IGF::CL,CT::IGF PSYCHE: JOURNEY TO A METAL WORLD THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE PHASE A CONCEPT DEFINITION PORTION OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014. THE MISSION PRINCIPAL INVESTIGATOR (PI), DR. LINDA ELKINS-TANTON, OF THE SCHOOL OF EARTH AND SPACE EXPLORATION AT ARIZONA STATE UNIVERSITY (ASU), IS RESPONSIBLE FOR THE SUCCESS AND SCIENTIFIC INTEGRITY OF THE MISSION. AS SUCH, THE PI SHALL LEAD THE PROJECT, MANAGE PROJECT RESOURCES, AND DIRECT ALL ACTIVITIES OF THE SCIENCE TEAM CARRIED OUT IN SUPPORT OF THE MISSION. SPECIFICALLY, DURING PHASE A, THE PI WILL LEAD THE MISSION TEAM IN CONDUCTING THE CONCEPT STUDY REPORT AND ASSOCIATED SITE VISIT. SHOULD THE MISSION BE SELECTED TO CONTINUE INTO PHASE B, THE PI WILL LEAD THE TEAM THROUGH THE INITIATION OF THE PHASE B EFFORT WITH A TRANSITION PHASE BETWEEN NOTIFICATION OF AWARD AND ESTABLISHMENT OF THE PHASE B CONTRACT. THE PI IS ASSISTED BY A DEPUTY PI, DR. JAMES BELL AT ARIZONA STATE UNIVERSITY. JET PROPULSION LABORATORY (JPL) IS THE MISSION MAJOR PARTNER FOR SPACECRAFT DEVELOPMENT AND MISSION IMPLEMENTATION, AND SHALL SUPPORT THE PI WITH A PROJECT TEAM EXPERIENCED IN MANAGEMENT, SYSTEMS ENGINEERING, MISSION DESIGN, PAYLOAD DEVELOPMENT, SAFETY AND MISSION ASSURANCE, NAVIGATION, AND MISSION OPERATIONS. SPECIFIC OBJECTIVES TO ADDRESS THE PHASE A CRITERIA AND GUIDELINES ARE: - PROJECT MANAGEMENT FOR THE PHASE A CONTRACT - CONDUCT AND SUPPORT OF PHASE A PROJECT REVIEWS - PHASE B/C/D/E SPACECRAFT DEVELOPMENT AND MISSION PLANNING - PHASE B/C/D/E COST ESTIMATES - CONCEPT STUDY REPORT PREPARATION - ORALS/SITE VISIT SUPPORT BY KEY PERSONNEL THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE PHASE A CONCEPT DEFINITION PORTION OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014. THE MISSION PRINCIPAL INVESTIGATOR (PI), DR. LINDA ELKINS-TANTON, OF THE SCHOOL OF EARTH AND SPACE EXPLORATION AT ARIZONA STATE UNIVERSITY (ASU), IS RESPONSIBLE FOR THE SUCCESS AND SCIENTIFIC INTEGRITY OF THE MISSION. AS SUCH, THE PI SHALL LEAD THE PROJECT, MANAGE PROJECT RESOURCES, AND DIRECT ALL ACTIVITIES OF THE SCIENCE TEAM CARRIED OUT IN SUPPORT OF THE MISSION. SPECIFICALLY, DURING PHASE A, THE PI WILL LEAD THE MISSION TEAM IN CONDUCTING THE CONCEPT STUDY REPORT AND ASSOCIATED SITE VISIT. SHOULD THE MISSION BE SELECTED TO CONTINUE INTO PHASE B, THE PI WILL LEAD THE TEAM THROUGH THE INITIATION OF THE PHASE B EFFORT WITH A TRANSITION PHASE BETWEEN NOTIFICATION OF AWARD AND ESTABLISHMENT OF THE PHASE B CONTRACT. THE PI IS ASSISTED BY A DEPUTY PI, DR. JAMES BELL AT ARIZONA STATE UNIVERSITY. JET PROPULSION LABORATORY (JPL) IS THE MISSION MAJOR PARTNER FOR SPACECRAFT DEVELOPMENT AND MISSION IMPLEMENTATION, AND SHALL SUPPORT THE PI WITH A PROJECT TEAM EXPERIENCED IN MANAGEMENT, SYSTEMS ENGINEERING, MISSION DESIGN, PAYLOAD DEVELOPMENT, SAFETY AND MISSION ASSURANCE, NAVIGATION, AND MISSION OPERATIONS. SPECIFIC OBJECTIVES TO ADDRESS THE PHASE A CRITERIA AND GUIDELINES ARE: - PROJECT MANAGEMENT FOR THE PHASE A CONTRACT - CONDUCT AND SUPPORT OF PHASE A PROJECT REVIEWS - PHASE B/C/D/E SPACECRAFT DEVELOPMENT AND MISSION PLANNING - PHASE B/C/D/E COST ESTIMATES - CONCEPT STUDY REPORT PREPARATION - ORALS/SITE VISIT SUPPORT BY KEY PERSONNEL

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyNational Aeronautics and Space Administration
OfficeNASA MARSHALL SPACE FLIGHT CENTER
NAICS541712
PSCAR14 — SPACE R&D SERVICES; SPACE FLIGHT, RESEARCH AND SUPPORTING ACTIVITIES; R&D ADMINISTRATIVE EXPENSES
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeCOST NO FEE
Obligations$50.1M
Current contract value$93.0M
Potential contract value / ceiling$93.0M
Start dateNov 13, 2015
Current end dateAug 31, 2032
Potential end dateAug 31, 2032
Latest award activityJun 18, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 63 of 63 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jun 18, 2026P00062$4.6MPSYCHE: JOURNEY TO A METAL WORLD - THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014.
Mar 31, 2026P00061$300.0KPSYCHE: JOURNEY TO A METAL WORLD - THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014.
Dec 1, 2025P00060$650.0KPSYCHE: JOURNEY TO A METAL WORLD - THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014.
Aug 5, 2025P00059$1.6MPSYCHE: JOURNEY TO A METAL WORLD - THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014.
Jun 26, 2025P00058$1.7MPSYCHE: JOURNEY TO A METAL WORLD - THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014.
May 12, 202557$1.1MPSYCHE: JOURNEY TO A METAL WORLD - THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014.
Mar 19, 202556$135.0KPSYCHE: JOURNEY TO A METAL WORLD - THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014.
Dec 10, 202455$0PSYCHE: JOURNEY TO A METAL WORLD - THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014.
Nov 6, 202454$424.3KPSYCHE: JOURNEY TO A METAL WORLD - THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014.
Jul 17, 202453$2.2MPSYCHE: JOURNEY TO A METAL WORLD - THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014.
Feb 29, 202452$1.1MPSYCHE: JOURNEY TO A METAL WORLD - THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014.
Feb 13, 202451$500.0KPSYCHE: JOURNEY TO A METAL WORLD - THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014.
Jan 24, 202450$0PSYCHE: JOURNEY TO A METAL WORLD - THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014.
Dec 14, 202349$0PSYCHE: JOURNEY TO A METAL WORLD - THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014.
Aug 28, 202348$377.0KPSYCHE: JOURNEY TO A METAL WORLD - THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014.
Jul 19, 202347$0PSYCHE: JOURNEY TO A METAL WORLD - THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014.
Jul 10, 202346$2.3MPSYCHE: JOURNEY TO A METAL WORLD - THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014.
Jun 27, 202345$0PSYCHE: JOURNEY TO A METAL WORLD - THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014.
Jun 5, 202344$0PSYCHE: JOURNEY TO A METAL WORLD - THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014.
May 15, 202343$0PSYCHE: JOURNEY TO A METAL WORLD - THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014.
Jan 30, 202342$0PSYCHE: JOURNEY TO A METAL WORLD - THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014.
Nov 29, 202241$377.1KPSYCHE: JOURNEY TO A METAL WORLD - THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014.
Sep 20, 202240$0PSYCHE: JOURNEY TO A METAL WORLD - THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014.
Aug 25, 202239$100.0KPSYCHE: JOURNEY TO A METAL WORLD - THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014.
Jul 22, 202238$0PSYCHE: JOURNEY TO A METAL WORLD - THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014.
Jun 15, 202237$210.0KPSYCHE: JOURNEY TO A METAL WORLD - THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014.
Apr 28, 202236$2.9MPSYCHE: JOURNEY TO A METAL WORLD - THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014.
Mar 2, 202235$570.0KPSYCHE: JOURNEY TO A METAL WORLD - THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014.
Jan 6, 202234$0PSYCHE: JOURNEY TO A METAL WORLD - THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014.
Jan 5, 202233$1.0MPSYCHE: JOURNEY TO A METAL WORLD - THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014.
Nov 22, 202132$0PSYCHE: JOURNEY TO A METAL WORLD - THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014.
Nov 18, 202131$600.0KPSYCHE: JOURNEY TO A METAL WORLD - THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014.
Nov 10, 202130$0PSYCHE: JOURNEY TO A METAL WORLD - THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014.
Oct 21, 202129$1.0MPSYCHE: JOURNEY TO A METAL WORLD - THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014.
Oct 20, 202128$0EO14042 PSYCHE: JOURNEY TO A METAL WORLD - THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014.
Jul 14, 202127$1.0MPSYCHE: JOURNEY TO A METAL WORLD THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014.
Mar 15, 202126$1.5MPSYCHE: JOURNEY TO A METAL WORLD THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE PHASE A CONCEPT DEFINITION PORTION OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014. THE MISSION PRINCIPAL INVESTIGATOR (PI), DR. LINDA ELKINS-TANTON, OF THE SCHOOL OF EARTH AND SPACE EXPLORATION AT ARIZONA STATE UNIVERSITY (ASU), IS RESPONSIBLE FOR THE SUCCESS AND SCIENTIFIC INTEGRITY OF THE MISSION. AS SUCH, THE PI SHALL LEAD THE PROJECT, MANAGE PROJECT RESOURCES, AND DIRECT ALL ACTIVITIES OF THE SCIENCE TEAM CARRIED OUT IN SUPPORT OF THE MISSION. SPECIFICALLY, DURING PHASE A, THE PI WILL LEAD THE MISSION TEAM IN CONDUCTING THE CONCEPT STUDY REPORT AND ASSOCIATED SITE VISIT. SHOULD THE MISSION BE SELECTED TO CONTINUE INTO PHASE B, THE PI WILL LEAD THE TEAM THROUGH THE INITIATION OF THE PHASE B EFFORT WITH A TRANSITION PHASE BETWEEN NOTIFICATION OF AWARD AND ESTABLISHMENT OF THE PHASE B CONTRACT. THE PI IS ASSISTED BY A DEPUTY PI, DR. JAMES BELL AT ARIZONA STATE UNIVERSITY. JET PROPULSION LABORATORY (JPL) IS THE MISSION MAJOR PARTNER FOR SPACECRAFT DEVELOPMENT AND MISSION IMPLEMENTATION, AND SHALL SUPPORT THE PI WITH A PROJECT TEAM EXPERIENCED IN MANAGEMENT, SYSTEMS ENGINEERING, MISSION DESIGN, PAYLOAD DEVELOPMENT, SAFETY AND MISSION ASSURANCE, NAVIGATION, AND MISSION OPERATIONS. SPECIFIC OBJECTIVES TO ADDRESS THE PHASE A CRITERIA AND GUIDELINES ARE: - PROJECT MANAGEMENT FOR THE PHASE A CONTRACT - CONDUCT AND SUPPORT OF PHASE A PROJECT REVIEWS - PHASE B/C/D/E SPACECRAFT DEVELOPMENT AND MISSION PLANNING - PHASE B/C/D/E COST ESTIMATES - CONCEPT STUDY REPORT PREPARATION - ORALS/SITE VISIT SUPPORT BY KEY PERSONNEL THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE PHASE A CONCEPT DEFINITION PORTION OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014. THE MISSION PRINCIPAL INVESTIGATOR (PI), DR. LINDA ELKINS-TANTON, OF THE SCHOOL OF EARTH AND SPACE EXPLORATION AT ARIZONA STATE UNIVERSITY (ASU), IS RESPONSIBLE FOR THE SUCCESS AND SCIENTIFIC INTEGRITY OF THE MISSION. AS SUCH, THE PI SHALL LEAD THE PROJECT, MANAGE PROJECT RESOURCES, AND DIRECT ALL ACTIVITIES OF THE SCIENCE TEAM CARRIED OUT IN SUPPORT OF THE MISSION. SPECIFICALLY, DURING PHASE A, THE PI WILL LEAD THE MISSION TEAM IN CONDUCTING THE CONCEPT STUDY REPORT AND ASSOCIATED SITE VISIT. SHOULD THE MISSION BE SELECTED TO CONTINUE INTO PHASE B, THE PI WILL LEAD THE TEAM THROUGH THE INITIATION OF THE PHASE B EFFORT WITH A TRANSITION PHASE BETWEEN NOTIFICATION OF AWARD AND ESTABLISHMENT OF THE PHASE B CONTRACT. THE PI IS ASSISTED BY A DEPUTY PI, DR. JAMES BELL AT ARIZONA STATE UNIVERSITY. JET PROPULSION LABORATORY (JPL) IS THE MISSION MAJOR PARTNER FOR SPACECRAFT DEVELOPMENT AND MISSION IMPLEMENTATION, AND SHALL SUPPORT THE PI WITH A PROJECT TEAM EXPERIENCED IN MANAGEMENT, SYSTEMS ENGINEERING, MISSION DESIGN, PAYLOAD DEVELOPMENT, SAFETY AND MISSION ASSURANCE, NAVIGATION, AND MISSION OPERATIONS. SPECIFIC OBJECTIVES TO ADDRESS THE PHASE A CRITERIA AND GUIDELINES ARE: - PROJECT MANAGEMENT FOR THE PHASE A CONTRACT - CONDUCT AND SUPPORT OF PHASE A PROJECT REVIEWS - PHASE B/C/D/E SPACECRAFT DEVELOPMENT AND MISSION PLANNING - PHASE B/C/D/E COST ESTIMATES - CONCEPT STUDY REPORT PREPARATION - ORALS/SITE VISIT SUPPORT BY KEY PERSONNEL
Jan 13, 202125$1.1MPSYCHE: JOURNEY TO A METAL WORLD THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE PHASE A CONCEPT DEFINITION PORTION OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014. THE MISSION PRINCIPAL INVESTIGATOR (PI), DR. LINDA ELKINS-TANTON, OF THE SCHOOL OF EARTH AND SPACE EXPLORATION AT ARIZONA STATE UNIVERSITY (ASU), IS RESPONSIBLE FOR THE SUCCESS AND SCIENTIFIC INTEGRITY OF THE MISSION. AS SUCH, THE PI SHALL LEAD THE PROJECT, MANAGE PROJECT RESOURCES, AND DIRECT ALL ACTIVITIES OF THE SCIENCE TEAM CARRIED OUT IN SUPPORT OF THE MISSION. SPECIFICALLY, DURING PHASE A, THE PI WILL LEAD THE MISSION TEAM IN CONDUCTING THE CONCEPT STUDY REPORT AND ASSOCIATED SITE VISIT. SHOULD THE MISSION BE SELECTED TO CONTINUE INTO PHASE B, THE PI WILL LEAD THE TEAM THROUGH THE INITIATION OF THE PHASE B EFFORT WITH A TRANSITION PHASE BETWEEN NOTIFICATION OF AWARD AND ESTABLISHMENT OF THE PHASE B CONTRACT. THE PI IS ASSISTED BY A DEPUTY PI, DR. JAMES BELL AT ARIZONA STATE UNIVERSITY. JET PROPULSION LABORATORY (JPL) IS THE MISSION MAJOR PARTNER FOR SPACECRAFT DEVELOPMENT AND MISSION IMPLEMENTATION, AND SHALL SUPPORT THE PI WITH A PROJECT TEAM EXPERIENCED IN MANAGEMENT, SYSTEMS ENGINEERING, MISSION DESIGN, PAYLOAD DEVELOPMENT, SAFETY AND MISSION ASSURANCE, NAVIGATION, AND MISSION OPERATIONS. SPECIFIC OBJECTIVES TO ADDRESS THE PHASE A CRITERIA AND GUIDELINES ARE: - PROJECT MANAGEMENT FOR THE PHASE A CONTRACT - CONDUCT AND SUPPORT OF PHASE A PROJECT REVIEWS - PHASE B/C/D/E SPACECRAFT DEVELOPMENT AND MISSION PLANNING - PHASE B/C/D/E COST ESTIMATES - CONCEPT STUDY REPORT PREPARATION - ORALS/SITE VISIT SUPPORT BY KEY PERSONNEL THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE PHASE A CONCEPT DEFINITION PORTION OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014. THE MISSION PRINCIPAL INVESTIGATOR (PI), DR. LINDA ELKINS-TANTON, OF THE SCHOOL OF EARTH AND SPACE EXPLORATION AT ARIZONA STATE UNIVERSITY (ASU), IS RESPONSIBLE FOR THE SUCCESS AND SCIENTIFIC INTEGRITY OF THE MISSION. AS SUCH, THE PI SHALL LEAD THE PROJECT, MANAGE PROJECT RESOURCES, AND DIRECT ALL ACTIVITIES OF THE SCIENCE TEAM CARRIED OUT IN SUPPORT OF THE MISSION. SPECIFICALLY, DURING PHASE A, THE PI WILL LEAD THE MISSION TEAM IN CONDUCTING THE CONCEPT STUDY REPORT AND ASSOCIATED SITE VISIT. SHOULD THE MISSION BE SELECTED TO CONTINUE INTO PHASE B, THE PI WILL LEAD THE TEAM THROUGH THE INITIATION OF THE PHASE B EFFORT WITH A TRANSITION PHASE BETWEEN NOTIFICATION OF AWARD AND ESTABLISHMENT OF THE PHASE B CONTRACT. THE PI IS ASSISTED BY A DEPUTY PI, DR. JAMES BELL AT ARIZONA STATE UNIVERSITY. JET PROPULSION LABORATORY (JPL) IS THE MISSION MAJOR PARTNER FOR SPACECRAFT DEVELOPMENT AND MISSION IMPLEMENTATION, AND SHALL SUPPORT THE PI WITH A PROJECT TEAM EXPERIENCED IN MANAGEMENT, SYSTEMS ENGINEERING, MISSION DESIGN, PAYLOAD DEVELOPMENT, SAFETY AND MISSION ASSURANCE, NAVIGATION, AND MISSION OPERATIONS. SPECIFIC OBJECTIVES TO ADDRESS THE PHASE A CRITERIA AND GUIDELINES ARE: - PROJECT MANAGEMENT FOR THE PHASE A CONTRACT - CONDUCT AND SUPPORT OF PHASE A PROJECT REVIEWS - PHASE B/C/D/E SPACECRAFT DEVELOPMENT AND MISSION PLANNING - PHASE B/C/D/E COST ESTIMATES - CONCEPT STUDY REPORT PREPARATION - ORALS/SITE VISIT SUPPORT BY KEY PERSONNEL
Oct 22, 202024$2.5MPSYCHE: JOURNEY TO A METAL WORLD THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE PHASE A CONCEPT DEFINITION PORTION OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014. THE MISSION PRINCIPAL INVESTIGATOR (PI), DR. LINDA ELKINS-TANTON, OF THE SCHOOL OF EARTH AND SPACE EXPLORATION AT ARIZONA STATE UNIVERSITY (ASU), IS RESPONSIBLE FOR THE SUCCESS AND SCIENTIFIC INTEGRITY OF THE MISSION. AS SUCH, THE PI SHALL LEAD THE PROJECT, MANAGE PROJECT RESOURCES, AND DIRECT ALL ACTIVITIES OF THE SCIENCE TEAM CARRIED OUT IN SUPPORT OF THE MISSION. SPECIFICALLY, DURING PHASE A, THE PI WILL LEAD THE MISSION TEAM IN CONDUCTING THE CONCEPT STUDY REPORT AND ASSOCIATED SITE VISIT. SHOULD THE MISSION BE SELECTED TO CONTINUE INTO PHASE B, THE PI WILL LEAD THE TEAM THROUGH THE INITIATION OF THE PHASE B EFFORT WITH A TRANSITION PHASE BETWEEN NOTIFICATION OF AWARD AND ESTABLISHMENT OF THE PHASE B CONTRACT. THE PI IS ASSISTED BY A DEPUTY PI, DR. JAMES BELL AT ARIZONA STATE UNIVERSITY. JET PROPULSION LABORATORY (JPL) IS THE MISSION MAJOR PARTNER FOR SPACECRAFT DEVELOPMENT AND MISSION IMPLEMENTATION, AND SHALL SUPPORT THE PI WITH A PROJECT TEAM EXPERIENCED IN MANAGEMENT, SYSTEMS ENGINEERING, MISSION DESIGN, PAYLOAD DEVELOPMENT, SAFETY AND MISSION ASSURANCE, NAVIGATION, AND MISSION OPERATIONS. SPECIFIC OBJECTIVES TO ADDRESS THE PHASE A CRITERIA AND GUIDELINES ARE: - PROJECT MANAGEMENT FOR THE PHASE A CONTRACT - CONDUCT AND SUPPORT OF PHASE A PROJECT REVIEWS - PHASE B/C/D/E SPACECRAFT DEVELOPMENT AND MISSION PLANNING - PHASE B/C/D/E COST ESTIMATES - CONCEPT STUDY REPORT PREPARATION - ORALS/SITE VISIT SUPPORT BY KEY PERSONNEL THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE PHASE A CONCEPT DEFINITION PORTION OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014. THE MISSION PRINCIPAL INVESTIGATOR (PI), DR. LINDA ELKINS-TANTON, OF THE SCHOOL OF EARTH AND SPACE EXPLORATION AT ARIZONA STATE UNIVERSITY (ASU), IS RESPONSIBLE FOR THE SUCCESS AND SCIENTIFIC INTEGRITY OF THE MISSION. AS SUCH, THE PI SHALL LEAD THE PROJECT, MANAGE PROJECT RESOURCES, AND DIRECT ALL ACTIVITIES OF THE SCIENCE TEAM CARRIED OUT IN SUPPORT OF THE MISSION. SPECIFICALLY, DURING PHASE A, THE PI WILL LEAD THE MISSION TEAM IN CONDUCTING THE CONCEPT STUDY REPORT AND ASSOCIATED SITE VISIT. SHOULD THE MISSION BE SELECTED TO CONTINUE INTO PHASE B, THE PI WILL LEAD THE TEAM THROUGH THE INITIATION OF THE PHASE B EFFORT WITH A TRANSITION PHASE BETWEEN NOTIFICATION OF AWARD AND ESTABLISHMENT OF THE PHASE B CONTRACT. THE PI IS ASSISTED BY A DEPUTY PI, DR. JAMES BELL AT ARIZONA STATE UNIVERSITY. JET PROPULSION LABORATORY (JPL) IS THE MISSION MAJOR PARTNER FOR SPACECRAFT DEVELOPMENT AND MISSION IMPLEMENTATION, AND SHALL SUPPORT THE PI WITH A PROJECT TEAM EXPERIENCED IN MANAGEMENT, SYSTEMS ENGINEERING, MISSION DESIGN, PAYLOAD DEVELOPMENT, SAFETY AND MISSION ASSURANCE, NAVIGATION, AND MISSION OPERATIONS. SPECIFIC OBJECTIVES TO ADDRESS THE PHASE A CRITERIA AND GUIDELINES ARE: - PROJECT MANAGEMENT FOR THE PHASE A CONTRACT - CONDUCT AND SUPPORT OF PHASE A PROJECT REVIEWS - PHASE B/C/D/E SPACECRAFT DEVELOPMENT AND MISSION PLANNING - PHASE B/C/D/E COST ESTIMATES - CONCEPT STUDY REPORT PREPARATION - ORALS/SITE VISIT SUPPORT BY KEY PERSONNEL
Mar 25, 202023$682.0KPSYCHE: JOURNEY TO A METAL WORLD THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE PHASE A CONCEPT DEFINITION PORTION OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014. THE MISSION PRINCIPAL INVESTIGATOR (PI), DR. LINDA ELKINS-TANTON, OF THE SCHOOL OF EARTH AND SPACE EXPLORATION AT ARIZONA STATE UNIVERSITY (ASU), IS RESPONSIBLE FOR THE SUCCESS AND SCIENTIFIC INTEGRITY OF THE MISSION. AS SUCH, THE PI SHALL LEAD THE PROJECT, MANAGE PROJECT RESOURCES, AND DIRECT ALL ACTIVITIES OF THE SCIENCE TEAM CARRIED OUT IN SUPPORT OF THE MISSION. SPECIFICALLY, DURING PHASE A, THE PI WILL LEAD THE MISSION TEAM IN CONDUCTING THE CONCEPT STUDY REPORT AND ASSOCIATED SITE VISIT. SHOULD THE MISSION BE SELECTED TO CONTINUE INTO PHASE B, THE PI WILL LEAD THE TEAM THROUGH THE INITIATION OF THE PHASE B EFFORT WITH A TRANSITION PHASE BETWEEN NOTIFICATION OF AWARD AND ESTABLISHMENT OF THE PHASE B CONTRACT. THE PI IS ASSISTED BY A DEPUTY PI, DR. JAMES BELL AT ARIZONA STATE UNIVERSITY. JET PROPULSION LABORATORY (JPL) IS THE MISSION MAJOR PARTNER FOR SPACECRAFT DEVELOPMENT AND MISSION IMPLEMENTATION, AND SHALL SUPPORT THE PI WITH A PROJECT TEAM EXPERIENCED IN MANAGEMENT, SYSTEMS ENGINEERING, MISSION DESIGN, PAYLOAD DEVELOPMENT, SAFETY AND MISSION ASSURANCE, NAVIGATION, AND MISSION OPERATIONS. SPECIFIC OBJECTIVES TO ADDRESS THE PHASE A CRITERIA AND GUIDELINES ARE: - PROJECT MANAGEMENT FOR THE PHASE A CONTRACT - CONDUCT AND SUPPORT OF PHASE A PROJECT REVIEWS - PHASE B/C/D/E SPACECRAFT DEVELOPMENT AND MISSION PLANNING - PHASE B/C/D/E COST ESTIMATES - CONCEPT STUDY REPORT PREPARATION - ORALS/SITE VISIT SUPPORT BY KEY PERSONNEL THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE PHASE A CONCEPT DEFINITION PORTION OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014. THE MISSION PRINCIPAL INVESTIGATOR (PI), DR. LINDA ELKINS-TANTON, OF THE SCHOOL OF EARTH AND SPACE EXPLORATION AT ARIZONA STATE UNIVERSITY (ASU), IS RESPONSIBLE FOR THE SUCCESS AND SCIENTIFIC INTEGRITY OF THE MISSION. AS SUCH, THE PI SHALL LEAD THE PROJECT, MANAGE PROJECT RESOURCES, AND DIRECT ALL ACTIVITIES OF THE SCIENCE TEAM CARRIED OUT IN SUPPORT OF THE MISSION. SPECIFICALLY, DURING PHASE A, THE PI WILL LEAD THE MISSION TEAM IN CONDUCTING THE CONCEPT STUDY REPORT AND ASSOCIATED SITE VISIT. SHOULD THE MISSION BE SELECTED TO CONTINUE INTO PHASE B, THE PI WILL LEAD THE TEAM THROUGH THE INITIATION OF THE PHASE B EFFORT WITH A TRANSITION PHASE BETWEEN NOTIFICATION OF AWARD AND ESTABLISHMENT OF THE PHASE B CONTRACT. THE PI IS ASSISTED BY A DEPUTY PI, DR. JAMES BELL AT ARIZONA STATE UNIVERSITY. JET PROPULSION LABORATORY (JPL) IS THE MISSION MAJOR PARTNER FOR SPACECRAFT DEVELOPMENT AND MISSION IMPLEMENTATION, AND SHALL SUPPORT THE PI WITH A PROJECT TEAM EXPERIENCED IN MANAGEMENT, SYSTEMS ENGINEERING, MISSION DESIGN, PAYLOAD DEVELOPMENT, SAFETY AND MISSION ASSURANCE, NAVIGATION, AND MISSION OPERATIONS. SPECIFIC OBJECTIVES TO ADDRESS THE PHASE A CRITERIA AND GUIDELINES ARE: - PROJECT MANAGEMENT FOR THE PHASE A CONTRACT - CONDUCT AND SUPPORT OF PHASE A PROJECT REVIEWS - PHASE B/C/D/E SPACECRAFT DEVELOPMENT AND MISSION PLANNING - PHASE B/C/D/E COST ESTIMATES - CONCEPT STUDY REPORT PREPARATION - ORALS/SITE VISIT SUPPORT BY KEY PERSONNEL
Mar 13, 202022$0PSYCHE: JOURNEY TO A METAL WORLD THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE PHASE A CONCEPT DEFINITION PORTION OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014. THE MISSION PRINCIPAL INVESTIGATOR (PI), DR. LINDA ELKINS-TANTON, OF THE SCHOOL OF EARTH AND SPACE EXPLORATION AT ARIZONA STATE UNIVERSITY (ASU), IS RESPONSIBLE FOR THE SUCCESS AND SCIENTIFIC INTEGRITY OF THE MISSION. AS SUCH, THE PI SHALL LEAD THE PROJECT, MANAGE PROJECT RESOURCES, AND DIRECT ALL ACTIVITIES OF THE SCIENCE TEAM CARRIED OUT IN SUPPORT OF THE MISSION. SPECIFICALLY, DURING PHASE A, THE PI WILL LEAD THE MISSION TEAM IN CONDUCTING THE CONCEPT STUDY REPORT AND ASSOCIATED SITE VISIT. SHOULD THE MISSION BE SELECTED TO CONTINUE INTO PHASE B, THE PI WILL LEAD THE TEAM THROUGH THE INITIATION OF THE PHASE B EFFORT WITH A TRANSITION PHASE BETWEEN NOTIFICATION OF AWARD AND ESTABLISHMENT OF THE PHASE B CONTRACT. THE PI IS ASSISTED BY A DEPUTY PI, DR. JAMES BELL AT ARIZONA STATE UNIVERSITY. JET PROPULSION LABORATORY (JPL) IS THE MISSION MAJOR PARTNER FOR SPACECRAFT DEVELOPMENT AND MISSION IMPLEMENTATION, AND SHALL SUPPORT THE PI WITH A PROJECT TEAM EXPERIENCED IN MANAGEMENT, SYSTEMS ENGINEERING, MISSION DESIGN, PAYLOAD DEVELOPMENT, SAFETY AND MISSION ASSURANCE, NAVIGATION, AND MISSION OPERATIONS. SPECIFIC OBJECTIVES TO ADDRESS THE PHASE A CRITERIA AND GUIDELINES ARE: - PROJECT MANAGEMENT FOR THE PHASE A CONTRACT - CONDUCT AND SUPPORT OF PHASE A PROJECT REVIEWS - PHASE B/C/D/E SPACECRAFT DEVELOPMENT AND MISSION PLANNING - PHASE B/C/D/E COST ESTIMATES - CONCEPT STUDY REPORT PREPARATION - ORALS/SITE VISIT SUPPORT BY KEY PERSONNEL THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE PHASE A CONCEPT DEFINITION PORTION OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014. THE MISSION PRINCIPAL INVESTIGATOR (PI), DR. LINDA ELKINS-TANTON, OF THE SCHOOL OF EARTH AND SPACE EXPLORATION AT ARIZONA STATE UNIVERSITY (ASU), IS RESPONSIBLE FOR THE SUCCESS AND SCIENTIFIC INTEGRITY OF THE MISSION. AS SUCH, THE PI SHALL LEAD THE PROJECT, MANAGE PROJECT RESOURCES, AND DIRECT ALL ACTIVITIES OF THE SCIENCE TEAM CARRIED OUT IN SUPPORT OF THE MISSION. SPECIFICALLY, DURING PHASE A, THE PI WILL LEAD THE MISSION TEAM IN CONDUCTING THE CONCEPT STUDY REPORT AND ASSOCIATED SITE VISIT. SHOULD THE MISSION BE SELECTED TO CONTINUE INTO PHASE B, THE PI WILL LEAD THE TEAM THROUGH THE INITIATION OF THE PHASE B EFFORT WITH A TRANSITION PHASE BETWEEN NOTIFICATION OF AWARD AND ESTABLISHMENT OF THE PHASE B CONTRACT. THE PI IS ASSISTED BY A DEPUTY PI, DR. JAMES BELL AT ARIZONA STATE UNIVERSITY. JET PROPULSION LABORATORY (JPL) IS THE MISSION MAJOR PARTNER FOR SPACECRAFT DEVELOPMENT AND MISSION IMPLEMENTATION, AND SHALL SUPPORT THE PI WITH A PROJECT TEAM EXPERIENCED IN MANAGEMENT, SYSTEMS ENGINEERING, MISSION DESIGN, PAYLOAD DEVELOPMENT, SAFETY AND MISSION ASSURANCE, NAVIGATION, AND MISSION OPERATIONS. SPECIFIC OBJECTIVES TO ADDRESS THE PHASE A CRITERIA AND GUIDELINES ARE: - PROJECT MANAGEMENT FOR THE PHASE A CONTRACT - CONDUCT AND SUPPORT OF PHASE A PROJECT REVIEWS - PHASE B/C/D/E SPACECRAFT DEVELOPMENT AND MISSION PLANNING - PHASE B/C/D/E COST ESTIMATES - CONCEPT STUDY REPORT PREPARATION - ORALS/SITE VISIT SUPPORT BY KEY PERSONNEL
Feb 20, 202021$4.1MPSYCHE: JOURNEY TO A METAL WORLD THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE PHASE A CONCEPT DEFINITION PORTION OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014. THE MISSION PRINCIPAL INVESTIGATOR (PI), DR. LINDA ELKINS-TANTON, OF THE SCHOOL OF EARTH AND SPACE EXPLORATION AT ARIZONA STATE UNIVERSITY (ASU), IS RESPONSIBLE FOR THE SUCCESS AND SCIENTIFIC INTEGRITY OF THE MISSION. AS SUCH, THE PI SHALL LEAD THE PROJECT, MANAGE PROJECT RESOURCES, AND DIRECT ALL ACTIVITIES OF THE SCIENCE TEAM CARRIED OUT IN SUPPORT OF THE MISSION. SPECIFICALLY, DURING PHASE A, THE PI WILL LEAD THE MISSION TEAM IN CONDUCTING THE CONCEPT STUDY REPORT AND ASSOCIATED SITE VISIT. SHOULD THE MISSION BE SELECTED TO CONTINUE INTO PHASE B, THE PI WILL LEAD THE TEAM THROUGH THE INITIATION OF THE PHASE B EFFORT WITH A TRANSITION PHASE BETWEEN NOTIFICATION OF AWARD AND ESTABLISHMENT OF THE PHASE B CONTRACT. THE PI IS ASSISTED BY A DEPUTY PI, DR. JAMES BELL AT ARIZONA STATE UNIVERSITY. JET PROPULSION LABORATORY (JPL) IS THE MISSION MAJOR PARTNER FOR SPACECRAFT DEVELOPMENT AND MISSION IMPLEMENTATION, AND SHALL SUPPORT THE PI WITH A PROJECT TEAM EXPERIENCED IN MANAGEMENT, SYSTEMS ENGINEERING, MISSION DESIGN, PAYLOAD DEVELOPMENT, SAFETY AND MISSION ASSURANCE, NAVIGATION, AND MISSION OPERATIONS. SPECIFIC OBJECTIVES TO ADDRESS THE PHASE A CRITERIA AND GUIDELINES ARE: - PROJECT MANAGEMENT FOR THE PHASE A CONTRACT - CONDUCT AND SUPPORT OF PHASE A PROJECT REVIEWS - PHASE B/C/D/E SPACECRAFT DEVELOPMENT AND MISSION PLANNING - PHASE B/C/D/E COST ESTIMATES - CONCEPT STUDY REPORT PREPARATION - ORALS/SITE VISIT SUPPORT BY KEY PERSONNEL THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE PHASE A CONCEPT DEFINITION PORTION OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014. THE MISSION PRINCIPAL INVESTIGATOR (PI), DR. LINDA ELKINS-TANTON, OF THE SCHOOL OF EARTH AND SPACE EXPLORATION AT ARIZONA STATE UNIVERSITY (ASU), IS RESPONSIBLE FOR THE SUCCESS AND SCIENTIFIC INTEGRITY OF THE MISSION. AS SUCH, THE PI SHALL LEAD THE PROJECT, MANAGE PROJECT RESOURCES, AND DIRECT ALL ACTIVITIES OF THE SCIENCE TEAM CARRIED OUT IN SUPPORT OF THE MISSION. SPECIFICALLY, DURING PHASE A, THE PI WILL LEAD THE MISSION TEAM IN CONDUCTING THE CONCEPT STUDY REPORT AND ASSOCIATED SITE VISIT. SHOULD THE MISSION BE SELECTED TO CONTINUE INTO PHASE B, THE PI WILL LEAD THE TEAM THROUGH THE INITIATION OF THE PHASE B EFFORT WITH A TRANSITION PHASE BETWEEN NOTIFICATION OF AWARD AND ESTABLISHMENT OF THE PHASE B CONTRACT. THE PI IS ASSISTED BY A DEPUTY PI, DR. JAMES BELL AT ARIZONA STATE UNIVERSITY. JET PROPULSION LABORATORY (JPL) IS THE MISSION MAJOR PARTNER FOR SPACECRAFT DEVELOPMENT AND MISSION IMPLEMENTATION, AND SHALL SUPPORT THE PI WITH A PROJECT TEAM EXPERIENCED IN MANAGEMENT, SYSTEMS ENGINEERING, MISSION DESIGN, PAYLOAD DEVELOPMENT, SAFETY AND MISSION ASSURANCE, NAVIGATION, AND MISSION OPERATIONS. SPECIFIC OBJECTIVES TO ADDRESS THE PHASE A CRITERIA AND GUIDELINES ARE: - PROJECT MANAGEMENT FOR THE PHASE A CONTRACT - CONDUCT AND SUPPORT OF PHASE A PROJECT REVIEWS - PHASE B/C/D/E SPACECRAFT DEVELOPMENT AND MISSION PLANNING - PHASE B/C/D/E COST ESTIMATES - CONCEPT STUDY REPORT PREPARATION - ORALS/SITE VISIT SUPPORT BY KEY PERSONNEL
Dec 11, 201920$899.9KPSYCHE: JOURNEY TO A METAL WORLD THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE PHASE A CONCEPT DEFINITION PORTION OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014. THE MISSION PRINCIPAL INVESTIGATOR (PI), DR. LINDA ELKINS-TANTON, OF THE SCHOOL OF EARTH AND SPACE EXPLORATION AT ARIZONA STATE UNIVERSITY (ASU), IS RESPONSIBLE FOR THE SUCCESS AND SCIENTIFIC INTEGRITY OF THE MISSION. AS SUCH, THE PI SHALL LEAD THE PROJECT, MANAGE PROJECT RESOURCES, AND DIRECT ALL ACTIVITIES OF THE SCIENCE TEAM CARRIED OUT IN SUPPORT OF THE MISSION. SPECIFICALLY, DURING PHASE A, THE PI WILL LEAD THE MISSION TEAM IN CONDUCTING THE CONCEPT STUDY REPORT AND ASSOCIATED SITE VISIT. SHOULD THE MISSION BE SELECTED TO CONTINUE INTO PHASE B, THE PI WILL LEAD THE TEAM THROUGH THE INITIATION OF THE PHASE B EFFORT WITH A TRANSITION PHASE BETWEEN NOTIFICATION OF AWARD AND ESTABLISHMENT OF THE PHASE B CONTRACT. THE PI IS ASSISTED BY A DEPUTY PI, DR. JAMES BELL AT ARIZONA STATE UNIVERSITY. JET PROPULSION LABORATORY (JPL) IS THE MISSION MAJOR PARTNER FOR SPACECRAFT DEVELOPMENT AND MISSION IMPLEMENTATION, AND SHALL SUPPORT THE PI WITH A PROJECT TEAM EXPERIENCED IN MANAGEMENT, SYSTEMS ENGINEERING, MISSION DESIGN, PAYLOAD DEVELOPMENT, SAFETY AND MISSION ASSURANCE, NAVIGATION, AND MISSION OPERATIONS. SPECIFIC OBJECTIVES TO ADDRESS THE PHASE A CRITERIA AND GUIDELINES ARE: - PROJECT MANAGEMENT FOR THE PHASE A CONTRACT - CONDUCT AND SUPPORT OF PHASE A PROJECT REVIEWS - PHASE B/C/D/E SPACECRAFT DEVELOPMENT AND MISSION PLANNING - PHASE B/C/D/E COST ESTIMATES - CONCEPT STUDY REPORT PREPARATION - ORALS/SITE VISIT SUPPORT BY KEY PERSONNEL THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE PHASE A CONCEPT DEFINITION PORTION OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014. THE MISSION PRINCIPAL INVESTIGATOR (PI), DR. LINDA ELKINS-TANTON, OF THE SCHOOL OF EARTH AND SPACE EXPLORATION AT ARIZONA STATE UNIVERSITY (ASU), IS RESPONSIBLE FOR THE SUCCESS AND SCIENTIFIC INTEGRITY OF THE MISSION. AS SUCH, THE PI SHALL LEAD THE PROJECT, MANAGE PROJECT RESOURCES, AND DIRECT ALL ACTIVITIES OF THE SCIENCE TEAM CARRIED OUT IN SUPPORT OF THE MISSION. SPECIFICALLY, DURING PHASE A, THE PI WILL LEAD THE MISSION TEAM IN CONDUCTING THE CONCEPT STUDY REPORT AND ASSOCIATED SITE VISIT. SHOULD THE MISSION BE SELECTED TO CONTINUE INTO PHASE B, THE PI WILL LEAD THE TEAM THROUGH THE INITIATION OF THE PHASE B EFFORT WITH A TRANSITION PHASE BETWEEN NOTIFICATION OF AWARD AND ESTABLISHMENT OF THE PHASE B CONTRACT. THE PI IS ASSISTED BY A DEPUTY PI, DR. JAMES BELL AT ARIZONA STATE UNIVERSITY. JET PROPULSION LABORATORY (JPL) IS THE MISSION MAJOR PARTNER FOR SPACECRAFT DEVELOPMENT AND MISSION IMPLEMENTATION, AND SHALL SUPPORT THE PI WITH A PROJECT TEAM EXPERIENCED IN MANAGEMENT, SYSTEMS ENGINEERING, MISSION DESIGN, PAYLOAD DEVELOPMENT, SAFETY AND MISSION ASSURANCE, NAVIGATION, AND MISSION OPERATIONS. SPECIFIC OBJECTIVES TO ADDRESS THE PHASE A CRITERIA AND GUIDELINES ARE: - PROJECT MANAGEMENT FOR THE PHASE A CONTRACT - CONDUCT AND SUPPORT OF PHASE A PROJECT REVIEWS - PHASE B/C/D/E SPACECRAFT DEVELOPMENT AND MISSION PLANNING - PHASE B/C/D/E COST ESTIMATES - CONCEPT STUDY REPORT PREPARATION - ORALS/SITE VISIT SUPPORT BY KEY PERSONNEL
Nov 4, 201919$2.3MPSYCHE: JOURNEY TO A METAL WORLD THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE PHASE A CONCEPT DEFINITION PORTION OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014. THE MISSION PRINCIPAL INVESTIGATOR (PI), DR. LINDA ELKINS-TANTON, OF THE SCHOOL OF EARTH AND SPACE EXPLORATION AT ARIZONA STATE UNIVERSITY (ASU), IS RESPONSIBLE FOR THE SUCCESS AND SCIENTIFIC INTEGRITY OF THE MISSION. AS SUCH, THE PI SHALL LEAD THE PROJECT, MANAGE PROJECT RESOURCES, AND DIRECT ALL ACTIVITIES OF THE SCIENCE TEAM CARRIED OUT IN SUPPORT OF THE MISSION. SPECIFICALLY, DURING PHASE A, THE PI WILL LEAD THE MISSION TEAM IN CONDUCTING THE CONCEPT STUDY REPORT AND ASSOCIATED SITE VISIT. SHOULD THE MISSION BE SELECTED TO CONTINUE INTO PHASE B, THE PI WILL LEAD THE TEAM THROUGH THE INITIATION OF THE PHASE B EFFORT WITH A TRANSITION PHASE BETWEEN NOTIFICATION OF AWARD AND ESTABLISHMENT OF THE PHASE B CONTRACT. THE PI IS ASSISTED BY A DEPUTY PI, DR. JAMES BELL AT ARIZONA STATE UNIVERSITY. JET PROPULSION LABORATORY (JPL) IS THE MISSION MAJOR PARTNER FOR SPACECRAFT DEVELOPMENT AND MISSION IMPLEMENTATION, AND SHALL SUPPORT THE PI WITH A PROJECT TEAM EXPERIENCED IN MANAGEMENT, SYSTEMS ENGINEERING, MISSION DESIGN, PAYLOAD DEVELOPMENT, SAFETY AND MISSION ASSURANCE, NAVIGATION, AND MISSION OPERATIONS. SPECIFIC OBJECTIVES TO ADDRESS THE PHASE A CRITERIA AND GUIDELINES ARE: - PROJECT MANAGEMENT FOR THE PHASE A CONTRACT - CONDUCT AND SUPPORT OF PHASE A PROJECT REVIEWS - PHASE B/C/D/E SPACECRAFT DEVELOPMENT AND MISSION PLANNING - PHASE B/C/D/E COST ESTIMATES - CONCEPT STUDY REPORT PREPARATION - ORALS/SITE VISIT SUPPORT BY KEY PERSONNEL THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE PHASE A CONCEPT DEFINITION PORTION OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014. THE MISSION PRINCIPAL INVESTIGATOR (PI), DR. LINDA ELKINS-TANTON, OF THE SCHOOL OF EARTH AND SPACE EXPLORATION AT ARIZONA STATE UNIVERSITY (ASU), IS RESPONSIBLE FOR THE SUCCESS AND SCIENTIFIC INTEGRITY OF THE MISSION. AS SUCH, THE PI SHALL LEAD THE PROJECT, MANAGE PROJECT RESOURCES, AND DIRECT ALL ACTIVITIES OF THE SCIENCE TEAM CARRIED OUT IN SUPPORT OF THE MISSION. SPECIFICALLY, DURING PHASE A, THE PI WILL LEAD THE MISSION TEAM IN CONDUCTING THE CONCEPT STUDY REPORT AND ASSOCIATED SITE VISIT. SHOULD THE MISSION BE SELECTED TO CONTINUE INTO PHASE B, THE PI WILL LEAD THE TEAM THROUGH THE INITIATION OF THE PHASE B EFFORT WITH A TRANSITION PHASE BETWEEN NOTIFICATION OF AWARD AND ESTABLISHMENT OF THE PHASE B CONTRACT. THE PI IS ASSISTED BY A DEPUTY PI, DR. JAMES BELL AT ARIZONA STATE UNIVERSITY. JET PROPULSION LABORATORY (JPL) IS THE MISSION MAJOR PARTNER FOR SPACECRAFT DEVELOPMENT AND MISSION IMPLEMENTATION, AND SHALL SUPPORT THE PI WITH A PROJECT TEAM EXPERIENCED IN MANAGEMENT, SYSTEMS ENGINEERING, MISSION DESIGN, PAYLOAD DEVELOPMENT, SAFETY AND MISSION ASSURANCE, NAVIGATION, AND MISSION OPERATIONS. SPECIFIC OBJECTIVES TO ADDRESS THE PHASE A CRITERIA AND GUIDELINES ARE: - PROJECT MANAGEMENT FOR THE PHASE A CONTRACT - CONDUCT AND SUPPORT OF PHASE A PROJECT REVIEWS - PHASE B/C/D/E SPACECRAFT DEVELOPMENT AND MISSION PLANNING - PHASE B/C/D/E COST ESTIMATES - CONCEPT STUDY REPORT PREPARATION - ORALS/SITE VISIT SUPPORT BY KEY PERSONNEL
Aug 22, 201918$1.6MPSYCHE: JOURNEY TO A METAL WORLD THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE PHASE A CONCEPT DEFINITION PORTION OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014. THE MISSION PRINCIPAL INVESTIGATOR (PI), DR. LINDA ELKINS-TANTON, OF THE SCHOOL OF EARTH AND SPACE EXPLORATION AT ARIZONA STATE UNIVERSITY (ASU), IS RESPONSIBLE FOR THE SUCCESS AND SCIENTIFIC INTEGRITY OF THE MISSION. AS SUCH, THE PI SHALL LEAD THE PROJECT, MANAGE PROJECT RESOURCES, AND DIRECT ALL ACTIVITIES OF THE SCIENCE TEAM CARRIED OUT IN SUPPORT OF THE MISSION. SPECIFICALLY, DURING PHASE A, THE PI WILL LEAD THE MISSION TEAM IN CONDUCTING THE CONCEPT STUDY REPORT AND ASSOCIATED SITE VISIT. SHOULD THE MISSION BE SELECTED TO CONTINUE INTO PHASE B, THE PI WILL LEAD THE TEAM THROUGH THE INITIATION OF THE PHASE B EFFORT WITH A TRANSITION PHASE BETWEEN NOTIFICATION OF AWARD AND ESTABLISHMENT OF THE PHASE B CONTRACT. THE PI IS ASSISTED BY A DEPUTY PI, DR. JAMES BELL AT ARIZONA STATE UNIVERSITY. JET PROPULSION LABORATORY (JPL) IS THE MISSION MAJOR PARTNER FOR SPACECRAFT DEVELOPMENT AND MISSION IMPLEMENTATION, AND SHALL SUPPORT THE PI WITH A PROJECT TEAM EXPERIENCED IN MANAGEMENT, SYSTEMS ENGINEERING, MISSION DESIGN, PAYLOAD DEVELOPMENT, SAFETY AND MISSION ASSURANCE, NAVIGATION, AND MISSION OPERATIONS. SPECIFIC OBJECTIVES TO ADDRESS THE PHASE A CRITERIA AND GUIDELINES ARE: - PROJECT MANAGEMENT FOR THE PHASE A CONTRACT - CONDUCT AND SUPPORT OF PHASE A PROJECT REVIEWS - PHASE B/C/D/E SPACECRAFT DEVELOPMENT AND MISSION PLANNING - PHASE B/C/D/E COST ESTIMATES - CONCEPT STUDY REPORT PREPARATION - ORALS/SITE VISIT SUPPORT BY KEY PERSONNEL THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE PHASE A CONCEPT DEFINITION PORTION OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014. THE MISSION PRINCIPAL INVESTIGATOR (PI), DR. LINDA ELKINS-TANTON, OF THE SCHOOL OF EARTH AND SPACE EXPLORATION AT ARIZONA STATE UNIVERSITY (ASU), IS RESPONSIBLE FOR THE SUCCESS AND SCIENTIFIC INTEGRITY OF THE MISSION. AS SUCH, THE PI SHALL LEAD THE PROJECT, MANAGE PROJECT RESOURCES, AND DIRECT ALL ACTIVITIES OF THE SCIENCE TEAM CARRIED OUT IN SUPPORT OF THE MISSION. SPECIFICALLY, DURING PHASE A, THE PI WILL LEAD THE MISSION TEAM IN CONDUCTING THE CONCEPT STUDY REPORT AND ASSOCIATED SITE VISIT. SHOULD THE MISSION BE SELECTED TO CONTINUE INTO PHASE B, THE PI WILL LEAD THE TEAM THROUGH THE INITIATION OF THE PHASE B EFFORT WITH A TRANSITION PHASE BETWEEN NOTIFICATION OF AWARD AND ESTABLISHMENT OF THE PHASE B CONTRACT. THE PI IS ASSISTED BY A DEPUTY PI, DR. JAMES BELL AT ARIZONA STATE UNIVERSITY. JET PROPULSION LABORATORY (JPL) IS THE MISSION MAJOR PARTNER FOR SPACECRAFT DEVELOPMENT AND MISSION IMPLEMENTATION, AND SHALL SUPPORT THE PI WITH A PROJECT TEAM EXPERIENCED IN MANAGEMENT, SYSTEMS ENGINEERING, MISSION DESIGN, PAYLOAD DEVELOPMENT, SAFETY AND MISSION ASSURANCE, NAVIGATION, AND MISSION OPERATIONS. SPECIFIC OBJECTIVES TO ADDRESS THE PHASE A CRITERIA AND GUIDELINES ARE: - PROJECT MANAGEMENT FOR THE PHASE A CONTRACT - CONDUCT AND SUPPORT OF PHASE A PROJECT REVIEWS - PHASE B/C/D/E SPACECRAFT DEVELOPMENT AND MISSION PLANNING - PHASE B/C/D/E COST ESTIMATES - CONCEPT STUDY REPORT PREPARATION - ORALS/SITE VISIT SUPPORT BY KEY PERSONNEL
Jun 5, 201917$3.5MPSYCHE: JOURNEY TO A METAL WORLD THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE PHASE A CONCEPT DEFINITION PORTION OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014. THE MISSION PRINCIPAL INVESTIGATOR (PI), DR. LINDA ELKINS-TANTON, OF THE SCHOOL OF EARTH AND SPACE EXPLORATION AT ARIZONA STATE UNIVERSITY (ASU), IS RESPONSIBLE FOR THE SUCCESS AND SCIENTIFIC INTEGRITY OF THE MISSION. AS SUCH, THE PI SHALL LEAD THE PROJECT, MANAGE PROJECT RESOURCES, AND DIRECT ALL ACTIVITIES OF THE SCIENCE TEAM CARRIED OUT IN SUPPORT OF THE MISSION. SPECIFICALLY, DURING PHASE A, THE PI WILL LEAD THE MISSION TEAM IN CONDUCTING THE CONCEPT STUDY REPORT AND ASSOCIATED SITE VISIT. SHOULD THE MISSION BE SELECTED TO CONTINUE INTO PHASE B, THE PI WILL LEAD THE TEAM THROUGH THE INITIATION OF THE PHASE B EFFORT WITH A TRANSITION PHASE BETWEEN NOTIFICATION OF AWARD AND ESTABLISHMENT OF THE PHASE B CONTRACT. THE PI IS ASSISTED BY A DEPUTY PI, DR. JAMES BELL AT ARIZONA STATE UNIVERSITY. JET PROPULSION LABORATORY (JPL) IS THE MISSION MAJOR PARTNER FOR SPACECRAFT DEVELOPMENT AND MISSION IMPLEMENTATION, AND SHALL SUPPORT THE PI WITH A PROJECT TEAM EXPERIENCED IN MANAGEMENT, SYSTEMS ENGINEERING, MISSION DESIGN, PAYLOAD DEVELOPMENT, SAFETY AND MISSION ASSURANCE, NAVIGATION, AND MISSION OPERATIONS. SPECIFIC OBJECTIVES TO ADDRESS THE PHASE A CRITERIA AND GUIDELINES ARE: - PROJECT MANAGEMENT FOR THE PHASE A CONTRACT - CONDUCT AND SUPPORT OF PHASE A PROJECT REVIEWS - PHASE B/C/D/E SPACECRAFT DEVELOPMENT AND MISSION PLANNING - PHASE B/C/D/E COST ESTIMATES - CONCEPT STUDY REPORT PREPARATION - ORALS/SITE VISIT SUPPORT BY KEY PERSONNEL THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE PHASE A CONCEPT DEFINITION PORTION OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014. THE MISSION PRINCIPAL INVESTIGATOR (PI), DR. LINDA ELKINS-TANTON, OF THE SCHOOL OF EARTH AND SPACE EXPLORATION AT ARIZONA STATE UNIVERSITY (ASU), IS RESPONSIBLE FOR THE SUCCESS AND SCIENTIFIC INTEGRITY OF THE MISSION. AS SUCH, THE PI SHALL LEAD THE PROJECT, MANAGE PROJECT RESOURCES, AND DIRECT ALL ACTIVITIES OF THE SCIENCE TEAM CARRIED OUT IN SUPPORT OF THE MISSION. SPECIFICALLY, DURING PHASE A, THE PI WILL LEAD THE MISSION TEAM IN CONDUCTING THE CONCEPT STUDY REPORT AND ASSOCIATED SITE VISIT. SHOULD THE MISSION BE SELECTED TO CONTINUE INTO PHASE B, THE PI WILL LEAD THE TEAM THROUGH THE INITIATION OF THE PHASE B EFFORT WITH A TRANSITION PHASE BETWEEN NOTIFICATION OF AWARD AND ESTABLISHMENT OF THE PHASE B CONTRACT. THE PI IS ASSISTED BY A DEPUTY PI, DR. JAMES BELL AT ARIZONA STATE UNIVERSITY. JET PROPULSION LABORATORY (JPL) IS THE MISSION MAJOR PARTNER FOR SPACECRAFT DEVELOPMENT AND MISSION IMPLEMENTATION, AND SHALL SUPPORT THE PI WITH A PROJECT TEAM EXPERIENCED IN MANAGEMENT, SYSTEMS ENGINEERING, MISSION DESIGN, PAYLOAD DEVELOPMENT, SAFETY AND MISSION ASSURANCE, NAVIGATION, AND MISSION OPERATIONS. SPECIFIC OBJECTIVES TO ADDRESS THE PHASE A CRITERIA AND GUIDELINES ARE: - PROJECT MANAGEMENT FOR THE PHASE A CONTRACT - CONDUCT AND SUPPORT OF PHASE A PROJECT REVIEWS - PHASE B/C/D/E SPACECRAFT DEVELOPMENT AND MISSION PLANNING - PHASE B/C/D/E COST ESTIMATES - CONCEPT STUDY REPORT PREPARATION - ORALS/SITE VISIT SUPPORT BY KEY PERSONNEL
Jun 4, 201916$-3.5MPSYCHE: JOURNEY TO A METAL WORLD THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE PHASE A CONCEPT DEFINITION PORTION OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014. THE MISSION PRINCIPAL INVESTIGATOR (PI), DR. LINDA ELKINS-TANTON, OF THE SCHOOL OF EARTH AND SPACE EXPLORATION AT ARIZONA STATE UNIVERSITY (ASU), IS RESPONSIBLE FOR THE SUCCESS AND SCIENTIFIC INTEGRITY OF THE MISSION. AS SUCH, THE PI SHALL LEAD THE PROJECT, MANAGE PROJECT RESOURCES, AND DIRECT ALL ACTIVITIES OF THE SCIENCE TEAM CARRIED OUT IN SUPPORT OF THE MISSION. SPECIFICALLY, DURING PHASE A, THE PI WILL LEAD THE MISSION TEAM IN CONDUCTING THE CONCEPT STUDY REPORT AND ASSOCIATED SITE VISIT. SHOULD THE MISSION BE SELECTED TO CONTINUE INTO PHASE B, THE PI WILL LEAD THE TEAM THROUGH THE INITIATION OF THE PHASE B EFFORT WITH A TRANSITION PHASE BETWEEN NOTIFICATION OF AWARD AND ESTABLISHMENT OF THE PHASE B CONTRACT. THE PI IS ASSISTED BY A DEPUTY PI, DR. JAMES BELL AT ARIZONA STATE UNIVERSITY. JET PROPULSION LABORATORY (JPL) IS THE MISSION MAJOR PARTNER FOR SPACECRAFT DEVELOPMENT AND MISSION IMPLEMENTATION, AND SHALL SUPPORT THE PI WITH A PROJECT TEAM EXPERIENCED IN MANAGEMENT, SYSTEMS ENGINEERING, MISSION DESIGN, PAYLOAD DEVELOPMENT, SAFETY AND MISSION ASSURANCE, NAVIGATION, AND MISSION OPERATIONS. SPECIFIC OBJECTIVES TO ADDRESS THE PHASE A CRITERIA AND GUIDELINES ARE: - PROJECT MANAGEMENT FOR THE PHASE A CONTRACT - CONDUCT AND SUPPORT OF PHASE A PROJECT REVIEWS - PHASE B/C/D/E SPACECRAFT DEVELOPMENT AND MISSION PLANNING - PHASE B/C/D/E COST ESTIMATES - CONCEPT STUDY REPORT PREPARATION - ORALS/SITE VISIT SUPPORT BY KEY PERSONNEL THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE PHASE A CONCEPT DEFINITION PORTION OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014. THE MISSION PRINCIPAL INVESTIGATOR (PI), DR. LINDA ELKINS-TANTON, OF THE SCHOOL OF EARTH AND SPACE EXPLORATION AT ARIZONA STATE UNIVERSITY (ASU), IS RESPONSIBLE FOR THE SUCCESS AND SCIENTIFIC INTEGRITY OF THE MISSION. AS SUCH, THE PI SHALL LEAD THE PROJECT, MANAGE PROJECT RESOURCES, AND DIRECT ALL ACTIVITIES OF THE SCIENCE TEAM CARRIED OUT IN SUPPORT OF THE MISSION. SPECIFICALLY, DURING PHASE A, THE PI WILL LEAD THE MISSION TEAM IN CONDUCTING THE CONCEPT STUDY REPORT AND ASSOCIATED SITE VISIT. SHOULD THE MISSION BE SELECTED TO CONTINUE INTO PHASE B, THE PI WILL LEAD THE TEAM THROUGH THE INITIATION OF THE PHASE B EFFORT WITH A TRANSITION PHASE BETWEEN NOTIFICATION OF AWARD AND ESTABLISHMENT OF THE PHASE B CONTRACT. THE PI IS ASSISTED BY A DEPUTY PI, DR. JAMES BELL AT ARIZONA STATE UNIVERSITY. JET PROPULSION LABORATORY (JPL) IS THE MISSION MAJOR PARTNER FOR SPACECRAFT DEVELOPMENT AND MISSION IMPLEMENTATION, AND SHALL SUPPORT THE PI WITH A PROJECT TEAM EXPERIENCED IN MANAGEMENT, SYSTEMS ENGINEERING, MISSION DESIGN, PAYLOAD DEVELOPMENT, SAFETY AND MISSION ASSURANCE, NAVIGATION, AND MISSION OPERATIONS. SPECIFIC OBJECTIVES TO ADDRESS THE PHASE A CRITERIA AND GUIDELINES ARE: - PROJECT MANAGEMENT FOR THE PHASE A CONTRACT - CONDUCT AND SUPPORT OF PHASE A PROJECT REVIEWS - PHASE B/C/D/E SPACECRAFT DEVELOPMENT AND MISSION PLANNING - PHASE B/C/D/E COST ESTIMATES - CONCEPT STUDY REPORT PREPARATION - ORALS/SITE VISIT SUPPORT BY KEY PERSONNEL
May 29, 201915$3.5MPSYCHE: JOURNEY TO A METAL WORLD THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE PHASE A CONCEPT DEFINITION PORTION OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014. THE MISSION PRINCIPAL INVESTIGATOR (PI), DR. LINDA ELKINS-TANTON, OF THE SCHOOL OF EARTH AND SPACE EXPLORATION AT ARIZONA STATE UNIVERSITY (ASU), IS RESPONSIBLE FOR THE SUCCESS AND SCIENTIFIC INTEGRITY OF THE MISSION. AS SUCH, THE PI SHALL LEAD THE PROJECT, MANAGE PROJECT RESOURCES, AND DIRECT ALL ACTIVITIES OF THE SCIENCE TEAM CARRIED OUT IN SUPPORT OF THE MISSION. SPECIFICALLY, DURING PHASE A, THE PI WILL LEAD THE MISSION TEAM IN CONDUCTING THE CONCEPT STUDY REPORT AND ASSOCIATED SITE VISIT. SHOULD THE MISSION BE SELECTED TO CONTINUE INTO PHASE B, THE PI WILL LEAD THE TEAM THROUGH THE INITIATION OF THE PHASE B EFFORT WITH A TRANSITION PHASE BETWEEN NOTIFICATION OF AWARD AND ESTABLISHMENT OF THE PHASE B CONTRACT. THE PI IS ASSISTED BY A DEPUTY PI, DR. JAMES BELL AT ARIZONA STATE UNIVERSITY. JET PROPULSION LABORATORY (JPL) IS THE MISSION MAJOR PARTNER FOR SPACECRAFT DEVELOPMENT AND MISSION IMPLEMENTATION, AND SHALL SUPPORT THE PI WITH A PROJECT TEAM EXPERIENCED IN MANAGEMENT, SYSTEMS ENGINEERING, MISSION DESIGN, PAYLOAD DEVELOPMENT, SAFETY AND MISSION ASSURANCE, NAVIGATION, AND MISSION OPERATIONS. SPECIFIC OBJECTIVES TO ADDRESS THE PHASE A CRITERIA AND GUIDELINES ARE: - PROJECT MANAGEMENT FOR THE PHASE A CONTRACT - CONDUCT AND SUPPORT OF PHASE A PROJECT REVIEWS - PHASE B/C/D/E SPACECRAFT DEVELOPMENT AND MISSION PLANNING - PHASE B/C/D/E COST ESTIMATES - CONCEPT STUDY REPORT PREPARATION - ORALS/SITE VISIT SUPPORT BY KEY PERSONNEL THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE PHASE A CONCEPT DEFINITION PORTION OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014. THE MISSION PRINCIPAL INVESTIGATOR (PI), DR. LINDA ELKINS-TANTON, OF THE SCHOOL OF EARTH AND SPACE EXPLORATION AT ARIZONA STATE UNIVERSITY (ASU), IS RESPONSIBLE FOR THE SUCCESS AND SCIENTIFIC INTEGRITY OF THE MISSION. AS SUCH, THE PI SHALL LEAD THE PROJECT, MANAGE PROJECT RESOURCES, AND DIRECT ALL ACTIVITIES OF THE SCIENCE TEAM CARRIED OUT IN SUPPORT OF THE MISSION. SPECIFICALLY, DURING PHASE A, THE PI WILL LEAD THE MISSION TEAM IN CONDUCTING THE CONCEPT STUDY REPORT AND ASSOCIATED SITE VISIT. SHOULD THE MISSION BE SELECTED TO CONTINUE INTO PHASE B, THE PI WILL LEAD THE TEAM THROUGH THE INITIATION OF THE PHASE B EFFORT WITH A TRANSITION PHASE BETWEEN NOTIFICATION OF AWARD AND ESTABLISHMENT OF THE PHASE B CONTRACT. THE PI IS ASSISTED BY A DEPUTY PI, DR. JAMES BELL AT ARIZONA STATE UNIVERSITY. JET PROPULSION LABORATORY (JPL) IS THE MISSION MAJOR PARTNER FOR SPACECRAFT DEVELOPMENT AND MISSION IMPLEMENTATION, AND SHALL SUPPORT THE PI WITH A PROJECT TEAM EXPERIENCED IN MANAGEMENT, SYSTEMS ENGINEERING, MISSION DESIGN, PAYLOAD DEVELOPMENT, SAFETY AND MISSION ASSURANCE, NAVIGATION, AND MISSION OPERATIONS. SPECIFIC OBJECTIVES TO ADDRESS THE PHASE A CRITERIA AND GUIDELINES ARE: - PROJECT MANAGEMENT FOR THE PHASE A CONTRACT - CONDUCT AND SUPPORT OF PHASE A PROJECT REVIEWS - PHASE B/C/D/E SPACECRAFT DEVELOPMENT AND MISSION PLANNING - PHASE B/C/D/E COST ESTIMATES - CONCEPT STUDY REPORT PREPARATION - ORALS/SITE VISIT SUPPORT BY KEY PERSONNEL
Nov 16, 201814$0PSYCHE: JOURNEY TO A METAL WORLD THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE PHASE A CONCEPT DEFINITION PORTION OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014. THE MISSION PRINCIPAL INVESTIGATOR (PI), DR. LINDA ELKINS-TANTON, OF THE SCHOOL OF EARTH AND SPACE EXPLORATION AT ARIZONA STATE UNIVERSITY (ASU), IS RESPONSIBLE FOR THE SUCCESS AND SCIENTIFIC INTEGRITY OF THE MISSION. AS SUCH, THE PI SHALL LEAD THE PROJECT, MANAGE PROJECT RESOURCES, AND DIRECT ALL ACTIVITIES OF THE SCIENCE TEAM CARRIED OUT IN SUPPORT OF THE MISSION. SPECIFICALLY, DURING PHASE A, THE PI WILL LEAD THE MISSION TEAM IN CONDUCTING THE CONCEPT STUDY REPORT AND ASSOCIATED SITE VISIT. SHOULD THE MISSION BE SELECTED TO CONTINUE INTO PHASE B, THE PI WILL LEAD THE TEAM THROUGH THE INITIATION OF THE PHASE B EFFORT WITH A TRANSITION PHASE BETWEEN NOTIFICATION OF AWARD AND ESTABLISHMENT OF THE PHASE B CONTRACT. THE PI IS ASSISTED BY A DEPUTY PI, DR. JAMES BELL AT ARIZONA STATE UNIVERSITY. JET PROPULSION LABORATORY (JPL) IS THE MISSION MAJOR PARTNER FOR SPACECRAFT DEVELOPMENT AND MISSION IMPLEMENTATION, AND SHALL SUPPORT THE PI WITH A PROJECT TEAM EXPERIENCED IN MANAGEMENT, SYSTEMS ENGINEERING, MISSION DESIGN, PAYLOAD DEVELOPMENT, SAFETY AND MISSION ASSURANCE, NAVIGATION, AND MISSION OPERATIONS. SPECIFIC OBJECTIVES TO ADDRESS THE PHASE A CRITERIA AND GUIDELINES ARE: - PROJECT MANAGEMENT FOR THE PHASE A CONTRACT - CONDUCT AND SUPPORT OF PHASE A PROJECT REVIEWS - PHASE B/C/D/E SPACECRAFT DEVELOPMENT AND MISSION PLANNING - PHASE B/C/D/E COST ESTIMATES - CONCEPT STUDY REPORT PREPARATION - ORALS/SITE VISIT SUPPORT BY KEY PERSONNEL THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE PHASE A CONCEPT DEFINITION PORTION OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014. THE MISSION PRINCIPAL INVESTIGATOR (PI), DR. LINDA ELKINS-TANTON, OF THE SCHOOL OF EARTH AND SPACE EXPLORATION AT ARIZONA STATE UNIVERSITY (ASU), IS RESPONSIBLE FOR THE SUCCESS AND SCIENTIFIC INTEGRITY OF THE MISSION. AS SUCH, THE PI SHALL LEAD THE PROJECT, MANAGE PROJECT RESOURCES, AND DIRECT ALL ACTIVITIES OF THE SCIENCE TEAM CARRIED OUT IN SUPPORT OF THE MISSION. SPECIFICALLY, DURING PHASE A, THE PI WILL LEAD THE MISSION TEAM IN CONDUCTING THE CONCEPT STUDY REPORT AND ASSOCIATED SITE VISIT. SHOULD THE MISSION BE SELECTED TO CONTINUE INTO PHASE B, THE PI WILL LEAD THE TEAM THROUGH THE INITIATION OF THE PHASE B EFFORT WITH A TRANSITION PHASE BETWEEN NOTIFICATION OF AWARD AND ESTABLISHMENT OF THE PHASE B CONTRACT. THE PI IS ASSISTED BY A DEPUTY PI, DR. JAMES BELL AT ARIZONA STATE UNIVERSITY. JET PROPULSION LABORATORY (JPL) IS THE MISSION MAJOR PARTNER FOR SPACECRAFT DEVELOPMENT AND MISSION IMPLEMENTATION, AND SHALL SUPPORT THE PI WITH A PROJECT TEAM EXPERIENCED IN MANAGEMENT, SYSTEMS ENGINEERING, MISSION DESIGN, PAYLOAD DEVELOPMENT, SAFETY AND MISSION ASSURANCE, NAVIGATION, AND MISSION OPERATIONS. SPECIFIC OBJECTIVES TO ADDRESS THE PHASE A CRITERIA AND GUIDELINES ARE: - PROJECT MANAGEMENT FOR THE PHASE A CONTRACT - CONDUCT AND SUPPORT OF PHASE A PROJECT REVIEWS - PHASE B/C/D/E SPACECRAFT DEVELOPMENT AND MISSION PLANNING - PHASE B/C/D/E COST ESTIMATES - CONCEPT STUDY REPORT PREPARATION - ORALS/SITE VISIT SUPPORT BY KEY PERSONNEL
Oct 23, 201813$1.8MIGF::CL,CT::IGF PSYCHE: JOURNEY TO A METAL WORLD THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE PHASE A CONCEPT DEFINITION PORTION OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014. THE MISSION PRINCIPAL INVESTIGATOR (PI), DR. LINDA ELKINS-TANTON, OF THE SCHOOL OF EARTH AND SPACE EXPLORATION AT ARIZONA STATE UNIVERSITY (ASU), IS RESPONSIBLE FOR THE SUCCESS AND SCIENTIFIC INTEGRITY OF THE MISSION. AS SUCH, THE PI SHALL LEAD THE PROJECT, MANAGE PROJECT RESOURCES, AND DIRECT ALL ACTIVITIES OF THE SCIENCE TEAM CARRIED OUT IN SUPPORT OF THE MISSION. SPECIFICALLY, DURING PHASE A, THE PI WILL LEAD THE MISSION TEAM IN CONDUCTING THE CONCEPT STUDY REPORT AND ASSOCIATED SITE VISIT. SHOULD THE MISSION BE SELECTED TO CONTINUE INTO PHASE B, THE PI WILL LEAD THE TEAM THROUGH THE INITIATION OF THE PHASE B EFFORT WITH A TRANSITION PHASE BETWEEN NOTIFICATION OF AWARD AND ESTABLISHMENT OF THE PHASE B CONTRACT. THE PI IS ASSISTED BY A DEPUTY PI, DR. JAMES BELL AT ARIZONA STATE UNIVERSITY. JET PROPULSION LABORATORY (JPL) IS THE MISSION MAJOR PARTNER FOR SPACECRAFT DEVELOPMENT AND MISSION IMPLEMENTATION, AND SHALL SUPPORT THE PI WITH A PROJECT TEAM EXPERIENCED IN MANAGEMENT, SYSTEMS ENGINEERING, MISSION DESIGN, PAYLOAD DEVELOPMENT, SAFETY AND MISSION ASSURANCE, NAVIGATION, AND MISSION OPERATIONS. SPECIFIC OBJECTIVES TO ADDRESS THE PHASE A CRITERIA AND GUIDELINES ARE: - PROJECT MANAGEMENT FOR THE PHASE A CONTRACT - CONDUCT AND SUPPORT OF PHASE A PROJECT REVIEWS - PHASE B/C/D/E SPACECRAFT DEVELOPMENT AND MISSION PLANNING - PHASE B/C/D/E COST ESTIMATES - CONCEPT STUDY REPORT PREPARATION - ORALS/SITE VISIT SUPPORT BY KEY PERSONNEL THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE PHASE A CONCEPT DEFINITION PORTION OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014. THE MISSION PRINCIPAL INVESTIGATOR (PI), DR. LINDA ELKINS-TANTON, OF THE SCHOOL OF EARTH AND SPACE EXPLORATION AT ARIZONA STATE UNIVERSITY (ASU), IS RESPONSIBLE FOR THE SUCCESS AND SCIENTIFIC INTEGRITY OF THE MISSION. AS SUCH, THE PI SHALL LEAD THE PROJECT, MANAGE PROJECT RESOURCES, AND DIRECT ALL ACTIVITIES OF THE SCIENCE TEAM CARRIED OUT IN SUPPORT OF THE MISSION. SPECIFICALLY, DURING PHASE A, THE PI WILL LEAD THE MISSION TEAM IN CONDUCTING THE CONCEPT STUDY REPORT AND ASSOCIATED SITE VISIT. SHOULD THE MISSION BE SELECTED TO CONTINUE INTO PHASE B, THE PI WILL LEAD THE TEAM THROUGH THE INITIATION OF THE PHASE B EFFORT WITH A TRANSITION PHASE BETWEEN NOTIFICATION OF AWARD AND ESTABLISHMENT OF THE PHASE B CONTRACT. THE PI IS ASSISTED BY A DEPUTY PI, DR. JAMES BELL AT ARIZONA STATE UNIVERSITY. JET PROPULSION LABORATORY (JPL) IS THE MISSION MAJOR PARTNER FOR SPACECRAFT DEVELOPMENT AND MISSION IMPLEMENTATION, AND SHALL SUPPORT THE PI WITH A PROJECT TEAM EXPERIENCED IN MANAGEMENT, SYSTEMS ENGINEERING, MISSION DESIGN, PAYLOAD DEVELOPMENT, SAFETY AND MISSION ASSURANCE, NAVIGATION, AND MISSION OPERATIONS. SPECIFIC OBJECTIVES TO ADDRESS THE PHASE A CRITERIA AND GUIDELINES ARE: - PROJECT MANAGEMENT FOR THE PHASE A CONTRACT - CONDUCT AND SUPPORT OF PHASE A PROJECT REVIEWS - PHASE B/C/D/E SPACECRAFT DEVELOPMENT AND MISSION PLANNING - PHASE B/C/D/E COST ESTIMATES - CONCEPT STUDY REPORT PREPARATION - ORALS/SITE VISIT SUPPORT BY KEY PERSONNEL
Jun 13, 201812$959.5KPSYCHE: JOURNEY TO A METAL WORLD THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE PHASE A CONCEPT DEFINITION PORTION OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014. THE MISSION PRINCIPAL INVESTIGATOR (PI), DR. LINDA ELKINS-TANTON, OF THE SCHOOL OF EARTH AND SPACE EXPLORATION AT ARIZONA STATE UNIVERSITY (ASU), IS RESPONSIBLE FOR THE SUCCESS AND SCIENTIFIC INTEGRITY OF THE MISSION. AS SUCH, THE PI SHALL LEAD THE PROJECT, MANAGE PROJECT RESOURCES, AND DIRECT ALL ACTIVITIES OF THE SCIENCE TEAM CARRIED OUT IN SUPPORT OF THE MISSION. SPECIFICALLY, DURING PHASE A, THE PI WILL LEAD THE MISSION TEAM IN CONDUCTING THE CONCEPT STUDY REPORT AND ASSOCIATED SITE VISIT. SHOULD THE MISSION BE SELECTED TO CONTINUE INTO PHASE B, THE PI WILL LEAD THE TEAM THROUGH THE INITIATION OF THE PHASE B EFFORT WITH A TRANSITION PHASE BETWEEN NOTIFICATION OF AWARD AND ESTABLISHMENT OF THE PHASE B CONTRACT. THE PI IS ASSISTED BY A DEPUTY PI, DR. JAMES BELL AT ARIZONA STATE UNIVERSITY. JET PROPULSION LABORATORY (JPL) IS THE MISSION MAJOR PARTNER FOR SPACECRAFT DEVELOPMENT AND MISSION IMPLEMENTATION, AND SHALL SUPPORT THE PI WITH A PROJECT TEAM EXPERIENCED IN MANAGEMENT, SYSTEMS ENGINEERING, MISSION DESIGN, PAYLOAD DEVELOPMENT, SAFETY AND MISSION ASSURANCE, NAVIGATION, AND MISSION OPERATIONS. SPECIFIC OBJECTIVES TO ADDRESS THE PHASE A CRITERIA AND GUIDELINES ARE: - PROJECT MANAGEMENT FOR THE PHASE A CONTRACT - CONDUCT AND SUPPORT OF PHASE A PROJECT REVIEWS - PHASE B/C/D/E SPACECRAFT DEVELOPMENT AND MISSION PLANNING - PHASE B/C/D/E COST ESTIMATES - CONCEPT STUDY REPORT PREPARATION - ORALS/SITE VISIT SUPPORT BY KEY PERSONNEL THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE PHASE A CONCEPT DEFINITION PORTION OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014. THE MISSION PRINCIPAL INVESTIGATOR (PI), DR. LINDA ELKINS-TANTON, OF THE SCHOOL OF EARTH AND SPACE EXPLORATION AT ARIZONA STATE UNIVERSITY (ASU), IS RESPONSIBLE FOR THE SUCCESS AND SCIENTIFIC INTEGRITY OF THE MISSION. AS SUCH, THE PI SHALL LEAD THE PROJECT, MANAGE PROJECT RESOURCES, AND DIRECT ALL ACTIVITIES OF THE SCIENCE TEAM CARRIED OUT IN SUPPORT OF THE MISSION. SPECIFICALLY, DURING PHASE A, THE PI WILL LEAD THE MISSION TEAM IN CONDUCTING THE CONCEPT STUDY REPORT AND ASSOCIATED SITE VISIT. SHOULD THE MISSION BE SELECTED TO CONTINUE INTO PHASE B, THE PI WILL LEAD THE TEAM THROUGH THE INITIATION OF THE PHASE B EFFORT WITH A TRANSITION PHASE BETWEEN NOTIFICATION OF AWARD AND ESTABLISHMENT OF THE PHASE B CONTRACT. THE PI IS ASSISTED BY A DEPUTY PI, DR. JAMES BELL AT ARIZONA STATE UNIVERSITY. JET PROPULSION LABORATORY (JPL) IS THE MISSION MAJOR PARTNER FOR SPACECRAFT DEVELOPMENT AND MISSION IMPLEMENTATION, AND SHALL SUPPORT THE PI WITH A PROJECT TEAM EXPERIENCED IN MANAGEMENT, SYSTEMS ENGINEERING, MISSION DESIGN, PAYLOAD DEVELOPMENT, SAFETY AND MISSION ASSURANCE, NAVIGATION, AND MISSION OPERATIONS. SPECIFIC OBJECTIVES TO ADDRESS THE PHASE A CRITERIA AND GUIDELINES ARE: - PROJECT MANAGEMENT FOR THE PHASE A CONTRACT - CONDUCT AND SUPPORT OF PHASE A PROJECT REVIEWS - PHASE B/C/D/E SPACECRAFT DEVELOPMENT AND MISSION PLANNING - PHASE B/C/D/E COST ESTIMATES - CONCEPT STUDY REPORT PREPARATION - ORALS/SITE VISIT SUPPORT BY KEY PERSONNEL
Jun 5, 201811$0PSYCHE: JOURNEY TO A METAL WORLD THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE PHASE A CONCEPT DEFINITION PORTION OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014. THE MISSION PRINCIPAL INVESTIGATOR (PI), DR. LINDA ELKINS-TANTON, OF THE SCHOOL OF EARTH AND SPACE EXPLORATION AT ARIZONA STATE UNIVERSITY (ASU), IS RESPONSIBLE FOR THE SUCCESS AND SCIENTIFIC INTEGRITY OF THE MISSION. AS SUCH, THE PI SHALL LEAD THE PROJECT, MANAGE PROJECT RESOURCES, AND DIRECT ALL ACTIVITIES OF THE SCIENCE TEAM CARRIED OUT IN SUPPORT OF THE MISSION. SPECIFICALLY, DURING PHASE A, THE PI WILL LEAD THE MISSION TEAM IN CONDUCTING THE CONCEPT STUDY REPORT AND ASSOCIATED SITE VISIT. SHOULD THE MISSION BE SELECTED TO CONTINUE INTO PHASE B, THE PI WILL LEAD THE TEAM THROUGH THE INITIATION OF THE PHASE B EFFORT WITH A TRANSITION PHASE BETWEEN NOTIFICATION OF AWARD AND ESTABLISHMENT OF THE PHASE B CONTRACT. THE PI IS ASSISTED BY A DEPUTY PI, DR. JAMES BELL AT ARIZONA STATE UNIVERSITY. JET PROPULSION LABORATORY (JPL) IS THE MISSION MAJOR PARTNER FOR SPACECRAFT DEVELOPMENT AND MISSION IMPLEMENTATION, AND SHALL SUPPORT THE PI WITH A PROJECT TEAM EXPERIENCED IN MANAGEMENT, SYSTEMS ENGINEERING, MISSION DESIGN, PAYLOAD DEVELOPMENT, SAFETY AND MISSION ASSURANCE, NAVIGATION, AND MISSION OPERATIONS. SPECIFIC OBJECTIVES TO ADDRESS THE PHASE A CRITERIA AND GUIDELINES ARE: - PROJECT MANAGEMENT FOR THE PHASE A CONTRACT - CONDUCT AND SUPPORT OF PHASE A PROJECT REVIEWS - PHASE B/C/D/E SPACECRAFT DEVELOPMENT AND MISSION PLANNING - PHASE B/C/D/E COST ESTIMATES - CONCEPT STUDY REPORT PREPARATION - ORALS/SITE VISIT SUPPORT BY KEY PERSONNEL THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE PHASE A CONCEPT DEFINITION PORTION OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014. THE MISSION PRINCIPAL INVESTIGATOR (PI), DR. LINDA ELKINS-TANTON, OF THE SCHOOL OF EARTH AND SPACE EXPLORATION AT ARIZONA STATE UNIVERSITY (ASU), IS RESPONSIBLE FOR THE SUCCESS AND SCIENTIFIC INTEGRITY OF THE MISSION. AS SUCH, THE PI SHALL LEAD THE PROJECT, MANAGE PROJECT RESOURCES, AND DIRECT ALL ACTIVITIES OF THE SCIENCE TEAM CARRIED OUT IN SUPPORT OF THE MISSION. SPECIFICALLY, DURING PHASE A, THE PI WILL LEAD THE MISSION TEAM IN CONDUCTING THE CONCEPT STUDY REPORT AND ASSOCIATED SITE VISIT. SHOULD THE MISSION BE SELECTED TO CONTINUE INTO PHASE B, THE PI WILL LEAD THE TEAM THROUGH THE INITIATION OF THE PHASE B EFFORT WITH A TRANSITION PHASE BETWEEN NOTIFICATION OF AWARD AND ESTABLISHMENT OF THE PHASE B CONTRACT. THE PI IS ASSISTED BY A DEPUTY PI, DR. JAMES BELL AT ARIZONA STATE UNIVERSITY. JET PROPULSION LABORATORY (JPL) IS THE MISSION MAJOR PARTNER FOR SPACECRAFT DEVELOPMENT AND MISSION IMPLEMENTATION, AND SHALL SUPPORT THE PI WITH A PROJECT TEAM EXPERIENCED IN MANAGEMENT, SYSTEMS ENGINEERING, MISSION DESIGN, PAYLOAD DEVELOPMENT, SAFETY AND MISSION ASSURANCE, NAVIGATION, AND MISSION OPERATIONS. SPECIFIC OBJECTIVES TO ADDRESS THE PHASE A CRITERIA AND GUIDELINES ARE: - PROJECT MANAGEMENT FOR THE PHASE A CONTRACT - CONDUCT AND SUPPORT OF PHASE A PROJECT REVIEWS - PHASE B/C/D/E SPACECRAFT DEVELOPMENT AND MISSION PLANNING - PHASE B/C/D/E COST ESTIMATES - CONCEPT STUDY REPORT PREPARATION - ORALS/SITE VISIT SUPPORT BY KEY PERSONNEL
Feb 15, 201810$1.2MIGF::CL,CT::IGF PSYCHE: JOURNEY TO A METAL WORLD THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE PHASE A CONCEPT DEFINITION PORTION OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014. THE MISSION PRINCIPAL INVESTIGATOR (PI), DR. LINDA ELKINS-TANTON, OF THE SCHOOL OF EARTH AND SPACE EXPLORATION AT ARIZONA STATE UNIVERSITY (ASU), IS RESPONSIBLE FOR THE SUCCESS AND SCIENTIFIC INTEGRITY OF THE MISSION. AS SUCH, THE PI SHALL LEAD THE PROJECT, MANAGE PROJECT RESOURCES, AND DIRECT ALL ACTIVITIES OF THE SCIENCE TEAM CARRIED OUT IN SUPPORT OF THE MISSION. SPECIFICALLY, DURING PHASE A, THE PI WILL LEAD THE MISSION TEAM IN CONDUCTING THE CONCEPT STUDY REPORT AND ASSOCIATED SITE VISIT. SHOULD THE MISSION BE SELECTED TO CONTINUE INTO PHASE B, THE PI WILL LEAD THE TEAM THROUGH THE INITIATION OF THE PHASE B EFFORT WITH A TRANSITION PHASE BETWEEN NOTIFICATION OF AWARD AND ESTABLISHMENT OF THE PHASE B CONTRACT. THE PI IS ASSISTED BY A DEPUTY PI, DR. JAMES BELL AT ARIZONA STATE UNIVERSITY. JET PROPULSION LABORATORY (JPL) IS THE MISSION MAJOR PARTNER FOR SPACECRAFT DEVELOPMENT AND MISSION IMPLEMENTATION, AND SHALL SUPPORT THE PI WITH A PROJECT TEAM EXPERIENCED IN MANAGEMENT, SYSTEMS ENGINEERING, MISSION DESIGN, PAYLOAD DEVELOPMENT, SAFETY AND MISSION ASSURANCE, NAVIGATION, AND MISSION OPERATIONS. SPECIFIC OBJECTIVES TO ADDRESS THE PHASE A CRITERIA AND GUIDELINES ARE: - PROJECT MANAGEMENT FOR THE PHASE A CONTRACT - CONDUCT AND SUPPORT OF PHASE A PROJECT REVIEWS - PHASE B/C/D/E SPACECRAFT DEVELOPMENT AND MISSION PLANNING - PHASE B/C/D/E COST ESTIMATES - CONCEPT STUDY REPORT PREPARATION - ORALS/SITE VISIT SUPPORT BY KEY PERSONNEL THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE PHASE A CONCEPT DEFINITION PORTION OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014. THE MISSION PRINCIPAL INVESTIGATOR (PI), DR. LINDA ELKINS-TANTON, OF THE SCHOOL OF EARTH AND SPACE EXPLORATION AT ARIZONA STATE UNIVERSITY (ASU), IS RESPONSIBLE FOR THE SUCCESS AND SCIENTIFIC INTEGRITY OF THE MISSION. AS SUCH, THE PI SHALL LEAD THE PROJECT, MANAGE PROJECT RESOURCES, AND DIRECT ALL ACTIVITIES OF THE SCIENCE TEAM CARRIED OUT IN SUPPORT OF THE MISSION. SPECIFICALLY, DURING PHASE A, THE PI WILL LEAD THE MISSION TEAM IN CONDUCTING THE CONCEPT STUDY REPORT AND ASSOCIATED SITE VISIT. SHOULD THE MISSION BE SELECTED TO CONTINUE INTO PHASE B, THE PI WILL LEAD THE TEAM THROUGH THE INITIATION OF THE PHASE B EFFORT WITH A TRANSITION PHASE BETWEEN NOTIFICATION OF AWARD AND ESTABLISHMENT OF THE PHASE B CONTRACT. THE PI IS ASSISTED BY A DEPUTY PI, DR. JAMES BELL AT ARIZONA STATE UNIVERSITY. JET PROPULSION LABORATORY (JPL) IS THE MISSION MAJOR PARTNER FOR SPACECRAFT DEVELOPMENT AND MISSION IMPLEMENTATION, AND SHALL SUPPORT THE PI WITH A PROJECT TEAM EXPERIENCED IN MANAGEMENT, SYSTEMS ENGINEERING, MISSION DESIGN, PAYLOAD DEVELOPMENT, SAFETY AND MISSION ASSURANCE, NAVIGATION, AND MISSION OPERATIONS. SPECIFIC OBJECTIVES TO ADDRESS THE PHASE A CRITERIA AND GUIDELINES ARE: - PROJECT MANAGEMENT FOR THE PHASE A CONTRACT - CONDUCT AND SUPPORT OF PHASE A PROJECT REVIEWS - PHASE B/C/D/E SPACECRAFT DEVELOPMENT AND MISSION PLANNING - PHASE B/C/D/E COST ESTIMATES - CONCEPT STUDY REPORT PREPARATION - ORALS/SITE VISIT SUPPORT BY KEY PERSONNEL
Feb 7, 20189$67.5KPSYCHE: JOURNEY TO A METAL WORLD THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE PHASE A CONCEPT DEFINITION PORTION OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014. THE MISSION PRINCIPAL INVESTIGATOR (PI), DR. LINDA ELKINS-TANTON, OF THE SCHOOL OF EARTH AND SPACE EXPLORATION AT ARIZONA STATE UNIVERSITY (ASU), IS RESPONSIBLE FOR THE SUCCESS AND SCIENTIFIC INTEGRITY OF THE MISSION. AS SUCH, THE PI SHALL LEAD THE PROJECT, MANAGE PROJECT RESOURCES, AND DIRECT ALL ACTIVITIES OF THE SCIENCE TEAM CARRIED OUT IN SUPPORT OF THE MISSION. SPECIFICALLY, DURING PHASE A, THE PI WILL LEAD THE MISSION TEAM IN CONDUCTING THE CONCEPT STUDY REPORT AND ASSOCIATED SITE VISIT. SHOULD THE MISSION BE SELECTED TO CONTINUE INTO PHASE B, THE PI WILL LEAD THE TEAM THROUGH THE INITIATION OF THE PHASE B EFFORT WITH A TRANSITION PHASE BETWEEN NOTIFICATION OF AWARD AND ESTABLISHMENT OF THE PHASE B CONTRACT. THE PI IS ASSISTED BY A DEPUTY PI, DR. JAMES BELL AT ARIZONA STATE UNIVERSITY. JET PROPULSION LABORATORY (JPL) IS THE MISSION MAJOR PARTNER FOR SPACECRAFT DEVELOPMENT AND MISSION IMPLEMENTATION, AND SHALL SUPPORT THE PI WITH A PROJECT TEAM EXPERIENCED IN MANAGEMENT, SYSTEMS ENGINEERING, MISSION DESIGN, PAYLOAD DEVELOPMENT, SAFETY AND MISSION ASSURANCE, NAVIGATION, AND MISSION OPERATIONS. SPECIFIC OBJECTIVES TO ADDRESS THE PHASE A CRITERIA AND GUIDELINES ARE: - PROJECT MANAGEMENT FOR THE PHASE A CONTRACT - CONDUCT AND SUPPORT OF PHASE A PROJECT REVIEWS - PHASE B/C/D/E SPACECRAFT DEVELOPMENT AND MISSION PLANNING - PHASE B/C/D/E COST ESTIMATES - CONCEPT STUDY REPORT PREPARATION - ORALS/SITE VISIT SUPPORT BY KEY PERSONNEL THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE PHASE A CONCEPT DEFINITION PORTION OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014. THE MISSION PRINCIPAL INVESTIGATOR (PI), DR. LINDA ELKINS-TANTON, OF THE SCHOOL OF EARTH AND SPACE EXPLORATION AT ARIZONA STATE UNIVERSITY (ASU), IS RESPONSIBLE FOR THE SUCCESS AND SCIENTIFIC INTEGRITY OF THE MISSION. AS SUCH, THE PI SHALL LEAD THE PROJECT, MANAGE PROJECT RESOURCES, AND DIRECT ALL ACTIVITIES OF THE SCIENCE TEAM CARRIED OUT IN SUPPORT OF THE MISSION. SPECIFICALLY, DURING PHASE A, THE PI WILL LEAD THE MISSION TEAM IN CONDUCTING THE CONCEPT STUDY REPORT AND ASSOCIATED SITE VISIT. SHOULD THE MISSION BE SELECTED TO CONTINUE INTO PHASE B, THE PI WILL LEAD THE TEAM THROUGH THE INITIATION OF THE PHASE B EFFORT WITH A TRANSITION PHASE BETWEEN NOTIFICATION OF AWARD AND ESTABLISHMENT OF THE PHASE B CONTRACT. THE PI IS ASSISTED BY A DEPUTY PI, DR. JAMES BELL AT ARIZONA STATE UNIVERSITY. JET PROPULSION LABORATORY (JPL) IS THE MISSION MAJOR PARTNER FOR SPACECRAFT DEVELOPMENT AND MISSION IMPLEMENTATION, AND SHALL SUPPORT THE PI WITH A PROJECT TEAM EXPERIENCED IN MANAGEMENT, SYSTEMS ENGINEERING, MISSION DESIGN, PAYLOAD DEVELOPMENT, SAFETY AND MISSION ASSURANCE, NAVIGATION, AND MISSION OPERATIONS. SPECIFIC OBJECTIVES TO ADDRESS THE PHASE A CRITERIA AND GUIDELINES ARE: - PROJECT MANAGEMENT FOR THE PHASE A CONTRACT - CONDUCT AND SUPPORT OF PHASE A PROJECT REVIEWS - PHASE B/C/D/E SPACECRAFT DEVELOPMENT AND MISSION PLANNING - PHASE B/C/D/E COST ESTIMATES - CONCEPT STUDY REPORT PREPARATION - ORALS/SITE VISIT SUPPORT BY KEY PERSONNEL
Oct 25, 20178$0IGF::CL,CT::IGF PSYCHE: JOURNEY TO A METAL WORLD THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE PHASE A CONCEPT DEFINITION PORTION OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014. THE MISSION PRINCIPAL INVESTIGATOR (PI), DR. LINDA ELKINS-TANTON, OF THE SCHOOL OF EARTH AND SPACE EXPLORATION AT ARIZONA STATE UNIVERSITY (ASU), IS RESPONSIBLE FOR THE SUCCESS AND SCIENTIFIC INTEGRITY OF THE MISSION. AS SUCH, THE PI SHALL LEAD THE PROJECT, MANAGE PROJECT RESOURCES, AND DIRECT ALL ACTIVITIES OF THE SCIENCE TEAM CARRIED OUT IN SUPPORT OF THE MISSION. SPECIFICALLY, DURING PHASE A, THE PI WILL LEAD THE MISSION TEAM IN CONDUCTING THE CONCEPT STUDY REPORT AND ASSOCIATED SITE VISIT. SHOULD THE MISSION BE SELECTED TO CONTINUE INTO PHASE B, THE PI WILL LEAD THE TEAM THROUGH THE INITIATION OF THE PHASE B EFFORT WITH A TRANSITION PHASE BETWEEN NOTIFICATION OF AWARD AND ESTABLISHMENT OF THE PHASE B CONTRACT. THE PI IS ASSISTED BY A DEPUTY PI, DR. JAMES BELL AT ARIZONA STATE UNIVERSITY. JET PROPULSION LABORATORY (JPL) IS THE MISSION MAJOR PARTNER FOR SPACECRAFT DEVELOPMENT AND MISSION IMPLEMENTATION, AND SHALL SUPPORT THE PI WITH A PROJECT TEAM EXPERIENCED IN MANAGEMENT, SYSTEMS ENGINEERING, MISSION DESIGN, PAYLOAD DEVELOPMENT, SAFETY AND MISSION ASSURANCE, NAVIGATION, AND MISSION OPERATIONS. SPECIFIC OBJECTIVES TO ADDRESS THE PHASE A CRITERIA AND GUIDELINES ARE: - PROJECT MANAGEMENT FOR THE PHASE A CONTRACT - CONDUCT AND SUPPORT OF PHASE A PROJECT REVIEWS - PHASE B/C/D/E SPACECRAFT DEVELOPMENT AND MISSION PLANNING - PHASE B/C/D/E COST ESTIMATES - CONCEPT STUDY REPORT PREPARATION - ORALS/SITE VISIT SUPPORT BY KEY PERSONNEL THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE PHASE A CONCEPT DEFINITION PORTION OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014. THE MISSION PRINCIPAL INVESTIGATOR (PI), DR. LINDA ELKINS-TANTON, OF THE SCHOOL OF EARTH AND SPACE EXPLORATION AT ARIZONA STATE UNIVERSITY (ASU), IS RESPONSIBLE FOR THE SUCCESS AND SCIENTIFIC INTEGRITY OF THE MISSION. AS SUCH, THE PI SHALL LEAD THE PROJECT, MANAGE PROJECT RESOURCES, AND DIRECT ALL ACTIVITIES OF THE SCIENCE TEAM CARRIED OUT IN SUPPORT OF THE MISSION. SPECIFICALLY, DURING PHASE A, THE PI WILL LEAD THE MISSION TEAM IN CONDUCTING THE CONCEPT STUDY REPORT AND ASSOCIATED SITE VISIT. SHOULD THE MISSION BE SELECTED TO CONTINUE INTO PHASE B, THE PI WILL LEAD THE TEAM THROUGH THE INITIATION OF THE PHASE B EFFORT WITH A TRANSITION PHASE BETWEEN NOTIFICATION OF AWARD AND ESTABLISHMENT OF THE PHASE B CONTRACT. THE PI IS ASSISTED BY A DEPUTY PI, DR. JAMES BELL AT ARIZONA STATE UNIVERSITY. JET PROPULSION LABORATORY (JPL) IS THE MISSION MAJOR PARTNER FOR SPACECRAFT DEVELOPMENT AND MISSION IMPLEMENTATION, AND SHALL SUPPORT THE PI WITH A PROJECT TEAM EXPERIENCED IN MANAGEMENT, SYSTEMS ENGINEERING, MISSION DESIGN, PAYLOAD DEVELOPMENT, SAFETY AND MISSION ASSURANCE, NAVIGATION, AND MISSION OPERATIONS. SPECIFIC OBJECTIVES TO ADDRESS THE PHASE A CRITERIA AND GUIDELINES ARE: - PROJECT MANAGEMENT FOR THE PHASE A CONTRACT - CONDUCT AND SUPPORT OF PHASE A PROJECT REVIEWS - PHASE B/C/D/E SPACECRAFT DEVELOPMENT AND MISSION PLANNING - PHASE B/C/D/E COST ESTIMATES - CONCEPT STUDY REPORT PREPARATION - ORALS/SITE VISIT SUPPORT BY KEY PERSONNEL
Jul 17, 20177$1.5MIGF::CT,CL::IGF PSYCHE: JOURNEY TO A METAL WORLD THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE PHASE A CONCEPT DEFINITION PORTION OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014. THE MISSION PRINCIPAL INVESTIGATOR (PI), DR. LINDA ELKINS-TANTON, OF THE SCHOOL OF EARTH AND SPACE EXPLORATION AT ARIZONA STATE UNIVERSITY (ASU), IS RESPONSIBLE FOR THE SUCCESS AND SCIENTIFIC INTEGRITY OF THE MISSION. AS SUCH, THE PI SHALL LEAD THE PROJECT, MANAGE PROJECT RESOURCES, AND DIRECT ALL ACTIVITIES OF THE SCIENCE TEAM CARRIED OUT IN SUPPORT OF THE MISSION. SPECIFICALLY, DURING PHASE A, THE PI WILL LEAD THE MISSION TEAM IN CONDUCTING THE CONCEPT STUDY REPORT AND ASSOCIATED SITE VISIT. SHOULD THE MISSION BE SELECTED TO CONTINUE INTO PHASE B, THE PI WILL LEAD THE TEAM THROUGH THE INITIATION OF THE PHASE B EFFORT WITH A TRANSITION PHASE BETWEEN NOTIFICATION OF AWARD AND ESTABLISHMENT OF THE PHASE B CONTRACT. THE PI IS ASSISTED BY A DEPUTY PI, DR. JAMES BELL AT ARIZONA STATE UNIVERSITY. JET PROPULSION LABORATORY (JPL) IS THE MISSION MAJOR PARTNER FOR SPACECRAFT DEVELOPMENT AND MISSION IMPLEMENTATION, AND SHALL SUPPORT THE PI WITH A PROJECT TEAM EXPERIENCED IN MANAGEMENT, SYSTEMS ENGINEERING, MISSION DESIGN, PAYLOAD DEVELOPMENT, SAFETY AND MISSION ASSURANCE, NAVIGATION, AND MISSION OPERATIONS. SPECIFIC OBJECTIVES TO ADDRESS THE PHASE A CRITERIA AND GUIDELINES ARE: PROJECT MANAGEMENT FOR THE PHASE A CONTRACT CONDUCT AND SUPPORT OF PHASE A PROJECT REVIEWS PHASE B/C/D/E SPACECRAFT DEVELOPMENT AND MISSION PLANNING PHASE B/C/D/E COST ESTIMATES CONCEPT STUDY REPORT PREPARATION ORALS/SITE VISIT SUPPORT BY KEY PERSONNEL
Jun 30, 20176$500.0KIGF::CT,CL::IGF PSYCHE: JOURNEY TO A METAL WORLD THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE PHASE A CONCEPT DEFINITION PORTION OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014. THE MISSION PRINCIPAL INVESTIGATOR (PI), DR. LINDA ELKINS-TANTON, OF THE SCHOOL OF EARTH AND SPACE EXPLORATION AT ARIZONA STATE UNIVERSITY (ASU), IS RESPONSIBLE FOR THE SUCCESS AND SCIENTIFIC INTEGRITY OF THE MISSION. AS SUCH, THE PI SHALL LEAD THE PROJECT, MANAGE PROJECT RESOURCES, AND DIRECT ALL ACTIVITIES OF THE SCIENCE TEAM CARRIED OUT IN SUPPORT OF THE MISSION. SPECIFICALLY, DURING PHASE A, THE PI WILL LEAD THE MISSION TEAM IN CONDUCTING THE CONCEPT STUDY REPORT AND ASSOCIATED SITE VISIT. SHOULD THE MISSION BE SELECTED TO CONTINUE INTO PHASE B, THE PI WILL LEAD THE TEAM THROUGH THE INITIATION OF THE PHASE B EFFORT WITH A TRANSITION PHASE BETWEEN NOTIFICATION OF AWARD AND ESTABLISHMENT OF THE PHASE B CONTRACT. THE PI IS ASSISTED BY A DEPUTY PI, DR. JAMES BELL AT ARIZONA STATE UNIVERSITY. JET PROPULSION LABORATORY (JPL) IS THE MISSION MAJOR PARTNER FOR SPACECRAFT DEVELOPMENT AND MISSION IMPLEMENTATION, AND SHALL SUPPORT THE PI WITH A PROJECT TEAM EXPERIENCED IN MANAGEMENT, SYSTEMS ENGINEERING, MISSION DESIGN, PAYLOAD DEVELOPMENT, SAFETY AND MISSION ASSURANCE, NAVIGATION, AND MISSION OPERATIONS. SPECIFIC OBJECTIVES TO ADDRESS THE PHASE A CRITERIA AND GUIDELINES ARE: - PROJECT MANAGEMENT FOR THE PHASE A CONTRACT - CONDUCT AND SUPPORT OF PHASE A PROJECT REVIEWS - PHASE B/C/D/E SPACECRAFT DEVELOPMENT AND MISSION PLANNING - PHASE B/C/D/E COST ESTIMATES - CONCEPT STUDY REPORT PREPARATION - ORALS/SITE VISIT SUPPORT BY KEY PERSONNEL THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE PHASE A CONCEPT DEFINITION PORTION OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014. THE MISSION PRINCIPAL INVESTIGATOR (PI), DR. LINDA ELKINS-TANTON, OF THE SCHOOL OF EARTH AND SPACE EXPLORATION AT ARIZONA STATE UNIVERSITY (ASU), IS RESPONSIBLE FOR THE SUCCESS AND SCIENTIFIC INTEGRITY OF THE MISSION. AS SUCH, THE PI SHALL LEAD THE PROJECT, MANAGE PROJECT RESOURCES, AND DIRECT ALL ACTIVITIES OF THE SCIENCE TEAM CARRIED OUT IN SUPPORT OF THE MISSION. SPECIFICALLY, DURING PHASE A, THE PI WILL LEAD THE MISSION TEAM IN CONDUCTING THE CONCEPT STUDY REPORT AND ASSOCIATED SITE VISIT. SHOULD THE MISSION BE SELECTED TO CONTINUE INTO PHASE B, THE PI WILL LEAD THE TEAM THROUGH THE INITIATION OF THE PHASE B EFFORT WITH A TRANSITION PHASE BETWEEN NOTIFICATION OF AWARD AND ESTABLISHMENT OF THE PHASE B CONTRACT. THE PI IS ASSISTED BY A DEPUTY PI, DR. JAMES BELL AT ARIZONA STATE UNIVERSITY. JET PROPULSION LABORATORY (JPL) IS THE MISSION MAJOR PARTNER FOR SPACECRAFT DEVELOPMENT AND MISSION IMPLEMENTATION, AND SHALL SUPPORT THE PI WITH A PROJECT TEAM EXPERIENCED IN MANAGEMENT, SYSTEMS ENGINEERING, MISSION DESIGN, PAYLOAD DEVELOPMENT, SAFETY AND MISSION ASSURANCE, NAVIGATION, AND MISSION OPERATIONS. SPECIFIC OBJECTIVES TO ADDRESS THE PHASE A CRITERIA AND GUIDELINES ARE: - PROJECT MANAGEMENT FOR THE PHASE A CONTRACT - CONDUCT AND SUPPORT OF PHASE A PROJECT REVIEWS - PHASE B/C/D/E SPACECRAFT DEVELOPMENT AND MISSION PLANNING - PHASE B/C/D/E COST ESTIMATES - CONCEPT STUDY REPORT PREPARATION - ORALS/SITE VISIT SUPPORT BY KEY PERSONNEL
Jun 22, 20175$338.5KIGF::CT,CL::IGF PSYCHE: JOURNEY TO A METAL WORLD THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE PHASE A CONCEPT DEFINITION PORTION OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014. THE MISSION PRINCIPAL INVESTIGATOR (PI), DR. LINDA ELKINS-TANTON, OF THE SCHOOL OF EARTH AND SPACE EXPLORATION AT ARIZONA STATE UNIVERSITY (ASU), IS RESPONSIBLE FOR THE SUCCESS AND SCIENTIFIC INTEGRITY OF THE MISSION. AS SUCH, THE PI SHALL LEAD THE PROJECT, MANAGE PROJECT RESOURCES, AND DIRECT ALL ACTIVITIES OF THE SCIENCE TEAM CARRIED OUT IN SUPPORT OF THE MISSION. SPECIFICALLY, DURING PHASE A, THE PI WILL LEAD THE MISSION TEAM IN CONDUCTING THE CONCEPT STUDY REPORT AND ASSOCIATED SITE VISIT. SHOULD THE MISSION BE SELECTED TO CONTINUE INTO PHASE B, THE PI WILL LEAD THE TEAM THROUGH THE INITIATION OF THE PHASE B EFFORT WITH A TRANSITION PHASE BETWEEN NOTIFICATION OF AWARD AND ESTABLISHMENT OF THE PHASE B CONTRACT. THE PI IS ASSISTED BY A DEPUTY PI, DR. JAMES BELL AT ARIZONA STATE UNIVERSITY. JET PROPULSION LABORATORY (JPL) IS THE MISSION MAJOR PARTNER FOR SPACECRAFT DEVELOPMENT AND MISSION IMPLEMENTATION, AND SHALL SUPPORT THE PI WITH A PROJECT TEAM EXPERIENCED IN MANAGEMENT, SYSTEMS ENGINEERING, MISSION DESIGN, PAYLOAD DEVELOPMENT, SAFETY AND MISSION ASSURANCE, NAVIGATION, AND MISSION OPERATIONS. SPECIFIC OBJECTIVES TO ADDRESS THE PHASE A CRITERIA AND GUIDELINES ARE: - PROJECT MANAGEMENT FOR THE PHASE A CONTRACT - CONDUCT AND SUPPORT OF PHASE A PROJECT REVIEWS - PHASE B/C/D/E SPACECRAFT DEVELOPMENT AND MISSION PLANNING - PHASE B/C/D/E COST ESTIMATES - CONCEPT STUDY REPORT PREPARATION - ORALS/SITE VISIT SUPPORT BY KEY PERSONNEL THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE PHASE A CONCEPT DEFINITION PORTION OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014. THE MISSION PRINCIPAL INVESTIGATOR (PI), DR. LINDA ELKINS-TANTON, OF THE SCHOOL OF EARTH AND SPACE EXPLORATION AT ARIZONA STATE UNIVERSITY (ASU), IS RESPONSIBLE FOR THE SUCCESS AND SCIENTIFIC INTEGRITY OF THE MISSION. AS SUCH, THE PI SHALL LEAD THE PROJECT, MANAGE PROJECT RESOURCES, AND DIRECT ALL ACTIVITIES OF THE SCIENCE TEAM CARRIED OUT IN SUPPORT OF THE MISSION. SPECIFICALLY, DURING PHASE A, THE PI WILL LEAD THE MISSION TEAM IN CONDUCTING THE CONCEPT STUDY REPORT AND ASSOCIATED SITE VISIT. SHOULD THE MISSION BE SELECTED TO CONTINUE INTO PHASE B, THE PI WILL LEAD THE TEAM THROUGH THE INITIATION OF THE PHASE B EFFORT WITH A TRANSITION PHASE BETWEEN NOTIFICATION OF AWARD AND ESTABLISHMENT OF THE PHASE B CONTRACT. THE PI IS ASSISTED BY A DEPUTY PI, DR. JAMES BELL AT ARIZONA STATE UNIVERSITY. JET PROPULSION LABORATORY (JPL) IS THE MISSION MAJOR PARTNER FOR SPACECRAFT DEVELOPMENT AND MISSION IMPLEMENTATION, AND SHALL SUPPORT THE PI WITH A PROJECT TEAM EXPERIENCED IN MANAGEMENT, SYSTEMS ENGINEERING, MISSION DESIGN, PAYLOAD DEVELOPMENT, SAFETY AND MISSION ASSURANCE, NAVIGATION, AND MISSION OPERATIONS. SPECIFIC OBJECTIVES TO ADDRESS THE PHASE A CRITERIA AND GUIDELINES ARE: - PROJECT MANAGEMENT FOR THE PHASE A CONTRACT - CONDUCT AND SUPPORT OF PHASE A PROJECT REVIEWS - PHASE B/C/D/E SPACECRAFT DEVELOPMENT AND MISSION PLANNING - PHASE B/C/D/E COST ESTIMATES - CONCEPT STUDY REPORT PREPARATION - ORALS/SITE VISIT SUPPORT BY KEY PERSONNEL
Jan 30, 20174$507.7KIGF::CT,CL::IGF PSYCHE: JOURNEY TO A METAL WORLD THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE PHASE A CONCEPT DEFINITION PORTION OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014. THE MISSION PRINCIPAL INVESTIGATOR (PI), DR. LINDA ELKINS-TANTON, OF THE SCHOOL OF EARTH AND SPACE EXPLORATION AT ARIZONA STATE UNIVERSITY (ASU), IS RESPONSIBLE FOR THE SUCCESS AND SCIENTIFIC INTEGRITY OF THE MISSION. AS SUCH, THE PI SHALL LEAD THE PROJECT, MANAGE PROJECT RESOURCES, AND DIRECT ALL ACTIVITIES OF THE SCIENCE TEAM CARRIED OUT IN SUPPORT OF THE MISSION. SPECIFICALLY, DURING PHASE A, THE PI WILL LEAD THE MISSION TEAM IN CONDUCTING THE CONCEPT STUDY REPORT AND ASSOCIATED SITE VISIT. SHOULD THE MISSION BE SELECTED TO CONTINUE INTO PHASE B, THE PI WILL LEAD THE TEAM THROUGH THE INITIATION OF THE PHASE B EFFORT WITH A TRANSITION PHASE BETWEEN NOTIFICATION OF AWARD AND ESTABLISHMENT OF THE PHASE B CONTRACT. THE PI IS ASSISTED BY A DEPUTY PI, DR. JAMES BELL AT ARIZONA STATE UNIVERSITY. JET PROPULSION LABORATORY (JPL) IS THE MISSION MAJOR PARTNER FOR SPACECRAFT DEVELOPMENT AND MISSION IMPLEMENTATION, AND SHALL SUPPORT THE PI WITH A PROJECT TEAM EXPERIENCED IN MANAGEMENT, SYSTEMS ENGINEERING, MISSION DESIGN, PAYLOAD DEVELOPMENT, SAFETY AND MISSION ASSURANCE, NAVIGATION, AND MISSION OPERATIONS. SPECIFIC OBJECTIVES TO ADDRESS THE PHASE A CRITERIA AND GUIDELINES ARE: - PROJECT MANAGEMENT FOR THE PHASE A CONTRACT - CONDUCT AND SUPPORT OF PHASE A PROJECT REVIEWS - PHASE B/C/D/E SPACECRAFT DEVELOPMENT AND MISSION PLANNING - PHASE B/C/D/E COST ESTIMATES - CONCEPT STUDY REPORT PREPARATION - ORALS/SITE VISIT SUPPORT BY KEY PERSONNEL
Dec 30, 20163$0IGF::CT,CL::IGF PSYCHE: JOURNEY TO A METAL WORLD THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE PHASE A CONCEPT DEFINITION PORTION OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014. THE MISSION PRINCIPAL INVESTIGATOR (PI), DR. LINDA ELKINS-TANTON, OF THE SCHOOL OF EARTH AND SPACE EXPLORATION AT ARIZONA STATE UNIVERSITY (ASU), IS RESPONSIBLE FOR THE SUCCESS AND SCIENTIFIC INTEGRITY OF THE MISSION. AS SUCH, THE PI SHALL LEAD THE PROJECT, MANAGE PROJECT RESOURCES, AND DIRECT ALL ACTIVITIES OF THE SCIENCE TEAM CARRIED OUT IN SUPPORT OF THE MISSION. SPECIFICALLY, DURING PHASE A, THE PI WILL LEAD THE MISSION TEAM IN CONDUCTING THE CONCEPT STUDY REPORT AND ASSOCIATED SITE VISIT. SHOULD THE MISSION BE SELECTED TO CONTINUE INTO PHASE B, THE PI WILL LEAD THE TEAM THROUGH THE INITIATION OF THE PHASE B EFFORT WITH A TRANSITION PHASE BETWEEN NOTIFICATION OF AWARD AND ESTABLISHMENT OF THE PHASE B CONTRACT. THE PI IS ASSISTED BY A DEPUTY PI, DR. JAMES BELL AT ARIZONA STATE UNIVERSITY. JET PROPULSION LABORATORY (JPL) IS THE MISSION MAJOR PARTNER FOR SPACECRAFT DEVELOPMENT AND MISSION IMPLEMENTATION, AND SHALL SUPPORT THE PI WITH A PROJECT TEAM EXPERIENCED IN MANAGEMENT, SYSTEMS ENGINEERING, MISSION DESIGN, PAYLOAD DEVELOPMENT, SAFETY AND MISSION ASSURANCE, NAVIGATION, AND MISSION OPERATIONS. SPECIFIC OBJECTIVES TO ADDRESS THE PHASE A CRITERIA AND GUIDELINES ARE: - PROJECT MANAGEMENT FOR THE PHASE A CONTRACT - CONDUCT AND SUPPORT OF PHASE A PROJECT REVIEWS - PHASE B/C/D/E SPACECRAFT DEVELOPMENT AND MISSION PLANNING - PHASE B/C/D/E COST ESTIMATES - CONCEPT STUDY REPORT PREPARATION - ORALS/SITE VISIT SUPPORT BY KEY PERSONNEL THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE PHASE A CONCEPT DEFINITION PORTION OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014. THE MISSION PRINCIPAL INVESTIGATOR (PI), DR. LINDA ELKINS-TANTON, OF THE SCHOOL OF EARTH AND SPACE EXPLORATION AT ARIZONA STATE UNIVERSITY (ASU), IS RESPONSIBLE FOR THE SUCCESS AND SCIENTIFIC INTEGRITY OF THE MISSION. AS SUCH, THE PI SHALL LEAD THE PROJECT, MANAGE PROJECT RESOURCES, AND DIRECT ALL ACTIVITIES OF THE SCIENCE TEAM CARRIED OUT IN SUPPORT OF THE MISSION. SPECIFICALLY, DURING PHASE A, THE PI WILL LEAD THE MISSION TEAM IN CONDUCTING THE CONCEPT STUDY REPORT AND ASSOCIATED SITE VISIT. SHOULD THE MISSION BE SELECTED TO CONTINUE INTO PHASE B, THE PI WILL LEAD THE TEAM THROUGH THE INITIATION OF THE PHASE B EFFORT WITH A TRANSITION PHASE BETWEEN NOTIFICATION OF AWARD AND ESTABLISHMENT OF THE PHASE B CONTRACT. THE PI IS ASSISTED BY A DEPUTY PI, DR. JAMES BELL AT ARIZONA STATE UNIVERSITY. JET PROPULSION LABORATORY (JPL) IS THE MISSION MAJOR PARTNER FOR SPACECRAFT DEVELOPMENT AND MISSION IMPLEMENTATION, AND SHALL SUPPORT THE PI WITH A PROJECT TEAM EXPERIENCED IN MANAGEMENT, SYSTEMS ENGINEERING, MISSION DESIGN, PAYLOAD DEVELOPMENT, SAFETY AND MISSION ASSURANCE, NAVIGATION, AND MISSION OPERATIONS. SPECIFIC OBJECTIVES TO ADDRESS THE PHASE A CRITERIA AND GUIDELINES ARE: - PROJECT MANAGEMENT FOR THE PHASE A CONTRACT - CONDUCT AND SUPPORT OF PHASE A PROJECT REVIEWS - PHASE B/C/D/E SPACECRAFT DEVELOPMENT AND MISSION PLANNING - PHASE B/C/D/E COST ESTIMATES - CONCEPT STUDY REPORT PREPARATION - ORALS/SITE VISIT SUPPORT BY KEY PERSONNEL
Jul 21, 20162$0IGF::CT,CL::IGF PSYCHE: JOURNEY TO A METAL WORLD THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE PHASE A CONCEPT DEFINITION PORTION OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014. THE MISSION PRINCIPAL INVESTIGATOR (PI), DR. LINDA ELKINS-TANTON, OF THE SCHOOL OF EARTH AND SPACE EXPLORATION AT ARIZONA STATE UNIVERSITY (ASU), IS RESPONSIBLE FOR THE SUCCESS AND SCIENTIFIC INTEGRITY OF THE MISSION. AS SUCH, THE PI SHALL LEAD THE PROJECT, MANAGE PROJECT RESOURCES, AND DIRECT ALL ACTIVITIES OF THE SCIENCE TEAM CARRIED OUT IN SUPPORT OF THE MISSION. SPECIFICALLY, DURING PHASE A, THE PI WILL LEAD THE MISSION TEAM IN CONDUCTING THE CONCEPT STUDY REPORT AND ASSOCIATED SITE VISIT. SHOULD THE MISSION BE SELECTED TO CONTINUE INTO PHASE B, THE PI WILL LEAD THE TEAM THROUGH THE INITIATION OF THE PHASE B EFFORT WITH A TRANSITION PHASE BETWEEN NOTIFICATION OF AWARD AND ESTABLISHMENT OF THE PHASE B CONTRACT. THE PI IS ASSISTED BY A DEPUTY PI, DR. JAMES BELL AT ARIZONA STATE UNIVERSITY. JET PROPULSION LABORATORY (JPL) IS THE MISSION MAJOR PARTNER FOR SPACECRAFT DEVELOPMENT AND MISSION IMPLEMENTATION, AND SHALL SUPPORT THE PI WITH A PROJECT TEAM EXPERIENCED IN MANAGEMENT, SYSTEMS ENGINEERING, MISSION DESIGN, PAYLOAD DEVELOPMENT, SAFETY AND MISSION ASSURANCE, NAVIGATION, AND MISSION OPERATIONS. SPECIFIC OBJECTIVES TO ADDRESS THE PHASE A CRITERIA AND GUIDELINES ARE: - PROJECT MANAGEMENT FOR THE PHASE A CONTRACT - CONDUCT AND SUPPORT OF PHASE A PROJECT REVIEWS - PHASE B/C/D/E SPACECRAFT DEVELOPMENT AND MISSION PLANNING - PHASE B/C/D/E COST ESTIMATES - CONCEPT STUDY REPORT PREPARATION - ORALS/SITE VISIT SUPPORT BY KEY PERSONNEL
Nov 24, 20151$0IGF::CL,CT::IGF PSYCHE: JOURNEY TO A METAL WORLD THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE PHASE A CONCEPT DEFINITION PORTION OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014. THE MISSION PRINCIPAL INVESTIGATOR (PI), DR. LINDA ELKINS-TANTON, OF THE SCHOOL OF EARTH AND SPACE EXPLORATION AT ARIZONA STATE UNIVERSITY (ASU), IS RESPONSIBLE FOR THE SUCCESS AND SCIENTIFIC INTEGRITY OF THE MISSION. AS SUCH, THE PI SHALL LEAD THE PROJECT, MANAGE PROJECT RESOURCES, AND DIRECT ALL ACTIVITIES OF THE SCIENCE TEAM CARRIED OUT IN SUPPORT OF THE MISSION. SPECIFICALLY, DURING PHASE A, THE PI WILL LEAD THE MISSION TEAM IN CONDUCTING THE CONCEPT STUDY REPORT AND ASSOCIATED SITE VISIT. SHOULD THE MISSION BE SELECTED TO CONTINUE INTO PHASE B, THE PI WILL LEAD THE TEAM THROUGH THE INITIATION OF THE PHASE B EFFORT WITH A TRANSITION PHASE BETWEEN NOTIFICATION OF AWARD AND ESTABLISHMENT OF THE PHASE B CONTRACT. THE PI IS ASSISTED BY A DEPUTY PI, DR. JAMES BELL AT ARIZONA STATE UNIVERSITY. JET PROPULSION LABORATORY (JPL) IS THE MISSION MAJOR PARTNER FOR SPACECRAFT DEVELOPMENT AND MISSION IMPLEMENTATION, AND SHALL SUPPORT THE PI WITH A PROJECT TEAM EXPERIENCED IN MANAGEMENT, SYSTEMS ENGINEERING, MISSION DESIGN, PAYLOAD DEVELOPMENT, SAFETY AND MISSION ASSURANCE, NAVIGATION, AND MISSION OPERATIONS. SPECIFIC OBJECTIVES TO ADDRESS THE PHASE A CRITERIA AND GUIDELINES ARE: - PROJECT MANAGEMENT FOR THE PHASE A CONTRACT - CONDUCT AND SUPPORT OF PHASE A PROJECT REVIEWS - PHASE B/C/D/E SPACECRAFT DEVELOPMENT AND MISSION PLANNING - PHASE B/C/D/E COST ESTIMATES - CONCEPT STUDY REPORT PREPARATION - ORALS/SITE VISIT SUPPORT BY KEY PERSONNEL
Nov 12, 20150$350.0KIGF::CL,CT::IGF PSYCHE: JOURNEY TO A METAL WORLD THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE PHASE A CONCEPT DEFINITION PORTION OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014. THE MISSION PRINCIPAL INVESTIGATOR (PI), DR. LINDA ELKINS-TANTON, OF THE SCHOOL OF EARTH AND SPACE EXPLORATION AT ARIZONA STATE UNIVERSITY (ASU), IS RESPONSIBLE FOR THE SUCCESS AND SCIENTIFIC INTEGRITY OF THE MISSION. AS SUCH, THE PI SHALL LEAD THE PROJECT, MANAGE PROJECT RESOURCES, AND DIRECT ALL ACTIVITIES OF THE SCIENCE TEAM CARRIED OUT IN SUPPORT OF THE MISSION. SPECIFICALLY, DURING PHASE A, THE PI WILL LEAD THE MISSION TEAM IN CONDUCTING THE CONCEPT STUDY REPORT AND ASSOCIATED SITE VISIT. SHOULD THE MISSION BE SELECTED TO CONTINUE INTO PHASE B, THE PI WILL LEAD THE TEAM THROUGH THE INITIATION OF THE PHASE B EFFORT WITH A TRANSITION PHASE BETWEEN NOTIFICATION OF AWARD AND ESTABLISHMENT OF THE PHASE B CONTRACT. THE PI IS ASSISTED BY A DEPUTY PI, DR. JAMES BELL AT ARIZONA STATE UNIVERSITY. JET PROPULSION LABORATORY (JPL) IS THE MISSION MAJOR PARTNER FOR SPACECRAFT DEVELOPMENT AND MISSION IMPLEMENTATION, AND SHALL SUPPORT THE PI WITH A PROJECT TEAM EXPERIENCED IN MANAGEMENT, SYSTEMS ENGINEERING, MISSION DESIGN, PAYLOAD DEVELOPMENT, SAFETY AND MISSION ASSURANCE, NAVIGATION, AND MISSION OPERATIONS. SPECIFIC OBJECTIVES TO ADDRESS THE PHASE A CRITERIA AND GUIDELINES ARE: - PROJECT MANAGEMENT FOR THE PHASE A CONTRACT - CONDUCT AND SUPPORT OF PHASE A PROJECT REVIEWS - PHASE B/C/D/E SPACECRAFT DEVELOPMENT AND MISSION PLANNING - PHASE B/C/D/E COST ESTIMATES - CONCEPT STUDY REPORT PREPARATION - ORALS/SITE VISIT SUPPORT BY KEY PERSONNEL THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE PHASE A CONCEPT DEFINITION PORTION OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014. THE MISSION PRINCIPAL INVESTIGATOR (PI), DR. LINDA ELKINS-TANTON, OF THE SCHOOL OF EARTH AND SPACE EXPLORATION AT ARIZONA STATE UNIVERSITY (ASU), IS RESPONSIBLE FOR THE SUCCESS AND SCIENTIFIC INTEGRITY OF THE MISSION. AS SUCH, THE PI SHALL LEAD THE PROJECT, MANAGE PROJECT RESOURCES, AND DIRECT ALL ACTIVITIES OF THE SCIENCE TEAM CARRIED OUT IN SUPPORT OF THE MISSION. SPECIFICALLY, DURING PHASE A, THE PI WILL LEAD THE MISSION TEAM IN CONDUCTING THE CONCEPT STUDY REPORT AND ASSOCIATED SITE VISIT. SHOULD THE MISSION BE SELECTED TO CONTINUE INTO PHASE B, THE PI WILL LEAD THE TEAM THROUGH THE INITIATION OF THE PHASE B EFFORT WITH A TRANSITION PHASE BETWEEN NOTIFICATION OF AWARD AND ESTABLISHMENT OF THE PHASE B CONTRACT. THE PI IS ASSISTED BY A DEPUTY PI, DR. JAMES BELL AT ARIZONA STATE UNIVERSITY. JET PROPULSION LABORATORY (JPL) IS THE MISSION MAJOR PARTNER FOR SPACECRAFT DEVELOPMENT AND MISSION IMPLEMENTATION, AND SHALL SUPPORT THE PI WITH A PROJECT TEAM EXPERIENCED IN MANAGEMENT, SYSTEMS ENGINEERING, MISSION DESIGN, PAYLOAD DEVELOPMENT, SAFETY AND MISSION ASSURANCE, NAVIGATION, AND MISSION OPERATIONS. SPECIFIC OBJECTIVES TO ADDRESS THE PHASE A CRITERIA AND GUIDELINES ARE: - PROJECT MANAGEMENT FOR THE PHASE A CONTRACT - CONDUCT AND SUPPORT OF PHASE A PROJECT REVIEWS - PHASE B/C/D/E SPACECRAFT DEVELOPMENT AND MISSION PLANNING - PHASE B/C/D/E COST ESTIMATES - CONCEPT STUDY REPORT PREPARATION - ORALS/SITE VISIT SUPPORT BY KEY PERSONNEL

Estimated positioning window

Aug 31, 2031 – Feb 29, 2032

Recompete signal:
25/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 25/100. Available recorded signals: 20 points.

Contract end 2032-08-31 (2137 days from calculation)
+5 points
1 historical awards in this buyer and category group
+0 points
63 recorded award transactions
+10 points
Latest award action: 2026-06-18
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+0 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.