Federal contract award
VA101CFMP0088
ARCHITECTURAL ENGINEERING SERVICES
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Veterans Affairs |
| Office | OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) |
| NAICS | 541310 — Architectural Services |
| PSC | C211 — Architect - Engineer Services (including landscaping, interior layout, and designing) |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $28.4M |
| Current contract value | $28.4M |
| Potential contract value / ceiling | $43.6M |
| Start date | Jul 1, 2010 |
| Current end date | Dec 31, 2026 |
| Potential end date | Dec 31, 2026 |
| Latest award activity | Aug 6, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 131 of 131 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Aug 6, 2026 | A00072 | $0 | THIS CONTRACT MODIFICATION IS TO EXTEND THE CONTRACT PERIOD OF PERFORMANCE FOR CONTINUED CONTRACT PERIOD SERVICES FOR PH E, CONTRACT VA101CFM-P-0088 MOD A00071, STOCKTON CBOC, CA. |
| Apr 24, 2026 | A00071 | $0 | THIS CONTRACT MODIFICATION IS TO EXTEND THE CONTRACT PERIOD OF PERFORMANCE FOR CONTINUED CONTRACT PERIOD SERVICES FOR PH E, CONTRACT VA101CFM-P-0088 MOD A00071, STOCKTON CBOC, CA. |
| Apr 17, 2026 | A00070 | $1.4M | THIS CONTRACT MODIFICATION IS TO PROVIDE ADDITIONAL CONSTRUCTION PERIOD SERVICES (CPS) FOR LIVERMORE PHASE A, CONTRACT VA101CFM-P-0088 MOD A00070, VAMC, LIVERMORE, CA. |
| Sep 17, 2025 | A00069 | $3.4K | THIS CONTRACT MODIFICATION IS TO PROVIDE CONSTRUCTION PERIOD SERVICES (CPS) FOR THE USGBC LEED PLAQUE FEES FOR PHASE E, CONTRACT VA101CFM-P-0088 MOD A00068, VAMC, LIVERMORE, CA. |
| Jul 14, 2025 | A00068 | $0 | THIS MODIFICATION IS FOR BLAST PROTECTION CONSULTANT REPLACEMENT, LIVERMORE VAMC REALIGNMENT AND CLOSURE, CONTRACT VA101CFM-P-0088 MOD A00068, VAMC, LIVERMORE, CA. |
| May 15, 2025 | A00067 | $-162.0K | DEOBLIGATION OF FUNDS FOR LIVERMORE STOCKTON A/E SERVICES TO PHASE A AND PHASE E FOR LEED PAYMENT |
| Mar 18, 2025 | A00066 | $-39.6K | DEOBLIGATION OF FUNDS FOR LIVERMORE STOCKTON A/E SERVICES TO PHASE A AND PHASE E FOR LEED PAYMENT |
| Jan 21, 2025 | A00065 | $3.9K | LIVERMORE STOCKTON A/E SERVICES TO PHASE A AND PHASE E FOR LEED PAYENT |
| Jan 14, 2025 | A00064 | $1.9M | LIVERMORE STOCKTON A/E SERVICES TO PHASE A, CLC CONSTRUCTION PERIOD |
| Aug 26, 2024 | A00063 | $0 | A/E SERVICES, THIS ADMINISTRATIVE MODIFICATION WILL CORRECT CLINS 0012AA - 0012AE: FROM: $48,440.37, TO: $9,688.07 |
| Jul 10, 2024 | P00051 | $0 | NEW ACO DESIGNATION AWARD. |
| Jun 20, 2024 | A00062 | $242.8K | TO AWARD THE REA FOR LM PHASE A,B,C,D (E) PER 1/9/2024 AGREEMENT |
| May 8, 2024 | A00061 | $16.4K | TO AWARD THE REA FOR LM PHASE A,B,C,E AND STOCKTON MASTER SITE LEED FEES, AGREED UPON AMOUNT ON 29 APR 24. |
| May 1, 2024 | A00060 | $989.3K | TO FUND A00059 PHASE E CLINS 0001 THROUGH 0007, WITH OPTIONAL CLINS 0008 THROUGH 0012 |
| Apr 24, 2024 | A00059 | $0 | PHASE E CLINS 0001 THROUGH 0007, WITH OPTIONAL CLINS 0008 THROUGH 0012 |
| Mar 7, 2024 | A00058 | $-40.5K | TO DE-OBLIGATE REFUND FOR FREMONT UNIVERSAL PLANNING APPLICATION. ADMINISTRATIVE MOD TO DE-OBLIGATE FUNDS FROM A00056 |
| Mar 4, 2024 | A00056 | $20.3K | TO DEOBLIGATE REFUND FOR FREMONT UNIVERSAL PLANNING APPLICATION. |
| Mar 4, 2024 | A00057 | $0 | NO COST ADMINISTRATIVE MODIFICATION. |
| Jan 31, 2024 | A00055 | $262.2K | ADMINISTRATIVE MODIFICATION TO REPLY TO BIDDER INQUIRIES. |
| Dec 21, 2023 | A00053 | $0 | ADMINISTRATIVE MODIFICATION FOR THE REPLACEMENT OF SOME KEY PERSONNEL. |
| Dec 21, 2023 | A00054 | $0 | ADMINISTRATIVE MODIFICATION FOR THE CHANGE IN OH AND WAGE RATES. |
| Oct 18, 2023 | P00050 | $-97.5K | ADMINISTRATIVE MODIFICATION FOR THE DEOBLIGATION OF EXCESS FUNDS DUE TO THE DOWNSIZING OF PART C, FREMONT CBOC. -97,503.33 |
| Sep 14, 2023 | A00052 | $-190.9K | THIS MODIFICATION ISSUED TO DELETE FUNDING FOR UNEXERCISED OPTIONS. |
| Aug 22, 2023 | A00051 | $0 | ALAMEDA CBOC AND COLUMBARIUM DESIGN - TO DE-OBLIGATE EXCESS FUNDS. |
| Aug 14, 2023 | A00050 | $-33.1K | THIS MODIFICATION ISSUED TO DELETE FUNDING FOR UNEXERCISED OPTIONS. |
| Aug 1, 2023 | A00049 | $600.5K | ADDITIONAL DESIGN FOR CLC |
| May 17, 2023 | A00048 | $49.0K | AWARD FOR OPTIONS 5AB, 5AC, 5AC AND 6AB. |
| Sep 15, 2022 | A00046 | $-28.7K | DEOBLIGATION OF EXCESS FUNDS DUE TO THE DOWNSIZING OF PART C, FREMONT CBOC. |
| Aug 8, 2022 | A00047 | $905.7K | PART A CLC DESIGN, CD-2A, CLINS 0001 THROUGH 0006AC |
| Dec 8, 2021 | A00045 | $527.1K | FREMONT SITE, PHASE C, UTILITIES RELOCATION |
| Sep 27, 2021 | P00049 | $0 | FUNDING ACTION TO SWAP FIVE YEAR FUNDS FOR ZERO YEAR FUNDS. |
| Apr 7, 2021 | A00044 | $165.9K | A/E SERVICES TO PROVIDE FOR MANTHEY ROAD IMPROVEMENTS AND ASSOCIATED UTILITY WORK DESIGN |
| Nov 10, 2020 | P00048 | $0 | EXTEND OBLIGATION END DATE TO DECEMBER 31, 2022 |
| Jul 27, 2020 | A00043 | $258.7K | A/E SERVICES TO PROVIDE REVIEW, EVALUATE AND RESOLVE 258 PEER REVIEW COMMENTS |
| Jun 16, 2020 | A00042 | $0 | A/E SERVICES TO PROVIDE PHASE B CBOC EQUIPMENT LIST REVISED UPDATE |
| Apr 27, 2020 | A00041 | $51.0K | A/E SERVICES TO PROVIDE PHASE B EQUIPMENT UPDATE |
| Dec 6, 2019 | A00040 | $0 | LIVERMORE OFFSITE UTILITIES REA ADMINISTRATIVE MODIFICATION TO CORRECT THE LOA. |
| Dec 5, 2019 | A00039 | $113.0K | LIVERMORE OFFSITE UTILITIES REA. |
| Oct 7, 2019 | A00038 | $17.4K | A/E SERVICES TO PROVIDE ADDITIONAL COMMENTS RESOLUTION FOR THE CD-2A FOR PART A CLC |
| Aug 6, 2019 | A00037 | $96.3K | DESIGN SERVICES TO DELETE A CLC NEIGHBORHOOD. |
| May 9, 2019 | P00047 | $0 | ADMINISTRATIVE MODIFICATION TO REVISE THE COA FROM KIM FORD TO CAROLYN MALLORY. |
| Mar 21, 2019 | A00035 | $38.6K | ADDITIONAL DESIGN SERVICES TO RESPOND TO DR. CHECKS COMMENTS FOR PART A, CLC AND PART E, ELB. |
| Feb 26, 2019 | A00033 | $36.7K | SUPPLEMENTAL AGREEMENT TO PROVIDE ADDITIONAL SERVICES TO PROVIDE FOR PBX VS VOIP FOR STOCKTON PART A CLC, AND PART E ELB |
| Feb 26, 2019 | A00034 | $0 | ADMINSTRATIVE MODIFICATION TO CORRECT LOA FOR A00032. |
| Feb 4, 2019 | A00032 | $48.9K | SUPPLEMENTAL AGREEMENT TO PROVIDE ADDITIONAL SERVICES FOR THE TRAFFIC STUDY AT STOCKTON CAMPUS. |
| Jan 17, 2019 | A00031 | $24.2K | SUPPLEMENTAL AGREEMENT TO PROVIDE CX SERVICES FOR THE CD PHASE OF THE ELB. |
| Dec 19, 2018 | A00030 | $0 | SUPPLEMENTAL AGREEMENT TO REVISE CD DOCUMENTS FOR CD-2A FOR THE STOCKTON CBOC, PART B. |
| Dec 13, 2018 | A00029 | $6.7K | SUPPLEMENTAL AGREEMENT TO REVISE CD DOCUMENTS FOR CD-2A FOR THE STOCKTON CBOC, PART B. |
| Nov 7, 2018 | A00027 | $-5.1K | SUPPLEMENTAL AGREEMENT TO COMPLETE DESIGN SERVICES FOR POLICE OPS FOR THE STOCKTON CBOC, PART B. |
| Nov 7, 2018 | A00028 | $-3.0K | SUPPLEMENTAL AGREEMENT TO PROVIDE ADDITIONAL DESIGN FOR UNRINALYSIS LABORATORY FOR THE STOCKTON CBOC, PART B. |
| Nov 6, 2018 | A00026 | $-2.3K | SUPPLEMENTAL AGREEMENT TO ADDITIONAL TRAFFIC STUDY SERVICES FOR STOCKTON FACILITY. |
| Oct 31, 2018 | A00025 | $-24.8K | SUPPLEMENTAL AGREEMENT TO DEFINITIZE DIVISION 01 MODIFICATIONS A00002, A00003, AND A00012. |
| Oct 4, 2018 | A00021 | $30.9K | SUPPLEMENTAL AGREEMENT FOR ADDED A/E SERVICES TO CONDUCT A SURVEY CONVERSION FROM NGVD29 TO NAVD88 AT FREMONT SITE |
| Oct 4, 2018 | A00022 | $7.4K | CHANGE ORDER FOR A/E SERVICES TO PROVIDE INCREASED WORK TO INCORPORATE CD-2A REVISIONS FOR PART B CBOC |
| Oct 4, 2018 | A00023 | $16.8K | SUPPLEMENTAL; AGREEMENT TO DEFINITIZE A00005, A00006 AND A00010 FOR BLOOD BANK, RADIOLOGY OFFICE AND PROSTHETICS PT/OT FOR PART B CBOC |
| Oct 4, 2018 | A00024 | $959 | SUPPLEMENTAL AGREEMENT TO DEFINITIZE MODS A00008 AND A00014FOR ADDITIONAL DESIGN SERVICES FOR PBX VS VOIP FOR PART B STOCKTON CBOC. |
| Sep 25, 2018 | A00020 | $0 | SUPPLEMENTAL AGREEMENT FOR RESOLUTION OF PEER REVIEW AND BCOES OUTSTANDING COMMENTS. |
| Sep 7, 2018 | A00019 | $7.4K | CHANGE ORDER FOR STOCKTON CBOC DESIGN SERVICES TO INCORPORATE CD-1 BCOES PEER REVIEW COMMENTS INTO CD-2 DOCUMENTS. |
| Aug 15, 2018 | A00018 | $10.5K | CHANGE ORDER FOR STOCKTON CBOC DESIGN SERVICES TO SATISFY USACE PEER REVIEW POLICY. |
| Jul 25, 2018 | A00017 | $0 | CHANGE ORDER FOR LIVERMORE AE CONTRACT TO INCORPORATE UPDATED LABOR AND OVERHEAD RATED FOR PRIME AND CONSULTANTS. |
| Jun 11, 2018 | A00016 | $0 | CHANGE ORDER FOR STOCKTON CBOC DESIGN SERVICES TO REVISE LABOR AND OVERHEAD RATES. |
| May 15, 2018 | A00013 | $40.9K | CHANGE ORDER FOR STOCKTON CBOC DESIGN SERVICES FOR POLICE OPERATIONS. |
| May 15, 2018 | A00014 | $16.2K | CHANGE ORDER FOR STOCKTON CBOC DESIGN SERVICES FOR VOIP VS PBX. |
| May 15, 2018 | A00015 | $25.6K | CHANGE ORDER FOR STOCKTON CBOC DESIGN SERVICES FOR VOIP VS PBX. |
| May 4, 2018 | A00012 | $116.0K | CHANGE ORDER FOR STOCKTON CBOC DESIGN SERVICES FOR DIVISION 01 SPECIFICATIONS, UPDATE AE COST ESTIMATE AND CREATE SUBMITTAL REGISTER. |
| May 2, 2018 | A00011 | $6.7K | CHANGE ORDER FOR STOCKTON CBOC DESIGN SERVICES FOR INCREASED TRAFFIC STUDY. |
| Apr 24, 2018 | A00010 | $0 | CHANGE ORDER FOR STOCKTON CBOC DESIGN SERVICES FOR BLOOD BAND, RADIOLOGY AND PROSTHETICS. |
| Apr 16, 2018 | A00007 | $30.9K | CHANGE ORDER FOR STOCKTON CBOC POLICE ROOM REDESIGN. |
| Apr 16, 2018 | A00008 | $13.0K | CHANGE ORDER FOR STOCKTON CBOC DESIGN SERVICES FOR PBX VS. VOIP. |
| Apr 12, 2018 | A00009 | $21.5K | CHANGE ORDER FOR STOCKTON CBOC URINALYSIS LABORATORY. |
| Apr 9, 2018 | A00006 | $122.4K | CHANGE ORDER FOR STOCKTON CBOC BLOOD BANK, RADIOLOGY OFFICE, AND PROSTHETICS PT/OT. |
| Mar 2, 2018 | A00005 | $56.6K | CHANGE ORDER FOR STOCKTON CBOC BLOOD BANK, RADIOLOGY OFFICE, AND PROSTHETICS PT/OT. |
| Feb 23, 2018 | P00046 | $0 | MODIFICATION TO EXTEND OBLIGATION END DATE. |
| Feb 20, 2018 | A00004 | $7.4K | CHANGE ORDER FOR STOCKTON TRAFFIC STUDY (USACE). |
| Nov 7, 2017 | A00002 | $47.7K | CHANGE ORDER TO PROVIDE USACE DIVISION 01 SPECIFICATIONS IN PLACE OF VA DIVISION 01 SPECIFICATIONS. |
| Nov 7, 2017 | A00003 | $0 | ADMINISTRATIVE MODIFICATION TO CORRECT ACCOUNTING DATA AND OBLIGATION NUMBER. |
| Sep 1, 2017 | A00001 | $0 | CHANGE ORDER TO PROVIDE NO COST USER (VAPAHCS) DESIRED CHANGES TO DESIGN. |
| Jun 14, 2017 | P00045 | $0 | SUPPLEMENTAL AGREEMENT ISSUED TO CORRECT FUNDING LINE OF P00043 ONLY. |
| May 31, 2017 | P00043 | $136.4K | REQUEST FOR EQUITABLE ADJUSTMENT FOR DD-2 ESCALATION FOR LABOR |
| May 31, 2017 | P00044 | $381.9K | TO DEFINITIZE CHANGE ORDERS FOR OFF-SITE UTILITY WORK. |
| May 17, 2017 | P00042 | $0 | CRITICAL FUNCTION: PROVIDE CORRECTED ACCOUNTING DATA LINE FOR P00040 FOR THE LIVERMORE REALIGNMENT PROJECT. |
| May 15, 2017 | P00040 | $345.6K | CRITICAL FUNCTION: PROVIDE FOR BIM PREPAID OPTIONS FOR CLINS 3, 11 AND 24 FOR THE DESIGN DEVELOPMENT DOCUMENTS FOR THE LIVERMORE REALIGNMENT PROJECT. |
| May 15, 2017 | P00041 | $215.7K | CRITICAL FUNCTION: TO EXERCISE PREPRICED OPTION FOR CLIN 37 FOR THE CONSTRUCTION DOCUMENTS FOR THE ENGINEERING LOGISTICS BUILDING FOR THE LIVERMORE REALIGNMENT PROJECT. |
| Apr 3, 2017 | P00039 | $0 | US ARMY CORPS OF ENGINEERS IS DESIGNATED AS CONTRACT ADMINISTRATOR FOR DESIGN ACTIVITIES. |
| Feb 13, 2017 | P00037 | $18.7K | ADDITIONAL SERVICE FOR STOCKTON SURVEY CONVERSION ANALYSIS |
| Feb 13, 2017 | P00038 | $0 | REVISE ECCA |
| Jan 17, 2017 | P00036 | $78.7K | PROFESSIONAL SERVICES TO ATTEND USACE PDRI AND CSRA REVIEW |
| Jan 6, 2017 | P00035 | $11.7K | TO PAY FOR A TRIP TO MONTERREY VAMC FOR THE DESIGN DEVELOPMENT DOCUMENTS FOR THE LIVERMORE REALIGNMENT PROJECT. |
| Oct 4, 2016 | P00034 | $137.8K | CRITICAL FUNCTION: PROVIDE FOR PACT INTEGRATION INTO THE DESIGN DEVELOPMENT DOCUMENTS FOR THE LIVERMORE REALIGNMENT PROJECT. |
| Sep 16, 2016 | P00033 | $177.5K | CRITICAL FUNCTION: PROVIDE FOR PACT INTEGRATION INTO THE DESIGN DEVELOPMENT DOCUMENTS FOR THE LIVERMORE REALIGNMENT PROJECT. |
| Aug 29, 2016 | P00032 | $60.2K | CRITICAL FUNCTION: PROVIDE FOR PACT INTEGRATION INTO THE DESIGN DEVELOPMENT DOCUMENTS FOR THE LIVERMORE REALIGNMENT PROJECT. |
| Jun 10, 2016 | P00030 | $281.6K | CRITICAL FUNCTION: PROVIDE FOR PACT INTEGRATION INTO THE DESIGN DEVELOPMENT DOCUMENTS FOR THE LIVERMORE REALIGNMENT PROJECT. |
| Jun 7, 2016 | P00031 | $155.4K | CRITICAL FUNCTION: PROVIDE FOR PACT INTEGRATION INTO THE DESIGN DEVELOPMENT DOCUMENTS FOR THE LIVERMORE REALIGNMENT PROJECT. |
| Feb 26, 2016 | P00029 | $95.0K | CRITICAL FUNCTION: PROVIDE FOR PACT INTEGRATION INTO THE DESIGN DEVELOPMENT DOCUMENTS FOR THE LIVERMORE REALIGNMENT PROJECT. |
| Dec 21, 2015 | P00027 | $350.4K | CRITICAL FUNCTION: PROVIDE FOR PACT INTEGRATION INTO THE DESIGN DEVELOPMENT DOCUMENTS FOR THE LIVERMORE REALIGNMENT PROJECT. |
| Dec 15, 2015 | P00026 | $132.8K | CRITICAL FUNCTION: PROVIDE FOR PACT INTEGRATION INTO THE DESIGN DEVELOPMENT DOCUMENTS FOR THE LIVERMORE REALIGNMENT PROJECT. |
| Dec 14, 2015 | P00025 | $121.2K | CRITICAL FUNCTION: PROVIDE FOR CENTRAL HOT WATER SYSTEM FOR CBOC AND CLC IN CUP FOR THE LIVERMORE REALIGNMENT PROJECT. |
| Nov 18, 2015 | P00023 | $29.9K | CRITICAL FUNCTION: PROVIDE FOR PACT INTEGRATION INTO THE DESIGN DEVELOPMENT DOCUMENTS FOR THE LIVERMORE REALIGNMENT PROJECT. |
| Sep 17, 2015 | P00024 | $413.6K | CRITICAL FUNCTION: PROVIDE FOR PACT INTEGRATION INTO THE DESIGN DEVELOPMENT DOCUMENTS FOR THE LIVERMORE REALIGNMENT PROJECT. |
| Aug 18, 2015 | P00017 | $0 | CRITICAL FUNCTION: PROVIDE FOR PACT INTEGRATION INTO THE DESIGN DEVELOPMENT DOCUMENTS FOR THE LIVERMORE REALIGNMENT PROJECT. |
| Aug 10, 2015 | P00022 | $67.2K | CRITICAL FUNCTION: PROVIDE FOR PACT INTEGRATION INTO THE DESIGN DEVELOPMENT DOCUMENTS FOR THE LIVERMORE REALIGNMENT PROJECT. |
| Aug 7, 2015 | P00019 | $237.3K | CRITICAL FUNCTION: PROVIDE FOR PACT INTEGRATION INTO THE DESIGN DEVELOPMENT DOCUMENTS FOR THE LIVERMORE REALIGNMENT PROJECT. |
| Aug 5, 2015 | P00021 | $99.6K | CRITICAL FUNCTION: PROVIDE FOR PACT INTEGRATION INTO THE DESIGN DEVELOPMENT DOCUMENTS FOR THE LIVERMORE REALIGNMENT PROJECT. |
| Aug 3, 2015 | P00018 | $5.5K | CRITICAL FUNCTION: PROVIDE FOR PACT INTEGRATION INTO THE DESIGN DEVELOPMENT DOCUMENTS FOR THE LIVERMORE REALIGNMENT PROJECT. |
| Aug 3, 2015 | P00020 | $84.7K | CRITICAL FUNCTION: PROVIDE FOR PACT INTEGRATION INTO THE DESIGN DEVELOPMENT DOCUMENTS FOR THE LIVERMORE REALIGNMENT PROJECT. |
| Apr 7, 2015 | P00016 | $95.0K | CRITICAL FUNCTION: PROVIDE FOR PACT INTEGRATION INTO THE DESIGN DEVELOPMENT DOCUMENTS FOR THE LIVERMORE REALIGNMENT PROJECT. |
| Mar 30, 2015 | P00015 | $5.7M | EXERCISE CD OPTIONS FOR PART A, B&C |
| Jan 8, 2015 | P00013 | $90.0K | CRITICAL FUNCTION: PROVIDE FOR PACT INTEGRATION INTO THE DESIGN DEVELOPMENT DOCUMENTS FOR THE LIVERMORE REALIGNMENT PROJECT. |
| Dec 29, 2014 | P00014 | $5.5K | CRITICAL FUNCTION: PROVIDE FOR PACT INTEGRATION INTO THE DESIGN DEVELOPMENT DOCUMENTS FOR THE LIVERMORE REALIGNMENT PROJECT. |
| Nov 17, 2014 | P00011 | $99.3K | CRITICAL FUNCTION: PROVIDE FOR PACT INTEGRATION INTO THE DESIGN DEVELOPMENT DOCUMENTS FOR THE LIVERMORE REALIGNMENT PROJECT. |
| Nov 17, 2014 | P00012 | $90.0K | CRITICAL FUNCTION: PROVIDE FOR PACT INTEGRATION INTO THE DESIGN DEVELOPMENT DOCUMENTS FOR THE LIVERMORE REALIGNMENT PROJECT. |
| Oct 7, 2014 | P00009 | $24.4K | CRITICAL FUNCTION: PROVIDE FOR PACT INTEGRATION INTO THE DESIGN DEVELOPMENT DOCUMENTS FOR THE LIVERMORE REALIGNMENT PROJECT. |
| Oct 7, 2014 | P00010 | $28.6K | CRITICAL FUNCTION: PROVIDE FOR PACT INTEGRATION INTO THE DESIGN DEVELOPMENT DOCUMENTS FOR THE LIVERMORE REALIGNMENT PROJECT. |
| Aug 19, 2014 | P00008 | $451.0K | CRITICAL FUNCTION: PROVIDE FOR PACT INTEGRATION INTO THE DESIGN DEVELOPMENT DOCUMENTS FOR THE LIVERMORE REALIGNMENT PROJECT. |
| May 12, 2014 | P00007 | $0 | CRITICAL FUNCTION: CHANGE KEY PERSONNEL FOR FIVE POSITIONS. |
| Apr 14, 2014 | P00006 | $0 | CRITICAL FUNCTION: CHANGE KEY PERSONNEL FOR FIVE POSITIONS. |
| Feb 26, 2014 | P00005 | $173.2K | MODIFICATION PROVIDES FOR EFFORTS ASSOCIATED WITH REDESIGN OF THE 2 COMMUNITY BASED OUTPATIENT CLINICS TO INTEGRATE THE PACT (PATIENT ALIGNED CARE TEAM) MODEL FOR THE LIVERMORE REALIGNMENT PROJECT 640-423. |
| Oct 7, 2013 | P00004 | $26.3K | MODIFICATION PROVIDES FOR EFFORTS ASSOCIATED WITH PERFORMING A CO-GEN LIFE CYCLE COST ANALYSIS FOR THE FRENCH CAMP (STOCKTON) SITE FOR THE LIVERMORE REALIGNMENT PROJECT 640-423. |
| Aug 7, 2013 | P00001 | $8.4K | SERVICES FOR LIFE CYCLE COST ANALYSIS FOR HOT WATER SYSTEMS FOR THE LIVERMORE REALIGNMENT AND CLOSURE, PROJECT 640-423 |
| Aug 7, 2013 | P00003 | $5.9K | MODIFICATION PROVIDES FOR PARTICIPATION IN PACT MEETINGS ON JANUARY 23 AND 24 TO DETERMINE COMPLIANCE WITH SD-2 SUBMITTALS FOR THE LIVERMORE REALIGNMENT PROJECT 640-423. |
| Apr 23, 2013 | P00002 | $11.9K | ATTEND PACT MEETINGS ON APRIL 24-26 AS PART OF THE LIVERMORE REALIGNMENT PROJECT 640-423. |
| May 31, 2012 | SA008 | $4.9M | CRITICAL FUNCTION: EXERCISING OPTIONS FOR DD'S AND EXECUTIVE OVERVIEWS ON PART A CLC, PART B CBOC AND PART C CBOC: CLIN'S 002,006,010,014,023,027 |
| Apr 9, 2012 | SA007 | $48.0K | CRITICAL FUNCTION: PROVIDE SCHEMATIC AND DESIGN DEVELOPMENT DOCUMENTS FOR PART A CLC, PART B CBOC AND PART C CBOC. THIS SA INCLUDES CHANGES TO ECCA, KEY PERSONNEL, CONTRACT SCHEDULE UPDATE AND PROVIDES DIRECT LABOR ESCALATION. |
| Dec 14, 2011 | SA004 | $85.5K | CRITICAL FUNCTION: EXERCISES CLIN 21: FRENCH CAMP SITE PARKING AND TRAFFIC SURVEY AND CLIN 34: FREMONT SITE PARKING AND TRAFFIC SURVEY FOR LIVERMORE REALIGNMENT AND CLOSURE PROJECT 640-423 |
| Dec 8, 2011 | SA006 | $41.7K | OTHER FUNCTION: PROVIDE PROFESSIONAL VERTICAL TRANSPORT CONSULTANT SERVICES |
| Dec 2, 2011 | SA009 | $0 | OTHER FUNCTIONS: ADMINISTRATIVE CHANGE TO CORRECT CLIN DOLLAR VALUE TO MATCH AGREED UPON OBLIGATED DOLLAR VALUE. |
| Nov 22, 2011 | SA001 | $19.9K | CRITICAL FUNCTION: PROVIDE ADDITIONAL SURVEY SERVICES ON THE FRENCH CAMP SITE FOR LIVERMORE REALIGNMENT AND CLOSURE PROJECT 640-423 |
| Nov 22, 2011 | SA002 | $50.4K | OTHER FUNCTION: PROVIDE ADDITIONAL SURVEY SERVICES ON THE FRENCH CAMP SITE FOR LIVERMORE REALIGNMENT AND CLOSURE PROJECT 640-423 |
| Nov 22, 2011 | SA003 | $58.6K | OTHER FUNCTIONS: PROVIDE ADDITIONAL SURVEY SERVICES ON THE FRENCH CAMP SITE FOR LIVERMORE REALIGNMENT AND CLOSURE PROJECT 640-423 |
| Nov 22, 2011 | SA005 | $43.8K | CRITICAL FUNCTION: PROVIDE ADDITIONAL PROGRAMMING/ VALIDATION MEETINGS FOR LIVERMORE REALIGNMENT AND CLOSURE PROJECT 640-423 |
| Jul 1, 2010 | 0 | $5.0M | ARCHITECTURAL ENGINEERING SERVICES |
Estimated positioning window
Oct 25, 2026 – Jan 23, 2027
65/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 65/100. Available recorded signals: 60 points.
- Contract end 2026-12-31 (67 days from calculation)
- +35 points
- 2 historical awards in this buyer and category group
- +10 points
- 131 recorded award transactions
- +10 points
- Latest award action: 2026-08-06
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +0 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-10-25 10:18:04.631876+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Oct 25, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.