NNM07AA75C

FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS); STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING; REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS; ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM; AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyNational Aeronautics and Space Administration
OfficeNASA MARSHALL SPACE FLIGHT CENTER
NAICS336415 — Guided Missile and Space Vehicle Propulsion Unit and Propulsion Unit Parts Manufacturing
PSCAR11 — SPACE R&D SERVICES; SPACE FLIGHT, RESEARCH AND SUPPORTING ACTIVITIES; BASIC RESEARCH
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeCOST PLUS AWARD FEE
Obligations$4.4B
Current contract value$4.5B
Potential contract value / ceiling$4.5B
Start dateApr 17, 2006
Current end dateDec 31, 2026
Potential end dateDec 31, 2026
Latest award activitySep 2, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 200 of 425 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Sep 2, 2026424$3.0MSPACE LAUNCH SYSTEM (SLS) BOOSTER
Aug 21, 2026422$0SPACE LAUNCH SYSTEM (SLS) BOOSTER
Aug 21, 2026423$-4.3MSPACE LAUNCH SYSTEM (SLS) BOOSTER
Aug 18, 2026421$0SPACE LAUNCH SYSTEM (SLS) BOOSTER
Jun 30, 2026420$0SPACE LAUNCH SYSTEM (SLS) BOOSTER
Jun 15, 2026419$0SPACE LAUNCH SYSTEM (SLS) BOOSTER
May 27, 2026418$5.0MSPACE LAUNCH SYSTEM (SLS) BOOSTER
May 7, 2026417$0SPACE LAUNCH SYSTEM (SLS) BOOSTER
Apr 30, 2026416$0SPACE LAUNCH SYSTEM (SLS) BOOSTER
Apr 27, 2026415$5.0MSPACE LAUNCH SYSTEM (SLS) BOOSTER
Mar 26, 2026414$2.0MSPACE LAUNCH SYSTEM (SLS) BOOSTER
Feb 24, 2026413$600.0KSPACE LAUNCH SYSTEM (SLS) BOOSTER
Jan 15, 2026412$1.2MSPACE LAUNCH SYSTEM (SLS) BOOSTER
Nov 24, 2025411$4.6MSPACE LAUNCH SYSTEM (SLS) BOOSTER
Nov 10, 2025410$125.5KSPACE LAUNCH SYSTEM (SLS) BOOSTER - INCREMENTAL FUNDING
Oct 31, 2025408$0SPACE LAUNCH SYSTEM (SLS) BOOSTER - ARTEMIS II AMERICA 250 LOGO.
Oct 31, 2025409$1.2MSPACE LAUNCH SYSTEM (SLS) BOOSTER - INCREMENTAL FUNDING
Sep 30, 2025407$0SPACE LAUNCH SYSTEM (SLS) BOOSTER - BUDGET TO BUDGET TRANSFER OF ARTEMIS II AND III - FLIGHT SUPPORT FROM NNM07AA75C TO 80MSFC20D0008.
Sep 18, 2025406$0SPACE LAUNCH SYSTEM (SLS) BOOSTER - IN-SCOPE ADMINISTRATIVE UPDATE TO FUND THROUGH DATE.
Sep 3, 2025405$3.0MSPACE LAUNCH SYSTEM (SLS) BOOSTER - INCREMENTAL FUNDING MODIFICATION.
Aug 28, 2025404$0THE PURPOSE OF THIS IN-SCOPE MODIFICATION IS TO INCORPORATE OVERRUN COSTS ASSOCIATED WITH CLIN 0007 - TASK ORDER 53 AND CLIN 0010.
Jul 29, 2025403$0THIS IN-SCOPE MODIFICATION INCORPORATES APU REQUIREMENT AND UPDATES FUND-THROUGH DATE AND B.7 LANGUAGE.
Jul 10, 2025402$0THIS IN-SCOPE MODIFICATION EQUITABLY ADJUSTS THE CONTRACT FOR THE INSURANCE PAYMENTS MADE FOR THE SLS PROGRAM.
Jun 12, 2025401$3.5MTHIS IN-SCOPE MODIFICATION ADDS ADDITIONAL INCREMENTAL FUNDING.
May 21, 2025400$0KEEP ORIGINAL SOW. FIRST DPT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP)
Apr 21, 2025399$0KEEP ORIGINAL SOW. FIRST DPT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP)
Apr 16, 2025398$0KEEP ORIGINAL SOW. FIRST DPT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP)
Apr 1, 2025397$1.9MKEEP ORIGINAL SOW. FIRST DPT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP)
Mar 28, 2025396$0KEEP ORIGINAL SOW. FIRST DPT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP)
Mar 24, 2025395$0KEEP ORIGINAL SOW. FIRST DPT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP)
Mar 14, 2025394$0KEEP ORIGINAL SOW. FIRST DPT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP)
Mar 10, 2025393$0KEEP ORIGINAL SOW. FIRST DPT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP)
Mar 3, 2025392$0KEEP ORIGINAL SOW. FIRST DPT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP)
Feb 27, 2025391$0KEEP ORIGINAL SOW: FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)...
Feb 20, 2025390$1.0MKEEP ORIGINAL SOW: FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)...
Dec 31, 2024389$0KEEP ORIGINAL SOW: FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)...
Dec 19, 2024388$0KEEP ORIGINAL SOW: FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)...
Dec 17, 2024387$4.0MFIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)...
Dec 16, 2024386$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)...
Dec 5, 2024385$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)...
Oct 28, 2024383$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)...
Oct 28, 2024384$4.3MFIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)...
Sep 20, 2024382$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)...
Aug 19, 2024381$7.0MFIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)...
Aug 12, 2024380$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)...
Jul 3, 2024379$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)...
Apr 19, 2024378$30.0MFIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)...
Apr 18, 2024377$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)...
Mar 12, 2024376$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)...
Mar 8, 2024375$7.5MFIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)...
Feb 13, 2024374$10.0MFIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)...
Jan 25, 2024373$4.0MFIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)...
Dec 13, 2023372$14.9MFIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)...
Nov 21, 2023371$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)...
Oct 25, 2023370$10.0MFIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)...
Oct 3, 2023368$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)...
Oct 3, 2023369$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)...
Sep 30, 2023367$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)...
Sep 27, 2023366$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)...
Sep 8, 2023365$16.9MFIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)...
Sep 7, 2023364$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)...
Aug 30, 2023363$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)...
Jul 26, 2023362$144.7KFIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)...
Jul 11, 2023361$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)...
Jun 1, 2023360$25.2MFIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)...
May 1, 2023359$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)...
Apr 3, 2023358$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)...
Mar 22, 2023357$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)...
Feb 21, 2023356$43.0MFIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)...
Feb 6, 2023355$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)...
Jan 23, 2023354$6.9MFIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)...
Dec 19, 2022353$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)...
Oct 21, 2022351$32.5MFIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)...
Oct 21, 2022352$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)...
Sep 19, 2022350$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)...
Sep 8, 2022349$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)...
Jul 26, 2022348$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)...
Jun 27, 2022347$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)...
May 26, 2022346$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)...
May 17, 2022345$40.4MFIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)...
May 3, 2022344$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)...
Apr 25, 2022343$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)...
Apr 14, 2022342$21.0MFIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)...
Apr 7, 2022341$7.5MKEEP ORIGINAL SOW: FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)...
Mar 3, 2022339$0COVID-19 KEEP ORIGINAL SOW: FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)...
Mar 3, 2022340$18.0MCOVID-19 KEEP ORIGINAL SOW: FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)...
Feb 17, 2022338$0COVID-19 KEEP ORIGINAL SOW: FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)...
Jan 24, 2022337$0COVID-19 KEEP ORIGINAL SOW: FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)...
Dec 21, 2021336$26.0MKEEP ORIGINAL SOW: FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)...
Dec 16, 2021335$0KEEP ORIGINAL SOW: FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)...
Dec 14, 2021334$0KEEP ORIGINAL SOW: FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)...
Nov 30, 2021333$6.1MKEEP ORIGINAL SOW: FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)...
Nov 9, 2021332$0KEEP ORIGINAL SOW: FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)...
Nov 3, 2021331$20.0MKEEP ORIGINAL SOW: FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)...
Nov 2, 2021330$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS) STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS
Oct 18, 2021329$0EO14042 FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS) STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS
Sep 28, 2021328$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS) STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS
Sep 22, 2021327$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS) STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS
Sep 21, 2021326$24.4MFIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS) STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS
Sep 1, 2021325$7.0MFIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS) STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS
Aug 5, 2021323$47.9MFIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS) STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS
Aug 5, 2021324$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS) STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS
Jul 14, 2021322$0KEEP ORIGINAL SOW: FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)...
Jun 17, 2021321$0KEEP ORIGINAL SOW: FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)...
Jun 10, 2021319$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS) STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS
May 18, 2021318$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)...
May 12, 2021317$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)...
Apr 22, 2021316$4.1MFIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE...
Apr 21, 2021315$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESS
Apr 7, 2021312$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS) STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS
Apr 7, 2021313$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS) STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS
Apr 7, 2021314$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS) STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS
Mar 23, 2021311$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS) STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS
Mar 17, 2021310$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS) STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS
Mar 4, 2021309$0KEEP ORIGINAL SOW: FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)...
Feb 23, 2021308$85.2MFIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS) STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS
Feb 23, 2021320$740.0KFIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS) STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS
Feb 16, 2021307$0KEEP ORIGINAL SOW: FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)
Jan 22, 2021306$5.0MKEEP ORIGINAL SOW: FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)
Jan 21, 2021304$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS) STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS
Jan 21, 2021305$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS) STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS
Dec 17, 2020302$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS) STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS
Dec 17, 2020303$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS) STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS
Dec 16, 2020301$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS) STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS
Nov 24, 2020300$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS) STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS
Nov 2, 2020299$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS) STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS
Oct 26, 2020298$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS) STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS
Oct 6, 2020297$0COVID-19 FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS) STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS
Sep 21, 2020296$37.2MFIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS) STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS
Sep 16, 2020295$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS) STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS
Aug 31, 2020294$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS) STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS
Aug 26, 2020293$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS) STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS
Jul 29, 2020290$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS) STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS
Jul 29, 2020291$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS) STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS
Jul 29, 2020292$82.0MFIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS) STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS
Jul 9, 2020289$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS) STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS
Jun 25, 2020287$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS) STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS
Jun 25, 2020288$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS) STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS
Jun 12, 2020284$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS) STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS
Jun 12, 2020285$-44.5MFIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS) STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS
Jun 12, 2020286$0RKEEP ORIGINAL SOW: FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB) / REUSABLE SOLID ROCKET MOTOR (RSRM)
May 29, 2020282$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS) STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS
May 29, 2020283$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS) STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS
Apr 20, 2020280$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS) STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS
Apr 20, 2020281$6.0MFIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS) STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS
Apr 9, 2020279$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS) STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS
Mar 30, 2020278$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS) STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS
Mar 19, 2020277$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS) STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS
Feb 19, 2020276$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS) STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS
Feb 13, 2020274$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS) STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS
Feb 13, 2020275$139.0MFIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS) STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS
Feb 7, 2020273$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS) STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS
Jan 22, 2020272$10.0MFIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS) STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS
Dec 19, 2019271$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS) STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS
Dec 17, 2019270$17.5MFIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS) STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS
Dec 16, 2019269$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS) STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS
Dec 9, 2019268$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS) STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS
Nov 25, 2019267$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS) STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS
Nov 20, 2019266$6.0MFIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS) STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS
Nov 15, 2019265$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS) STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS
Oct 30, 2019264$25.0MFIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS) STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS
Oct 25, 2019263$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS) STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS
Sep 24, 2019262$30.9MFIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS); STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING; REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS; ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM; AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS
Sep 16, 2019261$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS); STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING; REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS; ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM; AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS
Sep 9, 2019260$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS); STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING; REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS; ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM; AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS
Sep 4, 2019259$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS); STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING; REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS; ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM; AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS
Aug 20, 2019258$46.5MFIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS); STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING; REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS; ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM; AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS
Jul 31, 2019257$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS); STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING; REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS; ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM; AND THREE FLIGHT TEST VEHICLES.
Jul 23, 2019256$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS); STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING; REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS; ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM; AND THREE FLIGHT TEST VEHICLES.
Jul 2, 2019254$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS); STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING; REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS; ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM; AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS
Jul 2, 2019255$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS); STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING; REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS; ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM; AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS
Jun 19, 2019253$53.0MFIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS); STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING; REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS; ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM; AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS
May 20, 2019252$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS); STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING; REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS; ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM; AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS
May 15, 2019250$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS); STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING; REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS; ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM; AND THREE FLIGHT TEST VEHICLES.
May 14, 2019251$10.0KFIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS); STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING; REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS; ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM; AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS
May 7, 2019248$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS); STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING; REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS; ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM; AND THREE FLIGHT TEST VEHICLES.
May 7, 2019249$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS); STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING; REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS; ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM; AND THREE FLIGHT TEST VEHICLES.
May 1, 2019247$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS); STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING; REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS; ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM; AND THREE FLIGHT TEST VEHICLES.
Apr 25, 2019246$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS); STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING; REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS; ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM; AND THREE FLIGHT TEST VEHICLES.
Apr 12, 2019244$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS); STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING; REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS; ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM; AND THREE FLIGHT TEST VEHICLES.
Apr 12, 2019245$47.0MFIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS); STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING; REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS; ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM; AND THREE FLIGHT TEST VEHICLES.
Apr 9, 2019243$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS); STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING; REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS; ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM; AND THREE FLIGHT TEST VEHICLES.
Apr 3, 2019242$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS); STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING; REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS; ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM; AND THREE FLIGHT TEST VEHICLES.
Feb 15, 2019240$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS); STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING; REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS; ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM; AND THREE FLIGHT TEST VEHICLES.
Feb 15, 2019241$10.6MFIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS); STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING; REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS; ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM; AND THREE FLIGHT TEST VEHICLES.
Feb 5, 2019239$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS); STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING; REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS; ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM; AND THREE FLIGHT TEST VEHICLES.
Feb 1, 2019238$63.0MFIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS); STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING; REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS; ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM; AND THREE FLIGHT TEST VEHICLES.
Dec 20, 2018237$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS); STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING; REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS; ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM; AND THREE FLIGHT TEST VEHICLES.
Dec 17, 2018236$16.2MFIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS); STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING; REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS; ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM; AND THREE FLIGHT TEST VEHICLES.
Dec 12, 2018235$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS); STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING; REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS; ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM; AND THREE FLIGHT TEST VEHICLES.
Dec 3, 2018234$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS); STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING; REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS; ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM; AND THREE FLIGHT TEST VEHICLES.
Nov 19, 2018233$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS); STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING; REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS; ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM; AND THREE FLIGHT TEST VEHICLES.
Oct 24, 2018232$12.0MFIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS); STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING; REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS; ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM; AND THREE FLIGHT TEST VEHICLES.
Sep 27, 2018231$41.0MFIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS); STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING; REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS; ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM; AND THREE FLIGHT TEST VEHICLES.
Sep 26, 2018230$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS); STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING; REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS; ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM; AND THREE FLIGHT TEST VEHICLES.
Aug 23, 2018229$3.5MFIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS); STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING; REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS; ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM; AND THREE FLIGHT TEST VEHICLES.
Aug 16, 2018228$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS); STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING; REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS; ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM; AND THREE FLIGHT TEST VEHICLES.
Jul 26, 2018227$0ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS);STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING; REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS; ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM; AND THREE FLIGHT TEST VEHICLES.
Jul 24, 2018226$34.5MFIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS); STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING; REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS; ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM; AND THREE FLIGHT TEST VEHICLES.
Jun 13, 2018225$0FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS); STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING; REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS; ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM; AND THREE FLIGHT TEST VEHICLES.

Estimated positioning window

Oct 25, 2026 – Jan 23, 2027

Recompete signal:
65/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 65/100. Available recorded signals: 60 points.

Contract end 2026-12-31 (67 days from calculation)
+35 points
2 historical awards in this buyer and category group
+10 points
425 recorded award transactions
+10 points
Latest award action: 2026-09-02
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+0 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.