Federal contract award
NNM10AA11C
OSIRIS - REX ASTEROID SAMPLE RETURN MISSION. 1.1 OSIRIS - REX DEPUTY PRINCIPAL INVESTIGATOR, HEATHER ENOS, OSIRIS - REX BUSINESS MANAGER, DR. DRAKE AND DR. LAURETTA WILL HAVE THE OVERALL RESPONSIBILITY FOR THE DEVELOPMENT AND DELIVERY OF THE OSIRIS - REX PHASE A CONCEPT STUDY REPORT. THE CONCEPT STUDY REPORT MUST MEET THE REQUIREMENTS DELINEATED IN PART II OF THE STATEMENT OF WORK. 1.2 THE CONCEPT STUDY REPORT (CSR) WILL INCLUDE, BUT NOT LIMITED TO, PROPOSED LEVEL 1 SCIENCE REQUIREMENTS, CRITERIA FOR FULL MISSION SUCCESS SATISFYING THE BASELINE SCIENCE MISSION AND CRITERIA FOR MINIMUM MISSION SUCCESS SATISFYING THE THRESHOLD SCIENCE MISSION. 1.3 THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH THE GSFC AND LM MANAGEMENT TEAMS TO REFINE THE PROPOSED OSIRIS - REX MISSION COSTS. THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH GSFC PROJECT MANAGEMENT AND LM TO ASSESS THE ROBUSTNESS AND FEASIBILITY OF THE COST AND SCHEDULES. THE UA MANAGEMENT TEAM WILL HAVE THE LEAD FOR THE COST SECTION OF THE REPORT. 1.4 THE UA MANAGEMENT TEAM WILL PROVIDE SUPPORT IN THE DEVELOPMENT OF REQUIRED INTERNATIONAL AGREEMENTS SUCH AS TECHNICAL ASSISTANCE AGREEMENTS AND ITAR LICENSES. 1.5 THE UA MANAGEMENT TEAM WILL OVERSEE THE PHASE A CONTRACT WITH INSTRUMENT LEAD, DR. PHIL CHRISTENSEN, ASU. 1.6 THE UA MANAGEMENT TEAM WILL PROVIDE INPUTS AND VALIDATION SUPPORT TO THE GSFC INTEGRATED MASTER SCHEDULER. 1.7 DEPUTY PI, DR. LAURETTA, WILL LEAD THE DEVELOPMENT OF THE E/PO AND STUDENT COLLABORATION PLANS. 1.8 THE UNIVERSITY OF ARIZONA (UA) WILL SUPPORT THE OSIRIS-REX SITE VISIT AT LOCKHEED MARTIN, LITTLETON, CO.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | National Aeronautics and Space Administration |
| Office | NASA MARSHALL SPACE FLIGHT CENTER |
| NAICS | 541712 |
| PSC | AR13 — SPACE R&D SERVICES; SPACE FLIGHT, RESEARCH AND SUPPORTING ACTIVITIES; EXPERIMENTAL DEVELOPMENT |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | COST NO FEE |
| Obligations | $134.0M |
| Current contract value | $140.8M |
| Potential contract value / ceiling | $140.8M |
| Start date | Mar 16, 2010 |
| Current end date | Sep 30, 2029 |
| Potential end date | Sep 30, 2029 |
| Latest award activity | Sep 4, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 76 of 76 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Sep 4, 2026 | 75 | $61.5K | OSIRIS-REX ASTEROID SAMPLE RETURN MISSION |
| Jun 16, 2026 | 74 | $0 | OSIRIS-REX ASTEROID SAMPLE RETURN MISSION |
| Apr 28, 2026 | 73 | $1.5M | OSIRIS-REX ASTEROID SAMPLE RETURN MISSION |
| Jan 23, 2026 | 72 | $134.1K | OSIRIS-REX ASTEROID SAMPLE RETURN MISSION |
| Dec 3, 2025 | 71 | $1.5M | OSIRIS-REX ASTEROID SAMPLE RETURN MISSION |
| Sep 30, 2025 | 70 | $500.0K | OSIRIS-REX ASTEROID SAMPLE RETURN MISSION |
| Sep 3, 2025 | 69 | $500.0K | OSIRIS-REX ASTEROID SAMPLE RETURN MISSION |
| Aug 13, 2025 | 68 | $868.3K | OSIRIS-REX ASTEROID SAMPLE RETURN MISSION |
| Jun 26, 2025 | 67 | $2.5M | OSIRIS-REX ASTEROID SAMPLE RETURN MISSION |
| Mar 5, 2025 | 66 | $3.4M | OSIRIS-REX ASTEROID SAMPLE RETURN MISSION |
| Nov 25, 2024 | 65 | $1.4M | OSIRIS-REX ASTEROID SAMPLE RETURN MISSION |
| Aug 29, 2024 | 64 | $500.0K | OSIRIS-REX ASTEROID SAMPLE RETURN MISSION |
| Aug 19, 2024 | 63 | $1.5M | OSIRIS-REX ASTEROID SAMPLE RETURN MISSION |
| Nov 28, 2023 | 62 | $3.8M | OSIRIS-REX ASTEROID SAMPLE RETURN MISSION |
| Sep 28, 2023 | 60 | $650.0K | OSIRIS-REX ASTEROID SAMPLE RETURN MISSION |
| Sep 28, 2023 | 61 | $3.5M | OSIRIS-REX ASTEROID SAMPLE RETURN MISSION |
| Sep 19, 2023 | 58 | $0 | OSIRIS-REX ASTEROID SAMPLE RETURN MISSION |
| Sep 19, 2023 | 59 | $2.1M | OSIRIS-REX ASTEROID SAMPLE RETURN MISSION |
| Sep 12, 2023 | 57 | $0 | OSIRIS-REX ASTEROID SAMPLE RETURN MISSION |
| Jul 6, 2023 | 56 | $0 | OSIRIS-REX ASTEROID SAMPLE RETURN MISSION |
| Jun 6, 2023 | 55 | $0 | OSIRIS-REX ASTEROID SAMPLE RETURN MISSION |
| May 22, 2023 | 54 | $0 | OSIRIS-REX ASTEROID SAMPLE RETURN MISSION |
| Apr 28, 2023 | 53 | $1.8M | OSIRIS - REX ASTEROID SAMPLE RETURN MISSION. 1.1 OSIRIS - REX DEPUTY PRINCIPAL INVESTIGATOR, HEATHER ENOS, OSIRIS - REX BUSINESS MANAGER, DR. DRAKE AND DR. LAURETTA WILL HAVE THE OVERALL RESPONSIBILITY FOR THE DEVELOPMENT AND DELIVERY OF THE OSIRIS - REX PHASE A CONCEPT STUDY REPORT. THE CONCEPT STUDY REPORT MUST MEET THE REQUIREMENTS DELINEATED IN PART II OF THE STATEMENT OF WORK. 1.2 THE CONCEPT STUDY REPORT (CSR) WILL INCLUDE, BUT NOT LIMITED TO, PROPOSED LEVEL 1 SCIENCE REQUIREMENTS, CRITERIA FOR FULL MISSION SUCCESS SATISFYING THE BASELINE SCIENCE MISSION AND CRITERIA FOR MINIMUM MISSION SUCCESS SATISFYING THE THRESHOLD SCIENCE MISSION. 1.3 THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH THE GSFC AND LM MANAGEMENT TEAMS TO REFINE THE PROPOSED OSIRIS - REX MISSION COSTS. THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH GSFC PROJECT MANAGEMENT AND LM TO ASSESS THE ROBUSTNESS AND FEASIBILITY OF THE COST AND SCHEDULES. THE UA MANAGEMENT TEAM WILL HAVE THE LEAD FOR THE COST SECTION OF THE REPORT. 1.4 THE UA MANAGEMENT TEAM WILL PROVIDE SUPPORT IN THE DEVELOPMENT OF REQUIRED INTERNATIONAL AGREEMENTS SUCH AS TECHNICAL ASSISTANCE AGREEMENTS AND ITAR LICENSES. 1.5 THE UA MANAGEMENT TEAM WILL OVERSEE THE PHASE A CONTRACT WITH INSTRUMENT LEAD, DR. PHIL CHRISTENSEN, ASU. 1.6 THE UA MANAGEMENT TEAM WILL PROVIDE INPUTS AND VALIDATION SUPPORT TO THE GSFC INTEGRATED MASTER SCHEDULER. 1.7 DEPUTY PI, DR. LAURETTA, WILL LEAD THE DEVELOPMENT OF THE E/PO AND STUDENT COLLABORATION PLANS. 1.8 THE UNIVERSITY OF ARIZONA (UA) WILL SUPPORT THE OSIRIS-REX SITE VISIT AT LOCKHEED MARTIN, LITTLETON, CO. |
| Dec 12, 2022 | 51 | $0 | OSIRIS - REX ASTEROID SAMPLE RETURN MISSION. 1.1 OSIRIS - REX DEPUTY PRINCIPAL INVESTIGATOR, HEATHER ENOS, OSIRIS - REX BUSINESS MANAGER, DR. DRAKE AND DR. LAURETTA WILL HAVE THE OVERALL RESPONSIBILITY FOR THE DEVELOPMENT AND DELIVERY OF THE OSIRIS - REX PHASE A CONCEPT STUDY REPORT. THE CONCEPT STUDY REPORT MUST MEET THE REQUIREMENTS DELINEATED IN PART II OF THE STATEMENT OF WORK. 1.2 THE CONCEPT STUDY REPORT (CSR) WILL INCLUDE, BUT NOT LIMITED TO, PROPOSED LEVEL 1 SCIENCE REQUIREMENTS, CRITERIA FOR FULL MISSION SUCCESS SATISFYING THE BASELINE SCIENCE MISSION AND CRITERIA FOR MINIMUM MISSION SUCCESS SATISFYING THE THRESHOLD SCIENCE MISSION. 1.3 THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH THE GSFC AND LM MANAGEMENT TEAMS TO REFINE THE PROPOSED OSIRIS - REX MISSION COSTS. THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH GSFC PROJECT MANAGEMENT AND LM TO ASSESS THE ROBUSTNESS AND FEASIBILITY OF THE COST AND SCHEDULES. THE UA MANAGEMENT TEAM WILL HAVE THE LEAD FOR THE COST SECTION OF THE REPORT. 1.4 THE UA MANAGEMENT TEAM WILL PROVIDE SUPPORT IN THE DEVELOPMENT OF REQUIRED INTERNATIONAL AGREEMENTS SUCH AS TECHNICAL ASSISTANCE AGREEMENTS AND ITAR LICENSES. 1.5 THE UA MANAGEMENT TEAM WILL OVERSEE THE PHASE A CONTRACT WITH INSTRUMENT LEAD, DR. PHIL CHRISTENSEN, ASU. 1.6 THE UA MANAGEMENT TEAM WILL PROVIDE INPUTS AND VALIDATION SUPPORT TO THE GSFC INTEGRATED MASTER SCHEDULER. 1.7 DEPUTY PI, DR. LAURETTA, WILL LEAD THE DEVELOPMENT OF THE E/PO AND STUDENT COLLABORATION PLANS. 1.8 THE UNIVERSITY OF ARIZONA (UA) WILL SUPPORT THE OSIRIS-REX SITE VISIT AT LOCKHEED MARTIN, LITTLETON, CO. |
| Dec 12, 2022 | 52 | $600.0K | OSIRIS - REX ASTEROID SAMPLE RETURN MISSION. 1.1 OSIRIS - REX DEPUTY PRINCIPAL INVESTIGATOR, HEATHER ENOS, OSIRIS - REX BUSINESS MANAGER, DR. DRAKE AND DR. LAURETTA WILL HAVE THE OVERALL RESPONSIBILITY FOR THE DEVELOPMENT AND DELIVERY OF THE OSIRIS - REX PHASE A CONCEPT STUDY REPORT. THE CONCEPT STUDY REPORT MUST MEET THE REQUIREMENTS DELINEATED IN PART II OF THE STATEMENT OF WORK. 1.2 THE CONCEPT STUDY REPORT (CSR) WILL INCLUDE, BUT NOT LIMITED TO, PROPOSED LEVEL 1 SCIENCE REQUIREMENTS, CRITERIA FOR FULL MISSION SUCCESS SATISFYING THE BASELINE SCIENCE MISSION AND CRITERIA FOR MINIMUM MISSION SUCCESS SATISFYING THE THRESHOLD SCIENCE MISSION. 1.3 THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH THE GSFC AND LM MANAGEMENT TEAMS TO REFINE THE PROPOSED OSIRIS - REX MISSION COSTS. THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH GSFC PROJECT MANAGEMENT AND LM TO ASSESS THE ROBUSTNESS AND FEASIBILITY OF THE COST AND SCHEDULES. THE UA MANAGEMENT TEAM WILL HAVE THE LEAD FOR THE COST SECTION OF THE REPORT. 1.4 THE UA MANAGEMENT TEAM WILL PROVIDE SUPPORT IN THE DEVELOPMENT OF REQUIRED INTERNATIONAL AGREEMENTS SUCH AS TECHNICAL ASSISTANCE AGREEMENTS AND ITAR LICENSES. 1.5 THE UA MANAGEMENT TEAM WILL OVERSEE THE PHASE A CONTRACT WITH INSTRUMENT LEAD, DR. PHIL CHRISTENSEN, ASU. 1.6 THE UA MANAGEMENT TEAM WILL PROVIDE INPUTS AND VALIDATION SUPPORT TO THE GSFC INTEGRATED MASTER SCHEDULER. 1.7 DEPUTY PI, DR. LAURETTA, WILL LEAD THE DEVELOPMENT OF THE E/PO AND STUDENT COLLABORATION PLANS. 1.8 THE UNIVERSITY OF ARIZONA (UA) WILL SUPPORT THE OSIRIS-REX SITE VISIT AT LOCKHEED MARTIN, LITTLETON, CO. |
| Nov 1, 2022 | 50 | $3.2M | OSIRIS - REX ASTEROID SAMPLE RETURN MISSION. 1.1 OSIRIS - REX DEPUTY PRINCIPAL INVESTIGATOR, HEATHER ENOS, OSIRIS - REX BUSINESS MANAGER, DR. DRAKE AND DR. LAURETTA WILL HAVE THE OVERALL RESPONSIBILITY FOR THE DEVELOPMENT AND DELIVERY OF THE OSIRIS - REX PHASE A CONCEPT STUDY REPORT. THE CONCEPT STUDY REPORT MUST MEET THE REQUIREMENTS DELINEATED IN PART II OF THE STATEMENT OF WORK. 1.2 THE CONCEPT STUDY REPORT (CSR) WILL INCLUDE, BUT NOT LIMITED TO, PROPOSED LEVEL 1 SCIENCE REQUIREMENTS, CRITERIA FOR FULL MISSION SUCCESS SATISFYING THE BASELINE SCIENCE MISSION AND CRITERIA FOR MINIMUM MISSION SUCCESS SATISFYING THE THRESHOLD SCIENCE MISSION. 1.3 THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH THE GSFC AND LM MANAGEMENT TEAMS TO REFINE THE PROPOSED OSIRIS - REX MISSION COSTS. THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH GSFC PROJECT MANAGEMENT AND LM TO ASSESS THE ROBUSTNESS AND FEASIBILITY OF THE COST AND SCHEDULES. THE UA MANAGEMENT TEAM WILL HAVE THE LEAD FOR THE COST SECTION OF THE REPORT. 1.4 THE UA MANAGEMENT TEAM WILL PROVIDE SUPPORT IN THE DEVELOPMENT OF REQUIRED INTERNATIONAL AGREEMENTS SUCH AS TECHNICAL ASSISTANCE AGREEMENTS AND ITAR LICENSES. 1.5 THE UA MANAGEMENT TEAM WILL OVERSEE THE PHASE A CONTRACT WITH INSTRUMENT LEAD, DR. PHIL CHRISTENSEN, ASU. 1.6 THE UA MANAGEMENT TEAM WILL PROVIDE INPUTS AND VALIDATION SUPPORT TO THE GSFC INTEGRATED MASTER SCHEDULER. 1.7 DEPUTY PI, DR. LAURETTA, WILL LEAD THE DEVELOPMENT OF THE E/PO AND STUDENT COLLABORATION PLANS. 1.8 THE UNIVERSITY OF ARIZONA (UA) WILL SUPPORT THE OSIRIS-REX SITE VISIT AT LOCKHEED MARTIN, LITTLETON, CO. |
| Sep 28, 2022 | 49 | $0 | OSIRIS - REX ASTEROID SAMPLE RETURN MISSION. 1.1 OSIRIS - REX DEPUTY PRINCIPAL INVESTIGATOR, HEATHER ENOS, OSIRIS - REX BUSINESS MANAGER, DR. DRAKE AND DR. LAURETTA WILL HAVE THE OVERALL RESPONSIBILITY FOR THE DEVELOPMENT AND DELIVERY OF THE OSIRIS - REX PHASE A CONCEPT STUDY REPORT. THE CONCEPT STUDY REPORT MUST MEET THE REQUIREMENTS DELINEATED IN PART II OF THE STATEMENT OF WORK. 1.2 THE CONCEPT STUDY REPORT (CSR) WILL INCLUDE, BUT NOT LIMITED TO, PROPOSED LEVEL 1 SCIENCE REQUIREMENTS, CRITERIA FOR FULL MISSION SUCCESS SATISFYING THE BASELINE SCIENCE MISSION AND CRITERIA FOR MINIMUM MISSION SUCCESS SATISFYING THE THRESHOLD SCIENCE MISSION. 1.3 THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH THE GSFC AND LM MANAGEMENT TEAMS TO REFINE THE PROPOSED OSIRIS - REX MISSION COSTS. THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH GSFC PROJECT MANAGEMENT AND LM TO ASSESS THE ROBUSTNESS AND FEASIBILITY OF THE COST AND SCHEDULES. THE UA MANAGEMENT TEAM WILL HAVE THE LEAD FOR THE COST SECTION OF THE REPORT. 1.4 THE UA MANAGEMENT TEAM WILL PROVIDE SUPPORT IN THE DEVELOPMENT OF REQUIRED INTERNATIONAL AGREEMENTS SUCH AS TECHNICAL ASSISTANCE AGREEMENTS AND ITAR LICENSES. 1.5 THE UA MANAGEMENT TEAM WILL OVERSEE THE PHASE A CONTRACT WITH INSTRUMENT LEAD, DR. PHIL CHRISTENSEN, ASU. 1.6 THE UA MANAGEMENT TEAM WILL PROVIDE INPUTS AND VALIDATION SUPPORT TO THE GSFC INTEGRATED MASTER SCHEDULER. 1.7 DEPUTY PI, DR. LAURETTA, WILL LEAD THE DEVELOPMENT OF THE E/PO AND STUDENT COLLABORATION PLANS. 1.8 THE UNIVERSITY OF ARIZONA (UA) WILL SUPPORT THE OSIRIS-REX SITE VISIT AT LOCKHEED MARTIN, LITTLETON, CO. |
| Jul 12, 2022 | 48 | $0 | OSIRIS - REX ASTEROID SAMPLE RETURN MISSION. 1.1 OSIRIS - REX DEPUTY PRINCIPAL INVESTIGATOR, HEATHER ENOS, OSIRIS - REX BUSINESS MANAGER, DR. DRAKE AND DR. LAURETTA WILL HAVE THE OVERALL RESPONSIBILITY FOR THE DEVELOPMENT AND DELIVERY OF THE OSIRIS - REX PHASE A CONCEPT STUDY REPORT. THE CONCEPT STUDY REPORT MUST MEET THE REQUIREMENTS DELINEATED IN PART II OF THE STATEMENT OF WORK. 1.2 THE CONCEPT STUDY REPORT (CSR) WILL INCLUDE, BUT NOT LIMITED TO, PROPOSED LEVEL 1 SCIENCE REQUIREMENTS, CRITERIA FOR FULL MISSION SUCCESS SATISFYING THE BASELINE SCIENCE MISSION AND CRITERIA FOR MINIMUM MISSION SUCCESS SATISFYING THE THRESHOLD SCIENCE MISSION. 1.3 THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH THE GSFC AND LM MANAGEMENT TEAMS TO REFINE THE PROPOSED OSIRIS - REX MISSION COSTS. THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH GSFC PROJECT MANAGEMENT AND LM TO ASSESS THE ROBUSTNESS AND FEASIBILITY OF THE COST AND SCHEDULES. THE UA MANAGEMENT TEAM WILL HAVE THE LEAD FOR THE COST SECTION OF THE REPORT. 1.4 THE UA MANAGEMENT TEAM WILL PROVIDE SUPPORT IN THE DEVELOPMENT OF REQUIRED INTERNATIONAL AGREEMENTS SUCH AS TECHNICAL ASSISTANCE AGREEMENTS AND ITAR LICENSES. 1.5 THE UA MANAGEMENT TEAM WILL OVERSEE THE PHASE A CONTRACT WITH INSTRUMENT LEAD, DR. PHIL CHRISTENSEN, ASU. 1.6 THE UA MANAGEMENT TEAM WILL PROVIDE INPUTS AND VALIDATION SUPPORT TO THE GSFC INTEGRATED MASTER SCHEDULER. 1.7 DEPUTY PI, DR. LAURETTA, WILL LEAD THE DEVELOPMENT OF THE E/PO AND STUDENT COLLABORATION PLANS. 1.8 THE UNIVERSITY OF ARIZONA (UA) WILL SUPPORT THE OSIRIS-REX SITE VISIT AT LOCKHEED MARTIN, LITTLETON, CO. |
| Jun 29, 2022 | 47 | $3.0M | OSIRIS - REX ASTEROID SAMPLE RETURN MISSION. 1.1 OSIRIS - REX DEPUTY PRINCIPAL INVESTIGATOR, HEATHER ENOS, OSIRIS - REX BUSINESS MANAGER, DR. DRAKE AND DR. LAURETTA WILL HAVE THE OVERALL RESPONSIBILITY FOR THE DEVELOPMENT AND DELIVERY OF THE OSIRIS - REX PHASE A CONCEPT STUDY REPORT. THE CONCEPT STUDY REPORT MUST MEET THE REQUIREMENTS DELINEATED IN PART II OF THE STATEMENT OF WORK. 1.2 THE CONCEPT STUDY REPORT (CSR) WILL INCLUDE, BUT NOT LIMITED TO, PROPOSED LEVEL 1 SCIENCE REQUIREMENTS, CRITERIA FOR FULL MISSION SUCCESS SATISFYING THE BASELINE SCIENCE MISSION AND CRITERIA FOR MINIMUM MISSION SUCCESS SATISFYING THE THRESHOLD SCIENCE MISSION. 1.3 THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH THE GSFC AND LM MANAGEMENT TEAMS TO REFINE THE PROPOSED OSIRIS - REX MISSION COSTS. THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH GSFC PROJECT MANAGEMENT AND LM TO ASSESS THE ROBUSTNESS AND FEASIBILITY OF THE COST AND SCHEDULES. THE UA MANAGEMENT TEAM WILL HAVE THE LEAD FOR THE COST SECTION OF THE REPORT. 1.4 THE UA MANAGEMENT TEAM WILL PROVIDE SUPPORT IN THE DEVELOPMENT OF REQUIRED INTERNATIONAL AGREEMENTS SUCH AS TECHNICAL ASSISTANCE AGREEMENTS AND ITAR LICENSES. 1.5 THE UA MANAGEMENT TEAM WILL OVERSEE THE PHASE A CONTRACT WITH INSTRUMENT LEAD, DR. PHIL CHRISTENSEN, ASU. 1.6 THE UA MANAGEMENT TEAM WILL PROVIDE INPUTS AND VALIDATION SUPPORT TO THE GSFC INTEGRATED MASTER SCHEDULER. 1.7 DEPUTY PI, DR. LAURETTA, WILL LEAD THE DEVELOPMENT OF THE E/PO AND STUDENT COLLABORATION PLANS. 1.8 THE UNIVERSITY OF ARIZONA (UA) WILL SUPPORT THE OSIRIS-REX SITE VISIT AT LOCKHEED MARTIN, LITTLETON, CO. |
| Dec 21, 2021 | 46 | $0 | OSIRIS - REX ASTEROID SAMPLE RETURN MISSION. 1.1 OSIRIS - REX DEPUTY PRINCIPAL INVESTIGATOR, HEATHER ENOS, OSIRIS - REX BUSINESS MANAGER, DR. DRAKE AND DR. LAURETTA WILL HAVE THE OVERALL RESPONSIBILITY FOR THE DEVELOPMENT AND DELIVERY OF THE OSIRIS - REX PHASE A CONCEPT STUDY REPORT. THE CONCEPT STUDY REPORT MUST MEET THE REQUIREMENTS DELINEATED IN PART II OF THE STATEMENT OF WORK. 1.2 THE CONCEPT STUDY REPORT (CSR) WILL INCLUDE, BUT NOT LIMITED TO, PROPOSED LEVEL 1 SCIENCE REQUIREMENTS, CRITERIA FOR FULL MISSION SUCCESS SATISFYING THE BASELINE SCIENCE MISSION AND CRITERIA FOR MINIMUM MISSION SUCCESS SATISFYING THE THRESHOLD SCIENCE MISSION. 1.3 THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH THE GSFC AND LM MANAGEMENT TEAMS TO REFINE THE PROPOSED OSIRIS - REX MISSION COSTS. THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH GSFC PROJECT MANAGEMENT AND LM TO ASSESS THE ROBUSTNESS AND FEASIBILITY OF THE COST AND SCHEDULES. THE UA MANAGEMENT TEAM WILL HAVE THE LEAD FOR THE COST SECTION OF THE REPORT. 1.4 THE UA MANAGEMENT TEAM WILL PROVIDE SUPPORT IN THE DEVELOPMENT OF REQUIRED INTERNATIONAL AGREEMENTS SUCH AS TECHNICAL ASSISTANCE AGREEMENTS AND ITAR LICENSES. 1.5 THE UA MANAGEMENT TEAM WILL OVERSEE THE PHASE A CONTRACT WITH INSTRUMENT LEAD, DR. PHIL CHRISTENSEN, ASU. 1.6 THE UA MANAGEMENT TEAM WILL PROVIDE INPUTS AND VALIDATION SUPPORT TO THE GSFC INTEGRATED MASTER SCHEDULER. 1.7 DEPUTY PI, DR. LAURETTA, WILL LEAD THE DEVELOPMENT OF THE E/PO AND STUDENT COLLABORATION PLANS. 1.8 THE UNIVERSITY OF ARIZONA (UA) WILL SUPPORT THE OSIRIS-REX SITE VISIT AT LOCKHEED MARTIN, LITTLETON, CO. |
| Dec 13, 2021 | 45 | $-5.0K | OSIRIS - REX ASTEROID SAMPLE RETURN MISSION. 1.1 OSIRIS - REX DEPUTY PRINCIPAL INVESTIGATOR, HEATHER ENOS, OSIRIS - REX BUSINESS MANAGER, DR. DRAKE AND DR. LAURETTA WILL HAVE THE OVERALL RESPONSIBILITY FOR THE DEVELOPMENT AND DELIVERY OF THE OSIRIS - REX PHASE A CONCEPT STUDY REPORT. THE CONCEPT STUDY REPORT MUST MEET THE REQUIREMENTS DELINEATED IN PART II OF THE STATEMENT OF WORK. 1.2 THE CONCEPT STUDY REPORT (CSR) WILL INCLUDE, BUT NOT LIMITED TO, PROPOSED LEVEL 1 SCIENCE REQUIREMENTS, CRITERIA FOR FULL MISSION SUCCESS SATISFYING THE BASELINE SCIENCE MISSION AND CRITERIA FOR MINIMUM MISSION SUCCESS SATISFYING THE THRESHOLD SCIENCE MISSION. 1.3 THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH THE GSFC AND LM MANAGEMENT TEAMS TO REFINE THE PROPOSED OSIRIS - REX MISSION COSTS. THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH GSFC PROJECT MANAGEMENT AND LM TO ASSESS THE ROBUSTNESS AND FEASIBILITY OF THE COST AND SCHEDULES. THE UA MANAGEMENT TEAM WILL HAVE THE LEAD FOR THE COST SECTION OF THE REPORT. 1.4 THE UA MANAGEMENT TEAM WILL PROVIDE SUPPORT IN THE DEVELOPMENT OF REQUIRED INTERNATIONAL AGREEMENTS SUCH AS TECHNICAL ASSISTANCE AGREEMENTS AND ITAR LICENSES. 1.5 THE UA MANAGEMENT TEAM WILL OVERSEE THE PHASE A CONTRACT WITH INSTRUMENT LEAD, DR. PHIL CHRISTENSEN, ASU. 1.6 THE UA MANAGEMENT TEAM WILL PROVIDE INPUTS AND VALIDATION SUPPORT TO THE GSFC INTEGRATED MASTER SCHEDULER. 1.7 DEPUTY PI, DR. LAURETTA, WILL LEAD THE DEVELOPMENT OF THE E/PO AND STUDENT COLLABORATION PLANS. 1.8 THE UNIVERSITY OF ARIZONA (UA) WILL SUPPORT THE OSIRIS-REX SITE VISIT AT LOCKHEED MARTIN, LITTLETON, CO. |
| Oct 15, 2021 | 43 | $0 | EO14042 OSIRIS-REX ASTEROID SAMPLE RETURN MISSION |
| Sep 30, 2021 | 42 | $0 | OSIRIS-REX ASTEROID SAMPLE RETURN MISSION |
| Sep 14, 2021 | 41 | $0 | OSIRIS - REX ASTEROID SAMPLE RETURN MISSION. 1.1 OSIRIS - REX DEPUTY PRINCIPAL INVESTIGATOR, HEATHER ENOS, OSIRIS - REX BUSINESS MANAGER, DR. DRAKE AND DR. LAURETTA WILL HAVE THE OVERALL RESPONSIBILITY FOR THE DEVELOPMENT AND DELIVERY OF THE OSIRIS - REX PHASE A CONCEPT STUDY REPORT. THE CONCEPT STUDY REPORT MUST MEET THE REQUIREMENTS DELINEATED IN PART II OF THE STATEMENT OF WORK. 1.2 THE CONCEPT STUDY REPORT (CSR) WILL INCLUDE, BUT NOT LIMITED TO, PROPOSED LEVEL 1 SCIENCE REQUIREMENTS, CRITERIA FOR FULL MISSION SUCCESS SATISFYING THE BASELINE SCIENCE MISSION AND CRITERIA FOR MINIMUM MISSION SUCCESS SATISFYING THE THRESHOLD SCIENCE MISSION. 1.3 THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH THE GSFC AND LM MANAGEMENT TEAMS TO REFINE THE PROPOSED OSIRIS - REX MISSION COSTS. THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH GSFC PROJECT MANAGEMENT AND LM TO ASSESS THE ROBUSTNESS AND FEASIBILITY OF THE COST AND SCHEDULES. THE UA MANAGEMENT TEAM WILL HAVE THE LEAD FOR THE COST SECTION OF THE REPORT. 1.4 THE UA MANAGEMENT TEAM WILL PROVIDE SUPPORT IN THE DEVELOPMENT OF REQUIRED INTERNATIONAL AGREEMENTS SUCH AS TECHNICAL ASSISTANCE AGREEMENTS AND ITAR LICENSES. 1.5 THE UA MANAGEMENT TEAM WILL OVERSEE THE PHASE A CONTRACT WITH INSTRUMENT LEAD, DR. PHIL CHRISTENSEN, ASU. 1.6 THE UA MANAGEMENT TEAM WILL PROVIDE INPUTS AND VALIDATION SUPPORT TO THE GSFC INTEGRATED MASTER SCHEDULER. 1.7 DEPUTY PI, DR. LAURETTA, WILL LEAD THE DEVELOPMENT OF THE E/PO AND STUDENT COLLABORATION PLANS. 1.8 THE UNIVERSITY OF ARIZONA (UA) WILL SUPPORT THE OSIRIS-REX SITE VISIT AT LOCKHEED MARTIN, LITTLETON, CO. |
| Jan 29, 2021 | 40 | $-2.0M | OSIRIS - REX ASTEROID SAMPLE RETURN MISSION. 1.1 OSIRIS - REX DEPUTY PRINCIPAL INVESTIGATOR, HEATHER ENOS, OSIRIS - REX BUSINESS MANAGER, DR. DRAKE AND DR. LAURETTA WILL HAVE THE OVERALL RESPONSIBILITY FOR THE DEVELOPMENT AND DELIVERY OF THE OSIRIS - REX PHASE A CONCEPT STUDY REPORT. THE CONCEPT STUDY REPORT MUST MEET THE REQUIREMENTS DELINEATED IN PART II OF THE STATEMENT OF WORK. 1.2 THE CONCEPT STUDY REPORT (CSR) WILL INCLUDE, BUT NOT LIMITED TO, PROPOSED LEVEL 1 SCIENCE REQUIREMENTS, CRITERIA FOR FULL MISSION SUCCESS SATISFYING THE BASELINE SCIENCE MISSION AND CRITERIA FOR MINIMUM MISSION SUCCESS SATISFYING THE THRESHOLD SCIENCE MISSION. 1.3 THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH THE GSFC AND LM MANAGEMENT TEAMS TO REFINE THE PROPOSED OSIRIS - REX MISSION COSTS. THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH GSFC PROJECT MANAGEMENT AND LM TO ASSESS THE ROBUSTNESS AND FEASIBILITY OF THE COST AND SCHEDULES. THE UA MANAGEMENT TEAM WILL HAVE THE LEAD FOR THE COST SECTION OF THE REPORT. 1.4 THE UA MANAGEMENT TEAM WILL PROVIDE SUPPORT IN THE DEVELOPMENT OF REQUIRED INTERNATIONAL AGREEMENTS SUCH AS TECHNICAL ASSISTANCE AGREEMENTS AND ITAR LICENSES. 1.5 THE UA MANAGEMENT TEAM WILL OVERSEE THE PHASE A CONTRACT WITH INSTRUMENT LEAD, DR. PHIL CHRISTENSEN, ASU. 1.6 THE UA MANAGEMENT TEAM WILL PROVIDE INPUTS AND VALIDATION SUPPORT TO THE GSFC INTEGRATED MASTER SCHEDULER. 1.7 DEPUTY PI, DR. LAURETTA, WILL LEAD THE DEVELOPMENT OF THE E/PO AND STUDENT COLLABORATION PLANS. 1.8 THE UNIVERSITY OF ARIZONA (UA) WILL SUPPORT THE OSIRIS-REX SITE VISIT AT LOCKHEED MARTIN, LITTLETON, CO. |
| Jan 29, 2021 | 44 | $5.0K | OSIRIS - REX ASTEROID SAMPLE RETURN MISSION. 1.1 OSIRIS - REX DEPUTY PRINCIPAL INVESTIGATOR, HEATHER ENOS, OSIRIS - REX BUSINESS MANAGER, DR. DRAKE AND DR. LAURETTA WILL HAVE THE OVERALL RESPONSIBILITY FOR THE DEVELOPMENT AND DELIVERY OF THE OSIRIS - REX PHASE A CONCEPT STUDY REPORT. THE CONCEPT STUDY REPORT MUST MEET THE REQUIREMENTS DELINEATED IN PART II OF THE STATEMENT OF WORK. 1.2 THE CONCEPT STUDY REPORT (CSR) WILL INCLUDE, BUT NOT LIMITED TO, PROPOSED LEVEL 1 SCIENCE REQUIREMENTS, CRITERIA FOR FULL MISSION SUCCESS SATISFYING THE BASELINE SCIENCE MISSION AND CRITERIA FOR MINIMUM MISSION SUCCESS SATISFYING THE THRESHOLD SCIENCE MISSION. 1.3 THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH THE GSFC AND LM MANAGEMENT TEAMS TO REFINE THE PROPOSED OSIRIS - REX MISSION COSTS. THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH GSFC PROJECT MANAGEMENT AND LM TO ASSESS THE ROBUSTNESS AND FEASIBILITY OF THE COST AND SCHEDULES. THE UA MANAGEMENT TEAM WILL HAVE THE LEAD FOR THE COST SECTION OF THE REPORT. 1.4 THE UA MANAGEMENT TEAM WILL PROVIDE SUPPORT IN THE DEVELOPMENT OF REQUIRED INTERNATIONAL AGREEMENTS SUCH AS TECHNICAL ASSISTANCE AGREEMENTS AND ITAR LICENSES. 1.5 THE UA MANAGEMENT TEAM WILL OVERSEE THE PHASE A CONTRACT WITH INSTRUMENT LEAD, DR. PHIL CHRISTENSEN, ASU. 1.6 THE UA MANAGEMENT TEAM WILL PROVIDE INPUTS AND VALIDATION SUPPORT TO THE GSFC INTEGRATED MASTER SCHEDULER. 1.7 DEPUTY PI, DR. LAURETTA, WILL LEAD THE DEVELOPMENT OF THE E/PO AND STUDENT COLLABORATION PLANS. 1.8 THE UNIVERSITY OF ARIZONA (UA) WILL SUPPORT THE OSIRIS-REX SITE VISIT AT LOCKHEED MARTIN, LITTLETON, CO. |
| Jun 15, 2020 | 39 | $16.5M | OSIRIS - REX ASTEROID SAMPLE RETURN MISSION. 1.1 OSIRIS - REX DEPUTY PRINCIPAL INVESTIGATOR, HEATHER ENOS, OSIRIS - REX BUSINESS MANAGER, DR. DRAKE AND DR. LAURETTA WILL HAVE THE OVERALL RESPONSIBILITY FOR THE DEVELOPMENT AND DELIVERY OF THE OSIRIS - REX PHASE A CONCEPT STUDY REPORT. THE CONCEPT STUDY REPORT MUST MEET THE REQUIREMENTS DELINEATED IN PART II OF THE STATEMENT OF WORK. 1.2 THE CONCEPT STUDY REPORT (CSR) WILL INCLUDE, BUT NOT LIMITED TO, PROPOSED LEVEL 1 SCIENCE REQUIREMENTS, CRITERIA FOR FULL MISSION SUCCESS SATISFYING THE BASELINE SCIENCE MISSION AND CRITERIA FOR MINIMUM MISSION SUCCESS SATISFYING THE THRESHOLD SCIENCE MISSION. 1.3 THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH THE GSFC AND LM MANAGEMENT TEAMS TO REFINE THE PROPOSED OSIRIS - REX MISSION COSTS. THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH GSFC PROJECT MANAGEMENT AND LM TO ASSESS THE ROBUSTNESS AND FEASIBILITY OF THE COST AND SCHEDULES. THE UA MANAGEMENT TEAM WILL HAVE THE LEAD FOR THE COST SECTION OF THE REPORT. 1.4 THE UA MANAGEMENT TEAM WILL PROVIDE SUPPORT IN THE DEVELOPMENT OF REQUIRED INTERNATIONAL AGREEMENTS SUCH AS TECHNICAL ASSISTANCE AGREEMENTS AND ITAR LICENSES. 1.5 THE UA MANAGEMENT TEAM WILL OVERSEE THE PHASE A CONTRACT WITH INSTRUMENT LEAD, DR. PHIL CHRISTENSEN, ASU. 1.6 THE UA MANAGEMENT TEAM WILL PROVIDE INPUTS AND VALIDATION SUPPORT TO THE GSFC INTEGRATED MASTER SCHEDULER. 1.7 DEPUTY PI, DR. LAURETTA, WILL LEAD THE DEVELOPMENT OF THE E/PO AND STUDENT COLLABORATION PLANS. 1.8 THE UNIVERSITY OF ARIZONA (UA) WILL SUPPORT THE OSIRIS-REX SITE VISIT AT LOCKHEED MARTIN, LITTLETON, CO. |
| Mar 5, 2020 | 38 | $2.0M | OSIRIS - REX ASTEROID SAMPLE RETURN MISSION. 1.1 OSIRIS - REX DEPUTY PRINCIPAL INVESTIGATOR, HEATHER ENOS, OSIRIS - REX BUSINESS MANAGER, DR. DRAKE AND DR. LAURETTA WILL HAVE THE OVERALL RESPONSIBILITY FOR THE DEVELOPMENT AND DELIVERY OF THE OSIRIS - REX PHASE A CONCEPT STUDY REPORT. THE CONCEPT STUDY REPORT MUST MEET THE REQUIREMENTS DELINEATED IN PART II OF THE STATEMENT OF WORK. 1.2 THE CONCEPT STUDY REPORT (CSR) WILL INCLUDE, BUT NOT LIMITED TO, PROPOSED LEVEL 1 SCIENCE REQUIREMENTS, CRITERIA FOR FULL MISSION SUCCESS SATISFYING THE BASELINE SCIENCE MISSION AND CRITERIA FOR MINIMUM MISSION SUCCESS SATISFYING THE THRESHOLD SCIENCE MISSION. 1.3 THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH THE GSFC AND LM MANAGEMENT TEAMS TO REFINE THE PROPOSED OSIRIS - REX MISSION COSTS. THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH GSFC PROJECT MANAGEMENT AND LM TO ASSESS THE ROBUSTNESS AND FEASIBILITY OF THE COST AND SCHEDULES. THE UA MANAGEMENT TEAM WILL HAVE THE LEAD FOR THE COST SECTION OF THE REPORT. 1.4 THE UA MANAGEMENT TEAM WILL PROVIDE SUPPORT IN THE DEVELOPMENT OF REQUIRED INTERNATIONAL AGREEMENTS SUCH AS TECHNICAL ASSISTANCE AGREEMENTS AND ITAR LICENSES. 1.5 THE UA MANAGEMENT TEAM WILL OVERSEE THE PHASE A CONTRACT WITH INSTRUMENT LEAD, DR. PHIL CHRISTENSEN, ASU. 1.6 THE UA MANAGEMENT TEAM WILL PROVIDE INPUTS AND VALIDATION SUPPORT TO THE GSFC INTEGRATED MASTER SCHEDULER. 1.7 DEPUTY PI, DR. LAURETTA, WILL LEAD THE DEVELOPMENT OF THE E/PO AND STUDENT COLLABORATION PLANS. 1.8 THE UNIVERSITY OF ARIZONA (UA) WILL SUPPORT THE OSIRIS-REX SITE VISIT AT LOCKHEED MARTIN, LITTLETON, CO. |
| Jan 27, 2020 | 37 | $0 | OSIRIS - REX ASTEROID SAMPLE RETURN MISSION. 1.1 OSIRIS - REX DEPUTY PRINCIPAL INVESTIGATOR, HEATHER ENOS, OSIRIS - REX BUSINESS MANAGER, DR. DRAKE AND DR. LAURETTA WILL HAVE THE OVERALL RESPONSIBILITY FOR THE DEVELOPMENT AND DELIVERY OF THE OSIRIS - REX PHASE A CONCEPT STUDY REPORT. THE CONCEPT STUDY REPORT MUST MEET THE REQUIREMENTS DELINEATED IN PART II OF THE STATEMENT OF WORK. 1.2 THE CONCEPT STUDY REPORT (CSR) WILL INCLUDE, BUT NOT LIMITED TO, PROPOSED LEVEL 1 SCIENCE REQUIREMENTS, CRITERIA FOR FULL MISSION SUCCESS SATISFYING THE BASELINE SCIENCE MISSION AND CRITERIA FOR MINIMUM MISSION SUCCESS SATISFYING THE THRESHOLD SCIENCE MISSION. 1.3 THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH THE GSFC AND LM MANAGEMENT TEAMS TO REFINE THE PROPOSED OSIRIS - REX MISSION COSTS. THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH GSFC PROJECT MANAGEMENT AND LM TO ASSESS THE ROBUSTNESS AND FEASIBILITY OF THE COST AND SCHEDULES. THE UA MANAGEMENT TEAM WILL HAVE THE LEAD FOR THE COST SECTION OF THE REPORT. 1.4 THE UA MANAGEMENT TEAM WILL PROVIDE SUPPORT IN THE DEVELOPMENT OF REQUIRED INTERNATIONAL AGREEMENTS SUCH AS TECHNICAL ASSISTANCE AGREEMENTS AND ITAR LICENSES. 1.5 THE UA MANAGEMENT TEAM WILL OVERSEE THE PHASE A CONTRACT WITH INSTRUMENT LEAD, DR. PHIL CHRISTENSEN, ASU. 1.6 THE UA MANAGEMENT TEAM WILL PROVIDE INPUTS AND VALIDATION SUPPORT TO THE GSFC INTEGRATED MASTER SCHEDULER. 1.7 DEPUTY PI, DR. LAURETTA, WILL LEAD THE DEVELOPMENT OF THE E/PO AND STUDENT COLLABORATION PLANS. 1.8 THE UNIVERSITY OF ARIZONA (UA) WILL SUPPORT THE OSIRIS-REX SITE VISIT AT LOCKHEED MARTIN, LITTLETON, CO. |
| Nov 6, 2019 | 36 | $950.0K | OSIRIS - REX ASTEROID SAMPLE RETURN MISSION. 1.1 OSIRIS - REX DEPUTY PRINCIPAL INVESTIGATOR, HEATHER ENOS, OSIRIS - REX BUSINESS MANAGER, DR. DRAKE AND DR. LAURETTA WILL HAVE THE OVERALL RESPONSIBILITY FOR THE DEVELOPMENT AND DELIVERY OF THE OSIRIS - REX PHASE A CONCEPT STUDY REPORT. THE CONCEPT STUDY REPORT MUST MEET THE REQUIREMENTS DELINEATED IN PART II OF THE STATEMENT OF WORK. 1.2 THE CONCEPT STUDY REPORT (CSR) WILL INCLUDE, BUT NOT LIMITED TO, PROPOSED LEVEL 1 SCIENCE REQUIREMENTS, CRITERIA FOR FULL MISSION SUCCESS SATISFYING THE BASELINE SCIENCE MISSION AND CRITERIA FOR MINIMUM MISSION SUCCESS SATISFYING THE THRESHOLD SCIENCE MISSION. 1.3 THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH THE GSFC AND LM MANAGEMENT TEAMS TO REFINE THE PROPOSED OSIRIS - REX MISSION COSTS. THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH GSFC PROJECT MANAGEMENT AND LM TO ASSESS THE ROBUSTNESS AND FEASIBILITY OF THE COST AND SCHEDULES. THE UA MANAGEMENT TEAM WILL HAVE THE LEAD FOR THE COST SECTION OF THE REPORT. 1.4 THE UA MANAGEMENT TEAM WILL PROVIDE SUPPORT IN THE DEVELOPMENT OF REQUIRED INTERNATIONAL AGREEMENTS SUCH AS TECHNICAL ASSISTANCE AGREEMENTS AND ITAR LICENSES. 1.5 THE UA MANAGEMENT TEAM WILL OVERSEE THE PHASE A CONTRACT WITH INSTRUMENT LEAD, DR. PHIL CHRISTENSEN, ASU. 1.6 THE UA MANAGEMENT TEAM WILL PROVIDE INPUTS AND VALIDATION SUPPORT TO THE GSFC INTEGRATED MASTER SCHEDULER. 1.7 DEPUTY PI, DR. LAURETTA, WILL LEAD THE DEVELOPMENT OF THE E/PO AND STUDENT COLLABORATION PLANS. 1.8 THE UNIVERSITY OF ARIZONA (UA) WILL SUPPORT THE OSIRIS-REX SITE VISIT AT LOCKHEED MARTIN, LITTLETON, CO. |
| Mar 25, 2019 | 35 | $13.2M | OSIRIS - REX ASTEROID SAMPLE RETURN MISSION. 1.1 OSIRIS - REX DEPUTY PRINCIPAL INVESTIGATOR, HEATHER ENOS, OSIRIS - REX BUSINESS MANAGER, DR. DRAKE AND DR. LAURETTA WILL HAVE THE OVERALL RESPONSIBILITY FOR THE DEVELOPMENT AND DELIVERY OF THE OSIRIS - REX PHASE A CONCEPT STUDY REPORT. THE CONCEPT STUDY REPORT MUST MEET THE REQUIREMENTS DELINEATED IN PART II OF THE STATEMENT OF WORK. 1.2 THE CONCEPT STUDY REPORT (CSR) WILL INCLUDE, BUT NOT LIMITED TO, PROPOSED LEVEL 1 SCIENCE REQUIREMENTS, CRITERIA FOR FULL MISSION SUCCESS SATISFYING THE BASELINE SCIENCE MISSION AND CRITERIA FOR MINIMUM MISSION SUCCESS SATISFYING THE THRESHOLD SCIENCE MISSION. 1.3 THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH THE GSFC AND LM MANAGEMENT TEAMS TO REFINE THE PROPOSED OSIRIS - REX MISSION COSTS. THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH GSFC PROJECT MANAGEMENT AND LM TO ASSESS THE ROBUSTNESS AND FEASIBILITY OF THE COST AND SCHEDULES. THE UA MANAGEMENT TEAM WILL HAVE THE LEAD FOR THE COST SECTION OF THE REPORT. 1.4 THE UA MANAGEMENT TEAM WILL PROVIDE SUPPORT IN THE DEVELOPMENT OF REQUIRED INTERNATIONAL AGREEMENTS SUCH AS TECHNICAL ASSISTANCE AGREEMENTS AND ITAR LICENSES. 1.5 THE UA MANAGEMENT TEAM WILL OVERSEE THE PHASE A CONTRACT WITH INSTRUMENT LEAD, DR. PHIL CHRISTENSEN, ASU. 1.6 THE UA MANAGEMENT TEAM WILL PROVIDE INPUTS AND VALIDATION SUPPORT TO THE GSFC INTEGRATED MASTER SCHEDULER. 1.7 DEPUTY PI, DR. LAURETTA, WILL LEAD THE DEVELOPMENT OF THE E/PO AND STUDENT COLLABORATION PLANS. 1.8 THE UNIVERSITY OF ARIZONA (UA) WILL SUPPORT THE OSIRIS-REX SITE VISIT AT LOCKHEED MARTIN, LITTLETON, CO. |
| Mar 11, 2019 | 34 | $2.7M | OSIRIS - REX ASTEROID SAMPLE RETURN MISSION. 1.1 OSIRIS - REX DEPUTY PRINCIPAL INVESTIGATOR, HEATHER ENOS, OSIRIS - REX BUSINESS MANAGER, DR. DRAKE AND DR. LAURETTA WILL HAVE THE OVERALL RESPONSIBILITY FOR THE DEVELOPMENT AND DELIVERY OF THE OSIRIS - REX PHASE A CONCEPT STUDY REPORT. THE CONCEPT STUDY REPORT MUST MEET THE REQUIREMENTS DELINEATED IN PART II OF THE STATEMENT OF WORK. 1.2 THE CONCEPT STUDY REPORT (CSR) WILL INCLUDE, BUT NOT LIMITED TO, PROPOSED LEVEL 1 SCIENCE REQUIREMENTS, CRITERIA FOR FULL MISSION SUCCESS SATISFYING THE BASELINE SCIENCE MISSION AND CRITERIA FOR MINIMUM MISSION SUCCESS SATISFYING THE THRESHOLD SCIENCE MISSION. 1.3 THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH THE GSFC AND LM MANAGEMENT TEAMS TO REFINE THE PROPOSED OSIRIS - REX MISSION COSTS. THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH GSFC PROJECT MANAGEMENT AND LM TO ASSESS THE ROBUSTNESS AND FEASIBILITY OF THE COST AND SCHEDULES. THE UA MANAGEMENT TEAM WILL HAVE THE LEAD FOR THE COST SECTION OF THE REPORT. 1.4 THE UA MANAGEMENT TEAM WILL PROVIDE SUPPORT IN THE DEVELOPMENT OF REQUIRED INTERNATIONAL AGREEMENTS SUCH AS TECHNICAL ASSISTANCE AGREEMENTS AND ITAR LICENSES. 1.5 THE UA MANAGEMENT TEAM WILL OVERSEE THE PHASE A CONTRACT WITH INSTRUMENT LEAD, DR. PHIL CHRISTENSEN, ASU. 1.6 THE UA MANAGEMENT TEAM WILL PROVIDE INPUTS AND VALIDATION SUPPORT TO THE GSFC INTEGRATED MASTER SCHEDULER. 1.7 DEPUTY PI, DR. LAURETTA, WILL LEAD THE DEVELOPMENT OF THE E/PO AND STUDENT COLLABORATION PLANS. 1.8 THE UNIVERSITY OF ARIZONA (UA) WILL SUPPORT THE OSIRIS-REX SITE VISIT AT LOCKHEED MARTIN, LITTLETON, CO. |
| Feb 14, 2019 | 33 | $500.0K | OSIRIS - REX ASTEROID SAMPLE RETURN MISSION. 1.1 OSIRIS - REX DEPUTY PRINCIPAL INVESTIGATOR, HEATHER ENOS, OSIRIS - REX BUSINESS MANAGER, DR. DRAKE AND DR. LAURETTA WILL HAVE THE OVERALL RESPONSIBILITY FOR THE DEVELOPMENT AND DELIVERY OF THE OSIRIS - REX PHASE A CONCEPT STUDY REPORT. THE CONCEPT STUDY REPORT MUST MEET THE REQUIREMENTS DELINEATED IN PART II OF THE STATEMENT OF WORK. 1.2 THE CONCEPT STUDY REPORT (CSR) WILL INCLUDE, BUT NOT LIMITED TO, PROPOSED LEVEL 1 SCIENCE REQUIREMENTS, CRITERIA FOR FULL MISSION SUCCESS SATISFYING THE BASELINE SCIENCE MISSION AND CRITERIA FOR MINIMUM MISSION SUCCESS SATISFYING THE THRESHOLD SCIENCE MISSION. 1.3 THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH THE GSFC AND LM MANAGEMENT TEAMS TO REFINE THE PROPOSED OSIRIS - REX MISSION COSTS. THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH GSFC PROJECT MANAGEMENT AND LM TO ASSESS THE ROBUSTNESS AND FEASIBILITY OF THE COST AND SCHEDULES. THE UA MANAGEMENT TEAM WILL HAVE THE LEAD FOR THE COST SECTION OF THE REPORT. 1.4 THE UA MANAGEMENT TEAM WILL PROVIDE SUPPORT IN THE DEVELOPMENT OF REQUIRED INTERNATIONAL AGREEMENTS SUCH AS TECHNICAL ASSISTANCE AGREEMENTS AND ITAR LICENSES. 1.5 THE UA MANAGEMENT TEAM WILL OVERSEE THE PHASE A CONTRACT WITH INSTRUMENT LEAD, DR. PHIL CHRISTENSEN, ASU. 1.6 THE UA MANAGEMENT TEAM WILL PROVIDE INPUTS AND VALIDATION SUPPORT TO THE GSFC INTEGRATED MASTER SCHEDULER. 1.7 DEPUTY PI, DR. LAURETTA, WILL LEAD THE DEVELOPMENT OF THE E/PO AND STUDENT COLLABORATION PLANS. 1.8 THE UNIVERSITY OF ARIZONA (UA) WILL SUPPORT THE OSIRIS-REX SITE VISIT AT LOCKHEED MARTIN, LITTLETON, CO. |
| Nov 21, 2018 | 32 | $0 | OSIRIS - REX ASTEROID SAMPLE RETURN MISSION. 1.1 OSIRIS - REX DEPUTY PRINCIPAL INVESTIGATOR, HEATHER ENOS, OSIRIS - REX BUSINESS MANAGER, DR. DRAKE AND DR. LAURETTA WILL HAVE THE OVERALL RESPONSIBILITY FOR THE DEVELOPMENT AND DELIVERY OF THE OSIRIS - REX PHASE A CONCEPT STUDY REPORT. THE CONCEPT STUDY REPORT MUST MEET THE REQUIREMENTS DELINEATED IN PART II OF THE STATEMENT OF WORK. 1.2 THE CONCEPT STUDY REPORT (CSR) WILL INCLUDE, BUT NOT LIMITED TO, PROPOSED LEVEL 1 SCIENCE REQUIREMENTS, CRITERIA FOR FULL MISSION SUCCESS SATISFYING THE BASELINE SCIENCE MISSION AND CRITERIA FOR MINIMUM MISSION SUCCESS SATISFYING THE THRESHOLD SCIENCE MISSION. 1.3 THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH THE GSFC AND LM MANAGEMENT TEAMS TO REFINE THE PROPOSED OSIRIS - REX MISSION COSTS. THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH GSFC PROJECT MANAGEMENT AND LM TO ASSESS THE ROBUSTNESS AND FEASIBILITY OF THE COST AND SCHEDULES. THE UA MANAGEMENT TEAM WILL HAVE THE LEAD FOR THE COST SECTION OF THE REPORT. 1.4 THE UA MANAGEMENT TEAM WILL PROVIDE SUPPORT IN THE DEVELOPMENT OF REQUIRED INTERNATIONAL AGREEMENTS SUCH AS TECHNICAL ASSISTANCE AGREEMENTS AND ITAR LICENSES. 1.5 THE UA MANAGEMENT TEAM WILL OVERSEE THE PHASE A CONTRACT WITH INSTRUMENT LEAD, DR. PHIL CHRISTENSEN, ASU. 1.6 THE UA MANAGEMENT TEAM WILL PROVIDE INPUTS AND VALIDATION SUPPORT TO THE GSFC INTEGRATED MASTER SCHEDULER. 1.7 DEPUTY PI, DR. LAURETTA, WILL LEAD THE DEVELOPMENT OF THE E/PO AND STUDENT COLLABORATION PLANS. 1.8 THE UNIVERSITY OF ARIZONA (UA) WILL SUPPORT THE OSIRIS-REX SITE VISIT AT LOCKHEED MARTIN, LITTLETON, CO. |
| Nov 13, 2018 | 31 | $0 | OSIRIS - REX ASTEROID SAMPLE RETURN MISSION. 1.1 OSIRIS - REX DEPUTY PRINCIPAL INVESTIGATOR, HEATHER ENOS, OSIRIS - REX BUSINESS MANAGER, DR. DRAKE AND DR. LAURETTA WILL HAVE THE OVERALL RESPONSIBILITY FOR THE DEVELOPMENT AND DELIVERY OF THE OSIRIS - REX PHASE A CONCEPT STUDY REPORT. THE CONCEPT STUDY REPORT MUST MEET THE REQUIREMENTS DELINEATED IN PART II OF THE STATEMENT OF WORK. 1.2 THE CONCEPT STUDY REPORT (CSR) WILL INCLUDE, BUT NOT LIMITED TO, PROPOSED LEVEL 1 SCIENCE REQUIREMENTS, CRITERIA FOR FULL MISSION SUCCESS SATISFYING THE BASELINE SCIENCE MISSION AND CRITERIA FOR MINIMUM MISSION SUCCESS SATISFYING THE THRESHOLD SCIENCE MISSION. 1.3 THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH THE GSFC AND LM MANAGEMENT TEAMS TO REFINE THE PROPOSED OSIRIS - REX MISSION COSTS. THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH GSFC PROJECT MANAGEMENT AND LM TO ASSESS THE ROBUSTNESS AND FEASIBILITY OF THE COST AND SCHEDULES. THE UA MANAGEMENT TEAM WILL HAVE THE LEAD FOR THE COST SECTION OF THE REPORT. 1.4 THE UA MANAGEMENT TEAM WILL PROVIDE SUPPORT IN THE DEVELOPMENT OF REQUIRED INTERNATIONAL AGREEMENTS SUCH AS TECHNICAL ASSISTANCE AGREEMENTS AND ITAR LICENSES. 1.5 THE UA MANAGEMENT TEAM WILL OVERSEE THE PHASE A CONTRACT WITH INSTRUMENT LEAD, DR. PHIL CHRISTENSEN, ASU. 1.6 THE UA MANAGEMENT TEAM WILL PROVIDE INPUTS AND VALIDATION SUPPORT TO THE GSFC INTEGRATED MASTER SCHEDULER. 1.7 DEPUTY PI, DR. LAURETTA, WILL LEAD THE DEVELOPMENT OF THE E/PO AND STUDENT COLLABORATION PLANS. 1.8 THE UNIVERSITY OF ARIZONA (UA) WILL SUPPORT THE OSIRIS-REX SITE VISIT AT LOCKHEED MARTIN, LITTLETON, CO. |
| Jul 13, 2018 | 30 | $13.5M | OSIRIS - REX ASTEROID SAMPLE RETURN MISSION. 1.1 OSIRIS - REX DEPUTY PRINCIPAL INVESTIGATOR, HEATHER ENOS, OSIRIS - REX BUSINESS MANAGER, DR. DRAKE AND DR. LAURETTA WILL HAVE THE OVERALL RESPONSIBILITY FOR THE DEVELOPMENT AND DELIVERY OF THE OSIRIS - REX PHASE A CONCEPT STUDY REPORT. THE CONCEPT STUDY REPORT MUST MEET THE REQUIREMENTS DELINEATED IN PART II OF THE STATEMENT OF WORK. 1.2 THE CONCEPT STUDY REPORT (CSR) WILL INCLUDE, BUT NOT LIMITED TO, PROPOSED LEVEL 1 SCIENCE REQUIREMENTS, CRITERIA FOR FULL MISSION SUCCESS SATISFYING THE BASELINE SCIENCE MISSION AND CRITERIA FOR MINIMUM MISSION SUCCESS SATISFYING THE THRESHOLD SCIENCE MISSION. 1.3 THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH THE GSFC AND LM MANAGEMENT TEAMS TO REFINE THE PROPOSED OSIRIS - REX MISSION COSTS. THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH GSFC PROJECT MANAGEMENT AND LM TO ASSESS THE ROBUSTNESS AND FEASIBILITY OF THE COST AND SCHEDULES. THE UA MANAGEMENT TEAM WILL HAVE THE LEAD FOR THE COST SECTION OF THE REPORT. 1.4 THE UA MANAGEMENT TEAM WILL PROVIDE SUPPORT IN THE DEVELOPMENT OF REQUIRED INTERNATIONAL AGREEMENTS SUCH AS TECHNICAL ASSISTANCE AGREEMENTS AND ITAR LICENSES. 1.5 THE UA MANAGEMENT TEAM WILL OVERSEE THE PHASE A CONTRACT WITH INSTRUMENT LEAD, DR. PHIL CHRISTENSEN, ASU. 1.6 THE UA MANAGEMENT TEAM WILL PROVIDE INPUTS AND VALIDATION SUPPORT TO THE GSFC INTEGRATED MASTER SCHEDULER. 1.7 DEPUTY PI, DR. LAURETTA, WILL LEAD THE DEVELOPMENT OF THE E/PO AND STUDENT COLLABORATION PLANS. 1.8 THE UNIVERSITY OF ARIZONA (UA) WILL SUPPORT THE OSIRIS-REX SITE VISIT AT LOCKHEED MARTIN, LITTLETON, CO. |
| May 10, 2018 | 29 | $2.0M | OSIRIS - REX ASTEROID SAMPLE RETURN MISSION. 1.1 OSIRIS - REX DEPUTY PRINCIPAL INVESTIGATOR, HEATHER ENOS, OSIRIS - REX BUSINESS MANAGER, DR. DRAKE AND DR. LAURETTA WILL HAVE THE OVERALL RESPONSIBILITY FOR THE DEVELOPMENT AND DELIVERY OF THE OSIRIS - REX PHASE A CONCEPT STUDY REPORT. THE CONCEPT STUDY REPORT MUST MEET THE REQUIREMENTS DELINEATED IN PART II OF THE STATEMENT OF WORK. 1.2 THE CONCEPT STUDY REPORT (CSR) WILL INCLUDE, BUT NOT LIMITED TO, PROPOSED LEVEL 1 SCIENCE REQUIREMENTS, CRITERIA FOR FULL MISSION SUCCESS SATISFYING THE BASELINE SCIENCE MISSION AND CRITERIA FOR MINIMUM MISSION SUCCESS SATISFYING THE THRESHOLD SCIENCE MISSION. 1.3 THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH THE GSFC AND LM MANAGEMENT TEAMS TO REFINE THE PROPOSED OSIRIS - REX MISSION COSTS. THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH GSFC PROJECT MANAGEMENT AND LM TO ASSESS THE ROBUSTNESS AND FEASIBILITY OF THE COST AND SCHEDULES. THE UA MANAGEMENT TEAM WILL HAVE THE LEAD FOR THE COST SECTION OF THE REPORT. 1.4 THE UA MANAGEMENT TEAM WILL PROVIDE SUPPORT IN THE DEVELOPMENT OF REQUIRED INTERNATIONAL AGREEMENTS SUCH AS TECHNICAL ASSISTANCE AGREEMENTS AND ITAR LICENSES. 1.5 THE UA MANAGEMENT TEAM WILL OVERSEE THE PHASE A CONTRACT WITH INSTRUMENT LEAD, DR. PHIL CHRISTENSEN, ASU. 1.6 THE UA MANAGEMENT TEAM WILL PROVIDE INPUTS AND VALIDATION SUPPORT TO THE GSFC INTEGRATED MASTER SCHEDULER. 1.7 DEPUTY PI, DR. LAURETTA, WILL LEAD THE DEVELOPMENT OF THE E/PO AND STUDENT COLLABORATION PLANS. 1.8 THE UNIVERSITY OF ARIZONA (UA) WILL SUPPORT THE OSIRIS-REX SITE VISIT AT LOCKHEED MARTIN, LITTLETON, CO. |
| Apr 12, 2018 | 28 | $2.1M | OSIRIS - REX ASTEROID SAMPLE RETURN MISSION. 1.1 OSIRIS - REX DEPUTY PRINCIPAL INVESTIGATOR, HEATHER ENOS, OSIRIS - REX BUSINESS MANAGER, DR. DRAKE AND DR. LAURETTA WILL HAVE THE OVERALL RESPONSIBILITY FOR THE DEVELOPMENT AND DELIVERY OF THE OSIRIS - REX PHASE A CONCEPT STUDY REPORT. THE CONCEPT STUDY REPORT MUST MEET THE REQUIREMENTS DELINEATED IN PART II OF THE STATEMENT OF WORK. 1.2 THE CONCEPT STUDY REPORT (CSR) WILL INCLUDE, BUT NOT LIMITED TO, PROPOSED LEVEL 1 SCIENCE REQUIREMENTS, CRITERIA FOR FULL MISSION SUCCESS SATISFYING THE BASELINE SCIENCE MISSION AND CRITERIA FOR MINIMUM MISSION SUCCESS SATISFYING THE THRESHOLD SCIENCE MISSION. 1.3 THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH THE GSFC AND LM MANAGEMENT TEAMS TO REFINE THE PROPOSED OSIRIS - REX MISSION COSTS. THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH GSFC PROJECT MANAGEMENT AND LM TO ASSESS THE ROBUSTNESS AND FEASIBILITY OF THE COST AND SCHEDULES. THE UA MANAGEMENT TEAM WILL HAVE THE LEAD FOR THE COST SECTION OF THE REPORT. 1.4 THE UA MANAGEMENT TEAM WILL PROVIDE SUPPORT IN THE DEVELOPMENT OF REQUIRED INTERNATIONAL AGREEMENTS SUCH AS TECHNICAL ASSISTANCE AGREEMENTS AND ITAR LICENSES. 1.5 THE UA MANAGEMENT TEAM WILL OVERSEE THE PHASE A CONTRACT WITH INSTRUMENT LEAD, DR. PHIL CHRISTENSEN, ASU. 1.6 THE UA MANAGEMENT TEAM WILL PROVIDE INPUTS AND VALIDATION SUPPORT TO THE GSFC INTEGRATED MASTER SCHEDULER. 1.7 DEPUTY PI, DR. LAURETTA, WILL LEAD THE DEVELOPMENT OF THE E/PO AND STUDENT COLLABORATION PLANS. 1.8 THE UNIVERSITY OF ARIZONA (UA) WILL SUPPORT THE OSIRIS-REX SITE VISIT AT LOCKHEED MARTIN, LITTLETON, CO. |
| Apr 3, 2018 | 27 | $0 | OSIRIS - REX ASTEROID SAMPLE RETURN MISSION. 1.1 OSIRIS - REX DEPUTY PRINCIPAL INVESTIGATOR, HEATHER ENOS, OSIRIS - REX BUSINESS MANAGER, DR. DRAKE AND DR. LAURETTA WILL HAVE THE OVERALL RESPONSIBILITY FOR THE DEVELOPMENT AND DELIVERY OF THE OSIRIS - REX PHASE A CONCEPT STUDY REPORT. THE CONCEPT STUDY REPORT MUST MEET THE REQUIREMENTS DELINEATED IN PART II OF THE STATEMENT OF WORK. 1.2 THE CONCEPT STUDY REPORT (CSR) WILL INCLUDE, BUT NOT LIMITED TO, PROPOSED LEVEL 1 SCIENCE REQUIREMENTS, CRITERIA FOR FULL MISSION SUCCESS SATISFYING THE BASELINE SCIENCE MISSION AND CRITERIA FOR MINIMUM MISSION SUCCESS SATISFYING THE THRESHOLD SCIENCE MISSION. 1.3 THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH THE GSFC AND LM MANAGEMENT TEAMS TO REFINE THE PROPOSED OSIRIS - REX MISSION COSTS. THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH GSFC PROJECT MANAGEMENT AND LM TO ASSESS THE ROBUSTNESS AND FEASIBILITY OF THE COST AND SCHEDULES. THE UA MANAGEMENT TEAM WILL HAVE THE LEAD FOR THE COST SECTION OF THE REPORT. 1.4 THE UA MANAGEMENT TEAM WILL PROVIDE SUPPORT IN THE DEVELOPMENT OF REQUIRED INTERNATIONAL AGREEMENTS SUCH AS TECHNICAL ASSISTANCE AGREEMENTS AND ITAR LICENSES. 1.5 THE UA MANAGEMENT TEAM WILL OVERSEE THE PHASE A CONTRACT WITH INSTRUMENT LEAD, DR. PHIL CHRISTENSEN, ASU. 1.6 THE UA MANAGEMENT TEAM WILL PROVIDE INPUTS AND VALIDATION SUPPORT TO THE GSFC INTEGRATED MASTER SCHEDULER. 1.7 DEPUTY PI, DR. LAURETTA, WILL LEAD THE DEVELOPMENT OF THE E/PO AND STUDENT COLLABORATION PLANS. 1.8 THE UNIVERSITY OF ARIZONA (UA) WILL SUPPORT THE OSIRIS-REX SITE VISIT AT LOCKHEED MARTIN, LITTLETON, CO. |
| Dec 20, 2017 | 26 | $4.6M | OSIRIS - REX ASTEROID SAMPLE RETURN MISSION. 1.1 OSIRIS - REX DEPUTY PRINCIPAL INVESTIGATOR, HEATHER ENOS, OSIRIS - REX BUSINESS MANAGER, DR. DRAKE AND DR. LAURETTA WILL HAVE THE OVERALL RESPONSIBILITY FOR THE DEVELOPMENT AND DELIVERY OF THE OSIRIS - REX PHASE A CONCEPT STUDY REPORT. THE CONCEPT STUDY REPORT MUST MEET THE REQUIREMENTS DELINEATED IN PART II OF THE STATEMENT OF WORK. 1.2 THE CONCEPT STUDY REPORT (CSR) WILL INCLUDE, BUT NOT LIMITED TO, PROPOSED LEVEL 1 SCIENCE REQUIREMENTS, CRITERIA FOR FULL MISSION SUCCESS SATISFYING THE BASELINE SCIENCE MISSION AND CRITERIA FOR MINIMUM MISSION SUCCESS SATISFYING THE THRESHOLD SCIENCE MISSION. 1.3 THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH THE GSFC AND LM MANAGEMENT TEAMS TO REFINE THE PROPOSED OSIRIS - REX MISSION COSTS. THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH GSFC PROJECT MANAGEMENT AND LM TO ASSESS THE ROBUSTNESS AND FEASIBILITY OF THE COST AND SCHEDULES. THE UA MANAGEMENT TEAM WILL HAVE THE LEAD FOR THE COST SECTION OF THE REPORT. 1.4 THE UA MANAGEMENT TEAM WILL PROVIDE SUPPORT IN THE DEVELOPMENT OF REQUIRED INTERNATIONAL AGREEMENTS SUCH AS TECHNICAL ASSISTANCE AGREEMENTS AND ITAR LICENSES. 1.5 THE UA MANAGEMENT TEAM WILL OVERSEE THE PHASE A CONTRACT WITH INSTRUMENT LEAD, DR. PHIL CHRISTENSEN, ASU. 1.6 THE UA MANAGEMENT TEAM WILL PROVIDE INPUTS AND VALIDATION SUPPORT TO THE GSFC INTEGRATED MASTER SCHEDULER. 1.7 DEPUTY PI, DR. LAURETTA, WILL LEAD THE DEVELOPMENT OF THE E/PO AND STUDENT COLLABORATION PLANS. 1.8 THE UNIVERSITY OF ARIZONA (UA) WILL SUPPORT THE OSIRIS-REX SITE VISIT AT LOCKHEED MARTIN, LITTLETON, CO. |
| Jul 12, 2017 | 25 | $6.5M | OSIRIS-REX ASTEROID SAMPLE RETURN MISSION. |
| May 24, 2017 | 24 | $1.5M | OSIRIS-REX ASTEROID SAMPLE RETURN MISSION. 1.0 UNIVERSITY OF ARIZONA MANAGEMENT TEAM: DR. MICHAEL DRAKE, OSIRIS-REX PRINCIPAL INVESTIGATOR; DR. DANTE LAURETTA, OSIRIS-REX DEPUTY PRINCIPAL INVESTIGATOR; HEATHER ENOS, OSIRIS-REX BUSINESS MANAGER. 1.1 DR. DRAKE AND DR. LAURETTA WILL HAVE THE OVERALL RESPONSIBILITY FOR THE DEVELOPMENT AND DELIVERY OF THE OSIRIS-REX PHASE A CONCEPT STUDY REPORT. THE CONCEPT STUDY REPORT MUST MEET THE REQUIREMENTS DELINEATED IN PART II OF THE STATEMENT OF WORK. 1.2 THE CONCEPT STUDY REPORT (CSR) WILL INCLUDE, BUT NOT LIMITED TO, PROPOSED LEVEL 1 SCIENCE REQUIREMENTS, CRITERIA FOR FULL MISSION SUCCESS SATISFYING THE BASELINE SCIENCE MISSION AND CRITERIA FOR MINIMUM MISSION SUCCESS SATISFYING THE THRESHOLD SCIENCE MISSION. 1.3 THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH THE GSFC AND LM MANAGEMENT TEAMS TO REFINE THE PROPOSED OSIRIS-REX MISSION COSTS. THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH GSFC PROJECT MANAGEMENT AND LM TO ASSESS THE ROBUSTNESS AND FEASIBILITY OF THE COST AND SCHEDULES. THE UA MANAGEMENT TEAM WILL HAVE THE LEAD FOR THE COST SECTION OF THE REPORT. 1.4 THE UA MANAGEMENT TEAM WILL PROVIDE SUPPORT IN THE DEVELOPMENT OF REQUIRED INTERNATIONAL AGREEMENTS SUCH AS TECHNICAL ASSISTANCE AGREEMENTS AND ITAR LICENSES. 1.5 THE UA MANAGEMENT TEAM WILL OVERSEE THE PHASE A CONTRACT WITH INSTRUMENT LEAD, DR. PHIL CHRISTENSEN, ASU. 1.6 THE UA MANAGEMENT TEAM WILL PROVIDE INPUTS AND VALIDATION SUPPORT TO THE GSFC INTEGRATED MASTER SCHEDULER. 1.7 DEPUTY PI, DR. LAURETTA, WILL LEAD THE DEVELOPMENT OF THE E/PO AND STUDENT COLLABORATION PLANS. 1.8 THE UNIVERSITY OF ARIZONA (UA) WILL SUPPORT THE OSIRIS-REX SITE VISIT AT LOCKHEED MARTIN, LITTLETON, CO. |
| Jan 26, 2017 | 23 | $4.1M | OSIRIS-REX ASTEROID SAMPLE RETURN MISSION. 1.0 UNIVERSITY OF ARIZONA MANAGEMENT TEAM: DR. MICHAEL DRAKE, OSIRIS-REX PRINCIPAL INVESTIGATOR; DR. DANTE LAURETTA, OSIRIS-REX DEPUTY PRINCIPAL INVESTIGATOR; HEATHER ENOS, OSIRIS-REX BUSINESS MANAGER. 1.1 DR. DRAKE AND DR. LAURETTA WILL HAVE THE OVERALL RESPONSIBILITY FOR THE DEVELOPMENT AND DELIVERY OF THE OSIRIS-REX PHASE A CONCEPT STUDY REPORT. THE CONCEPT STUDY REPORT MUST MEET THE REQUIREMENTS DELINEATED IN PART II OF THE STATEMENT OF WORK. 1.2 THE CONCEPT STUDY REPORT (CSR) WILL INCLUDE, BUT NOT LIMITED TO, PROPOSED LEVEL 1 SCIENCE REQUIREMENTS, CRITERIA FOR FULL MISSION SUCCESS SATISFYING THE BASELINE SCIENCE MISSION AND CRITERIA FOR MINIMUM MISSION SUCCESS SATISFYING THE THRESHOLD SCIENCE MISSION. 1.3 THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH THE GSFC AND LM MANAGEMENT TEAMS TO REFINE THE PROPOSED OSIRIS-REX MISSION COSTS. THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH GSFC PROJECT MANAGEMENT AND LM TO ASSESS THE ROBUSTNESS AND FEASIBILITY OF THE COST AND SCHEDULES. THE UA MANAGEMENT TEAM WILL HAVE THE LEAD FOR THE COST SECTION OF THE REPORT. 1.4 THE UA MANAGEMENT TEAM WILL PROVIDE SUPPORT IN THE DEVELOPMENT OF REQUIRED INTERNATIONAL AGREEMENTS SUCH AS TECHNICAL ASSISTANCE AGREEMENTS AND ITAR LICENSES. 1.5 THE UA MANAGEMENT TEAM WILL OVERSEE THE PHASE A CONTRACT WITH INSTRUMENT LEAD, DR. PHIL CHRISTENSEN, ASU. 1.6 THE UA MANAGEMENT TEAM WILL PROVIDE INPUTS AND VALIDATION SUPPORT TO THE GSFC INTEGRATED MASTER SCHEDULER. 1.7 DEPUTY PI, DR. LAURETTA, WILL LEAD THE DEVELOPMENT OF THE E/PO AND STUDENT COLLABORATION PLANS. 1.8 THE UNIVERSITY OF ARIZONA (UA) WILL SUPPORT THE OSIRIS-REX SITE VISIT AT LOCKHEED MARTIN, LITTLETON, CO. |
| Dec 22, 2016 | 22 | $1.1M | OSIRIS-REX ASTEROID SAMPLE RETURN MISSION. 1.0 UNIVERSITY OF ARIZONA MANAGEMENT TEAM: DR. MICHAEL DRAKE, OSIRIS-REX PRINCIPAL INVESTIGATOR; DR. DANTE LAURETTA, OSIRIS-REX DEPUTY PRINCIPAL INVESTIGATOR; HEATHER ENOS, OSIRIS-REX BUSINESS MANAGER. 1.1 DR. DRAKE AND DR. LAURETTA WILL HAVE THE OVERALL RESPONSIBILITY FOR THE DEVELOPMENT AND DELIVERY OF THE OSIRIS-REX PHASE A CONCEPT STUDY REPORT. THE CONCEPT STUDY REPORT MUST MEET THE REQUIREMENTS DELINEATED IN PART II OF THE STATEMENT OF WORK. 1.2 THE CONCEPT STUDY REPORT (CSR) WILL INCLUDE, BUT NOT LIMITED TO, PROPOSED LEVEL 1 SCIENCE REQUIREMENTS, CRITERIA FOR FULL MISSION SUCCESS SATISFYING THE BASELINE SCIENCE MISSION AND CRITERIA FOR MINIMUM MISSION SUCCESS SATISFYING THE THRESHOLD SCIENCE MISSION. 1.3 THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH THE GSFC AND LM MANAGEMENT TEAMS TO REFINE THE PROPOSED OSIRIS-REX MISSION COSTS. THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH GSFC PROJECT MANAGEMENT AND LM TO ASSESS THE ROBUSTNESS AND FEASIBILITY OF THE COST AND SCHEDULES. THE UA MANAGEMENT TEAM WILL HAVE THE LEAD FOR THE COST SECTION OF THE REPORT. 1.4 THE UA MANAGEMENT TEAM WILL PROVIDE SUPPORT IN THE DEVELOPMENT OF REQUIRED INTERNATIONAL AGREEMENTS SUCH AS TECHNICAL ASSISTANCE AGREEMENTS AND ITAR LICENSES. 1.5 THE UA MANAGEMENT TEAM WILL OVERSEE THE PHASE A CONTRACT WITH INSTRUMENT LEAD, DR. PHIL CHRISTENSEN, ASU. 1.6 THE UA MANAGEMENT TEAM WILL PROVIDE INPUTS AND VALIDATION SUPPORT TO THE GSFC INTEGRATED MASTER SCHEDULER. 1.7 DEPUTY PI, DR. LAURETTA, WILL LEAD THE DEVELOPMENT OF THE E/PO AND STUDENT COLLABORATION PLANS. 1.8 THE UNIVERSITY OF ARIZONA (UA) WILL SUPPORT THE OSIRIS-REX SITE VISIT AT LOCKHEED MARTIN, LITTLETON, CO. |
| Oct 17, 2016 | 21 | $2.2M | OSIRIS - REX ASTEROID SAMPLE RETURN MISSION. 1.1 OSIRIS - REX DEPUTY PRINCIPAL INVESTIGATOR, HEATHER ENOS, OSIRIS - REX BUSINESS MANAGER, DR. DRAKE AND DR. LAURETTA WILL HAVE THE OVERALL RESPONSIBILITY FOR THE DEVELOPMENT AND DELIVERY OF THE OSIRIS - REX PHASE A CONCEPT STUDY REPORT. THE CONCEPT STUDY REPORT MUST MEET THE REQUIREMENTS DELINEATED IN PART II OF THE STATEMENT OF WORK. 1.2 THE CONCEPT STUDY REPORT (CSR) WILL INCLUDE, BUT NOT LIMITED TO, PROPOSED LEVEL 1 SCIENCE REQUIREMENTS, CRITERIA FOR FULL MISSION SUCCESS SATISFYING THE BASELINE SCIENCE MISSION AND CRITERIA FOR MINIMUM MISSION SUCCESS SATISFYING THE THRESHOLD SCIENCE MISSION. 1.3 THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH THE GSFC AND LM MANAGEMENT TEAMS TO REFINE THE PROPOSED OSIRIS - REX MISSION COSTS. THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH GSFC PROJECT MANAGEMENT AND LM TO ASSESS THE ROBUSTNESS AND FEASIBILITY OF THE COST AND SCHEDULES. THE UA MANAGEMENT TEAM WILL HAVE THE LEAD FOR THE COST SECTION OF THE REPORT. 1.4 THE UA MANAGEMENT TEAM WILL PROVIDE SUPPORT IN THE DEVELOPMENT OF REQUIRED INTERNATIONAL AGREEMENTS SUCH AS TECHNICAL ASSISTANCE AGREEMENTS AND ITAR LICENSES. 1.5 THE UA MANAGEMENT TEAM WILL OVERSEE THE PHASE A CONTRACT WITH INSTRUMENT LEAD, DR. PHIL CHRISTENSEN, ASU. 1.6 THE UA MANAGEMENT TEAM WILL PROVIDE INPUTS AND VALIDATION SUPPORT TO THE GSFC INTEGRATED MASTER SCHEDULER. 1.7 DEPUTY PI, DR. LAURETTA, WILL LEAD THE DEVELOPMENT OF THE E/PO AND STUDENT COLLABORATION PLANS. 1.8 THE UNIVERSITY OF ARIZONA (UA) WILL SUPPORT THE OSIRIS-REX SITE VISIT AT LOCKHEED MARTIN, LITTLETON, CO. |
| Jun 7, 2016 | 20 | $2.9M | OSIRIS-REX ASTEROID SAMPLE RETURN MISSION. 1.0 UNIVERSITY OF ARIZONA MANAGEMENT TEAM: DR. MICHAEL DRAKE, OSIRIS-REX PRINCIPAL INVESTIGATOR; DR. DANTE LAURETTA, OSIRIS-REX DEPUTY PRINCIPAL INVESTIGATOR; HEATHER ENOS, OSIRIS-REX BUSINESS MANAGER. 1.1 DR. DRAKE AND DR. LAURETTA WILL HAVE THE OVERALL RESPONSIBILITY FOR THE DEVELOPMENT AND DELIVERY OF THE OSIRIS-REX PHASE A CONCEPT STUDY REPORT. THE CONCEPT STUDY REPORT MUST MEET THE REQUIREMENTS DELINEATED IN PART II OF THE STATEMENT OF WORK. 1.2 THE CONCEPT STUDY REPORT (CSR) WILL INCLUDE, BUT NOT LIMITED TO, PROPOSED LEVEL 1 SCIENCE REQUIREMENTS, CRITERIA FOR FULL MISSION SUCCESS SATISFYING THE BASELINE SCIENCE MISSION AND CRITERIA FOR MINIMUM MISSION SUCCESS SATISFYING THE THRESHOLD SCIENCE MISSION. 1.3 THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH THE GSFC AND LM MANAGEMENT TEAMS TO REFINE THE PROPOSED OSIRIS-REX MISSION COSTS. THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH GSFC PROJECT MANAGEMENT AND LM TO ASSESS THE ROBUSTNESS AND FEASIBILITY OF THE COST AND SCHEDULES. THE UA MANAGEMENT TEAM WILL HAVE THE LEAD FOR THE COST SECTION OF THE REPORT. 1.4 THE UA MANAGEMENT TEAM WILL PROVIDE SUPPORT IN THE DEVELOPMENT OF REQUIRED INTERNATIONAL AGREEMENTS SUCH AS TECHNICAL ASSISTANCE AGREEMENTS AND ITAR LICENSES. 1.5 THE UA MANAGEMENT TEAM WILL OVERSEE THE PHASE A CONTRACT WITH INSTRUMENT LEAD, DR. PHIL CHRISTENSEN, ASU. 1.6 THE UA MANAGEMENT TEAM WILL PROVIDE INPUTS AND VALIDATION SUPPORT TO THE GSFC INTEGRATED MASTER SCHEDULER. 1.7 DEPUTY PI, DR. LAURETTA, WILL LEAD THE DEVELOPMENT OF THE E/PO AND STUDENT COLLABORATION PLANS. 1.8 THE UNIVERSITY OF ARIZONA (UA) WILL SUPPORT THE OSIRIS-REX SITE VISIT AT LOCKHEED MARTIN, LITTLETON, CO. |
| Mar 21, 2016 | 19 | $1.8M | OSIRIS-REX ASTEROID SAMPLE RETURN MISSION. 1.0 UNIVERSITY OF ARIZONA MANAGEMENT TEAM: DR. MICHAEL DRAKE, OSIRIS-REX PRINCIPAL INVESTIGATOR; DR. DANTE LAURETTA, OSIRIS-REX DEPUTY PRINCIPAL INVESTIGATOR; HEATHER ENOS, OSIRIS-REX BUSINESS MANAGER. 1.1 DR. DRAKE AND DR. LAURETTA WILL HAVE THE OVERALL RESPONSIBILITY FOR THE DEVELOPMENT AND DELIVERY OF THE OSIRIS-REX PHASE A CONCEPT STUDY REPORT. THE CONCEPT STUDY REPORT MUST MEET THE REQUIREMENTS DELINEATED IN PART II OF THE STATEMENT OF WORK. 1.2 THE CONCEPT STUDY REPORT (CSR) WILL INCLUDE, BUT NOT LIMITED TO, PROPOSED LEVEL 1 SCIENCE REQUIREMENTS, CRITERIA FOR FULL MISSION SUCCESS SATISFYING THE BASELINE SCIENCE MISSION AND CRITERIA FOR MINIMUM MISSION SUCCESS SATISFYING THE THRESHOLD SCIENCE MISSION. 1.3 THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH THE GSFC AND LM MANAGEMENT TEAMS TO REFINE THE PROPOSED OSIRIS-REX MISSION COSTS. THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH GSFC PROJECT MANAGEMENT AND LM TO ASSESS THE ROBUSTNESS AND FEASIBILITY OF THE COST AND SCHEDULES. THE UA MANAGEMENT TEAM WILL HAVE THE LEAD FOR THE COST SECTION OF THE REPORT. 1.4 THE UA MANAGEMENT TEAM WILL PROVIDE SUPPORT IN THE DEVELOPMENT OF REQUIRED INTERNATIONAL AGREEMENTS SUCH AS TECHNICAL ASSISTANCE AGREEMENTS AND ITAR LICENSES. 1.5 THE UA MANAGEMENT TEAM WILL OVERSEE THE PHASE A CONTRACT WITH INSTRUMENT LEAD, DR. PHIL CHRISTENSEN, ASU. 1.6 THE UA MANAGEMENT TEAM WILL PROVIDE INPUTS AND VALIDATION SUPPORT TO THE GSFC INTEGRATED MASTER SCHEDULER. 1.7 DEPUTY PI, DR. LAURETTA, WILL LEAD THE DEVELOPMENT OF THE E/PO AND STUDENT COLLABORATION PLANS. 1.8 THE UNIVERSITY OF ARIZONA (UA) WILL SUPPORT THE OSIRIS-REX SITE VISIT AT LOCKHEED MARTIN, LITTLETON, CO. |
| Aug 10, 2015 | 18 | $3.0M | OSIRIS-REX ASTEROID SAMPLE RETURN MISSION. 1.0 UNIVERSITY OF ARIZONA MANAGEMENT TEAM: DR. MICHAEL DRAKE, OSIRIS-REX PRINCIPAL INVESTIGATOR; DR. DANTE LAURETTA, OSIRIS-REX DEPUTY PRINCIPAL INVESTIGATOR; HEATHER ENOS, OSIRIS-REX BUSINESS MANAGER. 1.1 DR. DRAKE AND DR. LAURETTA WILL HAVE THE OVERALL RESPONSIBILITY FOR THE DEVELOPMENT AND DELIVERY OF THE OSIRIS-REX PHASE A CONCEPT STUDY REPORT. THE CONCEPT STUDY REPORT MUST MEET THE REQUIREMENTS DELINEATED IN PART II OF THE STATEMENT OF WORK. 1.2 THE CONCEPT STUDY REPORT (CSR) WILL INCLUDE, BUT NOT LIMITED TO, PROPOSED LEVEL 1 SCIENCE REQUIREMENTS, CRITERIA FOR FULL MISSION SUCCESS SATISFYING THE BASELINE SCIENCE MISSION AND CRITERIA FOR MINIMUM MISSION SUCCESS SATISFYING THE THRESHOLD SCIENCE MISSION. 1.3 THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH THE GSFC AND LM MANAGEMENT TEAMS TO REFINE THE PROPOSED OSIRIS-REX MISSION COSTS. THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH GSFC PROJECT MANAGEMENT AND LM TO ASSESS THE ROBUSTNESS AND FEASIBILITY OF THE COST AND SCHEDULES. THE UA MANAGEMENT TEAM WILL HAVE THE LEAD FOR THE COST SECTION OF THE REPORT. 1.4 THE UA MANAGEMENT TEAM WILL PROVIDE SUPPORT IN THE DEVELOPMENT OF REQUIRED INTERNATIONAL AGREEMENTS SUCH AS TECHNICAL ASSISTANCE AGREEMENTS AND ITAR LICENSES. 1.5 THE UA MANAGEMENT TEAM WILL OVERSEE THE PHASE A CONTRACT WITH INSTRUMENT LEAD, DR. PHIL CHRISTENSEN, ASU. 1.6 THE UA MANAGEMENT TEAM WILL PROVIDE INPUTS AND VALIDATION SUPPORT TO THE GSFC INTEGRATED MASTER SCHEDULER. 1.7 DEPUTY PI, DR. LAURETTA, WILL LEAD THE DEVELOPMENT OF THE E/PO AND STUDENT COLLABORATION PLANS. 1.8 THE UNIVERSITY OF ARIZONA (UA) WILL SUPPORT THE OSIRIS-REX SITE VISIT AT LOCKHEED MARTIN, LITTLETON, CO. |
| Jun 8, 2015 | 17 | $0 | OSIRIS-REX ASTEROID SAMPLE RETURN MISSION. 1.0 UNIVERSITY OF ARIZONA MANAGEMENT TEAM: DR. MICHAEL DRAKE, OSIRIS-REX PRINCIPAL INVESTIGATOR; DR. DANTE LAURETTA, OSIRIS-REX DEPUTY PRINCIPAL INVESTIGATOR; HEATHER ENOS, OSIRIS-REX BUSINESS MANAGER. 1.1 DR. DRAKE AND DR. LAURETTA WILL HAVE THE OVERALL RESPONSIBILITY FOR THE DEVELOPMENT AND DELIVERY OF THE OSIRIS-REX PHASE A CONCEPT STUDY REPORT. THE CONCEPT STUDY REPORT MUST MEET THE REQUIREMENTS DELINEATED IN PART II OF THE STATEMENT OF WORK. 1.2 THE CONCEPT STUDY REPORT (CSR) WILL INCLUDE, BUT NOT LIMITED TO, PROPOSED LEVEL 1 SCIENCE REQUIREMENTS, CRITERIA FOR FULL MISSION SUCCESS SATISFYING THE BASELINE SCIENCE MISSION AND CRITERIA FOR MINIMUM MISSION SUCCESS SATISFYING THE THRESHOLD SCIENCE MISSION. 1.3 THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH THE GSFC AND LM MANAGEMENT TEAMS TO REFINE THE PROPOSED OSIRIS-REX MISSION COSTS. THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH GSFC PROJECT MANAGEMENT AND LM TO ASSESS THE ROBUSTNESS AND FEASIBILITY OF THE COST AND SCHEDULES. THE UA MANAGEMENT TEAM WILL HAVE THE LEAD FOR THE COST SECTION OF THE REPORT. 1.4 THE UA MANAGEMENT TEAM WILL PROVIDE SUPPORT IN THE DEVELOPMENT OF REQUIRED INTERNATIONAL AGREEMENTS SUCH AS TECHNICAL ASSISTANCE AGREEMENTS AND ITAR LICENSES. 1.5 THE UA MANAGEMENT TEAM WILL OVERSEE THE PHASE A CONTRACT WITH INSTRUMENT LEAD, DR. PHIL CHRISTENSEN, ASU. 1.6 THE UA MANAGEMENT TEAM WILL PROVIDE INPUTS AND VALIDATION SUPPORT TO THE GSFC INTEGRATED MASTER SCHEDULER. 1.7 DEPUTY PI, DR. LAURETTA, WILL LEAD THE DEVELOPMENT OF THE E/PO AND STUDENT COLLABORATION PLANS. 1.8 THE UNIVERSITY OF ARIZONA (UA) WILL SUPPORT THE OSIRIS-REX SITE VISIT AT LOCKHEED MARTIN, LITTLETON, CO. |
| Feb 9, 2015 | 16 | $3.6M | OSIRIS-REX ASTEROID SAMPLE RETURN MISSION. 1.0 UNIVERSITY OF ARIZONA MANAGEMENT TEAM: DR. MICHAEL DRAKE, OSIRIS-REX PRINCIPAL INVESTIGATOR; DR. DANTE LAURETTA, OSIRIS-REX DEPUTY PRINCIPAL INVESTIGATOR; HEATHER ENOS, OSIRIS-REX BUSINESS MANAGER. 1.1 DR. DRAKE AND DR. LAURETTA WILL HAVE THE OVERALL RESPONSIBILITY FOR THE DEVELOPMENT AND DELIVERY OF THE OSIRIS-REX PHASE A CONCEPT STUDY REPORT. THE CONCEPT STUDY REPORT MUST MEET THE REQUIREMENTS DELINEATED IN PART II OF THE STATEMENT OF WORK. 1.2 THE CONCEPT STUDY REPORT (CSR) WILL INCLUDE, BUT NOT LIMITED TO, PROPOSED LEVEL 1 SCIENCE REQUIREMENTS, CRITERIA FOR FULL MISSION SUCCESS SATISFYING THE BASELINE SCIENCE MISSION AND CRITERIA FOR MINIMUM MISSION SUCCESS SATISFYING THE THRESHOLD SCIENCE MISSION. 1.3 THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH THE GSFC AND LM MANAGEMENT TEAMS TO REFINE THE PROPOSED OSIRIS-REX MISSION COSTS. THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH GSFC PROJECT MANAGEMENT AND LM TO ASSESS THE ROBUSTNESS AND FEASIBILITY OF THE COST AND SCHEDULES. THE UA MANAGEMENT TEAM WILL HAVE THE LEAD FOR THE COST SECTION OF THE REPORT. 1.4 THE UA MANAGEMENT TEAM WILL PROVIDE SUPPORT IN THE DEVELOPMENT OF REQUIRED INTERNATIONAL AGREEMENTS SUCH AS TECHNICAL ASSISTANCE AGREEMENTS AND ITAR LICENSES. 1.5 THE UA MANAGEMENT TEAM WILL OVERSEE THE PHASE A CONTRACT WITH INSTRUMENT LEAD, DR. PHIL CHRISTENSEN, ASU. 1.6 THE UA MANAGEMENT TEAM WILL PROVIDE INPUTS AND VALIDATION SUPPORT TO THE GSFC INTEGRATED MASTER SCHEDULER. 1.7 DEPUTY PI, DR. LAURETTA, WILL LEAD THE DEVELOPMENT OF THE E/PO AND STUDENT COLLABORATION PLANS. 1.8 THE UNIVERSITY OF ARIZONA (UA) WILL SUPPORT THE OSIRIS-REX SITE VISIT AT LOCKHEED MARTIN, LITTLETON, CO. |
| Oct 15, 2014 | 15 | $487.0K | OSIRIS-REX ASTEROID SAMPLE RETURN MISSION. 1.0 UNIVERSITY OF ARIZONA MANAGEMENT TEAM: DR. MICHAEL DRAKE, OSIRIS-REX PRINCIPAL INVESTIGATOR; DR. DANTE LAURETTA, OSIRIS-REX DEPUTY PRINCIPAL INVESTIGATOR; HEATHER ENOS, OSIRIS-REX BUSINESS MANAGER. 1.1 DR. DRAKE AND DR. LAURETTA WILL HAVE THE OVERALL RESPONSIBILITY FOR THE DEVELOPMENT AND DELIVERY OF THE OSIRIS-REX PHASE A CONCEPT STUDY REPORT. THE CONCEPT STUDY REPORT MUST MEET THE REQUIREMENTS DELINEATED IN PART II OF THE STATEMENT OF WORK. 1.2 THE CONCEPT STUDY REPORT (CSR) WILL INCLUDE, BUT NOT LIMITED TO, PROPOSED LEVEL 1 SCIENCE REQUIREMENTS, CRITERIA FOR FULL MISSION SUCCESS SATISFYING THE BASELINE SCIENCE MISSION AND CRITERIA FOR MINIMUM MISSION SUCCESS SATISFYING THE THRESHOLD SCIENCE MISSION. 1.3 THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH THE GSFC AND LM MANAGEMENT TEAMS TO REFINE THE PROPOSED OSIRIS-REX MISSION COSTS. THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH GSFC PROJECT MANAGEMENT AND LM TO ASSESS THE ROBUSTNESS AND FEASIBILITY OF THE COST AND SCHEDULES. THE UA MANAGEMENT TEAM WILL HAVE THE LEAD FOR THE COST SECTION OF THE REPORT. 1.4 THE UA MANAGEMENT TEAM WILL PROVIDE SUPPORT IN THE DEVELOPMENT OF REQUIRED INTERNATIONAL AGREEMENTS SUCH AS TECHNICAL ASSISTANCE AGREEMENTS AND ITAR LICENSES. 1.5 THE UA MANAGEMENT TEAM WILL OVERSEE THE PHASE A CONTRACT WITH INSTRUMENT LEAD, DR. PHIL CHRISTENSEN, ASU. 1.6 THE UA MANAGEMENT TEAM WILL PROVIDE INPUTS AND VALIDATION SUPPORT TO THE GSFC INTEGRATED MASTER SCHEDULER. 1.7 DEPUTY PI, DR. LAURETTA, WILL LEAD THE DEVELOPMENT OF THE E/PO AND STUDENT COLLABORATION PLANS. 1.8 THE UNIVERSITY OF ARIZONA (UA) WILL SUPPORT THE OSIRIS-REX SITE VISIT AT LOCKHEED MARTIN, LITTLETON, CO. |
| Mar 3, 2014 | 14 | $3.7M | OSIRIS - REX ASTEROID SAMPLE RETURN MISSION. 1.1 OSIRIS - REX DEPUTY PRINCIPAL INVESTIGATOR, HEATHER ENOS, OSIRIS - REX BUSINESS MANAGER, DR. DRAKE AND DR. LAURETTA WILL HAVE THE OVERALL RESPONSIBILITY FOR THE DEVELOPMENT AND DELIVERY OF THE OSIRIS - REX PHASE A CONCEPT STUDY REPORT. THE CONCEPT STUDY REPORT MUST MEET THE REQUIREMENTS DELINEATED IN PART II OF THE STATEMENT OF WORK. 1.2 THE CONCEPT STUDY REPORT (CSR) WILL INCLUDE, BUT NOT LIMITED TO, PROPOSED LEVEL 1 SCIENCE REQUIREMENTS, CRITERIA FOR FULL MISSION SUCCESS SATISFYING THE BASELINE SCIENCE MISSION AND CRITERIA FOR MINIMUM MISSION SUCCESS SATISFYING THE THRESHOLD SCIENCE MISSION. 1.3 THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH THE GSFC AND LM MANAGEMENT TEAMS TO REFINE THE PROPOSED OSIRIS - REX MISSION COSTS. THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH GSFC PROJECT MANAGEMENT AND LM TO ASSESS THE ROBUSTNESS AND FEASIBILITY OF THE COST AND SCHEDULES. THE UA MANAGEMENT TEAM WILL HAVE THE LEAD FOR THE COST SECTION OF THE REPORT. 1.4 THE UA MANAGEMENT TEAM WILL PROVIDE SUPPORT IN THE DEVELOPMENT OF REQUIRED INTERNATIONAL AGREEMENTS SUCH AS TECHNICAL ASSISTANCE AGREEMENTS AND ITAR LICENSES. 1.5 THE UA MANAGEMENT TEAM WILL OVERSEE THE PHASE A CONTRACT WITH INSTRUMENT LEAD, DR. PHIL CHRISTENSEN, ASU. 1.6 THE UA MANAGEMENT TEAM WILL PROVIDE INPUTS AND VALIDATION SUPPORT TO THE GSFC INTEGRATED MASTER SCHEDULER. 1.7 DEPUTY PI, DR. LAURETTA, WILL LEAD THE DEVELOPMENT OF THE E/PO AND STUDENT COLLABORATION PLANS. 1.8 THE UNIVERSITY OF ARIZONA (UA) WILL SUPPORT THE OSIRIS-REX SITE VISIT AT LOCKHEED MARTIN, LITTLETON, CO. |
| Jan 15, 2014 | 13 | $0 | OSIRIS-REX ASTEROID SAMPLE RETURN MISSION. 1.0 UNIVERSITY OF ARIZONA MANAGEMENT TEAM: DR. MICHAEL DRAKE, OSIRIS-REX PRINCIPAL INVESTIGATOR; DR. DANTE LAURETTA, OSIRIS-REX DEPUTY PRINCIPAL INVESTIGATOR; HEATHER ENOS, OSIRIS-REX BUSINESS MANAGER. 1.1 DR. DRAKE AND DR. LAURETTA WILL HAVE THE OVERALL RESPONSIBILITY FOR THE DEVELOPMENT AND DELIVERY OF THE OSIRIS-REX PHASE A CONCEPT STUDY REPORT. THE CONCEPT STUDY REPORT MUST MEET THE REQUIREMENTS DELINEATED IN PART II OF THE STATEMENT OF WORK. 1.2 THE CONCEPT STUDY REPORT (CSR) WILL INCLUDE, BUT NOT LIMITED TO, PROPOSED LEVEL 1 SCIENCE REQUIREMENTS, CRITERIA FOR FULL MISSION SUCCESS SATISFYING THE BASELINE SCIENCE MISSION AND CRITERIA FOR MINIMUM MISSION SUCCESS SATISFYING THE THRESHOLD SCIENCE MISSION. 1.3 THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH THE GSFC AND LM MANAGEMENT TEAMS TO REFINE THE PROPOSED OSIRIS-REX MISSION COSTS. THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH GSFC PROJECT MANAGEMENT AND LM TO ASSESS THE ROBUSTNESS AND FEASIBILITY OF THE COST AND SCHEDULES. THE UA MANAGEMENT TEAM WILL HAVE THE LEAD FOR THE COST SECTION OF THE REPORT. 1.4 THE UA MANAGEMENT TEAM WILL PROVIDE SUPPORT IN THE DEVELOPMENT OF REQUIRED INTERNATIONAL AGREEMENTS SUCH AS TECHNICAL ASSISTANCE AGREEMENTS AND ITAR LICENSES. 1.5 THE UA MANAGEMENT TEAM WILL OVERSEE THE PHASE A CONTRACT WITH INSTRUMENT LEAD, DR. PHIL CHRISTENSEN, ASU. 1.6 THE UA MANAGEMENT TEAM WILL PROVIDE INPUTS AND VALIDATION SUPPORT TO THE GSFC INTEGRATED MASTER SCHEDULER. 1.7 DEPUTY PI, DR. LAURETTA, WILL LEAD THE DEVELOPMENT OF THE E/PO AND STUDENT COLLABORATION PLANS. 1.8 THE UNIVERSITY OF ARIZONA (UA) WILL SUPPORT THE OSIRIS-REX SITE VISIT AT LOCKHEED MARTIN, LITTLETON, CO. |
| Oct 28, 2013 | 12 | $750.0K | OSIRIS-REX ASTEROID SAMPLE RETURN MISSION. 1.0 UNIVERSITY OF ARIZONA MANAGEMENT TEAM: DR. MICHAEL DRAKE, OSIRIS-REX PRINCIPAL INVESTIGATOR; DR. DANTE LAURETTA, OSIRIS-REX DEPUTY PRINCIPAL INVESTIGATOR; HEATHER ENOS, OSIRIS-REX BUSINESS MANAGER. 1.1 DR. DRAKE AND DR. LAURETTA WILL HAVE THE OVERALL RESPONSIBILITY FOR THE DEVELOPMENT AND DELIVERY OF THE OSIRIS-REX PHASE A CONCEPT STUDY REPORT. THE CONCEPT STUDY REPORT MUST MEET THE REQUIREMENTS DELINEATED IN PART II OF THE STATEMENT OF WORK. 1.2 THE CONCEPT STUDY REPORT (CSR) WILL INCLUDE, BUT NOT LIMITED TO, PROPOSED LEVEL 1 SCIENCE REQUIREMENTS, CRITERIA FOR FULL MISSION SUCCESS SATISFYING THE BASELINE SCIENCE MISSION AND CRITERIA FOR MINIMUM MISSION SUCCESS SATISFYING THE THRESHOLD SCIENCE MISSION. 1.3 THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH THE GSFC AND LM MANAGEMENT TEAMS TO REFINE THE PROPOSED OSIRIS-REX MISSION COSTS. THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH GSFC PROJECT MANAGEMENT AND LM TO ASSESS THE ROBUSTNESS AND FEASIBILITY OF THE COST AND SCHEDULES. THE UA MANAGEMENT TEAM WILL HAVE THE LEAD FOR THE COST SECTION OF THE REPORT. 1.4 THE UA MANAGEMENT TEAM WILL PROVIDE SUPPORT IN THE DEVELOPMENT OF REQUIRED INTERNATIONAL AGREEMENTS SUCH AS TECHNICAL ASSISTANCE AGREEMENTS AND ITAR LICENSES. 1.5 THE UA MANAGEMENT TEAM WILL OVERSEE THE PHASE A CONTRACT WITH INSTRUMENT LEAD, DR. PHIL CHRISTENSEN, ASU. 1.6 THE UA MANAGEMENT TEAM WILL PROVIDE INPUTS AND VALIDATION SUPPORT TO THE GSFC INTEGRATED MASTER SCHEDULER. 1.7 DEPUTY PI, DR. LAURETTA, WILL LEAD THE DEVELOPMENT OF THE E/PO AND STUDENT COLLABORATION PLANS. 1.8 THE UNIVERSITY OF ARIZONA (UA) WILL SUPPORT THE OSIRIS-REX SITE VISIT AT LOCKHEED MARTIN, LITTLETON, CO. |
| Sep 10, 2013 | 11 | $1.8M | OSIRIS-REX ASTEROID SAMPLE RETURN MISSION. 1.0 UNIVERSITY OF ARIZONA MANAGEMENT TEAM: DR. MICHAEL DRAKE, OSIRIS-REX PRINCIPAL INVESTIGATOR; DR. DANTE LAURETTA, OSIRIS-REX DEPUTY PRINCIPAL INVESTIGATOR; HEATHER ENOS, OSIRIS-REX BUSINESS MANAGER. 1.1 DR. DRAKE AND DR. LAURETTA WILL HAVE THE OVERALL RESPONSIBILITY FOR THE DEVELOPMENT AND DELIVERY OF THE OSIRIS-REX PHASE A CONCEPT STUDY REPORT. THE CONCEPT STUDY REPORT MUST MEET THE REQUIREMENTS DELINEATED IN PART II OF THE STATEMENT OF WORK. 1.2 THE CONCEPT STUDY REPORT (CSR) WILL INCLUDE, BUT NOT LIMITED TO, PROPOSED LEVEL 1 SCIENCE REQUIREMENTS, CRITERIA FOR FULL MISSION SUCCESS SATISFYING THE BASELINE SCIENCE MISSION AND CRITERIA FOR MINIMUM MISSION SUCCESS SATISFYING THE THRESHOLD SCIENCE MISSION. 1.3 THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH THE GSFC AND LM MANAGEMENT TEAMS TO REFINE THE PROPOSED OSIRIS-REX MISSION COSTS. THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH GSFC PROJECT MANAGEMENT AND LM TO ASSESS THE ROBUSTNESS AND FEASIBILITY OF THE COST AND SCHEDULES. THE UA MANAGEMENT TEAM WILL HAVE THE LEAD FOR THE COST SECTION OF THE REPORT. 1.4 THE UA MANAGEMENT TEAM WILL PROVIDE SUPPORT IN THE DEVELOPMENT OF REQUIRED INTERNATIONAL AGREEMENTS SUCH AS TECHNICAL ASSISTANCE AGREEMENTS AND ITAR LICENSES. 1.5 THE UA MANAGEMENT TEAM WILL OVERSEE THE PHASE A CONTRACT WITH INSTRUMENT LEAD, DR. PHIL CHRISTENSEN, ASU. 1.6 THE UA MANAGEMENT TEAM WILL PROVIDE INPUTS AND VALIDATION SUPPORT TO THE GSFC INTEGRATED MASTER SCHEDULER. 1.7 DEPUTY PI, DR. LAURETTA, WILL LEAD THE DEVELOPMENT OF THE E/PO AND STUDENT COLLABORATION PLANS. 1.8 THE UNIVERSITY OF ARIZONA (UA) WILL SUPPORT THE OSIRIS-REX SITE VISIT AT LOCKHEED MARTIN, LITTLETON, CO. |
| Jun 14, 2013 | 10 | $1.4M | OSIRIS-REX ASTEROID SAMPLE RETURN MISSION. 1.0 UNIVERSITY OF ARIZONA MANAGEMENT TEAM: DR. MICHAEL DRAKE, OSIRIS-REX PRINCIPAL INVESTIGATOR; DR. DANTE LAURETTA, OSIRIS-REX DEPUTY PRINCIPAL INVESTIGATOR; HEATHER ENOS, OSIRIS-REX BUSINESS MANAGER. 1.1 DR. DRAKE AND DR. LAURETTA WILL HAVE THE OVERALL RESPONSIBILITY FOR THE DEVELOPMENT AND DELIVERY OF THE OSIRIS-REX PHASE A CONCEPT STUDY REPORT. THE CONCEPT STUDY REPORT MUST MEET THE REQUIREMENTS DELINEATED IN PART II OF THE STATEMENT OF WORK. 1.2 THE CONCEPT STUDY REPORT (CSR) WILL INCLUDE, BUT NOT LIMITED TO, PROPOSED LEVEL 1 SCIENCE REQUIREMENTS, CRITERIA FOR FULL MISSION SUCCESS SATISFYING THE BASELINE SCIENCE MISSION AND CRITERIA FOR MINIMUM MISSION SUCCESS SATISFYING THE THRESHOLD SCIENCE MISSION. 1.3 THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH THE GSFC AND LM MANAGEMENT TEAMS TO REFINE THE PROPOSED OSIRIS-REX MISSION COSTS. THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH GSFC PROJECT MANAGEMENT AND LM TO ASSESS THE ROBUSTNESS AND FEASIBILITY OF THE COST AND SCHEDULES. THE UA MANAGEMENT TEAM WILL HAVE THE LEAD FOR THE COST SECTION OF THE REPORT. 1.4 THE UA MANAGEMENT TEAM WILL PROVIDE SUPPORT IN THE DEVELOPMENT OF REQUIRED INTERNATIONAL AGREEMENTS SUCH AS TECHNICAL ASSISTANCE AGREEMENTS AND ITAR LICENSES. 1.5 THE UA MANAGEMENT TEAM WILL OVERSEE THE PHASE A CONTRACT WITH INSTRUMENT LEAD, DR. PHIL CHRISTENSEN, ASU. 1.6 THE UA MANAGEMENT TEAM WILL PROVIDE INPUTS AND VALIDATION SUPPORT TO THE GSFC INTEGRATED MASTER SCHEDULER. 1.7 DEPUTY PI, DR. LAURETTA, WILL LEAD THE DEVELOPMENT OF THE E/PO AND STUDENT COLLABORATION PLANS. 1.8 THE UNIVERSITY OF ARIZONA (UA) WILL SUPPORT THE OSIRIS-REX SITE VISIT AT LOCKHEED MARTIN, LITTLETON, CO. |
| May 31, 2013 | 9 | $25.0K | OSIRIS-REX ASTEROID SAMPLE RETURN MISSION. 1.0 UNIVERSITY OF ARIZONA MANAGEMENT TEAM: DR. MICHAEL DRAKE, OSIRIS-REX PRINCIPAL INVESTIGATOR; DR. DANTE LAURETTA, OSIRIS-REX DEPUTY PRINCIPAL INVESTIGATOR; HEATHER ENOS, OSIRIS-REX BUSINESS MANAGER. 1.1 DR. DRAKE AND DR. LAURETTA WILL HAVE THE OVERALL RESPONSIBILITY FOR THE DEVELOPMENT AND DELIVERY OF THE OSIRIS-REX PHASE A CONCEPT STUDY REPORT. THE CONCEPT STUDY REPORT MUST MEET THE REQUIREMENTS DELINEATED IN PART II OF THE STATEMENT OF WORK. 1.2 THE CONCEPT STUDY REPORT (CSR) WILL INCLUDE, BUT NOT LIMITED TO, PROPOSED LEVEL 1 SCIENCE REQUIREMENTS, CRITERIA FOR FULL MISSION SUCCESS SATISFYING THE BASELINE SCIENCE MISSION AND CRITERIA FOR MINIMUM MISSION SUCCESS SATISFYING THE THRESHOLD SCIENCE MISSION. 1.3 THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH THE GSFC AND LM MANAGEMENT TEAMS TO REFINE THE PROPOSED OSIRIS-REX MISSION COSTS. THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH GSFC PROJECT MANAGEMENT AND LM TO ASSESS THE ROBUSTNESS AND FEASIBILITY OF THE COST AND SCHEDULES. THE UA MANAGEMENT TEAM WILL HAVE THE LEAD FOR THE COST SECTION OF THE REPORT. 1.4 THE UA MANAGEMENT TEAM WILL PROVIDE SUPPORT IN THE DEVELOPMENT OF REQUIRED INTERNATIONAL AGREEMENTS SUCH AS TECHNICAL ASSISTANCE AGREEMENTS AND ITAR LICENSES. 1.5 THE UA MANAGEMENT TEAM WILL OVERSEE THE PHASE A CONTRACT WITH INSTRUMENT LEAD, DR. PHIL CHRISTENSEN, ASU. 1.6 THE UA MANAGEMENT TEAM WILL PROVIDE INPUTS AND VALIDATION SUPPORT TO THE GSFC INTEGRATED MASTER SCHEDULER. 1.7 DEPUTY PI, DR. LAURETTA, WILL LEAD THE DEVELOPMENT OF THE E/PO AND STUDENT COLLABORATION PLANS. 1.8 THE UNIVERSITY OF ARIZONA (UA) WILL SUPPORT THE OSIRIS-REX SITE VISIT AT LOCKHEED MARTIN, LITTLETON, CO. |
| Jan 25, 2013 | 8 | $525.2K | OSIRIS-REX ASTEROID SAMPLE RETURN MISSION. 1.0 UNIVERSITY OF ARIZONA MANAGEMENT TEAM: DR. MICHAEL DRAKE, OSIRIS-REX PRINCIPAL INVESTIGATOR; DR. DANTE LAURETTA, OSIRIS-REX DEPUTY PRINCIPAL INVESTIGATOR; HEATHER ENOS, OSIRIS-REX BUSINESS MANAGER. 1.1 DR. DRAKE AND DR. LAURETTA WILL HAVE THE OVERALL RESPONSIBILITY FOR THE DEVELOPMENT AND DELIVERY OF THE OSIRIS-REX PHASE A CONCEPT STUDY REPORT. THE CONCEPT STUDY REPORT MUST MEET THE REQUIREMENTS DELINEATED IN PART II OF THE STATEMENT OF WORK. 1.2 THE CONCEPT STUDY REPORT (CSR) WILL INCLUDE, BUT NOT LIMITED TO, PROPOSED LEVEL 1 SCIENCE REQUIREMENTS, CRITERIA FOR FULL MISSION SUCCESS SATISFYING THE BASELINE SCIENCE MISSION AND CRITERIA FOR MINIMUM MISSION SUCCESS SATISFYING THE THRESHOLD SCIENCE MISSION. 1.3 THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH THE GSFC AND LM MANAGEMENT TEAMS TO REFINE THE PROPOSED OSIRIS-REX MISSION COSTS. THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH GSFC PROJECT MANAGEMENT AND LM TO ASSESS THE ROBUSTNESS AND FEASIBILITY OF THE COST AND SCHEDULES. THE UA MANAGEMENT TEAM WILL HAVE THE LEAD FOR THE COST SECTION OF THE REPORT. 1.4 THE UA MANAGEMENT TEAM WILL PROVIDE SUPPORT IN THE DEVELOPMENT OF REQUIRED INTERNATIONAL AGREEMENTS SUCH AS TECHNICAL ASSISTANCE AGREEMENTS AND ITAR LICENSES. 1.5 THE UA MANAGEMENT TEAM WILL OVERSEE THE PHASE A CONTRACT WITH INSTRUMENT LEAD, DR. PHIL CHRISTENSEN, ASU. 1.6 THE UA MANAGEMENT TEAM WILL PROVIDE INPUTS AND VALIDATION SUPPORT TO THE GSFC INTEGRATED MASTER SCHEDULER. 1.7 DEPUTY PI, DR. LAURETTA, WILL LEAD THE DEVELOPMENT OF THE E/PO AND STUDENT COLLABORATION PLANS. 1.8 THE UNIVERSITY OF ARIZONA (UA) WILL SUPPORT THE OSIRIS-REX SITE VISIT AT LOCKHEED MARTIN, LITTLETON, CO. |
| Jan 16, 2013 | 7 | $-525.2K | OSIRIS-REX ASTEROID SAMPLE RETURN MISSION. 1.0 UNIVERSITY OF ARIZONA MANAGEMENT TEAM: DR. MICHAEL DRAKE, OSIRIS-REX PRINCIPAL INVESTIGATOR; DR. DANTE LAURETTA, OSIRIS-REX DEPUTY PRINCIPAL INVESTIGATOR; HEATHER ENOS, OSIRIS-REX BUSINESS MANAGER. 1.1 DR. DRAKE AND DR. LAURETTA WILL HAVE THE OVERALL RESPONSIBILITY FOR THE DEVELOPMENT AND DELIVERY OF THE OSIRIS-REX PHASE A CONCEPT STUDY REPORT. THE CONCEPT STUDY REPORT MUST MEET THE REQUIREMENTS DELINEATED IN PART II OF THE STATEMENT OF WORK. 1.2 THE CONCEPT STUDY REPORT (CSR) WILL INCLUDE, BUT NOT LIMITED TO, PROPOSED LEVEL 1 SCIENCE REQUIREMENTS, CRITERIA FOR FULL MISSION SUCCESS SATISFYING THE BASELINE SCIENCE MISSION AND CRITERIA FOR MINIMUM MISSION SUCCESS SATISFYING THE THRESHOLD SCIENCE MISSION. 1.3 THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH THE GSFC AND LM MANAGEMENT TEAMS TO REFINE THE PROPOSED OSIRIS-REX MISSION COSTS. THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH GSFC PROJECT MANAGEMENT AND LM TO ASSESS THE ROBUSTNESS AND FEASIBILITY OF THE COST AND SCHEDULES. THE UA MANAGEMENT TEAM WILL HAVE THE LEAD FOR THE COST SECTION OF THE REPORT. 1.4 THE UA MANAGEMENT TEAM WILL PROVIDE SUPPORT IN THE DEVELOPMENT OF REQUIRED INTERNATIONAL AGREEMENTS SUCH AS TECHNICAL ASSISTANCE AGREEMENTS AND ITAR LICENSES. 1.5 THE UA MANAGEMENT TEAM WILL OVERSEE THE PHASE A CONTRACT WITH INSTRUMENT LEAD, DR. PHIL CHRISTENSEN, ASU. 1.6 THE UA MANAGEMENT TEAM WILL PROVIDE INPUTS AND VALIDATION SUPPORT TO THE GSFC INTEGRATED MASTER SCHEDULER. 1.7 DEPUTY PI, DR. LAURETTA, WILL LEAD THE DEVELOPMENT OF THE E/PO AND STUDENT COLLABORATION PLANS. 1.8 THE UNIVERSITY OF ARIZONA (UA) WILL SUPPORT THE OSIRIS-REX SITE VISIT AT LOCKHEED MARTIN, LITTLETON, CO. |
| Aug 20, 2012 | 6 | $2.0M | OSIRIS-REX ASTEROID SAMPLE RETURN MISSION. 1.0 UNIVERSITY OF ARIZONA MANAGEMENT TEAM: DR. MICHAEL DRAKE, OSIRIS-REX PRINCIPAL INVESTIGATOR; DR. DANTE LAURETTA, OSIRIS-REX DEPUTY PRINCIPAL INVESTIGATOR; HEATHER ENOS, OSIRIS-REX BUSINESS MANAGER. 1.1 DR. DRAKE AND DR. LAURETTA WILL HAVE THE OVERALL RESPONSIBILITY FOR THE DEVELOPMENT AND DELIVERY OF THE OSIRIS-REX PHASE A CONCEPT STUDY REPORT. THE CONCEPT STUDY REPORT MUST MEET THE REQUIREMENTS DELINEATED IN PART II OF THE STATEMENT OF WORK. 1.2 THE CONCEPT STUDY REPORT (CSR) WILL INCLUDE, BUT NOT LIMITED TO, PROPOSED LEVEL 1 SCIENCE REQUIREMENTS, CRITERIA FOR FULL MISSION SUCCESS SATISFYING THE BASELINE SCIENCE MISSION AND CRITERIA FOR MINIMUM MISSION SUCCESS SATISFYING THE THRESHOLD SCIENCE MISSION. 1.3 THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH THE GSFC AND LM MANAGEMENT TEAMS TO REFINE THE PROPOSED OSIRIS-REX MISSION COSTS. THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH GSFC PROJECT MANAGEMENT AND LM TO ASSESS THE ROBUSTNESS AND FEASIBILITY OF THE COST AND SCHEDULES. THE UA MANAGEMENT TEAM WILL HAVE THE LEAD FOR THE COST SECTION OF THE REPORT. 1.4 THE UA MANAGEMENT TEAM WILL PROVIDE SUPPORT IN THE DEVELOPMENT OF REQUIRED INTERNATIONAL AGREEMENTS SUCH AS TECHNICAL ASSISTANCE AGREEMENTS AND ITAR LICENSES. 1.5 THE UA MANAGEMENT TEAM WILL OVERSEE THE PHASE A CONTRACT WITH INSTRUMENT LEAD, DR. PHIL CHRISTENSEN, ASU. 1.6 THE UA MANAGEMENT TEAM WILL PROVIDE INPUTS AND VALIDATION SUPPORT TO THE GSFC INTEGRATED MASTER SCHEDULER. 1.7 DEPUTY PI, DR. LAURETTA, WILL LEAD THE DEVELOPMENT OF THE E/PO AND STUDENT COLLABORATION PLANS. 1.8 THE UNIVERSITY OF ARIZONA (UA) WILL SUPPORT THE OSIRIS-REX SITE VISIT AT LOCKHEED MARTIN, LITTLETON, CO. |
| Mar 27, 2012 | 5 | $3.2M | OSIRIS - REX ASTEROID SAMPLE RETURN MISSION. 1.1 OSIRIS - REX DEPUTY PRINCIPAL INVESTIGATOR, HEATHER ENOS, OSIRIS - REX BUSINESS MANAGER, DR. DRAKE AND DR. LAURETTA WILL HAVE THE OVERALL RESPONSIBILITY FOR THE DEVELOPMENT AND DELIVERY OF THE OSIRIS - REX PHASE A CONCEPT STUDY REPORT. THE CONCEPT STUDY REPORT MUST MEET THE REQUIREMENTS DELINEATED IN PART II OF THE STATEMENT OF WORK. 1.2 THE CONCEPT STUDY REPORT (CSR) WILL INCLUDE, BUT NOT LIMITED TO, PROPOSED LEVEL 1 SCIENCE REQUIREMENTS, CRITERIA FOR FULL MISSION SUCCESS SATISFYING THE BASELINE SCIENCE MISSION AND CRITERIA FOR MINIMUM MISSION SUCCESS SATISFYING THE THRESHOLD SCIENCE MISSION. 1.3 THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH THE GSFC AND LM MANAGEMENT TEAMS TO REFINE THE PROPOSED OSIRIS - REX MISSION COSTS. THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH GSFC PROJECT MANAGEMENT AND LM TO ASSESS THE ROBUSTNESS AND FEASIBILITY OF THE COST AND SCHEDULES. THE UA MANAGEMENT TEAM WILL HAVE THE LEAD FOR THE COST SECTION OF THE REPORT. 1.4 THE UA MANAGEMENT TEAM WILL PROVIDE SUPPORT IN THE DEVELOPMENT OF REQUIRED INTERNATIONAL AGREEMENTS SUCH AS TECHNICAL ASSISTANCE AGREEMENTS AND ITAR LICENSES. 1.5 THE UA MANAGEMENT TEAM WILL OVERSEE THE PHASE A CONTRACT WITH INSTRUMENT LEAD, DR. PHIL CHRISTENSEN, ASU. 1.6 THE UA MANAGEMENT TEAM WILL PROVIDE INPUTS AND VALIDATION SUPPORT TO THE GSFC INTEGRATED MASTER SCHEDULER. 1.7 DEPUTY PI, DR. LAURETTA, WILL LEAD THE DEVELOPMENT OF THE E/PO AND STUDENT COLLABORATION PLANS. 1.8 THE UNIVERSITY OF ARIZONA (UA) WILL SUPPORT THE OSIRIS-REX SITE VISIT AT LOCKHEED MARTIN, LITTLETON, CO. |
| Dec 19, 2011 | 4 | $1.3M | OSIRIS-REX ASTEROID SAMPLE RETURN MISSION. 1.0 UNIVERSITY OF ARIZONA MANAGEMENT TEAM: DR. MICHAEL DRAKE, OSIRIS-REX PRINCIPAL INVESTIGATOR;DR. DANTE LAURETTA, OSIRIS-REX DEPUTY PRINCIPAL INVESTIGATOR; HEATHER ENOS, OSIRIS-REX BUSINESS MANAGER. 1.1 DR. DRAKE AND DR. LAURETTA WILL HAVE THE OVERALL RESPONSIBILITY FOR THE DEVELOPMENT AND DELIVERY OF THE OSIRIS-REX PHASE A CONCEPT STUDY REPORT. THE CONCEPT STUDY REPORT MUST MEET THE REQUIREMENTS DELINEATED IN PART II OF THE STATEMENT OF WORK. 1.2 THE CONCEPT STUDY REPORT (CSR) WILL INCLUDE, BUT NOT LIMITED TO, PROPOSED LEVEL 1 SCIENCE REQUIREMENTS, CRITERIA FOR FULL MISSION SUCCESS SATISFYING THE BASELINE SCIENCE MISSION AND CRITERIA FOR MINIMUM MISSION SUCCESS SATISFYING THE THRESHOLD SCIENCE MISSION. 1.3 THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH THE GSFC AND LM MANAGEMENT TEAMS TO REFINE THE PROPOSED OSIRIS-REX MISSION COSTS. THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH GSFC PROJECT MANAGEMENT AND LM TO ASSESS THE ROBUSTNESS AND FEASIBILITY OF THE COST AND SCHEDULES. THE UA MANAGEMENT TEAM WILL HAVE THE LEAD FOR THE COST SECTION OF THE REPORT. 1.4 THE UA MANAGEMENT TEAM WILL PROVIDE SUPPORT IN THE DEVELOPMENT OF REQUIRED INTERNATIONAL AGREEMENTS SUCH AS TECHNICAL ASSISTANCE AGREEMENTS AND ITAR LICENSES. 1.5 THE UA MANAGEMENT TEAM WILL OVERSEE THE PHASE A CONTRACT WITH INSTRUMENT LEAD, DR. PHIL CHRISTENSEN, ASU. 1.6 THE UA MANAGEMENT TEAM WILL PROVIDE INPUTS AND VALIDATION SUPPORT TO THE GSFC INTEGRATED MASTER SCHEDULER. 1.7 DEPUTY PI, DR. LAURETTA, WILL LEAD THE DEVELOPMENT OF THE E/PO AND STUDENT COLLABORATION PLANS. 1.8 THE UNIVERSITY OF ARIZONA (UA) WILL SUPPORT THE OSIRIS-REX SITE VISIT AT LOCKHEED MARTIN, LITTLETON, CO. |
| Oct 26, 2011 | 3 | $1.2M | OSIRIS-REX ASTEROID SAMPLE RETURN MISSION. 1.0 UNIVERSITY OF ARIZONA MANAGEMENT TEAM: DR. MICHAEL DRAKE, OSIRIS-REX PRINCIPAL INVESTIGATOR;DR. DANTE LAURETTA, OSIRIS-REX DEPUTY PRINCIPAL INVESTIGATOR; HEATHER ENOS, OSIRIS-REX BUSINESS MANAGER. 1.1 DR. DRAKE AND DR. LAURETTA WILL HAVE THE OVERALL RESPONSIBILITY FOR THE DEVELOPMENT AND DELIVERY OF THE OSIRIS-REX PHASE A CONCEPT STUDY REPORT. THE CONCEPT STUDY REPORT MUST MEET THE REQUIREMENTS DELINEATED IN PART II OF THE STATEMENT OF WORK. 1.2 THE CONCEPT STUDY REPORT (CSR) WILL INCLUDE, BUT NOT LIMITED TO, PROPOSED LEVEL 1 SCIENCE REQUIREMENTS, CRITERIA FOR FULL MISSION SUCCESS SATISFYING THE BASELINE SCIENCE MISSION AND CRITERIA FOR MINIMUM MISSION SUCCESS SATISFYING THE THRESHOLD SCIENCE MISSION. 1.3 THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH THE GSFC AND LM MANAGEMENT TEAMS TO REFINE THE PROPOSED OSIRIS-REX MISSION COSTS. THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH GSFC PROJECT MANAGEMENT AND LM TO ASSESS THE ROBUSTNESS AND FEASIBILITY OF THE COST AND SCHEDULES. THE UA MANAGEMENT TEAM WILL HAVE THE LEAD FOR THE COST SECTION OF THE REPORT. 1.4 THE UA MANAGEMENT TEAM WILL PROVIDE SUPPORT IN THE DEVELOPMENT OF REQUIRED INTERNATIONAL AGREEMENTS SUCH AS TECHNICAL ASSISTANCE AGREEMENTS AND ITAR LICENSES. 1.5 THE UA MANAGEMENT TEAM WILL OVERSEE THE PHASE A CONTRACT WITH INSTRUMENT LEAD, DR. PHIL CHRISTENSEN, ASU. 1.6 THE UA MANAGEMENT TEAM WILL PROVIDE INPUTS AND VALIDATION SUPPORT TO THE GSFC INTEGRATED MASTER SCHEDULER. 1.7 DEPUTY PI, DR. LAURETTA, WILL LEAD THE DEVELOPMENT OF THE E/PO AND STUDENT COLLABORATION PLANS. 1.8 THE UNIVERSITY OF ARIZONA (UA) WILL SUPPORT THE OSIRIS-REX SITE VISIT AT LOCKHEED MARTIN, LITTLETON, CO. |
| Jul 15, 2011 | 2 | $1.4M | OSIRIS-REX ASTEROID SAMPLE RETURN MISSION. 1.0 UNIVERSITY OF ARIZONA MANAGEMENT TEAM: DR. MICHAEL DRAKE, OSIRIS-REX PRINCIPAL INVESTIGATOR;DR. DANTE LAURETTA, OSIRIS-REX DEPUTY PRINCIPAL INVESTIGATOR; HEATHER ENOS, OSIRIS-REX BUSINESS MANAGER. 1.1 DR. DRAKE AND DR. LAURETTA WILL HAVE THE OVERALL RESPONSIBILITY FOR THE DEVELOPMENT AND DELIVERY OF THE OSIRIS-REX PHASE A CONCEPT STUDY REPORT. THE CONCEPT STUDY REPORT MUST MEET THE REQUIREMENTS DELINEATED IN PART II OF THE STATEMENT OF WORK. 1.2 THE CONCEPT STUDY REPORT (CSR) WILL INCLUDE, BUT NOT LIMITED TO, PROPOSED LEVEL 1 SCIENCE REQUIREMENTS, CRITERIA FOR FULL MISSION SUCCESS SATISFYING THE BASELINE SCIENCE MISSION AND CRITERIA FOR MINIMUM MISSION SUCCESS SATISFYING THE THRESHOLD SCIENCE MISSION. 1.3 THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH THE GSFC AND LM MANAGEMENT TEAMS TO REFINE THE PROPOSED OSIRIS-REX MISSION COSTS. THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH GSFC PROJECT MANAGEMENT AND LM TO ASSESS THE ROBUSTNESS AND FEASIBILITY OF THE COST AND SCHEDULES. THE UA MANAGEMENT TEAM WILL HAVE THE LEAD FOR THE COST SECTION OF THE REPORT. 1.4 THE UA MANAGEMENT TEAM WILL PROVIDE SUPPORT IN THE DEVELOPMENT OF REQUIRED INTERNATIONAL AGREEMENTS SUCH AS TECHNICAL ASSISTANCE AGREEMENTS AND ITAR LICENSES. 1.5 THE UA MANAGEMENT TEAM WILL OVERSEE THE PHASE A CONTRACT WITH INSTRUMENT LEAD, DR. PHIL CHRISTENSEN, ASU. 1.6 THE UA MANAGEMENT TEAM WILL PROVIDE INPUTS AND VALIDATION SUPPORT TO THE GSFC INTEGRATED MASTER SCHEDULER. 1.7 DEPUTY PI, DR. LAURETTA, WILL LEAD THE DEVELOPMENT OF THE E/PO AND STUDENT COLLABORATION PLANS. 1.8 THE UNIVERSITY OF ARIZONA (UA) WILL SUPPORT THE OSIRIS-REX SITE VISIT AT LOCKHEED MARTIN, LITTLETON, CO. |
| Dec 8, 2010 | 1 | $267.7K | OSIRIS-REX ASTEROID SAMPLE RETURN MISSION. |
| Mar 16, 2010 | 0 | $632.3K | OSIRIS - REX ASTEROID SAMPLE RETURN MISSION. 1.1 OSIRIS - REX DEPUTY PRINCIPAL INVESTIGATOR, HEATHER ENOS, OSIRIS - REX BUSINESS MANAGER, DR. DRAKE AND DR. LAURETTA WILL HAVE THE OVERALL RESPONSIBILITY FOR THE DEVELOPMENT AND DELIVERY OF THE OSIRIS - REX PHASE A CONCEPT STUDY REPORT. THE CONCEPT STUDY REPORT MUST MEET THE REQUIREMENTS DELINEATED IN PART II OF THE STATEMENT OF WORK. 1.2 THE CONCEPT STUDY REPORT (CSR) WILL INCLUDE, BUT NOT LIMITED TO, PROPOSED LEVEL 1 SCIENCE REQUIREMENTS, CRITERIA FOR FULL MISSION SUCCESS SATISFYING THE BASELINE SCIENCE MISSION AND CRITERIA FOR MINIMUM MISSION SUCCESS SATISFYING THE THRESHOLD SCIENCE MISSION. 1.3 THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH THE GSFC AND LM MANAGEMENT TEAMS TO REFINE THE PROPOSED OSIRIS - REX MISSION COSTS. THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH GSFC PROJECT MANAGEMENT AND LM TO ASSESS THE ROBUSTNESS AND FEASIBILITY OF THE COST AND SCHEDULES. THE UA MANAGEMENT TEAM WILL HAVE THE LEAD FOR THE COST SECTION OF THE REPORT. 1.4 THE UA MANAGEMENT TEAM WILL PROVIDE SUPPORT IN THE DEVELOPMENT OF REQUIRED INTERNATIONAL AGREEMENTS SUCH AS TECHNICAL ASSISTANCE AGREEMENTS AND ITAR LICENSES. 1.5 THE UA MANAGEMENT TEAM WILL OVERSEE THE PHASE A CONTRACT WITH INSTRUMENT LEAD, DR. PHIL CHRISTENSEN, ASU. 1.6 THE UA MANAGEMENT TEAM WILL PROVIDE INPUTS AND VALIDATION SUPPORT TO THE GSFC INTEGRATED MASTER SCHEDULER. 1.7 DEPUTY PI, DR. LAURETTA, WILL LEAD THE DEVELOPMENT OF THE E/PO AND STUDENT COLLABORATION PLANS. 1.8 THE UNIVERSITY OF ARIZONA (UA) WILL SUPPORT THE OSIRIS-REX SITE VISIT AT LOCKHEED MARTIN, LITTLETON, CO. |
Estimated positioning window
Sep 30, 2028 – Mar 30, 2029
35/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 35/100. Available recorded signals: 30 points.
- Contract end 2029-09-30 (1071 days from calculation)
- +15 points
- 0 historical awards in this buyer and category group
- +0 points
- 76 recorded award transactions
- +10 points
- Latest award action: 2026-09-04
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +0 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-10-25 10:18:04.631876+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Oct 25, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.