Federal contract award
VA101CFMP0162
CORRECT SEISMIC DEFICIENCIES IN BLDG 1,6,8 AT SAN FRANCISCO VAMC
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Veterans Affairs |
| Office | OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) |
| NAICS | 541310 — Architectural Services |
| PSC | C211 — Architect - Engineer Services (including landscaping, interior layout, and designing) |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $39.7M |
| Current contract value | $39.7M |
| Potential contract value / ceiling | $39.7M |
| Start date | Sep 30, 2011 |
| Current end date | Mar 30, 2027 |
| Potential end date | Sep 30, 2027 |
| Latest award activity | Jun 23, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 135 of 135 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Jun 23, 2026 | A00083 | $263.6K | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE ADDITIONAL RFI REVIEW LABOR-HOURS IN SUPPORT OF THE SFVA BUILDING 8 SEISMIC-RETROFIT AND RENOVATION PROJECT, AE CONTRACT FOR SAN FRANCISCO VAMC. |
| Apr 30, 2026 | A00082 | $330.0K | THE PURPOSE OF UNILATERAL MODIFICATION IS TO ADD ADDITIONAL SUBMITTAL REVIEW AND SITE VISITS TO THE CONTRACT FOR CONSTRUCTION PHASE SERVICES FOR BUILDING 8 CONSTRUCTION, AE CONTRACT FOR SAN FRANCISCO VAMC. |
| Apr 14, 2026 | A00081 | $58.7K | THE PURPOSE OF THIS MODIFICATION IS A TO REFLECT LABOR ESCALATION COSTS FOR CPS DUE TO PERIOD OF PERFORMANCE IS EXTENDED TO MARCH 31, 2027, AE CONTRACT FOR SAN FRANCISCO VAMC. |
| Nov 10, 2025 | A00080 | $0 | THE PURPOSE OF THIS MODIFICATION IS A NO-COST MODIFICATION TO EXTENDS THE PERIOD OF PERFORMANCE FOR VARIOUS CLINS ON MODIFICATIONS A00050 AND A00055, PERIOD OF PERFORMANCE IS EXTENDED TO DECEMBER 31, 2026, AE CONTRACT FOR SAN FRANCISCO VAMC. |
| Jul 22, 2025 | P00043 | $0 | THE PURPOSE OF THIS MODIFICATION IS AN ADMINISTRATIVE ACTION TO: CORRECT PROCESSED OBLIGATIONS THAT USED INCORRECT FUNDS, REPLACING WITH CORRECT FUNDS, HEADER ACCOUNTING LINE 9, AE CONTRACT FOR SAN FRANCISCO VAMC. |
| May 13, 2025 | A00079 | $3.3M | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE REQUIREMENTS OF THE PFD/SEPS DELIVERABLES FROM CONTRACT MODIFICATION A00065 AND TO MEET CURRENT CODE AND CRITERIA, AE CONTRACT FOR SAN FRANCISCO VAMC. |
| Apr 15, 2025 | A00078 | $317.1K | THE PURPOSE OF THIS MODIFICATION IS TO FULFILL THE REQUIREMENT OF FAR 17.207(C).EXERCISE OPTION CLINS 14, 15, 28, 37, 38, 43. THESE OPTIONAL CLINS WERE INCORPORATED BY MODIFICATION A00050, AE CONTRACT FOR SAN FRANCISCO VAMC. |
| Apr 9, 2025 | A00077 | $40.9K | THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE OPTIONAL CLINS 0008AA 0008AB AND 0008AC SUPPLEMENTAL DESIGN, THESE OPTIONAL CLINS WERE INCORPORATED BY MODIFICATION A00065, AE CONTRACT FOR SAN FRANCISCO VAMC. |
| Apr 2, 2025 | A00076 | $104.4K | THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE OPTIONAL CLINS 0008AA 0008AB AND 0008AC SUPPLEMENTAL DESIGN, THESE OPTIONAL CLINS WERE INCORPORATED BY MODIFICATION A00065, AE CONTRACT FOR SAN FRANCISCO VAMC. |
| Mar 25, 2025 | A00074 | $497.0K | THE PURPOSE OF THIS MODIFICATION IS FOR THE A-E FIRM TO PERFORM A CODE AND CRITERIA COMPLIANCE REVIEWS AS DISCUSSED IN POLICY FLASH 2021-03.1 AE CONTRACT FOR SAN FRANCISCO VAMC. |
| Mar 24, 2025 | A00075 | $353.5K | THE PURPOSE OF THIS MODIFICATION IS TO RETAIN THE A-E FIRM TO PERFORM SITE VISITS AND PROVIDE ADDITIONAL SUBMITTAL REVIEWS, PROJECT 662-402, AE CONTRACT FOR SAN FRANCISCO VAMC. |
| Mar 3, 2025 | A00073 | $-674.0K | THE PURPOSE OF THIS MODIFICATION IS TO DESCOPE/DEOBLIGATE MOD A00065, CLIN 0001-PFD/SEPS UPDATE BLDG., CLIN 0003-SITE VISIT TO BLDG. 6, AND MOD A00069, CLIN 0002-B40 CD PACKAGE UPDATE COORDINATION. AE CONTRACT FOR SAN FRANCISCO VAMC. |
| Jan 21, 2025 | A00072 | $65.4K | THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE OPTIONAL CLIN 0011, OPTION TASK 6 OF 6 REVIEW SUBMITTALS. THIS OPTIONAL CLIN WAS INCORPORATED BY MODIFICATION A00050. AE CONTRACT FOR SAN FRANCISCO VAMC. |
| Dec 10, 2024 | A00071 | $142.9K | THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE OPTIONAL CLINS 0010, OPTION TASK 6 OF 5 OF 6, REVIEW SUBMITTALS, 0026 AND 0027, OPTION TASK 8 OF 7 AND 8 OF 8, INTERPRET CONSTRUCTION DOCUMENTS AND PROVIDE SUPPLEMENTAL DESIGN. THESE OPTIONAL CLINS WERE INCORPORATED BY MODIFICATION A00050, AE CONTRACT FOR SAN FRANCISCO VAMC. |
| Nov 14, 2024 | A00070 | $131.8K | THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE OPTIONAL CLINS 0012 AND 0013 INCORPORATED IN MODIFICATION A00050, AE CONTRACT FOR SAN FRANCISCO VAMC |
| Oct 21, 2024 | A00069 | $109.8K | THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE THE UNPRICED CHANGE ORDER TO ALLOW THE A-E TO COMMENCE SERVICES FOR THE BLDG.40 REDESIGN OF THE RETAINING WALL AND SIDEWALK DESIGN, AE CONTRACT FOR SAN FRANCISCO VAMC |
| Sep 3, 2024 | A00068 | $117.8K | THE PURPOSE OF THIS MODIFICATION IS TO TO AUTHORIZE AND DIRECT THE A-E TO COMMENCE SERVICES FOR THE BLDG.40 REDESIGN OF THE RETAINING WALL AND SIDEWALK DESIGN CONTRACT VA101CFM-P-0162 PROJECT NO. 662-402 ACO DELEGATION - AE CONTRACT FOR SAN FRANCISCO VAMC |
| Aug 12, 2024 | A00067 | $81.3K | THE PURPOSE OF THIS MODIFICATION IS TO TO AUTHORIZE AND DIRECT THE A-E TO COMMENCE SERVICES FOR THE BLDG.40 REDESIGN OF THE RETAINING WALL AND SIDEWALK DESIGN CONTRACT VA101CFM-P-0162 PROJECT NO. 662-402 ACO DELEGATION - AE CONTRACT FOR SAN FRANCISCO VAMC |
| Jul 30, 2024 | A00066 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO ADD FOR THE DURATION OF THE CONTRACT THE TELECOMMUNICATIONS SUBCONSULTANT, MEYERS ENGINEERS AS A SUBCONTRACTOR AND TO INCORPORATE LABOR AND PROFIT RATES TO CONTRACT VA101CFM-P-0162 PROJECT NO. 662-402 ACO DELEGATION - AE CONTRACT FOR SAN FRANCISCO VAMC |
| Jul 8, 2024 | P00042 | $0 | CHANGE IN ASSIGNMENT AND DELEGATION OF ACO FOR CONTRACT VA101CFM-P-0162 PROJECT NO. 662-402 ACO DELEGATION - AE CONTRACT FOR SAN FRANCISCO VAMC |
| Jun 28, 2024 | A00065 | $1.3M | THE PURPOSE OF THIS ACTION IS TO PROVIDE PLANNING FOR DESIGN (PFD) UPDATES FOR SF BLDGS. 1&6 IN SUPPORT OF THE PROJECT INCORPORATING AND EXERCISING TASKS/CLINS 1,3,4,5,6 AND 7 CONTRACT VA101CFM-P-0162 MOD A00063 PROJECT 662-402 AE CONTRACT FOR SAN FRANCISCO VAMC |
| Jun 6, 2024 | A00064 | $77.5K | EXERCISE OPTIONAL CLINS 0024 AND 0025 OF MOD A00050 CONTRACT VA101CFM-P-0162 MOD A00063 PROJECT 662-402 AE CONTRACT FOR SAN FRANCISCO VAMC |
| May 6, 2024 | A00063 | $65.4K | EXERCISE CLIN 0007 OF MOD A00050 CONTRACT VA101CFM-P-0162 MOD A00063, PROJECT 662 402 CORRECT SEISMIC DEFICIENCIES AT VAMC SAN FRANCISCO CA |
| Apr 15, 2024 | A00062 | $61.1K | THIS PURPOSE OF THIS MODIFICATION IS FOR THE A-E FIRM TO EXERCISE CLINS 0003AA, 0003AB AND 0003AC PROVIDE SUPPLEMENTAL DESIGN FOR BUILDING 40 INCORPORATED BY MOD A000059, PROJECT 662 402 CORRECT SEISMIC DEFICIENCIES AT VAMC SAN FRANCISCO CA |
| Feb 29, 2024 | A00061 | $4.1K | THIS PURPOSE OF THIS MODIFICATION IS FOR THE A-E FIRM TO INFORM THE US GREEN BUILDING COUNCIL (USGBC) OF THE GOVERNMENT INTENT TO PURSUE CERTIFICATION OF BLDG 40 UNDER LEED V4, PROJECT 662 402 CORRECT SEISMIC DEFICIENCIES AT VAMC SAN FRANCISCO CA |
| Feb 8, 2024 | A00060 | $208.3K | THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE CLINS 0007, 0008, REVIEW SUBMITTALS, AND CLINS 0022, AND 0023, INTERPRET CONSTRUCTION DOCUMENTS AND PROVIDE SUPPLEMENTAL DESIGN, PROJECT 662 402 CORRECT SEISMIC DEFICIENCIES AT VAMC SAN FRANCISCO CA |
| Dec 28, 2023 | A00059 | $415.0K | THE PURPOSE OF THE MODIFICATION IS TO INCORPORATE/EXERCISE CLIN 0001, 0002 (TASKS 1&2) TO INCORPORATE ALL ASPECTS OF THE CONDITIONALLY APPROVED USE OF CHILLED BEAMS, PROJECT 662 402 CORRECT SEISMIC DEFICIENCIES AT VAMC SAN FRANCISCO CA |
| Nov 22, 2023 | A00057 | $58.0K | THE PURPOSE OF THE MODIFICATION IS TO EXERCISE CLIN 0003 PREPROPOSAL SITE VISIT AND BIDDER INQUIRIES PER MODIFICATION A00044 PROJECT 662 402 BLDG CORRECT SEISMIC DEFICIENCIES AT VAMC SAN FRANCISCO CA |
| Nov 22, 2023 | A00058 | $166.3K | THE PURPOSE OF THE MODIFICATION IS TO EXERCISE SUB-CLINS 0013AA THROUGH 0013AC INCORPORATED IN MOD A00055 PROJECT 662 402 BLDG CORRECT SEISMIC DEFICIENCIES AT VAMC SAN FRANCISCO CA |
| Sep 14, 2023 | A00054 | $77.5K | BUILDING 8 EXERCISE CLINS 0020 AND 0021 REF MOD A00055 CONTRACT VA101CFM-P-0162 MOD A00054 PROJECT 662-402 BLDG CORRECT SEISMIC DEFICIENCIES AT VAMC SAN FRANCISCO, CA |
| Aug 30, 2023 | A00055 | $-33.8K | DESCOPING MODIFICATIONS A00050, A00035, A00037, A00041 AND A00046. RESCOPING OF SUBMITTAL REVIEWS (REF: MOD A00050), ADDING STRUCTURAL ENGINEER / GEOTECHNICAL ENGINEER ONSITE SUPPORT, 662-402 BLDG CORRECT SEISMIC DEFICIENCIES AT VAMC SAN FRANCISCO, CA |
| Aug 30, 2023 | P00041 | $12.0K | THIS MODIFICATION IS TO EXECUTE OBLIGATION THAT WAS INITIATE IN MOD A00055 FOR TOTAL SEISMIC (EQ) OBLIGATION OF IN THE AMOUNT OF $11,969.66 FOR CLIN?S 0001-0009 PROJECT 662-402 BLDG CORRECT SEISMIC DEFICIENCIES AT VAMC SAN FRANCISCO, CA |
| Jul 19, 2023 | A00056 | $128.4K | REDESIGN OF BUILDING 40 - ADDITIONAL EFFORT ? LEED REGISTRATION & DELETE ELECTRON MICROSCOPE, 662-402 BLDG CORRECT SEISMIC DEFICIENCIES AT VAMC SAN FRANCISCO, CA |
| May 31, 2023 | A00053 | $1.8M | ADDING CLINS 0001, 0002, 0003 AND 0004 AND EXERCISING BASECLIN-0001: TASKS 1-2E - BUILDING 1 AND OPTION CLIN-0002: TASKS 3-4E - BUILDING 6 PROJECT 662-402 VAMC SAN FRANCISCO, CA. |
| May 22, 2023 | A00052 | $128.8K | EXERCISE CLINS 0006AA THRU 0007AA, PROJECT NO. 662-402, FOR BLDG. 8 CONSTRUCTION AE CONTRACT FOR SAN FRANCISCO VAMC. |
| Mar 22, 2023 | A00051 | $210.4K | EXERCISE CLINS 0006AA THRU 0007AA, PROJECT NO. 662-402, FOR BLDG. 8 CONSTRUCTION AE CONTRACT FOR SAN FRANCISCO VAMC. |
| Mar 16, 2023 | A00050 | $623.9K | CONSTRUCTION PHASE SERVICES (CPS) FOR BLDG. 8 CONSTRUCTION AE CONTRACT FOR SAN FRANCISCO VAMC. |
| Mar 14, 2023 | A00049 | $5.8K | TO FUND THE REQUEST FOR EQUITABLE ADJUSTMENT DATED 13DEC22 FOR ENTITLEMENT OF ADDITIONAL HOURS DUE TO GOVERNMENTAL DELAYS IN 2014 AND 2015 AND NOW COMPLETED IN 2022, AE CONTRACT FOR SAN FRANCISCO VAMC. |
| Jan 25, 2023 | A00048 | $0 | ADD TO THE CONTRACT THE QUALIFIED FIRE PROTECTION ENGINEER (FPE), JENSEN HUGHES, INC., AS A SUBCONTRACTOR, AE CONTRACT FOR SAN FRANCISCO VAMC. |
| Oct 5, 2022 | A00047 | $42.7K | ADD TO THE CONTRACT THE QUALIFIED FIRE PROTECTION ENGINEER (FPE), JENSEN HUGHES, INC., AS A SUBCONTRACTOR, AE CONTRACT FOR SAN FRANCISCO VAMC. |
| Aug 24, 2022 | A00046 | $22.7K | ADD TO THE CONTRACT THE QUALIFIED FIRE PROTECTION ENGINEER (FPE), JENSEN HUGHES, INC., AS A SUBCONTRACTOR, AE CONTRACT FOR SAN FRANCISCO VAMC. |
| Aug 11, 2022 | A00045 | $0 | ADD TO THE CONTRACT THE QUALIFIED FIRE PROTECTION ENGINEER (FPE), JENSEN HUGHES, INC., AS A SUBCONTRACTOR, AE CONTRACT FOR SAN FRANCISCO VAMC. |
| Jul 13, 2022 | A00044 | $7.4M | THE PURPOSE OF THIS MODIFICATION IS TO REDESIGN BUILDING 40 AE CONTRACT FOR SAN FRANCISCO VAMC. |
| Jun 28, 2022 | A00043 | $3.1K | TO PROVIDE FUNDING FOR THE A-E FIRM TO PAY THE FEE AND REGISTER THE PROJECT WITH THE US GREEN BUILDING COUNCIL - LEED APPLICATION FEE. PROJECT NO. 662-402 AE CONTRACT FOR SAN FRANCISCO VAMC. |
| Apr 25, 2022 | A00042 | $31.8K | EXERCISE CLIN 0003 MODIFICATION VA101CFM-P-0162-A00032, (22FEB21) FOR PRE-PROPOSAL SITE VISIT AND BIDDER INQUIRIES PROJECT NO. 662-402 AE CONTRACT FOR SAN FRANCISCO VAMC. |
| Mar 31, 2022 | A00041 | $14.8K | EXERCISE CLINS 0008AC AT THE NEGOTIATED AMOUNTS ON MODIFICATION VA101CFM-P-0162-A00034 PROJECT NO. 662-402 AE CONTRACT FOR SAN FRANCISCO VAMC. |
| Feb 16, 2022 | A00040 | $-1.3K | DE-OBLIGATE FUND FOR MOD A00023 PROJECT NO. 662-402 AE CONTRACT FOR SAN FRANCISCO VAMC. |
| Jan 25, 2022 | A00039 | $33.7K | EXERCISE CLIN 008AA AND 008AB REDESIGN OF BUILDING 40 - PREPARE CONCEPT/SCHEMATIC DESIGN DOCUMENTS PROJECT NO. 662-402 AE CONTRACT FOR SAN FRANCISCO VAMC. |
| Dec 28, 2021 | P00040 | $0 | DE OBLIGATE LINES 29,30,31,32 & 34 AND RE OBLIGATE USING NO YEAR FUNDS VA101CFM-P-0162 P00040, PROJECT NO. 662-402 AE CONTRACT FOR SAN FRANCISCO VAMC |
| Sep 29, 2021 | A00038 | $-197.9K | DE-OBLIGATE FUNDS FOR GPR SURVEY WATER SYSTEM ASSESSMENT SCOPE REDUCTION AE CONTRACT FOR SAN FRANCISCO VAMC |
| Sep 8, 2021 | A00037 | $97.6K | TO EXERCISE TASKS 0005AA, 0005AB, 0006AA, 0006AB, 0007AA, 0007AB, 0008AA AND 0008AB A00035AE CONTRACT FOR SAN FRANCISCO VAMC |
| Sep 2, 2021 | A00036 | $863.2K | REDESIGN BUILDING 40, PREPARE CONCEPT AND SCHEMATIC DESIGN DOCUMENTS OPTION TASK 1B |
| Aug 18, 2021 | A00034 | $1.2M | BLDG. 40 REDESIGN TO DEFINITIZE UNPRICED CHANGE ORDER AWARDED AS MOD A00030 AE DESIGN CONTRACT FOR SAN FRANCISCO VAMC |
| Aug 11, 2021 | A00035 | $68.3K | ADDITIONAL SCOPE OF WORK INCLUDES CPS FOR THE BUILDING 8 SWING SPACE CONSTRUCTION PROJECT UNDER BASE SERVICE CONTRACT LINE ITEM NUMBERS (CLINS) PLUS OPTION OF CLINS TO BE EXERCISED AS REQUIRED. |
| May 6, 2021 | A00033 | $249.7K | BLDG. 40 REDESIGN TO DEFINITIZE UNPRICED CHANGE ORDER AWARDED AS MOD A00030 AE DESIGN CONTRACT FOR SAN FRANCISCO VAMC |
| Feb 24, 2021 | A00032 | $523.3K | INCORPORATE TASK AWARDED UNDER SCOPE OF WORK FOR CLIN 0001 THRU CLIN 0003 DATED FEB 19, 2021 AE DESIGN CONTRACT FOR SAN FRANCISCO VAMC |
| Feb 22, 2021 | A00031 | $26.5K | DEFINITIZATION OF MOD A00029-UCO FOR BLDG. 22 2ND FLOOR ELEVATOR MOD A00031 AE DESIGN CONTRACT FOR SAN FRANCISCO VAMC |
| Feb 4, 2021 | A00030 | $48.7K | ALLOW TO COMMENCE SERVICES FOR BUILDING 40 REDESIGN PROGRAMS MOD A00030 AE DESIGN CONTRACT FOR SAN FRANCISCO VAMC |
| Dec 2, 2020 | A00029 | $6.9K | ADDITIONAL AE DESIGN SERVICE FOR BUILDING 22 ELEVATOR REQUIRED FOR ADA COMPLIANCE |
| Nov 19, 2020 | A00028 | $0 | THIS MODIFICATION IS TO COMBINE AND ALIGN AT SCHEDULES FROM MODIFICATIONS A00026 SWING SPACE TASKS 1 & 2 & A00027 (MOD A00019 TASK 5 BUILDING 8 COMMUNICATIONS HUB) INTO A CONSOLIDATED SCHEDULED. |
| Aug 5, 2020 | A00026 | $990.0K | ADDITIONAL SCOPE FOR BLDG. 203, 22 AND PARKING LOT J AE DESIGN CONTRACT VAMC SAN FRANCISCO. |
| Aug 5, 2020 | A00027 | $148.0K | TO EXERCISE CLIN 0042, TASK 5, INCORPORATED INTO THE CONTRACT UNDER CONTRACT MODIFICATION A00019 AE DESIGN CONTRACT SAN FRANCISCO |
| Apr 3, 2020 | A00025 | $380.2K | UNDERGROUND UTILITIES INVESTIGATION AND THE WATER SYSTEM CONDITION ASSESSMENT AE DESIGN CONTRACT SAN FRANCISCO |
| Feb 7, 2020 | A00023 | $33.4K | DEFINITIZE MOD A00008 ADDITIONAL DESIGN SERVICE TO COMPLETE DIVISION 01 SPECIFICATION AE DESIGN CONTRACT SAN FRANCISCO |
| Feb 7, 2020 | A00024 | $0 | TO CORRECT SOW ISSUED UNDER MOD A00018 AE DESIGN CONTRACT SAN FRANCISCO |
| Jan 29, 2020 | A00022 | $25.2K | DEFINITIZE MOD A00007 DESIGN SERVICES BLDG. 1 WELCOME CENTER SITE REVISIONS AE DESIGN CONTRACT SAN FRANCISCO |
| Jan 24, 2020 | A00020 | $6.9K | DEFINITIZE MOD A00002 AND MOD A00004 AE DESIGN SERVICE SAN FRANCISCO VAMC |
| Jan 24, 2020 | A00021 | $38.3K | DEFINITIZE MOD A0006 AND A0008 FOR TOPOGRAPHICAL SURVEY AE DESIGN CONTRACT SAN FRANCISCO |
| Jan 16, 2020 | A00019 | $-124.4K | DEFINITIZE AND DE-OBLIGATED MOD A00009 AND MOD A00012 AE DESIGN SERVICES AE DESIGN CONTRACT SAN FRANCISCO |
| Dec 19, 2019 | A00018 | $46.6K | DEFINITIZE MODIFICATION A00016 AND FACILITATE CLIN 0001 AND CLIN 0002 OF THE SOW AE DESIGN CONTRACT SAN FRANCISCO |
| Dec 12, 2019 | A00017 | $43.0K | DEFINITIZE MODIFICATION A00015 AND CD1 SERVICES AE DESIGN CONTRACT SAN FRANCISCO |
| Oct 22, 2019 | A00016 | $38.2K | UNPRICED CHANGE ORDER TO ALLOW AE COMMENCE SERVICES TO PARTICIPATE IN MEETINGS WITH USACE VAMC SAN FRANCISCO |
| Aug 29, 2019 | A00015 | $41.8K | UNPRICED CHANGE ORDER TO ALLOW AE COMMENCE REVIEW, EVALUATION AND INPUT DISCUSSION COMMENTS FROM USACE AE DESIGN CONTRACT SAN FRANCISCO |
| Aug 27, 2019 | A00014 | $0 | CRITICAL FUNCTION: INCORPORATE LABOR AND OVERHEAD RATES FOR AE DESIGN CONTRACT SAN FRANCISCO |
| Aug 21, 2019 | A00013 | $0 | CRITICAL FUNCTION: KEY PERSONNEL REPLACEMENT FOR AE DESIGN CONTRACT SAN FRANCISCO |
| May 16, 2019 | P00039 | $0 | CRITICAL FUNCTION: ACO DELEGATION USACE - CAROLYN MALLORY FOR AE DESIGN CONTRACT SAN FRANCISCO |
| Feb 28, 2019 | A00005 | $0 | FEDERAL ACQUISITION REGULATION (FAR) 52.236-22 DESIGN WITHIN FUNDING LIMITATION - CHANGE ECCA FROM $108MIL TO $141,737,000. FOR AE DESIGN CONTRACT SAN FRANCISCO |
| Feb 28, 2019 | A00012 | $0 | CRITICAL FUNCTION: 5 SEPARATE CONSTRUCTION DOCUMENT PACKAGES FOR AE DESIGN CONTRACT SAN FRANCISCO |
| Jan 31, 2019 | A00011 | $0 | CRITICAL FUNCTION: 5 SEPARATE CONSTRUCTION DOCUMENT PACKAGES FOR AE DESIGN CONTRACT SAN FRANCISCO |
| Jan 10, 2019 | A00010 | $0 | REVISE SCHEDULE OF PERFORMANCE IN MOD A00007 AE CONTRACT FOR SAN FRANCISCO VAMC |
| Dec 3, 2018 | A00008 | $20.6K | DIVISION 01 SPECIFICATIONS FOR BLDG. 1, 6, 8, & PARKING GARAGE FOR AE DESIGN CONTRACT SAN FRANCISCO VAMC |
| Dec 3, 2018 | A00009 | $0 | UNPRICED CHANGE FOR BASE SERVICES BLDGS. 1, 6, & 8 FOR AE DESIGN CONTRACT SAN FRANCISCO VAMC |
| Nov 16, 2018 | A00007 | $3.8K | ADDITIONAL DESIGN SERVICES FOR BLDG. 1 WELCOME CENTER SITE REVISIONS AE DESIGN CONTRACT SAN FRANCISCO |
| Nov 8, 2018 | A00006 | $26.9K | ADDITIONAL DESIGN SERVICES BLDG. 1, 6, 8 & 12, AE DESIGN CONTRACT SAN FRANCISCO VAMC |
| Oct 11, 2018 | A00004 | $0 | UNPRICED CHANGE ORDER TO MOD A00002 AE CONTRACT FOR SAN FRANCISCO VAMC |
| Jun 22, 2018 | A00003 | $28.2K | CRITICAL FUNCTION: ADMINISTRATIVE CHANGE TO MOD A00002 CORRECT ACCOUNTING AND OBLIGATION DATA FOR AE DESIGN CONTRACT SAN FRANCISCO |
| Jun 12, 2018 | A00002 | $0 | CRITICAL FUNCTION: SWING SPACE CHARRETTE FOR BLDG. 1, 6 AND 8 AE DESIGN CONTRACT SAN FRANCISCO |
| May 15, 2018 | P00037 | $136.3K | CRITICAL FUNCTION: 5 SEPARATE CONSTRUCTION DOCUMENT PACKAGES FOR AE DESIGN CONTRACT SAN FRANCISCO |
| May 4, 2018 | A00001 | $0 | CHANGE CD-2 DELIVERABLE DUE DATE AE DESIGN CONTRACT SAN FRANCISCO |
| Apr 9, 2018 | P00038 | $99.8K | CRITICAL FUNCTION: CONTRACT VA101CFM-P-0162 MOD P00038 PROJECT 662-402 DEFINITIZE MOD P00035 USACE BCOES REVIEW |
| Feb 22, 2018 | P00036 | $191.4K | CRITICAL FUNCTION: THE VA IS ALSO GOING TO TEST THE REAL ESTATE AND DEVELOPMENT MARKET TO DETERMINE INTEREST IN UTILIZING A GSA EXCHANGE FOR LEVERAGING THE VALUE OF FT. MILEY TO ACQUIRE A NEW RIGHT-SIZED HEALTHCARE FACILITY ELSEWHERE IN SAN FRANCISCO. |
| Sep 29, 2017 | P00033 | $119.1K | CRITICAL FUNCTION: CORRECT SEISMIC DEFICIENCIES IN BLDG 1,6,8 AT SAN FRANCISCO VAMC. THIS MODIFICATION IS TO CORRECT AN ADMINISTRATIVE ERROR IN THE FUNDING LINE (BLOCK 12) OF P00014. |
| Sep 29, 2017 | P00034 | $0 | CRITICAL FUNCTION: CORRECT SEISMIC DEFICIENCIES IN BLDG 1,6,8 AT SAN FRANCISCO VAMC. THIS MODIFICATION IS TO CORRECT AN ADMINISTRATIVE ERROR IN THE FUNDING LINE (BLOCK 12) OF P00014. |
| Sep 12, 2017 | P00035 | $50.0K | CRITICAL FUNCTION: CORRECT SEISMIC DEFICIENCIES IN BLDG 1,6,8 AT SAN FRANCISCO VAMC. THIS MODIFICATION IS TO CORRECT AN ADMINISTRATIVE ERROR IN THE FUNDING LINE (BLOCK 12) OF P00014. |
| Aug 9, 2016 | P00032 | $32.7K | CRITICAL FUNCTION: CORRECT SEISMIC DEFICIENCIES IN BLDG 1,6,8 AT SAN FRANCISCO VAMC. THIS MODIFICATION IS TO CORRECT AN ADMINISTRATIVE ERROR IN THE FUNDING LINE (BLOCK 12) OF P00014. |
| Jun 17, 2016 | P00031 | $48.5K | CRITICAL FUNCTION: CORRECT SEISMIC DEFICIENCIES IN BLDG 1,6,8 AT SAN FRANCISCO VAMC. THIS MODIFICATION IS TO CORRECT AN ADMINISTRATIVE ERROR IN THE FUNDING LINE (BLOCK 12) OF P00014. |
| Mar 10, 2016 | P00030 | $9.8K | CRITICAL FUNCTION: CORRECT SEISMIC DEFICIENCIES IN BLDG 1,6,8 AT SAN FRANCISCO VAMC. THIS MODIFICATION IS TO CORRECT AN ADMINISTRATIVE ERROR IN THE FUNDING LINE (BLOCK 12) OF P00014. |
| Sep 21, 2015 | P00029 | $82.2K | CRITICAL FUNCTION: CORRECT SEISMIC DEFICIENCIES IN BLDG 1,6,8 AT SAN FRANCISCO VAMC. THIS MODIFICATION IS TO CORRECT AN ADMINISTRATIVE ERROR IN THE FUNDING LINE (BLOCK 12) OF P00014. |
| Aug 4, 2015 | P00025 | $98.3K | CRITICAL FUNCTION: CORRECT SEISMIC DEFICIENCIES IN BLDG 1,6,8 AT SAN FRANCISCO VAMC. THIS MODIFICATION IS TO CORRECT AN ADMINISTRATIVE ERROR IN THE FUNDING LINE (BLOCK 12) OF P00014. |
| Jul 20, 2015 | P00028 | $165.8K | CRITICAL FUNCTION: CORRECT SEISMIC DEFICIENCIES IN BLDG 1,6,8 AT SAN FRANCISCO VAMC. THIS MODIFICATION IS TO CORRECT AN ADMINISTRATIVE ERROR IN THE FUNDING LINE (BLOCK 12) OF P00014. |
| May 19, 2015 | P00026 | $0 | CRITICAL FUNCTION: CORRECT SEISMIC DEFICIENCIES IN BLDG 1,6,8 AT SAN FRANCISCO VAMC. THIS MODIFICATION IS TO CORRECT AN ADMINISTRATIVE ERROR IN THE FUNDING LINE (BLOCK 12) OF P00014. |
| May 19, 2015 | P00027 | $63.9K | CRITICAL FUNCTION: CORRECT SEISMIC DEFICIENCIES IN BLDG 1,6,8 AT SAN FRANCISCO VAMC. THIS MODIFICATION IS TO CORRECT AN ADMINISTRATIVE ERROR IN THE FUNDING LINE (BLOCK 12) OF P00014. |
| May 4, 2015 | P00024 | $32.7K | CRITICAL FUNCTION: CORRECT SEISMIC DEFICIENCIES IN BLDG 1,6,8 AT SAN FRANCISCO VAMC. THIS MODIFICATION IS TO CORRECT AN ADMINISTRATIVE ERROR IN THE FUNDING LINE (BLOCK 12) OF P00014. |
| Jan 5, 2015 | P00018 | $36.1K | CRITICAL FUNCTION: CORRECT SEISMIC DEFICIENCIES IN BLDG 1,6,8 AT SAN FRANCISCO VAMC. THIS MODIFICATION IS TO CORRECT AN ADMINISTRATIVE ERROR IN THE FUNDING LINE (BLOCK 12) OF P00014. |
| Jan 5, 2015 | P00023 | $75.9K | CRITICAL FUNCTION: CORRECT SEISMIC DEFICIENCIES IN BLDG 1,6,8 AT SAN FRANCISCO VAMC. THIS MODIFICATION IS TO CORRECT AN ADMINISTRATIVE ERROR IN THE FUNDING LINE (BLOCK 12) OF P00014. |
| Oct 15, 2014 | P00022 | $20.0K | CRITICAL FUNCTION: CORRECT SEISMIC DEFICIENCIES IN BLDG 1,6,8 AT SAN FRANCISCO VAMC. THIS MODIFICATION IS DESIGN A CONNECTING CORRIDOR BETWEEN BUILDINGS 40 AND 41 FOR CONSTRUCTION DOCUMENTS. |
| Sep 11, 2014 | P00020 | $99.0K | CRITICAL FUNCTION: CORRECT SEISMIC DEFICIENCIES IN BLDG 1,6,8 AT SAN FRANCISCO VAMC. THIS MODIFICATION IS TO ADD A CONNECTING CORRIDOR BETWEEN BUILDINGS 40 AND 41 FOR DESIGN DEVELOPMENT DOCUMENTS. |
| Sep 11, 2014 | P00021 | $95.1K | CRITICAL FUNCTION: CORRECT SEISMIC DEFICIENCIES IN BLDG 1,6,8 AT SAN FRANCISCO VAMC. THIS MODIFICATION IS DESIGN A CONNECTING CORRIDOR BETWEEN BUILDINGS 40 AND 41 FOR CONSTRUCTION DOCUMENTS. |
| Sep 9, 2014 | P00019 | $46.6K | CRITICAL FUNCTION: CORRECT SEISMIC DEFICIENCIES IN BLDG 1,6,8 AT SAN FRANCISCO VAMC. THIS MODIFICATION IS TO ADD CONSTRUCTION MANAGEMENT SERVICES FOR SITE LOGISTICS AND MASTER SCHEDULING AROUND BUILDING 40. |
| Jul 16, 2014 | P00017 | $44.5K | CRITICAL FUNCTION: CORRECT SEISMIC DEFICIENCIES IN BLDG 1,6,8 AT SAN FRANCISCO VAMC. THIS MODIFICATION IS TO CORRECT AN ADMINISTRATIVE ERROR IN THE FUNDING LINE (BLOCK 12) OF P00014. |
| May 5, 2014 | P00015 | $245.2K | CRITICAL FUNCTION: CORRECT SEISMIC DEFICIENCIES IN BLDG 1,6,8 AT SAN FRANCISCO VAMC. THIS MODIFICATION IS TO CORRECT AN ADMINISTRATIVE ERROR IN THE FUNDING LINE (BLOCK 12) OF P00014. |
| Apr 30, 2014 | P00014 | $6.0M | CRITICAL FUNCTION: CORRECT SEISMIC DEFICIENCIES IN BLDG 1,6,8 AT SAN FRANCISCO VAMC. THIS MODIFICATION EXERCISES PRE-PRICED CLINS FOR CONSTRUCTION DOCUMENTS FOR THE PARKING GARAGE, BUILDINGS 1,6,8 AND THE NEW RESEARCH BUILDING. |
| Mar 28, 2014 | P00013 | $51.8K | CRITICAL FUNCTION: CORRECT SEISMIC DEFICIENCIES IN BLDG 1,6,8 AT SAN FRANCISCO VAMC. THIS MODIFICATION IS TO PROVIDE SURVEY WORK FOR THE BUILDING 1 ROOF, GARAGE, AND WATER TOWER FOR PROJECT 662-402. |
| Mar 20, 2014 | P00012 | $15.1K | CRITICAL FUNCTION: CORRECT SEISMIC DEFICIENCIES IN BLDG 1,6,8 AT SAN FRANCISCO VAMC. THIS MODIFICATION IS TO PROVIDE MATERIAL TESTING TO ALLOW FOR AN ANALYSIS OF THE CONNECTING BRIDGE STRUCTURES BETWEEN BUILDINS 1 AND 200, 1 AND 2, AND 6 AND 4. |
| Feb 19, 2014 | P00011 | $5.5K | CRITICAL FUNCTION: CORRECT SEISMIC DEFICIENCIES IN BLDG 1,6,8 AT SAN FRANCISCO VAMC. THIS MODIFICATION IS TO PROVIDE PRINTING SERVICES FOR THE DD-2 SUBMISSION OF DESIGN. |
| Nov 26, 2013 | P00010 | $49.4K | CRITICAL FUNCTION: CORRECT SEISMIC DEFICIENCIES IN BLDG 1,6,8 AT SAN FRANCISCO VAMC. THIS MODIFICATION IS TO PROVIDE SERVICES FOR DESIGN OF TWO ELEVATORS IN EACH OF BUILDINGS 1,6 AND 8. |
| Oct 3, 2013 | P00009 | $93.7K | CRITICAL FUNCTION: CORRECT SEISMIC DEFICIENCIES IN BLDG 1,6,8 AT SAN FRANCISCO VAMC. THIS MODIFICATION IS TO PROVIDE SERVICES FOR FOUNDATION WORK FOR BUILDINGS 1,6 AND 8. |
| Jun 21, 2013 | P00008 | $63.0K | CRITICAL FUNCTION: CORRECT SEISMIC DEFICIENCIES IN BLDG 1,6,8 AT SAN FRANCISCO VAMC. THIS MODIFICATION IS TO PROVIDE ADDITIONAL SHPO SERVICES FOR BUILDINGS 1,6 AND 8 AND THE NEW RESEARCH BUILDING. |
| Jun 17, 2013 | P00006 | $8.5K | CRITICAL FUNCTION: CORRECT SEISMIC DEFICIENCIES IN BLDG 1,6,8 AT SAN FRANCISCO VAMC. THIS MODIFICATION IS TO PROVIDE ADDITIONAL TRAVEL COSTS ASSOCIATED WITH THE DD-1 REVIEW IN VA CENTRAL OFFICE. |
| Jun 13, 2013 | P00007 | $13.5K | CRITICAL FUNCTION: CORRECT SEISMIC DEFICIENCIES IN BLDG 1,6,8 AT SAN FRANCISCO VAMC. THIS MODIFICATION IS TO PROVIDE ADDITIONAL GEOTECHNICAL TESTING SERVICES FOR BUILDINGS 1,6 AND 8. |
| May 28, 2013 | P00003 | $12.8K | CRITICAL FUNCTION: CORRECT SEISMIC DEFICIENCIES IN BLDG 1,6,8 AT SAN FRANCISCO VAMC. THIS MODIFICATION ADDS PRINTING SERVICES FOR THE DD-1 SUBMITTAL. |
| May 28, 2013 | P00004 | $39.1K | CRITICAL FUNCTION: CORRECT SEISMIC DEFICIENCIES IN BLDG 1,6,8 AT SAN FRANCISCO VAMC. THIS MODIFICATION ADDS WIND TUNNEL STUDY SERVICES INCLUDING WIND TUNNEL TESTING FOR WIND-RESPONSIVE DESIGN. |
| May 28, 2013 | P00005 | $40.2K | CRITICAL FUNCTION: CORRECT SEISMIC DEFICIENCIES IN BLDG 1,6,8 AT SAN FRANCISCO VAMC. THIS MODIFICATION IS TO PROVIDE TRAVEL COSTS ASSOCIATED WITH THE DD-1 REVIEW IN VA CENTRAL OFFICE. |
| Apr 17, 2013 | P00002 | $29.7K | CRITICAL FUNCTION: CORRECT SEISMIC DEFICIENCIES IN BLDG 1,6,8 AT SAN FRANCISCO VAMC. THIS MODIFICATION EXERCISES THE SCHEMATIC AND DESIGN DEVELOPMENT FOR THE PARKING STRUCTURE AND MODULAR BUILDING AS NEGOTIATED IN THE BASE CONTRACT. |
| Mar 22, 2013 | SA004 | $0 | CRITICAL FUNCTION: CORRECT SEISMIC DEFICIENCIES IN BLDG 1,6,8 AT SAN FRANCISCO VAMC. THIS SUPPLEMENTAL AGREEMENT CHANGES THE DESIGN WITHIN FUNDING LIMITATIONS CLAUSE AND UPDATES THE CONTRACT AND SUBMISSION SCHEDULE. |
| Jan 29, 2013 | P00001 | $575.8K | CRITICAL FUNCTION: CORRECT SEISMIC DEFICIENCIES IN BLDG 1,6,8 AT SAN FRANCISCO VAMC. THIS MODIFICATION EXERCISES THE SCHEMATIC AND DESIGN DEVELOPMENT FOR THE PARKING STRUCTURE AND MODULAR BUILDING AS NEGOTIATED IN THE BASE CONTRACT. |
| Dec 5, 2012 | SA009 | $416 | CRITICAL FUNCTION: CORRECT SEISMIC DEFICIENCIES IN BLDG 1,6,8 AT SAN FRANCISCO VAMC. THIS SUPPLEMENTAL AGREEMENT PROVIDES FOR ADDITIONAL TRAVEL EXPENSES TO VA CENTRAL OFFICE FOR THE SD-2 SUBMITTAL. |
| Oct 18, 2012 | SA008 | $35.3K | CRITICAL FUNCTION: CORRECT SEISMIC DEFICIENCIES IN BLDG 1,6,8 AT SAN FRANCISCO VAMC. THIS SUPPLEMENTAL AGREEMENT PROVIDES FOR LABOR AND TRAVEL TO VA CENTRAL OFFICE FOR THE SD-2 SUBMITTAL. |
| Oct 4, 2012 | SA007 | $5.3K | CRITICAL FUNCTION: CORRECT SEISMIC DEFICIENCIES IN BLDG 1,6,8 AT SAN FRANCISCO VAMC. THIS SUPPLEMENTAL AGREEMENT PROVIDES FOR PRINTING SERVICES FOR THE SD-2 SUBMITTAL. |
| Sep 12, 2012 | SA006 | $5.2K | CRITICAL FUNCTION: THIS SUPPLEMENTAL AGREEMENT IS TO ADD ADDITIONAL GEOTECHNICAL SERVICES TO THE CONTRACT FOR WEEKEND WORK SO AS NOT TO DISRUPT THE MEDICAL CENTER FUNCTIONS. |
| Jul 6, 2012 | SA005 | $4.1K | CRITICAL FUNCTION: CORRECT SEISMIC DEFICIENCIES IN BLDG 1,6,8 AT SAN FRANCISCO VAMC. THIS SUPPLEMENTAL AGREEMENT EXERCISES CLIN 040: PROFESSIONAL GEOTECHNICAL SERVICES FOR SD'S AND DD'S. |
| Apr 20, 2012 | SA003 | $31.3K | CRITICAL FUNCTION: CORRECT SEISMIC DEFICIENCIES IN BLDG 1,6,8 AT SAN FRANCISCO VAMC. THIS SUPPLEMENTAL AGREEMENT EXERCISES CLIN 040: PROFESSIONAL GEOTECHNICAL SERVICES FOR SD'S AND DD'S. |
| Feb 27, 2012 | SA002 | $80.7K | CRITICAL FUNCTION: CORRECT SEISMIC DEFICIENCIES IN BLDG 1,6,8 AT SAN FRANCISCO VAMC. THIS SUPPLEMENTAL AGREEMENT EXERCISES CLIN 040: PROFESSIONAL GEOTECHNICAL SERVICES FOR SD'S AND DD'S. |
| Feb 21, 2012 | SA001 | $40.6K | CRITICAL FUNCTION: CORRECT SEISMIC DEFICIENCIES IN BLDG 1,6,8 AT SAN FRANCISCO VAMC. THIS SUPPLEMENTAL AGREEMENT FULLY FUNDS THE CLIN'S EXERCISED AT AWARD. |
| Sep 30, 2011 | 0 | $8.0M | CORRECT SEISMIC DEFICIENCIES IN BLDG 1,6,8 AT SAN FRANCISCO VAMC |
Estimated positioning window
Oct 25, 2026 – Mar 30, 2027
65/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 65/100. Available recorded signals: 60 points.
- Contract end 2027-09-30 (340 days from calculation)
- +35 points
- 2 historical awards in this buyer and category group
- +10 points
- 135 recorded award transactions
- +10 points
- Latest award action: 2026-06-23
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +0 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-10-25 10:18:04.631876+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Oct 25, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Verify whether remaining options may extend performance beyond the current end date.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.