Federal contract award
NNM12AA82C
INTERIM CRYOGENIC PROPULSION STAGE FOR SLS
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | National Aeronautics and Space Administration |
| Office | NASA MARSHALL SPACE FLIGHT CENTER |
| NAICS | 336415 — Guided Missile and Space Vehicle Propulsion Unit and Propulsion Unit Parts Manufacturing |
| PSC | 1820 — Space Vehicle Components |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | COST PLUS AWARD FEE |
| Obligations | $1.3B |
| Current contract value | $1.5B |
| Potential contract value / ceiling | $1.6B |
| Start date | Oct 1, 2012 |
| Current end date | Dec 31, 2027 |
| Potential end date | Dec 31, 2027 |
| Latest award activity | Aug 20, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 170 of 170 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Aug 20, 2026 | 171 | $0 | INTERIM CRYOGENIC PROPULSION STAGE (ICPS) FOR THE NASA SPACE LAUNCH SYSTEM (SLS). |
| Jul 31, 2026 | 170 | $49.0M | INTERIM CRYOGENIC PROPULSION STAGE (ICPS) FOR THE NASA SPACE LAUNCH SYSTEM (SLS). |
| Jun 29, 2026 | 169 | $17.3M | INTERIM CRYOGENIC PROPULSION STAGE (ICPS) FOR THE NASA SPACE LAUNCH SYSTEM (SLS). |
| Jun 1, 2026 | 168 | $0 | INTERIM CRYOGENIC PROPULSION STAGE (ICPS) FOR THE NASA SPACE LAUNCH SYSTEM (SLS). |
| May 27, 2026 | 167 | $10.2M | INTERIM CRYOGENIC PROPULSION STAGE (ICPS) FOR THE NASA SPACE LAUNCH SYSTEM (SLS). |
| Apr 29, 2026 | 166 | $2.7M | INTERIM CRYOGENIC PROPULSION STAGE (ICPS) FOR THE NASA SPACE LAUNCH SYSTEM (SLS). |
| Apr 28, 2026 | 165 | $0 | INTERIM CRYOGENIC PROPULSION STAGE (ICPS) FOR THE NASA SPACE LAUNCH SYSTEM (SLS). |
| Mar 31, 2026 | 164 | $10.9M | INTERIM CRYOGENIC PROPULSION STAGE (ICPS) FOR THE NASA SPACE LAUNCH SYSTEM (SLS). |
| Feb 26, 2026 | 163 | $8.0M | INTERIM CRYOGENIC PROPULSION STAGE (ICPS) FOR THE NASA SPACE LAUNCH SYSTEM (SLS). |
| Jan 26, 2026 | 162 | $20.0M | INTERIM CRYOGENIC PROPULSION STAGE (ICPS) FOR THE NASA SPACE LAUNCH SYSTEM (SLS). |
| Jan 14, 2026 | 161 | $0 | INTERIM CRYOGENIC PROPULSION STAGE (ICPS) FOR THE NASA SPACE LAUNCH SYSTEM (SLS). |
| Dec 8, 2025 | 160 | $0 | INTERIM CRYOGENIC PROPULSION STAGE (ICPS) FOR THE NASA SPACE LAUNCH SYSTEM (SLS). |
| Nov 26, 2025 | 159 | $28.0M | INTERIM CRYOGENIC PROPULSION STAGE (ICPS) FOR THE NASA SPACE LAUNCH SYSTEM (SLS). |
| Oct 30, 2025 | 158 | $4.5M | INTERIM CRYOGENIC PROPULSION STAGE (ICPS) FOR THE NASA SPACE LAUNCH SYSTEM (SLS). |
| Sep 25, 2025 | 157 | $0 | ACTION INTERIM CRYOGENIC PROPULSION STAGE (ICPS) FOR THE NASA SPACE LAUNCH (SLS) TO ADD FUNDING TO ENSURE CONTRACTUAL OBLIGATIONS ARE MET. |
| Sep 5, 2025 | 156 | $16.5M | ACTION INTERIM CRYOGENIC PROPULSION STAGE (ICPS) FOR THE NASA SPACE LAUNCH SYSTEM (SLS) TO ADD FUNDING TO ENSURE CONTRACTUAL OBLIGATIONS ARE MET. |
| Aug 7, 2025 | 155 | $15.6M | ACTION INTERIM CRYOGENIC PROPULSION STAGE (ICPS) FOR THE NASA SPACE LAUNCH SYSTEM (SLS) TO ADD FUNDING TO ENSURE CONTRACTUAL OBLIGATIONS ARE MET. |
| Aug 1, 2025 | 154 | $7.4M | ACTION INTERIM CRYOGENIC PROPULSION STAGE (ICPS) FOR THE NASA SPACE LAUNCH SYSTEM (SLS) TO ADD FUNDING TO ENSURE CONTRACTUAL OBLIGATIONS ARE MET. |
| Jul 21, 2025 | 153 | $0 | ACTION INTERIM CRYOGENIC PROPULSION STAGE (ICPS) FOR THE NASA SPACE LAUNCH SYSTEM (SLS) TO EXTEND FUNDED THROUGH DATE TO ENSURE CONTRACTUAL OBLIGATIONS ARE MET CURRENT FUNDING IS DEEMED SUFFICIENT TO FULFILL CURRENT CONTRACT OBLIGATIONS. |
| Jun 18, 2025 | 152 | $27.6M | MODIFICATION TO BILATERALLY INCREASE CONTRACT VALUE AND DEFINITIZED CONTRACT ACTION POP EXTENSION. |
| May 14, 2025 | 151 | $13.5M | MODIFICATION TO BILATERALLY INCREASE CONTRACT VALUE DURING THE UNDEFINITIZED CONTRACT ACTION POP |
| Mar 3, 2025 | 150 | $0 | INTERIM CRYOGENIC PROPULSION STAGE (ICPS) FOR THE NASA SPACE LAUNCH SYSTEM (SLS). |
| Feb 27, 2025 | 149 | $40.0M | INTERIM CRYOGENIC PROPULSION STAGE (ICPS) FOR THE NASA SPACE LAUNCH SYSTEM (SLS). |
| Feb 13, 2025 | 148 | $32.0M | INTERIM CRYOGENIC PROPULSION STAGE (ICPS) FOR THE NASA SPACE LAUNCH SYSTEM (SLS). |
| Jan 27, 2025 | 147 | $11.2M | INTERIM CRYOGENIC PROPULSION STAGE (ICPS) FOR THE NASA SPACE LAUNCH SYSTEM (SLS). |
| Dec 27, 2024 | 146 | $12.7M | INTERIM CRYOGENIC PROPULSION STAGE (ICPS) FOR THE NASA SPACE LAUNCH SYSTEM (SLS). |
| Dec 20, 2024 | 145 | $0 | INTERIM CRYOGENIC PROPULSION STAGE (ICPS) FOR THE NASA SPACE LAUNCH SYSTEM (SLS). |
| Nov 6, 2024 | 144 | $0 | INTERIM CRYOGENIC PROPULSION STAGE (ICPS) FOR THE NASA SPACE LAUNCH SYSTEM (SLS). |
| Oct 22, 2024 | 143 | $23.3M | INTERIM CRYOGENIC PROPULSION STAGE (ICPS) FOR THE NASA SPACE LAUNCH SYSTEM (SLS). |
| Aug 26, 2024 | 142 | $1.3M | INTERIM CRYOGENIC PROPULSION STAGE (ICPS) FOR THE NASA SPACE LAUNCH SYSTEM (SLS). |
| Jul 29, 2024 | 140 | $21.0M | INTERIM CRYOGENIC PROPULSION STAGE (ICPS) FOR THE NASA SPACE LAUNCH SYSTEM (SLS). |
| Jul 29, 2024 | 141 | $0 | INTERIM CRYOGENIC PROPULSION STAGE (ICPS) FOR THE NASA SPACE LAUNCH SYSTEM (SLS). |
| Jun 21, 2024 | 139 | $0 | INTERIM CRYOGENIC PROPULSION STAGE (ICPS) FOR THE NASA SPACE LAUNCH SYSTEM (SLS). |
| Apr 29, 2024 | 138 | $31.4M | INTERIM CRYOGENIC PROPULSION STAGE (ICPS) FOR THE NASA SPACE LAUNCH SYSTEM (SLS). |
| Apr 16, 2024 | 137 | $0 | INTERIM CRYOGENIC PROPULSION STAGE (ICPS) FOR THE NASA SPACE LAUNCH SYSTEM (SLS). |
| Apr 2, 2024 | 136 | $7.2M | INTERIM CRYOGENIC PROPULSION STAGE (ICPS) FOR THE NASA SPACE LAUNCH SYSTEM (SLS). |
| Mar 5, 2024 | 135 | $8.1M | INTERIM CRYOGENIC PROPULSION STAGE (ICPS) FOR THE NASA SPACE LAUNCH SYSTEM (SLS). |
| Feb 8, 2024 | 134 | $14.0M | INTERIM CRYOGENIC PROPULSION STAGE (ICPS) AND FAIRING SYSTEM FOR ICPS ON THE NASA SPACE LAUNCH SYSTEM (SLS). |
| Jan 22, 2024 | 133 | $2.6M | INTERIM CRYOGENIC PROPULSION STAGE (ICPS) AND FAIRING SYSTEM FOR ICPS ON THE NASA SPACE LAUNCH SYSTEM (SLS). |
| Dec 7, 2023 | 132 | $10.2M | INTERIM CRYOGENIC PROPULSION STAGE (ICPS) AND FAIRING SYSTEM FOR ICPS ON THE NASA SPACE LAUNCH SYSTEM (SLS). |
| Nov 21, 2023 | 131 | $0 | INTERIM CRYOGENIC PROPULSION STAGE (ICPS) AND FAIRING SYSTEM FOR ICPS ON THE NASA SPACE LAUNCH SYSTEM (SLS). |
| Oct 30, 2023 | 130 | $0 | INTERIM CRYOGENIC PROPULSION STAGE (ICPS) AND FAIRING SYSTEM FOR ICPS ON THE NASA SPACE LAUNCH SYSTEM (SLS). |
| Oct 19, 2023 | 129 | $9.9M | INTERIM CRYOGENIC PROPULSION STAGE (ICPS) AND FAIRING SYSTEM FOR ICPS ON THE NASA SPACE LAUNCH SYSTEM (SLS). |
| Aug 22, 2023 | 128 | $901.6K | INTERIM CRYOGENIC PROPULSION STAGE (ICPS) AND FAIRING SYSTEM FOR ICPS ON THE NASA SPACE LAUNCH SYSTEM (SLS). |
| Aug 16, 2023 | 127 | $0 | INTERIM CRYOGENIC PROPULSION STAGE (ICPS) AND FAIRING SYSTEM FOR ICPS ON THE NASA SPACE LAUNCH SYSTEM (SLS). |
| Jul 12, 2023 | 126 | $4.6M | INTERIM CRYOGENIC PROPULSION STAGE (ICPS) AND FAIRING SYSTEM FOR ICPS ON THE NASA SPACE LAUNCH SYSTEM (SLS). |
| Jun 5, 2023 | 125 | $15.3M | INTERIM CRYOGENIC PROPULSION STAGE (ICPS) AND FAIRING SYSTEM FOR ICPS ON THE NASA SPACE LAUNCH SYSTEM (SLS). |
| May 23, 2023 | 124 | $0 | INTERIM CRYOGENIC PROPULSION STAGE (ICPS) AND FAIRING SYSTEM FOR ICPS ON THE NASA SPACE LAUNCH SYSTEM (SLS). |
| Feb 22, 2023 | 123 | $29.9M | INTERIM CRYOGENIC PROPULSION STAGE (ICPS) AND FAIRING SYSTEM FOR ICPS ON THE NASA SPACE LAUNCH SYSTEM (SLS). |
| Feb 16, 2023 | 122 | $0 | INTERIM CRYOGENIC PROPULSION STAGE (ICPS) AND FAIRING SYSTEM FOR ICPS ON THE NASA SPACE LAUNCH SYSTEM (SLS). |
| Jan 19, 2023 | 121 | $8.0M | INTERIM CRYOGENIC PROPULSION STAGE (ICPS) AND FAIRING SYSTEM FOR ICPS ON THE NASA SPACE LAUNCH SYSTEM (SLS). |
| Dec 21, 2022 | 119 | $0 | INTERIM CRYOGENIC PROPULSION STAGE (ICPS) AND FAIRING SYSTEM FOR ICPS ON THE NASA SPACE LAUNCH SYSTEM (SLS). |
| Dec 21, 2022 | 120 | $0 | INTERIM CRYOGENIC PROPULSION STAGE (ICPS) AND FAIRING SYSTEM FOR ICPS ON THE NASA SPACE LAUNCH SYSTEM (SLS). |
| Oct 21, 2022 | 118 | $22.7M | INTERIM CRYOGENIC PROPULSION STAGE (ICPS) AND FAIRING SYSTEM FOR ICPS ON THE NASA SPACE LAUNCH SYSTEM (SLS). |
| Oct 7, 2022 | 117 | $0 | INTERIM CRYOGENIC PROPULSION STAGE (ICPS) AND FAIRING SYSTEM FOR ICPS ON THE NASA SPACE LAUNCH SYSTEM (SLS). |
| Sep 19, 2022 | 116 | $0 | INTERIM CRYOGENIC PROPULSION STAGE (ICPS) AND FAIRING SYSTEM FOR ICPS ON THE NASA SPACE LAUNCH SYSTEM (SLS). |
| Aug 30, 2022 | 115 | $865.2K | INTERIM CRYOGENIC PROPULSION STAGE (ICPS) AND FAIRING SYSTEM FOR ICPS ON THE NASA SPACE LAUNCH SYSTEM (SLS). |
| Aug 26, 2022 | 114 | $0 | INTERIM CRYOGENIC PROPULSION STAGE (ICPS) AND FAIRING SYSTEM FOR ICPS ON THE NASA SPACE LAUNCH SYSTEM (SLS). |
| Aug 15, 2022 | 113 | $0 | INTERIM CRYOGENIC PROPULSION STAGE (ICPS) AND FAIRING SYSTEM FOR ICPS ON THE NASA SPACE LAUNCH SYSTEM (SLS). |
| Jul 27, 2022 | 112 | $0 | INTERIM CRYOGENIC PROPULSION STAGE (ICPS) AND FAIRING SYSTEM FOR ICPS ON THE NASA SPACE LAUNCH SYSTEM (SLS). |
| Jun 30, 2022 | 111 | $2.0M | INTERIM CRYOGENIC PROPULSION STAGE (ICPS) AND FAIRING SYSTEM FOR ICPS ON THE NASA SPACE LAUNCH SYSTEM (SLS). |
| Jun 28, 2022 | 110 | $-2.0M | INTERIM CRYOGENIC PROPULSION STAGE (ICPS) AND FAIRING SYSTEM FOR ICPS ON THE NASA SPACE LAUNCH SYSTEM (SLS). |
| Jun 6, 2022 | 109 | $0 | INTERIM CRYOGENIC PROPULSION STAGE (ICPS) AND FAIRING SYSTEM FOR ICPS ON THE NASA SPACE LAUNCH SYSTEM (SLS). |
| May 5, 2022 | 108 | $0 | INTERIM CRYOGENIC PROPULSION STAGE (ICPS) AND FAIRING SYSTEM FOR ICPS ON THE NASA SPACE LAUNCH SYSTEM (SLS). |
| May 2, 2022 | 107 | $44.7M | INTERIM CRYOGENIC PROPULSION STAGE (ICPS) AND FAIRING SYSTEM FOR ICPS ON THE NASA SPACE LAUNCH SYSTEM (SLS). |
| Mar 31, 2022 | 105 | $4.2M | INTERIM CRYOGENIC PROPULSION STAGE (ICPS) AND FAIRING SYSTEM FOR ICPS ON THE NASA SPACE LAUNCH SYSTEM (SLS). |
| Mar 31, 2022 | 106 | $12.6M | INTERIM CRYOGENIC PROPULSION STAGE (ICPS) AND FAIRING SYSTEM FOR ICPS ON THE NASA SPACE LAUNCH SYSTEM (SLS). |
| Feb 18, 2022 | 104 | $0 | INTERIM CRYOGENIC PROPULSION STAGE (ICPS) AND FAIRING SYSTEM FOR ICPS ON THE NASA SPACE LAUNCH SYSTEM (SLS). |
| Feb 16, 2022 | 103 | $3.2M | INTERIM CRYOGENIC PROPULSION STAGE (ICPS) AND FAIRING SYSTEM FOR ICPS ON THE NASA SPACE LAUNCH SYSTEM (SLS). |
| Feb 10, 2022 | 102 | $0 | INTERIM CRYOGENIC PROPULSION STAGE (ICPS) AND FAIRING SYSTEM FOR ICPS ON THE NASA SPACE LAUNCH SYSTEM (SLS). |
| Jan 19, 2022 | 101 | $-3.8M | INTERIM CRYOGENIC PROPULSION STAGE (ICPS) AND FAIRING SYSTEM FOR ICPS ON THE NASA SPACE LAUNCH SYSTEM (SLS). |
| Dec 16, 2021 | 100 | $20.7M | INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Oct 21, 2021 | 98 | $0 | EO14042 INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Oct 21, 2021 | 99 | $27.5M | INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Sep 17, 2021 | 97 | $10.5M | INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Aug 12, 2021 | 96 | $0 | INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Aug 4, 2021 | 95 | $0 | INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Jul 14, 2021 | 93 | $0 | INTERIM CRYOGENIC PROPULSION STAGE (ICPS) AND FAIRING SYSTEM FOR ICPS ON THE NASA SPACE LAUNCH SYSTEM (SLS). |
| Jul 14, 2021 | 94 | $33.4M | INTERIM CRYOGENIC PROPULSION STAGE (ICPS) AND FAIRING SYSTEM FOR ICPS ON THE NASA SPACE LAUNCH SYSTEM (SLS). |
| May 26, 2021 | 92 | $0 | INTERIM CRYOGENIC PROPULSION STAGE (ICPS) AND FAIRING SYSTEM FOR ICPS ON THE NASA SPACE LAUNCH SYSTEM (SLS). |
| Apr 16, 2021 | 91 | $0 | INTERIM CRYOGENIC PROPULSION STAGE (ICPS) AND FAIRING SYSTEM FOR ICPS ON THE NASA SPACE LAUNCH SYSTEM (SLS). |
| Mar 29, 2021 | 90 | $44.4M | INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Mar 26, 2021 | 89 | $-3.4M | INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Feb 26, 2021 | 88 | $31.0M | INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Jan 27, 2021 | 87 | $16.0M | INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Dec 23, 2020 | 86 | $0 | INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Nov 24, 2020 | 85 | $0 | INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Oct 22, 2020 | 84 | $13.0M | INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Aug 28, 2020 | 83 | $16.1M | INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Aug 24, 2020 | 82 | $0 | INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Jul 28, 2020 | 81 | $14.7M | INTERIM CRYOGENIC PROPULSION STAGE (ICPS) AND FAIRING SYSTEM FOR ICPS ON THE NASA SPACE LAUNCH SYSTEM (SLS). |
| Jul 7, 2020 | 80 | $0 | INTERIM CRYOGENIC PROPULSION STAGE (ICPS) AND FAIRING SYSTEM FOR ICPS ON THE SPACE LAUNCH SYSTEM (SLS). |
| May 14, 2020 | 79 | $5.5M | INTERIM CRYOGENIC PROPULSION STAGE (ICPS) AND FAIRING SYSTEM FOR ICPS ON THE SPACE LAUNCH SYSTEM (SLS). |
| Apr 27, 2020 | 78 | $0 | INTERIM CRYOGENIC PROPULSION STAGE (ICPS) AND FAIRING SYSTEM FOR ICPS ON THE SPACE LAUNCH SYSTEM (SLS). |
| Mar 13, 2020 | 77 | $70.0M | INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Jan 31, 2020 | 76 | $0 | INTERIM CYROGENIC PROPULSION STAGE (ICPS) AND FAIRING SYSTEM FOR ICPS ON SPACE LAUNCH SYSTEM (SLS). |
| Jan 23, 2020 | 75 | $6.9M | INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Dec 18, 2019 | 74 | $6.0M | INTERIM CRYOGENIC PROPULSION STAGE (ICPS) AND FAIRING SYSTEM FOR ICPS ON SPACE LAUNCH SYSTEM (SLS) |
| Oct 29, 2019 | 73 | $5.0M | INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Aug 30, 2019 | 72 | $27.0M | INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Aug 12, 2019 | 71 | $-9.9M | INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Aug 2, 2019 | 70 | $11.5M | INTERIM CYROGENIC PROPULSION STAGE (ICPS) AND FAIRING SYSTEM FOR ICPS ON SPACE LAUNCH SYSTEM (SLS). |
| Jun 25, 2019 | 69 | $-9.9M | INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Apr 23, 2019 | 68 | $36.0M | INTERIM CRYOGENIC PROPULSION STAGE (ICPS) AND FAIRING SYSTEM FOR ICPS ON SPACE LAUNCH SYSTEM (SLS). |
| Mar 12, 2019 | 67 | $0 | INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Feb 13, 2019 | 66 | $7.8M | INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Dec 11, 2018 | 64 | $0 | INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Oct 22, 2018 | 63 | $0 | INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Oct 12, 2018 | 62 | $42.6M | INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Aug 15, 2018 | 61 | $0 | INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Jul 19, 2018 | 60 | $10.0M | INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Jun 21, 2018 | 59 | $5.0M | INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| May 16, 2018 | 58 | $5.0M | INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Apr 10, 2018 | 57 | $4.0M | INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Mar 22, 2018 | 56 | $2.4M | INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Dec 11, 2017 | 54 | $3.0M | INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Nov 8, 2017 | 53 | $10.1M | INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Oct 4, 2017 | 52 | $0 | INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Sep 29, 2017 | 51 | $5.0M | INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Aug 25, 2017 | 50 | $1.4M | INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Aug 11, 2017 | 49 | $4.6M | INTERIM CRYOGENIC PROPULSION STAGE FOR ICPS |
| Aug 8, 2017 | 48 | $7.4M | INTERIM CRYOGENIC PROPULSION STAGE FOR ICPS |
| Jul 7, 2017 | 47 | $-12.0M | INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Jun 30, 2017 | 46 | $12.0M | INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Jun 20, 2017 | 45 | $0 | INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Jun 7, 2017 | 44 | $7.0M | INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Apr 28, 2017 | 43 | $7.0M | INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Apr 20, 2017 | 42 | $5.3M | INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Feb 24, 2017 | 41 | $14.6M | INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Dec 30, 2016 | 40 | $10.3M | INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Dec 2, 2016 | 39 | $0 | INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Oct 26, 2016 | 38 | $4.2M | INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Sep 26, 2016 | 37 | $6.5M | INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Aug 26, 2016 | 36 | $4.0M | INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Aug 22, 2016 | 35 | $0 | INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Jul 29, 2016 | 34 | $1.6M | INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Jul 6, 2016 | 33 | $0 | INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Jun 30, 2016 | 32 | $-250.0K | INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Jun 21, 2016 | 31 | $10.0M | INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Apr 22, 2016 | 30 | $14.0M | INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Apr 4, 2016 | 29 | $0 | INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Jan 25, 2016 | 28 | $30.9M | INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Dec 23, 2015 | 27 | $10.5M | INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Dec 9, 2015 | 26 | $0 | INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Nov 5, 2015 | 25 | $4.4M | INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Sep 30, 2015 | 24 | $0 | INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Sep 17, 2015 | 23 | $643.9K | INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Aug 19, 2015 | 22 | $425.0K | INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Jun 11, 2015 | 21 | $0 | INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| May 22, 2015 | 20 | $0 | INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| May 8, 2015 | 19 | $4.3M | INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Feb 2, 2015 | 18 | $41.5M | INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Dec 23, 2014 | 17 | $14.3M | IGF::CT::IGF INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Dec 16, 2014 | 16 | $2.7M | IGF::CT::IGF INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Oct 21, 2014 | 13 | $8.3M | INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Oct 15, 2014 | 14 | $0 | IGF::CT::IGF INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Jul 28, 2014 | 12 | $-8.3M | INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| May 23, 2014 | 11 | $0 | INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Feb 3, 2014 | 15 | $9.6M | IGF::CT::IGF INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Dec 19, 2013 | 10 | $30.0M | IGF::CT::IGF INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Nov 25, 2013 | 9 | $0 | INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Sep 26, 2013 | 8 | $7.0M | IGF::CT::IGF INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Sep 5, 2013 | 7 | $300.0K | IGF::CT::IGF INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Jun 14, 2013 | 6 | $750.0K | IGF::CT::IGF INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| May 15, 2013 | 5 | $0 | IGF::CT::IGF INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Apr 30, 2013 | 4 | $10.5M | IGF::CT::IGF INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Feb 19, 2013 | 3 | $1.8M | INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Dec 19, 2012 | 2 | $1.5M | INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Oct 30, 2012 | 1 | $1.0M | INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
| Sep 28, 2012 | 0 | $750.0K | INTERIM CRYOGENIC PROPULSION STAGE FOR SLS |
Estimated positioning window
Dec 31, 2026 – Jun 30, 2027
45/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 45/100. Available recorded signals: 40 points.
- Contract end 2027-12-31 (432 days from calculation)
- +25 points
- 1 historical awards in this buyer and category group
- +0 points
- 170 recorded award transactions
- +10 points
- Latest award action: 2026-08-20
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +0 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-10-25 10:18:04.631876+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Oct 25, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Check the stated set-aside against the solicitation and current certifications.