Federal contract award

NNH15CN70C

IGF::OT::IGF NEXTSTEP-2: THE GATEWAY PROGRAM OFFICE WAS DIRECTED BY NASA HQ TO COMMENCE WORK ON DEVELOPING AND REFINING GATEWAY HABITATION CONCEPTS, LEADING TO DESIGN, DEVELOPMENT, TEST AND EVALUATION (DDT&E) AND DELIVERY OF A U.S. HABITATION MODULE TO NASA.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyNational Aeronautics and Space Administration
OfficeNASA MARSHALL SPACE FLIGHT CENTER
NAICS541712
PSCAR22 — SPACE SCIENCE AND APPLICATIONS - APPLIED RESEARCH/EXPLORATORY DEVELOPMENT
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$48.6M
Current contract value$48.6M
Potential contract value / ceiling$48.6M
Start dateSep 23, 2015
Current end dateDec 31, 2025
Potential end dateDec 31, 2025
Latest award activityJan 22, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 49 of 49 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jan 22, 202648$0NEXTSTEP-2
Dec 2, 202547$0NEXTSTEP-2
Apr 29, 202546$3.9MNEXTSTEP-2
Nov 26, 202445$0NEXTSTEP-2: THE GATEWAY PROGRAM OFFICE WAS DIRECTED BY NASA HQ TO COMMENCE WORK ON DEVELOPING AND REFINING GATEWAY HABITATION CONCEPTS, LEADING TO DESIGN, DEVELOPMENT, TEST AND EVALUATION (DDT&E) AND DELIVERY OF A U.S. HABITATION MODULE TO NASA.
Jun 27, 202444$2.2MNEXTSTEP-2: THE GATEWAY PROGRAM OFFICE WAS DIRECTED BY NASA HQ TO COMMENCE WORK ON DEVELOPING AND REFINING GATEWAY HABITATION CONCEPTS, LEADING TO DESIGN, DEVELOPMENT, TEST AND EVALUATION (DDT&E) AND DELIVERY OF A U.S. HABITATION MODULE TO NASA.
Apr 17, 202443$0NEXTSTEP-2: THE GATEWAY PROGRAM OFFICE WAS DIRECTED BY NASA HQ TO COMMENCE WORK ON DEVELOPING AND REFINING GATEWAY HABITATION CONCEPTS, LEADING TO DESIGN, DEVELOPMENT, TEST AND EVALUATION (DDT&E) AND DELIVERY OF A U.S. HABITATION MODULE TO NASA.
Apr 11, 202442$1.4MNEXTSTEP-2: THE GATEWAY PROGRAM OFFICE WAS DIRECTED BY NASA HQ TO COMMENCE WORK ON DEVELOPING AND REFINING GATEWAY HABITATION CONCEPTS, LEADING TO DESIGN, DEVELOPMENT, TEST AND EVALUATION (DDT&E) AND DELIVERY OF A U.S. HABITATION MODULE TO NASA.
Apr 10, 202441$-1.4MNEXTSTEP-2: THE GATEWAY PROGRAM OFFICE WAS DIRECTED BY NASA HQ TO COMMENCE WORK ON DEVELOPING AND REFINING GATEWAY HABITATION CONCEPTS, LEADING TO DESIGN, DEVELOPMENT, TEST AND EVALUATION (DDT&E) AND DELIVERY OF A U.S. HABITATION MODULE TO NASA.
Apr 1, 202440$1.4MNEXTSTEP-2: THE GATEWAY PROGRAM OFFICE WAS DIRECTED BY NASA HQ TO COMMENCE WORK ON DEVELOPING AND REFINING GATEWAY HABITATION CONCEPTS, LEADING TO DESIGN, DEVELOPMENT, TEST AND EVALUATION (DDT&E) AND DELIVERY OF A U.S. HABITATION MODULE TO NASA.
Dec 13, 202339$0NEXTSTEP-2: THE GATEWAY PROGRAM OFFICE WAS DIRECTED BY NASA HQ TO COMMENCE WORK ON DEVELOPING AND REFINING GATEWAY HABITATION CONCEPTS, LEADING TO DESIGN, DEVELOPMENT, TEST AND EVALUATION (DDT&E) AND DELIVERY OF A U.S. HABITATION MODULE TO NASA.
Jul 26, 202338$0NEXTSTEP-2: THE GATEWAY PROGRAM OFFICE WAS DIRECTED BY NASA HQ TO COMMENCE WORK ON DEVELOPING AND REFINING GATEWAY HABITATION CONCEPTS, LEADING TO DESIGN, DEVELOPMENT, TEST AND EVALUATION (DDT&E) AND DELIVERY OF A U.S. HABITATION MODULE TO NASA.
Mar 7, 202337$1.2MNEXTSTEP-2: THE GATEWAY PROGRAM OFFICE WAS DIRECTED BY NASA HQ TO COMMENCE WORK ON DEVELOPING AND REFINING GATEWAY HABITATION CONCEPTS, LEADING TO DESIGN, DEVELOPMENT, TEST AND EVALUATION (DDT&E) AND DELIVERY OF A U.S. HABITATION MODULE TO NASA.
Jan 18, 202336$0NEXTSTEP-2: THE GATEWAY PROGRAM OFFICE WAS DIRECTED BY NASA HQ TO COMMENCE WORK ON DEVELOPING AND REFINING GATEWAY HABITATION CONCEPTS, LEADING TO DESIGN, DEVELOPMENT, TEST AND EVALUATION (DDT&E) AND DELIVERY OF A U.S. HABITATION MODULE TO NASA.
Jun 1, 202235$174.4KNEXTSTEP-2: THE GATEWAY PROGRAM OFFICE WAS DIRECTED BY NASA HQ TO COMMENCE WORK ON DEVELOPING AND REFINING GATEWAY HABITATION CONCEPTS, LEADING TO DESIGN, DEVELOPMENT, TEST AND EVALUATION (DDT&E) AND DELIVERY OF A U.S. HABITATION MODULE TO NASA.
Mar 9, 202234$0NEXTSTEP-2: THE GATEWAY PROGRAM OFFICE WAS DIRECTED BY NASA HQ TO COMMENCE WORK ON DEVELOPING AND REFINING GATEWAY HABITATION CONCEPTS, LEADING TO DESIGN, DEVELOPMENT, TEST AND EVALUATION (DDT&E) AND DELIVERY OF A U.S. HABITATION MODULE TO NASA.
Oct 15, 202133$0EO14042 NEXTSTEP-2: THE GATEWAY PROGRAM OFFICE WAS DIRECTED BY NASA HQ TO COMMENCE WORK ON DEVELOPING AND REFINING GATEWAY HABITATION CONCEPTS, LEADING TO DESIGN, DEVELOPMENT, TEST AND EVALUATION (DDT&E) AND DELIVERY OF A U.S. HABITATION MODULE TO NASA.
Sep 26, 202132$7.1MNEXTSTEP-2: THE GATEWAY PROGRAM OFFICE WAS DIRECTED BY NASA HQ TO COMMENCE WORK ON DEVELOPING AND REFINING GATEWAY HABITATION CONCEPTS, LEADING TO DESIGN, DEVELOPMENT, TEST AND EVALUATION (DDT&E) AND DELIVERY OF A U.S. HABITATION MODULE TO NASA.
Aug 17, 202131$0NEXTSTEP-2: THE GATEWAY PROGRAM OFFICE WAS DIRECTED BY NASA HQ TO COMMENCE WORK ON DEVELOPING AND REFINING GATEWAY HABITATION CONCEPTS, LEADING TO DESIGN, DEVELOPMENT, TEST AND EVALUATION (DDT&E) AND DELIVERY OF A U.S. HABITATION MODULE TO NASA.
Feb 22, 202130$1.9MNEXTSTEP-2: THE GATEWAY PROGRAM OFFICE WAS DIRECTED BY NASA HQ TO COMMENCE WORK ON DEVELOPING AND REFINING GATEWAY HABITATION CONCEPTS, LEADING TO DESIGN, DEVELOPMENT, TEST AND EVALUATION (DDT&E) AND DELIVERY OF A U.S. HABITATION MODULE TO NASA.
Sep 29, 202029$48.0KNEXTSTEP-2: THE GATEWAY PROGRAM OFFICE WAS DIRECTED BY NASA HQ TO COMMENCE WORK ON DEVELOPING AND REFINING GATEWAY HABITATION CONCEPTS, LEADING TO DESIGN, DEVELOPMENT, TEST AND EVALUATION (DDT&E) AND DELIVERY OF A U.S. HABITATION MODULE TO NASA.
Sep 17, 202028$0NEXTSTEP-2: THE GATEWAY PROGRAM OFFICE WAS DIRECTED BY NASA HQ TO COMMENCE WORK ON DEVELOPING AND REFINING GATEWAY HABITATION CONCEPTS, LEADING TO DESIGN, DEVELOPMENT, TEST AND EVALUATION (DDT&E) AND DELIVERY OF A U.S. HABITATION MODULE TO NASA.
Jul 21, 202027$80.8KNEXTSTEP-2: THE GATEWAY PROGRAM OFFICE WAS DIRECTED BY NASA HQ TO COMMENCE WORK ON DEVELOPING AND REFINING GATEWAY HABITATION CONCEPTS, LEADING TO DESIGN, DEVELOPMENT, TEST AND EVALUATION (DDT&E) AND DELIVERY OF A U.S. HABITATION MODULE TO NASA.
Jul 6, 202026$0NEXTSTEP BAA AWARD. UNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE FOLLOWING: PROJECT MANAGEMENT: PROVIDE OVERALL LEADERSHIP FOR THE PROJECT INTERACT WITH THE CUSTOMER AND WRITE REPORTS. CUSTOMER MEETINGS: ORGANIZE MEETINGS, PREPARE PRESENTATIONS, ATTEND MEETINGS AND ADDRESS ACTION ITEMS. FIVE MEETINGS TOTAL: KICKOFF, THREE TIMS, AND FINAL CONCEPT REVIEW. BUSINESS OPERATIONS: PROVIDE CONTRACTUAL DIRECTION TO THE PROGRAM, INTERFACE WITH THE CUSTOMER, ISSUE BUDGETS AND MONITOR PERFORMANCE, MAINTAIN SCHEDULES, TRACK AND SUBMIT CONTRACT DELIVERABLES, AND ENSURE MISSION SUCCESS. DESIGN MATURATION: WORK WITH NASA TO REFINE DRM AND HIGH-LEVEL SYSTEM REQUIREMENTS TO BE USED IN SUBSYSTEM STUDIES. CAD MODEL SUPPORT: SUPPORT TO WORK ON EAM CONFIGURATION AND MAINTAIN CAD MODELS. SYSTEMS ENGINEERING AND INTEGRATION: SYSTEMS ENGINEERING SUPPORT TO COORDINATE TRADE STUDIES AND TRACK CONFIGURATION CHANGES. RESPONSIBLE FOR ENSURING SYSTEM REQUIREMENTS ARE MET. AIRLOCK/EVA STUDY: THIS STUDY WILL LOOK AT MULTIPLE OPTIONS FOR PROVIDING AN AIRLOCK CAPABILITY. OPTIONS INCLUDE INFLATABLE AIRLOCKS, INTEGRATED AIRLOCKS, AND RIGID AIRLOCKS. THE STUDY WILL ALSO DETERMINE IF THE AIRLOCK SHOULD BE LAUNCHED WITH THE EAM FIRST FLIGHT OR SEPARATELY. ATTITUDE CONTROL SYSTEM: DERIVE ATTITUDE CONTROL REQUIREMENTS FOR DRM AND EXTENDED MISSIONS. AVIONICS STUDY: APPLY HUMAN RATING REQUIREMENTS TO POINT-OF-DEPARTURE AVIONICS SUB-SYSTEM. STUDY HOW MAVEN-DERIVED AVIONICS ARCHITECTURE WOULD BE LEVERAGED FOR THE EAM AND ALSO STUDY THE USE OF ORION AS A BACKUP COMMAND CENTER. POWER SYSTEM STUDY: DERIVE POWER SYSTEM REQUIREMENTS FOR THE DRM AND EXTENDED MISSIONS. STUDY LOAD SHARING POSSIBILITIES WITH ORION. WE WILL CONSTRUCT A DETAILED POWER BUDGET BASED ON A DETAILED POWER EQUIPMENT LIST. THERMAL MANAGEMENT STUDY: PERFORM A THERMAL MANAGEMENT STUDY INTERNAL LAYOUT AND PACKAGING OPTIMIZATION: THIS STUDY WILL INVOLVE PERFORMING AN INTERNAL LAYOUT AND PACKAGING OPTIMIZATION INCLUDING PROVIDING A SOLAR STORM SAFE HAVEN. THE CHIL WILL BE USED TO STUDY HABITABILITY OF OUR DESIGN CONCEPTS. RADIATION SHELTER STUDY: STUDY MOST EFFICIENT WAY TO PROVIDE RADIATION PROTECTION ON BOARD THE EAM. STUDY WILL TRADE USING ORION VERSUS PROVIDING A SAFE HAVEN ON THE EAM. RADIATION MITIGATION STRATEGY STUDY: THIS STUDY WILL EXPLORE OPTIONS FOR METHODS OF MITIGATING LONG-TERM RADIATION EXPOSURE IN DEEP SPACE. DEVELOP AND TEST VARIOUS TECHNIQUES ON BOARD THE EAM. EVOLVABLE ECLSS STUDY: REQUIREMENTS DEFINITION AND BASELINE DESIGN: REQUIREMENTS DEFINITION AND BASELINE SYSTEM DESIGN AND CREATE HABITAT ECLSS SIMULINK MODEL. ECLSS STATE OF THE ART SURVEY: ENGAGE WITH INDUSTRY PARTNERS/VENDORS TO DETERMINE APPROPRIATE ECLSS SOLUTION AND POTENTIAL EVOLVABILITY SOLUTIONS. EVOLVABLE ECLSS STRATEGY: EXPLORE STRATEGIES FOR DESIGNING THE EAM TO SERVE AS A TEST BED FOR DEVELOPING A ROBUST AND COMPACT ECLSS.
Apr 16, 202025$4.1MNEXTSTEP BAA AWARD. UNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE FOLLOWING: PROJECT MANAGEMENT: PROVIDE OVERALL LEADERSHIP FOR THE PROJECT INTERACT WITH THE CUSTOMER AND WRITE REPORTS. CUSTOMER MEETINGS: ORGANIZE MEETINGS, PREPARE PRESENTATIONS, ATTEND MEETINGS AND ADDRESS ACTION ITEMS. FIVE MEETINGS TOTAL: KICKOFF, THREE TIMS, AND FINAL CONCEPT REVIEW. BUSINESS OPERATIONS: PROVIDE CONTRACTUAL DIRECTION TO THE PROGRAM, INTERFACE WITH THE CUSTOMER, ISSUE BUDGETS AND MONITOR PERFORMANCE, MAINTAIN SCHEDULES, TRACK AND SUBMIT CONTRACT DELIVERABLES, AND ENSURE MISSION SUCCESS. DESIGN MATURATION: WORK WITH NASA TO REFINE DRM AND HIGH-LEVEL SYSTEM REQUIREMENTS TO BE USED IN SUBSYSTEM STUDIES. CAD MODEL SUPPORT: SUPPORT TO WORK ON EAM CONFIGURATION AND MAINTAIN CAD MODELS. SYSTEMS ENGINEERING AND INTEGRATION: SYSTEMS ENGINEERING SUPPORT TO COORDINATE TRADE STUDIES AND TRACK CONFIGURATION CHANGES. RESPONSIBLE FOR ENSURING SYSTEM REQUIREMENTS ARE MET. AIRLOCK/EVA STUDY: THIS STUDY WILL LOOK AT MULTIPLE OPTIONS FOR PROVIDING AN AIRLOCK CAPABILITY. OPTIONS INCLUDE INFLATABLE AIRLOCKS, INTEGRATED AIRLOCKS, AND RIGID AIRLOCKS. THE STUDY WILL ALSO DETERMINE IF THE AIRLOCK SHOULD BE LAUNCHED WITH THE EAM FIRST FLIGHT OR SEPARATELY. ATTITUDE CONTROL SYSTEM: DERIVE ATTITUDE CONTROL REQUIREMENTS FOR DRM AND EXTENDED MISSIONS. AVIONICS STUDY: APPLY HUMAN RATING REQUIREMENTS TO POINT-OF-DEPARTURE AVIONICS SUB-SYSTEM. STUDY HOW MAVEN-DERIVED AVIONICS ARCHITECTURE WOULD BE LEVERAGED FOR THE EAM AND ALSO STUDY THE USE OF ORION AS A BACKUP COMMAND CENTER. POWER SYSTEM STUDY: DERIVE POWER SYSTEM REQUIREMENTS FOR THE DRM AND EXTENDED MISSIONS. STUDY LOAD SHARING POSSIBILITIES WITH ORION. WE WILL CONSTRUCT A DETAILED POWER BUDGET BASED ON A DETAILED POWER EQUIPMENT LIST. THERMAL MANAGEMENT STUDY: PERFORM A THERMAL MANAGEMENT STUDY INTERNAL LAYOUT AND PACKAGING OPTIMIZATION: THIS STUDY WILL INVOLVE PERFORMING AN INTERNAL LAYOUT AND PACKAGING OPTIMIZATION INCLUDING PROVIDING A SOLAR STORM SAFE HAVEN. THE CHIL WILL BE USED TO STUDY HABITABILITY OF OUR DESIGN CONCEPTS. RADIATION SHELTER STUDY: STUDY MOST EFFICIENT WAY TO PROVIDE RADIATION PROTECTION ON BOARD THE EAM. STUDY WILL TRADE USING ORION VERSUS PROVIDING A SAFE HAVEN ON THE EAM. RADIATION MITIGATION STRATEGY STUDY: THIS STUDY WILL EXPLORE OPTIONS FOR METHODS OF MITIGATING LONG-TERM RADIATION EXPOSURE IN DEEP SPACE. DEVELOP AND TEST VARIOUS TECHNIQUES ON BOARD THE EAM. EVOLVABLE ECLSS STUDY: REQUIREMENTS DEFINITION AND BASELINE DESIGN: REQUIREMENTS DEFINITION AND BASELINE SYSTEM DESIGN AND CREATE HABITAT ECLSS SIMULINK MODEL. ECLSS STATE OF THE ART SURVEY: ENGAGE WITH INDUSTRY PARTNERS/VENDORS TO DETERMINE APPROPRIATE ECLSS SOLUTION AND POTENTIAL EVOLVABILITY SOLUTIONS. EVOLVABLE ECLSS STRATEGY: EXPLORE STRATEGIES FOR DESIGNING THE EAM TO SERVE AS A TEST BED FOR DEVELOPING A ROBUST AND COMPACT ECLSS.
Nov 21, 201924$1.3MNEXTSTEP BAA AWARD. UNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE FOLLOWING: PROJECT MANAGEMENT: PROVIDE OVERALL LEADERSHIP FOR THE PROJECT INTERACT WITH THE CUSTOMER AND WRITE REPORTS. CUSTOMER MEETINGS: ORGANIZE MEETINGS, PREPARE PRESENTATIONS, ATTEND MEETINGS AND ADDRESS ACTION ITEMS. FIVE MEETINGS TOTAL: KICKOFF, THREE TIMS, AND FINAL CONCEPT REVIEW. BUSINESS OPERATIONS: PROVIDE CONTRACTUAL DIRECTION TO THE PROGRAM, INTERFACE WITH THE CUSTOMER, ISSUE BUDGETS AND MONITOR PERFORMANCE, MAINTAIN SCHEDULES, TRACK AND SUBMIT CONTRACT DELIVERABLES, AND ENSURE MISSION SUCCESS. DESIGN MATURATION: WORK WITH NASA TO REFINE DRM AND HIGH-LEVEL SYSTEM REQUIREMENTS TO BE USED IN SUBSYSTEM STUDIES. CAD MODEL SUPPORT: SUPPORT TO WORK ON EAM CONFIGURATION AND MAINTAIN CAD MODELS. SYSTEMS ENGINEERING AND INTEGRATION: SYSTEMS ENGINEERING SUPPORT TO COORDINATE TRADE STUDIES AND TRACK CONFIGURATION CHANGES. RESPONSIBLE FOR ENSURING SYSTEM REQUIREMENTS ARE MET. AIRLOCK/EVA STUDY: THIS STUDY WILL LOOK AT MULTIPLE OPTIONS FOR PROVIDING AN AIRLOCK CAPABILITY. OPTIONS INCLUDE INFLATABLE AIRLOCKS, INTEGRATED AIRLOCKS, AND RIGID AIRLOCKS. THE STUDY WILL ALSO DETERMINE IF THE AIRLOCK SHOULD BE LAUNCHED WITH THE EAM FIRST FLIGHT OR SEPARATELY. ATTITUDE CONTROL SYSTEM: DERIVE ATTITUDE CONTROL REQUIREMENTS FOR DRM AND EXTENDED MISSIONS. AVIONICS STUDY: APPLY HUMAN RATING REQUIREMENTS TO POINT-OF-DEPARTURE AVIONICS SUB-SYSTEM. STUDY HOW MAVEN-DERIVED AVIONICS ARCHITECTURE WOULD BE LEVERAGED FOR THE EAM AND ALSO STUDY THE USE OF ORION AS A BACKUP COMMAND CENTER. POWER SYSTEM STUDY: DERIVE POWER SYSTEM REQUIREMENTS FOR THE DRM AND EXTENDED MISSIONS. STUDY LOAD SHARING POSSIBILITIES WITH ORION. WE WILL CONSTRUCT A DETAILED POWER BUDGET BASED ON A DETAILED POWER EQUIPMENT LIST. THERMAL MANAGEMENT STUDY: PERFORM A THERMAL MANAGEMENT STUDY INTERNAL LAYOUT AND PACKAGING OPTIMIZATION: THIS STUDY WILL INVOLVE PERFORMING AN INTERNAL LAYOUT AND PACKAGING OPTIMIZATION INCLUDING PROVIDING A SOLAR STORM SAFE HAVEN. THE CHIL WILL BE USED TO STUDY HABITABILITY OF OUR DESIGN CONCEPTS. RADIATION SHELTER STUDY: STUDY MOST EFFICIENT WAY TO PROVIDE RADIATION PROTECTION ON BOARD THE EAM. STUDY WILL TRADE USING ORION VERSUS PROVIDING A SAFE HAVEN ON THE EAM. RADIATION MITIGATION STRATEGY STUDY: THIS STUDY WILL EXPLORE OPTIONS FOR METHODS OF MITIGATING LONG-TERM RADIATION EXPOSURE IN DEEP SPACE. DEVELOP AND TEST VARIOUS TECHNIQUES ON BOARD THE EAM. EVOLVABLE ECLSS STUDY: REQUIREMENTS DEFINITION AND BASELINE DESIGN: REQUIREMENTS DEFINITION AND BASELINE SYSTEM DESIGN AND CREATE HABITAT ECLSS SIMULINK MODEL. ECLSS STATE OF THE ART SURVEY: ENGAGE WITH INDUSTRY PARTNERS/VENDORS TO DETERMINE APPROPRIATE ECLSS SOLUTION AND POTENTIAL EVOLVABILITY SOLUTIONS. EVOLVABLE ECLSS STRATEGY: EXPLORE STRATEGIES FOR DESIGNING THE EAM TO SERVE AS A TEST BED FOR DEVELOPING A ROBUST AND COMPACT ECLSS.
Aug 6, 201923$0NEXTSTEP BAA AWARD. CONTRACT TRANSFERRED TO MSFC AT MOD 23. UNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE FOLLOWING: PROJECT MANAGEMENT: PROVIDE OVERALL LEADERSHIP FOR THE PROJECT INTERACT WITH THE CUSTOMER AND WRITE REPORTS. CUSTOMER MEETINGS: ORGANIZE MEETINGS, PREPARE PRESENTATIONS, ATTEND MEETINGS AND ADDRESS ACTION ITEMS. FIVE MEETINGS TOTAL: KICKOFF, THREE TIMS, AND FINAL CONCEPT REVIEW. BUSINESS OPERATIONS: PROVIDE CONTRACTUAL DIRECTION TO THE PROGRAM, INTERFACE WITH THE CUSTOMER, ISSUE BUDGETS AND MONITOR PERFORMANCE, MAINTAIN SCHEDULES, TRACK AND SUBMIT CONTRACT DELIVERABLES, AND ENSURE MISSION SUCCESS. DESIGN MATURATION: WORK WITH NASA TO REFINE DRM AND HIGH-LEVEL SYSTEM REQUIREMENTS TO BE USED IN SUBSYSTEM STUDIES. CAD MODEL SUPPORT: SUPPORT TO WORK ON EAM CONFIGURATION AND MAINTAIN CAD MODELS. SYSTEMS ENGINEERING AND INTEGRATION: SYSTEMS ENGINEERING SUPPORT TO COORDINATE TRADE STUDIES AND TRACK CONFIGURATION CHANGES. RESPONSIBLE FOR ENSURING SYSTEM REQUIREMENTS ARE MET. AIRLOCK/EVA STUDY: THIS STUDY WILL LOOK AT MULTIPLE OPTIONS FOR PROVIDING AN AIRLOCK CAPABILITY. OPTIONS INCLUDE INFLATABLE AIRLOCKS, INTEGRATED AIRLOCKS, AND RIGID AIRLOCKS. THE STUDY WILL ALSO DETERMINE IF THE AIRLOCK SHOULD BE LAUNCHED WITH THE EAM FIRST FLIGHT OR SEPARATELY. ATTITUDE CONTROL SYSTEM: DERIVE ATTITUDE CONTROL REQUIREMENTS FOR DRM AND EXTENDED MISSIONS. AVIONICS STUDY: APPLY HUMAN RATING REQUIREMENTS TO POINT-OF-DEPARTURE AVIONICS SUB-SYSTEM. STUDY HOW MAVEN-DERIVED AVIONICS ARCHITECTURE WOULD BE LEVERAGED FOR THE EAM AND ALSO STUDY THE USE OF ORION AS A BACKUP COMMAND CENTER. POWER SYSTEM STUDY: DERIVE POWER SYSTEM REQUIREMENTS FOR THE DRM AND EXTENDED MISSIONS. STUDY LOAD SHARING POSSIBILITIES WITH ORION. WE WILL CONSTRUCT A DETAILED POWER BUDGET BASED ON A DETAILED POWER EQUIPMENT LIST. THERMAL MANAGEMENT STUDY: PERFORM A THERMAL MANAGEMENT STUDY INTERNAL LAYOUT AND PACKAGING OPTIMIZATION: THIS STUDY WILL INVOLVE PERFORMING AN INTERNAL LAYOUT AND PACKAGING OPTIMIZATION INCLUDING PROVIDING A SOLAR STORM SAFE HAVEN. THE CHIL WILL BE USED TO STUDY HABITABILITY OF OUR DESIGN CONCEPTS. RADIATION SHELTER STUDY: STUDY MOST EFFICIENT WAY TO PROVIDE RADIATION PROTECTION ON BOARD THE EAM. STUDY WILL TRADE USING ORION VERSUS PROVIDING A SAFE HAVEN ON THE EAM. RADIATION MITIGATION STRATEGY STUDY: THIS STUDY WILL EXPLORE OPTIONS FOR METHODS OF MITIGATING LONG-TERM RADIATION EXPOSURE IN DEEP SPACE. DEVELOP AND TEST VARIOUS TECHNIQUES ON BOARD THE EAM. EVOLVABLE ECLSS STUDY: REQUIREMENTS DEFINITION AND BASELINE DESIGN: REQUIREMENTS DEFINITION AND BASELINE SYSTEM DESIGN AND CREATE HABITAT ECLSS SIMULINK MODEL. ECLSS STATE OF THE ART SURVEY: ENGAGE WITH INDUSTRY PARTNERS/VENDORS TO DETERMINE APPROPRIATE ECLSS SOLUTION AND POTENTIAL EVOLVABILITY SOLUTIONS. EVOLVABLE ECLSS STRATEGY: EXPLORE STRATEGIES FOR DESIGNING THE EAM TO SERVE AS A TEST BED FOR DEVELOPING A ROBUST AND COMPACT ECLSS.
Jul 23, 201922$3.3MNEXTSTEP BAA AWARD. UNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE FOLLOWING: PROJECT MANAGEMENT: PROVIDE OVERALL LEADERSHIP FOR THE PROJECT INTERACT WITH THE CUSTOMER AND WRITE REPORTS. CUSTOMER MEETINGS: ORGANIZE MEETINGS, PREPARE PRESENTATIONS, ATTEND MEETINGS AND ADDRESS ACTION ITEMS. FIVE MEETINGS TOTAL: KICKOFF, THREE TIMS, AND FINAL CONCEPT REVIEW. BUSINESS OPERATIONS: PROVIDE CONTRACTUAL DIRECTION TO THE PROGRAM, INTERFACE WITH THE CUSTOMER, ISSUE BUDGETS AND MONITOR PERFORMANCE, MAINTAIN SCHEDULES, TRACK AND SUBMIT CONTRACT DELIVERABLES, AND ENSURE MISSION SUCCESS. DESIGN MATURATION: WORK WITH NASA TO REFINE DRM AND HIGH-LEVEL SYSTEM REQUIREMENTS TO BE USED IN SUBSYSTEM STUDIES. CAD MODEL SUPPORT: SUPPORT TO WORK ON EAM CONFIGURATION AND MAINTAIN CAD MODELS. SYSTEMS ENGINEERING AND INTEGRATION: SYSTEMS ENGINEERING SUPPORT TO COORDINATE TRADE STUDIES AND TRACK CONFIGURATION CHANGES. RESPONSIBLE FOR ENSURING SYSTEM REQUIREMENTS ARE MET. AIRLOCK/EVA STUDY: THIS STUDY WILL LOOK AT MULTIPLE OPTIONS FOR PROVIDING AN AIRLOCK CAPABILITY. OPTIONS INCLUDE INFLATABLE AIRLOCKS, INTEGRATED AIRLOCKS, AND RIGID AIRLOCKS. THE STUDY WILL ALSO DETERMINE IF THE AIRLOCK SHOULD BE LAUNCHED WITH THE EAM FIRST FLIGHT OR SEPARATELY. ATTITUDE CONTROL SYSTEM: DERIVE ATTITUDE CONTROL REQUIREMENTS FOR DRM AND EXTENDED MISSIONS. AVIONICS STUDY: APPLY HUMAN RATING REQUIREMENTS TO POINT-OF-DEPARTURE AVIONICS SUB-SYSTEM. STUDY HOW MAVEN-DERIVED AVIONICS ARCHITECTURE WOULD BE LEVERAGED FOR THE EAM AND ALSO STUDY THE USE OF ORION AS A BACKUP COMMAND CENTER. POWER SYSTEM STUDY: DERIVE POWER SYSTEM REQUIREMENTS FOR THE DRM AND EXTENDED MISSIONS. STUDY LOAD SHARING POSSIBILITIES WITH ORION. WE WILL CONSTRUCT A DETAILED POWER BUDGET BASED ON A DETAILED POWER EQUIPMENT LIST. THERMAL MANAGEMENT STUDY: PERFORM A THERMAL MANAGEMENT STUDY INTERNAL LAYOUT AND PACKAGING OPTIMIZATION: THIS STUDY WILL INVOLVE PERFORMING AN INTERNAL LAYOUT AND PACKAGING OPTIMIZATION INCLUDING PROVIDING A SOLAR STORM SAFE HAVEN. THE CHIL WILL BE USED TO STUDY HABITABILITY OF OUR DESIGN CONCEPTS. RADIATION SHELTER STUDY: STUDY MOST EFFICIENT WAY TO PROVIDE RADIATION PROTECTION ON BOARD THE EAM. STUDY WILL TRADE USING ORION VERSUS PROVIDING A SAFE HAVEN ON THE EAM. RADIATION MITIGATION STRATEGY STUDY: THIS STUDY WILL EXPLORE OPTIONS FOR METHODS OF MITIGATING LONG-TERM RADIATION EXPOSURE IN DEEP SPACE. DEVELOP AND TEST VARIOUS TECHNIQUES ON BOARD THE EAM. EVOLVABLE ECLSS STUDY: REQUIREMENTS DEFINITION AND BASELINE DESIGN: REQUIREMENTS DEFINITION AND BASELINE SYSTEM DESIGN AND CREATE HABITAT ECLSS SIMULINK MODEL. ECLSS STATE OF THE ART SURVEY: ENGAGE WITH INDUSTRY PARTNERS/VENDORS TO DETERMINE APPROPRIATE ECLSS SOLUTION AND POTENTIAL EVOLVABILITY SOLUTIONS. EVOLVABLE ECLSS STRATEGY: EXPLORE STRATEGIES FOR DESIGNING THE EAM TO SERVE AS A TEST BED FOR DEVELOPING A ROBUST AND COMPACT ECLSS.
Jul 19, 201921$0NEXTSTEP BAA AWARD. UNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE FOLLOWING: PROJECT MANAGEMENT: PROVIDE OVERALL LEADERSHIP FOR THE PROJECT INTERACT WITH THE CUSTOMER AND WRITE REPORTS. CUSTOMER MEETINGS: ORGANIZE MEETINGS, PREPARE PRESENTATIONS, ATTEND MEETINGS AND ADDRESS ACTION ITEMS. FIVE MEETINGS TOTAL: KICKOFF, THREE TIMS, AND FINAL CONCEPT REVIEW. BUSINESS OPERATIONS: PROVIDE CONTRACTUAL DIRECTION TO THE PROGRAM, INTERFACE WITH THE CUSTOMER, ISSUE BUDGETS AND MONITOR PERFORMANCE, MAINTAIN SCHEDULES, TRACK AND SUBMIT CONTRACT DELIVERABLES, AND ENSURE MISSION SUCCESS. DESIGN MATURATION: WORK WITH NASA TO REFINE DRM AND HIGH-LEVEL SYSTEM REQUIREMENTS TO BE USED IN SUBSYSTEM STUDIES. CAD MODEL SUPPORT: SUPPORT TO WORK ON EAM CONFIGURATION AND MAINTAIN CAD MODELS. SYSTEMS ENGINEERING AND INTEGRATION: SYSTEMS ENGINEERING SUPPORT TO COORDINATE TRADE STUDIES AND TRACK CONFIGURATION CHANGES. RESPONSIBLE FOR ENSURING SYSTEM REQUIREMENTS ARE MET. AIRLOCK/EVA STUDY: THIS STUDY WILL LOOK AT MULTIPLE OPTIONS FOR PROVIDING AN AIRLOCK CAPABILITY. OPTIONS INCLUDE INFLATABLE AIRLOCKS, INTEGRATED AIRLOCKS, AND RIGID AIRLOCKS. THE STUDY WILL ALSO DETERMINE IF THE AIRLOCK SHOULD BE LAUNCHED WITH THE EAM FIRST FLIGHT OR SEPARATELY. ATTITUDE CONTROL SYSTEM: DERIVE ATTITUDE CONTROL REQUIREMENTS FOR DRM AND EXTENDED MISSIONS. AVIONICS STUDY: APPLY HUMAN RATING REQUIREMENTS TO POINT-OF-DEPARTURE AVIONICS SUB-SYSTEM. STUDY HOW MAVEN-DERIVED AVIONICS ARCHITECTURE WOULD BE LEVERAGED FOR THE EAM AND ALSO STUDY THE USE OF ORION AS A BACKUP COMMAND CENTER. POWER SYSTEM STUDY: DERIVE POWER SYSTEM REQUIREMENTS FOR THE DRM AND EXTENDED MISSIONS. STUDY LOAD SHARING POSSIBILITIES WITH ORION. WE WILL CONSTRUCT A DETAILED POWER BUDGET BASED ON A DETAILED POWER EQUIPMENT LIST. THERMAL MANAGEMENT STUDY: PERFORM A THERMAL MANAGEMENT STUDY INTERNAL LAYOUT AND PACKAGING OPTIMIZATION: THIS STUDY WILL INVOLVE PERFORMING AN INTERNAL LAYOUT AND PACKAGING OPTIMIZATION INCLUDING PROVIDING A SOLAR STORM SAFE HAVEN. THE CHIL WILL BE USED TO STUDY HABITABILITY OF OUR DESIGN CONCEPTS. RADIATION SHELTER STUDY: STUDY MOST EFFICIENT WAY TO PROVIDE RADIATION PROTECTION ON BOARD THE EAM. STUDY WILL TRADE USING ORION VERSUS PROVIDING A SAFE HAVEN ON THE EAM. RADIATION MITIGATION STRATEGY STUDY: THIS STUDY WILL EXPLORE OPTIONS FOR METHODS OF MITIGATING LONG-TERM RADIATION EXPOSURE IN DEEP SPACE. DEVELOP AND TEST VARIOUS TECHNIQUES ON BOARD THE EAM. EVOLVABLE ECLSS STUDY: REQUIREMENTS DEFINITION AND BASELINE DESIGN: REQUIREMENTS DEFINITION AND BASELINE SYSTEM DESIGN AND CREATE HABITAT ECLSS SIMULINK MODEL. ECLSS STATE OF THE ART SURVEY: ENGAGE WITH INDUSTRY PARTNERS/VENDORS TO DETERMINE APPROPRIATE ECLSS SOLUTION AND POTENTIAL EVOLVABILITY SOLUTIONS. EVOLVABLE ECLSS STRATEGY: EXPLORE STRATEGIES FOR DESIGNING THE EAM TO SERVE AS A TEST BED FOR DEVELOPING A ROBUST AND COMPACT ECLSS.
Jul 12, 201920$0NEXTSTEP BAA AWARD. UNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE FOLLOWING: PROJECT MANAGEMENT: PROVIDE OVERALL LEADERSHIP FOR THE PROJECT INTERACT WITH THE CUSTOMER AND WRITE REPORTS. CUSTOMER MEETINGS: ORGANIZE MEETINGS, PREPARE PRESENTATIONS, ATTEND MEETINGS AND ADDRESS ACTION ITEMS. FIVE MEETINGS TOTAL: KICKOFF, THREE TIMS, AND FINAL CONCEPT REVIEW. BUSINESS OPERATIONS: PROVIDE CONTRACTUAL DIRECTION TO THE PROGRAM, INTERFACE WITH THE CUSTOMER, ISSUE BUDGETS AND MONITOR PERFORMANCE, MAINTAIN SCHEDULES, TRACK AND SUBMIT CONTRACT DELIVERABLES, AND ENSURE MISSION SUCCESS. DESIGN MATURATION: WORK WITH NASA TO REFINE DRM AND HIGH-LEVEL SYSTEM REQUIREMENTS TO BE USED IN SUBSYSTEM STUDIES. CAD MODEL SUPPORT: SUPPORT TO WORK ON EAM CONFIGURATION AND MAINTAIN CAD MODELS. SYSTEMS ENGINEERING AND INTEGRATION: SYSTEMS ENGINEERING SUPPORT TO COORDINATE TRADE STUDIES AND TRACK CONFIGURATION CHANGES. RESPONSIBLE FOR ENSURING SYSTEM REQUIREMENTS ARE MET. AIRLOCK/EVA STUDY: THIS STUDY WILL LOOK AT MULTIPLE OPTIONS FOR PROVIDING AN AIRLOCK CAPABILITY. OPTIONS INCLUDE INFLATABLE AIRLOCKS, INTEGRATED AIRLOCKS, AND RIGID AIRLOCKS. THE STUDY WILL ALSO DETERMINE IF THE AIRLOCK SHOULD BE LAUNCHED WITH THE EAM FIRST FLIGHT OR SEPARATELY. ATTITUDE CONTROL SYSTEM: DERIVE ATTITUDE CONTROL REQUIREMENTS FOR DRM AND EXTENDED MISSIONS. AVIONICS STUDY: APPLY HUMAN RATING REQUIREMENTS TO POINT-OF-DEPARTURE AVIONICS SUB-SYSTEM. STUDY HOW MAVEN-DERIVED AVIONICS ARCHITECTURE WOULD BE LEVERAGED FOR THE EAM AND ALSO STUDY THE USE OF ORION AS A BACKUP COMMAND CENTER. POWER SYSTEM STUDY: DERIVE POWER SYSTEM REQUIREMENTS FOR THE DRM AND EXTENDED MISSIONS. STUDY LOAD SHARING POSSIBILITIES WITH ORION. WE WILL CONSTRUCT A DETAILED POWER BUDGET BASED ON A DETAILED POWER EQUIPMENT LIST. THERMAL MANAGEMENT STUDY: PERFORM A THERMAL MANAGEMENT STUDY INTERNAL LAYOUT AND PACKAGING OPTIMIZATION: THIS STUDY WILL INVOLVE PERFORMING AN INTERNAL LAYOUT AND PACKAGING OPTIMIZATION INCLUDING PROVIDING A SOLAR STORM SAFE HAVEN. THE CHIL WILL BE USED TO STUDY HABITABILITY OF OUR DESIGN CONCEPTS. RADIATION SHELTER STUDY: STUDY MOST EFFICIENT WAY TO PROVIDE RADIATION PROTECTION ON BOARD THE EAM. STUDY WILL TRADE USING ORION VERSUS PROVIDING A SAFE HAVEN ON THE EAM. RADIATION MITIGATION STRATEGY STUDY: THIS STUDY WILL EXPLORE OPTIONS FOR METHODS OF MITIGATING LONG-TERM RADIATION EXPOSURE IN DEEP SPACE. DEVELOP AND TEST VARIOUS TECHNIQUES ON BOARD THE EAM. EVOLVABLE ECLSS STUDY: REQUIREMENTS DEFINITION AND BASELINE DESIGN: REQUIREMENTS DEFINITION AND BASELINE SYSTEM DESIGN AND CREATE HABITAT ECLSS SIMULINK MODEL. ECLSS STATE OF THE ART SURVEY: ENGAGE WITH INDUSTRY PARTNERS/VENDORS TO DETERMINE APPROPRIATE ECLSS SOLUTION AND POTENTIAL EVOLVABILITY SOLUTIONS. EVOLVABLE ECLSS STRATEGY: EXPLORE STRATEGIES FOR DESIGNING THE EAM TO SERVE AS A TEST BED FOR DEVELOPING A ROBUST AND COMPACT ECLSS.
Jun 25, 201919$0IGF::OT::IGF NEXTSTEP BAA AWARD. UNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE FOLLOWING: PROJECT MANAGEMENT: PROVIDE OVERALL LEADERSHIP FOR THE PROJECT INTERACT WITH THE CUSTOMER AND WRITE REPORTS. CUSTOMER MEETINGS: ORGANIZE MEETINGS, PREPARE PRESENTATIONS, ATTEND MEETINGS AND ADDRESS ACTION ITEMS. FIVE MEETINGS TOTAL: KICKOFF, THREE TIMS, AND FINAL CONCEPT REVIEW. BUSINESS OPERATIONS: PROVIDE CONTRACTUAL DIRECTION TO THE PROGRAM, INTERFACE WITH THE CUSTOMER, ISSUE BUDGETS AND MONITOR PERFORMANCE, MAINTAIN SCHEDULES, TRACK AND SUBMIT CONTRACT DELIVERABLES, AND ENSURE MISSION SUCCESS. DESIGN MATURATION: WORK WITH NASA TO REFINE DRM AND HIGH-LEVEL SYSTEM REQUIREMENTS TO BE USED IN SUBSYSTEM STUDIES. CAD MODEL SUPPORT: SUPPORT TO WORK ON EAM CONFIGURATION AND MAINTAIN CAD MODELS. SYSTEMS ENGINEERING AND INTEGRATION: SYSTEMS ENGINEERING SUPPORT TO COORDINATE TRADE STUDIES AND TRACK CONFIGURATION CHANGES. RESPONSIBLE FOR ENSURING SYSTEM REQUIREMENTS ARE MET. AIRLOCK/EVA STUDY: THIS STUDY WILL LOOK AT MULTIPLE OPTIONS FOR PROVIDING AN AIRLOCK CAPABILITY. OPTIONS INCLUDE INFLATABLE AIRLOCKS, INTEGRATED AIRLOCKS, AND RIGID AIRLOCKS. THE STUDY WILL ALSO DETERMINE IF THE AIRLOCK SHOULD BE LAUNCHED WITH THE EAM FIRST FLIGHT OR SEPARATELY. ATTITUDE CONTROL SYSTEM: DERIVE ATTITUDE CONTROL REQUIREMENTS FOR DRM AND EXTENDED MISSIONS. AVIONICS STUDY: APPLY HUMAN RATING REQUIREMENTS TO POINT-OF-DEPARTURE AVIONICS SUB-SYSTEM. STUDY HOW MAVEN-DERIVED AVIONICS ARCHITECTURE WOULD BE LEVERAGED FOR THE EAM AND ALSO STUDY THE USE OF ORION AS A BACKUP COMMAND CENTER. POWER SYSTEM STUDY: DERIVE POWER SYSTEM REQUIREMENTS FOR THE DRM AND EXTENDED MISSIONS. STUDY LOAD SHARING POSSIBILITIES WITH ORION. WE WILL CONSTRUCT A DETAILED POWER BUDGET BASED ON A DETAILED POWER EQUIPMENT LIST. THERMAL MANAGEMENT STUDY: PERFORM A THERMAL MANAGEMENT STUDY INTERNAL LAYOUT AND PACKAGING OPTIMIZATION: THIS STUDY WILL INVOLVE PERFORMING AN INTERNAL LAYOUT AND PACKAGING OPTIMIZATION INCLUDING PROVIDING A SOLAR STORM SAFE HAVEN. THE CHIL WILL BE USED TO STUDY HABITABILITY OF OUR DESIGN CONCEPTS. RADIATION SHELTER STUDY: STUDY MOST EFFICIENT WAY TO PROVIDE RADIATION PROTECTION ON BOARD THE EAM. STUDY WILL TRADE USING ORION VERSUS PROVIDING A SAFE HAVEN ON THE EAM. RADIATION MITIGATION STRATEGY STUDY: THIS STUDY WILL EXPLORE OPTIONS FOR METHODS OF MITIGATING LONG-TERM RADIATION EXPOSURE IN DEEP SPACE. DEVELOP AND TEST VARIOUS TECHNIQUES ON BOARD THE EAM. EVOLVABLE ECLSS STUDY: REQUIREMENTS DEFINITION AND BASELINE DESIGN: REQUIREMENTS DEFINITION AND BASELINE SYSTEM DESIGN AND CREATE HABITAT ECLSS SIMULINK MODEL. ECLSS STATE OF THE ART SURVEY: ENGAGE WITH INDUSTRY PARTNERS/VENDORS TO DETERMINE APPROPRIATE ECLSS SOLUTION AND POTENTIAL EVOLVABILITY SOLUTIONS. EVOLVABLE ECLSS STRATEGY: EXPLORE STRATEGIES FOR DESIGNING THE EAM TO SERVE AS A TEST BED FOR DEVELOPING A ROBUST AND COMPACT ECLSS.
May 2, 201918$2.0MIGF::OT::IGF NEXTSTEP BAA AWARD. UNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE FOLLOWING: PROJECT MANAGEMENT: PROVIDE OVERALL LEADERSHIP FOR THE PROJECT INTERACT WITH THE CUSTOMER AND WRITE REPORTS. CUSTOMER MEETINGS: ORGANIZE MEETINGS, PREPARE PRESENTATIONS, ATTEND MEETINGS AND ADDRESS ACTION ITEMS. FIVE MEETINGS TOTAL: KICKOFF, THREE TIMS, AND FINAL CONCEPT REVIEW. BUSINESS OPERATIONS: PROVIDE CONTRACTUAL DIRECTION TO THE PROGRAM, INTERFACE WITH THE CUSTOMER, ISSUE BUDGETS AND MONITOR PERFORMANCE, MAINTAIN SCHEDULES, TRACK AND SUBMIT CONTRACT DELIVERABLES, AND ENSURE MISSION SUCCESS. DESIGN MATURATION: WORK WITH NASA TO REFINE DRM AND HIGH-LEVEL SYSTEM REQUIREMENTS TO BE USED IN SUBSYSTEM STUDIES. CAD MODEL SUPPORT: SUPPORT TO WORK ON EAM CONFIGURATION AND MAINTAIN CAD MODELS. SYSTEMS ENGINEERING AND INTEGRATION: SYSTEMS ENGINEERING SUPPORT TO COORDINATE TRADE STUDIES AND TRACK CONFIGURATION CHANGES. RESPONSIBLE FOR ENSURING SYSTEM REQUIREMENTS ARE MET. AIRLOCK/EVA STUDY: THIS STUDY WILL LOOK AT MULTIPLE OPTIONS FOR PROVIDING AN AIRLOCK CAPABILITY. OPTIONS INCLUDE INFLATABLE AIRLOCKS, INTEGRATED AIRLOCKS, AND RIGID AIRLOCKS. THE STUDY WILL ALSO DETERMINE IF THE AIRLOCK SHOULD BE LAUNCHED WITH THE EAM FIRST FLIGHT OR SEPARATELY. ATTITUDE CONTROL SYSTEM: DERIVE ATTITUDE CONTROL REQUIREMENTS FOR DRM AND EXTENDED MISSIONS. AVIONICS STUDY: APPLY HUMAN RATING REQUIREMENTS TO POINT-OF-DEPARTURE AVIONICS SUB-SYSTEM. STUDY HOW MAVEN-DERIVED AVIONICS ARCHITECTURE WOULD BE LEVERAGED FOR THE EAM AND ALSO STUDY THE USE OF ORION AS A BACKUP COMMAND CENTER. POWER SYSTEM STUDY: DERIVE POWER SYSTEM REQUIREMENTS FOR THE DRM AND EXTENDED MISSIONS. STUDY LOAD SHARING POSSIBILITIES WITH ORION. WE WILL CONSTRUCT A DETAILED POWER BUDGET BASED ON A DETAILED POWER EQUIPMENT LIST. THERMAL MANAGEMENT STUDY: PERFORM A THERMAL MANAGEMENT STUDY INTERNAL LAYOUT AND PACKAGING OPTIMIZATION: THIS STUDY WILL INVOLVE PERFORMING AN INTERNAL LAYOUT AND PACKAGING OPTIMIZATION INCLUDING PROVIDING A SOLAR STORM SAFE HAVEN. THE CHIL WILL BE USED TO STUDY HABITABILITY OF OUR DESIGN CONCEPTS. RADIATION SHELTER STUDY: STUDY MOST EFFICIENT WAY TO PROVIDE RADIATION PROTECTION ON BOARD THE EAM. STUDY WILL TRADE USING ORION VERSUS PROVIDING A SAFE HAVEN ON THE EAM. RADIATION MITIGATION STRATEGY STUDY: THIS STUDY WILL EXPLORE OPTIONS FOR METHODS OF MITIGATING LONG-TERM RADIATION EXPOSURE IN DEEP SPACE. DEVELOP AND TEST VARIOUS TECHNIQUES ON BOARD THE EAM. EVOLVABLE ECLSS STUDY: REQUIREMENTS DEFINITION AND BASELINE DESIGN: REQUIREMENTS DEFINITION AND BASELINE SYSTEM DESIGN AND CREATE HABITAT ECLSS SIMULINK MODEL. ECLSS STATE OF THE ART SURVEY: ENGAGE WITH INDUSTRY PARTNERS/VENDORS TO DETERMINE APPROPRIATE ECLSS SOLUTION AND POTENTIAL EVOLVABILITY SOLUTIONS. EVOLVABLE ECLSS STRATEGY: EXPLORE STRATEGIES FOR DESIGNING THE EAM TO SERVE AS A TEST BED FOR DEVELOPING A ROBUST AND COMPACT ECLSS.
Mar 18, 201917$361.4KIGF::OT::IGF NEXTSTEP BAA AWARD. UNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE FOLLOWING: PROJECT MANAGEMENT: PROVIDE OVERALL LEADERSHIP FOR THE PROJECT INTERACT WITH THE CUSTOMER AND WRITE REPORTS. CUSTOMER MEETINGS: ORGANIZE MEETINGS, PREPARE PRESENTATIONS, ATTEND MEETINGS AND ADDRESS ACTION ITEMS. FIVE MEETINGS TOTAL: KICKOFF, THREE TIMS, AND FINAL CONCEPT REVIEW. BUSINESS OPERATIONS: PROVIDE CONTRACTUAL DIRECTION TO THE PROGRAM, INTERFACE WITH THE CUSTOMER, ISSUE BUDGETS AND MONITOR PERFORMANCE, MAINTAIN SCHEDULES, TRACK AND SUBMIT CONTRACT DELIVERABLES, AND ENSURE MISSION SUCCESS. DESIGN MATURATION: WORK WITH NASA TO REFINE DRM AND HIGH-LEVEL SYSTEM REQUIREMENTS TO BE USED IN SUBSYSTEM STUDIES. CAD MODEL SUPPORT: SUPPORT TO WORK ON EAM CONFIGURATION AND MAINTAIN CAD MODELS. SYSTEMS ENGINEERING AND INTEGRATION: SYSTEMS ENGINEERING SUPPORT TO COORDINATE TRADE STUDIES AND TRACK CONFIGURATION CHANGES. RESPONSIBLE FOR ENSURING SYSTEM REQUIREMENTS ARE MET. AIRLOCK/EVA STUDY: THIS STUDY WILL LOOK AT MULTIPLE OPTIONS FOR PROVIDING AN AIRLOCK CAPABILITY. OPTIONS INCLUDE INFLATABLE AIRLOCKS, INTEGRATED AIRLOCKS, AND RIGID AIRLOCKS. THE STUDY WILL ALSO DETERMINE IF THE AIRLOCK SHOULD BE LAUNCHED WITH THE EAM FIRST FLIGHT OR SEPARATELY. ATTITUDE CONTROL SYSTEM: DERIVE ATTITUDE CONTROL REQUIREMENTS FOR DRM AND EXTENDED MISSIONS. AVIONICS STUDY: APPLY HUMAN RATING REQUIREMENTS TO POINT-OF-DEPARTURE AVIONICS SUB-SYSTEM. STUDY HOW MAVEN-DERIVED AVIONICS ARCHITECTURE WOULD BE LEVERAGED FOR THE EAM AND ALSO STUDY THE USE OF ORION AS A BACKUP COMMAND CENTER. POWER SYSTEM STUDY: DERIVE POWER SYSTEM REQUIREMENTS FOR THE DRM AND EXTENDED MISSIONS. STUDY LOAD SHARING POSSIBILITIES WITH ORION. WE WILL CONSTRUCT A DETAILED POWER BUDGET BASED ON A DETAILED POWER EQUIPMENT LIST. THERMAL MANAGEMENT STUDY: PERFORM A THERMAL MANAGEMENT STUDY INTERNAL LAYOUT AND PACKAGING OPTIMIZATION: THIS STUDY WILL INVOLVE PERFORMING AN INTERNAL LAYOUT AND PACKAGING OPTIMIZATION INCLUDING PROVIDING A SOLAR STORM SAFE HAVEN. THE CHIL WILL BE USED TO STUDY HABITABILITY OF OUR DESIGN CONCEPTS. RADIATION SHELTER STUDY: STUDY MOST EFFICIENT WAY TO PROVIDE RADIATION PROTECTION ON BOARD THE EAM. STUDY WILL TRADE USING ORION VERSUS PROVIDING A SAFE HAVEN ON THE EAM. RADIATION MITIGATION STRATEGY STUDY: THIS STUDY WILL EXPLORE OPTIONS FOR METHODS OF MITIGATING LONG-TERM RADIATION EXPOSURE IN DEEP SPACE. DEVELOP AND TEST VARIOUS TECHNIQUES ON BOARD THE EAM. EVOLVABLE ECLSS STUDY: REQUIREMENTS DEFINITION AND BASELINE DESIGN: REQUIREMENTS DEFINITION AND BASELINE SYSTEM DESIGN AND CREATE HABITAT ECLSS SIMULINK MODEL. ECLSS STATE OF THE ART SURVEY: ENGAGE WITH INDUSTRY PARTNERS/VENDORS TO DETERMINE APPROPRIATE ECLSS SOLUTION AND POTENTIAL EVOLVABILITY SOLUTIONS. EVOLVABLE ECLSS STRATEGY: EXPLORE STRATEGIES FOR DESIGNING THE EAM TO SERVE AS A TEST BED FOR DEVELOPING A ROBUST AND COMPACT ECLSS.
Jan 30, 201916$950.0KIGF::OT::IGF NEXTSTEP BAA AWARD. UNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE FOLLOWING: PROJECT MANAGEMENT: PROVIDE OVERALL LEADERSHIP FOR THE PROJECT INTERACT WITH THE CUSTOMER AND WRITE REPORTS. CUSTOMER MEETINGS: ORGANIZE MEETINGS, PREPARE PRESENTATIONS, ATTEND MEETINGS AND ADDRESS ACTION ITEMS. FIVE MEETINGS TOTAL: KICKOFF, THREE TIMS, AND FINAL CONCEPT REVIEW. BUSINESS OPERATIONS: PROVIDE CONTRACTUAL DIRECTION TO THE PROGRAM, INTERFACE WITH THE CUSTOMER, ISSUE BUDGETS AND MONITOR PERFORMANCE, MAINTAIN SCHEDULES, TRACK AND SUBMIT CONTRACT DELIVERABLES, AND ENSURE MISSION SUCCESS. DESIGN MATURATION: WORK WITH NASA TO REFINE DRM AND HIGH-LEVEL SYSTEM REQUIREMENTS TO BE USED IN SUBSYSTEM STUDIES. CAD MODEL SUPPORT: SUPPORT TO WORK ON EAM CONFIGURATION AND MAINTAIN CAD MODELS. SYSTEMS ENGINEERING AND INTEGRATION: SYSTEMS ENGINEERING SUPPORT TO COORDINATE TRADE STUDIES AND TRACK CONFIGURATION CHANGES. RESPONSIBLE FOR ENSURING SYSTEM REQUIREMENTS ARE MET. AIRLOCK/EVA STUDY: THIS STUDY WILL LOOK AT MULTIPLE OPTIONS FOR PROVIDING AN AIRLOCK CAPABILITY. OPTIONS INCLUDE INFLATABLE AIRLOCKS, INTEGRATED AIRLOCKS, AND RIGID AIRLOCKS. THE STUDY WILL ALSO DETERMINE IF THE AIRLOCK SHOULD BE LAUNCHED WITH THE EAM FIRST FLIGHT OR SEPARATELY. ATTITUDE CONTROL SYSTEM: DERIVE ATTITUDE CONTROL REQUIREMENTS FOR DRM AND EXTENDED MISSIONS. AVIONICS STUDY: APPLY HUMAN RATING REQUIREMENTS TO POINT-OF-DEPARTURE AVIONICS SUB-SYSTEM. STUDY HOW MAVEN-DERIVED AVIONICS ARCHITECTURE WOULD BE LEVERAGED FOR THE EAM AND ALSO STUDY THE USE OF ORION AS A BACKUP COMMAND CENTER. POWER SYSTEM STUDY: DERIVE POWER SYSTEM REQUIREMENTS FOR THE DRM AND EXTENDED MISSIONS. STUDY LOAD SHARING POSSIBILITIES WITH ORION. WE WILL CONSTRUCT A DETAILED POWER BUDGET BASED ON A DETAILED POWER EQUIPMENT LIST. THERMAL MANAGEMENT STUDY: PERFORM A THERMAL MANAGEMENT STUDY INTERNAL LAYOUT AND PACKAGING OPTIMIZATION: THIS STUDY WILL INVOLVE PERFORMING AN INTERNAL LAYOUT AND PACKAGING OPTIMIZATION INCLUDING PROVIDING A SOLAR STORM SAFE HAVEN. THE CHIL WILL BE USED TO STUDY HABITABILITY OF OUR DESIGN CONCEPTS. RADIATION SHELTER STUDY: STUDY MOST EFFICIENT WAY TO PROVIDE RADIATION PROTECTION ON BOARD THE EAM. STUDY WILL TRADE USING ORION VERSUS PROVIDING A SAFE HAVEN ON THE EAM. RADIATION MITIGATION STRATEGY STUDY: THIS STUDY WILL EXPLORE OPTIONS FOR METHODS OF MITIGATING LONG-TERM RADIATION EXPOSURE IN DEEP SPACE. DEVELOP AND TEST VARIOUS TECHNIQUES ON BOARD THE EAM. EVOLVABLE ECLSS STUDY: REQUIREMENTS DEFINITION AND BASELINE DESIGN: REQUIREMENTS DEFINITION AND BASELINE SYSTEM DESIGN AND CREATE HABITAT ECLSS SIMULINK MODEL. ECLSS STATE OF THE ART SURVEY: ENGAGE WITH INDUSTRY PARTNERS/VENDORS TO DETERMINE APPROPRIATE ECLSS SOLUTION AND POTENTIAL EVOLVABILITY SOLUTIONS. EVOLVABLE ECLSS STRATEGY: EXPLORE STRATEGIES FOR DESIGNING THE EAM TO SERVE AS A TEST BED FOR DEVELOPING A ROBUST AND COMPACT ECLSS.
Oct 11, 201815$0IGF::OT::IGF NEXTSTEP BAA AWARD. UNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE FOLLOWING: PROJECT MANAGEMENT: PROVIDE OVERALL LEADERSHIP FOR THE PROJECT INTERACT WITH THE CUSTOMER AND WRITE REPORTS. CUSTOMER MEETINGS: ORGANIZE MEETINGS, PREPARE PRESENTATIONS, ATTEND MEETINGS AND ADDRESS ACTION ITEMS. FIVE MEETINGS TOTAL: KICKOFF, THREE TIMS, AND FINAL CONCEPT REVIEW. BUSINESS OPERATIONS: PROVIDE CONTRACTUAL DIRECTION TO THE PROGRAM, INTERFACE WITH THE CUSTOMER, ISSUE BUDGETS AND MONITOR PERFORMANCE, MAINTAIN SCHEDULES, TRACK AND SUBMIT CONTRACT DELIVERABLES, AND ENSURE MISSION SUCCESS. DESIGN MATURATION: WORK WITH NASA TO REFINE DRM AND HIGH-LEVEL SYSTEM REQUIREMENTS TO BE USED IN SUBSYSTEM STUDIES. CAD MODEL SUPPORT: SUPPORT TO WORK ON EAM CONFIGURATION AND MAINTAIN CAD MODELS. SYSTEMS ENGINEERING AND INTEGRATION: SYSTEMS ENGINEERING SUPPORT TO COORDINATE TRADE STUDIES AND TRACK CONFIGURATION CHANGES. RESPONSIBLE FOR ENSURING SYSTEM REQUIREMENTS ARE MET. AIRLOCK/EVA STUDY: THIS STUDY WILL LOOK AT MULTIPLE OPTIONS FOR PROVIDING AN AIRLOCK CAPABILITY. OPTIONS INCLUDE INFLATABLE AIRLOCKS, INTEGRATED AIRLOCKS, AND RIGID AIRLOCKS. THE STUDY WILL ALSO DETERMINE IF THE AIRLOCK SHOULD BE LAUNCHED WITH THE EAM FIRST FLIGHT OR SEPARATELY. ATTITUDE CONTROL SYSTEM: DERIVE ATTITUDE CONTROL REQUIREMENTS FOR DRM AND EXTENDED MISSIONS. AVIONICS STUDY: APPLY HUMAN RATING REQUIREMENTS TO POINT-OF-DEPARTURE AVIONICS SUB-SYSTEM. STUDY HOW MAVEN-DERIVED AVIONICS ARCHITECTURE WOULD BE LEVERAGED FOR THE EAM AND ALSO STUDY THE USE OF ORION AS A BACKUP COMMAND CENTER. POWER SYSTEM STUDY: DERIVE POWER SYSTEM REQUIREMENTS FOR THE DRM AND EXTENDED MISSIONS. STUDY LOAD SHARING POSSIBILITIES WITH ORION. WE WILL CONSTRUCT A DETAILED POWER BUDGET BASED ON A DETAILED POWER EQUIPMENT LIST. THERMAL MANAGEMENT STUDY: PERFORM A THERMAL MANAGEMENT STUDY INTERNAL LAYOUT AND PACKAGING OPTIMIZATION: THIS STUDY WILL INVOLVE PERFORMING AN INTERNAL LAYOUT AND PACKAGING OPTIMIZATION INCLUDING PROVIDING A SOLAR STORM SAFE HAVEN. THE CHIL WILL BE USED TO STUDY HABITABILITY OF OUR DESIGN CONCEPTS. RADIATION SHELTER STUDY: STUDY MOST EFFICIENT WAY TO PROVIDE RADIATION PROTECTION ON BOARD THE EAM. STUDY WILL TRADE USING ORION VERSUS PROVIDING A SAFE HAVEN ON THE EAM. RADIATION MITIGATION STRATEGY STUDY: THIS STUDY WILL EXPLORE OPTIONS FOR METHODS OF MITIGATING LONG-TERM RADIATION EXPOSURE IN DEEP SPACE. DEVELOP AND TEST VARIOUS TECHNIQUES ON BOARD THE EAM. EVOLVABLE ECLSS STUDY: REQUIREMENTS DEFINITION AND BASELINE DESIGN: REQUIREMENTS DEFINITION AND BASELINE SYSTEM DESIGN AND CREATE HABITAT ECLSS SIMULINK MODEL. ECLSS STATE OF THE ART SURVEY: ENGAGE WITH INDUSTRY PARTNERS/VENDORS TO DETERMINE APPROPRIATE ECLSS SOLUTION AND POTENTIAL EVOLVABILITY SOLUTIONS. EVOLVABLE ECLSS STRATEGY: EXPLORE STRATEGIES FOR DESIGNING THE EAM TO SERVE AS A TEST BED FOR DEVELOPING A ROBUST AND COMPACT ECLSS.
Aug 13, 201814$4.5MIGF::OT::IGF NEXTSTEP BAA AWARD. UNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE FOLLOWING: PROJECT MANAGEMENT: PROVIDE OVERALL LEADERSHIP FOR THE PROJECT INTERACT WITH THE CUSTOMER AND WRITE REPORTS. CUSTOMER MEETINGS: ORGANIZE MEETINGS, PREPARE PRESENTATIONS, ATTEND MEETINGS AND ADDRESS ACTION ITEMS. FIVE MEETINGS TOTAL: KICKOFF, THREE TIMS, AND FINAL CONCEPT REVIEW. BUSINESS OPERATIONS: PROVIDE CONTRACTUAL DIRECTION TO THE PROGRAM, INTERFACE WITH THE CUSTOMER, ISSUE BUDGETS AND MONITOR PERFORMANCE, MAINTAIN SCHEDULES, TRACK AND SUBMIT CONTRACT DELIVERABLES, AND ENSURE MISSION SUCCESS. DESIGN MATURATION: WORK WITH NASA TO REFINE DRM AND HIGH-LEVEL SYSTEM REQUIREMENTS TO BE USED IN SUBSYSTEM STUDIES. CAD MODEL SUPPORT: SUPPORT TO WORK ON EAM CONFIGURATION AND MAINTAIN CAD MODELS. SYSTEMS ENGINEERING AND INTEGRATION: SYSTEMS ENGINEERING SUPPORT TO COORDINATE TRADE STUDIES AND TRACK CONFIGURATION CHANGES. RESPONSIBLE FOR ENSURING SYSTEM REQUIREMENTS ARE MET. AIRLOCK/EVA STUDY: THIS STUDY WILL LOOK AT MULTIPLE OPTIONS FOR PROVIDING AN AIRLOCK CAPABILITY. OPTIONS INCLUDE INFLATABLE AIRLOCKS, INTEGRATED AIRLOCKS, AND RIGID AIRLOCKS. THE STUDY WILL ALSO DETERMINE IF THE AIRLOCK SHOULD BE LAUNCHED WITH THE EAM FIRST FLIGHT OR SEPARATELY. ATTITUDE CONTROL SYSTEM: DERIVE ATTITUDE CONTROL REQUIREMENTS FOR DRM AND EXTENDED MISSIONS. AVIONICS STUDY: APPLY HUMAN RATING REQUIREMENTS TO POINT-OF-DEPARTURE AVIONICS SUB-SYSTEM. STUDY HOW MAVEN-DERIVED AVIONICS ARCHITECTURE WOULD BE LEVERAGED FOR THE EAM AND ALSO STUDY THE USE OF ORION AS A BACKUP COMMAND CENTER. POWER SYSTEM STUDY: DERIVE POWER SYSTEM REQUIREMENTS FOR THE DRM AND EXTENDED MISSIONS. STUDY LOAD SHARING POSSIBILITIES WITH ORION. WE WILL CONSTRUCT A DETAILED POWER BUDGET BASED ON A DETAILED POWER EQUIPMENT LIST. THERMAL MANAGEMENT STUDY: PERFORM A THERMAL MANAGEMENT STUDY INTERNAL LAYOUT AND PACKAGING OPTIMIZATION: THIS STUDY WILL INVOLVE PERFORMING AN INTERNAL LAYOUT AND PACKAGING OPTIMIZATION INCLUDING PROVIDING A SOLAR STORM SAFE HAVEN. THE CHIL WILL BE USED TO STUDY HABITABILITY OF OUR DESIGN CONCEPTS. RADIATION SHELTER STUDY: STUDY MOST EFFICIENT WAY TO PROVIDE RADIATION PROTECTION ON BOARD THE EAM. STUDY WILL TRADE USING ORION VERSUS PROVIDING A SAFE HAVEN ON THE EAM. RADIATION MITIGATION STRATEGY STUDY: THIS STUDY WILL EXPLORE OPTIONS FOR METHODS OF MITIGATING LONG-TERM RADIATION EXPOSURE IN DEEP SPACE. DEVELOP AND TEST VARIOUS TECHNIQUES ON BOARD THE EAM. EVOLVABLE ECLSS STUDY: REQUIREMENTS DEFINITION AND BASELINE DESIGN: REQUIREMENTS DEFINITION AND BASELINE SYSTEM DESIGN AND CREATE HABITAT ECLSS SIMULINK MODEL. ECLSS STATE OF THE ART SURVEY: ENGAGE WITH INDUSTRY PARTNERS/VENDORS TO DETERMINE APPROPRIATE ECLSS SOLUTION AND POTENTIAL EVOLVABILITY SOLUTIONS. EVOLVABLE ECLSS STRATEGY: EXPLORE STRATEGIES FOR DESIGNING THE EAM TO SERVE AS A TEST BED FOR DEVELOPING A ROBUST AND COMPACT ECLSS.
Apr 3, 201813$0IGF::OT::IGF NEXTSTEP BAA AWARD. UNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE FOLLOWING: PROJECT MANAGEMENT: PROVIDE OVERALL LEADERSHIP FOR THE PROJECT INTERACT WITH THE CUSTOMER AND WRITE REPORTS. CUSTOMER MEETINGS: ORGANIZE MEETINGS, PREPARE PRESENTATIONS, ATTEND MEETINGS AND ADDRESS ACTION ITEMS. FIVE MEETINGS TOTAL: KICKOFF, THREE TIMS, AND FINAL CONCEPT REVIEW. BUSINESS OPERATIONS: PROVIDE CONTRACTUAL DIRECTION TO THE PROGRAM, INTERFACE WITH THE CUSTOMER, ISSUE BUDGETS AND MONITOR PERFORMANCE, MAINTAIN SCHEDULES, TRACK AND SUBMIT CONTRACT DELIVERABLES, AND ENSURE MISSION SUCCESS. DESIGN MATURATION: WORK WITH NASA TO REFINE DRM AND HIGH-LEVEL SYSTEM REQUIREMENTS TO BE USED IN SUBSYSTEM STUDIES. CAD MODEL SUPPORT: SUPPORT TO WORK ON EAM CONFIGURATION AND MAINTAIN CAD MODELS. SYSTEMS ENGINEERING AND INTEGRATION: SYSTEMS ENGINEERING SUPPORT TO COORDINATE TRADE STUDIES AND TRACK CONFIGURATION CHANGES. RESPONSIBLE FOR ENSURING SYSTEM REQUIREMENTS ARE MET. AIRLOCK/EVA STUDY: THIS STUDY WILL LOOK AT MULTIPLE OPTIONS FOR PROVIDING AN AIRLOCK CAPABILITY. OPTIONS INCLUDE INFLATABLE AIRLOCKS, INTEGRATED AIRLOCKS, AND RIGID AIRLOCKS. THE STUDY WILL ALSO DETERMINE IF THE AIRLOCK SHOULD BE LAUNCHED WITH THE EAM FIRST FLIGHT OR SEPARATELY. ATTITUDE CONTROL SYSTEM: DERIVE ATTITUDE CONTROL REQUIREMENTS FOR DRM AND EXTENDED MISSIONS. AVIONICS STUDY: APPLY HUMAN RATING REQUIREMENTS TO POINT-OF-DEPARTURE AVIONICS SUB-SYSTEM. STUDY HOW MAVEN-DERIVED AVIONICS ARCHITECTURE WOULD BE LEVERAGED FOR THE EAM AND ALSO STUDY THE USE OF ORION AS A BACKUP COMMAND CENTER. POWER SYSTEM STUDY: DERIVE POWER SYSTEM REQUIREMENTS FOR THE DRM AND EXTENDED MISSIONS. STUDY LOAD SHARING POSSIBILITIES WITH ORION. WE WILL CONSTRUCT A DETAILED POWER BUDGET BASED ON A DETAILED POWER EQUIPMENT LIST. THERMAL MANAGEMENT STUDY: PERFORM A THERMAL MANAGEMENT STUDY INTERNAL LAYOUT AND PACKAGING OPTIMIZATION: THIS STUDY WILL INVOLVE PERFORMING AN INTERNAL LAYOUT AND PACKAGING OPTIMIZATION INCLUDING PROVIDING A SOLAR STORM SAFE HAVEN. THE CHIL WILL BE USED TO STUDY HABITABILITY OF OUR DESIGN CONCEPTS. RADIATION SHELTER STUDY: STUDY MOST EFFICIENT WAY TO PROVIDE RADIATION PROTECTION ON BOARD THE EAM. STUDY WILL TRADE USING ORION VERSUS PROVIDING A SAFE HAVEN ON THE EAM. RADIATION MITIGATION STRATEGY STUDY: THIS STUDY WILL EXPLORE OPTIONS FOR METHODS OF MITIGATING LONG-TERM RADIATION EXPOSURE IN DEEP SPACE. DEVELOP AND TEST VARIOUS TECHNIQUES ON BOARD THE EAM. EVOLVABLE ECLSS STUDY: REQUIREMENTS DEFINITION AND BASELINE DESIGN: REQUIREMENTS DEFINITION AND BASELINE SYSTEM DESIGN AND CREATE HABITAT ECLSS SIMULINK MODEL. ECLSS STATE OF THE ART SURVEY: ENGAGE WITH INDUSTRY PARTNERS/VENDORS TO DETERMINE APPROPRIATE ECLSS SOLUTION AND POTENTIAL EVOLVABILITY SOLUTIONS. EVOLVABLE ECLSS STRATEGY: EXPLORE STRATEGIES FOR DESIGNING THE EAM TO SERVE AS A TEST BED FOR DEVELOPING A ROBUST AND COMPACT ECLSS.
Mar 16, 201812$0IGF::OT::IGF NEXTSTEP BAA AWARD. UNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE FOLLOWING: PROJECT MANAGEMENT: PROVIDE OVERALL LEADERSHIP FOR THE PROJECT INTERACT WITH THE CUSTOMER AND WRITE REPORTS. CUSTOMER MEETINGS: ORGANIZE MEETINGS, PREPARE PRESENTATIONS, ATTEND MEETINGS AND ADDRESS ACTION ITEMS. FIVE MEETINGS TOTAL: KICKOFF, THREE TIMS, AND FINAL CONCEPT REVIEW. BUSINESS OPERATIONS: PROVIDE CONTRACTUAL DIRECTION TO THE PROGRAM, INTERFACE WITH THE CUSTOMER, ISSUE BUDGETS AND MONITOR PERFORMANCE, MAINTAIN SCHEDULES, TRACK AND SUBMIT CONTRACT DELIVERABLES, AND ENSURE MISSION SUCCESS. DESIGN MATURATION: WORK WITH NASA TO REFINE DRM AND HIGH-LEVEL SYSTEM REQUIREMENTS TO BE USED IN SUBSYSTEM STUDIES. CAD MODEL SUPPORT: SUPPORT TO WORK ON EAM CONFIGURATION AND MAINTAIN CAD MODELS. SYSTEMS ENGINEERING AND INTEGRATION: SYSTEMS ENGINEERING SUPPORT TO COORDINATE TRADE STUDIES AND TRACK CONFIGURATION CHANGES. RESPONSIBLE FOR ENSURING SYSTEM REQUIREMENTS ARE MET. AIRLOCK/EVA STUDY: THIS STUDY WILL LOOK AT MULTIPLE OPTIONS FOR PROVIDING AN AIRLOCK CAPABILITY. OPTIONS INCLUDE INFLATABLE AIRLOCKS, INTEGRATED AIRLOCKS, AND RIGID AIRLOCKS. THE STUDY WILL ALSO DETERMINE IF THE AIRLOCK SHOULD BE LAUNCHED WITH THE EAM FIRST FLIGHT OR SEPARATELY. ATTITUDE CONTROL SYSTEM: DERIVE ATTITUDE CONTROL REQUIREMENTS FOR DRM AND EXTENDED MISSIONS. AVIONICS STUDY: APPLY HUMAN RATING REQUIREMENTS TO POINT-OF-DEPARTURE AVIONICS SUB-SYSTEM. STUDY HOW MAVEN-DERIVED AVIONICS ARCHITECTURE WOULD BE LEVERAGED FOR THE EAM AND ALSO STUDY THE USE OF ORION AS A BACKUP COMMAND CENTER. POWER SYSTEM STUDY: DERIVE POWER SYSTEM REQUIREMENTS FOR THE DRM AND EXTENDED MISSIONS. STUDY LOAD SHARING POSSIBILITIES WITH ORION. WE WILL CONSTRUCT A DETAILED POWER BUDGET BASED ON A DETAILED POWER EQUIPMENT LIST. THERMAL MANAGEMENT STUDY: PERFORM A THERMAL MANAGEMENT STUDY INTERNAL LAYOUT AND PACKAGING OPTIMIZATION: THIS STUDY WILL INVOLVE PERFORMING AN INTERNAL LAYOUT AND PACKAGING OPTIMIZATION INCLUDING PROVIDING A SOLAR STORM SAFE HAVEN. THE CHIL WILL BE USED TO STUDY HABITABILITY OF OUR DESIGN CONCEPTS. RADIATION SHELTER STUDY: STUDY MOST EFFICIENT WAY TO PROVIDE RADIATION PROTECTION ON BOARD THE EAM. STUDY WILL TRADE USING ORION VERSUS PROVIDING A SAFE HAVEN ON THE EAM. RADIATION MITIGATION STRATEGY STUDY: THIS STUDY WILL EXPLORE OPTIONS FOR METHODS OF MITIGATING LONG-TERM RADIATION EXPOSURE IN DEEP SPACE. DEVELOP AND TEST VARIOUS TECHNIQUES ON BOARD THE EAM. EVOLVABLE ECLSS STUDY: REQUIREMENTS DEFINITION AND BASELINE DESIGN: REQUIREMENTS DEFINITION AND BASELINE SYSTEM DESIGN AND CREATE HABITAT ECLSS SIMULINK MODEL. ECLSS STATE OF THE ART SURVEY: ENGAGE WITH INDUSTRY PARTNERS/VENDORS TO DETERMINE APPROPRIATE ECLSS SOLUTION AND POTENTIAL EVOLVABILITY SOLUTIONS. EVOLVABLE ECLSS STRATEGY: EXPLORE STRATEGIES FOR DESIGNING THE EAM TO SERVE AS A TEST BED FOR DEVELOPING A ROBUST AND COMPACT ECLSS.
Jan 18, 201811$3.0MIGF::OT::IGF NEXTSTEP BAA AWARD. UNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE FOLLOWING: PROJECT MANAGEMENT: PROVIDE OVERALL LEADERSHIP FOR THE PROJECT INTERACT WITH THE CUSTOMER AND WRITE REPORTS. CUSTOMER MEETINGS: ORGANIZE MEETINGS, PREPARE PRESENTATIONS, ATTEND MEETINGS AND ADDRESS ACTION ITEMS. FIVE MEETINGS TOTAL: KICKOFF, THREE TIMS, AND FINAL CONCEPT REVIEW. BUSINESS OPERATIONS: PROVIDE CONTRACTUAL DIRECTION TO THE PROGRAM, INTERFACE WITH THE CUSTOMER, ISSUE BUDGETS AND MONITOR PERFORMANCE, MAINTAIN SCHEDULES, TRACK AND SUBMIT CONTRACT DELIVERABLES, AND ENSURE MISSION SUCCESS. DESIGN MATURATION: WORK WITH NASA TO REFINE DRM AND HIGH-LEVEL SYSTEM REQUIREMENTS TO BE USED IN SUBSYSTEM STUDIES. CAD MODEL SUPPORT: SUPPORT TO WORK ON EAM CONFIGURATION AND MAINTAIN CAD MODELS. SYSTEMS ENGINEERING AND INTEGRATION: SYSTEMS ENGINEERING SUPPORT TO COORDINATE TRADE STUDIES AND TRACK CONFIGURATION CHANGES. RESPONSIBLE FOR ENSURING SYSTEM REQUIREMENTS ARE MET. AIRLOCK/EVA STUDY: THIS STUDY WILL LOOK AT MULTIPLE OPTIONS FOR PROVIDING AN AIRLOCK CAPABILITY. OPTIONS INCLUDE INFLATABLE AIRLOCKS, INTEGRATED AIRLOCKS, AND RIGID AIRLOCKS. THE STUDY WILL ALSO DETERMINE IF THE AIRLOCK SHOULD BE LAUNCHED WITH THE EAM FIRST FLIGHT OR SEPARATELY. ATTITUDE CONTROL SYSTEM: DERIVE ATTITUDE CONTROL REQUIREMENTS FOR DRM AND EXTENDED MISSIONS. AVIONICS STUDY: APPLY HUMAN RATING REQUIREMENTS TO POINT-OF-DEPARTURE AVIONICS SUB-SYSTEM. STUDY HOW MAVEN-DERIVED AVIONICS ARCHITECTURE WOULD BE LEVERAGED FOR THE EAM AND ALSO STUDY THE USE OF ORION AS A BACKUP COMMAND CENTER. POWER SYSTEM STUDY: DERIVE POWER SYSTEM REQUIREMENTS FOR THE DRM AND EXTENDED MISSIONS. STUDY LOAD SHARING POSSIBILITIES WITH ORION. WE WILL CONSTRUCT A DETAILED POWER BUDGET BASED ON A DETAILED POWER EQUIPMENT LIST. THERMAL MANAGEMENT STUDY: PERFORM A THERMAL MANAGEMENT STUDY INTERNAL LAYOUT AND PACKAGING OPTIMIZATION: THIS STUDY WILL INVOLVE PERFORMING AN INTERNAL LAYOUT AND PACKAGING OPTIMIZATION INCLUDING PROVIDING A SOLAR STORM SAFE HAVEN. THE CHIL WILL BE USED TO STUDY HABITABILITY OF OUR DESIGN CONCEPTS. RADIATION SHELTER STUDY: STUDY MOST EFFICIENT WAY TO PROVIDE RADIATION PROTECTION ON BOARD THE EAM. STUDY WILL TRADE USING ORION VERSUS PROVIDING A SAFE HAVEN ON THE EAM. RADIATION MITIGATION STRATEGY STUDY: THIS STUDY WILL EXPLORE OPTIONS FOR METHODS OF MITIGATING LONG-TERM RADIATION EXPOSURE IN DEEP SPACE. DEVELOP AND TEST VARIOUS TECHNIQUES ON BOARD THE EAM. EVOLVABLE ECLSS STUDY: REQUIREMENTS DEFINITION AND BASELINE DESIGN: REQUIREMENTS DEFINITION AND BASELINE SYSTEM DESIGN AND CREATE HABITAT ECLSS SIMULINK MODEL. ECLSS STATE OF THE ART SURVEY: ENGAGE WITH INDUSTRY PARTNERS/VENDORS TO DETERMINE APPROPRIATE ECLSS SOLUTION AND POTENTIAL EVOLVABILITY SOLUTIONS. EVOLVABLE ECLSS STRATEGY: EXPLORE STRATEGIES FOR DESIGNING THE EAM TO SERVE AS A TEST BED FOR DEVELOPING A ROBUST AND COMPACT ECLSS.
Aug 30, 201710$3.5MIGF::OT::IGF NEXTSTEP BAA AWARD. UNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE FOLLOWING: PROJECT MANAGEMENT: PROVIDE OVERALL LEADERSHIP FOR THE PROJECT INTERACT WITH THE CUSTOMER AND WRITE REPORTS. CUSTOMER MEETINGS: ORGANIZE MEETINGS, PREPARE PRESENTATIONS, ATTEND MEETINGS AND ADDRESS ACTION ITEMS. FIVE MEETINGS TOTAL: KICKOFF, THREE TIMS, AND FINAL CONCEPT REVIEW. BUSINESS OPERATIONS: PROVIDE CONTRACTUAL DIRECTION TO THE PROGRAM, INTERFACE WITH THE CUSTOMER, ISSUE BUDGETS AND MONITOR PERFORMANCE, MAINTAIN SCHEDULES, TRACK AND SUBMIT CONTRACT DELIVERABLES, AND ENSURE MISSION SUCCESS. DESIGN MATURATION: WORK WITH NASA TO REFINE DRM AND HIGH-LEVEL SYSTEM REQUIREMENTS TO BE USED IN SUBSYSTEM STUDIES. CAD MODEL SUPPORT: SUPPORT TO WORK ON EAM CONFIGURATION AND MAINTAIN CAD MODELS. SYSTEMS ENGINEERING AND INTEGRATION: SYSTEMS ENGINEERING SUPPORT TO COORDINATE TRADE STUDIES AND TRACK CONFIGURATION CHANGES. RESPONSIBLE FOR ENSURING SYSTEM REQUIREMENTS ARE MET. AIRLOCK/EVA STUDY: THIS STUDY WILL LOOK AT MULTIPLE OPTIONS FOR PROVIDING AN AIRLOCK CAPABILITY. OPTIONS INCLUDE INFLATABLE AIRLOCKS, INTEGRATED AIRLOCKS, AND RIGID AIRLOCKS. THE STUDY WILL ALSO DETERMINE IF THE AIRLOCK SHOULD BE LAUNCHED WITH THE EAM FIRST FLIGHT OR SEPARATELY. ATTITUDE CONTROL SYSTEM: DERIVE ATTITUDE CONTROL REQUIREMENTS FOR DRM AND EXTENDED MISSIONS. AVIONICS STUDY: APPLY HUMAN RATING REQUIREMENTS TO POINT-OF-DEPARTURE AVIONICS SUB-SYSTEM. STUDY HOW MAVEN-DERIVED AVIONICS ARCHITECTURE WOULD BE LEVERAGED FOR THE EAM AND ALSO STUDY THE USE OF ORION AS A BACKUP COMMAND CENTER. POWER SYSTEM STUDY: DERIVE POWER SYSTEM REQUIREMENTS FOR THE DRM AND EXTENDED MISSIONS. STUDY LOAD SHARING POSSIBILITIES WITH ORION. WE WILL CONSTRUCT A DETAILED POWER BUDGET BASED ON A DETAILED POWER EQUIPMENT LIST. THERMAL MANAGEMENT STUDY: PERFORM A THERMAL MANAGEMENT STUDY INTERNAL LAYOUT AND PACKAGING OPTIMIZATION: THIS STUDY WILL INVOLVE PERFORMING AN INTERNAL LAYOUT AND PACKAGING OPTIMIZATION INCLUDING PROVIDING A SOLAR STORM SAFE HAVEN. THE CHIL WILL BE USED TO STUDY HABITABILITY OF OUR DESIGN CONCEPTS. RADIATION SHELTER STUDY: STUDY MOST EFFICIENT WAY TO PROVIDE RADIATION PROTECTION ON BOARD THE EAM. STUDY WILL TRADE USING ORION VERSUS PROVIDING A SAFE HAVEN ON THE EAM. RADIATION MITIGATION STRATEGY STUDY: THIS STUDY WILL EXPLORE OPTIONS FOR METHODS OF MITIGATING LONG-TERM RADIATION EXPOSURE IN DEEP SPACE. DEVELOP AND TEST VARIOUS TECHNIQUES ON BOARD THE EAM. EVOLVABLE ECLSS STUDY: REQUIREMENTS DEFINITION AND BASELINE DESIGN: REQUIREMENTS DEFINITION AND BASELINE SYSTEM DESIGN AND CREATE HABITAT ECLSS SIMULINK MODEL. ECLSS STATE OF THE ART SURVEY: ENGAGE WITH INDUSTRY PARTNERS/VENDORS TO DETERMINE APPROPRIATE ECLSS SOLUTION AND POTENTIAL EVOLVABILITY SOLUTIONS. EVOLVABLE ECLSS STRATEGY: EXPLORE STRATEGIES FOR DESIGNING THE EAM TO SERVE AS A TEST BED FOR DEVELOPING A ROBUST AND COMPACT ECLSS.
Jun 30, 20179$6.5MIGF::OT::IGF NEXTSTEP BAA AWARD. UNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE FOLLOWING: PROJECT MANAGEMENT: PROVIDE OVERALL LEADERSHIP FOR THE PROJECT INTERACT WITH THE CUSTOMER AND WRITE REPORTS. CUSTOMER MEETINGS: ORGANIZE MEETINGS, PREPARE PRESENTATIONS, ATTEND MEETINGS AND ADDRESS ACTION ITEMS. FIVE MEETINGS TOTAL: KICKOFF, THREE TIMS, AND FINAL CONCEPT REVIEW. BUSINESS OPERATIONS: PROVIDE CONTRACTUAL DIRECTION TO THE PROGRAM, INTERFACE WITH THE CUSTOMER, ISSUE BUDGETS AND MONITOR PERFORMANCE, MAINTAIN SCHEDULES, TRACK AND SUBMIT CONTRACT DELIVERABLES, AND ENSURE MISSION SUCCESS. DESIGN MATURATION: WORK WITH NASA TO REFINE DRM AND HIGH-LEVEL SYSTEM REQUIREMENTS TO BE USED IN SUBSYSTEM STUDIES. CAD MODEL SUPPORT: SUPPORT TO WORK ON EAM CONFIGURATION AND MAINTAIN CAD MODELS. SYSTEMS ENGINEERING AND INTEGRATION: SYSTEMS ENGINEERING SUPPORT TO COORDINATE TRADE STUDIES AND TRACK CONFIGURATION CHANGES. RESPONSIBLE FOR ENSURING SYSTEM REQUIREMENTS ARE MET. AIRLOCK/EVA STUDY: THIS STUDY WILL LOOK AT MULTIPLE OPTIONS FOR PROVIDING AN AIRLOCK CAPABILITY. OPTIONS INCLUDE INFLATABLE AIRLOCKS, INTEGRATED AIRLOCKS, AND RIGID AIRLOCKS. THE STUDY WILL ALSO DETERMINE IF THE AIRLOCK SHOULD BE LAUNCHED WITH THE EAM FIRST FLIGHT OR SEPARATELY. ATTITUDE CONTROL SYSTEM: DERIVE ATTITUDE CONTROL REQUIREMENTS FOR DRM AND EXTENDED MISSIONS. AVIONICS STUDY: APPLY HUMAN RATING REQUIREMENTS TO POINT-OF-DEPARTURE AVIONICS SUB-SYSTEM. STUDY HOW MAVEN-DERIVED AVIONICS ARCHITECTURE WOULD BE LEVERAGED FOR THE EAM AND ALSO STUDY THE USE OF ORION AS A BACKUP COMMAND CENTER. POWER SYSTEM STUDY: DERIVE POWER SYSTEM REQUIREMENTS FOR THE DRM AND EXTENDED MISSIONS. STUDY LOAD SHARING POSSIBILITIES WITH ORION. WE WILL CONSTRUCT A DETAILED POWER BUDGET BASED ON A DETAILED POWER EQUIPMENT LIST. THERMAL MANAGEMENT STUDY: PERFORM A THERMAL MANAGEMENT STUDY INTERNAL LAYOUT AND PACKAGING OPTIMIZATION: THIS STUDY WILL INVOLVE PERFORMING AN INTERNAL LAYOUT AND PACKAGING OPTIMIZATION INCLUDING PROVIDING A SOLAR STORM SAFE HAVEN. THE CHIL WILL BE USED TO STUDY HABITABILITY OF OUR DESIGN CONCEPTS. RADIATION SHELTER STUDY: STUDY MOST EFFICIENT WAY TO PROVIDE RADIATION PROTECTION ON BOARD THE EAM. STUDY WILL TRADE USING ORION VERSUS PROVIDING A SAFE HAVEN ON THE EAM. RADIATION MITIGATION STRATEGY STUDY: THIS STUDY WILL EXPLORE OPTIONS FOR METHODS OF MITIGATING LONG-TERM RADIATION EXPOSURE IN DEEP SPACE. DEVELOP AND TEST VARIOUS TECHNIQUES ON BOARD THE EAM. EVOLVABLE ECLSS STUDY: REQUIREMENTS DEFINITION AND BASELINE DESIGN: REQUIREMENTS DEFINITION AND BASELINE SYSTEM DESIGN AND CREATE HABITAT ECLSS SIMULINK MODEL. ECLSS STATE OF THE ART SURVEY: ENGAGE WITH INDUSTRY PARTNERS/VENDORS TO DETERMINE APPROPRIATE ECLSS SOLUTION AND POTENTIAL EVOLVABILITY SOLUTIONS. EVOLVABLE ECLSS STRATEGY: EXPLORE STRATEGIES FOR DESIGNING THE EAM TO SERVE AS A TEST BED FOR DEVELOPING A ROBUST AND COMPACT ECLSS.
Jun 2, 20178$0IGF::OT::IGF NEXTSTEP BAA AWARD. UNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE FOLLOWING: PROJECT MANAGEMENT: PROVIDE OVERALL LEADERSHIP FOR THE PROJECT INTERACT WITH THE CUSTOMER AND WRITE REPORTS. CUSTOMER MEETINGS: ORGANIZE MEETINGS, PREPARE PRESENTATIONS, ATTEND MEETINGS AND ADDRESS ACTION ITEMS. FIVE MEETINGS TOTAL: KICKOFF, THREE TIMS, AND FINAL CONCEPT REVIEW. BUSINESS OPERATIONS: PROVIDE CONTRACTUAL DIRECTION TO THE PROGRAM, INTERFACE WITH THE CUSTOMER, ISSUE BUDGETS AND MONITOR PERFORMANCE, MAINTAIN SCHEDULES, TRACK AND SUBMIT CONTRACT DELIVERABLES, AND ENSURE MISSION SUCCESS. DESIGN MATURATION: WORK WITH NASA TO REFINE DRM AND HIGH-LEVEL SYSTEM REQUIREMENTS TO BE USED IN SUBSYSTEM STUDIES. CAD MODEL SUPPORT: SUPPORT TO WORK ON EAM CONFIGURATION AND MAINTAIN CAD MODELS. SYSTEMS ENGINEERING AND INTEGRATION: SYSTEMS ENGINEERING SUPPORT TO COORDINATE TRADE STUDIES AND TRACK CONFIGURATION CHANGES. RESPONSIBLE FOR ENSURING SYSTEM REQUIREMENTS ARE MET. AIRLOCK/EVA STUDY: THIS STUDY WILL LOOK AT MULTIPLE OPTIONS FOR PROVIDING AN AIRLOCK CAPABILITY. OPTIONS INCLUDE INFLATABLE AIRLOCKS, INTEGRATED AIRLOCKS, AND RIGID AIRLOCKS. THE STUDY WILL ALSO DETERMINE IF THE AIRLOCK SHOULD BE LAUNCHED WITH THE EAM FIRST FLIGHT OR SEPARATELY. ATTITUDE CONTROL SYSTEM: DERIVE ATTITUDE CONTROL REQUIREMENTS FOR DRM AND EXTENDED MISSIONS. AVIONICS STUDY: APPLY HUMAN RATING REQUIREMENTS TO POINT-OF-DEPARTURE AVIONICS SUB-SYSTEM. STUDY HOW MAVEN-DERIVED AVIONICS ARCHITECTURE WOULD BE LEVERAGED FOR THE EAM AND ALSO STUDY THE USE OF ORION AS A BACKUP COMMAND CENTER. POWER SYSTEM STUDY: DERIVE POWER SYSTEM REQUIREMENTS FOR THE DRM AND EXTENDED MISSIONS. STUDY LOAD SHARING POSSIBILITIES WITH ORION. WE WILL CONSTRUCT A DETAILED POWER BUDGET BASED ON A DETAILED POWER EQUIPMENT LIST. THERMAL MANAGEMENT STUDY: PERFORM A THERMAL MANAGEMENT STUDY INTERNAL LAYOUT AND PACKAGING OPTIMIZATION: THIS STUDY WILL INVOLVE PERFORMING AN INTERNAL LAYOUT AND PACKAGING OPTIMIZATION INCLUDING PROVIDING A SOLAR STORM SAFE HAVEN. THE CHIL WILL BE USED TO STUDY HABITABILITY OF OUR DESIGN CONCEPTS. RADIATION SHELTER STUDY: STUDY MOST EFFICIENT WAY TO PROVIDE RADIATION PROTECTION ON BOARD THE EAM. STUDY WILL TRADE USING ORION VERSUS PROVIDING A SAFE HAVEN ON THE EAM. RADIATION MITIGATION STRATEGY STUDY: THIS STUDY WILL EXPLORE OPTIONS FOR METHODS OF MITIGATING LONG-TERM RADIATION EXPOSURE IN DEEP SPACE. DEVELOP AND TEST VARIOUS TECHNIQUES ON BOARD THE EAM. EVOLVABLE ECLSS STUDY: REQUIREMENTS DEFINITION AND BASELINE DESIGN: REQUIREMENTS DEFINITION AND BASELINE SYSTEM DESIGN AND CREATE HABITAT ECLSS SIMULINK MODEL. ECLSS STATE OF THE ART SURVEY: ENGAGE WITH INDUSTRY PARTNERS/VENDORS TO DETERMINE APPROPRIATE ECLSS SOLUTION AND POTENTIAL EVOLVABILITY SOLUTIONS. EVOLVABLE ECLSS STRATEGY: EXPLORE STRATEGIES FOR DESIGNING THE EAM TO SERVE AS A TEST BED FOR DEVELOPING A ROBUST AND COMPACT ECLSS.
Mar 31, 20177$0IGF::OT::IGF NEXTSTEP BAA AWARD. UNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE FOLLOWING: PROJECT MANAGEMENT: PROVIDE OVERALL LEADERSHIP FOR THE PROJECT INTERACT WITH THE CUSTOMER AND WRITE REPORTS. CUSTOMER MEETINGS: ORGANIZE MEETINGS, PREPARE PRESENTATIONS, ATTEND MEETINGS AND ADDRESS ACTION ITEMS. FIVE MEETINGS TOTAL: KICKOFF, THREE TIMS, AND FINAL CONCEPT REVIEW. BUSINESS OPERATIONS: PROVIDE CONTRACTUAL DIRECTION TO THE PROGRAM, INTERFACE WITH THE CUSTOMER, ISSUE BUDGETS AND MONITOR PERFORMANCE, MAINTAIN SCHEDULES, TRACK AND SUBMIT CONTRACT DELIVERABLES, AND ENSURE MISSION SUCCESS. DESIGN MATURATION: WORK WITH NASA TO REFINE DRM AND HIGH-LEVEL SYSTEM REQUIREMENTS TO BE USED IN SUBSYSTEM STUDIES. CAD MODEL SUPPORT: SUPPORT TO WORK ON EAM CONFIGURATION AND MAINTAIN CAD MODELS. SYSTEMS ENGINEERING AND INTEGRATION: SYSTEMS ENGINEERING SUPPORT TO COORDINATE TRADE STUDIES AND TRACK CONFIGURATION CHANGES. RESPONSIBLE FOR ENSURING SYSTEM REQUIREMENTS ARE MET. AIRLOCK/EVA STUDY: THIS STUDY WILL LOOK AT MULTIPLE OPTIONS FOR PROVIDING AN AIRLOCK CAPABILITY. OPTIONS INCLUDE INFLATABLE AIRLOCKS, INTEGRATED AIRLOCKS, AND RIGID AIRLOCKS. THE STUDY WILL ALSO DETERMINE IF THE AIRLOCK SHOULD BE LAUNCHED WITH THE EAM FIRST FLIGHT OR SEPARATELY. ATTITUDE CONTROL SYSTEM: DERIVE ATTITUDE CONTROL REQUIREMENTS FOR DRM AND EXTENDED MISSIONS. AVIONICS STUDY: APPLY HUMAN RATING REQUIREMENTS TO POINT-OF-DEPARTURE AVIONICS SUB-SYSTEM. STUDY HOW MAVEN-DERIVED AVIONICS ARCHITECTURE WOULD BE LEVERAGED FOR THE EAM AND ALSO STUDY THE USE OF ORION AS A BACKUP COMMAND CENTER. POWER SYSTEM STUDY: DERIVE POWER SYSTEM REQUIREMENTS FOR THE DRM AND EXTENDED MISSIONS. STUDY LOAD SHARING POSSIBILITIES WITH ORION. WE WILL CONSTRUCT A DETAILED POWER BUDGET BASED ON A DETAILED POWER EQUIPMENT LIST. THERMAL MANAGEMENT STUDY: PERFORM A THERMAL MANAGEMENT STUDY INTERNAL LAYOUT AND PACKAGING OPTIMIZATION: THIS STUDY WILL INVOLVE PERFORMING AN INTERNAL LAYOUT AND PACKAGING OPTIMIZATION INCLUDING PROVIDING A SOLAR STORM SAFE HAVEN. THE CHIL WILL BE USED TO STUDY HABITABILITY OF OUR DESIGN CONCEPTS. RADIATION SHELTER STUDY: STUDY MOST EFFICIENT WAY TO PROVIDE RADIATION PROTECTION ON BOARD THE EAM. STUDY WILL TRADE USING ORION VERSUS PROVIDING A SAFE HAVEN ON THE EAM. RADIATION MITIGATION STRATEGY STUDY: THIS STUDY WILL EXPLORE OPTIONS FOR METHODS OF MITIGATING LONG-TERM RADIATION EXPOSURE IN DEEP SPACE. DEVELOP AND TEST VARIOUS TECHNIQUES ON BOARD THE EAM. EVOLVABLE ECLSS STUDY: REQUIREMENTS DEFINITION AND BASELINE DESIGN: REQUIREMENTS DEFINITION AND BASELINE SYSTEM DESIGN AND CREATE HABITAT ECLSS SIMULINK MODEL. ECLSS STATE OF THE ART SURVEY: ENGAGE WITH INDUSTRY PARTNERS/VENDORS TO DETERMINE APPROPRIATE ECLSS SOLUTION AND POTENTIAL EVOLVABILITY SOLUTIONS. EVOLVABLE ECLSS STRATEGY: EXPLORE STRATEGIES FOR DESIGNING THE EAM TO SERVE AS A TEST BED FOR DEVELOPING A ROBUST AND COMPACT ECLSS.
Jan 31, 20176$0IGF::OT::IGF NEXTSTEP BAA AWARD. UNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE FOLLOWING: PROJECT MANAGEMENT: PROVIDE OVERALL LEADERSHIP FOR THE PROJECT INTERACT WITH THE CUSTOMER AND WRITE REPORTS. CUSTOMER MEETINGS: ORGANIZE MEETINGS, PREPARE PRESENTATIONS, ATTEND MEETINGS AND ADDRESS ACTION ITEMS. FIVE MEETINGS TOTAL: KICKOFF, THREE TIMS, AND FINAL CONCEPT REVIEW. BUSINESS OPERATIONS: PROVIDE CONTRACTUAL DIRECTION TO THE PROGRAM, INTERFACE WITH THE CUSTOMER, ISSUE BUDGETS AND MONITOR PERFORMANCE, MAINTAIN SCHEDULES, TRACK AND SUBMIT CONTRACT DELIVERABLES, AND ENSURE MISSION SUCCESS. DESIGN MATURATION: WORK WITH NASA TO REFINE DRM AND HIGH-LEVEL SYSTEM REQUIREMENTS TO BE USED IN SUBSYSTEM STUDIES. CAD MODEL SUPPORT: SUPPORT TO WORK ON EAM CONFIGURATION AND MAINTAIN CAD MODELS. SYSTEMS ENGINEERING AND INTEGRATION: SYSTEMS ENGINEERING SUPPORT TO COORDINATE TRADE STUDIES AND TRACK CONFIGURATION CHANGES. RESPONSIBLE FOR ENSURING SYSTEM REQUIREMENTS ARE MET. AIRLOCK/EVA STUDY: THIS STUDY WILL LOOK AT MULTIPLE OPTIONS FOR PROVIDING AN AIRLOCK CAPABILITY. OPTIONS INCLUDE INFLATABLE AIRLOCKS, INTEGRATED AIRLOCKS, AND RIGID AIRLOCKS. THE STUDY WILL ALSO DETERMINE IF THE AIRLOCK SHOULD BE LAUNCHED WITH THE EAM FIRST FLIGHT OR SEPARATELY. ATTITUDE CONTROL SYSTEM: DERIVE ATTITUDE CONTROL REQUIREMENTS FOR DRM AND EXTENDED MISSIONS. AVIONICS STUDY: APPLY HUMAN RATING REQUIREMENTS TO POINT-OF-DEPARTURE AVIONICS SUB-SYSTEM. STUDY HOW MAVEN-DERIVED AVIONICS ARCHITECTURE WOULD BE LEVERAGED FOR THE EAM AND ALSO STUDY THE USE OF ORION AS A BACKUP COMMAND CENTER. POWER SYSTEM STUDY: DERIVE POWER SYSTEM REQUIREMENTS FOR THE DRM AND EXTENDED MISSIONS. STUDY LOAD SHARING POSSIBILITIES WITH ORION. WE WILL CONSTRUCT A DETAILED POWER BUDGET BASED ON A DETAILED POWER EQUIPMENT LIST. THERMAL MANAGEMENT STUDY: PERFORM A THERMAL MANAGEMENT STUDY INTERNAL LAYOUT AND PACKAGING OPTIMIZATION: THIS STUDY WILL INVOLVE PERFORMING AN INTERNAL LAYOUT AND PACKAGING OPTIMIZATION INCLUDING PROVIDING A SOLAR STORM SAFE HAVEN. THE CHIL WILL BE USED TO STUDY HABITABILITY OF OUR DESIGN CONCEPTS. RADIATION SHELTER STUDY: STUDY MOST EFFICIENT WAY TO PROVIDE RADIATION PROTECTION ON BOARD THE EAM. STUDY WILL TRADE USING ORION VERSUS PROVIDING A SAFE HAVEN ON THE EAM. RADIATION MITIGATION STRATEGY STUDY: THIS STUDY WILL EXPLORE OPTIONS FOR METHODS OF MITIGATING LONG-TERM RADIATION EXPOSURE IN DEEP SPACE. DEVELOP AND TEST VARIOUS TECHNIQUES ON BOARD THE EAM. EVOLVABLE ECLSS STUDY: REQUIREMENTS DEFINITION AND BASELINE DESIGN: REQUIREMENTS DEFINITION AND BASELINE SYSTEM DESIGN AND CREATE HABITAT ECLSS SIMULINK MODEL. ECLSS STATE OF THE ART SURVEY: ENGAGE WITH INDUSTRY PARTNERS/VENDORS TO DETERMINE APPROPRIATE ECLSS SOLUTION AND POTENTIAL EVOLVABILITY SOLUTIONS. EVOLVABLE ECLSS STRATEGY: EXPLORE STRATEGIES FOR DESIGNING THE EAM TO SERVE AS A TEST BED FOR DEVELOPING A ROBUST AND COMPACT ECLSS.
Oct 26, 20165$0IGF::OT::IGF NEXTSTEP BAA AWARD. UNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE FOLLOWING: PROJECT MANAGEMENT: PROVIDE OVERALL LEADERSHIP FOR THE PROJECT INTERACT WITH THE CUSTOMER AND WRITE REPORTS. CUSTOMER MEETINGS: ORGANIZE MEETINGS, PREPARE PRESENTATIONS, ATTEND MEETINGS AND ADDRESS ACTION ITEMS. FIVE MEETINGS TOTAL: KICKOFF, THREE TIMS, AND FINAL CONCEPT REVIEW. BUSINESS OPERATIONS: PROVIDE CONTRACTUAL DIRECTION TO THE PROGRAM, INTERFACE WITH THE CUSTOMER, ISSUE BUDGETS AND MONITOR PERFORMANCE, MAINTAIN SCHEDULES, TRACK AND SUBMIT CONTRACT DELIVERABLES, AND ENSURE MISSION SUCCESS. DESIGN MATURATION: WORK WITH NASA TO REFINE DRM AND HIGH-LEVEL SYSTEM REQUIREMENTS TO BE USED IN SUBSYSTEM STUDIES. CAD MODEL SUPPORT: SUPPORT TO WORK ON EAM CONFIGURATION AND MAINTAIN CAD MODELS. SYSTEMS ENGINEERING AND INTEGRATION: SYSTEMS ENGINEERING SUPPORT TO COORDINATE TRADE STUDIES AND TRACK CONFIGURATION CHANGES. RESPONSIBLE FOR ENSURING SYSTEM REQUIREMENTS ARE MET. AIRLOCK/EVA STUDY: THIS STUDY WILL LOOK AT MULTIPLE OPTIONS FOR PROVIDING AN AIRLOCK CAPABILITY. OPTIONS INCLUDE INFLATABLE AIRLOCKS, INTEGRATED AIRLOCKS, AND RIGID AIRLOCKS. THE STUDY WILL ALSO DETERMINE IF THE AIRLOCK SHOULD BE LAUNCHED WITH THE EAM FIRST FLIGHT OR SEPARATELY. ATTITUDE CONTROL SYSTEM: DERIVE ATTITUDE CONTROL REQUIREMENTS FOR DRM AND EXTENDED MISSIONS. AVIONICS STUDY: APPLY HUMAN RATING REQUIREMENTS TO POINT-OF-DEPARTURE AVIONICS SUB-SYSTEM. STUDY HOW MAVEN-DERIVED AVIONICS ARCHITECTURE WOULD BE LEVERAGED FOR THE EAM AND ALSO STUDY THE USE OF ORION AS A BACKUP COMMAND CENTER. POWER SYSTEM STUDY: DERIVE POWER SYSTEM REQUIREMENTS FOR THE DRM AND EXTENDED MISSIONS. STUDY LOAD SHARING POSSIBILITIES WITH ORION. WE WILL CONSTRUCT A DETAILED POWER BUDGET BASED ON A DETAILED POWER EQUIPMENT LIST. THERMAL MANAGEMENT STUDY: PERFORM A THERMAL MANAGEMENT STUDY INTERNAL LAYOUT AND PACKAGING OPTIMIZATION: THIS STUDY WILL INVOLVE PERFORMING AN INTERNAL LAYOUT AND PACKAGING OPTIMIZATION INCLUDING PROVIDING A SOLAR STORM SAFE HAVEN. THE CHIL WILL BE USED TO STUDY HABITABILITY OF OUR DESIGN CONCEPTS. RADIATION SHELTER STUDY: STUDY MOST EFFICIENT WAY TO PROVIDE RADIATION PROTECTION ON BOARD THE EAM. STUDY WILL TRADE USING ORION VERSUS PROVIDING A SAFE HAVEN ON THE EAM. RADIATION MITIGATION STRATEGY STUDY: THIS STUDY WILL EXPLORE OPTIONS FOR METHODS OF MITIGATING LONG-TERM RADIATION EXPOSURE IN DEEP SPACE. DEVELOP AND TEST VARIOUS TECHNIQUES ON BOARD THE EAM. EVOLVABLE ECLSS STUDY: REQUIREMENTS DEFINITION AND BASELINE DESIGN: REQUIREMENTS DEFINITION AND BASELINE SYSTEM DESIGN AND CREATE HABITAT ECLSS SIMULINK MODEL. ECLSS STATE OF THE ART SURVEY: ENGAGE WITH INDUSTRY PARTNERS/VENDORS TO DETERMINE APPROPRIATE ECLSS SOLUTION AND POTENTIAL EVOLVABILITY SOLUTIONS. EVOLVABLE ECLSS STRATEGY: EXPLORE STRATEGIES FOR DESIGNING THE EAM TO SERVE AS A TEST BED FOR DEVELOPING A ROBUST AND COMPACT ECLSS.
Jun 1, 20164$0IGF::OT::IGF NEXTSTEP BAA AWARD. UNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE FOLLOWING: PROJECT MANAGEMENT: PROVIDE OVERALL LEADERSHIP FOR THE PROJECT INTERACT WITH THE CUSTOMER AND WRITE REPORTS. CUSTOMER MEETINGS: ORGANIZE MEETINGS, PREPARE PRESENTATIONS, ATTEND MEETINGS AND ADDRESS ACTION ITEMS. FIVE MEETINGS TOTAL: KICKOFF, THREE TIMS, AND FINAL CONCEPT REVIEW. BUSINESS OPERATIONS: PROVIDE CONTRACTUAL DIRECTION TO THE PROGRAM, INTERFACE WITH THE CUSTOMER, ISSUE BUDGETS AND MONITOR PERFORMANCE, MAINTAIN SCHEDULES, TRACK AND SUBMIT CONTRACT DELIVERABLES, AND ENSURE MISSION SUCCESS. DESIGN MATURATION: WORK WITH NASA TO REFINE DRM AND HIGH-LEVEL SYSTEM REQUIREMENTS TO BE USED IN SUBSYSTEM STUDIES. CAD MODEL SUPPORT: SUPPORT TO WORK ON EAM CONFIGURATION AND MAINTAIN CAD MODELS. SYSTEMS ENGINEERING AND INTEGRATION: SYSTEMS ENGINEERING SUPPORT TO COORDINATE TRADE STUDIES AND TRACK CONFIGURATION CHANGES. RESPONSIBLE FOR ENSURING SYSTEM REQUIREMENTS ARE MET. AIRLOCK/EVA STUDY: THIS STUDY WILL LOOK AT MULTIPLE OPTIONS FOR PROVIDING AN AIRLOCK CAPABILITY. OPTIONS INCLUDE INFLATABLE AIRLOCKS, INTEGRATED AIRLOCKS, AND RIGID AIRLOCKS. THE STUDY WILL ALSO DETERMINE IF THE AIRLOCK SHOULD BE LAUNCHED WITH THE EAM FIRST FLIGHT OR SEPARATELY. ATTITUDE CONTROL SYSTEM: DERIVE ATTITUDE CONTROL REQUIREMENTS FOR DRM AND EXTENDED MISSIONS. AVIONICS STUDY: APPLY HUMAN RATING REQUIREMENTS TO POINT-OF-DEPARTURE AVIONICS SUB-SYSTEM. STUDY HOW MAVEN-DERIVED AVIONICS ARCHITECTURE WOULD BE LEVERAGED FOR THE EAM AND ALSO STUDY THE USE OF ORION AS A BACKUP COMMAND CENTER. POWER SYSTEM STUDY: DERIVE POWER SYSTEM REQUIREMENTS FOR THE DRM AND EXTENDED MISSIONS. STUDY LOAD SHARING POSSIBILITIES WITH ORION. WE WILL CONSTRUCT A DETAILED POWER BUDGET BASED ON A DETAILED POWER EQUIPMENT LIST. THERMAL MANAGEMENT STUDY: PERFORM A THERMAL MANAGEMENT STUDY INTERNAL LAYOUT AND PACKAGING OPTIMIZATION: THIS STUDY WILL INVOLVE PERFORMING AN INTERNAL LAYOUT AND PACKAGING OPTIMIZATION INCLUDING PROVIDING A SOLAR STORM SAFE HAVEN. THE CHIL WILL BE USED TO STUDY HABITABILITY OF OUR DESIGN CONCEPTS. RADIATION SHELTER STUDY: STUDY MOST EFFICIENT WAY TO PROVIDE RADIATION PROTECTION ON BOARD THE EAM. STUDY WILL TRADE USING ORION VERSUS PROVIDING A SAFE HAVEN ON THE EAM. RADIATION MITIGATION STRATEGY STUDY: THIS STUDY WILL EXPLORE OPTIONS FOR METHODS OF MITIGATING LONG-TERM RADIATION EXPOSURE IN DEEP SPACE. DEVELOP AND TEST VARIOUS TECHNIQUES ON BOARD THE EAM. EVOLVABLE ECLSS STUDY: REQUIREMENTS DEFINITION AND BASELINE DESIGN: REQUIREMENTS DEFINITION AND BASELINE SYSTEM DESIGN AND CREATE HABITAT ECLSS SIMULINK MODEL. ECLSS STATE OF THE ART SURVEY: ENGAGE WITH INDUSTRY PARTNERS/VENDORS TO DETERMINE APPROPRIATE ECLSS SOLUTION AND POTENTIAL EVOLVABILITY SOLUTIONS. EVOLVABLE ECLSS STRATEGY: EXPLORE STRATEGIES FOR DESIGNING THE EAM TO SERVE AS A TEST BED FOR DEVELOPING A ROBUST AND COMPACT ECLSS.
Feb 22, 20163$392.8KIGF::OT::IGF NEXTSTEP BAA AWARD. UNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE FOLLOWING: PROJECT MANAGEMENT: PROVIDE OVERALL LEADERSHIP FOR THE PROJECT INTERACT WITH THE CUSTOMER AND WRITE REPORTS. CUSTOMER MEETINGS: ORGANIZE MEETINGS, PREPARE PRESENTATIONS, ATTEND MEETINGS AND ADDRESS ACTION ITEMS. FIVE MEETINGS TOTAL: KICKOFF, THREE TIMS, AND FINAL CONCEPT REVIEW. BUSINESS OPERATIONS: PROVIDE CONTRACTUAL DIRECTION TO THE PROGRAM, INTERFACE WITH THE CUSTOMER, ISSUE BUDGETS AND MONITOR PERFORMANCE, MAINTAIN SCHEDULES, TRACK AND SUBMIT CONTRACT DELIVERABLES, AND ENSURE MISSION SUCCESS. DESIGN MATURATION: WORK WITH NASA TO REFINE DRM AND HIGH-LEVEL SYSTEM REQUIREMENTS TO BE USED IN SUBSYSTEM STUDIES. CAD MODEL SUPPORT: SUPPORT TO WORK ON EAM CONFIGURATION AND MAINTAIN CAD MODELS. SYSTEMS ENGINEERING AND INTEGRATION: SYSTEMS ENGINEERING SUPPORT TO COORDINATE TRADE STUDIES AND TRACK CONFIGURATION CHANGES. RESPONSIBLE FOR ENSURING SYSTEM REQUIREMENTS ARE MET. AIRLOCK/EVA STUDY: THIS STUDY WILL LOOK AT MULTIPLE OPTIONS FOR PROVIDING AN AIRLOCK CAPABILITY. OPTIONS INCLUDE INFLATABLE AIRLOCKS, INTEGRATED AIRLOCKS, AND RIGID AIRLOCKS. THE STUDY WILL ALSO DETERMINE IF THE AIRLOCK SHOULD BE LAUNCHED WITH THE EAM FIRST FLIGHT OR SEPARATELY. ATTITUDE CONTROL SYSTEM: DERIVE ATTITUDE CONTROL REQUIREMENTS FOR DRM AND EXTENDED MISSIONS. AVIONICS STUDY: APPLY HUMAN RATING REQUIREMENTS TO POINT-OF-DEPARTURE AVIONICS SUB-SYSTEM. STUDY HOW MAVEN-DERIVED AVIONICS ARCHITECTURE WOULD BE LEVERAGED FOR THE EAM AND ALSO STUDY THE USE OF ORION AS A BACKUP COMMAND CENTER. POWER SYSTEM STUDY: DERIVE POWER SYSTEM REQUIREMENTS FOR THE DRM AND EXTENDED MISSIONS. STUDY LOAD SHARING POSSIBILITIES WITH ORION. WE WILL CONSTRUCT A DETAILED POWER BUDGET BASED ON A DETAILED POWER EQUIPMENT LIST. THERMAL MANAGEMENT STUDY: PERFORM A THERMAL MANAGEMENT STUDY INTERNAL LAYOUT AND PACKAGING OPTIMIZATION: THIS STUDY WILL INVOLVE PERFORMING AN INTERNAL LAYOUT AND PACKAGING OPTIMIZATION INCLUDING PROVIDING A SOLAR STORM SAFE HAVEN. THE CHIL WILL BE USED TO STUDY HABITABILITY OF OUR DESIGN CONCEPTS. RADIATION SHELTER STUDY: STUDY MOST EFFICIENT WAY TO PROVIDE RADIATION PROTECTION ON BOARD THE EAM. STUDY WILL TRADE USING ORION VERSUS PROVIDING A SAFE HAVEN ON THE EAM. RADIATION MITIGATION STRATEGY STUDY: THIS STUDY WILL EXPLORE OPTIONS FOR METHODS OF MITIGATING LONG-TERM RADIATION EXPOSURE IN DEEP SPACE. DEVELOP AND TEST VARIOUS TECHNIQUES ON BOARD THE EAM. EVOLVABLE ECLSS STUDY: REQUIREMENTS DEFINITION AND BASELINE DESIGN: REQUIREMENTS DEFINITION AND BASELINE SYSTEM DESIGN AND CREATE HABITAT ECLSS SIMULINK MODEL. ECLSS STATE OF THE ART SURVEY: ENGAGE WITH INDUSTRY PARTNERS/VENDORS TO DETERMINE APPROPRIATE ECLSS SOLUTION AND POTENTIAL EVOLVABILITY SOLUTIONS. EVOLVABLE ECLSS STRATEGY: EXPLORE STRATEGIES FOR DESIGNING THE EAM TO SERVE AS A TEST BED FOR DEVELOPING A ROBUST AND COMPACT ECLSS.
Jan 12, 20162$196.4KIGF::OT::IGF NEXTSTEP BAA AWARD. UNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE FOLLOWING: PROJECT MANAGEMENT: PROVIDE OVERALL LEADERSHIP FOR THE PROJECT INTERACT WITH THE CUSTOMER AND WRITE REPORTS. CUSTOMER MEETINGS: ORGANIZE MEETINGS, PREPARE PRESENTATIONS, ATTEND MEETINGS AND ADDRESS ACTION ITEMS. FIVE MEETINGS TOTAL: KICKOFF, THREE TIMS, AND FINAL CONCEPT REVIEW. BUSINESS OPERATIONS: PROVIDE CONTRACTUAL DIRECTION TO THE PROGRAM, INTERFACE WITH THE CUSTOMER, ISSUE BUDGETS AND MONITOR PERFORMANCE, MAINTAIN SCHEDULES, TRACK AND SUBMIT CONTRACT DELIVERABLES, AND ENSURE MISSION SUCCESS. DESIGN MATURATION: WORK WITH NASA TO REFINE DRM AND HIGH-LEVEL SYSTEM REQUIREMENTS TO BE USED IN SUBSYSTEM STUDIES. CAD MODEL SUPPORT: SUPPORT TO WORK ON EAM CONFIGURATION AND MAINTAIN CAD MODELS. SYSTEMS ENGINEERING AND INTEGRATION: SYSTEMS ENGINEERING SUPPORT TO COORDINATE TRADE STUDIES AND TRACK CONFIGURATION CHANGES. RESPONSIBLE FOR ENSURING SYSTEM REQUIREMENTS ARE MET. AIRLOCK/EVA STUDY: THIS STUDY WILL LOOK AT MULTIPLE OPTIONS FOR PROVIDING AN AIRLOCK CAPABILITY. OPTIONS INCLUDE INFLATABLE AIRLOCKS, INTEGRATED AIRLOCKS, AND RIGID AIRLOCKS. THE STUDY WILL ALSO DETERMINE IF THE AIRLOCK SHOULD BE LAUNCHED WITH THE EAM FIRST FLIGHT OR SEPARATELY. ATTITUDE CONTROL SYSTEM: DERIVE ATTITUDE CONTROL REQUIREMENTS FOR DRM AND EXTENDED MISSIONS. AVIONICS STUDY: APPLY HUMAN RATING REQUIREMENTS TO POINT-OF-DEPARTURE AVIONICS SUB-SYSTEM. STUDY HOW MAVEN-DERIVED AVIONICS ARCHITECTURE WOULD BE LEVERAGED FOR THE EAM AND ALSO STUDY THE USE OF ORION AS A BACKUP COMMAND CENTER. POWER SYSTEM STUDY: DERIVE POWER SYSTEM REQUIREMENTS FOR THE DRM AND EXTENDED MISSIONS. STUDY LOAD SHARING POSSIBILITIES WITH ORION. WE WILL CONSTRUCT A DETAILED POWER BUDGET BASED ON A DETAILED POWER EQUIPMENT LIST. THERMAL MANAGEMENT STUDY: PERFORM A THERMAL MANAGEMENT STUDY INTERNAL LAYOUT AND PACKAGING OPTIMIZATION: THIS STUDY WILL INVOLVE PERFORMING AN INTERNAL LAYOUT AND PACKAGING OPTIMIZATION INCLUDING PROVIDING A SOLAR STORM SAFE HAVEN. THE CHIL WILL BE USED TO STUDY HABITABILITY OF OUR DESIGN CONCEPTS. RADIATION SHELTER STUDY: STUDY MOST EFFICIENT WAY TO PROVIDE RADIATION PROTECTION ON BOARD THE EAM. STUDY WILL TRADE USING ORION VERSUS PROVIDING A SAFE HAVEN ON THE EAM. RADIATION MITIGATION STRATEGY STUDY: THIS STUDY WILL EXPLORE OPTIONS FOR METHODS OF MITIGATING LONG-TERM RADIATION EXPOSURE IN DEEP SPACE. DEVELOP AND TEST VARIOUS TECHNIQUES ON BOARD THE EAM. EVOLVABLE ECLSS STUDY: REQUIREMENTS DEFINITION AND BASELINE DESIGN: REQUIREMENTS DEFINITION AND BASELINE SYSTEM DESIGN AND CREATE HABITAT ECLSS SIMULINK MODEL. ECLSS STATE OF THE ART SURVEY: ENGAGE WITH INDUSTRY PARTNERS/VENDORS TO DETERMINE APPROPRIATE ECLSS SOLUTION AND POTENTIAL EVOLVABILITY SOLUTIONS. EVOLVABLE ECLSS STRATEGY: EXPLORE STRATEGIES FOR DESIGNING THE EAM TO SERVE AS A TEST BED FOR DEVELOPING A ROBUST AND COMPACT ECLSS.
Oct 29, 20151$196.4KIGF::OT::IGF NEXTSTEP BAA AWARD. UNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE FOLLOWING: PROJECT MANAGEMENT: PROVIDE OVERALL LEADERSHIP FOR THE PROJECT INTERACT WITH THE CUSTOMER AND WRITE REPORTS. CUSTOMER MEETINGS: ORGANIZE MEETINGS, PREPARE PRESENTATIONS, ATTEND MEETINGS AND ADDRESS ACTION ITEMS. FIVE MEETINGS TOTAL: KICKOFF, THREE TIMS, AND FINAL CONCEPT REVIEW. BUSINESS OPERATIONS: PROVIDE CONTRACTUAL DIRECTION TO THE PROGRAM, INTERFACE WITH THE CUSTOMER, ISSUE BUDGETS AND MONITOR PERFORMANCE, MAINTAIN SCHEDULES, TRACK AND SUBMIT CONTRACT DELIVERABLES, AND ENSURE MISSION SUCCESS. DESIGN MATURATION: WORK WITH NASA TO REFINE DRM AND HIGH-LEVEL SYSTEM REQUIREMENTS TO BE USED IN SUBSYSTEM STUDIES. CAD MODEL SUPPORT: SUPPORT TO WORK ON EAM CONFIGURATION AND MAINTAIN CAD MODELS. SYSTEMS ENGINEERING AND INTEGRATION: SYSTEMS ENGINEERING SUPPORT TO COORDINATE TRADE STUDIES AND TRACK CONFIGURATION CHANGES. RESPONSIBLE FOR ENSURING SYSTEM REQUIREMENTS ARE MET. AIRLOCK/EVA STUDY: THIS STUDY WILL LOOK AT MULTIPLE OPTIONS FOR PROVIDING AN AIRLOCK CAPABILITY. OPTIONS INCLUDE INFLATABLE AIRLOCKS, INTEGRATED AIRLOCKS, AND RIGID AIRLOCKS. THE STUDY WILL ALSO DETERMINE IF THE AIRLOCK SHOULD BE LAUNCHED WITH THE EAM FIRST FLIGHT OR SEPARATELY. ATTITUDE CONTROL SYSTEM: DERIVE ATTITUDE CONTROL REQUIREMENTS FOR DRM AND EXTENDED MISSIONS. AVIONICS STUDY: APPLY HUMAN RATING REQUIREMENTS TO POINT-OF-DEPARTURE AVIONICS SUB-SYSTEM. STUDY HOW MAVEN-DERIVED AVIONICS ARCHITECTURE WOULD BE LEVERAGED FOR THE EAM AND ALSO STUDY THE USE OF ORION AS A BACKUP COMMAND CENTER. POWER SYSTEM STUDY: DERIVE POWER SYSTEM REQUIREMENTS FOR THE DRM AND EXTENDED MISSIONS. STUDY LOAD SHARING POSSIBILITIES WITH ORION. WE WILL CONSTRUCT A DETAILED POWER BUDGET BASED ON A DETAILED POWER EQUIPMENT LIST. THERMAL MANAGEMENT STUDY: PERFORM A THERMAL MANAGEMENT STUDY INTERNAL LAYOUT AND PACKAGING OPTIMIZATION: THIS STUDY WILL INVOLVE PERFORMING AN INTERNAL LAYOUT AND PACKAGING OPTIMIZATION INCLUDING PROVIDING A SOLAR STORM SAFE HAVEN. THE CHIL WILL BE USED TO STUDY HABITABILITY OF OUR DESIGN CONCEPTS. RADIATION SHELTER STUDY: STUDY MOST EFFICIENT WAY TO PROVIDE RADIATION PROTECTION ON BOARD THE EAM. STUDY WILL TRADE USING ORION VERSUS PROVIDING A SAFE HAVEN ON THE EAM. RADIATION MITIGATION STRATEGY STUDY: THIS STUDY WILL EXPLORE OPTIONS FOR METHODS OF MITIGATING LONG-TERM RADIATION EXPOSURE IN DEEP SPACE. DEVELOP AND TEST VARIOUS TECHNIQUES ON BOARD THE EAM. EVOLVABLE ECLSS STUDY: REQUIREMENTS DEFINITION AND BASELINE DESIGN: REQUIREMENTS DEFINITION AND BASELINE SYSTEM DESIGN AND CREATE HABITAT ECLSS SIMULINK MODEL. ECLSS STATE OF THE ART SURVEY: ENGAGE WITH INDUSTRY PARTNERS/VENDORS TO DETERMINE APPROPRIATE ECLSS SOLUTION AND POTENTIAL EVOLVABILITY SOLUTIONS. EVOLVABLE ECLSS STRATEGY: EXPLORE STRATEGIES FOR DESIGNING THE EAM TO SERVE AS A TEST BED FOR DEVELOPING A ROBUST AND COMPACT ECLSS.
Sep 23, 20150$196.4KIGF::OT::IGF NEXTSTEP-2: THE GATEWAY PROGRAM OFFICE WAS DIRECTED BY NASA HQ TO COMMENCE WORK ON DEVELOPING AND REFINING GATEWAY HABITATION CONCEPTS, LEADING TO DESIGN, DEVELOPMENT, TEST AND EVALUATION (DDT&E) AND DELIVERY OF A U.S. HABITATION MODULE TO NASA.

Research next steps

  1. Check the stated set-aside against the solicitation and current certifications.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.