ACCORDANCE WITH THE CONCEPT STUDY GUIDELINES. IN PERFORMANCE OF THIS STUDY, THE ICON TEAM SHALL: A. CONDUCT TRADE AND RISK REDUCTION STUDIES B. UPDATE AND REFINE THE EXISTING MISSION COST ESTIMATES AND FINANCIAL PLAN C. INTEGRATE AND DELIVER TO NASA ALL SUBCONTRACTOR AND UCB FINANCIAL REPORTS D. DEVELOP PLAN FOR EARNED VALUE MANAGEMENT TO BE IN PLACE DURING PHASES C AND D E. DEVELOP THE MISSION IMPLEMENTATION PLAN FOR PHASE B/CID, AND E F. DEFME THE RISK MANAGEMENT PLAN AND DEVELOP MITIGATION STRATEGIES G. OUTLINE THE FABRICATION, INTEGRATION, TEST, AND OPERATION OF THE SYSTEM H. DEFINE THE EDUCATION, OUTREACH, TECHNOLOGY, AND SMALL BUSINESS DISADVANTAGED BUSINESS PLANS I. DEVELOP A PRELIMINARY PERFORMANCE ASSURANCE IMPLEMENTATION PLAN (PAIP) J. DEVELOP A PRELIMINARY SYSTEMS ENGINEERING MANAGEMENT PLAN K. DOCUMENT THE RESULTS OF THE STUDIES IN THE PHASE A CONCEPT STUDY REPORT AND L. PRESENT THE ICON CONCEPT TO THE NASA ASSOCIATE ADMINISTRATOR. |
| Jun 13, 2022 | 58 | $495.2K | PHASE A THROUGH F - ICON. THIS CONTRACT IS FOR THE UNIVERSITY OF CALIFORNIA (UCB) AT BERKELEY SPACE SCIENCES LABORATORY, THE PRIME CONTRACTUAL INTERFACE FOR NASA FOR THE IONOSPHERIC CONNECTION EXPLORER (LCON) MISSION INVESTIGATION TEAM, THAT COVERS PHASE A OF THE MISSION. THE NASA AO IS NNHIIZDA0020. UNDER THE DIRECTION OF THE PRINCIPAL INVESTIGATOR (PI) DR. THOMAS IMMEL, UCB WILL BE THE PRINCIPAL CONTRACTOR TO NASA FOR ICON. UCB SHALL CONDUCT THE PHASE A CONCEPT STUDY IN ACCORDANCE WITH THE CONCEPT STUDY GUIDELINES. IN PERFORMANCE OF THIS STUDY, THE ICON TEAM SHALL: A. CONDUCT TRADE AND RISK REDUCTION STUDIES B. UPDATE AND REFINE THE EXISTING MISSION COST ESTIMATES AND FINANCIAL PLAN C. INTEGRATE AND DELIVER TO NASA ALL SUBCONTRACTOR AND UCB FINANCIAL REPORTS D. DEVELOP PLAN FOR EARNED VALUE MANAGEMENT TO BE IN PLACE DURING PHASES C AND D E. DEVELOP THE MISSION IMPLEMENTATION PLAN FOR PHASE B/CID, AND E F. DEFME THE RISK MANAGEMENT PLAN AND DEVELOP MITIGATION STRATEGIES G. OUTLINE THE FABRICATION, INTEGRATION, TEST, AND OPERATION OF THE SYSTEM H. DEFINE THE EDUCATION, OUTREACH, TECHNOLOGY, AND SMALL BUSINESS DISADVANTAGED BUSINESS PLANS I. DEVELOP A PRELIMINARY PERFORMANCE ASSURANCE IMPLEMENTATION PLAN (PAIP) J. DEVELOP A PRELIMINARY SYSTEMS ENGINEERING MANAGEMENT PLAN K. DOCUMENT THE RESULTS OF THE STUDIES IN THE PHASE A CONCEPT STUDY REPORT AND L. PRESENT THE ICON CONCEPT TO THE NASA ASSOCIATE ADMINISTRATOR. |
| Mar 24, 2022 | 57 | $0 | PHASE A THROUGH F - ICON. THIS CONTRACT IS FOR THE UNIVERSITY OF CALIFORNIA (UCB) AT BERKELEY SPACE SCIENCES LABORATORY, THE PRIME CONTRACTUAL INTERFACE FOR NASA FOR THE IONOSPHERIC CONNECTION EXPLORER (LCON) MISSION INVESTIGATION TEAM, THAT COVERS PHASE A OF THE MISSION. THE NASA AO IS NNHIIZDA0020. UNDER THE DIRECTION OF THE PRINCIPAL INVESTIGATOR (PI) DR. THOMAS IMMEL, UCB WILL BE THE PRINCIPAL CONTRACTOR TO NASA FOR ICON. UCB SHALL CONDUCT THE PHASE A CONCEPT STUDY IN ACCORDANCE WITH THE CONCEPT STUDY GUIDELINES. IN PERFORMANCE OF THIS STUDY, THE ICON TEAM SHALL: A. CONDUCT TRADE AND RISK REDUCTION STUDIES B. UPDATE AND REFINE THE EXISTING MISSION COST ESTIMATES AND FINANCIAL PLAN C. INTEGRATE AND DELIVER TO NASA ALL SUBCONTRACTOR AND UCB FINANCIAL REPORTS D. DEVELOP PLAN FOR EARNED VALUE MANAGEMENT TO BE IN PLACE DURING PHASES C AND D E. DEVELOP THE MISSION IMPLEMENTATION PLAN FOR PHASE B/CID, AND E F. DEFME THE RISK MANAGEMENT PLAN AND DEVELOP MITIGATION STRATEGIES G. OUTLINE THE FABRICATION, INTEGRATION, TEST, AND OPERATION OF THE SYSTEM H. DEFINE THE EDUCATION, OUTREACH, TECHNOLOGY, AND SMALL BUSINESS DISADVANTAGED BUSINESS PLANS I. DEVELOP A PRELIMINARY PERFORMANCE ASSURANCE IMPLEMENTATION PLAN (PAIP) J. DEVELOP A PRELIMINARY SYSTEMS ENGINEERING MANAGEMENT PLAN K. DOCUMENT THE RESULTS OF THE STUDIES IN THE PHASE A CONCEPT STUDY REPORT AND L. PRESENT THE ICON CONCEPT TO THE NASA ASSOCIATE ADMINISTRATOR. |
| Mar 4, 2022 | 56 | $2.0M | PHASE A THROUGH F - ICON. THIS CONTRACT IS FOR THE UNIVERSITY OF CALIFORNIA (UCB) AT BERKELEY SPACE SCIENCES LABORATORY, THE PRIME CONTRACTUAL INTERFACE FOR NASA FOR THE IONOSPHERIC CONNECTION EXPLORER (LCON) MISSION INVESTIGATION TEAM, THAT COVERS PHASE A OF THE MISSION. THE NASA AO IS NNHIIZDA0020. UNDER THE DIRECTION OF THE PRINCIPAL INVESTIGATOR (PI) DR. THOMAS IMMEL, UCB WILL BE THE PRINCIPAL CONTRACTOR TO NASA FOR ICON. UCB SHALL CONDUCT THE PHASE A CONCEPT STUDY IN ACCORDANCE WITH THE CONCEPT STUDY GUIDELINES. IN PERFORMANCE OF THIS STUDY, THE ICON TEAM SHALL: A. CONDUCT TRADE AND RISK REDUCTION STUDIES B. UPDATE AND REFINE THE EXISTING MISSION COST ESTIMATES AND FINANCIAL PLAN C. INTEGRATE AND DELIVER TO NASA ALL SUBCONTRACTOR AND UCB FINANCIAL REPORTS D. DEVELOP PLAN FOR EARNED VALUE MANAGEMENT TO BE IN PLACE DURING PHASES C AND D E. DEVELOP THE MISSION IMPLEMENTATION PLAN FOR PHASE B/CID, AND E F. DEFME THE RISK MANAGEMENT PLAN AND DEVELOP MITIGATION STRATEGIES G. OUTLINE THE FABRICATION, INTEGRATION, TEST, AND OPERATION OF THE SYSTEM H. DEFINE THE EDUCATION, OUTREACH, TECHNOLOGY, AND SMALL BUSINESS DISADVANTAGED BUSINESS PLANS I. DEVELOP A PRELIMINARY PERFORMANCE ASSURANCE IMPLEMENTATION PLAN (PAIP) J. DEVELOP A PRELIMINARY SYSTEMS ENGINEERING MANAGEMENT PLAN K. DOCUMENT THE RESULTS OF THE STUDIES IN THE PHASE A CONCEPT STUDY REPORT AND L. PRESENT THE ICON CONCEPT TO THE NASA ASSOCIATE ADMINISTRATOR. |
| Nov 18, 2021 | 55 | $0 | PHASE A THROUGH F - ICON. THIS CONTRACT IS FOR THE UNIVERSITY OF CALIFORNIA (UCB) AT BERKELEY SPACE SCIENCES LABORATORY, THE PRIME CONTRACTUAL INTERFACE FOR NASA FOR THE IONOSPHERIC CONNECTION EXPLORER (LCON) MISSION INVESTIGATION TEAM, THAT COVERS PHASE A OF THE MISSION. THE NASA AO IS NNHIIZDA0020. UNDER THE DIRECTION OF THE PRINCIPAL INVESTIGATOR (PI) DR. THOMAS IMMEL, UCB WILL BE THE PRINCIPAL CONTRACTOR TO NASA FOR ICON. UCB SHALL CONDUCT THE PHASE A CONCEPT STUDY IN ACCORDANCE WITH THE CONCEPT STUDY GUIDELINES. IN PERFORMANCE OF THIS STUDY, THE ICON TEAM SHALL: A. CONDUCT TRADE AND RISK REDUCTION STUDIES B. UPDATE AND REFINE THE EXISTING MISSION COST ESTIMATES AND FINANCIAL PLAN C. INTEGRATE AND DELIVER TO NASA ALL SUBCONTRACTOR AND UCB FINANCIAL REPORTS D. DEVELOP PLAN FOR EARNED VALUE MANAGEMENT TO BE IN PLACE DURING PHASES C AND D E. DEVELOP THE MISSION IMPLEMENTATION PLAN FOR PHASE B/CID, AND E F. DEFME THE RISK MANAGEMENT PLAN AND DEVELOP MITIGATION STRATEGIES G. OUTLINE THE FABRICATION, INTEGRATION, TEST, AND OPERATION OF THE SYSTEM H. DEFINE THE EDUCATION, OUTREACH, TECHNOLOGY, AND SMALL BUSINESS DISADVANTAGED BUSINESS PLANS I. DEVELOP A PRELIMINARY PERFORMANCE ASSURANCE IMPLEMENTATION PLAN (PAIP) J. DEVELOP A PRELIMINARY SYSTEMS ENGINEERING MANAGEMENT PLAN K. DOCUMENT THE RESULTS OF THE STUDIES IN THE PHASE A CONCEPT STUDY REPORT AND L. PRESENT THE ICON CONCEPT TO THE NASA ASSOCIATE ADMINISTRATOR. |
| Oct 18, 2021 | 54 | $0 | EO14042 PHASE A THROUGH F - ICON. THIS CONTRACT IS FOR THE UNIVERSITY OF CALIFORNIA (UCB) AT BERKELEY SPACE SCIENCES LABORATORY, THE PRIME CONTRACTUAL INTERFACE FOR NASA FOR THE IONOSPHERIC CONNECTION EXPLORER (LCON) MISSION INVESTIGATION TEAM, THAT COVERS PHASE A OF THE MISSION. THE NASA AO IS NNHIIZDA0020. UNDER THE DIRECTION OF THE PRINCIPAL INVESTIGATOR (PI) DR. THOMAS IMMEL, UCB WILL BE THE PRINCIPAL CONTRACTOR TO NASA FOR ICON. UCB SHALL CONDUCT THE PHASE A CONCEPT STUDY IN ACCORDANCE WITH THE CONCEPT STUDY GUIDELINES. IN PERFORMANCE OF THIS STUDY, THE ICON TEAM SHALL: A. CONDUCT TRADE AND RISK REDUCTION STUDIES B. UPDATE AND REFINE THE EXISTING MISSION COST ESTIMATES AND FINANCIAL PLAN C. INTEGRATE AND DELIVER TO NASA ALL SUBCONTRACTOR AND UCB FINANCIAL REPORTS D. DEVELOP PLAN FOR EARNED VALUE MANAGEMENT TO BE IN PLACE DURING PHASES C AND D E. DEVELOP THE MISSION IMPLEMENTATION PLAN FOR PHASE B/CID, AND E F. DEFME THE RISK MANAGEMENT PLAN AND DEVELOP MITIGATION STRATEGIES G. OUTLINE THE FABRICATION, INTEGRATION, TEST, AND OPERATION OF THE SYSTEM H. DEFINE THE EDUCATION, OUTREACH, TECHNOLOGY, AND SMALL BUSINESS DISADVANTAGED BUSINESS PLANS I. DEVELOP A PRELIMINARY PERFORMANCE ASSURANCE IMPLEMENTATION PLAN (PAIP) J. DEVELOP A PRELIMINARY SYSTEMS ENGINEERING MANAGEMENT PLAN K. DOCUMENT THE RESULTS OF THE STUDIES IN THE PHASE A CONCEPT STUDY REPORT AND L. PRESENT THE ICON CONCEPT TO THE NASA ASSOCIATE ADMINISTRATOR. |
| Sep 30, 2021 | 53 | $2.0M | PHASE A THROUGH F - ICON. THIS CONTRACT IS FOR THE UNIVERSITY OF CALIFORNIA (UCB) AT BERKELEY SPACE SCIENCES LABORATORY, THE PRIME CONTRACTUAL INTERFACE FOR NASA FOR THE IONOSPHERIC CONNECTION EXPLORER (LCON) MISSION INVESTIGATION TEAM, THAT COVERS PHASE A OF THE MISSION. THE NASA AO IS NNHIIZDA0020. UNDER THE DIRECTION OF THE PRINCIPAL INVESTIGATOR (PI) DR. THOMAS IMMEL, UCB WILL BE THE PRINCIPAL CONTRACTOR TO NASA FOR ICON. UCB SHALL CONDUCT THE PHASE A CONCEPT STUDY IN ACCORDANCE WITH THE CONCEPT STUDY GUIDELINES. IN PERFORMANCE OF THIS STUDY, THE ICON TEAM SHALL: A. CONDUCT TRADE AND RISK REDUCTION STUDIES B. UPDATE AND REFINE THE EXISTING MISSION COST ESTIMATES AND FINANCIAL PLAN C. INTEGRATE AND DELIVER TO NASA ALL SUBCONTRACTOR AND UCB FINANCIAL REPORTS D. DEVELOP PLAN FOR EARNED VALUE MANAGEMENT TO BE IN PLACE DURING PHASES C AND D E. DEVELOP THE MISSION IMPLEMENTATION PLAN FOR PHASE B/CID, AND E F. DEFME THE RISK MANAGEMENT PLAN AND DEVELOP MITIGATION STRATEGIES G. OUTLINE THE FABRICATION, INTEGRATION, TEST, AND OPERATION OF THE SYSTEM H. DEFINE THE EDUCATION, OUTREACH, TECHNOLOGY, AND SMALL BUSINESS DISADVANTAGED BUSINESS PLANS I. DEVELOP A PRELIMINARY PERFORMANCE ASSURANCE IMPLEMENTATION PLAN (PAIP) J. DEVELOP A PRELIMINARY SYSTEMS ENGINEERING MANAGEMENT PLAN K. DOCUMENT THE RESULTS OF THE STUDIES IN THE PHASE A CONCEPT STUDY REPORT AND L. PRESENT THE ICON CONCEPT TO THE NASA ASSOCIATE ADMINISTRATOR. |
| Jul 30, 2021 | 52 | $339.7K | PHASE A THROUGH F - ICON. THIS CONTRACT IS FOR THE UNIVERSITY OF CALIFORNIA (UCB) AT BERKELEY SPACE SCIENCES LABORATORY, THE PRIME CONTRACTUAL INTERFACE FOR NASA FOR THE IONOSPHERIC CONNECTION EXPLORER (LCON) MISSION INVESTIGATION TEAM, THAT COVERS PHASE A OF THE MISSION. THE NASA AO IS NNHIIZDA0020. UNDER THE DIRECTION OF THE PRINCIPAL INVESTIGATOR (PI) DR. THOMAS IMMEL, UCB WILL BE THE PRINCIPAL CONTRACTOR TO NASA FOR ICON. UCB SHALL CONDUCT THE PHASE A CONCEPT STUDY IN ACCORDANCE WITH THE CONCEPT STUDY GUIDELINES. IN PERFORMANCE OF THIS STUDY, THE ICON TEAM SHALL: A. CONDUCT TRADE AND RISK REDUCTION STUDIES B. UPDATE AND REFINE THE EXISTING MISSION COST ESTIMATES AND FINANCIAL PLAN C. INTEGRATE AND DELIVER TO NASA ALL SUBCONTRACTOR AND UCB FINANCIAL REPORTS D. DEVELOP PLAN FOR EARNED VALUE MANAGEMENT TO BE IN PLACE DURING PHASES C AND D E. DEVELOP THE MISSION IMPLEMENTATION PLAN FOR PHASE B/CID, AND E F. DEFME THE RISK MANAGEMENT PLAN AND DEVELOP MITIGATION STRATEGIES G. OUTLINE THE FABRICATION, INTEGRATION, TEST, AND OPERATION OF THE SYSTEM H. DEFINE THE EDUCATION, OUTREACH, TECHNOLOGY, AND SMALL BUSINESS DISADVANTAGED BUSINESS PLANS I. DEVELOP A PRELIMINARY PERFORMANCE ASSURANCE IMPLEMENTATION PLAN (PAIP) J. DEVELOP A PRELIMINARY SYSTEMS ENGINEERING MANAGEMENT PLAN K. DOCUMENT THE RESULTS OF THE STUDIES IN THE PHASE A CONCEPT STUDY REPORT AND L. PRESENT THE ICON CONCEPT TO THE NASA ASSOCIATE ADMINISTRATOR. |
| May 26, 2021 | 51 | $0 | PHASE A THROUGH F - ICON. THIS CONTRACT IS FOR THE UNIVERSITY OF CALIFORNIA (UCB) AT BERKELEY SPACE SCIENCES LABORATORY, THE PRIME CONTRACTUAL INTERFACE FOR NASA FOR THE IONOSPHERIC CONNECTION EXPLORER (LCON) MISSION INVESTIGATION TEAM, THAT COVERS PHASE A OF THE MISSION. THE NASA AO IS NNHIIZDA0020. UNDER THE DIRECTION OF THE PRINCIPAL INVESTIGATOR (PI) DR. THOMAS IMMEL, UCB WILL BE THE PRINCIPAL CONTRACTOR TO NASA FOR ICON. UCB SHALL CONDUCT THE PHASE A CONCEPT STUDY IN ACCORDANCE WITH THE CONCEPT STUDY GUIDELINES. IN PERFORMANCE OF THIS STUDY, THE ICON TEAM SHALL: A. CONDUCT TRADE AND RISK REDUCTION STUDIES B. UPDATE AND REFINE THE EXISTING MISSION COST ESTIMATES AND FINANCIAL PLAN C. INTEGRATE AND DELIVER TO NASA ALL SUBCONTRACTOR AND UCB FINANCIAL REPORTS D. DEVELOP PLAN FOR EARNED VALUE MANAGEMENT TO BE IN PLACE DURING PHASES C AND D E. DEVELOP THE MISSION IMPLEMENTATION PLAN FOR PHASE B/CID, AND E F. DEFME THE RISK MANAGEMENT PLAN AND DEVELOP MITIGATION STRATEGIES G. OUTLINE THE FABRICATION, INTEGRATION, TEST, AND OPERATION OF THE SYSTEM H. DEFINE THE EDUCATION, OUTREACH, TECHNOLOGY, AND SMALL BUSINESS DISADVANTAGED BUSINESS PLANS I. DEVELOP A PRELIMINARY PERFORMANCE ASSURANCE IMPLEMENTATION PLAN (PAIP) J. DEVELOP A PRELIMINARY SYSTEMS ENGINEERING MANAGEMENT PLAN K. DOCUMENT THE RESULTS OF THE STUDIES IN THE PHASE A CONCEPT STUDY REPORT AND L. PRESENT THE ICON CONCEPT TO THE NASA ASSOCIATE ADMINISTRATOR. |
| Feb 2, 2021 | 50 | $1.6M | PHASE A THROUGH F - ICON. THIS CONTRACT IS FOR THE UNIVERSITY OF CALIFORNIA (UCB) AT BERKELEY SPACE SCIENCES LABORATORY, THE PRIME CONTRACTUAL INTERFACE FOR NASA FOR THE IONOSPHERIC CONNECTION EXPLORER (LCON) MISSION INVESTIGATION TEAM, THAT COVERS PHASE A OF THE MISSION. THE NASA AO IS NNHIIZDA0020. UNDER THE DIRECTION OF THE PRINCIPAL INVESTIGATOR (PI) DR. THOMAS IMMEL, UCB WILL BE THE PRINCIPAL CONTRACTOR TO NASA FOR ICON. UCB SHALL CONDUCT THE PHASE A CONCEPT STUDY IN ACCORDANCE WITH THE CONCEPT STUDY GUIDELINES. IN PERFORMANCE OF THIS STUDY, THE ICON TEAM SHALL: A. CONDUCT TRADE AND RISK REDUCTION STUDIES B. UPDATE AND REFINE THE EXISTING MISSION COST ESTIMATES AND FINANCIAL PLAN C. INTEGRATE AND DELIVER TO NASA ALL SUBCONTRACTOR AND UCB FINANCIAL REPORTS D. DEVELOP PLAN FOR EARNED VALUE MANAGEMENT TO BE IN PLACE DURING PHASES C AND D E. DEVELOP THE MISSION IMPLEMENTATION PLAN FOR PHASE B/CID, AND E F. DEFME THE RISK MANAGEMENT PLAN AND DEVELOP MITIGATION STRATEGIES G. OUTLINE THE FABRICATION, INTEGRATION, TEST, AND OPERATION OF THE SYSTEM H. DEFINE THE EDUCATION, OUTREACH, TECHNOLOGY, AND SMALL BUSINESS DISADVANTAGED BUSINESS PLANS I. DEVELOP A PRELIMINARY PERFORMANCE ASSURANCE IMPLEMENTATION PLAN (PAIP) J. DEVELOP A PRELIMINARY SYSTEMS ENGINEERING MANAGEMENT PLAN K. DOCUMENT THE RESULTS OF THE STUDIES IN THE PHASE A CONCEPT STUDY REPORT AND L. PRESENT THE ICON CONCEPT TO THE NASA ASSOCIATE ADMINISTRATOR. |
| Feb 1, 2021 | 49 | $0 | PHASE A THROUGH F - ICON. THIS CONTRACT IS FOR THE UNIVERSITY OF CALIFORNIA (UCB) AT BERKELEY SPACE SCIENCES LABORATORY, THE PRIME CONTRACTUAL INTERFACE FOR NASA FOR THE IONOSPHERIC CONNECTION EXPLORER (LCON) MISSION INVESTIGATION TEAM, THAT COVERS PHASE A OF THE MISSION. THE NASA AO IS NNHIIZDA0020. UNDER THE DIRECTION OF THE PRINCIPAL INVESTIGATOR (PI) DR. THOMAS IMMEL, UCB WILL BE THE PRINCIPAL CONTRACTOR TO NASA FOR ICON. UCB SHALL CONDUCT THE PHASE A CONCEPT STUDY IN ACCORDANCE WITH THE CONCEPT STUDY GUIDELINES. IN PERFORMANCE OF THIS STUDY, THE ICON TEAM SHALL: A. CONDUCT TRADE AND RISK REDUCTION STUDIES B. UPDATE AND REFINE THE EXISTING MISSION COST ESTIMATES AND FINANCIAL PLAN C. INTEGRATE AND DELIVER TO NASA ALL SUBCONTRACTOR AND UCB FINANCIAL REPORTS D. DEVELOP PLAN FOR EARNED VALUE MANAGEMENT TO BE IN PLACE DURING PHASES C AND D E. DEVELOP THE MISSION IMPLEMENTATION PLAN FOR PHASE B/CID, AND E F. DEFME THE RISK MANAGEMENT PLAN AND DEVELOP MITIGATION STRATEGIES G. OUTLINE THE FABRICATION, INTEGRATION, TEST, AND OPERATION OF THE SYSTEM H. DEFINE THE EDUCATION, OUTREACH, TECHNOLOGY, AND SMALL BUSINESS DISADVANTAGED BUSINESS PLANS I. DEVELOP A PRELIMINARY PERFORMANCE ASSURANCE IMPLEMENTATION PLAN (PAIP) J. DEVELOP A PRELIMINARY SYSTEMS ENGINEERING MANAGEMENT PLAN K. DOCUMENT THE RESULTS OF THE STUDIES IN THE PHASE A CONCEPT STUDY REPORT AND L. PRESENT THE ICON CONCEPT TO THE NASA ASSOCIATE ADMINISTRATOR. |
| Sep 25, 2020 | 48 | $14.4K | PHASE A THROUGH F - ICON. THIS CONTRACT IS FOR THE UNIVERSITY OF CALIFORNIA (UCB) AT BERKELEY SPACE SCIENCES LABORATORY, THE PRIME CONTRACTUAL INTERFACE FOR NASA FOR THE IONOSPHERIC CONNECTION EXPLORER (LCON) MISSION INVESTIGATION TEAM, THAT COVERS PHASE A OF THE MISSION. THE NASA AO IS NNHIIZDA0020. UNDER THE DIRECTION OF THE PRINCIPAL INVESTIGATOR (PI) DR. THOMAS IMMEL, UCB WILL BE THE PRINCIPAL CONTRACTOR TO NASA FOR ICON. UCB SHALL CONDUCT THE PHASE A CONCEPT STUDY IN ACCORDANCE WITH THE CONCEPT STUDY GUIDELINES. IN PERFORMANCE OF THIS STUDY, THE ICON TEAM SHALL: A. CONDUCT TRADE AND RISK REDUCTION STUDIES B. UPDATE AND REFINE THE EXISTING MISSION COST ESTIMATES AND FINANCIAL PLAN C. INTEGRATE AND DELIVER TO NASA ALL SUBCONTRACTOR AND UCB FINANCIAL REPORTS D. DEVELOP PLAN FOR EARNED VALUE MANAGEMENT TO BE IN PLACE DURING PHASES C AND D E. DEVELOP THE MISSION IMPLEMENTATION PLAN FOR PHASE B/CID, AND E F. DEFME THE RISK MANAGEMENT PLAN AND DEVELOP MITIGATION STRATEGIES G. OUTLINE THE FABRICATION, INTEGRATION, TEST, AND OPERATION OF THE SYSTEM H. DEFINE THE EDUCATION, OUTREACH, TECHNOLOGY, AND SMALL BUSINESS DISADVANTAGED BUSINESS PLANS I. DEVELOP A PRELIMINARY PERFORMANCE ASSURANCE IMPLEMENTATION PLAN (PAIP) J. DEVELOP A PRELIMINARY SYSTEMS ENGINEERING MANAGEMENT PLAN K. DOCUMENT THE RESULTS OF THE STUDIES IN THE PHASE A CONCEPT STUDY REPORT AND L. PRESENT THE ICON CONCEPT TO THE NASA ASSOCIATE ADMINISTRATOR. |
| Aug 27, 2020 | 47 | $2.1M | PHASE A THROUGH F - ICON. THIS CONTRACT IS FOR THE UNIVERSITY OF CALIFORNIA (UCB) AT BERKELEY SPACE SCIENCES LABORATORY, THE PRIME CONTRACTUAL INTERFACE FOR NASA FOR THE IONOSPHERIC CONNECTION EXPLORER (LCON) MISSION INVESTIGATION TEAM, THAT COVERS PHASE A OF THE MISSION. THE NASA AO IS NNHIIZDA0020. UNDER THE DIRECTION OF THE PRINCIPAL INVESTIGATOR (PI) DR. THOMAS IMMEL, UCB WILL BE THE PRINCIPAL CONTRACTOR TO NASA FOR ICON. UCB SHALL CONDUCT THE PHASE A CONCEPT STUDY IN ACCORDANCE WITH THE CONCEPT STUDY GUIDELINES. IN PERFORMANCE OF THIS STUDY, THE ICON TEAM SHALL: A. CONDUCT TRADE AND RISK REDUCTION STUDIES B. UPDATE AND REFINE THE EXISTING MISSION COST ESTIMATES AND FINANCIAL PLAN C. INTEGRATE AND DELIVER TO NASA ALL SUBCONTRACTOR AND UCB FINANCIAL REPORTS D. DEVELOP PLAN FOR EARNED VALUE MANAGEMENT TO BE IN PLACE DURING PHASES C AND D E. DEVELOP THE MISSION IMPLEMENTATION PLAN FOR PHASE B/CID, AND E F. DEFME THE RISK MANAGEMENT PLAN AND DEVELOP MITIGATION STRATEGIES G. OUTLINE THE FABRICATION, INTEGRATION, TEST, AND OPERATION OF THE SYSTEM H. DEFINE THE EDUCATION, OUTREACH, TECHNOLOGY, AND SMALL BUSINESS DISADVANTAGED BUSINESS PLANS I. DEVELOP A PRELIMINARY PERFORMANCE ASSURANCE IMPLEMENTATION PLAN (PAIP) J. DEVELOP A PRELIMINARY SYSTEMS ENGINEERING MANAGEMENT PLAN K. DOCUMENT THE RESULTS OF THE STUDIES IN THE PHASE A CONCEPT STUDY REPORT AND L. PRESENT THE ICON CONCEPT TO THE NASA ASSOCIATE ADMINISTRATOR. |
| Jul 31, 2020 | 46 | $0 | PHASE A THROUGH F - ICON. THIS CONTRACT IS FOR THE UNIVERSITY OF CALIFORNIA (UCB) AT BERKELEY SPACE SCIENCES LABORATORY, THE PRIME CONTRACTUAL INTERFACE FOR NASA FOR THE IONOSPHERIC CONNECTION EXPLORER (LCON) MISSION INVESTIGATION TEAM, THAT COVERS PHASE A OF THE MISSION. THE NASA AO IS NNHIIZDA0020. UNDER THE DIRECTION OF THE PRINCIPAL INVESTIGATOR (PI) DR. THOMAS IMMEL, UCB WILL BE THE PRINCIPAL CONTRACTOR TO NASA FOR ICON. UCB SHALL CONDUCT THE PHASE A CONCEPT STUDY IN ACCORDANCE WITH THE CONCEPT STUDY GUIDELINES. IN PERFORMANCE OF THIS STUDY, THE ICON TEAM SHALL: A. CONDUCT TRADE AND RISK REDUCTION STUDIES B. UPDATE AND REFINE THE EXISTING MISSION COST ESTIMATES AND FINANCIAL PLAN C. INTEGRATE AND DELIVER TO NASA ALL SUBCONTRACTOR AND UCB FINANCIAL REPORTS D. DEVELOP PLAN FOR EARNED VALUE MANAGEMENT TO BE IN PLACE DURING PHASES C AND D E. DEVELOP THE MISSION IMPLEMENTATION PLAN FOR PHASE B/CID, AND E F. DEFME THE RISK MANAGEMENT PLAN AND DEVELOP MITIGATION STRATEGIES G. OUTLINE THE FABRICATION, INTEGRATION, TEST, AND OPERATION OF THE SYSTEM H. DEFINE THE EDUCATION, OUTREACH, TECHNOLOGY, AND SMALL BUSINESS DISADVANTAGED BUSINESS PLANS I. DEVELOP A PRELIMINARY PERFORMANCE ASSURANCE IMPLEMENTATION PLAN (PAIP) J. DEVELOP A PRELIMINARY SYSTEMS ENGINEERING MANAGEMENT PLAN K. DOCUMENT THE RESULTS OF THE STUDIES IN THE PHASE A CONCEPT STUDY REPORT AND L. PRESENT THE ICON CONCEPT TO THE NASA ASSOCIATE ADMINISTRATOR. |
| Jan 6, 2020 | 45 | $0 | PHASE A THROUGH F - ICON. THIS CONTRACT IS FOR THE UNIVERSITY OF CALIFORNIA (UCB) AT BERKELEY SPACE SCIENCES LABORATORY, THE PRIME CONTRACTUAL INTERFACE FOR NASA FOR THE IONOSPHERIC CONNECTION EXPLORER (LCON) MISSION INVESTIGATION TEAM, THAT COVERS PHASE A OF THE MISSION. THE NASA AO IS NNHIIZDA0020. UNDER THE DIRECTION OF THE PRINCIPAL INVESTIGATOR (PI) DR. THOMAS IMMEL, UCB WILL BE THE PRINCIPAL CONTRACTOR TO NASA FOR ICON. UCB SHALL CONDUCT THE PHASE A CONCEPT STUDY IN ACCORDANCE WITH THE CONCEPT STUDY GUIDELINES. IN PERFORMANCE OF THIS STUDY, THE ICON TEAM SHALL: A. CONDUCT TRADE AND RISK REDUCTION STUDIES B. UPDATE AND REFINE THE EXISTING MISSION COST ESTIMATES AND FINANCIAL PLAN C. INTEGRATE AND DELIVER TO NASA ALL SUBCONTRACTOR AND UCB FINANCIAL REPORTS D. DEVELOP PLAN FOR EARNED VALUE MANAGEMENT TO BE IN PLACE DURING PHASES C AND D E. DEVELOP THE MISSION IMPLEMENTATION PLAN FOR PHASE B/CID, AND E F. DEFME THE RISK MANAGEMENT PLAN AND DEVELOP MITIGATION STRATEGIES G. OUTLINE THE FABRICATION, INTEGRATION, TEST, AND OPERATION OF THE SYSTEM H. DEFINE THE EDUCATION, OUTREACH, TECHNOLOGY, AND SMALL BUSINESS DISADVANTAGED BUSINESS PLANS I. DEVELOP A PRELIMINARY PERFORMANCE ASSURANCE IMPLEMENTATION PLAN (PAIP) J. DEVELOP A PRELIMINARY SYSTEMS ENGINEERING MANAGEMENT PLAN K. DOCUMENT THE RESULTS OF THE STUDIES IN THE PHASE A CONCEPT STUDY REPORT AND L. PRESENT THE ICON CONCEPT TO THE NASA ASSOCIATE ADMINISTRATOR. |
| Nov 26, 2019 | 44 | $4.8M | PHASE A THROUGH F - ICON. THIS CONTRACT IS FOR THE UNIVERSITY OF CALIFORNIA (UCB) AT BERKELEY SPACE SCIENCES LABORATORY, THE PRIME CONTRACTUAL INTERFACE FOR NASA FOR THE IONOSPHERIC CONNECTION EXPLORER (LCON) MISSION INVESTIGATION TEAM, THAT COVERS PHASE A OF THE MISSION. THE NASA AO IS NNHIIZDA0020. UNDER THE DIRECTION OF THE PRINCIPAL INVESTIGATOR (PI) DR. THOMAS IMMEL, UCB WILL BE THE PRINCIPAL CONTRACTOR TO NASA FOR ICON. UCB SHALL CONDUCT THE PHASE A CONCEPT STUDY IN ACCORDANCE WITH THE CONCEPT STUDY GUIDELINES. IN PERFORMANCE OF THIS STUDY, THE ICON TEAM SHALL: A. CONDUCT TRADE AND RISK REDUCTION STUDIES B. UPDATE AND REFINE THE EXISTING MISSION COST ESTIMATES AND FINANCIAL PLAN C. INTEGRATE AND DELIVER TO NASA ALL SUBCONTRACTOR AND UCB FINANCIAL REPORTS D. DEVELOP PLAN FOR EARNED VALUE MANAGEMENT TO BE IN PLACE DURING PHASES C AND D E. DEVELOP THE MISSION IMPLEMENTATION PLAN FOR PHASE B/CID, AND E F. DEFME THE RISK MANAGEMENT PLAN AND DEVELOP MITIGATION STRATEGIES G. OUTLINE THE FABRICATION, INTEGRATION, TEST, AND OPERATION OF THE SYSTEM H. DEFINE THE EDUCATION, OUTREACH, TECHNOLOGY, AND SMALL BUSINESS DISADVANTAGED BUSINESS PLANS I. DEVELOP A PRELIMINARY PERFORMANCE ASSURANCE IMPLEMENTATION PLAN (PAIP) J. DEVELOP A PRELIMINARY SYSTEMS ENGINEERING MANAGEMENT PLAN K. DOCUMENT THE RESULTS OF THE STUDIES IN THE PHASE A CONCEPT STUDY REPORT AND L. PRESENT THE ICON CONCEPT TO THE NASA ASSOCIATE ADMINISTRATOR. |
| Oct 31, 2019 | 43 | $1.0M | PHASE A THROUGH F - ICON. THIS CONTRACT IS FOR THE UNIVERSITY OF CALIFORNIA (UCB) AT BERKELEY SPACE SCIENCES LABORATORY, THE PRIME CONTRACTUAL INTERFACE FOR NASA FOR THE IONOSPHERIC CONNECTION EXPLORER (LCON) MISSION INVESTIGATION TEAM, THAT COVERS PHASE A OF THE MISSION. THE NASA AO IS NNHIIZDA0020. UNDER THE DIRECTION OF THE PRINCIPAL INVESTIGATOR (PI) DR. THOMAS IMMEL, UCB WILL BE THE PRINCIPAL CONTRACTOR TO NASA FOR ICON. UCB SHALL CONDUCT THE PHASE A CONCEPT STUDY IN ACCORDANCE WITH THE CONCEPT STUDY GUIDELINES. IN PERFORMANCE OF THIS STUDY, THE ICON TEAM SHALL: A. CONDUCT TRADE AND RISK REDUCTION STUDIES B. UPDATE AND REFINE THE EXISTING MISSION COST ESTIMATES AND FINANCIAL PLAN C. INTEGRATE AND DELIVER TO NASA ALL SUBCONTRACTOR AND UCB FINANCIAL REPORTS D. DEVELOP PLAN FOR EARNED VALUE MANAGEMENT TO BE IN PLACE DURING PHASES C AND D E. DEVELOP THE MISSION IMPLEMENTATION PLAN FOR PHASE B/CID, AND E F. DEFME THE RISK MANAGEMENT PLAN AND DEVELOP MITIGATION STRATEGIES G. OUTLINE THE FABRICATION, INTEGRATION, TEST, AND OPERATION OF THE SYSTEM H. DEFINE THE EDUCATION, OUTREACH, TECHNOLOGY, AND SMALL BUSINESS DISADVANTAGED BUSINESS PLANS I. DEVELOP A PRELIMINARY PERFORMANCE ASSURANCE IMPLEMENTATION PLAN (PAIP) J. DEVELOP A PRELIMINARY SYSTEMS ENGINEERING MANAGEMENT PLAN K. DOCUMENT THE RESULTS OF THE STUDIES IN THE PHASE A CONCEPT STUDY REPORT AND L. PRESENT THE ICON CONCEPT TO THE NASA ASSOCIATE ADMINISTRATOR. |
| Oct 22, 2019 | 42 | $0 | PHASE A THROUGH F - ICON. THIS CONTRACT IS FOR THE UNIVERSITY OF CALIFORNIA (UCB) AT BERKELEY SPACE SCIENCES LABORATORY, THE PRIME CONTRACTUAL INTERFACE FOR NASA FOR THE IONOSPHERIC CONNECTION EXPLORER (LCON) MISSION INVESTIGATION TEAM, THAT COVERS PHASE A OF THE MISSION. THE NASA AO IS NNHIIZDA0020. UNDER THE DIRECTION OF THE PRINCIPAL INVESTIGATOR (PI) DR. THOMAS IMMEL, UCB WILL BE THE PRINCIPAL CONTRACTOR TO NASA FOR ICON. UCB SHALL CONDUCT THE PHASE A CONCEPT STUDY IN ACCORDANCE WITH THE CONCEPT STUDY GUIDELINES. IN PERFORMANCE OF THIS STUDY, THE ICON TEAM SHALL: A. CONDUCT TRADE AND RISK REDUCTION STUDIES; B. UPDATE AND REFINE THE EXISTING MISSION COST ESTIMATES AND FINANCIAL PLAN; C. INTEGRATE AND DELIVER TO NASA ALL SUBCONTRACTOR AND UCB FINANCIAL REPORTS; D. DEVELOP PLAN FOR EARNED VALUE MANAGEMENT TO BE IN PLACE DURING PHASES C AND D; E. DEVELOP THE MISSION IMPLEMENTATION PLAN FOR PHASE B/CID, AND E; F. DEFME THE RISK MANAGEMENT PLAN AND DEVELOP MITIGATION STRATEGIES; G. OUTLINE THE FABRICATION, INTEGRATION, TEST, AND OPERATION OF THE SYSTEM; H. DEFINE THE EDUCATION, OUTREACH, TECHNOLOGY, AND SMALL BUSINESS DISADVANTAGED BUSINESS PLANS; I. DEVELOP A PRELIMINARY PERFORMANCE ASSURANCE IMPLEMENTATION PLAN (PAIP); J. DEVELOP A PRELIMINARY SYSTEMS ENGINEERING MANAGEMENT PLAN; K. DOCUMENT THE RESULTS OF THE STUDIES IN THE PHASE A CONCEPT STUDY REPORT; AND L. PRESENT THE ICON CONCEPT TO THE NASA ASSOCIATE ADMINISTRATOR. |
| May 2, 2019 | 41 | $3.0M | PHASE A THROUGH F - ICON. THIS CONTRACT IS FOR THE UNIVERSITY OF CALIFORNIA (UCB) AT BERKELEY SPACE SCIENCES LABORATORY, THE PRIME CONTRACTUAL INTERFACE FOR NASA FOR THE IONOSPHERIC CONNECTION EXPLORER (LCON) MISSION INVESTIGATION TEAM, THAT COVERS PHASE A OF THE MISSION. THE NASA AO IS NNHIIZDA0020. UNDER THE DIRECTION OF THE PRINCIPAL INVESTIGATOR (PI) DR. THOMAS IMMEL, UCB WILL BE THE PRINCIPAL CONTRACTOR TO NASA FOR ICON. UCB SHALL CONDUCT THE PHASE A CONCEPT STUDY IN ACCORDANCE WITH THE CONCEPT STUDY GUIDELINES. IN PERFORMANCE OF THIS STUDY, THE ICON TEAM SHALL: A. CONDUCT TRADE AND RISK REDUCTION STUDIES; B. UPDATE AND REFINE THE EXISTING MISSION COST ESTIMATES AND FINANCIAL PLAN; C. INTEGRATE AND DELIVER TO NASA ALL SUBCONTRACTOR AND UCB FINANCIAL REPORTS; D. DEVELOP PLAN FOR EARNED VALUE MANAGEMENT TO BE IN PLACE DURING PHASES C AND D; E. DEVELOP THE MISSION IMPLEMENTATION PLAN FOR PHASE B/CID, AND E; F. DEFME THE RISK MANAGEMENT PLAN AND DEVELOP MITIGATION STRATEGIES; G. OUTLINE THE FABRICATION, INTEGRATION, TEST, AND OPERATION OF THE SYSTEM; H. DEFINE THE EDUCATION, OUTREACH, TECHNOLOGY, AND SMALL BUSINESS DISADVANTAGED BUSINESS PLANS; I. DEVELOP A PRELIMINARY PERFORMANCE ASSURANCE IMPLEMENTATION PLAN (PAIP); J. DEVELOP A PRELIMINARY SYSTEMS ENGINEERING MANAGEMENT PLAN; K. DOCUMENT THE RESULTS OF THE STUDIES IN THE PHASE A CONCEPT STUDY REPORT; AND L. PRESENT THE ICON CONCEPT TO THE NASA ASSOCIATE ADMINISTRATOR. |
| Feb 1, 2019 | 40 | $2.4M | PHASE A THROUGH F - ICON. THIS CONTRACT IS FOR THE UNIVERSITY OF CALIFORNIA (UCB) AT BERKELEY SPACE SCIENCES LABORATORY, THE PRIME CONTRACTUAL INTERFACE FOR NASA FOR THE IONOSPHERIC CONNECTION EXPLORER (LCON) MISSION INVESTIGATION TEAM, THAT COVERS PHASE A OF THE MISSION. THE NASA AO IS NNHIIZDA0020. UNDER THE DIRECTION OF THE PRINCIPAL INVESTIGATOR (PI) DR. THOMAS IMMEL, UCB WILL BE THE PRINCIPAL CONTRACTOR TO NASA FOR ICON. UCB SHALL CONDUCT THE PHASE A CONCEPT STUDY IN ACCORDANCE WITH THE CONCEPT STUDY GUIDELINES. IN PERFORMANCE OF THIS STUDY, THE ICON TEAM SHALL: A. CONDUCT TRADE AND RISK REDUCTION STUDIES; B. UPDATE AND REFINE THE EXISTING MISSION COST ESTIMATES AND FINANCIAL PLAN; C. INTEGRATE AND DELIVER TO NASA ALL SUBCONTRACTOR AND UCB FINANCIAL REPORTS; D. DEVELOP PLAN FOR EARNED VALUE MANAGEMENT TO BE IN PLACE DURING PHASES C AND D; E. DEVELOP THE MISSION IMPLEMENTATION PLAN FOR PHASE B/CID, AND E; F. DEFME THE RISK MANAGEMENT PLAN AND DEVELOP MITIGATION STRATEGIES; G. OUTLINE THE FABRICATION, INTEGRATION, TEST, AND OPERATION OF THE SYSTEM; H. DEFINE THE EDUCATION, OUTREACH, TECHNOLOGY, AND SMALL BUSINESS DISADVANTAGED BUSINESS PLANS; I. DEVELOP A PRELIMINARY PERFORMANCE ASSURANCE IMPLEMENTATION PLAN (PAIP); J. DEVELOP A PRELIMINARY SYSTEMS ENGINEERING MANAGEMENT PLAN; K. DOCUMENT THE RESULTS OF THE STUDIES IN THE PHASE A CONCEPT STUDY REPORT; AND L. PRESENT THE ICON CONCEPT TO THE NASA ASSOCIATE ADMINISTRATOR. |
| Dec 20, 2018 | 39 | $982.0K | PHASE A THROUGH F - ICON. THIS CONTRACT IS FOR THE UNIVERSITY OF CALIFORNIA (UCB) AT BERKELEY SPACE SCIENCES LABORATORY, THE PRIME CONTRACTUAL INTERFACE FOR NASA FOR THE IONOSPHERIC CONNECTION EXPLORER (LCON) MISSION INVESTIGATION TEAM, THAT COVERS PHASE A OF THE MISSION. THE NASA AO IS NNHIIZDA0020. UNDER THE DIRECTION OF THE PRINCIPAL INVESTIGATOR (PI) DR. THOMAS IMMEL, UCB WILL BE THE PRINCIPAL CONTRACTOR TO NASA FOR ICON. UCB SHALL CONDUCT THE PHASE A CONCEPT STUDY IN ACCORDANCE WITH THE CONCEPT STUDY GUIDELINES. IN PERFORMANCE OF THIS STUDY, THE ICON TEAM SHALL: A. CONDUCT TRADE AND RISK REDUCTION STUDIES; B. UPDATE AND REFINE THE EXISTING MISSION COST ESTIMATES AND FINANCIAL PLAN; C. INTEGRATE AND DELIVER TO NASA ALL SUBCONTRACTOR AND UCB FINANCIAL REPORTS; D. DEVELOP PLAN FOR EARNED VALUE MANAGEMENT TO BE IN PLACE DURING PHASES C AND D; E. DEVELOP THE MISSION IMPLEMENTATION PLAN FOR PHASE B/CID, AND E; F. DEFME THE RISK MANAGEMENT PLAN AND DEVELOP MITIGATION STRATEGIES; G. OUTLINE THE FABRICATION, INTEGRATION, TEST, AND OPERATION OF THE SYSTEM; H. DEFINE THE EDUCATION, OUTREACH, TECHNOLOGY, AND SMALL BUSINESS DISADVANTAGED BUSINESS PLANS; I. DEVELOP A PRELIMINARY PERFORMANCE ASSURANCE IMPLEMENTATION PLAN (PAIP); J. DEVELOP A PRELIMINARY SYSTEMS ENGINEERING MANAGEMENT PLAN; K. DOCUMENT THE RESULTS OF THE STUDIES IN THE PHASE A CONCEPT STUDY REPORT; AND L. PRESENT THE ICON CONCEPT TO THE NASA ASSOCIATE ADMINISTRATOR. |
| Dec 18, 2018 | 38 | $78.6K | PHASE A THROUGH F - ICON. THIS CONTRACT IS FOR THE UNIVERSITY OF CALIFORNIA (UCB) AT BERKELEY SPACE SCIENCES LABORATORY, THE PRIME CONTRACTUAL INTERFACE FOR NASA FOR THE IONOSPHERIC CONNECTION EXPLORER (LCON) MISSION INVESTIGATION TEAM, THAT COVERS PHASE A OF THE MISSION. THE NASA AO IS NNHIIZDA0020. UNDER THE DIRECTION OF THE PRINCIPAL INVESTIGATOR (PI) DR. THOMAS IMMEL, UCB WILL BE THE PRINCIPAL CONTRACTOR TO NASA FOR ICON. UCB SHALL CONDUCT THE PHASE A CONCEPT STUDY IN ACCORDANCE WITH THE CONCEPT STUDY GUIDELINES. IN PERFORMANCE OF THIS STUDY, THE ICON TEAM SHALL: A. CONDUCT TRADE AND RISK REDUCTION STUDIES; B. UPDATE AND REFINE THE EXISTING MISSION COST ESTIMATES AND FINANCIAL PLAN; C. INTEGRATE AND DELIVER TO NASA ALL SUBCONTRACTOR AND UCB FINANCIAL REPORTS; D. DEVELOP PLAN FOR EARNED VALUE MANAGEMENT TO BE IN PLACE DURING PHASES C AND D; E. DEVELOP THE MISSION IMPLEMENTATION PLAN FOR PHASE B/CID, AND E; F. DEFME THE RISK MANAGEMENT PLAN AND DEVELOP MITIGATION STRATEGIES; G. OUTLINE THE FABRICATION, INTEGRATION, TEST, AND OPERATION OF THE SYSTEM; H. DEFINE THE EDUCATION, OUTREACH, TECHNOLOGY, AND SMALL BUSINESS DISADVANTAGED BUSINESS PLANS; I. DEVELOP A PRELIMINARY PERFORMANCE ASSURANCE IMPLEMENTATION PLAN (PAIP); J. DEVELOP A PRELIMINARY SYSTEMS ENGINEERING MANAGEMENT PLAN; K. DOCUMENT THE RESULTS OF THE STUDIES IN THE PHASE A CONCEPT STUDY REPORT; AND L. PRESENT THE ICON CONCEPT TO THE NASA ASSOCIATE ADMINISTRATOR. |
| Oct 10, 2018 | 37 | $150.0K | PHASE A THROUGH F - ICON. THIS CONTRACT IS FOR THE UNIVERSITY OF CALIFORNIA (UCB) AT BERKELEY SPACE SCIENCES LABORATORY, THE PRIME CONTRACTUAL INTERFACE FOR NASA FOR THE IONOSPHERIC CONNECTION EXPLORER (LCON) MISSION INVESTIGATION TEAM, THAT COVERS PHASE A OF THE MISSION. THE NASA AO IS NNHIIZDA0020. UNDER THE DIRECTION OF THE PRINCIPAL INVESTIGATOR (PI) DR. THOMAS IMMEL, UCB WILL BE THE PRINCIPAL CONTRACTOR TO NASA FOR ICON. UCB SHALL CONDUCT THE PHASE A CONCEPT STUDY IN ACCORDANCE WITH THE CONCEPT STUDY GUIDELINES. IN PERFORMANCE OF THIS STUDY, THE ICON TEAM SHALL: A. CONDUCT TRADE AND RISK REDUCTION STUDIES; B. UPDATE AND REFINE THE EXISTING MISSION COST ESTIMATES AND FINANCIAL PLAN; C. INTEGRATE AND DELIVER TO NASA ALL SUBCONTRACTOR AND UCB FINANCIAL REPORTS; D. DEVELOP PLAN FOR EARNED VALUE MANAGEMENT TO BE IN PLACE DURING PHASES C AND D; E. DEVELOP THE MISSION IMPLEMENTATION PLAN FOR PHASE B/CID, AND E; F. DEFME THE RISK MANAGEMENT PLAN AND DEVELOP MITIGATION STRATEGIES; G. OUTLINE THE FABRICATION, INTEGRATION, TEST, AND OPERATION OF THE SYSTEM; H. DEFINE THE EDUCATION, OUTREACH, TECHNOLOGY, AND SMALL BUSINESS DISADVANTAGED BUSINESS PLANS; I. DEVELOP A PRELIMINARY PERFORMANCE ASSURANCE IMPLEMENTATION PLAN (PAIP); J. DEVELOP A PRELIMINARY SYSTEMS ENGINEERING MANAGEMENT PLAN; K. DOCUMENT THE RESULTS OF THE STUDIES IN THE PHASE A CONCEPT STUDY REPORT; AND L. PRESENT THE ICON CONCEPT TO THE NASA ASSOCIATE ADMINISTRATOR. |
| Sep 27, 2018 | 36 | $2.7M | PHASE A THROUGH F - ICON. THIS CONTRACT IS FOR THE UNIVERSITY OF CALIFORNIA (UCB) AT BERKELEY SPACE SCIENCES LABORATORY, THE PRIME CONTRACTUAL INTERFACE FOR NASA FOR THE IONOSPHERIC CONNECTION EXPLORER (LCON) MISSION INVESTIGATION TEAM, THAT COVERS PHASE A OF THE MISSION. THE NASA AO IS NNHIIZDA0020. UNDER THE DIRECTION OF THE PRINCIPAL INVESTIGATOR (PI) DR. THOMAS IMMEL, UCB WILL BE THE PRINCIPAL CONTRACTOR TO NASA FOR ICON. UCB SHALL CONDUCT THE PHASE A CONCEPT STUDY IN ACCORDANCE WITH THE CONCEPT STUDY GUIDELINES. IN PERFORMANCE OF THIS STUDY, THE ICON TEAM SHALL: A. CONDUCT TRADE AND RISK REDUCTION STUDIES; B. UPDATE AND REFINE THE EXISTING MISSION COST ESTIMATES AND FINANCIAL PLAN; C. INTEGRATE AND DELIVER TO NASA ALL SUBCONTRACTOR AND UCB FINANCIAL REPORTS; D. DEVELOP PLAN FOR EARNED VALUE MANAGEMENT TO BE IN PLACE DURING PHASES C AND D; E. DEVELOP THE MISSION IMPLEMENTATION PLAN FOR PHASE B/CID, AND E; F. DEFME THE RISK MANAGEMENT PLAN AND DEVELOP MITIGATION STRATEGIES; G. OUTLINE THE FABRICATION, INTEGRATION, TEST, AND OPERATION OF THE SYSTEM; H. DEFINE THE EDUCATION, OUTREACH, TECHNOLOGY, AND SMALL BUSINESS DISADVANTAGED BUSINESS PLANS; I. DEVELOP A PRELIMINARY PERFORMANCE ASSURANCE IMPLEMENTATION PLAN (PAIP); J. DEVELOP A PRELIMINARY SYSTEMS ENGINEERING MANAGEMENT PLAN; K. DOCUMENT THE RESULTS OF THE STUDIES IN THE PHASE A CONCEPT STUDY REPORT; AND L. PRESENT THE ICON CONCEPT TO THE NASA ASSOCIATE ADMINISTRATOR. |
| Jul 27, 2018 | 35 | $-150.0K | PHASE A THROUGH F - ICON. THIS CONTRACT IS FOR THE UNIVERSITY OF CALIFORNIA (UCB) AT BERKELEY SPACE SCIENCES LABORATORY, THE PRIME CONTRACTUAL INTERFACE FOR NASA FOR THE IONOSPHERIC CONNECTION EXPLORER (LCON) MISSION INVESTIGATION TEAM, THAT COVERS PHASE A OF THE MISSION. THE NASA AO IS NNHIIZDA0020. UNDER THE DIRECTION OF THE PRINCIPAL INVESTIGATOR (PI) DR. THOMAS IMMEL, UCB WILL BE THE PRINCIPAL CONTRACTOR TO NASA FOR ICON. UCB SHALL CONDUCT THE PHASE A CONCEPT STUDY IN ACCORDANCE WITH THE CONCEPT STUDY GUIDELINES. IN PERFORMANCE OF THIS STUDY, THE ICON TEAM SHALL: A. CONDUCT TRADE AND RISK REDUCTION STUDIES; B. UPDATE AND REFINE THE EXISTING MISSION COST ESTIMATES AND FINANCIAL PLAN; C. INTEGRATE AND DELIVER TO NASA ALL SUBCONTRACTOR AND UCB FINANCIAL REPORTS; D. DEVELOP PLAN FOR EARNED VALUE MANAGEMENT TO BE IN PLACE DURING PHASES C AND D; E. DEVELOP THE MISSION IMPLEMENTATION PLAN FOR PHASE B/CID, AND E; F. DEFME THE RISK MANAGEMENT PLAN AND DEVELOP MITIGATION STRATEGIES; G. OUTLINE THE FABRICATION, INTEGRATION, TEST, AND OPERATION OF THE SYSTEM; H. DEFINE THE EDUCATION, OUTREACH, TECHNOLOGY, AND SMALL BUSINESS DISADVANTAGED BUSINESS PLANS; I. DEVELOP A PRELIMINARY PERFORMANCE ASSURANCE IMPLEMENTATION PLAN (PAIP); J. DEVELOP A PRELIMINARY SYSTEMS ENGINEERING MANAGEMENT PLAN; K. DOCUMENT THE RESULTS OF THE STUDIES IN THE PHASE A CONCEPT STUDY REPORT; AND L. PRESENT THE ICON CONCEPT TO THE NASA ASSOCIATE ADMINISTRATOR. |
| Jul 24, 2018 | 34 | $4.5M | PHASE A THROUGH F - ICON. THIS CONTRACT IS FOR THE UNIVERSITY OF CALIFORNIA (UCB) AT BERKELEY SPACE SCIENCES LABORATORY, THE PRIME CONTRACTUAL INTERFACE FOR NASA FOR THE IONOSPHERIC CONNECTION EXPLORER (LCON) MISSION INVESTIGATION TEAM, THAT COVERS PHASE A OF THE MISSION. THE NASA AO IS NNHIIZDA0020. UNDER THE DIRECTION OF THE PRINCIPAL INVESTIGATOR (PI) DR. THOMAS IMMEL, UCB WILL BE THE PRINCIPAL CONTRACTOR TO NASA FOR ICON. UCB SHALL CONDUCT THE PHASE A CONCEPT STUDY IN ACCORDANCE WITH THE CONCEPT STUDY GUIDELINES. IN PERFORMANCE OF THIS STUDY, THE ICON TEAM SHALL: A. CONDUCT TRADE AND RISK REDUCTION STUDIES; B. UPDATE AND REFINE THE EXISTING MISSION COST ESTIMATES AND FINANCIAL PLAN; C. INTEGRATE AND DELIVER TO NASA ALL SUBCONTRACTOR AND UCB FINANCIAL REPORTS; D. DEVELOP PLAN FOR EARNED VALUE MANAGEMENT TO BE IN PLACE DURING PHASES C AND D; E. DEVELOP THE MISSION IMPLEMENTATION PLAN FOR PHASE B/CID, AND E; F. DEFME THE RISK MANAGEMENT PLAN AND DEVELOP MITIGATION STRATEGIES; G. OUTLINE THE FABRICATION, INTEGRATION, TEST, AND OPERATION OF THE SYSTEM; H. DEFINE THE EDUCATION, OUTREACH, TECHNOLOGY, AND SMALL BUSINESS DISADVANTAGED BUSINESS PLANS; I. DEVELOP A PRELIMINARY PERFORMANCE ASSURANCE IMPLEMENTATION PLAN (PAIP); J. DEVELOP A PRELIMINARY SYSTEMS ENGINEERING MANAGEMENT PLAN; K. DOCUMENT THE RESULTS OF THE STUDIES IN THE PHASE A CONCEPT STUDY REPORT; AND L. PRESENT THE ICON CONCEPT TO THE NASA ASSOCIATE ADMINISTRATOR. |
| Jul 9, 2018 | 33 | $457.0K | PHASE A THROUGH F - ICON. THIS CONTRACT IS FOR THE UNIVERSITY OF CALIFORNIA (UCB) AT BERKELEY SPACE SCIENCES LABORATORY, THE PRIME CONTRACTUAL INTERFACE FOR NASA FOR THE IONOSPHERIC CONNECTION EXPLORER (LCON) MISSION INVESTIGATION TEAM, THAT COVERS PHASE A OF THE MISSION. THE NASA AO IS NNHIIZDA0020. UNDER THE DIRECTION OF THE PRINCIPAL INVESTIGATOR (PI) DR. THOMAS IMMEL, UCB WILL BE THE PRINCIPAL CONTRACTOR TO NASA FOR ICON. UCB SHALL CONDUCT THE PHASE A CONCEPT STUDY IN ACCORDANCE WITH THE CONCEPT STUDY GUIDELINES. IN PERFORMANCE OF THIS STUDY, THE ICON TEAM SHALL: A. CONDUCT TRADE AND RISK REDUCTION STUDIES; B. UPDATE AND REFINE THE EXISTING MISSION COST ESTIMATES AND FINANCIAL PLAN; C. INTEGRATE AND DELIVER TO NASA ALL SUBCONTRACTOR AND UCB FINANCIAL REPORTS; D. DEVELOP PLAN FOR EARNED VALUE MANAGEMENT TO BE IN PLACE DURING PHASES C AND D; E. DEVELOP THE MISSION IMPLEMENTATION PLAN FOR PHASE B/CID, AND E; F. DEFME THE RISK MANAGEMENT PLAN AND DEVELOP MITIGATION STRATEGIES; G. OUTLINE THE FABRICATION, INTEGRATION, TEST, AND OPERATION OF THE SYSTEM; H. DEFINE THE EDUCATION, OUTREACH, TECHNOLOGY, AND SMALL BUSINESS DISADVANTAGED BUSINESS PLANS; I. DEVELOP A PRELIMINARY PERFORMANCE ASSURANCE IMPLEMENTATION PLAN (PAIP); J. DEVELOP A PRELIMINARY SYSTEMS ENGINEERING MANAGEMENT PLAN; K. DOCUMENT THE RESULTS OF THE STUDIES IN THE PHASE A CONCEPT STUDY REPORT; AND L. PRESENT THE ICON CONCEPT TO THE NASA ASSOCIATE ADMINISTRATOR. |
| Feb 22, 2018 | 32 | $0 | PHASE A THROUGH F - ICON. THIS CONTRACT IS FOR THE UNIVERSITY OF CALIFORNIA (UCB) AT BERKELEY SPACE SCIENCES LABORATORY, THE PRIME CONTRACTUAL INTERFACE FOR NASA FOR THE IONOSPHERIC CONNECTION EXPLORER (LCON) MISSION INVESTIGATION TEAM, THAT COVERS PHASE A OF THE MISSION. THE NASA AO IS NNHIIZDA0020. UNDER THE DIRECTION OF THE PRINCIPAL INVESTIGATOR (PI) DR. THOMAS IMMEL, UCB WILL BE THE PRINCIPAL CONTRACTOR TO NASA FOR ICON. UCB SHALL CONDUCT THE PHASE A CONCEPT STUDY IN ACCORDANCE WITH THE CONCEPT STUDY GUIDELINES. IN PERFORMANCE OF THIS STUDY, THE ICON TEAM SHALL: A. CONDUCT TRADE AND RISK REDUCTION STUDIES; B. UPDATE AND REFINE THE EXISTING MISSION COST ESTIMATES AND FINANCIAL PLAN; C. INTEGRATE AND DELIVER TO NASA ALL SUBCONTRACTOR AND UCB FINANCIAL REPORTS; D. DEVELOP PLAN FOR EARNED VALUE MANAGEMENT TO BE IN PLACE DURING PHASES C AND D; E. DEVELOP THE MISSION IMPLEMENTATION PLAN FOR PHASE B/CID, AND E; F. DEFME THE RISK MANAGEMENT PLAN AND DEVELOP MITIGATION STRATEGIES; G. OUTLINE THE FABRICATION, INTEGRATION, TEST, AND OPERATION OF THE SYSTEM; H. DEFINE THE EDUCATION, OUTREACH, TECHNOLOGY, AND SMALL BUSINESS DISADVANTAGED BUSINESS PLANS; I. DEVELOP A PRELIMINARY PERFORMANCE ASSURANCE IMPLEMENTATION PLAN (PAIP); J. DEVELOP A PRELIMINARY SYSTEMS ENGINEERING MANAGEMENT PLAN; K. DOCUMENT THE RESULTS OF THE STUDIES IN THE PHASE A CONCEPT STUDY REPORT; AND L. PRESENT THE ICON CONCEPT TO THE NASA ASSOCIATE ADMINISTRATOR. |
| Dec 7, 2017 | 30 | $0 | PHASE A THROUGH F - ICON. THIS CONTRACT IS FOR THE UNIVERSITY OF CALIFORNIA (UCB) AT BERKELEY SPACE SCIENCES LABORATORY, THE PRIME CONTRACTUAL INTERFACE FOR NASA FOR THE IONOSPHERIC CONNECTION EXPLORER (LCON) MISSION INVESTIGATION TEAM, THAT COVERS PHASE A OF THE MISSION. THE NASA AO IS NNHIIZDA0020. UNDER THE DIRECTION OF THE PRINCIPAL INVESTIGATOR (PI) DR. THOMAS IMMEL, UCB WILL BE THE PRINCIPAL CONTRACTOR TO NASA FOR ICON. UCB SHALL CONDUCT THE PHASE A CONCEPT STUDY IN ACCORDANCE WITH THE CONCEPT STUDY GUIDELINES. IN PERFORMANCE OF THIS STUDY, THE ICON TEAM SHALL: A. CONDUCT TRADE AND RISK REDUCTION STUDIES; B. UPDATE AND REFINE THE EXISTING MISSION COST ESTIMATES AND FINANCIAL PLAN; C. INTEGRATE AND DELIVER TO NASA ALL SUBCONTRACTOR AND UCB FINANCIAL REPORTS; D. DEVELOP PLAN FOR EARNED VALUE MANAGEMENT TO BE IN PLACE DURING PHASES C AND D; E. DEVELOP THE MISSION IMPLEMENTATION PLAN FOR PHASE B/CID, AND E; F. DEFME THE RISK MANAGEMENT PLAN AND DEVELOP MITIGATION STRATEGIES; G. OUTLINE THE FABRICATION, INTEGRATION, TEST, AND OPERATION OF THE SYSTEM; H. DEFINE THE EDUCATION, OUTREACH, TECHNOLOGY, AND SMALL BUSINESS DISADVANTAGED BUSINESS PLANS; I. DEVELOP A PRELIMINARY PERFORMANCE ASSURANCE IMPLEMENTATION PLAN (PAIP); J. DEVELOP A PRELIMINARY SYSTEMS ENGINEERING MANAGEMENT PLAN; K. DOCUMENT THE RESULTS OF THE STUDIES IN THE PHASE A CONCEPT STUDY REPORT; AND L. PRESENT THE ICON CONCEPT TO THE NASA ASSOCIATE ADMINISTRATOR. |
| Sep 7, 2017 | 29 | $29.3K | PHASE A THROUGH F - ICON. THIS CONTRACT IS FOR THE UNIVERSITY OF CALIFORNIA (UCB) AT BERKELEY SPACE SCIENCES LABORATORY, THE PRIME CONTRACTUAL INTERFACE FOR NASA FOR THE IONOSPHERIC CONNECTION EXPLORER (LCON) MISSION INVESTIGATION TEAM, THAT COVERS PHASE A OF THE MISSION. THE NASA AO IS NNHIIZDA0020. UNDER THE DIRECTION OF THE PRINCIPAL INVESTIGATOR (PI) DR. THOMAS IMMEL, UCB WILL BE THE PRINCIPAL CONTRACTOR TO NASA FOR ICON. UCB SHALL CONDUCT THE PHASE A CONCEPT STUDY IN ACCORDANCE WITH THE CONCEPT STUDY GUIDELINES. IN PERFORMANCE OF THIS STUDY, THE ICON TEAM SHALL: A. CONDUCT TRADE AND RISK REDUCTION STUDIES; B. UPDATE AND REFINE THE EXISTING MISSION COST ESTIMATES AND FINANCIAL PLAN; C. INTEGRATE AND DELIVER TO NASA ALL SUBCONTRACTOR AND UCB FINANCIAL REPORTS; D. DEVELOP PLAN FOR EARNED VALUE MANAGEMENT TO BE IN PLACE DURING PHASES C AND D; E. DEVELOP THE MISSION IMPLEMENTATION PLAN FOR PHASE B/CID, AND E; F. DEFME THE RISK MANAGEMENT PLAN AND DEVELOP MITIGATION STRATEGIES; G. OUTLINE THE FABRICATION, INTEGRATION, TEST, AND OPERATION OF THE SYSTEM; H. DEFINE THE EDUCATION, OUTREACH, TECHNOLOGY, AND SMALL BUSINESS DISADVANTAGED BUSINESS PLANS; I. DEVELOP A PRELIMINARY PERFORMANCE ASSURANCE IMPLEMENTATION PLAN (PAIP); J. DEVELOP A PRELIMINARY SYSTEMS ENGINEERING MANAGEMENT PLAN; K. DOCUMENT THE RESULTS OF THE STUDIES IN THE PHASE A CONCEPT STUDY REPORT; AND L. PRESENT THE ICON CONCEPT TO THE NASA ASSOCIATE ADMINISTRATOR. |
| Aug 23, 2017 | 28 | $8.3M | PHASE A THROUGH F - ICON. THIS CONTRACT IS FOR THE UNIVERSITY OF CALIFORNIA (UCB) AT BERKELEY SPACE SCIENCES LABORATORY, THE PRIME CONTRACTUAL INTERFACE FOR NASA FOR THE IONOSPHERIC CONNECTION EXPLORER (LCON) MISSION INVESTIGATION TEAM, THAT COVERS PHASE A OF THE MISSION. THE NASA AO IS NNHIIZDA0020. UNDER THE DIRECTION OF THE PRINCIPAL INVESTIGATOR (PI) DR. THOMAS IMMEL, UCB WILL BE THE PRINCIPAL CONTRACTOR TO NASA FOR ICON. UCB SHALL CONDUCT THE PHASE A CONCEPT STUDY IN ACCORDANCE WITH THE CONCEPT STUDY GUIDELINES. IN PERFORMANCE OF THIS STUDY, THE ICON TEAM SHALL: A. CONDUCT TRADE AND RISK REDUCTION STUDIES; B. UPDATE AND REFINE THE EXISTING MISSION COST ESTIMATES AND FINANCIAL PLAN; C. INTEGRATE AND DELIVER TO NASA ALL SUBCONTRACTOR AND UCB FINANCIAL REPORTS; D. DEVELOP PLAN FOR EARNED VALUE MANAGEMENT TO BE IN PLACE DURING PHASES C AND D; E. DEVELOP THE MISSION IMPLEMENTATION PLAN FOR PHASE B/CID, AND E; F. DEFME THE RISK MANAGEMENT PLAN AND DEVELOP MITIGATION STRATEGIES; G. OUTLINE THE FABRICATION, INTEGRATION, TEST, AND OPERATION OF THE SYSTEM; H. DEFINE THE EDUCATION, OUTREACH, TECHNOLOGY, AND SMALL BUSINESS DISADVANTAGED BUSINESS PLANS; I. DEVELOP A PRELIMINARY PERFORMANCE ASSURANCE IMPLEMENTATION PLAN (PAIP); J. DEVELOP A PRELIMINARY SYSTEMS ENGINEERING MANAGEMENT PLAN; K. DOCUMENT THE RESULTS OF THE STUDIES IN THE PHASE A CONCEPT STUDY REPORT; AND L. PRESENT THE ICON CONCEPT TO THE NASA ASSOCIATE ADMINISTRATOR. |
| Jun 13, 2017 | 27 | $0 | PHASE A THROUGH F - ICON. THIS CONTRACT IS FOR THE UNIVERSITY OF CALIFORNIA (UCB) AT BERKELEY SPACE SCIENCES LABORATORY, THE PRIME CONTRACTUAL INTERFACE FOR NASA FOR THE IONOSPHERIC CONNECTION EXPLORER (LCON) MISSION INVESTIGATION TEAM, THAT COVERS PHASE A OF THE MISSION. THE NASA AO IS NNHIIZDA0020. UNDER THE DIRECTION OF THE PRINCIPAL INVESTIGATOR (PI) DR. THOMAS IMMEL, UCB WILL BE THE PRINCIPAL CONTRACTOR TO NASA FOR ICON. UCB SHALL CONDUCT THE PHASE A CONCEPT STUDY IN ACCORDANCE WITH THE CONCEPT STUDY GUIDELINES. IN PERFORMANCE OF THIS STUDY, THE ICON TEAM SHALL: A. CONDUCT TRADE AND RISK REDUCTION STUDIES; B. UPDATE AND REFINE THE EXISTING MISSION COST ESTIMATES AND FINANCIAL PLAN; C. INTEGRATE AND DELIVER TO NASA ALL SUBCONTRACTOR AND UCB FINANCIAL REPORTS; D. DEVELOP PLAN FOR EARNED VALUE MANAGEMENT TO BE IN PLACE DURING PHASES C AND D; E. DEVELOP THE MISSION IMPLEMENTATION PLAN FOR PHASE B/CID, AND E; F. DEFME THE RISK MANAGEMENT PLAN AND DEVELOP MITIGATION STRATEGIES; G. OUTLINE THE FABRICATION, INTEGRATION, TEST, AND OPERATION OF THE SYSTEM; H. DEFINE THE EDUCATION, OUTREACH, TECHNOLOGY, AND SMALL BUSINESS DISADVANTAGED BUSINESS PLANS; I. DEVELOP A PRELIMINARY PERFORMANCE ASSURANCE IMPLEMENTATION PLAN (PAIP); J. DEVELOP A PRELIMINARY SYSTEMS ENGINEERING MANAGEMENT PLAN; K. DOCUMENT THE RESULTS OF THE STUDIES IN THE PHASE A CONCEPT STUDY REPORT; AND L. PRESENT THE ICON CONCEPT TO THE NASA ASSOCIATE ADMINISTRATOR. |
| Jun 7, 2017 | 26 | $2.5M | PHASE A THROUGH F - ICON. THIS CONTRACT IS FOR THE UNIVERSITY OF CALIFORNIA (UCB) AT BERKELEY SPACE SCIENCES LABORATORY, THE PRIME CONTRACTUAL INTERFACE FOR NASA FOR THE IONOSPHERIC CONNECTION EXPLORER (LCON) MISSION INVESTIGATION TEAM, THAT COVERS PHASE A OF THE MISSION. THE NASA AO IS NNHIIZDA0020. UNDER THE DIRECTION OF THE PRINCIPAL INVESTIGATOR (PI) DR. THOMAS IMMEL, UCB WILL BE THE PRINCIPAL CONTRACTOR TO NASA FOR ICON. UCB SHALL CONDUCT THE PHASE A CONCEPT STUDY IN ACCORDANCE WITH THE CONCEPT STUDY GUIDELINES. IN PERFORMANCE OF THIS STUDY, THE ICON TEAM SHALL: A. CONDUCT TRADE AND RISK REDUCTION STUDIES; B. UPDATE AND REFINE THE EXISTING MISSION COST ESTIMATES AND FINANCIAL PLAN; C. INTEGRATE AND DELIVER TO NASA ALL SUBCONTRACTOR AND UCB FINANCIAL REPORTS; D. DEVELOP PLAN FOR EARNED VALUE MANAGEMENT TO BE IN PLACE DURING PHASES C AND D; E. DEVELOP THE MISSION IMPLEMENTATION PLAN FOR PHASE B/CID, AND E; F. DEFME THE RISK MANAGEMENT PLAN AND DEVELOP MITIGATION STRATEGIES; G. OUTLINE THE FABRICATION, INTEGRATION, TEST, AND OPERATION OF THE SYSTEM; H. DEFINE THE EDUCATION, OUTREACH, TECHNOLOGY, AND SMALL BUSINESS DISADVANTAGED BUSINESS PLANS; I. DEVELOP A PRELIMINARY PERFORMANCE ASSURANCE IMPLEMENTATION PLAN (PAIP); J. DEVELOP A PRELIMINARY SYSTEMS ENGINEERING MANAGEMENT PLAN; K. DOCUMENT THE RESULTS OF THE STUDIES IN THE PHASE A CONCEPT STUDY REPORT; AND L. PRESENT THE ICON CONCEPT TO THE NASA ASSOCIATE ADMINISTRATOR. |
| Apr 17, 2017 | 25 | $0 | PHASE A THROUGH F - ICON. THIS CONTRACT IS FOR THE UNIVERSITY OF CALIFORNIA (UCB) AT BERKELEY SPACE SCIENCES LABORATORY, THE PRIME CONTRACTUAL INTERFACE FOR NASA FOR THE IONOSPHERIC CONNECTION EXPLORER (LCON) MISSION INVESTIGATION TEAM, THAT COVERS PHASE A OF THE MISSION. THE NASA AO IS NNHIIZDA0020. UNDER THE DIRECTION OF THE PRINCIPAL INVESTIGATOR (PI) DR. THOMAS IMMEL, UCB WILL BE THE PRINCIPAL CONTRACTOR TO NASA FOR ICON. UCB SHALL CONDUCT THE PHASE A CONCEPT STUDY IN ACCORDANCE WITH THE CONCEPT STUDY GUIDELINES. IN PERFORMANCE OF THIS STUDY, THE ICON TEAM SHALL: A. CONDUCT TRADE AND RISK REDUCTION STUDIES; B. UPDATE AND REFINE THE EXISTING MISSION COST ESTIMATES AND FINANCIAL PLAN; C. INTEGRATE AND DELIVER TO NASA ALL SUBCONTRACTOR AND UCB FINANCIAL REPORTS; D. DEVELOP PLAN FOR EARNED VALUE MANAGEMENT TO BE IN PLACE DURING PHASES C AND D; E. DEVELOP THE MISSION IMPLEMENTATION PLAN FOR PHASE B/CID, AND E; F. DEFME THE RISK MANAGEMENT PLAN AND DEVELOP MITIGATION STRATEGIES; G. OUTLINE THE FABRICATION, INTEGRATION, TEST, AND OPERATION OF THE SYSTEM; H. DEFINE THE EDUCATION, OUTREACH, TECHNOLOGY, AND SMALL BUSINESS DISADVANTAGED BUSINESS PLANS; I. DEVELOP A PRELIMINARY PERFORMANCE ASSURANCE IMPLEMENTATION PLAN (PAIP); J. DEVELOP A PRELIMINARY SYSTEMS ENGINEERING MANAGEMENT PLAN; K. DOCUMENT THE RESULTS OF THE STUDIES IN THE PHASE A CONCEPT STUDY REPORT; AND L. PRESENT THE ICON CONCEPT TO THE NASA ASSOCIATE ADMINISTRATOR. |
| Feb 7, 2017 | 31 | $0 | PHASE A THROUGH F - ICON. THIS CONTRACT IS FOR THE UNIVERSITY OF CALIFORNIA (UCB) AT BERKELEY SPACE SCIENCES LABORATORY, THE PRIME CONTRACTUAL INTERFACE FOR NASA FOR THE IONOSPHERIC CONNECTION EXPLORER (LCON) MISSION INVESTIGATION TEAM, THAT COVERS PHASE A OF THE MISSION. THE NASA AO IS NNHIIZDA0020. UNDER THE DIRECTION OF THE PRINCIPAL INVESTIGATOR (PI) DR. THOMAS IMMEL, UCB WILL BE THE PRINCIPAL CONTRACTOR TO NASA FOR ICON. UCB SHALL CONDUCT THE PHASE A CONCEPT STUDY IN ACCORDANCE WITH THE CONCEPT STUDY GUIDELINES. IN PERFORMANCE OF THIS STUDY, THE ICON TEAM SHALL: A. CONDUCT TRADE AND RISK REDUCTION STUDIES; B. UPDATE AND REFINE THE EXISTING MISSION COST ESTIMATES AND FINANCIAL PLAN; C. INTEGRATE AND DELIVER TO NASA ALL SUBCONTRACTOR AND UCB FINANCIAL REPORTS; D. DEVELOP PLAN FOR EARNED VALUE MANAGEMENT TO BE IN PLACE DURING PHASES C AND D; E. DEVELOP THE MISSION IMPLEMENTATION PLAN FOR PHASE B/CID, AND E; F. DEFME THE RISK MANAGEMENT PLAN AND DEVELOP MITIGATION STRATEGIES; G. OUTLINE THE FABRICATION, INTEGRATION, TEST, AND OPERATION OF THE SYSTEM; H. DEFINE THE EDUCATION, OUTREACH, TECHNOLOGY, AND SMALL BUSINESS DISADVANTAGED BUSINESS PLANS; I. DEVELOP A PRELIMINARY PERFORMANCE ASSURANCE IMPLEMENTATION PLAN (PAIP); J. DEVELOP A PRELIMINARY SYSTEMS ENGINEERING MANAGEMENT PLAN; K. DOCUMENT THE RESULTS OF THE STUDIES IN THE PHASE A CONCEPT STUDY REPORT; AND L. PRESENT THE ICON CONCEPT TO THE NASA ASSOCIATE ADMINISTRATOR. |
| Jan 31, 2017 | 24 | $8.1M | PHASE A THROUGH F - ICON. THIS CONTRACT IS FOR THE UNIVERSITY OF CALIFORNIA (UCB) AT BERKELEY SPACE SCIENCES LABORATORY, THE PRIME CONTRACTUAL INTERFACE FOR NASA FOR THE IONOSPHERIC CONNECTION EXPLORER (LCON) MISSION INVESTIGATION TEAM, THAT COVERS PHASE A OF THE MISSION. THE NASA AO IS NNHIIZDA0020. UNDER THE DIRECTION OF THE PRINCIPAL INVESTIGATOR (PI) DR. THOMAS IMMEL, UCB WILL BE THE PRINCIPAL CONTRACTOR TO NASA FOR ICON. UCB SHALL CONDUCT THE PHASE A CONCEPT STUDY IN ACCORDANCE WITH THE CONCEPT STUDY GUIDELINES. IN PERFORMANCE OF THIS STUDY, THE ICON TEAM SHALL: A. CONDUCT TRADE AND RISK REDUCTION STUDIES; B. UPDATE AND REFINE THE EXISTING MISSION COST ESTIMATES AND FINANCIAL PLAN; C. INTEGRATE AND DELIVER TO NASA ALL SUBCONTRACTOR AND UCB FINANCIAL REPORTS; D. DEVELOP PLAN FOR EARNED VALUE MANAGEMENT TO BE IN PLACE DURING PHASES C AND D; E. DEVELOP THE MISSION IMPLEMENTATION PLAN FOR PHASE B/CID, AND E; F. DEFME THE RISK MANAGEMENT PLAN AND DEVELOP MITIGATION STRATEGIES; G. OUTLINE THE FABRICATION, INTEGRATION, TEST, AND OPERATION OF THE SYSTEM; H. DEFINE THE EDUCATION, OUTREACH, TECHNOLOGY, AND SMALL BUSINESS DISADVANTAGED BUSINESS PLANS; I. DEVELOP A PRELIMINARY PERFORMANCE ASSURANCE IMPLEMENTATION PLAN (PAIP); J. DEVELOP A PRELIMINARY SYSTEMS ENGINEERING MANAGEMENT PLAN; K. DOCUMENT THE RESULTS OF THE STUDIES IN THE PHASE A CONCEPT STUDY REPORT; AND L. PRESENT THE ICON CONCEPT TO THE NASA ASSOCIATE ADMINISTRATOR. |
| Oct 26, 2016 | 23 | $6.0M | PHASE A THROUGH F - ICON. THIS CONTRACT IS FOR THE UNIVERSITY OF CALIFORNIA (UCB) AT BERKELEY SPACE SCIENCES LABORATORY, THE PRIME CONTRACTUAL INTERFACE FOR NASA FOR THE IONOSPHERIC CONNECTION EXPLORER (LCON) MISSION INVESTIGATION TEAM, THAT COVERS PHASE A OF THE MISSION. THE NASA AO IS NNHIIZDA0020. UNDER THE DIRECTION OF THE PRINCIPAL INVESTIGATOR (PI) DR. THOMAS IMMEL, UCB WILL BE THE PRINCIPAL CONTRACTOR TO NASA FOR ICON. UCB SHALL CONDUCT THE PHASE A CONCEPT STUDY IN ACCORDANCE WITH THE CONCEPT STUDY GUIDELINES. IN PERFORMANCE OF THIS STUDY, THE ICON TEAM SHALL: A. CONDUCT TRADE AND RISK REDUCTION STUDIES; B. UPDATE AND REFINE THE EXISTING MISSION COST ESTIMATES AND FINANCIAL PLAN; C. INTEGRATE AND DELIVER TO NASA ALL SUBCONTRACTOR AND UCB FINANCIAL REPORTS; D. DEVELOP PLAN FOR EARNED VALUE MANAGEMENT TO BE IN PLACE DURING PHASES C AND D; E. DEVELOP THE MISSION IMPLEMENTATION PLAN FOR PHASE B/CID, AND E; F. DEFME THE RISK MANAGEMENT PLAN AND DEVELOP MITIGATION STRATEGIES; G. OUTLINE THE FABRICATION, INTEGRATION, TEST, AND OPERATION OF THE SYSTEM; H. DEFINE THE EDUCATION, OUTREACH, TECHNOLOGY, AND SMALL BUSINESS DISADVANTAGED BUSINESS PLANS; I. DEVELOP A PRELIMINARY PERFORMANCE ASSURANCE IMPLEMENTATION PLAN (PAIP); J. DEVELOP A PRELIMINARY SYSTEMS ENGINEERING MANAGEMENT PLAN; K. DOCUMENT THE RESULTS OF THE STUDIES IN THE PHASE A CONCEPT STUDY REPORT; AND L. PRESENT THE ICON CONCEPT TO THE NASA ASSOCIATE ADMINISTRATOR. |
| Jun 23, 2016 | 22 | $8.0M | PHASE A THROUGH F - ICON. THIS CONTRACT IS FOR THE UNIVERSITY OF CALIFORNIA (UCB) AT BERKELEY SPACE SCIENCES LABORATORY, THE PRIME CONTRACTUAL INTERFACE FOR NASA FOR THE IONOSPHERIC CONNECTION EXPLORER (LCON) MISSION INVESTIGATION TEAM, THAT COVERS PHASE A OF THE MISSION. THE NASA AO IS NNHIIZDA0020. UNDER THE DIRECTION OF THE PRINCIPAL INVESTIGATOR (PI) DR. THOMAS IMMEL, UCB WILL BE THE PRINCIPAL CONTRACTOR TO NASA FOR ICON. UCB SHALL CONDUCT THE PHASE A CONCEPT STUDY IN ACCORDANCE WITH THE CONCEPT STUDY GUIDELINES. IN PERFORMANCE OF THIS STUDY, THE ICON TEAM SHALL: A. CONDUCT TRADE AND RISK REDUCTION STUDIES; B. UPDATE AND REFINE THE EXISTING MISSION COST ESTIMATES AND FINANCIAL PLAN; C. INTEGRATE AND DELIVER TO NASA ALL SUBCONTRACTOR AND UCB FINANCIAL REPORTS; D. DEVELOP PLAN FOR EARNED VALUE MANAGEMENT TO BE IN PLACE DURING PHASES C AND D; E. DEVELOP THE MISSION IMPLEMENTATION PLAN FOR PHASE B/CID, AND E; F. DEFME THE RISK MANAGEMENT PLAN AND DEVELOP MITIGATION STRATEGIES; G. OUTLINE THE FABRICATION, INTEGRATION, TEST, AND OPERATION OF THE SYSTEM; H. DEFINE THE EDUCATION, OUTREACH, TECHNOLOGY, AND SMALL BUSINESS DISADVANTAGED BUSINESS PLANS; I. DEVELOP A PRELIMINARY PERFORMANCE ASSURANCE IMPLEMENTATION PLAN (PAIP); J. DEVELOP A PRELIMINARY SYSTEMS ENGINEERING MANAGEMENT PLAN; K. DOCUMENT THE RESULTS OF THE STUDIES IN THE PHASE A CONCEPT STUDY REPORT; AND L. PRESENT THE ICON CONCEPT TO THE NASA ASSOCIATE ADMINISTRATOR. |
| Apr 5, 2016 | 21 | $12.8M | PHASE A THROUGH F - ICON. THIS CONTRACT IS FOR THE UNIVERSITY OF CALIFORNIA (UCB) AT BERKELEY SPACE SCIENCES LABORATORY, THE PRIME CONTRACTUAL INTERFACE FOR NASA FOR THE IONOSPHERIC CONNECTION EXPLORER (LCON) MISSION INVESTIGATION TEAM, THAT COVERS PHASE A OF THE MISSION. THE NASA AO IS NNHIIZDA0020. UNDER THE DIRECTION OF THE PRINCIPAL INVESTIGATOR (PI) DR. THOMAS IMMEL, UCB WILL BE THE PRINCIPAL CONTRACTOR TO NASA FOR ICON. UCB SHALL CONDUCT THE PHASE A CONCEPT STUDY IN ACCORDANCE WITH THE CONCEPT STUDY GUIDELINES. IN PERFORMANCE OF THIS STUDY, THE ICON TEAM SHALL: A. CONDUCT TRADE AND RISK REDUCTION STUDIES; B. UPDATE AND REFINE THE EXISTING MISSION COST ESTIMATES AND FINANCIAL PLAN; C. INTEGRATE AND DELIVER TO NASA ALL SUBCONTRACTOR AND UCB FINANCIAL REPORTS; D. DEVELOP PLAN FOR EARNED VALUE MANAGEMENT TO BE IN PLACE DURING PHASES C AND D; E. DEVELOP THE MISSION IMPLEMENTATION PLAN FOR PHASE B/CID, AND E; F. DEFME THE RISK MANAGEMENT PLAN AND DEVELOP MITIGATION STRATEGIES; G. OUTLINE THE FABRICATION, INTEGRATION, TEST, AND OPERATION OF THE SYSTEM; H. DEFINE THE EDUCATION, OUTREACH, TECHNOLOGY, AND SMALL BUSINESS DISADVANTAGED BUSINESS PLANS; I. DEVELOP A PRELIMINARY PERFORMANCE ASSURANCE IMPLEMENTATION PLAN (PAIP); J. DEVELOP A PRELIMINARY SYSTEMS ENGINEERING MANAGEMENT PLAN; K. DOCUMENT THE RESULTS OF THE STUDIES IN THE PHASE A CONCEPT STUDY REPORT; AND L. PRESENT THE ICON CONCEPT TO THE NASA ASSOCIATE ADMINISTRATOR. |
| Dec 3, 2015 | 20 | $3.5M | PHASE A THROUGH F - ICON. THIS CONTRACT IS FOR THE UNIVERSITY OF CALIFORNIA (UCB) AT BERKELEY SPACE SCIENCES LABORATORY, THE PRIME CONTRACTUAL INTERFACE FOR NASA FOR THE IONOSPHERIC CONNECTION EXPLORER (LCON) MISSION INVESTIGATION TEAM, THAT COVERS PHASE A OF THE MISSION. THE NASA AO IS NNHIIZDA0020. UNDER THE DIRECTION OF THE PRINCIPAL INVESTIGATOR (PI) DR. THOMAS IMMEL, UCB WILL BE THE PRINCIPAL CONTRACTOR TO NASA FOR ICON. UCB SHALL CONDUCT THE PHASE A CONCEPT STUDY IN ACCORDANCE WITH THE CONCEPT STUDY GUIDELINES. IN PERFORMANCE OF THIS STUDY, THE ICON TEAM SHALL: A. CONDUCT TRADE AND RISK REDUCTION STUDIES; B. UPDATE AND REFINE THE EXISTING MISSION COST ESTIMATES AND FINANCIAL PLAN; C. INTEGRATE AND DELIVER TO NASA ALL SUBCONTRACTOR AND UCB FINANCIAL REPORTS; D. DEVELOP PLAN FOR EARNED VALUE MANAGEMENT TO BE IN PLACE DURING PHASES C AND D; E. DEVELOP THE MISSION IMPLEMENTATION PLAN FOR PHASE B/CID, AND E; F. DEFME THE RISK MANAGEMENT PLAN AND DEVELOP MITIGATION STRATEGIES; G. OUTLINE THE FABRICATION, INTEGRATION, TEST, AND OPERATION OF THE SYSTEM; H. DEFINE THE EDUCATION, OUTREACH, TECHNOLOGY, AND SMALL BUSINESS DISADVANTAGED BUSINESS PLANS; I. DEVELOP A PRELIMINARY PERFORMANCE ASSURANCE IMPLEMENTATION PLAN (PAIP); J. DEVELOP A PRELIMINARY SYSTEMS ENGINEERING MANAGEMENT PLAN; K. DOCUMENT THE RESULTS OF THE STUDIES IN THE PHASE A CONCEPT STUDY REPORT; AND L. PRESENT THE ICON CONCEPT TO THE NASA ASSOCIATE ADMINISTRATOR. |
| Sep 28, 2015 | 19 | $364.2K | PHASE A THROUGH F - ICON. THIS CONTRACT IS FOR THE UNIVERSITY OF CALIFORNIA (UCB) AT BERKELEY SPACE SCIENCES LABORATORY, THE PRIME CONTRACTUAL INTERFACE FOR NASA FOR THE IONOSPHERIC CONNECTION EXPLORER (LCON) MISSION INVESTIGATION TEAM, THAT COVERS PHASE A OF THE MISSION. THE NASA AO IS NNHIIZDA0020. UNDER THE DIRECTION OF THE PRINCIPAL INVESTIGATOR (PI) DR. THOMAS IMMEL, UCB WILL BE THE PRINCIPAL CONTRACTOR TO NASA FOR ICON. UCB SHALL CONDUCT THE PHASE A CONCEPT STUDY IN ACCORDANCE WITH THE CONCEPT STUDY GUIDELINES. IN PERFORMANCE OF THIS STUDY, THE ICON TEAM SHALL: A. CONDUCT TRADE AND RISK REDUCTION STUDIES; B. UPDATE AND REFINE THE EXISTING MISSION COST ESTIMATES AND FINANCIAL PLAN; C. INTEGRATE AND DELIVER TO NASA ALL SUBCONTRACTOR AND UCB FINANCIAL REPORTS; D. DEVELOP PLAN FOR EARNED VALUE MANAGEMENT TO BE IN PLACE DURING PHASES C AND D; E. DEVELOP THE MISSION IMPLEMENTATION PLAN FOR PHASE B/CID, AND E; F. DEFME THE RISK MANAGEMENT PLAN AND DEVELOP MITIGATION STRATEGIES; G. OUTLINE THE FABRICATION, INTEGRATION, TEST, AND OPERATION OF THE SYSTEM; H. DEFINE THE EDUCATION, OUTREACH, TECHNOLOGY, AND SMALL BUSINESS DISADVANTAGED BUSINESS PLANS; I. DEVELOP A PRELIMINARY PERFORMANCE ASSURANCE IMPLEMENTATION PLAN (PAIP); J. DEVELOP A PRELIMINARY SYSTEMS ENGINEERING MANAGEMENT PLAN; K. DOCUMENT THE RESULTS OF THE STUDIES IN THE PHASE A CONCEPT STUDY REPORT; AND L. PRESENT THE ICON CONCEPT TO THE NASA ASSOCIATE ADMINISTRATOR. |
| Aug 18, 2015 | 18 | $23.3M | PHASE A THROUGH F - ICON. THIS CONTRACT IS FOR THE UNIVERSITY OF CALIFORNIA (UCB) AT BERKELEY SPACE SCIENCES LABORATORY, THE PRIME CONTRACTUAL INTERFACE FOR NASA FOR THE IONOSPHERIC CONNECTION EXPLORER (LCON) MISSION INVESTIGATION TEAM, THAT COVERS PHASE A OF THE MISSION. THE NASA AO IS NNHIIZDA0020. UNDER THE DIRECTION OF THE PRINCIPAL INVESTIGATOR (PI) DR. THOMAS IMMEL, UCB WILL BE THE PRINCIPAL CONTRACTOR TO NASA FOR ICON. UCB SHALL CONDUCT THE PHASE A CONCEPT STUDY IN ACCORDANCE WITH THE CONCEPT STUDY GUIDELINES. IN PERFORMANCE OF THIS STUDY, THE ICON TEAM SHALL: A. CONDUCT TRADE AND RISK REDUCTION STUDIES; B. UPDATE AND REFINE THE EXISTING MISSION COST ESTIMATES AND FINANCIAL PLAN; C. INTEGRATE AND DELIVER TO NASA ALL SUBCONTRACTOR AND UCB FINANCIAL REPORTS; D. DEVELOP PLAN FOR EARNED VALUE MANAGEMENT TO BE IN PLACE DURING PHASES C AND D; E. DEVELOP THE MISSION IMPLEMENTATION PLAN FOR PHASE B/CID, AND E; F. DEFME THE RISK MANAGEMENT PLAN AND DEVELOP MITIGATION STRATEGIES; G. OUTLINE THE FABRICATION, INTEGRATION, TEST, AND OPERATION OF THE SYSTEM; H. DEFINE THE EDUCATION, OUTREACH, TECHNOLOGY, AND SMALL BUSINESS DISADVANTAGED BUSINESS PLANS; I. DEVELOP A PRELIMINARY PERFORMANCE ASSURANCE IMPLEMENTATION PLAN (PAIP); J. DEVELOP A PRELIMINARY SYSTEMS ENGINEERING MANAGEMENT PLAN; K. DOCUMENT THE RESULTS OF THE STUDIES IN THE PHASE A CONCEPT STUDY REPORT; AND L. PRESENT THE ICON CONCEPT TO THE NASA ASSOCIATE ADMINISTRATOR. |
| Jul 28, 2015 | 17 | $0 | PHASE A THROUGH F - ICON. THIS CONTRACT IS FOR THE UNIVERSITY OF CALIFORNIA (UCB) AT BERKELEY SPACE SCIENCES LABORATORY, THE PRIME CONTRACTUAL INTERFACE FOR NASA FOR THE IONOSPHERIC CONNECTION EXPLORER (LCON) MISSION INVESTIGATION TEAM, THAT COVERS PHASE A OF THE MISSION. THE NASA AO IS NNHIIZDA0020. UNDER THE DIRECTION OF THE PRINCIPAL INVESTIGATOR (PI) DR. THOMAS IMMEL, UCB WILL BE THE PRINCIPAL CONTRACTOR TO NASA FOR ICON. UCB SHALL CONDUCT THE PHASE A CONCEPT STUDY IN ACCORDANCE WITH THE CONCEPT STUDY GUIDELINES. IN PERFORMANCE OF THIS STUDY, THE ICON TEAM SHALL: A. CONDUCT TRADE AND RISK REDUCTION STUDIES; B. UPDATE AND REFINE THE EXISTING MISSION COST ESTIMATES AND FINANCIAL PLAN; C. INTEGRATE AND DELIVER TO NASA ALL SUBCONTRACTOR AND UCB FINANCIAL REPORTS; D. DEVELOP PLAN FOR EARNED VALUE MANAGEMENT TO BE IN PLACE DURING PHASES C AND D; E. DEVELOP THE MISSION IMPLEMENTATION PLAN FOR PHASE B/CID, AND E; F. DEFME THE RISK MANAGEMENT PLAN AND DEVELOP MITIGATION STRATEGIES; G. OUTLINE THE FABRICATION, INTEGRATION, TEST, AND OPERATION OF THE SYSTEM; H. DEFINE THE EDUCATION, OUTREACH, TECHNOLOGY, AND SMALL BUSINESS DISADVANTAGED BUSINESS PLANS; I. DEVELOP A PRELIMINARY PERFORMANCE ASSURANCE IMPLEMENTATION PLAN (PAIP); J. DEVELOP A PRELIMINARY SYSTEMS ENGINEERING MANAGEMENT PLAN; K. DOCUMENT THE RESULTS OF THE STUDIES IN THE PHASE A CONCEPT STUDY REPORT; AND L. PRESENT THE ICON CONCEPT TO THE NASA ASSOCIATE ADMINISTRATOR. |
| May 21, 2015 | 16 | $16.9M | PHASE A THROUGH F - ICON. THIS CONTRACT IS FOR THE UNIVERSITY OF CALIFORNIA (UCB) AT BERKELEY SPACE SCIENCES LABORATORY, THE PRIME CONTRACTUAL INTERFACE FOR NASA FOR THE IONOSPHERIC CONNECTION EXPLORER (LCON) MISSION INVESTIGATION TEAM, THAT COVERS PHASE A OF THE MISSION. THE NASA AO IS NNHIIZDA0020. UNDER THE DIRECTION OF THE PRINCIPAL INVESTIGATOR (PI) DR. THOMAS IMMEL, UCB WILL BE THE PRINCIPAL CONTRACTOR TO NASA FOR ICON. UCB SHALL CONDUCT THE PHASE A CONCEPT STUDY IN ACCORDANCE WITH THE CONCEPT STUDY GUIDELINES. IN PERFORMANCE OF THIS STUDY, THE ICON TEAM SHALL: A. CONDUCT TRADE AND RISK REDUCTION STUDIES; B. UPDATE AND REFINE THE EXISTING MISSION COST ESTIMATES AND FINANCIAL PLAN; C. INTEGRATE AND DELIVER TO NASA ALL SUBCONTRACTOR AND UCB FINANCIAL REPORTS; D. DEVELOP PLAN FOR EARNED VALUE MANAGEMENT TO BE IN PLACE DURING PHASES C AND D; E. DEVELOP THE MISSION IMPLEMENTATION PLAN FOR PHASE B/CID, AND E; F. DEFME THE RISK MANAGEMENT PLAN AND DEVELOP MITIGATION STRATEGIES; G. OUTLINE THE FABRICATION, INTEGRATION, TEST, AND OPERATION OF THE SYSTEM; H. DEFINE THE EDUCATION, OUTREACH, TECHNOLOGY, AND SMALL BUSINESS DISADVANTAGED BUSINESS PLANS; I. DEVELOP A PRELIMINARY PERFORMANCE ASSURANCE IMPLEMENTATION PLAN (PAIP); J. DEVELOP A PRELIMINARY SYSTEMS ENGINEERING MANAGEMENT PLAN; K. DOCUMENT THE RESULTS OF THE STUDIES IN THE PHASE A CONCEPT STUDY REPORT; AND L. PRESENT THE ICON CONCEPT TO THE NASA ASSOCIATE ADMINISTRATOR. |
| Jan 28, 2015 | 15 | $0 | PHASE A THROUGH F - ICON. THIS CONTRACT IS FOR THE UNIVERSITY OF CALIFORNIA (UCB) AT BERKELEY SPACE SCIENCES LABORATORY, THE PRIME CONTRACTUAL INTERFACE FOR NASA FOR THE IONOSPHERIC CONNECTION EXPLORER (LCON) MISSION INVESTIGATION TEAM, THAT COVERS PHASE A OF THE MISSION. THE NASA AO IS NNHIIZDA0020. UNDER THE DIRECTION OF THE PRINCIPAL INVESTIGATOR (PI) DR. THOMAS IMMEL, UCB WILL BE THE PRINCIPAL CONTRACTOR TO NASA FOR ICON. UCB SHALL CONDUCT THE PHASE A CONCEPT STUDY IN ACCORDANCE WITH THE CONCEPT STUDY GUIDELINES. IN PERFORMANCE OF THIS STUDY, THE ICON TEAM SHALL: A. CONDUCT TRADE AND RISK REDUCTION STUDIES; B. UPDATE AND REFINE THE EXISTING MISSION COST ESTIMATES AND FINANCIAL PLAN; C. INTEGRATE AND DELIVER TO NASA ALL SUBCONTRACTOR AND UCB FINANCIAL REPORTS; D. DEVELOP PLAN FOR EARNED VALUE MANAGEMENT TO BE IN PLACE DURING PHASES C AND D; E. DEVELOP THE MISSION IMPLEMENTATION PLAN FOR PHASE B/CID, AND E; F. DEFME THE RISK MANAGEMENT PLAN AND DEVELOP MITIGATION STRATEGIES; G. OUTLINE THE FABRICATION, INTEGRATION, TEST, AND OPERATION OF THE SYSTEM; H. DEFINE THE EDUCATION, OUTREACH, TECHNOLOGY, AND SMALL BUSINESS DISADVANTAGED BUSINESS PLANS; I. DEVELOP A PRELIMINARY PERFORMANCE ASSURANCE IMPLEMENTATION PLAN (PAIP); J. DEVELOP A PRELIMINARY SYSTEMS ENGINEERING MANAGEMENT PLAN; K. DOCUMENT THE RESULTS OF THE STUDIES IN THE PHASE A CONCEPT STUDY REPORT; AND L. PRESENT THE ICON CONCEPT TO THE NASA ASSOCIATE ADMINISTRATOR. |
| Oct 2, 2014 | 14 | $20.1M | PHASE A THROUGH F - ICON. THIS CONTRACT IS FOR THE UNIVERSITY OF CALIFORNIA (UCB) AT BERKELEY SPACE SCIENCES LABORATORY, THE PRIME CONTRACTUAL INTERFACE FOR NASA FOR THE IONOSPHERIC CONNECTION EXPLORER (LCON) MISSION INVESTIGATION TEAM, THAT COVERS PHASE A OF THE MISSION. THE NASA AO IS NNHIIZDA0020. UNDER THE DIRECTION OF THE PRINCIPAL INVESTIGATOR (PI) DR. THOMAS IMMEL, UCB WILL BE THE PRINCIPAL CONTRACTOR TO NASA FOR ICON. UCB SHALL CONDUCT THE PHASE A CONCEPT STUDY IN ACCORDANCE WITH THE CONCEPT STUDY GUIDELINES. IN PERFORMANCE OF THIS STUDY, THE ICON TEAM SHALL: A. CONDUCT TRADE AND RISK REDUCTION STUDIES; B. UPDATE AND REFINE THE EXISTING MISSION COST ESTIMATES AND FINANCIAL PLAN; C. INTEGRATE AND DELIVER TO NASA ALL SUBCONTRACTOR AND UCB FINANCIAL REPORTS; D. DEVELOP PLAN FOR EARNED VALUE MANAGEMENT TO BE IN PLACE DURING PHASES C AND D; E. DEVELOP THE MISSION IMPLEMENTATION PLAN FOR PHASE B/CID, AND E; F. DEFME THE RISK MANAGEMENT PLAN AND DEVELOP MITIGATION STRATEGIES; G. OUTLINE THE FABRICATION, INTEGRATION, TEST, AND OPERATION OF THE SYSTEM; H. DEFINE THE EDUCATION, OUTREACH, TECHNOLOGY, AND SMALL BUSINESS DISADVANTAGED BUSINESS PLANS; I. DEVELOP A PRELIMINARY PERFORMANCE ASSURANCE IMPLEMENTATION PLAN (PAIP); J. DEVELOP A PRELIMINARY SYSTEMS ENGINEERING MANAGEMENT PLAN; K. DOCUMENT THE RESULTS OF THE STUDIES IN THE PHASE A CONCEPT STUDY REPORT; AND L. PRESENT THE ICON CONCEPT TO THE NASA ASSOCIATE ADMINISTRATOR. |
| Jul 16, 2014 | 13 | $5.0M | PHASE A THROUGH F - ICON. THIS CONTRACT IS FOR THE UNIVERSITY OF CALIFORNIA (UCB) AT BERKELEY SPACE SCIENCES LABORATORY, THE PRIME CONTRACTUAL INTERFACE FOR NASA FOR THE IONOSPHERIC CONNECTION EXPLORER (LCON) MISSION INVESTIGATION TEAM, THAT COVERS PHASE A OF THE MISSION. THE NASA AO IS NNHIIZDA0020. UNDER THE DIRECTION OF THE PRINCIPAL INVESTIGATOR (PI) DR. THOMAS IMMEL, UCB WILL BE THE PRINCIPAL CONTRACTOR TO NASA FOR ICON. UCB SHALL CONDUCT THE PHASE A CONCEPT STUDY IN ACCORDANCE WITH THE CONCEPT STUDY GUIDELINES. IN PERFORMANCE OF THIS STUDY, THE ICON TEAM SHALL: A. CONDUCT TRADE AND RISK REDUCTION STUDIES; B. UPDATE AND REFINE THE EXISTING MISSION COST ESTIMATES AND FINANCIAL PLAN; C. INTEGRATE AND DELIVER TO NASA ALL SUBCONTRACTOR AND UCB FINANCIAL REPORTS; D. DEVELOP PLAN FOR EARNED VALUE MANAGEMENT TO BE IN PLACE DURING PHASES C AND D; E. DEVELOP THE MISSION IMPLEMENTATION PLAN FOR PHASE B/CID, AND E; F. DEFME THE RISK MANAGEMENT PLAN AND DEVELOP MITIGATION STRATEGIES; G. OUTLINE THE FABRICATION, INTEGRATION, TEST, AND OPERATION OF THE SYSTEM; H. DEFINE THE EDUCATION, OUTREACH, TECHNOLOGY, AND SMALL BUSINESS DISADVANTAGED BUSINESS PLANS; I. DEVELOP A PRELIMINARY PERFORMANCE ASSURANCE IMPLEMENTATION PLAN (PAIP); J. DEVELOP A PRELIMINARY SYSTEMS ENGINEERING MANAGEMENT PLAN; K. DOCUMENT THE RESULTS OF THE STUDIES IN THE PHASE A CONCEPT STUDY REPORT; AND L. PRESENT THE ICON CONCEPT TO THE NASA ASSOCIATE ADMINISTRATOR. |
| Mar 26, 2014 | 12 | $17.6M | PHASE A THROUGH F - ICON. THIS CONTRACT IS FOR THE UNIVERSITY OF CALIFORNIA (UCB) AT BERKELEY SPACE SCIENCES LABORATORY, THE PRIME CONTRACTUAL INTERFACE FOR NASA FOR THE IONOSPHERIC CONNECTION EXPLORER (LCON) MISSION INVESTIGATION TEAM, THAT COVERS PHASE A OF THE MISSION. THE NASA AO IS NNHIIZDA0020. UNDER THE DIRECTION OF THE PRINCIPAL INVESTIGATOR (PI) DR. THOMAS IMMEL, UCB WILL BE THE PRINCIPAL CONTRACTOR TO NASA FOR ICON. UCB SHALL CONDUCT THE PHASE A CONCEPT STUDY IN ACCORDANCE WITH THE CONCEPT STUDY GUIDELINES. IN PERFORMANCE OF THIS STUDY, THE ICON TEAM SHALL: A. CONDUCT TRADE AND RISK REDUCTION STUDIES; B. UPDATE AND REFINE THE EXISTING MISSION COST ESTIMATES AND FINANCIAL PLAN; C. INTEGRATE AND DELIVER TO NASA ALL SUBCONTRACTOR AND UCB FINANCIAL REPORTS; D. DEVELOP PLAN FOR EARNED VALUE MANAGEMENT TO BE IN PLACE DURING PHASES C AND D; E. DEVELOP THE MISSION IMPLEMENTATION PLAN FOR PHASE B/CID, AND E; F. DEFME THE RISK MANAGEMENT PLAN AND DEVELOP MITIGATION STRATEGIES; G. OUTLINE THE FABRICATION, INTEGRATION, TEST, AND OPERATION OF THE SYSTEM; H. DEFINE THE EDUCATION, OUTREACH, TECHNOLOGY, AND SMALL BUSINESS DISADVANTAGED BUSINESS PLANS; I. DEVELOP A PRELIMINARY PERFORMANCE ASSURANCE IMPLEMENTATION PLAN (PAIP); J. DEVELOP A PRELIMINARY SYSTEMS ENGINEERING MANAGEMENT PLAN; K. DOCUMENT THE RESULTS OF THE STUDIES IN THE PHASE A CONCEPT STUDY REPORT; AND L. PRESENT THE ICON CONCEPT TO THE NASA ASSOCIATE ADMINISTRATOR. |
| Jan 10, 2014 | 11 | $5.0M | PHASE A THROUGH F - ICON. THIS CONTRACT IS FOR THE UNIVERSITY OF CALIFORNIA (UCB) AT BERKELEY SPACE SCIENCES LABORATORY, THE PRIME CONTRACTUAL INTERFACE FOR NASA FOR THE IONOSPHERIC CONNECTION EXPLORER (LCON) MISSION INVESTIGATION TEAM, THAT COVERS PHASE A OF THE MISSION. THE NASA AO IS NNHIIZDA0020. UNDER THE DIRECTION OF THE PRINCIPAL INVESTIGATOR (PI) DR. THOMAS IMMEL, UCB WILL BE THE PRINCIPAL CONTRACTOR TO NASA FOR ICON. UCB SHALL CONDUCT THE PHASE A CONCEPT STUDY IN ACCORDANCE WITH THE CONCEPT STUDY GUIDELINES. IN PERFORMANCE OF THIS STUDY, THE ICON TEAM SHALL: A. CONDUCT TRADE AND RISK REDUCTION STUDIES; B. UPDATE AND REFINE THE EXISTING MISSION COST ESTIMATES AND FINANCIAL PLAN; C. INTEGRATE AND DELIVER TO NASA ALL SUBCONTRACTOR AND UCB FINANCIAL REPORTS; D. DEVELOP PLAN FOR EARNED VALUE MANAGEMENT TO BE IN PLACE DURING PHASES C AND D; E. DEVELOP THE MISSION IMPLEMENTATION PLAN FOR PHASE B/CID, AND E; F. DEFME THE RISK MANAGEMENT PLAN AND DEVELOP MITIGATION STRATEGIES; G. OUTLINE THE FABRICATION, INTEGRATION, TEST, AND OPERATION OF THE SYSTEM; H. DEFINE THE EDUCATION, OUTREACH, TECHNOLOGY, AND SMALL BUSINESS DISADVANTAGED BUSINESS PLANS; I. DEVELOP A PRELIMINARY PERFORMANCE ASSURANCE IMPLEMENTATION PLAN (PAIP); J. DEVELOP A PRELIMINARY SYSTEMS ENGINEERING MANAGEMENT PLAN; K. DOCUMENT THE RESULTS OF THE STUDIES IN THE PHASE A CONCEPT STUDY REPORT; AND L. PRESENT THE ICON CONCEPT TO THE NASA ASSOCIATE ADMINISTRATOR. |
| Dec 6, 2013 | 10 | $1.6M | PHASE A THROUGH F - ICON. THIS CONTRACT IS FOR THE UNIVERSITY OF CALIFORNIA (UCB) AT BERKELEY SPACE SCIENCES LABORATORY, THE PRIME CONTRACTUAL INTERFACE FOR NASA FOR THE IONOSPHERIC CONNECTION EXPLORER (LCON) MISSION INVESTIGATION TEAM, THAT COVERS PHASE A OF THE MISSION. THE NASA AO IS NNHIIZDA0020. UNDER THE DIRECTION OF THE PRINCIPAL INVESTIGATOR (PI) DR. THOMAS IMMEL, UCB WILL BE THE PRINCIPAL CONTRACTOR TO NASA FOR ICON. UCB SHALL CONDUCT THE PHASE A CONCEPT STUDY IN ACCORDANCE WITH THE CONCEPT STUDY GUIDELINES. IN PERFORMANCE OF THIS STUDY, THE ICON TEAM SHALL: A. CONDUCT TRADE AND RISK REDUCTION STUDIES; B. UPDATE AND REFINE THE EXISTING MISSION COST ESTIMATES AND FINANCIAL PLAN; C. INTEGRATE AND DELIVER TO NASA ALL SUBCONTRACTOR AND UCB FINANCIAL REPORTS; D. DEVELOP PLAN FOR EARNED VALUE MANAGEMENT TO BE IN PLACE DURING PHASES C AND D; E. DEVELOP THE MISSION IMPLEMENTATION PLAN FOR PHASE B/CID, AND E; F. DEFME THE RISK MANAGEMENT PLAN AND DEVELOP MITIGATION STRATEGIES; G. OUTLINE THE FABRICATION, INTEGRATION, TEST, AND OPERATION OF THE SYSTEM; H. DEFINE THE EDUCATION, OUTREACH, TECHNOLOGY, AND SMALL BUSINESS DISADVANTAGED BUSINESS PLANS; I. DEVELOP A PRELIMINARY PERFORMANCE ASSURANCE IMPLEMENTATION PLAN (PAIP); J. DEVELOP A PRELIMINARY SYSTEMS ENGINEERING MANAGEMENT PLAN; K. DOCUMENT THE RESULTS OF THE STUDIES IN THE PHASE A CONCEPT STUDY REPORT; AND L. PRESENT THE ICON CONCEPT TO THE NASA ASSOCIATE ADMINISTRATOR. |
| Nov 20, 2013 | 9 | $0 | PHASE A THROUGH F - ICON. THIS CONTRACT IS FOR THE UNIVERSITY OF CALIFORNIA (UCB) AT BERKELEY SPACE SCIENCES LABORATORY, THE PRIME CONTRACTUAL INTERFACE FOR NASA FOR THE IONOSPHERIC CONNECTION EXPLORER (LCON) MISSION INVESTIGATION TEAM, THAT COVERS PHASE A OF THE MISSION. THE NASA AO IS NNHIIZDA0020. UNDER THE DIRECTION OF THE PRINCIPAL INVESTIGATOR (PI) DR. THOMAS IMMEL, UCB WILL BE THE PRINCIPAL CONTRACTOR TO NASA FOR ICON. UCB SHALL CONDUCT THE PHASE A CONCEPT STUDY IN ACCORDANCE WITH THE CONCEPT STUDY GUIDELINES. IN PERFORMANCE OF THIS STUDY, THE ICON TEAM SHALL: A. CONDUCT TRADE AND RISK REDUCTION STUDIES; B. UPDATE AND REFINE THE EXISTING MISSION COST ESTIMATES AND FINANCIAL PLAN; C. INTEGRATE AND DELIVER TO NASA ALL SUBCONTRACTOR AND UCB FINANCIAL REPORTS; D. DEVELOP PLAN FOR EARNED VALUE MANAGEMENT TO BE IN PLACE DURING PHASES C AND D; E. DEVELOP THE MISSION IMPLEMENTATION PLAN FOR PHASE B/CID, AND E; F. DEFME THE RISK MANAGEMENT PLAN AND DEVELOP MITIGATION STRATEGIES; G. OUTLINE THE FABRICATION, INTEGRATION, TEST, AND OPERATION OF THE SYSTEM; H. DEFINE THE EDUCATION, OUTREACH, TECHNOLOGY, AND SMALL BUSINESS DISADVANTAGED BUSINESS PLANS; I. DEVELOP A PRELIMINARY PERFORMANCE ASSURANCE IMPLEMENTATION PLAN (PAIP); J. DEVELOP A PRELIMINARY SYSTEMS ENGINEERING MANAGEMENT PLAN; K. DOCUMENT THE RESULTS OF THE STUDIES IN THE PHASE A CONCEPT STUDY REPORT; AND L. PRESENT THE ICON CONCEPT TO THE NASA ASSOCIATE ADMINISTRATOR. |
| Sep 26, 2013 | 8 | $0 | PHASE A THROUGH F - ICON. THIS CONTRACT IS FOR THE UNIVERSITY OF CALIFORNIA (UCB) AT BERKELEY SPACE SCIENCES LABORATORY, THE PRIME CONTRACTUAL INTERFACE FOR NASA FOR THE IONOSPHERIC CONNECTION EXPLORER (LCON) MISSION INVESTIGATION TEAM, THAT COVERS PHASE A OF THE MISSION. THE NASA AO IS NNHIIZDA0020. UNDER THE DIRECTION OF THE PRINCIPAL INVESTIGATOR (PI) DR. THOMAS IMMEL, UCB WILL BE THE PRINCIPAL CONTRACTOR TO NASA FOR ICON. UCB SHALL CONDUCT THE PHASE A CONCEPT STUDY IN ACCORDANCE WITH THE CONCEPT STUDY GUIDELINES. IN PERFORMANCE OF THIS STUDY, THE ICON TEAM SHALL: A. CONDUCT TRADE AND RISK REDUCTION STUDIES; B. UPDATE AND REFINE THE EXISTING MISSION COST ESTIMATES AND FINANCIAL PLAN; C. INTEGRATE AND DELIVER TO NASA ALL SUBCONTRACTOR AND UCB FINANCIAL REPORTS; D. DEVELOP PLAN FOR EARNED VALUE MANAGEMENT TO BE IN PLACE DURING PHASES C AND D; E. DEVELOP THE MISSION IMPLEMENTATION PLAN FOR PHASE B/CID, AND E; F. DEFME THE RISK MANAGEMENT PLAN AND DEVELOP MITIGATION STRATEGIES; G. OUTLINE THE FABRICATION, INTEGRATION, TEST, AND OPERATION OF THE SYSTEM; H. DEFINE THE EDUCATION, OUTREACH, TECHNOLOGY, AND SMALL BUSINESS DISADVANTAGED BUSINESS PLANS; I. DEVELOP A PRELIMINARY PERFORMANCE ASSURANCE IMPLEMENTATION PLAN (PAIP); J. DEVELOP A PRELIMINARY SYSTEMS ENGINEERING MANAGEMENT PLAN; K. DOCUMENT THE RESULTS OF THE STUDIES IN THE PHASE A CONCEPT STUDY REPORT; AND L. PRESENT THE ICON CONCEPT TO THE NASA ASSOCIATE ADMINISTRATOR. |
| Sep 10, 2013 | 7 | $4.4M | PHASE A THROUGH F - ICON. THIS CONTRACT IS FOR THE UNIVERSITY OF CALIFORNIA (UCB) AT BERKELEY SPACE SCIENCES LABORATORY, THE PRIME CONTRACTUAL INTERFACE FOR NASA FOR THE IONOSPHERIC CONNECTION EXPLORER (LCON) MISSION INVESTIGATION TEAM, THAT COVERS PHASE A OF THE MISSION. THE NASA AO IS NNHIIZDA0020. UNDER THE DIRECTION OF THE PRINCIPAL INVESTIGATOR (PI) DR. THOMAS IMMEL, UCB WILL BE THE PRINCIPAL CONTRACTOR TO NASA FOR ICON. UCB SHALL CONDUCT THE PHASE A CONCEPT STUDY IN ACCORDANCE WITH THE CONCEPT STUDY GUIDELINES. IN PERFORMANCE OF THIS STUDY, THE ICON TEAM SHALL: A. CONDUCT TRADE AND RISK REDUCTION STUDIES; B. UPDATE AND REFINE THE EXISTING MISSION COST ESTIMATES AND FINANCIAL PLAN; C. INTEGRATE AND DELIVER TO NASA ALL SUBCONTRACTOR AND UCB FINANCIAL REPORTS; D. DEVELOP PLAN FOR EARNED VALUE MANAGEMENT TO BE IN PLACE DURING PHASES C AND D; E. DEVELOP THE MISSION IMPLEMENTATION PLAN FOR PHASE B/CID, AND E; F. DEFME THE RISK MANAGEMENT PLAN AND DEVELOP MITIGATION STRATEGIES; G. OUTLINE THE FABRICATION, INTEGRATION, TEST, AND OPERATION OF THE SYSTEM; H. DEFINE THE EDUCATION, OUTREACH, TECHNOLOGY, AND SMALL BUSINESS DISADVANTAGED BUSINESS PLANS; I. DEVELOP A PRELIMINARY PERFORMANCE ASSURANCE IMPLEMENTATION PLAN (PAIP); J. DEVELOP A PRELIMINARY SYSTEMS ENGINEERING MANAGEMENT PLAN; K. DOCUMENT THE RESULTS OF THE STUDIES IN THE PHASE A CONCEPT STUDY REPORT; AND L. PRESENT THE ICON CONCEPT TO THE NASA ASSOCIATE ADMINISTRATOR. |
| Sep 9, 2013 | 6 | $-4.4M | PHASE A THROUGH F - ICON. THIS CONTRACT IS FOR THE UNIVERSITY OF CALIFORNIA (UCB) AT BERKELEY SPACE SCIENCES LABORATORY, THE PRIME CONTRACTUAL INTERFACE FOR NASA FOR THE IONOSPHERIC CONNECTION EXPLORER (LCON) MISSION INVESTIGATION TEAM, THAT COVERS PHASE A OF THE MISSION. THE NASA AO IS NNHIIZDA0020. UNDER THE DIRECTION OF THE PRINCIPAL INVESTIGATOR (PI) DR. THOMAS IMMEL, UCB WILL BE THE PRINCIPAL CONTRACTOR TO NASA FOR ICON. UCB SHALL CONDUCT THE PHASE A CONCEPT STUDY IN ACCORDANCE WITH THE CONCEPT STUDY GUIDELINES. IN PERFORMANCE OF THIS STUDY, THE ICON TEAM SHALL: A. CONDUCT TRADE AND RISK REDUCTION STUDIES; B. UPDATE AND REFINE THE EXISTING MISSION COST ESTIMATES AND FINANCIAL PLAN; C. INTEGRATE AND DELIVER TO NASA ALL SUBCONTRACTOR AND UCB FINANCIAL REPORTS; D. DEVELOP PLAN FOR EARNED VALUE MANAGEMENT TO BE IN PLACE DURING PHASES C AND D; E. DEVELOP THE MISSION IMPLEMENTATION PLAN FOR PHASE B/CID, AND E; F. DEFME THE RISK MANAGEMENT PLAN AND DEVELOP MITIGATION STRATEGIES; G. OUTLINE THE FABRICATION, INTEGRATION, TEST, AND OPERATION OF THE SYSTEM; H. DEFINE THE EDUCATION, OUTREACH, TECHNOLOGY, AND SMALL BUSINESS DISADVANTAGED BUSINESS PLANS; I. DEVELOP A PRELIMINARY PERFORMANCE ASSURANCE IMPLEMENTATION PLAN (PAIP); J. DEVELOP A PRELIMINARY SYSTEMS ENGINEERING MANAGEMENT PLAN; K. DOCUMENT THE RESULTS OF THE STUDIES IN THE PHASE A CONCEPT STUDY REPORT; AND L. PRESENT THE ICON CONCEPT TO THE NASA ASSOCIATE ADMINISTRATOR. |
| Jun 18, 2013 | 5 | $0 | PHASE A THROUGH F - ICON. THIS CONTRACT IS FOR THE UNIVERSITY OF CALIFORNIA (UCB) AT BERKELEY SPACE SCIENCES LABORATORY, THE PRIME CONTRACTUAL INTERFACE FOR NASA FOR THE IONOSPHERIC CONNECTION EXPLORER (LCON) MISSION INVESTIGATION TEAM, THAT COVERS PHASE A OF THE MISSION. THE NASA AO IS NNHIIZDA0020. UNDER THE DIRECTION OF THE PRINCIPAL INVESTIGATOR (PI) DR. THOMAS IMMEL, UCB WILL BE THE PRINCIPAL CONTRACTOR TO NASA FOR ICON. UCB SHALL CONDUCT THE PHASE A CONCEPT STUDY IN ACCORDANCE WITH THE CONCEPT STUDY GUIDELINES. IN PERFORMANCE OF THIS STUDY, THE ICON TEAM SHALL: A. CONDUCT TRADE AND RISK REDUCTION STUDIES; B. UPDATE AND REFINE THE EXISTING MISSION COST ESTIMATES AND FINANCIAL PLAN; C. INTEGRATE AND DELIVER TO NASA ALL SUBCONTRACTOR AND UCB FINANCIAL REPORTS; D. DEVELOP PLAN FOR EARNED VALUE MANAGEMENT TO BE IN PLACE DURING PHASES C AND D; E. DEVELOP THE MISSION IMPLEMENTATION PLAN FOR PHASE B/CID, AND E; F. DEFME THE RISK MANAGEMENT PLAN AND DEVELOP MITIGATION STRATEGIES; G. OUTLINE THE FABRICATION, INTEGRATION, TEST, AND OPERATION OF THE SYSTEM; H. DEFINE THE EDUCATION, OUTREACH, TECHNOLOGY, AND SMALL BUSINESS DISADVANTAGED BUSINESS PLANS; I. DEVELOP A PRELIMINARY PERFORMANCE ASSURANCE IMPLEMENTATION PLAN (PAIP); J. DEVELOP A PRELIMINARY SYSTEMS ENGINEERING MANAGEMENT PLAN; K. DOCUMENT THE RESULTS OF THE STUDIES IN THE PHASE A CONCEPT STUDY REPORT; AND L. PRESENT THE ICON CONCEPT TO THE NASA ASSOCIATE ADMINISTRATOR. |
| May 29, 2013 | 4 | $4.4M | PHASE A THROUGH F - ICON. THIS CONTRACT IS FOR THE UNIVERSITY OF CALIFORNIA (UCB) AT BERKELEY SPACE SCIENCES LABORATORY, THE PRIME CONTRACTUAL INTERFACE FOR NASA FOR THE IONOSPHERIC CONNECTION EXPLORER (LCON) MISSION INVESTIGATION TEAM, THAT COVERS PHASE A OF THE MISSION. THE NASA AO IS NNHIIZDA0020. UNDER THE DIRECTION OF THE PRINCIPAL INVESTIGATOR (PI) DR. THOMAS IMMEL, UCB WILL BE THE PRINCIPAL CONTRACTOR TO NASA FOR ICON. UCB SHALL CONDUCT THE PHASE A CONCEPT STUDY IN ACCORDANCE WITH THE CONCEPT STUDY GUIDELINES. IN PERFORMANCE OF THIS STUDY, THE ICON TEAM SHALL: A. CONDUCT TRADE AND RISK REDUCTION STUDIES; B. UPDATE AND REFINE THE EXISTING MISSION COST ESTIMATES AND FINANCIAL PLAN; C. INTEGRATE AND DELIVER TO NASA ALL SUBCONTRACTOR AND UCB FINANCIAL REPORTS; D. DEVELOP PLAN FOR EARNED VALUE MANAGEMENT TO BE IN PLACE DURING PHASES C AND D; E. DEVELOP THE MISSION IMPLEMENTATION PLAN FOR PHASE B/CID, AND E; F. DEFME THE RISK MANAGEMENT PLAN AND DEVELOP MITIGATION STRATEGIES; G. OUTLINE THE FABRICATION, INTEGRATION, TEST, AND OPERATION OF THE SYSTEM; H. DEFINE THE EDUCATION, OUTREACH, TECHNOLOGY, AND SMALL BUSINESS DISADVANTAGED BUSINESS PLANS; I. DEVELOP A PRELIMINARY PERFORMANCE ASSURANCE IMPLEMENTATION PLAN (PAIP); J. DEVELOP A PRELIMINARY SYSTEMS ENGINEERING MANAGEMENT PLAN; K. DOCUMENT THE RESULTS OF THE STUDIES IN THE PHASE A CONCEPT STUDY REPORT; AND L. PRESENT THE ICON CONCEPT TO THE NASA ASSOCIATE ADMINISTRATOR. |
| May 15, 2013 | 3 | $0 | PHASE A - ICON. THIS CONTRACT IS FOR THE UNIVERSITY OF CALIFORNIA (UCB) AT BERKELEY SPACE SCIENCES LABORATORY, THE PRIME CONTRACTUAL INTERFACE FOR NASA FOR THE IONOSPHERIC CONNECTION EXPLORER (LCON) MISSION INVESTIGATION TEAM, THAT COVERS PHASE A OF THE MISSION. THE NASA AO IS NNHIIZDA0020. UNDER THE DIRECTION OF THE PRINCIPAL INVESTIGATOR (PI) DR. THOMAS IMMEL, UCB WILL BE THE PRINCIPAL CONTRACTOR TO NASA FOR ICON. UCB SHALL CONDUCT THE PHASE A CONCEPT STUDY IN ACCORDANCE WITH THE CONCEPT STUDY GUIDELINES. IN PERFORMANCE OF THIS STUDY, THE ICON TEAM SHALL: A. CONDUCT TRADE AND RISK REDUCTION STUDIES; B. UPDATE AND REFINE THE EXISTING MISSION COST ESTIMATES AND FINANCIAL PLAN; C. INTEGRATE AND DELIVER TO NASA ALL SUBCONTRACTOR AND UCB FINANCIAL REPORTS; D. DEVELOP PLAN FOR EARNED VALUE MANAGEMENT TO BE IN PLACE DURING PHASES C AND D; E. DEVELOP THE MISSION IMPLEMENTATION PLAN FOR PHASE B/CID, AND E; F. DEFME THE RISK MANAGEMENT PLAN AND DEVELOP MITIGATION STRATEGIES; G. OUTLINE THE FABRICATION, INTEGRATION, TEST, AND OPERATION OF THE SYSTEM; H. DEFINE THE EDUCATION, OUTREACH, TECHNOLOGY, AND SMALL BUSINESS DISADVANTAGED BUSINESS PLANS; I. DEVELOP A PRELIMINARY PERFORMANCE ASSURANCE IMPLEMENTATION PLAN (PAIP); J. DEVELOP A PRELIMINARY SYSTEMS ENGINEERING MANAGEMENT PLAN; K. DOCUMENT THE RESULTS OF THE STUDIES IN THE PHASE A CONCEPT STUDY REPORT; AND L. PRESENT THE ICON CONCEPT TO THE NASA ASSOCIATE ADMINISTRATOR. |
| Mar 13, 2013 | 2 | $0 | PHASE A THROUGH F - ICON. THIS CONTRACT IS FOR THE UNIVERSITY OF CALIFORNIA (UCB) AT BERKELEY SPACE SCIENCES LABORATORY, THE PRIME CONTRACTUAL INTERFACE FOR NASA FOR THE IONOSPHERIC CONNECTION EXPLORER (LCON) MISSION INVESTIGATION TEAM, THAT COVERS PHASE A OF THE MISSION. THE NASA AO IS NNHIIZDA0020. UNDER THE DIRECTION OF THE PRINCIPAL INVESTIGATOR (PI) DR. THOMAS IMMEL, UCB WILL BE THE PRINCIPAL CONTRACTOR TO NASA FOR ICON. UCB SHALL CONDUCT THE PHASE A CONCEPT STUDY IN ACCORDANCE WITH THE CONCEPT STUDY GUIDELINES. IN PERFORMANCE OF THIS STUDY, THE ICON TEAM SHALL: A. CONDUCT TRADE AND RISK REDUCTION STUDIES; B. UPDATE AND REFINE THE EXISTING MISSION COST ESTIMATES AND FINANCIAL PLAN; C. INTEGRATE AND DELIVER TO NASA ALL SUBCONTRACTOR AND UCB FINANCIAL REPORTS; D. DEVELOP PLAN FOR EARNED VALUE MANAGEMENT TO BE IN PLACE DURING PHASES C AND D; E. DEVELOP THE MISSION IMPLEMENTATION PLAN FOR PHASE B/CID, AND E; F. DEFME THE RISK MANAGEMENT PLAN AND DEVELOP MITIGATION STRATEGIES; G. OUTLINE THE FABRICATION, INTEGRATION, TEST, AND OPERATION OF THE SYSTEM; H. DEFINE THE EDUCATION, OUTREACH, TECHNOLOGY, AND SMALL BUSINESS DISADVANTAGED BUSINESS PLANS; I. DEVELOP A PRELIMINARY PERFORMANCE ASSURANCE IMPLEMENTATION PLAN (PAIP); J. DEVELOP A PRELIMINARY SYSTEMS ENGINEERING MANAGEMENT PLAN; K. DOCUMENT THE RESULTS OF THE STUDIES IN THE PHASE A CONCEPT STUDY REPORT; AND L. PRESENT THE ICON CONCEPT TO THE NASA ASSOCIATE ADMINISTRATOR. |
| Nov 19, 2012 | 1 | $0 | PHASE A - ICON. THIS CONTRACT IS FOR THE UNIVERSITY OF CALIFORNIA (UCB) AT BERKELEY SPACE SCIENCES LABORATORY, THE PRIME CONTRACTUAL INTERFACE FOR NASA FOR THE IONOSPHERIC CONNECTION EXPLORER (LCON) MISSION INVESTIGATION TEAM, THAT COVERS PHASE A OF THE MISSION. THE NASA AO IS NNHIIZDA0020. UNDER THE DIRECTION OF THE PRINCIPAL INVESTIGATOR (PI) DR. THOMAS IMMEL, UCB WILL BE THE PRINCIPAL CONTRACTOR TO NASA FOR ICON. UCB SHALL CONDUCT THE PHASE A CONCEPT STUDY IN ACCORDANCE WITH THE CONCEPT STUDY GUIDELINES. IN PERFORMANCE OF THIS STUDY, THE ICON TEAM SHALL: A. CONDUCT TRADE AND RISK REDUCTION STUDIES; B. UPDATE AND REFINE THE EXISTING MISSION COST ESTIMATES AND FINANCIAL PLAN; C. INTEGRATE AND DELIVER TO NASA ALL SUBCONTRACTOR AND UCB FINANCIAL REPORTS; D. DEVELOP PLAN FOR EARNED VALUE MANAGEMENT TO BE IN PLACE DURING PHASES C AND D; E. DEVELOP THE MISSION IMPLEMENTATION PLAN FOR PHASE B/CID, AND E; F. DEFME THE RISK MANAGEMENT PLAN AND DEVELOP MITIGATION STRATEGIES; G. OUTLINE THE FABRICATION, INTEGRATION, TEST, AND OPERATION OF THE SYSTEM; H. DEFINE THE EDUCATION, OUTREACH, TECHNOLOGY, AND SMALL BUSINESS DISADVANTAGED BUSINESS PLANS; I. DEVELOP A PRELIMINARY PERFORMANCE ASSURANCE IMPLEMENTATION PLAN (PAIP); J. DEVELOP A PRELIMINARY SYSTEMS ENGINEERING MANAGEMENT PLAN; K. DOCUMENT THE RESULTS OF THE STUDIES IN THE PHASE A CONCEPT STUDY REPORT; AND L. PRESENT THE ICON CONCEPT TO THE NASA ASSOCIATE ADMINISTRATOR. |
| Jan 11, 2012 | 0 | $789.1K | PHASE A THROUGH F - ICON. THIS CONTRACT IS FOR THE UNIVERSITY OF CALIFORNIA (UCB) AT BERKELEY SPACE SCIENCES LABORATORY, THE PRIME CONTRACTUAL INTERFACE FOR NASA FOR THE IONOSPHERIC CONNECTION EXPLORER (LCON) MISSION INVESTIGATION TEAM, THAT COVERS PHASE A OF THE MISSION. THE NASA AO IS NNHIIZDA0020. UNDER THE DIRECTION OF THE PRINCIPAL INVESTIGATOR (PI) DR. THOMAS IMMEL, UCB WILL BE THE PRINCIPAL CONTRACTOR TO NASA FOR ICON. UCB SHALL CONDUCT THE PHASE A CONCEPT STUDY IN ACCORDANCE WITH THE CONCEPT STUDY GUIDELINES. IN PERFORMANCE OF THIS STUDY, THE ICON TEAM SHALL: A. CONDUCT TRADE AND RISK REDUCTION STUDIES B. UPDATE AND REFINE THE EXISTING MISSION COST ESTIMATES AND FINANCIAL PLAN C. INTEGRATE AND DELIVER TO NASA ALL SUBCONTRACTOR AND UCB FINANCIAL REPORTS D. DEVELOP PLAN FOR EARNED VALUE MANAGEMENT TO BE IN PLACE DURING PHASES C AND D E. DEVELOP THE MISSION IMPLEMENTATION PLAN FOR PHASE B/CID, AND E F. DEFME THE RISK MANAGEMENT PLAN AND DEVELOP MITIGATION STRATEGIES G. OUTLINE THE FABRICATION, INTEGRATION, TEST, AND OPERATION OF THE SYSTEM H. DEFINE THE EDUCATION, OUTREACH, TECHNOLOGY, AND SMALL BUSINESS DISADVANTAGED BUSINESS PLANS I. DEVELOP A PRELIMINARY PERFORMANCE ASSURANCE IMPLEMENTATION PLAN (PAIP) J. DEVELOP A PRELIMINARY SYSTEMS ENGINEERING MANAGEMENT PLAN K. DOCUMENT THE RESULTS OF THE STUDIES IN THE PHASE A CONCEPT STUDY REPORT AND L. PRESENT THE ICON CONCEPT TO THE NASA ASSOCIATE ADMINISTRATOR. |
Research next steps
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.