Federal contract award

NNL15AB31T

IGF::OT::IGF TROPOSPHERIC EMISSIONS: MONITORING OF POLLUTION (TEMPO) ELECTROMAGNETIC INTERFERENCE (EMI)/ELECTROMAGNETIC COMPATIBILITY (EMC) ENGINEERING DEVELOPMENT UNIT (EDU) RISK REDUCTION TESTING - PERFORM EMI/EMC EDU RISK REDUCTION TESTING OF THE TEMPO INSTRUMENT CONTROL ELECTRONICS (ICE) AND FOCAL PLANE SUBSYSTEM (FPS) TO IDENTIFY ANY LIKELY NON-COMPLIANCE WITH FLIGHT TEST ENVIRONMENTS AND ALLOW FOR ANY REQUIRED SUBSYSTEM RE-WORK TO TAKE PLACE PRIOR TO THE BUILD OF THE FLIGHT INSTRUMENT.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyNational Aeronautics and Space Administration
OfficeLANGLEY RESEARCH CENTER
NAICS541712
PSCAR11 — SPACE R&D SERVICES; SPACE FLIGHT, RESEARCH AND SUPPORTING ACTIVITIES; BASIC RESEARCH
Parent award / vehicleNNL13AQ01C
Set-asideNO SET ASIDE USED.
Pricing typeCOST PLUS FIXED FEE
ObligationsNot reported
Current contract value$0
Potential contract value / ceiling$0
Start dateOct 27, 2015
Current end dateOct 31, 2015
Potential end dateOct 31, 2015
Latest award activityOct 27, 2015
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 5 of 5 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Sep 7, 20214$-5.5KTROPOSPHERIC EMISSIONS: MONITORING OF POLLUTION (TEMPO) ELECTROMAGNETIC INTERFERENCE (EMI)/ELECTROMAGNETIC COMPATIBILITY (EMC) ENGINEERING DEVELOPMENT UNIT (EDU) RISK REDUCTION TESTING - PERFORM EMI/EMC EDU RISK REDUCTION TESTING OF THE TEMPO INSTRUMENT CONTROL ELECTRONICS (ICE) AND FOCAL PLANE SUBSYSTEM (FPS) TO IDENTIFY ANY LIKELY NON-COMPLIANCE WITH FLIGHT TEST ENVIRONMENTS AND ALLOW FOR ANY REQUIRED SUBSYSTEM RE-WORK TO TAKE PLACE PRIOR TO THE BUILD OF THE FLIGHT INSTRUMENT.
Oct 27, 20153$0IGF::OT::IGF TROPOSPHERIC EMISSIONS: MONITORING OF POLLUTION (TEMPO) ELECTROMAGNETIC INTERFERENCE (EMI)/ELECTROMAGNETIC COMPATIBILITY (EMC) ENGINEERING DEVELOPMENT UNIT (EDU) RISK REDUCTION TESTING - PERFORM EMI/EMC EDU RISK REDUCTION TESTING OF THE TEMPO INSTRUMENT CONTROL ELECTRONICS (ICE) AND FOCAL PLANE SUBSYSTEM (FPS) TO IDENTIFY ANY LIKELY NON-COMPLIANCE WITH FLIGHT TEST ENVIRONMENTS AND ALLOW FOR ANY REQUIRED SUBSYSTEM RE-WORK TO TAKE PLACE PRIOR TO THE BUILD OF THE FLIGHT INSTRUMENT.
Sep 30, 20152$47.6KIGF::OT::IGF TROPOSPHERIC EMISSIONS: MONITORING OF POLLUTION (TEMPO) ELECTROMAGNETIC INTERFERENCE (EMI)/ELECTROMAGNETIC COMPATIBILITY (EMC) ENGINEERING DEVELOPMENT UNIT (EDU) RISK REDUCTION TESTING - PERFORM EMI/EMC EDU RISK REDUCTION TESTING OF THE TEMPO INSTRUMENT CONTROL ELECTRONICS (ICE) AND FOCAL PLANE SUBSYSTEM (FPS) TO IDENTIFY ANY LIKELY NON-COMPLIANCE WITH FLIGHT TEST ENVIRONMENTS AND ALLOW FOR ANY REQUIRED SUBSYSTEM RE-WORK TO TAKE PLACE PRIOR TO THE BUILD OF THE FLIGHT INSTRUMENT.
Aug 11, 20151$0IGF::OT::IGF TROPOSPHERIC EMISSIONS: MONITORING OF POLLUTION (TEMPO) ELECTROMAGNETIC INTERFERENCE (EMI)/ELECTROMAGNETIC COMPATIBILITY (EMC) ENGINEERING DEVELOPMENT UNIT (EDU) RISK REDUCTION TESTING - PERFORM EMI/EMC EDU RISK REDUCTION TESTING OF THE TEMPO INSTRUMENT CONTROL ELECTRONICS (ICE) AND FOCAL PLANE SUBSYSTEM (FPS) TO IDENTIFY ANY LIKELY NON-COMPLIANCE WITH FLIGHT TEST ENVIRONMENTS AND ALLOW FOR ANY REQUIRED SUBSYSTEM RE-WORK TO TAKE PLACE PRIOR TO THE BUILD OF THE FLIGHT INSTRUMENT.
May 20, 20150$153.9KIGF::OT::IGF TROPOSPHERIC EMISSIONS: MONITORING OF POLLUTION (TEMPO) ELECTROMAGNETIC INTERFERENCE (EMI)/ELECTROMAGNETIC COMPATIBILITY (EMC) ENGINEERING DEVELOPMENT UNIT (EDU) RISK REDUCTION TESTING - PERFORM EMI/EMC EDU RISK REDUCTION TESTING OF THE TEMPO INSTRUMENT CONTROL ELECTRONICS (ICE) AND FOCAL PLANE SUBSYSTEM (FPS) TO IDENTIFY ANY LIKELY NON-COMPLIANCE WITH FLIGHT TEST ENVIRONMENTS AND ALLOW FOR ANY REQUIRED SUBSYSTEM RE-WORK TO TAKE PLACE PRIOR TO THE BUILD OF THE FLIGHT INSTRUMENT.

Research next steps

  1. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.